CN106436720A - Small-size deep foundation pit supporting structure for pipe jacking construction - Google Patents

Small-size deep foundation pit supporting structure for pipe jacking construction Download PDF

Info

Publication number
CN106436720A
CN106436720A CN201611004018.4A CN201611004018A CN106436720A CN 106436720 A CN106436720 A CN 106436720A CN 201611004018 A CN201611004018 A CN 201611004018A CN 106436720 A CN106436720 A CN 106436720A
Authority
CN
China
Prior art keywords
pile
construction
foundation pit
cast
supporting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611004018.4A
Other languages
Chinese (zh)
Other versions
CN106436720B (en
Inventor
朱太山
贾少燕
姚高岭
李玉娥
杨华军
王志军
陈满圈
李红涛
姜辉
曹捷
魏珂
黄杏成
王春磊
杨保军
翁宛
李洋
范梦宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Water and Power Engineering Consulting Co Ltd
Original Assignee
Henan Water and Power Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Water and Power Engineering Consulting Co Ltd filed Critical Henan Water and Power Engineering Consulting Co Ltd
Priority to CN201611004018.4A priority Critical patent/CN106436720B/en
Publication of CN106436720A publication Critical patent/CN106436720A/en
Application granted granted Critical
Publication of CN106436720B publication Critical patent/CN106436720B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a small-size deep foundation pit supporting structure for pipe jacking construction. The supporting structure is constructed through the steps that firstly, bored perfusion pile rows are constructed around the determined foundation pit position, a high-pressure jet grouting pile row is constructed in a gap formed between every two adjacent bored perfusion pile rows, a side slope is excavated from the ground, an annular crown beam is poured on the tops of the bored perfusion pile rows, asphalt felt is laid between the crown beam and pile bodies, and then a brick wall is built on the top of the crown beam; secondly, a foundation pit is excavated after the crown beam reaches the required strength, and after the foundation building surface meets the construction requirement, the side wall of the foundation pit and an inner lining (the position where a jacking pipe is arranged in a penetrating mode is reserved) of a bottom plate are poured with reinforced concrete; lastly, opening treatment is conducted on the jacking pipe, a second-stage reinforced concrete layer is built on the dismantling face, and after the later-period pipe jacking construction requirements are met, overall supporting structure construction is completed. According to the small-size deep foundation pit supporting structure for pipe jacking construction, a conventional cantilever pile supporting method is broken through, and the supporting structure arranged in the foundation pit in a finite space meets the supporting requirement of a surrounding complex environment; meanwhile, by combining the construction characteristics of pipe jacking construction, basic guarantee conditions are provided for normal and safe construction of pipe jacking engineering.

