CN106223989A - Unsymmetrial loading tunnel hole excavation safeguard structure and construction method - Google Patents

Unsymmetrial loading tunnel hole excavation safeguard structure and construction method Download PDF

Info

Publication number
CN106223989A
CN106223989A CN201610650180.7A CN201610650180A CN106223989A CN 106223989 A CN106223989 A CN 106223989A CN 201610650180 A CN201610650180 A CN 201610650180A CN 106223989 A CN106223989 A CN 106223989A
Authority
CN
China
Prior art keywords
side wall
pipe
tunnel
anchor cable
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610650180.7A
Other languages
Chinese (zh)
Other versions
CN106223989B (en
Inventor
董建华
颉永斌
董旭光
葛万民
李建军
魏少强
鞠鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Lanzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University of Technology filed Critical Lanzhou University of Technology
Priority to CN201610650180.7A priority Critical patent/CN106223989B/en
Publication of CN106223989A publication Critical patent/CN106223989A/en
Application granted granted Critical
Publication of CN106223989B publication Critical patent/CN106223989B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Abstract

Unsymmetrial loading tunnel hole excavation safeguard structure and construction method, belong to Tunnel Engineering field, including framework, Guan Peng, anchor cable, friction pile and side wall;Side, tunnel side slope carries out a gear by anchor cable and framework anchor connection;Tunnels in Shallow Buried side arranges side wall, and guide pipe stretches into massif through side wall top, is holed by guide pipe;Pipe canopy passes guide pipe, and anchor cable is inserted in pipe canopy;Base of frame arranges friction pile, connects with friction pile top bottom frame column, and anchor cable is anchored in the stable region of massif through friction pile;The back-filling in layers soil body tamping between side wall and massif;Side wall and friction pile are linked to be overall structure and are anchored in Rock mass stability district by the timesharing grouting and reinforcing soil body in pipe canopy and anchor cable, anchor cable and pipe canopy, carry out boring construction tunnel in side wall, friction pile and Guan Peng enclosed area.The present invention forms protection body before hole is excavated, and the backfill soil body contributes to hole excavation, can reduce biasing force, prevent tunnel sliding, it is ensured that unsymmetrial loading tunnel safe construction and operation.

