CN109578014A - Anti- dash forward of one kind gushes back cover structure and construction method - Google Patents
Anti- dash forward of one kind gushes back cover structure and construction method Download PDFInfo
- Publication number
- CN109578014A CN109578014A CN201910078063.1A CN201910078063A CN109578014A CN 109578014 A CN109578014 A CN 109578014A CN 201910078063 A CN201910078063 A CN 201910078063A CN 109578014 A CN109578014 A CN 109578014A
- Authority
- CN
- China
- Prior art keywords
- construction
- curtain
- upper layer
- crown
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 63
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 30
- 210000005239 tubule Anatomy 0.000 claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 32
- 239000010959 steel Substances 0.000 claims description 32
- 239000002689 soil Substances 0.000 claims description 24
- 238000000034 method Methods 0.000 claims description 12
- 238000007710 freezing Methods 0.000 claims description 10
- 230000008014 freezing Effects 0.000 claims description 10
- 238000009412 basement excavation Methods 0.000 claims description 7
- 238000005266 casting Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 5
- 230000005641 tunneling Effects 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000000605 extraction Methods 0.000 claims description 3
- 238000009415 formwork Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000007363 ring formation reaction Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 238000001556 precipitation Methods 0.000 description 5
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 230000006837 decompression Effects 0.000 description 1
- 230000009189 diving Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/003—Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Soil Sciences (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention discloses anti-dash forward of one kind and gushes back cover structure and construction method, and the two sides of top beam are respectively equipped with the small pilot tunnel in upper layer;It is connected between top beam and by two lining structure of crown between the small pilot tunnel of top beam and upper layer;The top of two lining structure of crown is fixed with crown end bay and just props up one, crown end bay just branch two.Construction temporary construction vertical shaft and upper layer occasional passage, lower layer's occasional passage;The small pilot tunnel in upper layer is set in the occasional passage of upper layer;Big pipe curtain, tubule curtain are set along set contour line in lower layer's occasional passage.The present invention can avoid depressurizing underground water artificial rainmaking when hidden digging structure is constructed, and destroy water resource, and can realize anhydrous operation when station construction to guarantee safe construction, it can be achieved that the advance support effect of hidden digging structure construction, is effective against the prominent of artesian water and gushes risk.
Description
Technical field
The invention belongs to construction of underground structure technical field, in particular to a kind of anti-dash forward gushes back cover structure and construction method.
Background technique
With the fast development of China's urban construction, the construction of Underground Rail Transit system is to solve big and medium-sized cities traffic to ask
The important means of topic, with the development of Metro Construction, subway foundation pit develops to deep, big direction, and underground water is to foundation pit work
The influence of journey becomes the major issue of control Station Project construction safety.
When surface condition is by limited time, cavern-pile method is that have using more construction to periphery in metro station construction
Environment influences the advantages that small, highly-safe, wide adaptability, but with traditional shallow burial hidden digging on structural shape and construction technology
Premised on anhydrous operation, need to take to diving artificial rainmaking, the measure of artesian water precipitation decompression, large volume before excavating operation
Precipitation undoubtedly will cause water resource waste, if can also surrounding enviroment be impacted by dealing with improperly.As environmental consciousness enhances, city
City's ground water protection is increasingly stringenter, in constructing underground building, in water rich strata and under conditions of do not allow precipitation, with precipitation
Premised on traditional cavern-pile method will no longer be applicable in.
The new challenge proposed to traditional design and construction method is increased in face of buried depth, effectively controlling underground water is buriedly
Ironworker's journey matter of utmost importance to be solved.