Description

Jacking construction small size deep foundation pit supporting structure
Technical field
The present invention relates to piping laying construction technology, especially relate to a kind of jacking construction small size deep foundation pit support knot Structure.
Background technology
Jacking construction is exactly no-dig technique(Or excavate less)Pipeline(Including Urban Underground water supply and sewerage pipeline, sky hot gas petroleum pipeline Road, communication cable pipeline etc.)Burial and construction technology.This technology thoroughly solves in piping laying work progress to City Building Destruction and the difficult problem such as impact to road traffic, steady soil and environmental protection aspect advantage are become apparent from.Normal condition Under, for the various pipe traverse project for 1m ~ 3m for the caliber, particularly in urban environment and in order to protect earth's surface important Ecology, greenery patches and the facility such as river course, building exempt from and destroy it will usually select the jacking construction of non-excavation type.
For meeting long-distance pipe jacking engine request, need to arrange various working pits or received well base at engineering two ends and along journey Hole, is less than the foundation ditch of 8m, typically carries out supporting using conventional single-cantilever stake for depth.But some push pipe foundation ditches are for warp Ji, investment reduction, interior diameter is generally less(It is only capable of meeting jacking construction requirement), therefore conventional cantilever soldier pile retaining structure scheme is subject to To restriction, and subsurface geology complicated condition, the foundation ditch in urban environment, if peripheral facility(Various pipelines, optical cable and building Thing)Numerous, it is also not suitable for the supporting scheme using conventional anchor cable and inner support combine and is constructed, therefore, for this little Diameter(3 ~ 8 meters)And depth is more than 8m(8 ~ 13 meters)Deep basal pit be accomplished by designing a kind of new supporting scheme, to meet safety The requirement of construction.
Content of the invention
It is an object of the invention to provide one kind can meet pipe-jacking project construction safety, protect surrounding enviroment to pacify again Entirely, and jacking construction small size deep foundation pit supporting structure economic and that social benefit is all good.
For achieving the above object, the present invention can take following technical proposals:
Jacking construction of the present invention small size deep foundation pit supporting structure, its construction procedure is:
The first step, around the multiple cast-in-situ bored piles of foundation ditch interval construction around the foundation ditch position that ground determines, forms annular Drill-pouring row of piles;The diameter of cast-in-situ bored pile, depth can be according to hydrogeologic condition, peripheral facility load, pattern foundation pit supporting structure peaces The conditions such as the foundation depth of congruent level and supporting calculate and determine;
Second step, according to the actual underground water elevation measured, high-pressure rotary jet grouting pile of constructing at the gap of adjacent two cast-in-situ bored piles, High-pressure rotary jet grouting pile 2 is made to form the water-stop curtain of closing together with cast-in-situ bored pile 1, the pile body diameter of wherein high-pressure rotary jet grouting pile is less than The pile body diameter of cast-in-situ bored pile;
3rd step, from ground according to not suddenly in 1:1 side slope is excavated, and cutting depth is not more than three meters, reduces slope pair as far as possible The impact of surrounding enviroment, then pours annular Guan Liang, the combination of annular Guan Liang and cast-in-situ bored pile at drill-pouring row of piles top Laying asphalt felt on face is it is ensured that stake top forms freely-supported force structure;Then build height by laying bricks or stones in circular crown back portion and be less than two meters Brick wall;
4th step, after annular Guan Liang reaches intensity requirement, by projected depth excavation pit;
5th step, after excavation of foundation pit finishes and foundation plane reaches construction requirement, carries out the cast of foundation ditch liner:Poured into a mould with reinforced concrete Push pipe is worn position during the wall of casting lining side and reserves out by liner side wall and interior underboarding;
6th step, after the intensity of detection cast-in-situ bored pile, high-pressure rotary jet grouting pile and liner side wall, interior underboarding reaches acceptance condition, Carry out broken pile enabling at push pipe to process:According to design requirement, by the cast-in-situ bored pile at reserved position of pushing tube and high-pressure rotary jet grouting pile Pile body remove, and build reinforced concrete floor by laying bricks or stones in dismounting face, to meet the space requirement of later stage jacking construction, integer support is tied Structure construction completes.
It is an advantage of the current invention that breaching the method for protecting support of conventional cantilever stake, and unlike conventional cantilever stake, top Guan Liang is not to arrange for detailing requiments, but and campshed is together as overall force structure composition support system, this prop System can meet the supporting of around environment in the foundation ditch of the confined space, in combination with the construction characteristic of pipe-jacking project, Provide the foundation guaranteed conditions for the construction of pipe-jacking project normal safe.
Brief description
Fig. 1 is the supporting construction top view that present invention construction finishes.
Fig. 2 is Figure 1A-A to sectional view.
Fig. 3 is the sectional schematic diagram at Fig. 1 poling.
Specific embodiment
Jacking construction of the present invention small size deep foundation pit supporting structure as shown in Figure 1-2, according to walking in detail below Suddenly constructed:
