CN108049395A - A kind of anti-collapse impact holing construction method in complex karst place - Google Patents

A kind of anti-collapse impact holing construction method in complex karst place Download PDF

Info

Publication number
CN108049395A
CN108049395A CN201711315383.1A CN201711315383A CN108049395A CN 108049395 A CN108049395 A CN 108049395A CN 201711315383 A CN201711315383 A CN 201711315383A CN 108049395 A CN108049395 A CN 108049395A
Authority
CN
China
Prior art keywords
impact holing
karst
construction method
punching
block stamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711315383.1A
Other languages
Chinese (zh)
Inventor
彭卫平
张庆华
温忠义
闫培龙
张耀华
余玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Urban Planning Survey and Design Institute
Original Assignee
Guangzhou Urban Planning Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Urban Planning Survey and Design Institute filed Critical Guangzhou Urban Planning Survey and Design Institute
Priority to CN201711315383.1A priority Critical patent/CN108049395A/en
Publication of CN108049395A publication Critical patent/CN108049395A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of anti-collapse impact holing construction methods in complex karst place, comprise the following steps:A., punching drilling machine is installed, is equipped with mud pit and mud circulating system;B. steel pile casting is squeezed into, and steel pile casting is reinforced;C. the block stamp of punching drilling machine by small stroke it is low it is urgent hit in a manner of carry out impact holing, and pass through the steel pile casting, mudstone hole wall and the mud circulating system and carry out retaining wall;D. punching is cleared up, and transfers steel reinforcement cage and casting concrete.The anti-collapse impact holing construction method of the present invention causes easy for construction, safety, can realize that the Karst Sites in complicated geology are constructed, while also ensures to rush stake machinery and the safety of operating personnel and the pile quality of pile foundation.

Description

A kind of anti-collapse impact holing construction method in complex karst place
Technical field
The present invention relates to a kind of punching pile construction methods, are applied more particularly to a kind of anti-collapse impact holing in complex karst place Work method.
Background technology
The design method of pile foundation and construction technology are more ripe at present, but in the complex geologic conditions of cover type karst area, Pile foundation construction is susceptible to the qualitative problems of construction such as " sliding pile ", " outstanding stake ", " half outstanding stake ", causes pile foundation unstability.Therefore in karst Before the punching pile driving construction in place, generally first it is in the milk to soil cave and solution cavity and top loose weak soil layer is carried out at reinforcing Reason, according to the connectedness between the development characteristics of Karst Features, solution cavity scale, charges state, filling situation and solution cavity, by molten The order starched, got on, get off after first big after small, first outside and then inside, the first concrete in hole, is respectively adopted high pressure pouring element concrete or cement mortar, low Pressure injection enters neat slurry, mixed clay mortar or cement mortar and waterglass dual slurry, middle pressure injection enter neat slurry or cement mortar and Waterglass dual slurry is filled the large holes such as solution cavity and solution crack, blocks, and solution cavity filler is reinforced.This rock Molten grouting strengthening method is more ripe, but for the molten soil cave of no charges, half filling or beading unicom, grouting amount and slip casting Experience is closely related, molten soil cave need to be filled with, and grouting amount is big, and cost is excessively high for pile foundation engineering, is not achieved optimal Economic benefit;For reinforcing the processing method of top loose weak soil layer, generally use mixing pile is reinforced;It is deep for existing The stratum such as thick mud layer and layer of sand need to use large scale equipment and consolidation effect unobvious;Slurry coat method once leaks during pile foundation pore-forming It turns pale and easily occurs that collapse hole is dangerous, and project cost increases, the construction time lengthens, using being restricted.
To sum up, in the pile foundation engineering of Karst Sites, molten soil cave is filled using grouting or soft layer progress large area is added Gu processing, quantities is huge, long in time limit, deficiency in economic performance, limits it and is widely applied, therefore active demand one kind is in complexity The construction method of the anti-collapse impact holing of Karst Sites.
The content of the invention
To solve the above problems, the anti-collapse impact holing construction method in a kind of complex karst place provided by the invention, it can It realizes that the Karst Sites in complicated geology carry out large-area construction, while also can guarantee the pile quality of pile foundation, and short time limit.
Based on this, a kind of anti-collapse impact holing construction method in complex karst place provided by the invention comprises the following steps:
A., punching drilling machine is installed, is equipped with mud pit and mud circulating system;
B. steel pile casting is squeezed into, and the steel pile casting is reinforced;
C. the block stamp of the punching drilling machine by small stroke it is low it is urgent hit in a manner of carry out impact holing, and pass through described Steel pile casting, mudstone hole wall and the mud circulating system carry out retaining wall;
When impact holing to solution cavity, by punching into solution cavity the packed mixture of throwing, and by the block stamp with small punching The low urgent mode hit of journey squeezes packed mixture and forms retaining wall, blocks the solution cavity of connection, is then impacted again by the block stamp Pore-forming passes through solution cavity;
When there is inclined hole or the block stamp card is hammered into shape, carry out repairing hole processing;
D. punching is cleared up, and transfers steel reinforcement cage and casting concrete.
Further, in stepb, protected by being embedded steel pipe at the top periphery of the steel pile casting with reinforcing the steel Cylinder.
Further, in step b, the steel pile casting throws projected depth by the way of vibration hammer vibration-sunk.
Further, the steel pile casting wall thickness is 15~20mm, length is 6~8m, and described in the steel pile casting internal diameter ratio Percussion Piles diameter is big.
Further, in step c, when near the block stamp punching to Upper Plate of Karst Cave, mud balance is increased, and is passed through The block stamp by small stroke it is low it is urgent hit in a manner of, gradually Upper Plate of Karst Cave is punctured.
Further, the packed mixture is the mixture for including slabstone, clay and cement.
Further, the ratio of the slabstone, the clay and the cement is 6:3:1.
Further, in step c, when impact holing mud loss occurs to solution cavity, the block stamp, throwing institute are promoted It states packed mixture and accumulation height will at least be higher by the 1.5~2m of Upper Plate of Karst Cave, then tighten the steel wire of the punching drilling machine Rope, and the block stamp using small stroke it is low it is urgent hit by way of form the mudstone hole wall guard aperture.
Further, in step c, when there is the inclined hole or the block stamp card is hammered into shape, slabstone and accumulation described in throwing Height to be at least higher by the inclined hole or card hammer position 0.5m, and the block stamp using it is low it is urgent hit by way of carry out repairing hole Processing.
Further, the slabstone specification is 100mm × (300~500mm) × (300~500mm).
Implement the embodiment of the present invention, have the advantages that:
1st, the anti-collapse impact holing construction method in complex karst place of the invention, by using steel pile casting retaining wall, and uses The low urgent mode impact holing hit of small stroke and utilize mud off pore-forming, can realize Karst Sites in complicated geology into Row construction, while also ensure and rush stake machinery and the safety of operating personnel and the pile quality of pile foundation, in addition when Percussion Piles pour After the completion of building, steel pile casting, which can be extracted, realizes recycling.
2nd, lapies, fluid bowl and steep scar are carried out using throwing slabstone and small stroke low urgent striking repairing hole processing, it can It avoids card hammer occurring or into the inclined risk of Percussion Piles, reduces the fullness coefficient for rushing stake, accelerate construction progress, also ensure simultaneously The quality and construction safety of Percussion Piles.
3rd, when spillage phenomenon occurs in impact holing to solution cavity, using by 6:3:1 ratio throwing slabstone+clay+cement Packed mixture blocks solution cavity, you can prevents mud loss, and can block the communication passage between solution cavity, avoids pouring mixed There is concrete during solidifying soil to flow in the solution cavity of perforation, save project cost.
Description of the drawings
Fig. 1 is the anti-collapse impact holing construction method schematic diagram in complex karst place described in the embodiment of the present invention.
Fig. 2 is that punching pile driving construction when running into clint, olecranon rock or scar out-of-flatness position described in the embodiment of the present invention shows It is intended to.
Fig. 3 is the schematic diagram when impact holing to Upper Plate of Karst Cave described in the embodiment of the present invention.
Fig. 4 is not install steel pile casting and installation steel shield described in the embodiment of the present invention in mud loss or collapse hole The punching pile driving construction control schematic diagram of cylinder.
Fig. 5 is punching pile driving construction schematic diagram when running into mud loss or collapse hole situation described in the embodiment of the present invention.
Reference sign:
Wherein, 1, punching drilling machine, 2, steel wire rope, 3, block stamp, 4, mud pit, 41, mud circulating system, 5, steel pipe, 6, steel Casing, 7, mud, 8, perfusion pile body, 9, punching scope line, 10, clint, olecranon rock or scar out-of-flatness position, 11, slabstone, 12nd, mud loss, 13, collapse hole, 14, the anti-collapse hole of steel pile casting retaining wall, 15, packed mixture.
Specific embodiment
Below in conjunction with the drawings and examples in the present invention, technical scheme is clearly and completely retouched It states, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Based on the present invention In embodiment, the every other implementation that those of ordinary skill in the art are obtained without making creative work Example, belongs to protection scope of the present invention.
With reference to shown in Fig. 1, a kind of anti-collapse impact holing construction method in complex karst place described in the embodiment of the present invention, including Following steps:
A., punching drilling machine 1 is installed, is equipped with mud pit 4 and mud circulating system 41;
B. steel pile casting 6 is squeezed into, and steel pile casting 6 is reinforced;
C. the block stamp 3 of punching drilling machine 1 by small stroke it is low it is urgent hit in a manner of carry out impact holing, and pass through steel pile casting 6th, mudstone hole wall and mud circulating system 41 carry out retaining wall;
When impact holing to solution cavity, by punching into solution cavity the packed mixture 15 of throwing, and by block stamp 3 with small stroke The low urgent mode hit squeezes packed mixture 15 and forms retaining wall, blocks the solution cavity of connection, then passes through 3 impact holing of block stamp again Through solution cavity;
When there is the inclined hole or the card hammer of block stamp 3, carry out repairing hole processing;
D. punching is cleared up, and transfers steel reinforcement cage and casting concrete.
Be based on more than construction method, the anti-collapse impact holing construction method of the present embodiment by using 6 retaining wall of steel pile casting, and Using small stroke it is low it is urgent hit by the way of impact holing and utilize 7 retaining wall pore-forming of mud so that it is easy for construction, safety, Neng Goushi The construction of stake is punched out in the environment of the complicated geologies such as present karsts developing area, solution cavity and big, the mollisol thickness of soil cave scale, is protected The safety for rushing stake machinery and operating personnel has been demonstrate,proved, and has ensured the pile quality of pile foundation, while after the completion of the Percussion Piles pour, Steel pile casting 6, which can be extracted, realizes recycling, can also retain steel pile casting 6 to enhance the anti-pressure ability of the Percussion Piles, saves Cost obtains optimum economic benefit.
Specifically, when foundation pile impact holing is constructed, understand stake position advance drilling data in detail first, matched somebody with somebody according to arrangement and method for construction Premium mud 7 processed, reasonable Arrangement mud pit 4, and install mud circulating system 41, preparation filling solution cavity or anti-collapse hole it is emergent Material.Then the length of steel pile casting 6 is determined according to advance drilling data, using the stringent mode of operation of vibration hammer vibration-sunk steel Casing 6 throws projected depth into, and multiple fixing pieces are installed at the top periphery of steel pile casting 6, and the fixing piece is steel Pipe 5,5 a diameter of 45~50mm of steel pipe, thickness are 2~4mm, length is 3~5m, wherein it is preferred that 4 a diameter of 48mm, thickness are 3mm, the steel pipe 5 that length is 4m are reinforced, and are prevented from falling, tilt or shifting under steel pile casting 6 during impact holing, finally be made It obtains on the aperture ground after steel pipe 5 lies against leveling hardening;Or welding spreading is carried out to steel pile casting 6 according to on-site actual situations Processing, is operated by the way of steel pile casting 6 is squeezed into punching, steel pile casting 6 is generally required to enter silty through layer of sand and is glued 1~2m of property soil layer is advisable.And then pile is carried out to solution cavity top using the pile mode of 1 punching of punching drilling machine, 7 retaining wall of mud Operation;In the range of solution cavity impact holing construct when, forbid using big stroke impact, steel wire rope 2 should be tightened, using small stroke into Row it is low it is urgent hit, gradually Upper Plate of Karst Cave is punctured, avoids the impact of big stroke once breakdown Upper Plate of Karst Cave can cause 7 transient flow of mud It loses and construction risk occurs.In addition, when passing through solution cavity, the situation of steel wire rope 2 is also kept a close eye on, to judge whether tiltedly Hole must carry out repairing hole processing in time using throwing slabstone 11 if there is the inclined hole.In solution cavity position during pore-forming, if occurring Spillage or other abnormal conditions promote block stamp 3 to aperture, throwing slabstone 11 or packed mixture 15 to form mudstone hole wall at once Guard aperture to prevent there is 13 phenomenon of collapse hole, then using small stroke punching pore-forming, finally starts borehole cleaning, steel is transferred after the completion of borehole cleaning Muscle cage and casting concrete extract retaining wall steel pile casting 6 or retain steel pile casting 6 in punching scope line 9 after initial set to be achieved.
Wherein, the wall thickness of steel pile casting 6 is 15~20mm, length is 6~8m, and the internal diameter of steel pile casting 6 is than the Percussion Piles Outer diameter it is big, generally about 3mm, you can meet the requirement that collapses of protection loose soil bed, and can facilitate and extract steel pile casting 6 and realize weight It is multiple to utilize;Meanwhile multiple hanging rings are set in 6 outside of steel pile casting or are provided with multiple lifting hole(eyelet)s, later stage extraction steel pile casting 6 is also convenient for, it is real Now reuse.In the present embodiment, the mud 7 in mud pit 4 includes bentonite, carboxymethyl cellulose, caustic soda and water, and described Bentonite, the carboxymethyl cellulose, the ratio of the caustic soda and the water are 1:10%:0.03%~0.05%:0.4%~ 0.5%, wherein carboxymethyl cellulose (CMC) and caustic soda (Na2CO3), it each serves as the viscosity of increase mud 7 and increases bentonite The effect of the negative electrical charge of particle surface absorption, finally qualified bentonite is put into slurry mixer and be sufficiently stirred 6~ 8min, be incorporated to pond storage 24 it is small when more than be allowed to abundant aquation, you can be delivered for use.
Wherein, if the contaminated rear property deterioration of mud 7, reusable after processing.Mud purification recycling, which can be used, shakes The methods of dynamic sieve, cyclone, chute and sedimentation basin (coagulative precipitation) or forced dehydration.Mud conditioning uses mechanical treatment and gravity Precipitation process is combined progress, and the mud cemented out from impact opening flows into sedimentation basin progress gravity after mechanical treatment and sinks It forms sediment, after gravity precipitation 16 is stablized when small, takes the thin part pulp-water in surface away to filtering ponds with water pump, and pass through four layers of strainer mistake Filter, waste water is exhausted, remaining slurry regeneration recycling.It is difficult to handle or gives up if handling uneconomical person as seriously polluted.
With reference to shown in Fig. 2, in order to avoid there is the danger of the inclined hole or card hammer, steel wire rope 2 should be tightened, block stamp 3 is adopted With small stroke carry out it is low it is urgent hit, forbid using big stroke impact.And if block stamp 3 runs into clint, olecranon rock or scar injustice During whole position 10, the inclined hole or card hammer phenomenon are susceptible to, then tightens steel wire rope 2, throwing slabstone 11 and accumulation height at least Be higher by the inclined hole or card hammer position 0.5m, and block stamp 3 using it is low it is urgent hit by way of repair hole and handle, at leisure Steeply inclined scar is accomplished into horizontal bench, until entirely constructing contact surface just to terminate to repair hole operation during homogeneous scar, ensures block stamp 3 Work surface even intensity, wherein 11 specification of slabstone be 100mm × 300~500mm × 300~500mm, be effectively guaranteed institute The quality of Percussion Piles is stated, avoids the generation again of the inclined hole and card hammer phenomenon.
With reference to shown in Fig. 3 and Fig. 4, when impact holing to the Upper Plate of Karst Cave 1m or so, mud loss 12 is susceptible to Situation, embody the importance of steel pile casting 6 herein, if 8 top of perfusion pile body does not use steel pile casting 6, lose mud 7 and protect 13 phenomenon of collapse hole will occur for loose soil bed, layer of sand or the mud of wall so that block stamp can then occur for upper soil horizon and surface collapse 3 are embedded in a bottom or punching drilling machine 1 topples and danger or even engineering safety accident occurs, then in requisition for re-starting punching Pile, operating expenses increase, pile quality are difficult to ensure that;Even if above-mentioned security incident does not occur after there is collapse hole 13 but, then The fullness coefficient of casting concrete can also increase at this time so that construction cost is high;If 8 top of pile body is perfused using steel pile casting 6, Then in the case of 6 retaining wall of steel pile casting, the anti-collapse hole 14 of steel pile casting retaining wall is formed, then can greatly reduce and the general of collapse hole 13 occur Rate ensures the quality of the Percussion Piles.
With reference to shown in Fig. 5, when there is 12 situation of mud loss, then block stamp 3 is promoted to aperture, according still further to 6:3:1 ratio The packed mixture 15 of example throwing slabstone 11, clay and cement forms mudstone hole wall guard aperture, and accumulates packed mixture 15 Height will at least be higher by 1.5~2m of the Upper Plate of Karst Cave, so that mud face no longer declines in stable state, then tighten Steel wire rope 2 is squeezed using small stroke tip-tap and blocks solution cavity internal channel, forms mudstone hole wall guard aperture.Wherein 11 specification of slabstone is 100mm × 300~500mm × 300~500mm, so operate repeatedly, until no longer spillage, are then rushed again by block stamp 3 Solution cavity is simultaneously smoothly passed through in hole.
To sum up, the anti-collapse impact holing construction method in the complex karst place that above-described embodiment is provided, by using steel 6 retaining wall of casing, and using small stroke it is low it is urgent hit by the way of impact holing and utilize 7 retaining wall pore-forming of mud, can realize on ground The Karst Sites of matter complexity are constructed, while also ensure to rush stake machinery and the safety of operating personnel and the pile matter of pile foundation Amount avoids the occurrence of the inclined hole, blocks the phenomenon that hammer or mud loss 12.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these improve and replace Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of anti-collapse impact holing construction method in complex karst place, which is characterized in that comprise the following steps:
A., punching drilling machine is installed, is equipped with mud pit and mud circulating system;
B. steel pile casting is squeezed into, and the steel pile casting is reinforced;
C. the block stamp of the punching drilling machine by small stroke it is low it is urgent hit in a manner of carry out impact holing, and pass through the steel and protect Cylinder, mudstone hole wall and the mud circulating system carry out retaining wall;
When impact holing to solution cavity, by punching into solution cavity the packed mixture of throwing, it is and the block stamp is low with small stroke The urgent mode hit squeezes packed mixture and forms retaining wall, blocks the solution cavity of connection, then passes through the block stamp impact holing again Through solution cavity;
When there is inclined hole or the block stamp card is hammered into shape, carry out repairing hole processing;
D. punching is cleared up, and transfers steel reinforcement cage and casting concrete.
2. the anti-collapse impact holing construction method in complex karst place as described in claim 1, which is characterized in that in stepb, By being embedded steel pipe at the top periphery of the steel pile casting to reinforce the steel pile casting.
3. the anti-collapse impact holing construction method in complex karst place as described in claim 1, which is characterized in that in step b, institute It states steel pile casting and throws projected depth by the way of vibration hammer vibration-sunk.
4. the anti-collapse impact holing construction method in complex karst place as described in claim 1, which is characterized in that the steel pile casting Wall thickness is 15~20mm, length is 6~8m, and the steel pile casting internal diameter is bigger than the Percussion Piles diameter.
5. the anti-collapse impact holing construction method in complex karst place according to claim 1, which is characterized in that in step c In, when near the block stamp punching to Upper Plate of Karst Cave, mud balance is increased, and passes through the block stamp and urgent is hit so that small stroke is low Mode, gradually Upper Plate of Karst Cave is punctured.
6. the anti-collapse impact holing construction method in complex karst place as described in claim 1, which is characterized in that described packed mixed It is the mixture for including slabstone, clay and cement to close material.
7. the anti-collapse impact holing construction method in complex karst place as claimed in claim 6, which is characterized in that the slabstone, The ratio of the clay and the cement is 6:3:1.
8. the anti-collapse impact holing construction method in complex karst place according to claim 1, which is characterized in that in step c In, when impact holing mud loss occurs to solution cavity, promote the block stamp, packed mixture described in throwing and accumulation height extremely 1.5~the 2m of Upper Plate of Karst Cave is higher by less, then tightens the steel wire rope of the punching drilling machine, and small punching is used by the block stamp The low urgent mode hit of journey forms the mudstone hole wall guard aperture.
9. the anti-collapse impact holing construction method in complex karst place according to claim 1, which is characterized in that in step c In, when there is the inclined hole or the block stamp card and hammering into shape, slabstone described in throwing and accumulation height to be at least higher by the inclined hole or Card hammer position 0.5m, and the block stamp using it is low it is urgent hit by way of repair hole and handle.
10. the anti-collapse impact holing construction method in complex karst place according to claim 9, which is characterized in that described Stone specification is 100mm × (300~500mm) × (300~500mm).
CN201711315383.1A 2017-12-12 2017-12-12 A kind of anti-collapse impact holing construction method in complex karst place Pending CN108049395A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711315383.1A CN108049395A (en) 2017-12-12 2017-12-12 A kind of anti-collapse impact holing construction method in complex karst place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711315383.1A CN108049395A (en) 2017-12-12 2017-12-12 A kind of anti-collapse impact holing construction method in complex karst place

Publications (1)

Publication Number Publication Date
CN108049395A true CN108049395A (en) 2018-05-18

Family

ID=62124322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711315383.1A Pending CN108049395A (en) 2017-12-12 2017-12-12 A kind of anti-collapse impact holing construction method in complex karst place

Country Status (1)

Country Link
CN (1) CN108049395A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978642A (en) * 2018-06-28 2018-12-11 广州市恒盛建设工程有限公司 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method
CN109113051A (en) * 2018-09-30 2019-01-01 中交第三航务工程局有限公司 The method of bored pile construction work efficiency is improved under the conditions of karsts developing area
CN109518677A (en) * 2018-11-26 2019-03-26 五冶集团上海有限公司 Punching Borehole Cast-in-place Concrete Pile karst cave treatment method
CN109629560A (en) * 2018-11-22 2019-04-16 温州正建设有限公司 A kind of cast-in-place pile construction method
CN110055948A (en) * 2019-04-29 2019-07-26 华东交通大学 A kind of big Treatment Methods of Karst Foundation of depth and device
CN111910634A (en) * 2020-07-27 2020-11-10 中国建筑第二工程局有限公司 Karst geological impact pore-forming construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN104674780A (en) * 2015-02-06 2015-06-03 中鼎国际工程有限责任公司 Karst stratum stabilization structure
CN105625293A (en) * 2016-01-26 2016-06-01 广西建工集团第五建筑工程有限责任公司 Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof
CN107386252A (en) * 2017-08-24 2017-11-24 大连海事大学 A kind of Punching Borehole Cast-in-place Concrete Pile pile foundation Seines types automatic discrimination system and its method of work

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN104674780A (en) * 2015-02-06 2015-06-03 中鼎国际工程有限责任公司 Karst stratum stabilization structure
CN105625293A (en) * 2016-01-26 2016-06-01 广西建工集团第五建筑工程有限责任公司 Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof
CN107386252A (en) * 2017-08-24 2017-11-24 大连海事大学 A kind of Punching Borehole Cast-in-place Concrete Pile pile foundation Seines types automatic discrimination system and its method of work

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孔定娥: "《基础工程施工》", 31 May 2010, 合肥工业大学出版社 *
董文才: "《唐山港地连墙板桩码头》", 31 August 2009, 河海大学出版社 *
陈国良: "《岩溶地区桩基的成孔施工技术》", 《水运工程》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978642A (en) * 2018-06-28 2018-12-11 广州市恒盛建设工程有限公司 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method
CN109113051A (en) * 2018-09-30 2019-01-01 中交第三航务工程局有限公司 The method of bored pile construction work efficiency is improved under the conditions of karsts developing area
CN109629560A (en) * 2018-11-22 2019-04-16 温州正建设有限公司 A kind of cast-in-place pile construction method
CN109518677A (en) * 2018-11-26 2019-03-26 五冶集团上海有限公司 Punching Borehole Cast-in-place Concrete Pile karst cave treatment method
CN110055948A (en) * 2019-04-29 2019-07-26 华东交通大学 A kind of big Treatment Methods of Karst Foundation of depth and device
CN111910634A (en) * 2020-07-27 2020-11-10 中国建筑第二工程局有限公司 Karst geological impact pore-forming construction method

Similar Documents

Publication Publication Date Title
CN108049395A (en) A kind of anti-collapse impact holing construction method in complex karst place
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN102322058B (en) Construction process and equipment for downhole impacting high-pressure jet grouting pile
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN105839622B (en) Soft soil foundation reinforcing method based on flying dust, flying dust stake and foundation stabilization pipe casing
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
CN111042116A (en) Karst cave stratum pile foundation construction method
CN206646497U (en) A kind of clad steel casing structure
CN113605434A (en) Bridge pile foundation construction method for high-speed railway karst
CN106192999A (en) The construction method of uplift pile
CN109914399A (en) A kind of pile base construction method of environmental protection
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
CN110735441A (en) Construction method of building pile foundation
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN106381878B (en) Clad steel sheet pile core combined cofferdam environment-friendly demounting construction method
CN106638646B (en) A kind of construction method of open caisson secondary bottom sealing structure
KR102028182B1 (en) Construction method of pillar type underground structure using excavation system for structural casing burial
CN102677657A (en) Construction method of row cast thin-walled concrete compound pile wall and special hole forming device thereof
CN208749373U (en) A kind of Tunnel Gushing disposal plant
CN208563316U (en) Large-diameter cast-in-place pile bottom loose soil sediment treatment device
CN107975027B (en) Construction method for reinforcing soil body at shield launching and arrival end
CN203247580U (en) Construction structure of cast-in-place concrete pile of deep soft soil foundation bridge girder
CN104988981B (en) A kind of well construction method of riding on present situation operation shield method drainage pipeline
CN106320187A (en) Bridge construction method and device for special strata
RU131747U1 (en) ANTI-FILTRATION SCREEN

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180518

RJ01 Rejection of invention patent application after publication