Summary of the invention
The present invention for the technical problems in the prior art, provides anti-dash forward of one kind and gushes back cover structure and construction method,
It can avoid depressurizing underground water artificial rainmaking when hidden digging structure is constructed, destroy water resource, and can realize anhydrous when station construction
Operation is to guarantee safe construction, it can be achieved that the advance support effect of hidden digging structure construction, is effective against the prominent of artesian water and gushes risk.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: anti-dash forward of one kind gushes back cover structure, including lateral
Building enclosure (9), top beam (12), two lining structure of crown (14), in hardened structure (15), floor structure (16);
The two sides of the top beam (12) are respectively equipped with the small pilot tunnel in upper layer (4);Between the top beam (12) and top beam
(12) it is connect between the small pilot tunnel in upper layer (4) by two lining structure of crown (14);The top of two lining structure of crown (14) is solid
Surely it is equipped with crown end bay and just props up one (11), crown end bay just two (13) of branch;
Hardened structure (15), floor structure (16) in being successively arranged below two lining structure of crown (14), the bottom plate knot
The bottom end of structure (16) is equipped with multiple big pipe curtains (5);
The bottom end of the top beam (12) is equipped with steel pipe column (10);One end and top beam (12) of the steel pipe column (10)
Be fixedly connected, the other end sequentially pass through in hardened structure (15), floor structure (16) and be fixedly installed in big pipe curtain (5);
The bottom end of the small pilot tunnel in upper layer (4) is equipped with building enclosure (9);The both ends of the building enclosure (9) respectively with enclose
Protection structure (9), big pipe curtain (5) are fixedly connected;
It is equipped with multiple tubule curtains (6) between the adjacent big pipe curtain (5), is equipped in each tubule curtain (6)
Freezing pipe (7).
Preferably, equal fill concrete in the big pipe curtain (5), tubule curtain (6).
Preferably, passing through connection bolt (17) connection between multiple tubule curtains (6).
Anti- dash forward of one kind gushes back cover construction method, comprising the following steps:
Before the construction of water rich strata main body stage excavation, combined ground surrounding enviroment and station main structure, accessory structure
Form, construct temporary construction vertical shaft (1) and upper layer occasional passage (2), lower layer's occasional passage (3);Occasional passage (2) on upper layer
Inside set the small pilot tunnel in upper layer (4);Big pipe curtain (5), tubule curtain (6) are set along set contour line in lower layer's occasional passage (3);
Freezing pipe (7) are laid in tubule curtain (6), actively freeze to form Frozen Soil Cylinder (8);In Frozen Soil Cylinder (8) supporting
Under, pipe interlude connection bolt (17) is set in tubule curtain (6) internal openings, big pipe curtain (5) is fixedly connected with, pipe curtain is made to form entirety
Encircle bearing structure, guarantees arch back cover bearing structure globality;Fill concrete forms back cover structure in pipe curtain, increases pipe curtain knot
Structure overall stiffness and counterweight are effective against in foundation soil counter-force and water rich strata and exist in conjunction with the Frozen Soil Cylinder (8) of pipe interlude
High artesian jacking force, guarantee anti-prominent during structural excavation to gush stability;
Along the set contour line construction lateral building enclosure of tunneling (9) and steel pipe column (10) in the small pilot tunnel in upper layer (4);Wait open
Big pipe curtain (5) top mark eminence is dug, in the internal artificial aperture of big pipe curtain (5);In the big interior pouring construction bed course of pipe curtain (5), lifting
It places lateral building enclosure (9), and timely casting concrete;Big pipe curtain (5) also serves as hidden digging structure as arch structure fulcrum
Lateral building enclosure (9) and steel pipe column (10) strip footing, make arch tube curtain structure form complete stress system with hidden digging structure;
Construction skirt piles crown beam, the crown end bay for erecting the small pilot tunnel in upper layer (4) interior main arch just prop up one (11);Upper layer is small leads for backfill
The upper space in hole (4);Slurry coat method in extraction in stake, manually installed steel pipe column locator, and according to design merogenesis lifting,
Steel reinforcement cage in steel pipe column and steel pipe column is installed;It is closely knit using coarse sand backfill between steel pipe column and steel pile casting;Construction top beam
(12), and the splice that main arch two serves as a contrast is reserved, is laid with waterproof layer;
The main arch soil body is excavated, crown end bay is performed and just props up two (13);The small pilot tunnel in upper layer (4) abutment wall is removed paragraph by paragraph, is laid with anti-
Water layer, formwork erection pour two lining structure of crown (14);
Continue to excavate soil layer board bottom absolute altitude into negative one layer downwards, entirely mould, is laid with waterproof layer, pours in negative one layer
Plate, central sill and in hardened structure (15), station hall layer closing cyclization;Reserved reinforcing bar of plugging into bottom side wall;
Soil layer plate absolute altitude on earth is excavated downwards, is laid with bed course, waterproof layer, is poured side wall and floor structure (16);Work car
It stands internal structure, station main body civil construction is completed.
Compared with prior art, the present invention has the beneficial effects that the present invention realizes water rich strata shallow mining method
Shi Wushui operating condition to underground water artificial rainmaking pressure relief rupture water resource when can avoid constructing, and can be evaded in excavation project
The prominent construction risk gushed of the artesian water faced, guarantees construction safety.