Description

Unsymmetrial loading tunnel hole excavation safeguard structure and construction method
Technical field
Present invention relates particularly to unsymmetrial loading tunnel hole excavation safeguard structure, belong to Tunnel Engineering technical field.
Background technology
The highway of China, high speed railway construction are flourish in recent years, produce substantial amounts of Tunnel Engineering therewith, and big Most highway, railways typically connect up along cheuch, and therefore in these Tunnel Engineering, Unevenly-pressured shallow tunnel occupies sizable proportion.Partially Pressure tunnel portal excavation is a great problem of Geotechnical Engineering industry all the time, especially shows landform, geological environment complexity Weak surrounding rock area, its rock matter weakness, low bearing capacity, developmental joint fissure, structure are broken, the poor stability of massif own, bias Tunnel portal section buried depth is the most shallow, big to massif disturbance during excavation, it is likely that cause slope, side, tunnel body slump, Tunnel Landslide, lining The problem such as crack and tunnel overall offset of block, threatens the safety of tunnel excavation personnel, affects the normal operation in tunnel, to people's people's livelihood Life property safety brings hidden trouble.
Protection in existing unsymmetrial loading tunnel entrance construction is mainly: take to backfill in shallow embedding side back-pressure soil balance portion outside hole Bias;Take to reduce every cyclic advance in hole, strengthen steel arch-shelf, bar diameter and increase secondary lining thickness and reduce tunnel and open Sedimentation, skew and crack in digging.Although these methods are widely used in the excavation of unsymmetrial loading tunnel, but the most fundamentally add Gu unstable massif, reduce the disturbance to weak surrounding rock, and be to increase tunnel internal rigidity and resist bias and hillside to tunnel Failure by shear.In the range of the unsymmetrial loading tunnel Portal Section taking the method to construct is in unstable slip mass, tectonic stress is with inclined Pressure directly acts on tunnel, and tunnel is likely to be due to unstable landslide in excavation or operation at any time and whole slide occurs, and splits Gap, landslide etc. destroys.It would therefore be desirable to a kind of unsymmetrial loading tunnel hole safeguard structure, it is possible to integral reinforcing instability massif, subtract Light structure and the gravity bias to tunnel.
Summary of the invention
It is an object of the invention to provide a kind of unsymmetrial loading tunnel hole excavation safeguard structure and construction method.
The present invention is unsymmetrial loading tunnel hole excavation safeguard structure and construction method, unsymmetrial loading tunnel hole excavation safeguard structure bag Include framework 2, pipe canopy 3, anchor cable 4, friction pile 5 and side wall 6, it is characterised in that: side, tunnel 11 side slope is by anchor cable 4 and framework 2 Anchor connection carries out a gear;Shallow embedding side, tunnel 11 arranges side wall 6, and guide pipe 7 stretches into massif 1 through side wall 6 top, by guiding Pipe 7 is holed;Pipe canopy 3 is through guide pipe 7, and anchor cable 4 is inserted in pipe canopy 3;Friction pile 5 is arranged, bottom frame column and antiskid bottom framework 2 Stake 5 tops connect, and anchor cable 4 is anchored in the stable region of massif 1 through friction pile 5;The back-filling in layers soil body between side wall 6 and massif 1 And tamp;By with the Grouting Pipe 10 of rubber ring 9 and grouting nozzle 8 the timesharing grouting and reinforcing soil body, anchor in anchor cable 4 and pipe canopy 3 Side wall 6 and friction pile 5 are linked to be overall structure and are anchored in massif 1 stable region by rope 4 and pipe canopy 3;Massif, backfill soil and side wall 6 Intersection arranges gutter, boring construction tunnel 11 in side wall 6, friction pile 5 and pipe canopy 3 enclosed area.
The construction method of unsymmetrial loading tunnel hole of the present invention excavation safeguard structure, the steps include:
(1) side, tunnel 11 side slope boring, formwork supporting plate, assembling reinforcement, casting concrete formation framework 2, anchor cable 4 is through framework 2 Stretch in hole, slip casting, stretch-draw anchor 4, anchor cable 4 is anchored on framework 2;
(2) according to tunnel 11 bias condition, excavating side wall 6 tunnel at tunnel 11, shallow embedding side abutment wall 3-5m, the end, hole, is in tunnel 5-8m below inverted arch, flattens bed course, formwork, assembling reinforcement, fixes two row's guide pipes 7 at side wall 6 top and stretch into massif 1, watering Build concrete and form side wall 6;
