CN110055948A - A kind of big Treatment Methods of Karst Foundation of depth and device - Google Patents

A kind of big Treatment Methods of Karst Foundation of depth and device Download PDF

Info

Publication number
CN110055948A
CN110055948A CN201910353872.9A CN201910353872A CN110055948A CN 110055948 A CN110055948 A CN 110055948A CN 201910353872 A CN201910353872 A CN 201910353872A CN 110055948 A CN110055948 A CN 110055948A
Authority
CN
China
Prior art keywords
punching
solution cavity
gravelly soil
karst
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910353872.9A
Other languages
Chinese (zh)
Inventor
张新亚
王宁
胡文韬
耿大新
黄龙华
乐意
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
Original Assignee
East China Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University filed Critical East China Jiaotong University
Priority to CN201910353872.9A priority Critical patent/CN110055948A/en
Publication of CN110055948A publication Critical patent/CN110055948A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Foundations (AREA)

Abstract

A kind of big Treatment Methods of Karst Foundation of depth, the method carry out strong rammer pretreatment (5) to solution cavity (1) bottom plate;Solution cavity is filled to Karst roof position with gravelly soil (6);Impact extrusion gravelly soil is hammered into shape using punching, until punching is formed on solution cavity bottom;It is refilled at gravelly soil to Karst roof position, is hammered into shape using punching and squeeze gravelly soil, until punching is formed on solution cavity bottom;Repeat again the filling and impact extrusion of next stage gravelly soil (8);Borehole cleaning processing is carried out to the stake holes of completion;The construction of pile foundation (10), form compound foundation can be carried out on this basis.The present invention is directed to large and medium-sized solution cavity problem, fills the good gravelly soil of compactness, basis is made to have better stability, and construction technology is simple, economical and practical using gravelly soil, environmentally protective, therefore has good prospect of the application.And the gravelly soil materials filled are convenient, and cost is relatively low.

