CN108978642A - A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method - Google Patents

A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method Download PDF

Info

Publication number
CN108978642A
CN108978642A CN201810684229.XA CN201810684229A CN108978642A CN 108978642 A CN108978642 A CN 108978642A CN 201810684229 A CN201810684229 A CN 201810684229A CN 108978642 A CN108978642 A CN 108978642A
Authority
CN
China
Prior art keywords
solution cavity
steel pile
slabstone
upper plate
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810684229.XA
Other languages
Chinese (zh)
Inventor
李慧莹
张连录
陈卫文
王辉
俞瑜
颜培育
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hengsheng Construction Engineering Co Ltd
Original Assignee
Guangzhou Hengsheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hengsheng Construction Engineering Co Ltd filed Critical Guangzhou Hengsheng Construction Engineering Co Ltd
Priority to CN201810684229.XA priority Critical patent/CN108978642A/en
Publication of CN108978642A publication Critical patent/CN108978642A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of double steel pile castings, and throwing clay slabstone to be added to handle pile foundation of bridge pier solution cavity construction method, including outer steel pile casting vibration-sunk, block stamp punching, alternately operating is up to outer sinking steel protecting canister to Upper Plate of Karst Cave, hammer is mentioned to portal, throwing bagged cement and wire netting fragment, small bore wears out Upper Plate of Karst Cave, solution cavity is filled up by small bore water filling, the small stroke of block stamp is gently hammered into shape, it is slow to puncture broken Upper Plate of Karst Cave or drill Upper Plate of Karst Cave, hammer is mentioned to portal, backfill clay, slabstone and bagged cement, it is filled into solution cavity top, later again punching to solution cavity bottom, it is repeated multiple times until determining that solution cavity has been filled with, block stamp pinch shock filler punching enters solution cavity bottom plate, interior sinking steel protecting canister to solution cavity bottom plate enters bottom plate 1m, designed elevation of the continuation punching to pile foundation of bridge pier.Method of the invention has the advantages that technical feasibility, economical rationality, simple process, easy to operate, construction safety, meets the developing direction of modern engineering technology, has biggish promotion prospect.

Description

A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method
Technical field
The present invention relates to the technical fields of municipal construction more particularly to a kind of double steel pile castings, and throwing clay slabstone to be added to handle bridge Pier pile foundation solution cavity construction method.
Background technique
With the fast development of China's economic and transportation business, many urban municipal construction of China are to existing city bridge Beam is transformed, to meet growth requirement.It is common thing that solution cavity is encountered when Urban Bridge pile foundation construction, and drilling encounters solution cavity It is whether stable that hole wall is analyzed first, bit freezing, burying situation can or can not occurs.If certainly will not, just further look to rush Washing lotion misses situation.If flushing liquor leakage is not serious, one can be slowly ground in the bottom of solution cavity using decompression drilling method A aperture, when the depth of aperture reaches 0.5m or so, so that it may restore normal drilling.If hole wall is stable, flushing liquor leakage Seriously, the method water blockoff for throwing clay or clay ball can be used.When hole depth is greater than 15m, clay or clay ball are to be not easy on earth , drilling tool force feed down can be used.If though hole wall is unstable, solution cavity height less, when being not in serious collapsing, can also Retaining wall is carried out with throwing clay or clay ball method.If hole wall is very unstable, solution cavity height is big, in fact it could happen that serious to collapse and very To when scrapping, the depth location of solution cavity is first studied.If depth is little, such as at hole depth 15m, so that it may be managed and protected using set Wall, the method for variable diameter drilling.It is originally the aperture 110mm, 108 casings can be descended, then use 89 drilling tools drilling instead.It constructs in complex area When, in order to prevent drilling accident, often in the leeway for determining that aperture bore has just stayed level-one, even two-stage.If hole wall is unstable Fixed and cavern depth is larger, such as uses casing retaining wall, variable diameter drilling method.May because can not caused by recovery of casing cost it is excessively high When, can be using cement slurry consolidation after, the method crept into again.In order to save time, solid hole cement slurry can add accelerator, When not having accelerator for the moment, salt can be used.The above processing is the technology developed in recent years, has short construction period, economy suitable With, building energy consumption is low, urban ecological environment quality is ensured the features such as, for this purpose, having been more and more widely used.But it is existing There are no double steel pile castings, and throwing clay slabstone to be added to handle pile foundation of bridge pier solution cavity construction method in technology.