It avoids depressurizing underground water artificial rainmaking when hidden digging structure is constructed, destroys water resource, and can realize station construction
Shi Wushui operation guarantees safe construction, at the same time it can also realize the advance support effect of hidden digging structure construction, is effective against and holds
Pressure the prominent of water gushes risk, has stronger engineering exploitativeness and promotional value.
Detailed description of the invention
Fig. 1-7 is construction procedure schematic diagram of the invention;
Fig. 8 is the schematic cross section of structure of the invention;
Fig. 9 is pipe curtain type of attachment schematic diagram of the invention;
Figure 10 is construction process figure of the invention.
1- temporary construction vertical shaft in figure, the upper layer 2- occasional passage, 3- lower layer occasional passage, the small pilot tunnel in the upper layer 4-, the big pipe of 5-
Curtain, 6- tubule curtain, 7- freezing pipe, 8- Frozen Soil Cylinder, the side 9- just prop up one to building enclosure, 10- steel pipe column, 11- crown end bay,
12- top beam, 13- crown end bay just prop up two, 14- crown, two lining structure, hardened structure in 15-, 16- floor structure, 17- connection spiral shell
Bolt.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, in the following with reference to the drawings and specific embodiments
It elaborates to the present invention.
One kind is anti-prominent to gush back cover structure, including lateral building enclosure (9), top beam (12), two lining structure of crown (14), in
Hardened structure (15), floor structure (16);
The two sides of top beam (12) are respectively equipped with the small pilot tunnel in upper layer (4);Between top beam (12) and top beam (12) with it is upper
It is connected between the small pilot tunnel (4) of layer by two lining structure of crown (14);The top of two lining structure of crown (14) is fixed with crown side
Two (13) are just propped up across one (11) of first branch, crown end bay;
Hardened structure (15), floor structure (16) in being successively arranged below two lining structure of crown (14), floor structure (16)
Bottom end is equipped with multiple big pipe curtains (5);
The bottom end of top beam (12) is equipped with steel pipe column (10);One end and top beam (12) of steel pipe column (10) are fixed to be connected
Connect, the other end sequentially pass through in hardened structure (15), floor structure (16) and be fixedly installed in big pipe curtain (5);
The bottom end of the small pilot tunnel in upper layer (4) is equipped with building enclosure (9);The both ends of building enclosure (9) respectively with building enclosure
(9), big pipe curtain (5) is fixedly connected;
It is equipped with multiple tubule curtains (6) between adjacent big pipe curtain (5), is equipped with freezing pipe in each tubule curtain (6)
(7)。
In the present embodiment, equal fill concrete in big pipe curtain (5), tubule curtain (6).
In the present embodiment, pass through connection bolt (17) connection between multiple tubule curtains (6).
Anti- dash forward of one kind gushes back cover construction method, comprising the following steps:
Referring to figure 1: before the construction of water rich strata main body stage excavation, combined ground surrounding enviroment and station main body
Structure, accessory structure form, construct temporary construction vertical shaft (1) and upper layer occasional passage (2), lower layer's occasional passage (3);Upper
The small pilot tunnel in upper layer (4) is set in layer occasional passage (2);Big pipe curtain is set along set contour line in lower layer's occasional passage (3)
(5), tubule curtain (6);
Referring to shown in attached drawing 2: laying freezing pipe (7) in tubule curtain (6), actively freeze to form Frozen Soil Cylinder (8);Freezing
Under native curtain (8) supporting, pipe interlude connection bolt (17) is set in tubule curtain (6) internal openings, is fixedly connected with big pipe curtain (5),
So that pipe curtain is formed whole arch bearing structure, guarantees arch back cover bearing structure globality;Fill concrete forms back cover in pipe curtain
Structure increases pipe curtain structure overall stiffness and counterweight in conjunction with the Frozen Soil Cylinder (8) of pipe interlude and is effective against foundation soil counter-force
And high artesian jacking force present in water rich strata, anti-dash forward gushes stability during guaranteeing structural excavation;
Referring to shown in attached drawing 3: in the small pilot tunnel in upper layer (4) along the set contour line construction lateral building enclosure of tunneling (9) and
Steel pipe column (10);Wait excavate big pipe curtain (5) top mark eminence, in the internal artificial aperture of big pipe curtain (5);It is poured in big pipe curtain (5)
Construction cushion coat is built, lateral building enclosure (9), and timely casting concrete are placed in lifting;Big pipe curtain (5) is same as arch structure fulcrum