Description

A kind of big Treatment Methods of Karst Foundation of depth and device
Technical field
The present invention relates to a kind of big Treatment Methods of Karst Foundation of depth and device, dependent territory to build technical field of construction.
Background technique
Karst exists generally, the building in Southwestern China mountain area is applied as a kind of unfavorable geology disaster in In Limestone Area It is even more to frequently encounter during work.The method of conventional process solution cavity generallys use cement grouting, concrete or other waste residues to fill Solution cavity is filled out, or pile foundation is used to pass through the method for solution cavity with consolidated subsoil.But when solution cavity to be treated is compared with deep, range is larger When, if continuing the method using material filling, it will appear that consumptive material is serious, uneconomic phenomenon, therefore this method is no longer applicable in. When conventionally employed pile foundation passes through, spillage, necking down and collapse hole are easily caused in stake holes forming process, and when concrete perfusion, be easy Cause the superfilled amount of concrete, fullness coefficient high, and pile foundation bottom lacks firm pier.
Summary of the invention
The object of the present invention is to deficiency in view of the above technology, the present invention proposes a kind of big Treatment Methods of Karst Foundation of depth And device.
The technical solution that the present invention realizes is as follows, and a kind of big Treatment Methods of Karst Foundation of depth, the method is to solution cavity bottom plate Carry out strong rammer pretreatment;Solution cavity is filled to Karst roof position with gravelly soil;Impact extrusion gravelly soil is hammered into shape using punching, until solution cavity bottom Form punching;It is refilled at gravelly soil to Karst roof position, is hammered into shape using punching and squeeze gravelly soil, until punching is formed on solution cavity bottom Hole;Repeat again the filling and impact extrusion of next stage gravelly soil;Borehole cleaning processing is carried out to the stake holes of completion;It on this basis can be into The construction of row pile foundation, form compound foundation.
Specific step is as follows for a kind of big Treatment Methods of Karst Foundation of depth:
(1) advance drilling geological mapping: determining solution cavity development range and spatial shape, and deep drilling verifies the form and solution cavity of solution cavity Interior water-filling fills mud situation;
(2) punch work platform is set up in basement process point be punched out construction;
(3) pretreatment of solution cavity bottom plate is carried out;
(4) at gravelly soil filling solution cavity to Karst roof position, impact extrusion gravelly soil then is hammered into shape using punching, gravelly soil can rush Under drift effect, to two sides solution cavity cavity rolling extrusion, until punching is formed on punching hammer punching to solution cavity bottom;
(5) backfill and compacting for carrying out next stage gravelly soil are refilled with rubble that is, into the punching of the step (4) formation At soil to Karst roof position, further uses punching and hammer punching into shape to solution cavity bottom;
(6) techniqueflow for repeating step (5), carries out again the filling and impact extrusion of next stage gravelly soil;When punching rubble is hammered in punching into shape Number of shocks needed for soil to bottom plate, when number of shocks needed for differential settlement identical as general soil layer arrival is impacted is consistent, then at this After the completion of level punching, the backfill of gravelly soil is no longer carried out;
(7) borehole cleaning processing is carried out to the stake holes that step (6) are completed, then can carries out the construction of pile foundation on this basis, formed multiple Close ground.
The frequency of the punching is 2 times/min-5 times/min, stroke 1-3m.
The solution cavity bottom plate pretreatment, 3 ~ 10 tons of punching hammer, which is promoted to certain altitude, using hoist engine makes under its freedom It falls, tamps solution cavity bottom plate using powerful tamping energy.
The pile foundation includes reinforced concrete pile, broken stone pile or CFG.
The punched hole construction includes smooth location, clears up construction site;It is in place to place perforating press for measure of pile position setting-out;It buries If casing is punched out operation, boulder layer is encountered, explosion is carried out using stake stone hole;Complete punching in punching to solution cavity position.
The method can be used for clump of piles processing.
A kind of big karst ground treatment device of depth of the present invention, including hoist engine, punching hammer, casing and punch work platform; The punch work platform is arranged on the ground outside karst hole;Hoist engine is mounted on punch work platform;Punching hammer peace On perforating press, drawn by the guide rod of hoist engine;Casing be it is columnar structured, casing vertical level is mounted under hoist engine Side;Punching hammer does up-and-down motion in casing, and compacting solution cavity bottom plate, punching are completed under the traction of hoist engine and is stood Stake.