Summary of the invention
Based on the above the deficiencies in the prior art, technical problem solved by the invention is to provide a kind of double steel pile castings and adds throwing Fill out clay slabstone processing pile foundation of bridge pier solution cavity construction method, this method technical feasibility, economical rationality, simple process, it is easy to operate, Construction safety.
In order to solve the above technical problem, the present invention provides a kind of double steel pile castings, and throwing clay slabstone to be added to handle pile foundation of bridge pier Solution cavity construction method, comprising the following steps:
The following steps are included:
One, outer steel pile casting vibration-sunk;
Two, block stamp punching;
Three, alternately operating is up to outer sinking steel protecting canister to Upper Plate of Karst Cave 0.2m;
Four, it mentions hammer to portal, throwing bagged cement and wire netting fragment, small stroke block stamp mix, and mention hammer and portal, and stand observation 24 hours;
Five, small bore wears out Upper Plate of Karst Cave, fills up solution cavity by small bore water filling;
Six, the small stroke of block stamp is gently hammered into shape, slow breakdown breaks Upper Plate of Karst Cave or drills Upper Plate of Karst Cave;
Seven, it mentions hammer to portal, hangs into interior steel pile casting, backfill clay, slabstone and bagged cement, be filled into solution cavity top, later Punching is repeated multiple times until determining that solution cavity has been filled with to solution cavity bottom again;
Eight, the punching of block stamp pinch shock filler enters solution cavity bottom plate 1m;
Nine, interior sinking steel protecting canister to solution cavity bottom plate enters bottom plate 1m.
Ten, designed elevation of the continuation punching to pile foundation of bridge pier.
Wherein, casing used when the outer steel pile casting is using punching pile driving construction, the diameter of outer steel pile casting are 2500mm, Wall thickness 15mm, the diameter of interior steel pile casting are 2200mm, wall thickness 10mm;
Gap between the interior steel pile casting and outer steel pile casting is filled using C30 Underwater Concrete, from Upper Plate of Karst Cave face fill to Cushion cap base surface;
When the outer steel pile casting enters Upper Plate of Karst Cave 0.2m, for the pile foundation on riverbank, outer steel pile casting is higher by original ground 0.5m, For the pile foundation of river levee, outer steel pile casting is higher by one-shot job steel platform 0.3m.
In the step 4: the consolidation thickness that the throwing bagged cement and wire netting fragment are formed is 1.5m.
In the step 5: water filling fills up solution cavity observation and all goes well the broken Upper Plate of Karst Cave of backlash breakdown, fills the water for eliminating Differential water pressures and detection solution cavity size inside and outside solution cavity.
In the step 6: being less than 1.5m for thickness or have the Upper Plate of Karst Cave of crack and interlayer, drilled using churning driven Or the every 40cm spacing in periphery in outer steel pile casting along top plate uniformly drill after light block stamp breakdown.
In the step 7: the cylindrical body that throwing slabstone and clay amount are formed with the area of a circle of a height of diameter in hole multiplied by hole height 1.5 times of calculating, the ratio of slabstone, clay and bagged cement is 6:3:1;
Throwing bagged cement reaches burying depth 1.5m in outer steel pile casting.
In the present invention, the pile foundation solution cavity sequence of construction of the same cushion cap is the pile foundation of first construction Upper Plate of Karst Cave thickness, then applies The thin pile foundation of work Upper Plate of Karst Cave.