When also serve as the lateral building enclosure of hidden digging structure (9) and steel pipe column (10) strip footing, make arch tube curtain structure with hidden digging structure shape
At complete stress system;
Referring to shown in attached drawing 4: construction skirt piles crown beam, the crown end bay for erecting the small pilot tunnel in upper layer (4) interior main arch just prop up one
(11);Backfill the upper space of the small pilot tunnel in upper layer (4);Slurry coat method in extraction in stake, manually installed steel pipe column locator, and
According to the steel reinforcement cage in the lifting of design merogenesis, installation steel pipe column and steel pipe column;It is returned between steel pipe column and steel pile casting using coarse sand
Packing is real;It constructs top beam (12), and the splice that reserved main arch two serves as a contrast, is laid with waterproof layer;
Referring to shown in attached drawing 5: excavating the main arch soil body, perform crown end bay and just prop up two (13);The small pilot tunnel in upper layer is removed paragraph by paragraph
(4) abutment wall, is laid with waterproof layer, and formwork erection pours two lining structure of crown (14);
Referring to shown in attached drawing 6: continue to excavate soil layer board bottom absolute altitude into negative one layer downwards, entirely mould, laying waterproof layer,
Pour plate in negative one layer, central sill and in hardened structure (15), station hall layer closing cyclization;Reserved reinforcing bar of plugging into bottom side wall;
Referring to shown in attached drawing 7: excavating soil layer plate absolute altitude on earth downwards, be laid with bed course, waterproof layer, pour side wall and bottom plate knot
Structure (16);Construction station internal structure, station main body civil construction are completed.
In the present embodiment, temporary construction vertical shaft and transverse passage-way can be excavated with construction site on ground, in the transverse passage-way of upper layer
The small pilot tunnel in station is set, arch tube curtain (being divided into big pipe curtain tubule curtain by internal diameter difference) structure is set in lower layer's transverse passage-way,
Laying freezing pipe forms the Frozen Soil Cylinder being used cooperatively with pipe curtain structure in pipe curtain.
In the present embodiment, this method is suitable for building for the buried Station of water rich strata, the tunneling vehicle in water rich strata
It stands in construction process, can avoid influence of the Underground Construction to traffic above-ground and pipeline, while avoiding traditional subsurface excavation method station
The larger bring groundwater treatment problem of buried depth.
In the present embodiment, big pipe curtain (5), tubule curtain (6) and Frozen Soil Cylinder (8) form domes can to resist foundation soil anti-
Power and water buoyancy form closing water-stop curtain with water barrier and the lateral building enclosure of hidden digging structure (9), guarantee anhydrous job execution
Condition.
In the present embodiment, it is not necessarily to ground artificial precipitation, by arranging freezing pipe (7) in pipe curtain, to pipe curtain week in construction
Side rich water soil layer, which actively freezes, forms Frozen Soil Cylinder (8), forms closing water-stop curtain with the lateral building enclosure of hidden digging structure (9).
In the present embodiment, the small pilot tunnel in upper layer (4) is for the structures such as the lateral building enclosure in station (9), steel pipe column (10) of constructing;
When the small pilot tunnel in upper layer (4) is located at water level line or less and is unable to dewatering construction, according to Practical Project using slip casting or freezing sealing
Measure.
In the present embodiment, tubule curtain (6) is mainly arranged in arch structure span centre position, plays connection and intermal force, and diameter
Meet construction personnel's working space requirement;Big pipe curtain (5) is used as arch structure fulcrum force, and also serve as hidden digging structure vertical applied force
Member base, it is ensured that arch tube curtain structure forms complete structure stress system with tunneling main structure, guarantees structure safety,
Its diameter need to meet foundation bearing capacity and construction personnel's working space requirement.
In the present embodiment, big pipe curtain (5) is used as vertical applied force member base, when foundation bearing capacity is unsatisfactory for requiring, in advance
Injected hole is stayed, grouting and reinforcing is carried out to ground, improves foundation bearing capacity.
In the present embodiment, big pipe curtain (5) also serves as lateral building enclosure (9) strip footing and steel pipe as arch structure fulcrum again
Strip footing under column (10) guarantees structural system integrality, while realizing underwater operating machine and melting digging.