The first step, around the multiple cast-in-situ bored piles 1 of foundation ditch interval construction around the foundation ditch position that ground determines, forms annular Drill-pouring row of piles;During Specific construction, the depth of the diameter of cast-in-situ bored pile and interval and supporting is according to foundation depth, present situation Geological conditions, all side load and Groundwater feature etc. carry out calculating comprehensive determination.Under normal circumstances, cast-in-situ bored pile is straight Footpath is typically just intended to be 0.80m~2m;
Second step, according to the actual underground water elevation measured, high-pressure rotary jet grouting pile of constructing at the gap of adjacent two cast-in-situ bored piles 1 2, the wherein pile body diameter of high-pressure rotary jet grouting pile 2 is less than the pile body diameter of cast-in-situ bored pile 1 it is contemplated that base pit engineering feature and economy Save, the pile body diameter of high-pressure rotary jet grouting pile 2 is generally 40 ~ 80cm, and high-pressure rotary jet grouting pile 2 and cast-in-situ bored pile 1 cooperatively form The water stop curtain structure of closing, meets the internal anhydrous job requirements of construction period foundation ditch;
3rd step, from ground 1:After 1 slope excavates three meters, pouring longitudinal section at drill-pouring row of piles top is rectangle or pros The annular Guan Liang 3 of shape, laying asphalt felt 4 on the faying face of annular Guan Liang 3 and cast-in-situ bored pile 1 is it is ensured that stake top formation freely-supported is subject to Power structure;Then build, at annular Guan Liang 3 top, the brick wall 5 that height is less than two meters by laying bricks or stones, brick wall thickness according to gear soil height can be 24cm or 37cm, facilitates later stage temporary project to remove and surface management work;
4th step, after annular Guan Liang 3 reaches intensity requirement, by projected depth excavation pit 6, the diameter of foundation ditch 6 does not typically surpass Cross eight meters;
5th step, foundation ditch 6 excavates and finishes and after foundation plane reaches construction requirement, carries out the cast of foundation ditch liner:Poured with reinforced concrete The position that wears of push pipe 9 is reserved out during the wall 7 of casting lining side by note liner side wall 7 and interior underboarding 8;Pour thickness according to Construction technology and push pipe integrally push up power and calculate requirement, generally 20 ~ 40cm;
6th step, the intensity of detection cast-in-situ bored pile 1, high-pressure rotary jet grouting pile 2 and liner side wall 7, interior underboarding 8 reaches acceptance condition Afterwards, carry out broken pile enabling at push pipe to process:According to design requirement, by the cast-in-situ bored pile at reserved position of pushing tube and high-pressure rotary-spray The pile body of stake is removed, and builds the second stage of reinforced concrete floor 10 by laying bricks or stones in dismounting face(Borehole structure, according to pipe diameter and combine push pipe Technological requirement, is computed determining, generally 30 ~ 50cm), by the Bar Anchorage at pile body broken pile in reinforced concrete floor, with Meet the space requirement of later stage jacking construction, so far, integer support structure construction completes.
7th step, after integer support structure reaches intensity requirement, carries out jacking and two end pipes of push pipe 9 according to a conventional method The connection in road, the section structure of the push pipe 9 passing from the second stage of reinforced concrete floor 10 is as shown in Figure 3;Can also carry out permanent Combine with temporary project, pour pipeline valve pit and pipe laying valve member at this foundation ditch position, or on demand at pipeline Corner arranges anchor block 11, meets the pressure requirements of pipeline.
8th step, when in push pipe 9 and well valve pit or anchor block 11 construction after the completion of, foundation ditch 6 is backfilled, backfill is organic Matter content must not exceed 5%, and compactness cannot be less than 0.96, and needs compaction in layers to process.
According to structural mechanics method, supporting construction of the present invention is carried out checking correlation computations:1. by the top pile body after removing Deadweight overhangs at Guan Liang as Vertical Load, and at this, Guan Liang is checked according to simply supported beam, and support distance is that both sides are complete At pile body position.2. by whole for top pile body Gravitative Loads in the Dong Dingchu of the second stage of lining concrete, the second stage of lining cutting circular hole according to " O " type framework carries out structure and checks.3. according to two ends freely-supported, bearing is respectively Guan Liang and inner liner location to the top pile body after broken pile Place, pile body is primarily subjected to horizontal earth pressure and is checked.4. utilize the reaction force to liner for the top pile body, check liner plane Framework.
According to member structure system, calculated according to structural mechanics method, computation model is as follows:Stake top Guan Liang is according to list Support structure designs, Guan Liang cross section is rectangle, reinforced concrete structure:1. horizontal direction:Supporting construction top Guan Liang according to Structural mechanics method calculates, and top Guan Liang is born horizontal loading and calculated according to hinged-support transmission counter-force, according to reinforced concrete Native flexure member correlation formula is determined Guan Liang section.2. vertical direction:Pile body pair when considering that push pipe opens the door The impact of Guan Liang vertical load is checked, and carries out internal force meter according to armored concrete flexure member correlation formula Calculate.
Conclusion:Supporting construction of the present invention is carried out after checking calculation according to said method it was demonstrated that:On small size deep basal pit top In plumber's journey, by using Guan Liang, as a structure stress system part, and the common coordinative role of campshed, as a kind of pipe-jacking project Foundation pit supporting construction can fully meet jacking construction safety requirements.