(3), after side wall 6 intensity reaches 80%, at guide pipe 7, drilling pipe canopy hole and anchor cable hole are arranged with plum blossom-shaped;
(4) bottom framework 2 excavate friction pile stake holes, when digging to Guan Peng hole, first with Nylon Bag block Guan Peng aperture, after continue out Dig pile body until 5-8m below inverted arch, pass through pre-buried pvc pipe, colligation antiskid respectively at friction pile 5 at stake top 1-2m and Guan Peng hole Stake reinforcing bar;
(5) being inserted from the Guan Peng aperture of side wall 6 by pipe canopy 3 and go deep in massif 1, anchor cable 4 inserts anchor cable hole through pipe canopy 3;
(6) casting concrete, friction pile 5 and framework 2 bottom connection, along the pre-buried pvc pipe in stake top to massif 1 internal drilling, in hole Penetrate anchor cable 4, slip casting, stretch-draw, anchoring anchor cable;
(7) successively backfill between side wall 6 and massif 1, tamp the soil body to side wall (6) highly, the suitable slope that the gradient is 2%-10% is set, Backfill soil intersection arranges gutter;
(8) pipe canopy 3 and anchor cable 4 carry out timesharing slip casting;By the Grouting Pipe 10 with rubber ring 9 through pipe canopy 3 and anchor cable 4, rubber Circle 9 is positioned at bottom, hole, Guan Peng hole, gives anchor cable 4 slip casting by Grouting Pipe 10, and slip casting is extracted after completing, and it is swollen that rubber ring 9 runs into serosity Swollen it is fixed on pipe canopy 3 end, prevents slurry from passing through rubber ring 9 and flow into pipe canopy 3, treat that slurry intensity reaches more than 80% post-stretching anchor Rope 4, is anchored in side wall 6 with anchorage;Pipe canopy 3 slip casting is given by grouting nozzle 8;
(9) between side wall 6 and friction pile 5, boring construction tunnel 11 is carried out.
Beneficial effects of the present invention: (1) build side wall backfill soil body increase Tunnels in Shallow Buried side buried depth, back-pressure mountain slope toe, Using side wall as pipe canopy support, reduce and execute drilling pipe canopy hole operation;Anchor cable and pipe canopy share boring, by timesharing slip casting by pipe canopy with Anchor cable combines, and improves backfill soil and the physico-mechanical properties of surrounding weak surrounding rock not only through slip casting, add country rock from Hold ability, and form a girder structure with stablizing massif for fulcrum with side wall, and utilize anchor cable total to be anchored in Stablize massif, prevent shallow embedding side from occurring unitary side to displacement under bias condition.(2) performing Anchor anti-slide piles in buried side can Reduce the structure bias with the gravity generation shearing force to tunnel, improve the coefficient of stability of massif side side slope and at friction pile Upper embedding steel pipe, adjustment working procedure solve the cross-cutting issue of pipe canopy and friction pile cleverly, make friction pile, side wall and Guan Peng Form the framework door type structure with prestress anchorage cable.The present invention carries out consolidation process to unsymmetrial loading tunnel inlet side, prevents tunnel There is excessive deformation during excavation or operation, caves in, moves integrally and destroy with crack etc. in import biased side.
Accompanying drawing explanation
Fig. 1 is the front view of safeguard structure;Fig. 2 is the A-A profile of safeguard structure;Fig. 3 is pipe canopy schematic diagram;Fig. 4 is Grouting Pipe schematic diagram;Fig. 5 is pipe canopy, anchor cable and friction pile profile.
Description of reference numerals: massif 1, framework 2, pipe canopy 3, piled anchor 4, friction pile 5, side wall 6, guide pipe 7, grouting nozzle 8, rubber Cushion rubber 9, Grouting Pipe 10, tunnel 11.
Detailed description of the invention
Below in conjunction with the accompanying drawings and be embodied as example the present invention is further described, example is served only for explaining the present invention It is not limited only to this example.Reading after the present invention, all equivalents of being made in the principle of the invention, amendment broadly fall into this Bright protection domain.
As shown in Fig. 1,2,3,4 and 5, unsymmetrial loading tunnel hole excavation safeguard structure includes framework 2, pipe canopy 3, anchor cable 4, antiskid Stake 5 and side wall 6, side, tunnel 11 side slope carries out a gear by anchor cable 4 and framework 2 anchor connection;Shallow embedding side, tunnel 11 arranges side Wall 6, guide pipe 7 is stretched into massif 1 through side wall 6 top, is holed by guide pipe 7;Pipe canopy 3 is through guide pipe 7, and anchor cable 4 is inserted in Pipe canopy 3;Arranging friction pile 5 bottom framework 2, connect with friction pile 5 top bottom frame column, anchor cable 4 is anchored in through friction pile 5 In the stable region of massif 1;The back-filling in layers soil body tamping between side wall 6 and massif 1;By Grouting Pipe 10 He with rubber ring 9 Side wall 6 and friction pile 5 are linked to be entirety by grouting nozzle 8 the timesharing grouting and reinforcing soil body, anchor cable 4 and pipe canopy 3 in anchor cable 4 and pipe canopy 3 Structure anchor is in massif 1 stable region;The intersection of massif, backfill soil and side wall 6 arranges gutter, at side wall 6, friction pile 5 and Boring construction tunnel 11 in pipe canopy 3 enclosed area.
As illustrated in fig. 1 and 2, side wall 6 is 1-2m away from tunnel 11, shallow embedding side abutment wall 3-5m, width, and wall is risen and pushed up in tunnel 11 Absolute altitude 6-8m, less than inverted arch 5-8m at the bottom of wall.
As shown in figures 2 and 5, guide pipe 7 be thickness be 1-2cm, the steel pipe that diameter matches with pipe canopy 3, on steel pipe with The circular hole of the 1-2cm arranged in plum blossom-shaped;Guide pipe 7 horizontal spacing is 0.5-0.8m, and vertical spacing is 1-1.5m.
As shown in Fig. 1,2,3 and 5, pipe canopy 3 be a diameter of 8-18cm, wall thickness be the steel pipe of 1-3cm, with in prunus mume (sieb.) sieb.et zucc. on steel pipe The circular hole of flower-shaped a diameter of 1-2cm, termination is welded with grouting nozzle 8.
As illustrated in fig. 1 and 2, anchor cable 4 is through side wall 6 and friction pile 5.
As illustrated in fig. 1 and 2, the elevation of bottom of friction pile 5 is less than inverted arch 5-8m, and downward 1-2m and Guan Peng hole, stake top is through place The most pre-buried pvc pipe.
As in figure 2 it is shown, use the method successively tamped to backfill when backfilling the soil body between described massif 1 and side wall 6, return Fill out the rear gradient and be maintained at 2%-10%.
As shown in Figures 4 and 5, Grouting Pipe 10 is a pipe, a diameter of 2-3cm.
As shown in Figures 4 and 5, the inner ring of rubber ring 9 can be inserted into Grouting Pipe 10, outer ring can be by pipe canopy 3, a length of 8- 12cm, water-swellable, expansion rate is 200%-300%.
The construction method of unsymmetrial loading tunnel hole excavation safeguard structure, the steps include:
(1) side, tunnel 11 side slope boring, formwork supporting plate, assembling reinforcement, casting concrete formation framework 2, anchor cable 4 is through framework 2 Stretch in hole, slip casting, stretch-draw anchor 4, anchor cable 4 is anchored on framework 2;
(2) according to tunnel 11 bias condition, excavating side wall 6 tunnel at tunnel 11, shallow embedding side abutment wall 3-5m, the end, hole, is in tunnel 5-8m below inverted arch, flattens bed course, formwork, assembling reinforcement, fixes two row's guide pipes 7 at side wall 6 top and stretch into massif 1, watering Build concrete and form side wall 6;
(3), after side wall 6 intensity reaches 80%, at guide pipe 7, drilling pipe canopy hole and anchor cable hole are arranged with plum blossom-shaped;
(4) bottom framework 2 excavate friction pile stake holes, when digging to Guan Peng hole, first with Nylon Bag block Guan Peng aperture, after continue out Dig pile body until 5-8m below inverted arch, pass through pre-buried pvc pipe, colligation antiskid respectively at friction pile 5 at stake top 1-2m and Guan Peng hole Stake reinforcing bar;
(5) being inserted from the Guan Peng aperture of side wall 6 by pipe canopy 3 and go deep in massif 1, anchor cable 4 inserts anchor cable hole through pipe canopy 3;
(6) casting concrete, friction pile 5 and framework 2 bottom connection, along the pre-buried pvc pipe in stake top to massif 1 internal drilling, in hole Penetrate anchor cable 4, slip casting, stretch-draw, anchoring anchor cable;
(7) successively backfill between side wall 6 and massif 1, tamp the soil body to side wall (6) highly, the suitable slope that the gradient is 2%-10% is set, Backfill soil intersection arranges gutter;
(8) pipe canopy 3 and anchor cable 4 carry out timesharing slip casting;By the Grouting Pipe 10 with rubber ring 9 through pipe canopy 3 and anchor cable 4, rubber Circle 9 is positioned at bottom, hole, Guan Peng hole, gives anchor cable 4 slip casting by Grouting Pipe 10, and slip casting is extracted after completing, and it is swollen that rubber ring 9 runs into serosity Swollen it is fixed on pipe canopy 3 end, prevents slurry from passing through rubber ring 9 and flow into pipe canopy 3, treat that slurry intensity reaches more than 80% post-stretching anchor Rope 4, is anchored in side wall 6 with anchorage;Pipe canopy 3 slip casting is given by grouting nozzle 8;
(9) between side wall 6 and friction pile 5, boring construction tunnel 11 is carried out.