It is described the invention in detail above by embodiment, but the content is only exemplary implementation of the invention
Example, should not be considered as limiting the scope of the invention.Protection scope of the present invention is defined by the claims.All utilizations
Technical solutions according to the invention or those skilled in the art are under the inspiration of technical solution of the present invention, in reality of the invention
In matter and protection scope, designs similar technical solution and reach above-mentioned technical effect, or to made by application range
All the changes and improvements etc. should still belong to patent of the invention and cover within protection scope.It should be noted that in order to clear
It is stated, part and protection scope of the present invention is omitted in explanation of the invention without being directly significantly associated with but this field skill
The statement of component known to art personnel and processing.
Claims (4)
1. anti-dash forward of one kind gushes back cover structure, which is characterized in that including lateral building enclosure (9), top beam (12), the lining knot of crown two
Structure (14), in hardened structure (15), floor structure (16);
The two sides of the top beam (12) are respectively equipped with the small pilot tunnel in upper layer (4);Between the top beam (12) and top beam (12)
It is connect between the small pilot tunnel in upper layer (4) by two lining structure of crown (14);The top fixation of two lining structure of crown (14) is set
There is crown end bay just to prop up one (11), crown end bay just two (13) of branch;
Hardened structure (15), floor structure (16) in being successively arranged below two lining structure of crown (14), the floor structure
(16) bottom end is equipped with multiple big pipe curtains (5);
The bottom end of the top beam (12) is equipped with steel pipe column (10);One end and top beam (12) of the steel pipe column (10) are fixed
Connection, the other end sequentially pass through in hardened structure (15), floor structure (16) and be fixedly installed in big pipe curtain (5);
The bottom end of the small pilot tunnel in upper layer (4) is equipped with building enclosure (9);The both ends of the building enclosure (9) respectively with go along with sb. to guard him knot
Structure (9), big pipe curtain (5) are fixedly connected;
It is equipped with multiple tubule curtains (6) between the adjacent big pipe curtain (5), is equipped with and freezes in each tubule curtain (6)
It manages (7).
2. a kind of anti-dash forward according to claim 1 gushes back cover structure, which is characterized in that the big pipe curtain (5), tubule curtain
(6) equal fill concrete in.
3. a kind of anti-dash forward according to claim 1 gushes back cover structure, which is characterized in that between multiple tubule curtains (6)
Pass through connection bolt (17) connection.
4. anti-dash forward of one kind gushes back cover construction method, comprising the following steps:
Before the construction of water rich strata main body stage excavation, combined ground surrounding enviroment and station main structure, accessory structure form,
Construction temporary construction vertical shaft (1) and upper layer occasional passage (2), lower layer's occasional passage (3);It is beaten in occasional passage (2) on upper layer
If the small pilot tunnel in upper layer (4);Big pipe curtain (5), tubule curtain (6) are set along set contour line in lower layer's occasional passage (3);
Freezing pipe (7) are laid in tubule curtain (6), actively freeze to form Frozen Soil Cylinder (8);Under Frozen Soil Cylinder (8) supporting,
Tubule curtain (6) internal openings set pipe interlude connection bolt (17), are fixedly connected with big pipe curtain (5);
Along the set contour line construction lateral building enclosure of tunneling (9) and steel pipe column (10) in the small pilot tunnel in upper layer (4);Wait excavate
Big pipe curtain (5) top mark eminence, in the internal artificial aperture of big pipe curtain (5);In the big interior pouring construction bed course of pipe curtain (5), lifting is placed
Lateral building enclosure (9), and timely casting concrete;
Construction skirt piles crown beam, the crown end bay for erecting the small pilot tunnel in upper layer (4) interior main arch just prop up one (11);Backfill the small pilot tunnel in upper layer
(4) upper space;Slurry coat method in extraction in stake, manually installed steel pipe column locator, and according to the lifting of design merogenesis, peace