Claims (1)

1. a kind of jacking construction with small size deep foundation pit supporting structure it is characterised in that:Including following construction procedures:
The first step, around the multiple cast-in-situ bored piles of foundation ditch interval construction around the foundation ditch position that ground determines, forms annular Drill-pouring row of piles;
Second step, according to the actual underground water elevation measured, high-pressure rotary jet grouting pile of constructing at the gap of adjacent two cast-in-situ bored piles, High-pressure rotary jet grouting pile 2 and cast-in-situ bored pile 1 is made to form the water-stop curtain of closing, the wherein pile body diameter of high-pressure rotary jet grouting pile is less than boring The pile body diameter of bored concrete pile;
3rd step, from ground according to not suddenly in 1:1 side slope is excavated, and cutting depth is not more than three meters, then in drill-pouring Row of piles top pours annular Guan Liang, and on the faying face of annular Guan Liang and cast-in-situ bored pile, laying asphalt felt is it is ensured that stake top forms letter Prop up force structure;Then build, in circular crown back portion, the brick wall that height is less than two meters by laying bricks or stones;
4th step, after annular Guan Liang reaches intensity requirement, by projected depth excavation pit;
5th step, after excavation of foundation pit finishes and foundation plane reaches construction requirement, carries out the cast of foundation ditch liner:Poured into a mould with reinforced concrete Push pipe is worn position during the wall of casting lining side and reserves out by liner side wall and interior underboarding;
6th step, after the intensity of detection cast-in-situ bored pile, high-pressure rotary jet grouting pile and liner side wall, interior underboarding reaches acceptance condition, Carry out broken pile enabling at push pipe to process:According to design requirement, by the cast-in-situ bored pile at reserved position of pushing tube and high-pressure rotary jet grouting pile Pile body remove, and build reinforced concrete floor by laying bricks or stones in dismounting face, to meet the space requirement of later stage jacking construction, integer support is tied Structure construction completes.
CN201611004018.4A 2016-11-15 2016-11-15 The construction method of jacking construction small size deep foundation pit supporting structure Active CN106436720B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611004018.4A CN106436720B (en) 2016-11-15 2016-11-15 The construction method of jacking construction small size deep foundation pit supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611004018.4A CN106436720B (en) 2016-11-15 2016-11-15 The construction method of jacking construction small size deep foundation pit supporting structure

Publications (2)

Publication Number Publication Date
CN106436720A true CN106436720A (en) 2017-02-22
CN106436720B CN106436720B (en) 2018-04-10

Family

ID=58207805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611004018.4A Active CN106436720B (en) 2016-11-15 2016-11-15 The construction method of jacking construction small size deep foundation pit supporting structure

Country Status (1)