Claims (10)

1. unsymmetrial loading tunnel hole excavation safeguard structure, including framework (2), pipe canopy (3), anchor cable (4), friction pile (5) and side wall (6), it is characterised in that: tunnel (11) side side slope carries out a gear by anchor cable (4) and framework (2) anchor connection;Tunnel (11) Shallow embedding side arranges side wall (6), and guide pipe (7) stretches into massif (1) through side wall (6) top, is holed by guide pipe (7);Pipe canopy (3) through guide pipe (7), anchor cable (4) is inserted in pipe canopy (3);Friction pile (5) is arranged, bottom frame column and antiskid in framework (2) bottom Stake (5) top connects, and anchor cable (4) is anchored in the stable region of massif (1) through friction pile (5);Between side wall (6) and massif (1) The back-filling in layers soil body is also tamped;By with the Grouting Pipe (10) of rubber ring (9) and grouting nozzle (8) to anchor cable (4) and pipe canopy (3) Side wall (6) and friction pile (5) are linked to be overall structure and are anchored in massif by the interior timesharing grouting and reinforcing soil body, anchor cable (4) and pipe canopy (3) (1) stable region;The intersection of massif, backfill soil and side wall (6) arranges gutter, at side wall (6), friction pile (5) and pipe canopy (3) Boring construction tunnel (11) in enclosed area.
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described side wall (6) away from Tunnel, shallow embedding side (11) abutment wall 3-5m, width is 1-2m, and wall is risen in tunnel (11) top mark height 6-8m, less than inverted arch 5-at the bottom of wall 8m。
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described guide pipe (7) Be thickness be 1-2cm, the steel pipe that diameter matches with Guan Peng (3), with the circular hole of the 1-2cm arranged in plum blossom-shaped on steel pipe; Guide pipe (7) horizontal spacing is 0.5-0.8m, and vertical spacing is 1-1.5m.
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described pipe canopy (3) is A diameter of 8-18cm, wall thickness are the steel pipe of 1-3cm, and with the circular hole of 1-2cm a diameter of in plum blossom-shaped on steel pipe, termination is welded with Grouting nozzle (8).
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described anchor cable (4) is worn Cross side wall (6) and friction pile (5).
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described friction pile (5) Elevation of bottom less than inverted arch 5-8m, downward 1-2m and Guan Peng hole, stake top is through locating the most pre-buried pvc pipe.
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described massif (1) with The suitable slope gradient that the soil body keeps 2%-10% is backfilled between side wall (6).
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described Grouting Pipe (10) It is a pipe, a diameter of 2-3cm.
Unsymmetrial loading tunnel hole the most according to claim 1 excavation safeguard structure, it is characterised in that: described rubber ring (9) Inner ring can be inserted into Grouting Pipe (10), outer ring can be by pipe canopy (3), a length of 8-12cm, water-swellable, expansion rate is 200%- 300%。
10. the construction method of unsymmetrial loading tunnel hole excavation safeguard structure, it is characterised in that the steps include:
(1) tunnel (11) side side slope boring, formwork supporting plate, assembling reinforcement, casting concrete formation framework (2), anchor cable (4) passes Framework (2) stretches in hole, slip casting, stretch-draw anchor (4), is anchored on framework (2) by anchor cable (4);
(2) according to tunnel (11) bias condition, at tunnel, shallow embedding side (11) abutment wall 3-5m, excavating side wall (6) tunnel, cheating the end 5-8m below tunnel inverted arch, flattens bed course, formwork, assembling reinforcement, fixes two row's guide pipes (7) at side wall (6) top and stretch Entering massif (1), casting concrete forms side wall (6);
(3), after side wall (6) intensity reaches 80%, sentence plum blossom-shaped at guide pipe (7) and arrange drilling pipe canopy hole and anchor cable hole;
(4), in framework (2) bottom excavation friction pile stake holes, when digging to Guan Peng hole, first block Guan Peng aperture with Nylon Bag, continue afterwards Excavation pile body, until 5-8m below inverted arch, passes through friction pile (5) place pre-buried pvc pipe, colligation respectively at stake top 1-2m and Guan Peng hole Friction pile reinforcing bar;
(5) being inserted from the Guan Peng aperture of side wall (6) by pipe canopy (3) and go deep in massif (1), anchor cable (4) inserts through pipe canopy (3) Anchor cable hole;
(6) casting concrete, friction pile (5) and framework (2) bottom connection, along the pre-buried pvc pipe in stake top to massif (1) internal drilling, Anchor cable (4), slip casting, stretch-draw, anchoring anchor cable is penetrated in hole;
(7) successively backfilling between side wall (6) and massif (1), tamp the soil body to side wall (6) highly, arranging the gradient is 2%-10%'s Along slope, backfill soil intersection arranges gutter;
(8) pipe canopy (3) and anchor cable (4) carry out timesharing slip casting;Will with the Grouting Pipe (10) of rubber ring (9) through pipe canopy (3) and Anchor cable (4), rubber ring (9) is positioned at bottom, hole, Guan Peng hole, gives anchor cable (4) slip casting by Grouting Pipe (10), and slip casting is extracted after completing, Rubber ring (9) runs into slurry dilatancy and is fixed on Guan Peng (3) end, prevents slurry from passing through rubber ring (9) and flows into pipe canopy (3), waits to starch Body intensity reaches more than 80% post-tensioning anchor cable (4), is anchored in side wall (6) with anchorage;Note to pipe canopy (3) by grouting nozzle (8) Slurry;
(9) between side wall (6) and friction pile (5), boring construction tunnel (11) is carried out.
CN201610650180.7A 2016-08-10 2016-08-10 Excavate safeguard structure and construction method in unsymmetrial loading tunnel hole Active CN106223989B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610650180.7A CN106223989B (en) 2016-08-10 2016-08-10 Excavate safeguard structure and construction method in unsymmetrial loading tunnel hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610650180.7A CN106223989B (en) 2016-08-10 2016-08-10 Excavate safeguard structure and construction method in unsymmetrial loading tunnel hole