Steel reinforcement cage in steel loading tubing string and steel pipe column;It is closely knit using coarse sand backfill between steel pipe column and steel pile casting;Construction top beam
(12), and the splice that main arch two serves as a contrast is reserved, is laid with waterproof layer;
The main arch soil body is excavated, crown end bay is performed and just props up two (13);The small pilot tunnel in upper layer (4) abutment wall is removed paragraph by paragraph, is laid with waterproof layer,
Formwork erection pours two lining structure of crown (14);
Continue to excavate soil layer board bottom absolute altitude into negative one layer downwards, entirely mould, be laid with waterproof layer, pour plate in negative one layer, in
Beam hardened structure (15) in, station hall layer closing cyclization;Reserved reinforcing bar of plugging into bottom side wall;
Soil layer plate absolute altitude on earth is excavated downwards, is laid with bed course, waterproof layer, is poured side wall and floor structure (16);It constructs in station
Portion's structure, station main body civil construction are completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910078063.1A CN109578014B (en) | 2019-01-28 | 2019-01-28 | Anti-surging bottom sealing structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910078063.1A CN109578014B (en) | 2019-01-28 | 2019-01-28 | Anti-surging bottom sealing structure and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109578014A true CN109578014A (en) | 2019-04-05 |
CN109578014B CN109578014B (en) | 2024-02-09 |
Family
ID=65917664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910078063.1A Active CN109578014B (en) | 2019-01-28 | 2019-01-28 | Anti-surging bottom sealing structure and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109578014B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958443A (en) * | 2019-04-30 | 2019-07-02 | 北京万兴建筑集团有限公司 | The vertical shaft arranged side by side and its construction method secretly made in a kind of piping lane tunnel |
CN110608047A (en) * | 2019-08-30 | 2019-12-24 | 同济大学建筑设计研究院(集团)有限公司 | Underpass subway supporting structure and manufacturing method thereof |
CN113847040A (en) * | 2021-12-02 | 2021-12-28 | 中国铁路设计集团有限公司 | Large-span non-column underground station underground excavation construction method |
CN114263215A (en) * | 2021-12-21 | 2022-04-01 | 中铁十四局集团隧道工程有限公司 | Construction method for building waterproof structure at storey-adding joint of subway station by combining open excavation and underground excavation |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102644466A (en) * | 2012-04-27 | 2012-08-22 | 北京城建设计研究总院有限责任公司 | Joist arching method for constructing ultra-shallow buried large-span underground excavated subway station in rocky stratum |
CN204729099U (en) * | 2015-07-13 | 2015-10-28 | 中铁第六勘察设计院集团有限公司 | Rock quality layer tunneling three layers of subway station canopy structure |
CN204941545U (en) * | 2015-09-19 | 2016-01-06 | 中铁二十二局集团第一工程有限公司 | Station boring construction system |
WO2016095629A1 (en) * | 2014-12-15 | 2016-06-23 | 中铁第四勘察设计院集团有限公司 | Advanced support structure for oversized variable-cross-section tunnel |
CN106337686A (en) * | 2015-07-13 | 2017-01-18 | 中铁第六勘察设计院集团有限公司 | Rock stratum underground excavation three-story subway station umbrella cover structure and construction method thereof |
CN106703814A (en) * | 2015-07-30 | 2017-05-24 | 宏润建设集团股份有限公司 | Mined metro station hole pile construction method |
CN106703828A (en) * | 2017-01-22 | 2017-05-24 | 济南轨道交通集团有限公司 | The construction method of building subway station with fabricated lining combination PBA |
CN107218046A (en) * | 2017-07-31 | 2017-09-29 | 北京市市政工程设计研究总院有限公司 | Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel |
CN108005664A (en) * | 2018-02-02 | 2018-05-08 | 北京市政建设集团有限责任公司 | A kind of hole pile construction method of platform structure |
CN209430204U (en) * | 2019-01-28 | 2019-09-24 | 中铁第六勘察设计院集团有限公司 | Anti- dash forward of one kind gushes back cover structure |
-
2019
- 2019-01-28 CN CN201910078063.1A patent/CN109578014B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102644466A (en) * | 2012-04-27 | 2012-08-22 | 北京城建设计研究总院有限责任公司 | Joist arching method for constructing ultra-shallow buried large-span underground excavated subway station in rocky stratum |
WO2016095629A1 (en) * | 2014-12-15 | 2016-06-23 | 中铁第四勘察设计院集团有限公司 | Advanced support structure for oversized variable-cross-section tunnel |
CN204729099U (en) * | 2015-07-13 | 2015-10-28 | 中铁第六勘察设计院集团有限公司 | Rock quality layer tunneling three layers of subway station canopy structure |
CN106337686A (en) * | 2015-07-13 | 2017-01-18 | 中铁第六勘察设计院集团有限公司 | Rock stratum underground excavation three-story subway station umbrella cover structure and construction method thereof |