By upper, double steel pile castings of the invention add throwing clay slabstone processing pile foundation of bridge pier solution cavity construction method in outer steel pile casting When sinking down into Upper Plate of Karst Cave, throwing bagged cement and wire netting fragment, between blocking between outer steel pile casting and Upper Plate of Karst Cave Gap, to prevent external drift sand from entering in casing;Upper Plate of Karst Cave is worn out using small bore, solution cavity is filled up by small bore water filling, with The differential water pressures and detection solution cavity size inside and outside solution cavity are eliminated, the measures balance external steel pile casting external and internal pressure such as moisturizing, very great Cheng are taken Reduced on degree outer steel pile casting deform, the collapsing of periphery layer of sand and bottom spillage.Double steel pile castings of the invention add Throwing clay slabstone handle pile foundation of bridge pier solution cavity construction method have technical feasibility, economical rationality, simple process, it is easy to operate, The advantages of construction safety, meets the developing direction of modern engineering technology, has biggish promotion prospect.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention, And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects, features and advantages of the invention can It is clearer and more comprehensible, below in conjunction with preferred embodiment, and cooperates attached drawing, detailed description are as follows.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, the attached drawing to embodiment is simply situated between below It continues.
Fig. 1 is the process flow that double steel pile castings of the invention add throwing clay slabstone processing pile foundation of bridge pier solution cavity construction method Figure;
Fig. 2 is the outer steel pile casting vibration-sunk stage schematic diagram of the preferred embodiment of the present invention;
Fig. 3 is the outer steel pile casting vibration-sunk schematic diagram in place of the preferred embodiment of the present invention;
Fig. 4 is the schematic diagram that bottom stands bonding course in the outer steel pile casting of the preferred embodiment of the present invention;
Fig. 5 is the small bore conduit water filling filling schematic diagram of the preferred embodiment of the present invention;
Fig. 6 is that Upper Plate of Karst Cave schematic diagram is worn out in the block stamp impact of the preferred embodiment of the present invention;
Fig. 7 be the preferred embodiment of the present invention backfill clay and slabstone block stamp shock-diffusion after schematic diagram;
Fig. 8 is that the block stamp punching of the preferred embodiment of the present invention enters solution cavity bottom plate 1m, interior sinking steel protecting canister to solution cavity bottom plate Lower 1m schematic diagram;
Fig. 9 is the block stamp punching extremely design stake bottom absolute altitude schematic diagram of the preferred embodiment of the present invention;
Figure 10 is 5#, 6# pier arrangement of pile foundation schematic diagram in specific embodiments of the present invention.
Specific embodiment
The embodiment of the invention will now be described in detail with reference to the accompanying drawings, and as part of this specification passes through Embodiment illustrates the principle of the present invention, and other aspects of the present invention, feature and its advantage will become by the detailed description It is very clear.In the attached drawing of institute's reference, the same or similar component is indicated using identical drawing reference numeral in different figures.
Embodiment
The embodiment of the present invention is located at Guangzhou Huadu District Xin Jie daling village, across the heavenly steed river bridge work in Huadu District Industrial Avenue Journey is about 3674 meters to the east of wide aloof from politics and material pursuits speed west from the main road Hua Gang, by successively extra large across the road Li Hong, heavenly steed river, planning west to east River road.Project content includes that across heavenly steed He Zhuqiao and two sides are led the way part, and main bridge pier K1+214.490~k1+734.490 draws Road divides thing side to lead the way, and lead the way pile No. K1+734.490~K1+845 in east side, and lead the way K1+065~K1+214.490 in west side.Road Grade is major urban arterial highway, designs speed per hour 40km/h.Heavenly steed river is required without navigation.Starting point is No. 0 abutment, and design stake number is 14 Root, pile No. 1~14, left width design stake diameter is 1300mm, and right width design stake diameter is 1500mm;Terminal is No. 14 abutments, designs stake Number is 16, pile No. 1~16, and design stake diameter is 1300mm.Intermediate to design 13 bridge piers altogether, bridge pier number is No. 1~No. 13, every pier Design stake number 4~10 differs, and double Pier Design stake diameters are 1600mm, and three Pier Design stake diameters are 1800mm.
1. since the scar fluctuating that place can make supporting course is very big, and karsts developing area, use bored concrete pile foundation.