Publications (2)

Publication Number Publication Date
CN106223989A true CN106223989A (en) 2016-12-14
CN106223989B CN106223989B (en) 2018-01-16

Family

ID=57547882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610650180.7A Active CN106223989B (en) 2016-08-10 2016-08-10 Excavate safeguard structure and construction method in unsymmetrial loading tunnel hole

Country Status (1)

Country Link
CN (1) CN106223989B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638509A (en) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 Tunnel structure capable of reducing slope excavation and construction method thereof
CN106968260A (en) * 2017-04-05 2017-07-21 五冶集团上海有限公司 The device and method come down for Strengthening Tunnel mountain body entrance
CN106996299A (en) * 2017-05-25 2017-08-01 中铁局集团厦门建设工程有限公司 Control the steel floral tube pile retaining structure and its construction method of tunnel biased deformation
CN107034905A (en) * 2017-05-25 2017-08-11 中铁局集团厦门建设工程有限公司 Control the combination retaining structure and its construction method of biased deformation
CN107143358A (en) * 2017-06-28 2017-09-08 山东省地质矿产勘查开发局八0水文地质工程地质大队(山东省地矿工程勘察院) Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof
CN108150190A (en) * 2018-01-08 2018-06-12 兰州理工大学 Unevenly-pressured shallow tunnel rock crusher section excavates safeguard structure and construction method
CN108316951A (en) * 2018-04-13 2018-07-24 兰州理工大学 Enter the equipment and application method that mould pours by window for tunnel double-lining concrete
CN110206042A (en) * 2019-06-18 2019-09-06 深圳市中天基础勘测设计有限公司 A kind of foundation pit of network column supporting
CN110374633A (en) * 2019-07-19 2019-10-25 中铁隧道集团二处有限公司 The Portal Section Construction method of Tunnel Passing loose media
CN111119208A (en) * 2020-01-17 2020-05-08 中铁二院工程集团有限责任公司 Hole anchor pile protection structure and construction method thereof
CN111576481A (en) * 2020-05-12 2020-08-25 中铁二十局集团第三工程有限公司 Tunnel portal open cut tunnel reinforcing construction method
CN111636902A (en) * 2020-05-30 2020-09-08 中铁十八局集团有限公司 TF type pile and method for preventing and treating large bias voltage and large deformation of tunnel slope based on TF type pile
CN111648790A (en) * 2020-06-12 2020-09-11 安徽省公路桥梁工程有限公司 Shallow-buried bias tunnel entry structure and construction method
CN111764908A (en) * 2020-06-12 2020-10-13 中铁第四勘察设计院集团有限公司 Construction method suitable for wide-angle oblique crossing transition between open cut method and mine method
CN112922635A (en) * 2021-02-04 2021-06-08 中工武大设计研究有限公司 Hydraulic tunnel excavation supporting structure and construction method
CN112983461A (en) * 2021-03-22 2021-06-18 中铁五局集团第一工程有限责任公司 Construction method for bias tunnel portal in slope volume
CN114809039A (en) * 2022-06-06 2022-07-29 新疆北新路桥集团股份有限公司 Mountain slope supporting structure and mountain slope supporting method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280373A (en) * 1998-03-26 1999-10-12 Toshinori Toyoda Starting device and method for portal
KR100653268B1 (en) * 2005-01-18 2006-12-05 주식회사 하이콘엔지니어링 Method for Constructing Rock Shed Tunnel Using Anchor
JP2010126938A (en) * 2008-11-26 2010-06-10 Shimizu Corp Slope stabilizing construction method
CN102392658A (en) * 2011-09-23 2012-03-28 中南大学 Quantification design method for preliminary bracing parameters of unsymmetrical loading tunnel
CN203308470U (en) * 2013-05-28 2013-11-27 山西省交通科学研究院 Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN204000900U (en) * 2014-07-17 2014-12-10 陕西路桥集团第一工程有限公司 A kind of ruggedized construction that is applied to the landslide of unsymmetrial loading tunnel hole
CN104278993A (en) * 2013-07-11 2015-01-14 福州市规划设计研究院 Construction method of unsymmetrical loading tunnel heterotropic hole
CN204283438U (en) * 2014-11-28 2015-04-22 中铁第四勘察设计院集团有限公司 Portal supporting and protection structure
CN204419195U (en) * 2014-12-29 2015-06-24 山西省交通科学研究院 A kind of supporting and protection structure pattern being applicable to tunnel portal section
CN205117376U (en) * 2015-11-08 2016-03-30 湖北省交通规划设计院 A novel anchor bolt support structure for shallow unsymmetrial loading tunnel that buries
CN205154179U (en) * 2015-11-26 2016-04-13 王道远 Stabilize shallow protective structure who buries bias voltage tunnel portal

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280373A (en) * 1998-03-26 1999-10-12 Toshinori Toyoda Starting device and method for portal
KR100653268B1 (en) * 2005-01-18 2006-12-05 주식회사 하이콘엔지니어링 Method for Constructing Rock Shed Tunnel Using Anchor
JP2010126938A (en) * 2008-11-26 2010-06-10 Shimizu Corp Slope stabilizing construction method
CN102392658A (en) * 2011-09-23 2012-03-28 中南大学 Quantification design method for preliminary bracing parameters of unsymmetrical loading tunnel
CN203308470U (en) * 2013-05-28 2013-11-27 山西省交通科学研究院 Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN104278993A (en) * 2013-07-11 2015-01-14 福州市规划设计研究院 Construction method of unsymmetrical loading tunnel heterotropic hole
CN204000900U (en) * 2014-07-17 2014-12-10 陕西路桥集团第一工程有限公司 A kind of ruggedized construction that is applied to the landslide of unsymmetrial loading tunnel hole
CN204283438U (en) * 2014-11-28 2015-04-22 中铁第四勘察设计院集团有限公司 Portal supporting and protection structure
CN204419195U (en) * 2014-12-29 2015-06-24 山西省交通科学研究院 A kind of supporting and protection structure pattern being applicable to tunnel portal section
CN205117376U (en) * 2015-11-08 2016-03-30 湖北省交通规划设计院 A novel anchor bolt support structure for shallow unsymmetrial loading tunnel that buries
CN205154179U (en) * 2015-11-26 2016-04-13 王道远 Stabilize shallow protective structure who buries bias voltage tunnel portal

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638509A (en) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 Tunnel structure capable of reducing slope excavation and construction method thereof
CN106968260A (en) * 2017-04-05 2017-07-21 五冶集团上海有限公司 The device and method come down for Strengthening Tunnel mountain body entrance
CN106996299A (en) * 2017-05-25 2017-08-01 中铁局集团厦门建设工程有限公司 Control the steel floral tube pile retaining structure and its construction method of tunnel biased deformation
CN107034905A (en) * 2017-05-25 2017-08-11 中铁局集团厦门建设工程有限公司 Control the combination retaining structure and its construction method of biased deformation
CN107143358B (en) * 2017-06-28 2024-04-09 山东省地质矿产勘查开发局八0一水文地质工程地质大队(山东省地矿工程勘察院) Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof
CN107143358A (en) * 2017-06-28 2017-09-08 山东省地质矿产勘查开发局八0水文地质工程地质大队(山东省地矿工程勘察院) Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof
CN108150190A (en) * 2018-01-08 2018-06-12 兰州理工大学 Unevenly-pressured shallow tunnel rock crusher section excavates safeguard structure and construction method
CN108316951A (en) * 2018-04-13 2018-07-24 兰州理工大学 Enter the equipment and application method that mould pours by window for tunnel double-lining concrete
CN110206042A (en) * 2019-06-18 2019-09-06 深圳市中天基础勘测设计有限公司 A kind of foundation pit of network column supporting
CN110374633A (en) * 2019-07-19 2019-10-25 中铁隧道集团二处有限公司 The Portal Section Construction method of Tunnel Passing loose media
CN111119208A (en) * 2020-01-17 2020-05-08 中铁二院工程集团有限责任公司 Hole anchor pile protection structure and construction method thereof
CN111576481A (en) * 2020-05-12 2020-08-25 中铁二十局集团第三工程有限公司 Tunnel portal open cut tunnel reinforcing construction method
CN111636902B (en) * 2020-05-30 2023-02-28 中铁十八局集团有限公司 Method for preventing and treating large bias voltage and large deformation of tunnel slope by TF type piles
CN111636902A (en) * 2020-05-30 2020-09-08 中铁十八局集团有限公司 TF type pile and method for preventing and treating large bias voltage and large deformation of tunnel slope based on TF type pile
CN111648790A (en) * 2020-06-12 2020-09-11 安徽省公路桥梁工程有限公司 Shallow-buried bias tunnel entry structure and construction method
CN111764908A (en) * 2020-06-12 2020-10-13 中铁第四勘察设计院集团有限公司 Construction method suitable for wide-angle oblique crossing transition between open cut method and mine method
CN111648790B (en) * 2020-06-12 2023-03-14 安徽省公路桥梁工程有限公司 Shallow-buried bias tunnel entry structure and construction method
CN112922635A (en) * 2021-02-04 2021-06-08 中工武大设计研究有限公司 Hydraulic tunnel excavation supporting structure and construction method
CN112983461A (en) * 2021-03-22 2021-06-18 中铁五局集团第一工程有限责任公司 Construction method for bias tunnel portal in slope volume
CN112983461B (en) * 2021-03-22 2024-03-15 中铁五局集团第一工程有限责任公司 Construction method for biasing tunnel portal in slope integrated
CN114809039A (en) * 2022-06-06 2022-07-29 新疆北新路桥集团股份有限公司 Mountain slope supporting structure and mountain slope supporting method

Also Published As

Publication number Publication date
CN106223989B (en) 2018-01-16

Similar Documents

Publication Publication Date Title
CN106223989B (en) Excavate safeguard structure and construction method in unsymmetrial loading tunnel hole
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN107130613B (en) Large span tunnel is just wearing the retaining structure and its construction method of existing barricade
CN102134998B (en) Construction method for wind-blown sand tunnel
CN107542470B (en) Existing railway Business Line construction method is worn under the shallow tunnel of karst broken region
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN102031736A (en) Construction technology for under-passing existing line under complicated geological condition
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN106121659B (en) The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one kind
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN102477744A (en) Pit excavation method in large-area pit with internal support under condition of soft soil foundation
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN110284885A (en) Shield inspection-pit construction method
CN110469332A (en) A kind of advance support consolidation method passing through Debris Flow Deposition body tunnel
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN107965325B (en) A kind of small interval shallow tunnel just branch arch replacement construction method
CN110259490A (en) A kind of Underground Subway Station construction method
CN109578014A (en) Anti- dash forward of one kind gushes back cover structure and construction method
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN114278313A (en) Supporting system based on interval different excavation construction method conversion and construction method
CN109594565A (en) Large area circular deep foundation pit support and water-stopping method in weak water rich strata
CN106087996B (en) Manual digging pile construction method based on self leveling backpressure device
CN108222951A (en) Pass through fine sand layer tunnel portal weak surrounding rock section constructing method
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six
CN208605199U (en) The ruggedized construction of structures is worn under a kind of weak soil rich water large cross-section tunnel group

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230914

Address after: 730030 No. 63 Heping Road, Chengguan District, Lanzhou City, Gansu Province

Patentee after: THE 2ND ENGINEERING CO.,LTD. OF CHINA RAILWAY 21ST BUREAU GROUP CO.,LTD.

Address before: 730050 No. 287 LAN Gong Ping, Gansu City, Lanzhou Province

Patentee before: LANZHOU University OF TECHNOLOGY

TR01 Transfer of patent right