The invention has the advantages that the present invention is directed to large and medium-sized solution cavity problem, the good gravelly soil of compactness is filled, is made There is better stability on basis, and construction technology is simple, economical and practical using gravelly soil, environmentally protective, thus have make well Use prospect.And the gravelly soil materials filled are convenient, and cost is relatively low.
Detailed description of the invention
Fig. 1 is general deep big karst schematic diagram;Fig. 2 is that Upper Plate of Karst Cave schematic diagram is worn in punching hammering;
Fig. 3 is rubble earthen backfill schematic diagram;Fig. 4 is punching hammering blow gravelly soil pore-forming schematic diagram;
Fig. 5 is next stage rubble earthen backfill schematic diagram;Fig. 6 is that next stage gravelly soil hammers punching schematic diagram;
Fig. 7 is armored concrete pile composite foundation schematic diagram;Fig. 8 is replacement stone pile composite foundation schematic diagram;
Fig. 9 is CFG pile composite foundation schematic diagram;Figure 10 is that a clump of piles handles big karst schematic diagram;
In figure, 1 is deep big karst;2 be punch work platform;3 be punching hammer;4 be general soil layer;5 be that solution cavity jacking of floor is pre- Processing;6 be gravelly soil;7 be impact holing;8 be next stage rubble earthen backfill;9 be next stage impact holing;10 be reinforced concrete Native stake;11 be broken stone pile;12 be CFG;13 be a clump of piles.
Specific embodiment
A specific embodiment of the invention is as shown in the picture.
A kind of big Treatment Methods of Karst Foundation of depth of the present embodiment, specifically includes the following steps:
Step 1, advance drilling geological mapping: determine that solution cavity 1 develops range and spatial shape, deep drilling verifies the form of solution cavity 1 And water-filling in solution cavity 1, fill mud situation.
Step 2, it sets up punch work platform 2 and is punched out construction: mainly including 1) smooth location, clearing up construction site; 2) it is in place to place perforating press for measure of pile position setting-out;3) casing is buried, operation is punched out, encounters boulder layer, using stake Shi Kongjin Row explosion;4) punching is completed in punching to 1 position of solution cavity, wherein the punching frequency is 2 times/min-5 times/min, stroke 1-3m.
Step 3, the pretreatment of 1 bottom plate of solution cavity is carried out:
3 pairs of 1 bottom plates of solution cavity are hammered into shape using punching and carry out strong rammer pretreatment, and 3 ~ 10 tons of punching hammer 3 is promoted to one using hoist engine It is fixed highly to make its free-falling, solution cavity bottom plate is tamped using powerful tamping energy, as shown in Figure 2.
Step 4, it is filled at solution cavity 1 to Karst roof position with gravelly soil 6, as shown in figure 3, then hammering impact extrusion into shape using punching Gravelly soil 6, gravelly soil can be in the case where 3 effects be hammered in punching into shape, to two sides solution cavity cavity rolling extrusion, until punching hammer is rushed to solution cavity bottom Punching is formed, as shown in Figure 4.
Step 5, the backfill and compacting of next stage gravelly soil is carried out to be refilled with that is, into the punching of the step 4 formation At gravelly soil 5 to Karst roof position, as shown in Figure 5.It further uses punching and hammers punching into shape to solution cavity bottom, as shown in Figure 6.
Step 6, the techniqueflow of step 5 is repeated, the filling and impact extrusion of next stage gravelly soil are carried out again.When 3 punching of punching hammer Number of shocks needed for hole gravelly soil to bottom plate, when consistent with number of shocks needed for general soil layer 4 reaches identical differential settlement is impacted, Then after the completion of the level punching, the backfill of gravelly soil is no longer carried out.
Step 7, borehole cleaning processing is carried out to the stake holes that step 6 is completed, then can carries out reinforced concrete pile on this basis The construction of (as shown in Figure 7), broken stone pile (as shown in Figure 8) or CFG (as shown in Figure 9), form compound foundation.
The operating condition excessive for solution cavity horizontal area range, as shown in Figure 10, single pile is not enough to play the work of consolidated subsoil The inventive method can be used in used time, carries out multi-column pier foundation construction.
The method for so using classification backfill gravelly soil and shock ramming is constructed, can be existing molten using pile foundation processing On the basis of hole, solid pier is formed in pile foundation lower part, makes list (group) stake that there is better stability.

Claims (8)

1. a kind of big Treatment Methods of Karst Foundation of depth, which is characterized in that the method carries out strong rammer pretreatment to solution cavity bottom plate;With Gravelly soil fills solution cavity to Karst roof position;Impact extrusion gravelly soil is hammered into shape using punching, until punching is formed on solution cavity bottom;It is refilled with It at gravelly soil to Karst roof position, is hammered into shape using punching and squeezes gravelly soil, until punching is formed on solution cavity bottom;Repeat next stage again The filling and impact extrusion of gravelly soil;Borehole cleaning processing is carried out to the stake holes of completion;The construction of pile foundation can be carried out on this basis, formed multiple Close ground.
2. the big Treatment Methods of Karst Foundation of a kind of depth according to claim 1, which is characterized in that the specific step of the method It is rapid as follows:
(1) advance drilling geological mapping: determining solution cavity development range and spatial shape, and deep drilling verifies the form and solution cavity of solution cavity Interior water-filling fills mud situation;
(2) punch work platform is set up in basement process point be punched out construction;
(3) pretreatment of solution cavity bottom plate is carried out;
(4) at gravelly soil filling solution cavity to Karst roof position, impact extrusion gravelly soil then is hammered into shape using punching, gravelly soil can rush Under drift effect, to two sides solution cavity cavity rolling extrusion, until punching is formed on punching hammer punching to solution cavity bottom;
(5) backfill and compacting for carrying out next stage gravelly soil are refilled with rubble that is, into the punching of the step (4) formation At soil to Karst roof position, further uses punching and hammer punching into shape to solution cavity bottom;
(6) techniqueflow for repeating step (5), carries out again the filling and impact extrusion of next stage gravelly soil;When punching rubble is hammered in punching into shape Number of shocks needed for soil to bottom plate, when number of shocks needed for differential settlement identical as general soil layer arrival is impacted is consistent, then at this After the completion of level punching, the backfill of gravelly soil is no longer carried out;
(7) borehole cleaning processing is carried out to the stake holes that step (6) are completed, then can carries out the construction of pile foundation on this basis, formed multiple Close ground.
3. the big Treatment Methods of Karst Foundation of a kind of depth according to claim 2, which is characterized in that the frequency of the punching is 2 times/min-5 times/min, stroke 1-3m.
4. the big Treatment Methods of Karst Foundation of a kind of depth according to claim 2, which is characterized in that the solution cavity bottom plate is located in advance Reason, 3 ~ 10 tons of punching hammer, which is promoted to certain altitude, using hoist engine makes its free-falling, is tamped using powerful tamping energy Solution cavity bottom plate.
5. the big Treatment Methods of Karst Foundation of a kind of depth according to claim 2, which is characterized in that the pile foundation includes reinforcing bar Concrete-pile, broken stone pile or CFG.
6. the big Treatment Methods of Karst Foundation of a kind of depth according to claim 2, which is characterized in that the punched hole construction includes Smooth location clears up construction site;It is in place to place perforating press for measure of pile position setting-out;Embedded casing, is punched out operation, encounters Boulder layer carries out explosion using stake stone hole;Complete punching in punching to solution cavity position.
7. the big Treatment Methods of Karst Foundation of a kind of depth according to claim 1, which is characterized in that the method can be used for group Stake processing.
8. a kind of big karst ground treatment device of depth, which is characterized in that described device includes hoist engine, punching hammer, casing and punching Hole workbench;The punch work platform is arranged on the ground outside karst hole;Hoist engine is mounted on punch work platform On;Punching hammer is mounted on perforating press, is drawn by the guide rod of hoist engine;Casing is columnar structured, casing vertical level peace Below hoist engine;Punching hammer does up-and-down motion in casing, and compacting solution cavity is completed under the traction of hoist engine Bottom plate, punching and staking out.
CN201910353872.9A 2019-04-29 2019-04-29 A kind of big Treatment Methods of Karst Foundation of depth and device Pending CN110055948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910353872.9A CN110055948A (en) 2019-04-29 2019-04-29 A kind of big Treatment Methods of Karst Foundation of depth and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910353872.9A CN110055948A (en) 2019-04-29 2019-04-29 A kind of big Treatment Methods of Karst Foundation of depth and device

Publications (1)

Publication Number Publication Date
CN110055948A true CN110055948A (en) 2019-07-26

Family

ID=67321462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910353872.9A Pending CN110055948A (en) 2019-04-29 2019-04-29 A kind of big Treatment Methods of Karst Foundation of depth and device

Country Status (1)

Country Link
CN (1) CN110055948A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112001014A (en) * 2020-08-24 2020-11-27 湖南大学 Method for treating karst cave area foundation by dynamic compaction
CN113931161A (en) * 2021-10-29 2022-01-14 贵州建工集团第一建筑工程有限责任公司 Dynamic compaction treatment method for karst landform foundation
CN114108675A (en) * 2021-12-06 2022-03-01 中冶集团武汉勘察研究院有限公司 Pile forming method for pile foundation in karst area
CN115492088A (en) * 2022-09-28 2022-12-20 中铁二院昆明勘察设计研究院有限责任公司 Pile forming method for CFG (cement fly-ash gravel) pile bottom expanding grouting in karst region