CN106703814A (en) * | 2015-07-30 | 2017-05-24 | 宏润建设集团股份有限公司 | Mined metro station hole pile construction method |
CN204941545U (en) * | 2015-09-19 | 2016-01-06 | 中铁二十二局集团第一工程有限公司 | Station boring construction system |
CN106703828A (en) * | 2017-01-22 | 2017-05-24 | 济南轨道交通集团有限公司 | The construction method of building subway station with fabricated lining combination PBA |
CN107218046A (en) * | 2017-07-31 | 2017-09-29 | 北京市市政工程设计研究总院有限公司 | Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel |
CN108005664A (en) * | 2018-02-02 | 2018-05-08 | 北京市政建设集团有限责任公司 | A kind of hole pile construction method of platform structure |
CN209430204U (en) * | 2019-01-28 | 2019-09-24 | 中铁第六勘察设计院集团有限公司 | Anti- dash forward of one kind gushes back cover structure |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109958443A (en) * | 2019-04-30 | 2019-07-02 | 北京万兴建筑集团有限公司 | The vertical shaft arranged side by side and its construction method secretly made in a kind of piping lane tunnel |
CN109958443B (en) * | 2019-04-30 | 2024-04-02 | 北京市市政工程设计研究总院有限公司 | Parallel vertical shafts hidden in pipe gallery tunnel and construction method thereof |
CN110608047A (en) * | 2019-08-30 | 2019-12-24 | 同济大学建筑设计研究院(集团)有限公司 | Underpass subway supporting structure and manufacturing method thereof |
CN113847040A (en) * | 2021-12-02 | 2021-12-28 | 中国铁路设计集团有限公司 | Large-span non-column underground station underground excavation construction method |
CN114263215A (en) * | 2021-12-21 | 2022-04-01 | 中铁十四局集团隧道工程有限公司 | Construction method for building waterproof structure at storey-adding joint of subway station by combining open excavation and underground excavation |
CN114263215B (en) * | 2021-12-21 | 2023-05-02 | 中铁十四局集团隧道工程有限公司 | Construction method for building waterproof structure at storey-added connection part of subway station by combined excavation and excavation |
Also Published As
Publication number | Publication date |
---|---|
CN109578014B (en) | 2024-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704957B (en) | Shed-frame method for shallowly burying large-sized underground structure construction | |
CN101139838B (en) | Construction method for high artesian area ultra-deep foundation pit | |
CN109578014A (en) | Anti- dash forward of one kind gushes back cover structure and construction method | |
CN106150506B (en) | A kind of entrance open excavation section inverted side-wall construction method | |
CN106907159A (en) | A kind of Shallow Covered Metro Station separates open type structure and its construction method | |
CN106703828A (en) | The construction method of building subway station with fabricated lining combination PBA | |
CN102363961A (en) | Deepwater single-wall steel plate pile cofferdam structure with low buried depth and construction method thereof | |
CN110043264A (en) | A kind of construction method of jacking prefabricated rectangle shaft structure pattern | |
CN106812542B (en) | It is a kind of using prefabricated components and preceding slotting shield builds the construction method of subway station | |
CN106436720A (en) | Small-size deep foundation pit supporting structure for pipe jacking construction | |
CN106988750A (en) | The embodiment at existing station is worn under a kind of large span running tunnel super close distance | |
CN207063982U (en) | Mechanical assistance sealing Station structure in a kind of pilot tunnel | |
CN108589771A (en) | One kind having runed underground station increasing layer transfer node construction method | |
CN106049195A (en) | Method for strengthening subgrade basement of existing high speed railway line | |
CN206888990U (en) | A kind of Shallow Covered Metro Station separates open type structure | |
CN202401462U (en) | Deep-water single-wall steel sheet pile cofferdam structure with small soil penetration depth | |
JP3908464B2 (en) | Construction method of underwater tunnel | |
CN107829747B (en) | Construction method suitable for shallow-buried underground excavation tunnel in expansive soil area | |
CN109339079A (en) | A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum | |
CN209430204U (en) | Anti- dash forward of one kind gushes back cover structure | |
CN111101540B (en) | Construction method for passing existing electric power tunnel on open cut tunnel | |
CN110486062B (en) | Method for mechanically underground excavating multi-layer multi-span underground engineering in soft soil | |
CN209260739U (en) | A kind of foundation pit water-stopping system close to river permeable stratum | |
CN206917655U (en) | Pile foundation type bored tunnel in deep backfill | |
CN215165817U (en) | Semi-covered excavation sequential city tunnel structure next to subway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |