CN111910634A - Karst geological impact pore-forming construction method - Google Patents

Karst geological impact pore-forming construction method Download PDF

Info

Publication number
CN111910634A
CN111910634A CN202010732573.9A CN202010732573A CN111910634A CN 111910634 A CN111910634 A CN 111910634A CN 202010732573 A CN202010732573 A CN 202010732573A CN 111910634 A CN111910634 A CN 111910634A
Authority
CN
China
Prior art keywords
pile
karst
karst cave
slurry
impact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010732573.9A
Other languages
Chinese (zh)
Inventor
王晓晓
郑斌
张世贵
刘振宇
龚颖康
胡春
蔡小云
张跃君
邓齐祝
罗晓琪
周丛瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202010732573.9A priority Critical patent/CN111910634A/en
Publication of CN111910634A publication Critical patent/CN111910634A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B1/00Percussion drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/11Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Wood Science & Technology (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a karst geological impact pore-forming construction method. According to the method, before pile foundation construction, advanced drilling treatment is carried out, a pile casing is embedded at a design hole position to a design depth, and reinforcement treatment is carried out on the pile casing; preparing slurry, punching the slurry into a rock stratum through a punching hammer of a punching drilling machine, maintaining the water level of the slurry to be stable through a slurry circulating system, and protecting walls through a protecting cylinder and filling mud stone clay; when the distance between the top plate and the karst cave is 0.8-1.2 m, adopting a small hammer to impact the top plate of the karst cave in a low stroke manner until the top plate of the karst cave is broken down, filling the karst cave with flaky clay to form a protective wall, and repeatedly impacting the protective wall in the low stroke manner by using the small hammer until the top plate of the karst cave is broken down; if the small hammer can not break the top plate of the karst cave, the big hammer is used for breaking the top plate of the karst cave by low-stroke impact; cleaning pile holes, carrying out geological detection, and transporting mud and drilling slag; and installing and positioning the reinforcement cage, installing a guide pipe for secondary hole cleaning, monitoring the performance of slurry, and pouring underwater concrete to a pile diameter which is one time of the design elevation. The invention can ensure the safety of pile-punching machinery and operators and the pile-forming quality of pile foundations.

Description

Karst geological impact pore-forming construction method
Technical Field
The invention relates to a karst geological impact pore-forming construction method, and belongs to the technical field of punching pile construction.
Background
The bored pile has the advantages of low construction noise, free control of the diameter of the pile body, suitability for various bottom layers, high bearing capacity, low construction cost, good earthquake resistance and the like, but the bored pile also has the defects that: through pipe method pouring concrete under water, pile shaft quality all is less than precast concrete pile, more because karst development area water resource is abundant, and strong development such as solution channel, solution tank and karst cave is difficult to accurate description in the geological survey before the construction, still in the work progress because the drilling is bored the operation of not normal of pouring, in case pile foundation quality defects such as laitance, double-layered mud, honeycomb, segregation appear very easily in case the problem appears.
The rock surface of the base in the karst area fluctuates, so that the stressed compression deformation of the foundation of the overlying soil layer is larger. In the horizontal direction, the thickness of the soil layer can reach 4-6 m, even more than ten meters at two points with the same distance (such as 1-2 m). The bottom of a thick soil layer generally has soft soil, so that the nonuniformity of the foundation is aggravated, and the phenomenon of hole deviation is caused when pile foundation construction is carried out and the pile foundation enters a bearing layer. Karst areas have shallow-buried, large-span and flat karst caves, and the upper soil layer is unstable or collapsed due to large disturbance to the soil layer in the construction process, or local damage of the foundation due to collapse is possible after engineering construction because the load stress of the stratum is changed by a building. The foundation soil cave is developed and can be kept relatively stable after being formed, but karst collapse is induced by artificial factors such as drilling, and a series of construction difficulties such as slurry leakage, drill jamming and drill dropping are easily caused when the drilling holes penetrate through the underground soil cave due to low bearing capacity of a karst area, and even collapse caused by hole collapse is caused.
Generally, the construction accidents of the cast-in-place pile foundation in the karst area can be mainly divided into two types: firstly, accidents such as slurry leakage, hole collapse, hole inclination, drill sticking and the like occur in the process of forming holes and piles; secondly, after pile forming, quality inspection finds that the quality of the pile foundation is unqualified, and even the accident of scrapping must be done if remedial measures such as pile breaking and the like are needed.
Disclosure of Invention
Aiming at the technical problem of difficult construction of karst geological impact hole forming, the invention provides the karst geological impact hole forming construction method which can ensure the safety of pile punching machinery and operators and the pile forming quality of pile foundations.
The technical scheme adopted by the invention for solving the technical problems is as follows:
a karst geological impact pore-forming construction method comprises the following specific steps:
(1) before pile foundation construction, advance drilling treatment is carried out: measuring and lofting the pile position, tamping the area around an excavation point, adopting a core drilling machine to drill a hole in advance at the pile position, and prejudging the karst cave position and the slurry leakage condition according to the soil property parameters and the integrity of the core sample;
(2) embedding a pile casing at a design hole position to a design depth, and reinforcing the pile casing;
(3) preparing a slurry pool and a slurry circulating system, and preparing slurry;
(4) the rock stratum is flushed by a punching hammer of the punching drilling machine, the water level of the slurry is kept stable by a slurry circulating system, and the wall is protected by a protecting cylinder and filled with mud stone clay; when the distance between the top plate and the karst cave is 0.8-1.2 m, adopting a small hammer to impact the top plate of the karst cave in a low stroke manner until the top plate of the karst cave is broken down, filling the karst cave with flaky clay to form a protective wall, and repeatedly impacting the protective wall in the low stroke manner by using the small hammer until the top plate of the karst cave is broken down; if the small hammer can not break the top plate of the karst cave, the big hammer is used for breaking the top plate of the karst cave by low-stroke impact;
(5) cleaning pile holes, carrying out geological detection, and transporting mud and drilling slag;
(6) and installing and positioning the reinforcement cage, installing a guide pipe for secondary hole cleaning, monitoring the performance of slurry, and pouring underwater concrete to a pile diameter which is one time of the design elevation.
The concrete method for prejudging the position of the karst cave and the slurry leakage condition in the step (1) is
1) The first stage is as follows: surveying the geology in the field in the early construction period, arranging drilled holes at intervals of 2 x 2m to find the boundary position of a karst cave, and surveying the position of the karst in the field;
2) and a second stage: the advanced geological drilling during the construction of the bored pile carries out karst investigation of a karst area of a field according to the position of karst, wherein the investigation parameters are the type of the karst, the thickness and the elevation of a top plate and a bottom plate, and the drilling depth is below 1m when the advanced geological drilling is drilled into a weathered bearing stratum or 5m when the advanced geological drilling is drilled into the bottom of the pile.