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625293A (en) * 2016-01-26 2016-06-01 广西建工集团第五建筑工程有限责任公司 Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof
JP2018009336A (en) * 2016-07-12 2018-01-18 株式会社 Showa Underground space construction method
CN107794915A (en) * 2017-09-30 2018-03-13 上海市建工设计研究总院有限公司 It is adapted to the karst cave treatment method of pile foundation construction in karst area
CN107938676A (en) * 2017-11-21 2018-04-20 重庆建工市政交通工程有限责任公司 A kind of pile base construction method for passing through full packing type solution cavity
CN108049395A (en) * 2017-12-12 2018-05-18 广州市城市规划勘测设计研究院 A kind of anti-collapse impact holing construction method in complex karst place
CN108589718A (en) * 2018-03-30 2018-09-28 中交路桥北方工程有限公司 Piles in Karst Region base construction method
CN108978642A (en) * 2018-06-28 2018-12-11 广州市恒盛建设工程有限公司 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625293A (en) * 2016-01-26 2016-06-01 广西建工集团第五建筑工程有限责任公司 Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof
JP2018009336A (en) * 2016-07-12 2018-01-18 株式会社 Showa Underground space construction method
CN107794915A (en) * 2017-09-30 2018-03-13 上海市建工设计研究总院有限公司 It is adapted to the karst cave treatment method of pile foundation construction in karst area
CN107938676A (en) * 2017-11-21 2018-04-20 重庆建工市政交通工程有限责任公司 A kind of pile base construction method for passing through full packing type solution cavity
CN108049395A (en) * 2017-12-12 2018-05-18 广州市城市规划勘测设计研究院 A kind of anti-collapse impact holing construction method in complex karst place
CN108589718A (en) * 2018-03-30 2018-09-28 中交路桥北方工程有限公司 Piles in Karst Region base construction method
CN108978642A (en) * 2018-06-28 2018-12-11 广州市恒盛建设工程有限公司 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112001014A (en) * 2020-08-24 2020-11-27 湖南大学 Method for treating karst cave area foundation by dynamic compaction
CN113931161A (en) * 2021-10-29 2022-01-14 贵州建工集团第一建筑工程有限责任公司 Dynamic compaction treatment method for karst landform foundation
CN114108675A (en) * 2021-12-06 2022-03-01 中冶集团武汉勘察研究院有限公司 Pile forming method for pile foundation in karst area
CN114108675B (en) * 2021-12-06 2022-12-16 中冶集团武汉勘察研究院有限公司 Pile forming method for pile foundation in karst area
CN115492088A (en) * 2022-09-28 2022-12-20 中铁二院昆明勘察设计研究院有限责任公司 Pile forming method for CFG (cement fly-ash gravel) pile bottom expanding grouting in karst region
CN115492088B (en) * 2022-09-28 2023-09-12 中铁二院昆明勘察设计研究院有限责任公司 Pile forming method for pile bottom enlarged grouting CFG pile in karst region

Similar Documents

Publication Publication Date Title
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN102888834B (en) A kind of construction method of major diameter broken stone pile
CN102733378B (en) Construction method of concrete pile
CN106567379B (en) Method for reinforcing manual dewatering, bedding course, low-energy replacement dynamic compaction shallow foundation
CN108914912A (en) A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN110318393A (en) A kind of construction method of composite pile
CN106703004A (en) Treatment method for collapsible loess foundation
CN101200893A (en) Construction method of pile with bearing base
US10487468B2 (en) Mandrel and a method for soil compaction
CN105714773A (en) Foundation treatment method
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN104746505A (en) Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting
CN104294818A (en) Construction method for concrete pile
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN104264655A (en) Preformed hole deep-layer underwater tamping method
CN110761265A (en) Karst cave disposal method for deep foundation pit pile foundation construction in karst area
CN104213485A (en) Construction method used for combined dynamic compaction treatment of lake region soil-rock mixed filling roadbed
CN104947648A (en) Deep replacement dynamic compaction gravel pile foundation reinforcement method
CN104153355B (en) The constructing device of concrete-pile and construction method thereof
CN104818658B (en) Road widening method for collapsible yellow earth foundation layer
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN110258504A (en) It is a kind of to carry out the sinking tube compacted pile constructing process that bottom is rammed using built-in hammer ram

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726

RJ01 Rejection of invention patent application after publication