GB346573A - Improvements in or relating to the construction of piles or columns - Google Patents

Improvements in or relating to the construction of piles or columns

Info

Publication number
GB346573A
GB346573A GB1160730A GB1160730A GB346573A GB 346573 A GB346573 A GB 346573A GB 1160730 A GB1160730 A GB 1160730A GB 1160730 A GB1160730 A GB 1160730A GB 346573 A GB346573 A GB 346573A
Authority
GB
United Kingdom
Prior art keywords
pile
tube
shoe
concrete
withdrawn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
GB1160730A
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
British Steel Piling Co Ltd
Original Assignee
British Steel Piling Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by British Steel Piling Co Ltd filed Critical British Steel Piling Co Ltd
Priority to GB1160730A priority Critical patent/GB346573A/en
Publication of GB346573A publication Critical patent/GB346573A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

346,573. Piles or columns. BRITISH STEEL PILING CO., Ltd. and HILEY, A., 54A, Parliament Street, London. April 11, 1930, No. 11607. [Class 68 (ii).] In making a composite pile or column, a tube is driven into the ground with a pointed shoe in front of it, and a lower pile portion is driven down so as to carry down further the shoe ; the tube is then filled with concrete and withdrawn by vertical vibratory movements. As shown, a tube A with a pointed shoe A3 is driven by a hammer, and a pile B, designed to form the bottom of the pile, is dropped into the tube A until a bolt B<1> traversing its upper end rests on the top end of the tube A, the lower end of the pile B being then some distance above the shoe A<3>. The pile is then slung by cords c<1> and hooks c<3>, the bolt B<1> is withdrawn, and the pile is gradually lowered until its end rests on the shoe A<3>. the annulus surrounding it being then filled with mortar previously placed in the tube A. The cords c<1> and hooks c<3> at the top end of the pile B are then disengaged and removed, and the pile B is rammed by means of a hammer and dolly. The shoe A<3> is pushed down, the pile B being guided by the rim A<4>, Fig. 8, and suitable distance-pieces elsewhere in the tube A. The dolly is then withdrawn from the tube A, into which is then placed a reinforcing-cage, and then concrete. The tube A is then extracted as described in Specification 197,430, [Class 68 (ii), Subaqueous buildings &c.], thus tamping the concrete. The parts A3, A<4> may be integral, or the part A may be integral with the tube A<1>, or the part A<3> may be in sections. The pile B may be of timber or reinforced concrete, or a steel tube filled with solidified concrete or steel sections.
GB1160730A 1930-04-11 1930-04-11 Improvements in or relating to the construction of piles or columns Expired GB346573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB1160730A GB346573A (en) 1930-04-11 1930-04-11 Improvements in or relating to the construction of piles or columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1160730A GB346573A (en) 1930-04-11 1930-04-11 Improvements in or relating to the construction of piles or columns

Publications (1)

Publication Number Publication Date
GB346573A true GB346573A (en) 1931-04-16

Family

ID=9989342

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1160730A Expired GB346573A (en) 1930-04-11 1930-04-11 Improvements in or relating to the construction of piles or columns

Country Status (1)

Country Link
GB (1) GB346573A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2557174A1 (en) * 1983-12-27 1985-06-28 Vyzk Ustav Inzhenerskikh DEEP COMPACTION FOUNDATION, METHOD AND DEVICE FOR CARRYING OUT SAID METHOD

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2557174A1 (en) * 1983-12-27 1985-06-28 Vyzk Ustav Inzhenerskikh DEEP COMPACTION FOUNDATION, METHOD AND DEVICE FOR CARRYING OUT SAID METHOD

Similar Documents

Publication Publication Date Title
CN105863650B (en) It is a kind of elder generation wall after hole tunnel construction method
CN110685286A (en) Deep foundation pit supporting construction process for adjacent road under complex geological condition
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN109667273A (en) A kind of construction method of deep foundation pit supporting structure
GB402799A (en) Improvements relating to piling foundations
CN107975062A (en) A kind of light-duty combination retaining structure of Steep Slope Embankment and construction method
GB346573A (en) Improvements in or relating to the construction of piles or columns
GB325093A (en) Improvements relating to the provision of substructures, particularly for subaqueous work
GB385647A (en) Improvements in or relating to the construction of concrete piles
CN107165170B (en) A kind of foundation ditch construction method
CN108914942A (en) A kind of system of deep foundation pit support and its construction method
CN211080248U (en) Deep foundation pit supporting structure of adjacent road under complex geological condition
CN212656235U (en) Double-row steel pipe pile supporting structure for foundation pit supporting
CN108677985A (en) A kind of prefabricated binder, mating pile foundation and combinations thereof structure and construction method
US1969229A (en) Apparatus for forming concrete structures
US3654767A (en) Method of forming a composite pile
CN208668431U (en) A kind of system of deep foundation pit support
US2332168A (en) Concrete pile and method of sinking it
US2203978A (en) Means and method of shoring bell bottom pile holes
GB289495A (en) Improvements relating to the construction of concrete piles
GB1326136A (en) Casting concrete piles
GB366514A (en) Improvements in and relating to foundation piles
US2608830A (en) Foundation structure
CN217630002U (en) Novel foam concrete landscape restoration structure
GB515120A (en) Improved method of and means for forming concrete piles