And (2) performing advanced drilling treatment in the step (1) to form a pile and multiple probes.
In the step (2), the wall thickness of the pile casing is 10-15 mm, the length of the pile casing is 5-8 m, the inner diameter of the pile casing is 0.5-1.0 mm larger than the diameter of the punched pile, and a supporting piece is embedded outside the pile casing in the pile casing reinforcing treatment method.
The slurry in the step (3) is bentonite slurry, and the mass concentration of bentonite in the slurry is 50-60%.
And (4) the impact hammer is impacted into a rock stratum, if a non-open type fracture karst cave is met, large stones with the diameter not less than 500mm are thrown into the pile hole until the stacking height of the large stones exceeds 50-100 cm of the top surface of the karst cave, then the large stones are impacted to the position 30cm away from the top surface of the karst cave, then a mixture of broken stones and soil or cement is thrown until the stacking height of the broken stones and the soil or the cement exceeds 5-10 cm of the top surface of the karst cave, and the impact is carried out after the mixture is solidified.
Further, in the impact process of the impact hammer, if the water level in the hole is unstable, pouring cement mortar or underwater concrete at the position of the non-open type fracture karst cave to block the non-open type fracture karst cave, standing for more than 24 hours, removing the mortar layer or the underwater concrete layer, and continuously adopting the impact hammer to impact the hole; when the non-open type fracture caverns are continuously encountered within a distance of 5m, the non-open type fracture caverns are separately blocked or continuously blocked, wherein the continuous blocking is realized by treating two or more non-open type fracture caverns together.
And (4) the impact hammer is impacted into the rock stratum, if the rock stratum meets the open type fracture karst cave, the stability of the hole wall is monitored, if the hole wall is stable, the impact hammer continuously impacts, meanwhile, the rolled steel casing is tightly held, the steel casing is put to a preset position by a loosening method, wherein the thickness of the steel casing is more than 4mm, the outer diameter of the steel casing is the same as or 1-2 cm smaller than the hole diameter of the pile, and the length of the steel casing is 3-4 m larger than the depth of the karst cave.
And (3) monitoring the slurry performance in the step (6) to ensure that the sand content is less than 4%, the specific gravity of the slurry is 1.1-1.2, and the viscosity is 18-23 s.
The invention has the beneficial effects that:
according to the invention, through advanced drilling treatment, the karst cave position and the slurry leakage condition can be pre-judged through the soil property parameters and the integrity of the core sample, and when the distance is 0.5-1.5 m m away from the top plate of the karst cave, a low-speed drilling mode is adopted, so that the phenomenon that the liquid level in the hole suddenly drops to cause hole collapse when the karst cave is met in the drilling process is avoided; the method comprises the steps of punching a punching hammer into a rock stratum, when the punching hammer meets an unopened fracture karst cave, throwing large stones with the diameter not less than 500mm into a pile hole until the stacking height of the large stones exceeds 50-100 cm of the top surface of the karst cave, then impacting until the stacking height of the large stones exceeds 30cm of the top surface of the karst cave, then throwing a mixture of broken stones and soil or cement until the stacking height of the broken stones and the soil or the cement exceeds 5-10 cm of the top surface of the karst cave, impacting after solidification to block passages of the karst fractures or the karst cave at pile foundation positions, and blocking or reducing the water passing road surface of.
The specific implementation mode is as follows:
the present invention will be further described with reference to the following embodiments.
Example 1: a karst geological impact pore-forming construction method comprises the following specific steps:
(1) before pile foundation construction, advance drilling treatment is carried out: measuring and lofting the pile position, tamping the area around an excavation point, and adopting a core drilling machine to drill a hole in advance at the pile position, wherein the hole drilling process is one pile and multiple probes so as to improve the accuracy of judging the position, the size, the distribution condition of karst cave cracks and the slurry leakage degree of the karst cave, and the position and the slurry leakage condition of the karst cave are pre-judged according to the soil property parameters and the integrity of the core sample;
the concrete method for pre-judging the position of the karst cave and the slurry leakage condition comprises
1) The first stage is as follows: surveying the geology in the field in the early construction period, arranging drilled holes at intervals of 2 x 2m to find the boundary position of a karst cave, and surveying the position of the karst in the field;
2) and a second stage: the advanced geological drilling during the construction of the bored pile carries out karst investigation of a karst area of a field according to the position of karst, wherein the investigation parameters are the type of the karst, the thickness and the elevation of a top plate and a bottom plate, and the drilling depth is below 1m when the drilling is carried out to a middle weathering bearing stratum or 5m when the drilling is carried out to the designed elevation of the pile bottom;
(2) embedding a pile casing at a design hole position to a design depth, and reinforcing the pile casing; the wall thickness of the pile casing is 10-15 mm, the length of the pile casing is 5-8 m, the inner diameter of the pile casing is 0.5-1.0 mm larger than the diameter of the punched pile, and a supporting piece is embedded outside the pile casing in the pile casing reinforcing treatment method;
(3) preparing a slurry pool and a slurry circulating system, and preparing slurry; wherein the slurry is bentonite slurry, and the mass concentration of the bentonite in the slurry is 50-60%;
(4) the rock stratum is flushed by a punching hammer of the punching drilling machine, the water level of the slurry is kept stable by a slurry circulating system, and the wall is protected by a protecting cylinder and filled with mud stone clay; when the distance between the top plate and the karst cave is 0.8-1.2 m, adopting a small hammer to impact the top plate of the karst cave in a low stroke manner until the top plate of the karst cave is broken down, filling the karst cave with flaky clay to form a protective wall, and repeatedly impacting the protective wall in the low stroke manner by using the small hammer until the top plate of the karst cave is broken down; if the small hammer can not break the top plate of the karst cave, the big hammer is used for breaking the top plate of the karst cave by low-stroke impact;
the method comprises the following steps that a punching hammer is punched into a rock stratum, if an open-type crack karst cave is met, the stability of a hole wall is monitored, if the hole wall is stable, the punching hammer continues to impact, a rolled steel casing is gripped, the steel casing is put to a preset position by a loosening method, wherein the thickness of the steel casing is more than 4mm, the outer diameter of the steel casing is the same as the diameter of a pile or smaller than the diameter of the pile by 1-2 cm, and the length of the steel casing is 3-4 m larger than the depth of the karst cave; in the impact process of the impact hammer, if the water level in the hole is unstable, pouring cement mortar or underwater concrete at the position of the non-open type fracture karst cave to block the non-open type fracture karst cave, standing for more than 24 hours, removing the mortar layer or the underwater concrete layer, and continuously adopting the impact hammer to impact the hole; when the non-open type fracture caverns are continuously encountered within a distance of 5m, the non-open type fracture caverns are separately blocked or continuously blocked, wherein the continuous blocking is that two or more than two non-open type fracture caverns are treated together;
the method comprises the following steps that a punching hammer is punched into a rock stratum, if an open-type crack karst cave is met, the stability of a hole wall is monitored, if the hole wall is stable, the punching hammer continues to impact, a rolled steel casing is gripped, the steel casing is put to a preset position by a loosening method, wherein the thickness of the steel casing is more than 4mm, the outer diameter of the steel casing is the same as the diameter of a pile or smaller than the diameter of the pile by 1-2 cm, and the length of the steel casing is 3-4 m larger than the depth of the karst cave;
when the karst cave is constructed in the drilling process, if the karst cave is not filled compactly, slurry in the hole can be quickly lost to form slurry leakage, the liquid level in the hole can be quickly reduced or the duration time is too long when the hole is serious, so that the hole collapse phenomenon is caused by overlarge pressure difference between the inside and the outside of the hole, a steel pile casing or a double sleeve is selected, wherein the outer diameter of the first pile casing of the double sleeve is 2-3 grades larger than the pile diameter and is placed into a clay layer, and the outer side of the bottom of the pile casing is solidified and stopped by adopting cement mortar; the second casing is 1 grade larger than the pile diameter and is put on bedrock in a karst fissure strong development zone to prevent the hole wall from collapsing;
(5) cleaning pile holes, carrying out geological detection, and transporting mud and drilling slag; and tracking and measuring the slurry performance in the hole cleaning process, wherein the slurry performance is that the sand content is less than 8%, the specific gravity of the slurry is 1.15-1.20 (the specific gravity of a sand layer is 1.2-1.4), and the viscosity is as follows: the bottom layer is 16-25 s, and the loose bottom layer is 19-28 s;
(6) installing and positioning a steel reinforcement cage, installing a guide pipe for secondary hole cleaning, monitoring mud performance, and pouring underwater concrete to a pile diameter which is one time of a design elevation, wherein the monitoring mud performance is that the sand content is less than 4%, the mud proportion is 1.1-1.2, and the viscosity is 18-23 s.
Example 2: the embodiment is a karst geological impact pore-forming method in certain highway engineering in Yunnan;
a karst geological impact pore-forming construction method comprises the following specific steps:
(1) before pile foundation construction, advance drilling treatment is carried out: measuring and lofting the pile position, tamping the area around an excavation point, and adopting a core drilling machine to drill a hole in advance at the pile position, wherein the hole drilling process is one pile and multiple probes so as to improve the accuracy of judging the position, the size, the distribution condition of karst cave cracks and the slurry leakage degree of the karst cave, and the position and the slurry leakage condition of the karst cave are pre-judged according to the soil property parameters and the integrity of the core sample;
the concrete method for pre-judging the position of the karst cave and the slurry leakage condition comprises
1) The first stage is as follows: surveying the geology in the field in the early construction period, arranging drilled holes at intervals of 2 x 2m to find the boundary position of a karst cave, and surveying the position of the karst in the field;
2) and a second stage: the advanced geological drilling during the construction of the bored pile carries out karst investigation of a karst area of a field according to the position of karst, wherein the investigation parameters are the type of the karst, the thickness and the elevation of a top plate and a bottom plate, and the drilling depth is below 1m when the drilling is carried out to a middle weathering bearing stratum or 5m when the drilling is carried out to the designed elevation of the pile bottom;
(2) embedding a pile casing at a design hole position to a design depth, and reinforcing the pile casing; the wall thickness of the pile casing is 12mm, the length of the pile casing is 8m, the inner diameter of the pile casing is 0.8mm larger than the diameter of the punched pile, and a supporting piece is embedded outside the pile casing in the pile casing reinforcing treatment method;
(3) preparing a slurry pool and a slurry circulating system, and preparing slurry; wherein the mud is bentonite mud, and the mass concentration of the bentonite in the mud is 55 percent;
(4) the rock stratum is flushed by a punching hammer of the punching drilling machine, the water level of the slurry is kept stable by a slurry circulating system, and the wall is protected by a protecting cylinder and filled with mud stone clay; when the distance is 1.1m from the top plate of the karst cave, adopting a small hammer to impact the top plate of the karst cave in a low stroke manner until the top plate of the karst cave is broken down, then adopting rubble clay to fill the karst cave to form a protective wall, and repeatedly impacting the karst cave top plate in a low stroke manner by using the small hammer to break the karst cave top plate; if the small hammer can not break the top plate of the karst cave, the big hammer is used for breaking the top plate of the karst cave by low-stroke impact;
the method comprises the following steps that a punching hammer is punched into a rock stratum, if an open-type crack karst cave is met, the stability of a hole wall is monitored, if the hole wall is stable, the punching hammer continues to impact, a rolled steel casing is gripped, the steel casing is put to a preset position by a loosening method, wherein the thickness of the steel casing is more than 4mm, the outer diameter of the steel casing is the same as the diameter of a pile or smaller than the diameter of the pile by 1-2 cm, and the length of the steel casing is 3-4 m larger than the depth of the karst cave; in the impact process of the impact hammer, if the water level in the hole is unstable, pouring cement mortar or underwater concrete at the position of the non-open type fracture karst cave to block the non-open type fracture karst cave, standing for more than 24 hours, removing the mortar layer or the underwater concrete layer, and continuously adopting the impact hammer to impact the hole; when the non-open type fracture caverns are continuously encountered within a distance of 5m, the non-open type fracture caverns are separately blocked or continuously blocked, wherein the continuous blocking is that two or more than two non-open type fracture caverns are treated together;
the method comprises the following steps that a punching hammer is punched into a rock stratum, if an open-type crack karst cave is met, the stability of a hole wall is monitored, if the hole wall is stable, the punching hammer continues to impact, a rolled steel casing is gripped, the steel casing is put to a preset position by a loosening method, wherein the thickness of the steel casing is more than 4mm, the outer diameter of the steel casing is the same as the diameter of a pile or smaller than the diameter of the pile by 1-2 cm, and the length of the steel casing is 3-4 m larger than the depth of the karst cave;
when the karst cave is constructed in the drilling process, if the karst cave is not filled compactly, slurry in the hole can be quickly lost to form slurry leakage, the liquid level in the hole can be quickly reduced or the duration time is too long when the hole is serious, so that the hole collapse phenomenon is caused by overlarge pressure difference between the inside and the outside of the hole, a steel pile casing or a double sleeve is selected, wherein the outer diameter of the first pile casing of the double sleeve is 2-3 grades larger than the pile diameter and is placed into a clay layer, and the outer side of the bottom of the pile casing is solidified and stopped by adopting cement mortar; the second casing is 1 grade larger than the pile diameter and is put on bedrock in a karst fissure strong development zone to prevent the hole wall from collapsing;
(5) cleaning pile holes, carrying out geological detection, and transporting mud and drilling slag; and tracking and measuring the slurry performance in the hole cleaning process, wherein the slurry performance is that the sand content is less than 8%, the specific gravity of the slurry is 1.15-1.20 (the specific gravity of a sand layer is 1.2-1.4), and the viscosity is as follows: the bottom layer is 16-25 s, and the loose bottom layer is 19-28 s;
(6) installing and positioning a steel reinforcement cage, installing a guide pipe for secondary hole cleaning, monitoring mud performance, and pouring underwater concrete to a pile diameter which is one time of a design elevation, wherein the monitoring mud performance is that the sand content is less than 4%, the mud proportion is 1.1-1.2, and the viscosity is 18-23 s.
While the present invention has been described in detail with reference to the specific embodiments thereof, it will be apparent to one skilled in the art that various changes and modifications can be made therein without departing from the spirit and scope thereof.

Claims (9)

1. A karst geology impact pore-forming construction method is characterized by comprising the following specific steps:
(1) before pile foundation construction, advance drilling treatment is carried out: measuring and lofting the pile position, tamping the area around an excavation point, adopting a core drilling machine to drill a hole in advance at the pile position, and prejudging the karst cave position and the slurry leakage condition according to the soil property parameters and the integrity of the core sample;
(2) embedding a pile casing at a design hole position to a design depth, and reinforcing the pile casing;
(3) preparing a slurry pool and a slurry circulating system, and preparing slurry;
(4) the rock stratum is flushed by a punching hammer of the punching drilling machine, the water level of the slurry is kept stable by a slurry circulating system, and the wall is protected by a protecting cylinder and filled with mud stone clay; when the distance between the top plate and the karst cave is 0.8-1.2 m, adopting a small hammer to impact the top plate of the karst cave in a low stroke manner until the top plate of the karst cave is broken down, filling the karst cave with flaky clay to form a protective wall, and repeatedly impacting the protective wall in the low stroke manner by using the small hammer until the top plate of the karst cave is broken down; if the small hammer can not break the top plate of the karst cave, the big hammer is used for breaking the top plate of the karst cave by low-stroke impact;
(5) cleaning pile holes, carrying out geological detection, and transporting mud and drilling slag;
(6) and installing and positioning the reinforcement cage, installing a guide pipe for secondary hole cleaning, monitoring the performance of slurry, and pouring underwater concrete to a pile diameter which is one time of the design elevation.
2. The karst geological impact pore-forming construction method according to claim 1, characterized in that: the concrete method for prejudging the position of the karst cave and the slurry leakage condition in the step (1) is
1) The first stage is as follows: surveying the geology in the field in the early construction period, arranging drilled holes at intervals of 2 x 2m to find the boundary position of a karst cave, and surveying the position of the karst in the field;
2) and a second stage: the advanced geological drilling during the construction of the bored pile carries out karst investigation of a karst area of a field according to the position of karst, wherein the investigation parameters are the type of the karst, the thickness and the elevation of a top plate and a bottom plate, and the drilling depth is below 1m when the advanced geological drilling is drilled into a weathered bearing stratum or 5m when the advanced geological drilling is drilled into the bottom of the pile.
3. The karst geological impact pore-forming construction method according to claim 1, characterized in that: and (2) performing advanced drilling treatment to form a pile with multiple probes.
4. The karst geological impact pore-forming construction method according to claim 1, characterized in that: in the step (2), the wall thickness of the pile casing is 10-15 mm, the length of the pile casing is 5-8 m, the inner diameter of the pile casing is 0.5-1.0 mm larger than the diameter of the punched pile, and a supporting piece is embedded outside the pile casing in the pile casing reinforcing treatment method.
5. The karst geological impact pore-forming construction method according to claim 1, characterized in that: and (3) the slurry is bentonite slurry, and the mass concentration of the bentonite in the slurry is 50-60%.
6. The karst geological impact pore-forming construction method according to claim 1, characterized in that: and (4) the impact hammer is impacted into a rock stratum, if a non-open type fracture karst cave is met, large stones with the diameter not smaller than 500mm are thrown into the pile hole until the stacking height of the large stones exceeds 50-100 cm of the top surface of the karst cave, then the large stones are impacted to a position 30cm away from the top surface of the karst cave, then a mixture of broken stones and soil or cement is thrown until the stacking height of the broken stones and the soil or the cement exceeds 5-10 cm of the top surface of the karst cave, and the impact is carried out after the mixture is solidified.
7. The karst geological impact pore-forming construction method according to claim 6, characterized in that: in the impact process of the impact hammer, if the water level in the hole is unstable, pouring cement mortar or underwater concrete at the position of the non-open type fracture karst cave to block the non-open type fracture karst cave, standing for more than 24 hours, removing the mortar layer or the underwater concrete layer, and continuously adopting the impact hammer to impact the hole; when the non-open type fracture caverns are continuously encountered within a distance of 5m, the non-open type fracture caverns are separately blocked or continuously blocked, wherein the continuous blocking is realized by treating two or more non-open type fracture caverns together.
8. The karst geological impact pore-forming construction method according to claim 1, characterized in that: and (4) the impact hammer is impacted into a rock stratum, if the rock stratum meets the open type fracture karst cave, the stability of the hole wall is monitored, if the hole wall is stable, the impact hammer continuously impacts, meanwhile, the rolled steel casing is tightly held, the steel casing is put to a preset position by a loosening method, wherein the thickness of the steel casing is more than 4mm, the outer diameter of the steel casing is the same as the diameter of the pile or smaller than the diameter of the pile by 1-2 cm, and the length of the steel casing is larger than the depth of the karst cave by 3-4 m.
9. The karst geological impact pore-forming construction method according to claim 1, characterized in that: and (6) monitoring the slurry performance in the step (6) that the sand content is less than 4%, the specific gravity of the slurry is 1.1-1.2, and the viscosity is 18-23 s.
CN202010732573.9A 2020-07-27 2020-07-27 Karst geological impact pore-forming construction method Pending CN111910634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010732573.9A CN111910634A (en) 2020-07-27 2020-07-27 Karst geological impact pore-forming construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010732573.9A CN111910634A (en) 2020-07-27 2020-07-27 Karst geological impact pore-forming construction method

Publications (1)

Publication Number Publication Date
CN111910634A true CN111910634A (en) 2020-11-10

Family

ID=73281834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010732573.9A Pending CN111910634A (en) 2020-07-27 2020-07-27 Karst geological impact pore-forming construction method

Country Status (1)

Country Link
CN (1) CN111910634A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113010997A (en) * 2021-02-03 2021-06-22 桂林理工大学 Early warning treatment method for pile foundation impact hole-forming construction accidents in karst development area
CN114908738A (en) * 2022-06-08 2022-08-16 中铁一局集团(广州)建设工程有限公司 Construction method of foundation pile of deep-water bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2365137A1 (en) * 2010-03-12 2011-09-14 DeCombi B.V. Device and method for preparing a pole in a surface
CN103469789A (en) * 2013-09-30 2013-12-25 中铁二十局集团有限公司 Karst-area underwater bridge pier drilled pile construction method
WO2015156757A1 (en) * 2014-04-07 2015-10-15 Halliburton Energy Services, Inc. Soil and rock grouting using a hydrajetting tool
CN107938676A (en) * 2017-11-21 2018-04-20 重庆建工市政交通工程有限责任公司 A kind of pile base construction method for passing through full packing type solution cavity
CN108049395A (en) * 2017-12-12 2018-05-18 广州市城市规划勘测设计研究院 A kind of anti-collapse impact holing construction method in complex karst place
CN109113051A (en) * 2018-09-30 2019-01-01 中交第三航务工程局有限公司 The method of bored pile construction work efficiency is improved under the conditions of karsts developing area

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2365137A1 (en) * 2010-03-12 2011-09-14 DeCombi B.V. Device and method for preparing a pole in a surface
CN103469789A (en) * 2013-09-30 2013-12-25 中铁二十局集团有限公司 Karst-area underwater bridge pier drilled pile construction method
WO2015156757A1 (en) * 2014-04-07 2015-10-15 Halliburton Energy Services, Inc. Soil and rock grouting using a hydrajetting tool
CN107938676A (en) * 2017-11-21 2018-04-20 重庆建工市政交通工程有限责任公司 A kind of pile base construction method for passing through full packing type solution cavity
CN108049395A (en) * 2017-12-12 2018-05-18 广州市城市规划勘测设计研究院 A kind of anti-collapse impact holing construction method in complex karst place
CN109113051A (en) * 2018-09-30 2019-01-01 中交第三航务工程局有限公司 The method of bored pile construction work efficiency is improved under the conditions of karsts developing area

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王东生等: "《岩溶高原湖湓区城市快速路施工新技术—哨关路工程施工实践》", 30 April 2018, 西南交通大学出版社 *
萧俭广: "建筑桩基遇复杂岩溶的防治", 《建筑技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113010997A (en) * 2021-02-03 2021-06-22 桂林理工大学 Early warning treatment method for pile foundation impact hole-forming construction accidents in karst development area
CN113010997B (en) * 2021-02-03 2022-07-19 桂林理工大学 Early warning treatment method for pile foundation impact hole forming construction accidents in karst development area
CN114908738A (en) * 2022-06-08 2022-08-16 中铁一局集团(广州)建设工程有限公司 Construction method of foundation pile of deep-water bridge

Similar Documents

Publication Publication Date Title
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN108894214B (en) Karst cave geological environment cast-in-place pile and pile-forming construction method thereof
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN111042116A (en) Karst cave stratum pile foundation construction method
CN111335306A (en) Rapid construction method for deep and thick hard rock section drilled pile
CN112030956A (en) Karst stratum bored pile construction method
CN113174961B (en) Foundation pit slope supporting method
CN110761265A (en) Karst cave disposal method for deep foundation pit pile foundation construction in karst area
CN110735432A (en) Method for clearing pile foundation and controlling parameters in shield tunneling machine over-invasion limit tunnel range
CN111910634A (en) Karst geological impact pore-forming construction method
CN217419613U (en) Protection structure for excavating and unloading existing underground structure
CN107100164A (en) A kind of long auger guncreting pile construction method
CN110410001A (en) A kind of construction method of superhard rock stratum pile foundation pore-forming
CN113846618A (en) Dynamic compaction replacement reinforcing method for foundation treatment
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN110512594B (en) Simple method for forming hole and pile in cavity of rotary drilling rig
CN112227389A (en) Rectangular-section slide-resistant pile combined mechanical pore-forming construction method
Baker Jr et al. Caisson construction problems and correction in Chicago
CN113482028B (en) Construction method for breaking open caisson pile
CN109113054A (en) A kind of reclaimation area complex geological condition cast-in-situ bored pile multimachine combined construction method
CN114837209A (en) Construction method of deep sand layer large-diameter pile foundation in karst development area
CN211113598U (en) Karst cave handling system for deep foundation pit pile foundation construction in karst area
CN112982381A (en) Construction method of slide-resistant pile
CN111705790A (en) Large-diameter bottom expanding construction method for firm rock mass machinery
CN111691426A (en) Comprehensive construction method for non-occluded water stop pile of deep foundation pit drilling support structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201110

RJ01 Rejection of invention patent application after publication