Country Link
CN (1) CN106436720B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142948A (en) * 2017-05-18 2017-09-08 河北省高速公路廊坊北三县管理处 A kind of highway wears high ferro viaduct system and construction method without pre- leave
CN107326911A (en) * 2017-08-28 2017-11-07 西南交通大学 A kind of foundation pit enclosure stake
CN107988894A (en) * 2017-08-31 2018-05-04 中铁二院工程集团有限责任公司 The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN108062453A (en) * 2018-01-12 2018-05-22 河南省水利勘测设计研究有限公司 Water Conservancy Information system flood efficient simulation and high Visual Dynamic methods of exhibiting true to nature
CN109025970A (en) * 2018-08-21 2018-12-18 中国十七冶集团有限公司 A kind of contraction type engineering pile enters rock controller and control method
CN109208608A (en) * 2018-10-17 2019-01-15 上海市城市建设设计研究总院(集团)有限公司 Facet foundation pit is inverse to make rapid construction devices and methods therefor
CN109797778A (en) * 2019-03-27 2019-05-24 中铁四局集团有限公司 A kind of pipe jacking working well suitable for desert anhydrous sand layer area and construction method
CN110629763A (en) * 2019-08-19 2019-12-31 中国一冶集团有限公司 Drag pipe well chamber foundation pit supporting structure and construction method thereof
CN110670586A (en) * 2019-09-29 2020-01-10 上海隆基建设股份有限公司 Construction method for light reconstruction of airport runway surface
CN110700280A (en) * 2019-11-07 2020-01-17 安徽水安建设集团股份有限公司 A kind of diversion device and construction method for foundation pit support construction in narrow area
CN110792085A (en) * 2019-09-30 2020-02-14 成都市市政工程设计研究院 Pipe-jacking working pit supporting method
CN111778985A (en) * 2020-07-14 2020-10-16 北京海瑞兴能源科技有限责任公司 A working pit structure and installation method adjacent to a river channel
CN111778992A (en) * 2020-07-01 2020-10-16 中电建十一局工程有限公司 A construction method for the section of the "U" channel passing through the old city building group area
CN111851597A (en) * 2020-07-31 2020-10-30 安徽省交通建设股份有限公司 Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3507730A1 (en) * 1985-03-05 1986-09-11 Dyckerhoff & Widmann AG, 8000 München Trench sheeting designed for driving through by means of a driving shield during the driving of an earth tube between a starting shaft and a target shaft
JPH03169914A (en) * 1989-11-27 1991-07-23 Aisawa Kogyo Kk Laying of underground structure and open shield machine therefor
CN202430723U (en) * 2011-12-29 2012-09-12 南京金宸建筑设计有限公司 Horizontal jacking pipe and rigid pile composite supporting structure
CN202440823U (en) * 2012-03-02 2012-09-19 天津市赛英工程建设咨询管理有限公司 Supporting structure of pipe jacking pit
CN104846829B (en) * 2014-02-18 2017-05-10 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN105986578A (en) * 2015-02-13 2016-10-05 杭州南联地基基础工程有限公司 Ejecting pipe construction method of roadside tubular underground garage

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142948A (en) * 2017-05-18 2017-09-08 河北省高速公路廊坊北三县管理处 A kind of highway wears high ferro viaduct system and construction method without pre- leave
CN107326911A (en) * 2017-08-28 2017-11-07 西南交通大学 A kind of foundation pit enclosure stake
CN107988894A (en) * 2017-08-31 2018-05-04 中铁二院工程集团有限责任公司 The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN107988894B (en) * 2017-08-31 2023-07-18 中铁二院工程集团有限责任公司 Concrete buttress structure for preventing high-steep slope pier from shifting
CN108062453B (en) * 2018-01-12 2021-06-29 河南省水利勘测设计研究有限公司 Flood high-efficiency simulation and high-fidelity visual dynamic display method for water conservancy information system
CN108062453A (en) * 2018-01-12 2018-05-22 河南省水利勘测设计研究有限公司 Water Conservancy Information system flood efficient simulation and high Visual Dynamic methods of exhibiting true to nature
CN109025970A (en) * 2018-08-21 2018-12-18 中国十七冶集团有限公司 A kind of contraction type engineering pile enters rock controller and control method
CN109208608A (en) * 2018-10-17 2019-01-15 上海市城市建设设计研究总院(集团)有限公司 Facet foundation pit is inverse to make rapid construction devices and methods therefor
CN109797778A (en) * 2019-03-27 2019-05-24 中铁四局集团有限公司 A kind of pipe jacking working well suitable for desert anhydrous sand layer area and construction method
CN110629763A (en) * 2019-08-19 2019-12-31 中国一冶集团有限公司 Drag pipe well chamber foundation pit supporting structure and construction method thereof
CN110670586A (en) * 2019-09-29 2020-01-10 上海隆基建设股份有限公司 Construction method for light reconstruction of airport runway surface
CN110670586B (en) * 2019-09-29 2021-06-04 上海隆基建设股份有限公司 Construction method for light reconstruction of airport runway surface
CN110792085A (en) * 2019-09-30 2020-02-14 成都市市政工程设计研究院 Pipe-jacking working pit supporting method
CN110700280A (en) * 2019-11-07 2020-01-17 安徽水安建设集团股份有限公司 A kind of diversion device and construction method for foundation pit support construction in narrow area
CN111778992A (en) * 2020-07-01 2020-10-16 中电建十一局工程有限公司 A construction method for the section of the "U" channel passing through the old city building group area
CN111778985A (en) * 2020-07-14 2020-10-16 北京海瑞兴能源科技有限责任公司 A working pit structure and installation method adjacent to a river channel
CN111851597A (en) * 2020-07-31 2020-10-30 安徽省交通建设股份有限公司 Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method
CN111851597B (en) * 2020-07-31 2021-09-07 安徽省交通建设股份有限公司 Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method

Also Published As

Publication number Publication date
CN106436720B (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN106436720B (en) The construction method of jacking construction small size deep foundation pit supporting structure
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN202707075U (en) Long-span subway station main structure constructed based on column and arch method
CN111706362A (en) A kind of treatment method of karst cave for tunnel construction
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN103321246B (en) Construction Method of Foundation Pit Using Underground Diaphragm Wall
CN101476466A (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN105672450A (en) Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN116756940A (en) Push pipe engineering design and construction method based on stress performances of different geological environments
Lai et al. A new installation technology of large diameter deeply-buried caissons: Practical application and observed performance
CN112576265A (en) Sedimentation control method for old villages penetrated by shield
CN219158994U (en) A foundation pit support structure for ultra-deep and large-diameter circular pipe-jacking wells in deep soft soil areas
CN204311456U (en) Foundation ditch strengthening structure
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
Zhang et al. Excavation failure cases and analysis
Long et al. Application of super large and deep diameter assembly shafts in soft soil layers
CN108221970A (en) A kind of urban road under-traverse tunnel and city underground crossed construction technology
CN209430204U (en) Anti- dash forward of one kind gushes back cover structure
CN109306712A (en) Upper pipe working well is inverse to build construction
CN206173974U (en) Push pipe construction is with dark underground structure of small -size
CN106968271B (en) Underground pipe gallery excavates and the construction method of support
Lei et al. Construction technology of deep foundation pit around existing subway project
Il’ichev et al. Bases and Foundations of Moscow Citadels: Reconstruction and New Construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Taishan

Inventor after: Cao Jie

Inventor after: Wei Ke

Inventor after: Huang Xingcheng

Inventor after: Wang Chunlei

Inventor after: Yang Baojun

Inventor after: Weng Wan

Inventor after: Li Yang

Inventor after: Fan Mengyu

Inventor after: Jia Shaoyan

Inventor after: Yao Gaoling

Inventor after: Li Yue

Inventor after: Yang Huajun

Inventor after: Wang Zhijun

Inventor after: Chen Manquan

Inventor after: Li Hongtao

Inventor after: Jiang Hui

Inventor before: Zhu Taishan

Inventor before: Cao Jie

Inventor before: Wei Ke

Inventor before: Huang Xingcheng

Inventor before: Wang Chunlei

Inventor before: Yang Baojun

Inventor before: Weng Wan

Inventor before: Li Yang

Inventor before: Fan Mengyu

Inventor before: Jia Shaoyan

Inventor before: Yao Gaoling

Inventor before: Li Yue

Inventor before: Yang Huajun

Inventor before: Wang Zhijun

Inventor before: Chen Manquan

Inventor before: Li Hongtao

Inventor before: Jiang Hui