2. place solution cavity, soil cave are developed, during drilling construction, once occurred what small-scale terrestrial collapsed in the position of No. 5 piers Phenomenon is handled solution cavity, soil cave before pile foundation construction, and the method for cement injection mortar or cement slurry is taken to carry out at filling There are the geological disasters such as karst ground subsidence, jeopardize construction equipment and the safety of construction personnel in reason, prevention.
3. at No. 5 stake positions of No. 5 piers, in probing discovery have be compared with cavern this engineering difficult point.
Left 6~1,6~2,6~5,6~6 designing pile length 30.9m, right 6~3,6~4,6~7,6~8 designing pile lengths 27.4m.The steel platform that the operation platform of pile foundation in water plinth uses steel-pipe pile+Bailey beam+I-steel to set up, steel platform design are divided into Two regions: drilling construction area and material area, steel platform are attached with bank using steel suspension bridge.
As shown in Figure 10, the present invention is handled for the pile foundation cavity of 5#, 6# pier, and each pier position respectively has pile foundation 8, stake diameter For Ф 180cm, totally 564.4 linear meter(lin.m.).5#, 6# pier Pile Foundations Design end hole condition are: reaching design stake bottom absolute altitude and enter complete micro- Decomposed rock is no less than 2 times of stake diameters.
Since 5# pier is located at heavenly steed river river levee slope foot, 6# pier is located at heavenly steed korneforos, and position is special.And at the pile foundation of pier position lower part In karsts developing area area, 5# pier solution cavity is up to 4.2~11m, and 6# pier solution cavity is up to 5.6~11.5m, is more than the solution cavity of 4m to height Design adds the scheme of clay, slabstone processing pile foundation solution cavity using double steel pile castings.Solution principle are as follows: steel pile casting effect in outside prevents molten Hole top plate causes large area to be caved in when puncturing, and interior steel pile casting effect is the pile protection of solution cavity section.Stake can be effectively reduced in the program The filling of base solution cavity causes layer of sand to be lost the risk for collapsing and causing river levee collapsing and steel platform unstability.According to the cavern area that first constructs The principle of pile foundation, the left width of 5# pier are first constructed 5-5# pile foundation, and the right width of 5# pier is first constructed 5-4# pile foundation, and the left width of 6# pier is first constructed 6-5# Base, the right width of 6# pier are first constructed 6-6# pile foundation.
Pile foundation construction process classification schedule
Technology category Pile foundation stake position Remarks
Common drought stake 5-1、5-2、5-3
Pile foundation in water 8 pile of 6# pier Steel platform need to be set up
Double steel pile casting solution cavities 5-4、5-5、5-6、5-8、6-5、6-6 6-5,6-6 need to set up steel platform
Single steel pile casting solution cavity 6-1、6-2、6-7、6-8 Steel platform need to be set up
As shown in Figures 1 to 9, double steel pile castings of the invention add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method The following steps are included:
One, outer steel pile casting vibration-sunk, first smooth location, built-in length 2m, diameter 2.7m, wall thickness are 10mm's Aperture retaining wall steel pile casting.
Two, block stamp punching presses normal punching technology punching using block stamp, more than punching to Upper Plate of Karst Cave, to the top of solution cavity Plate thickness is rushed in solution cavity rimrock layer less than 1m, mentions hammer and portal.
Three, alternately operating is sunk up to outer sinking steel protecting canister to Upper Plate of Karst Cave 0.2m using DZ90 vibration hammer auxiliary, Pile monkey can be used when vibration-sunk is had any problem and be blown to sinking (outer steel pile casting top solder fashioned iron stress frame).
Four, it mentions hammer to portal, throwing bagged cement and wire netting fragment, small stroke block stamp mix, and mention hammer and portal, and stand observation 24 hours, Upper Plate of Karst Cave was uneven, and throwing bagged cement and wire netting fragment are mainly used for blocking outer steel pile casting and solution cavity top Gap between plate, to prevent external drift sand from entering in outer steel pile casting.
Five, small bore wears out Upper Plate of Karst Cave, fills up solution cavity by small bore water filling, water filling is filled up solution cavity observation and all gone well Backlash punctures broken Upper Plate of Karst Cave, and main function is the differential water pressures and detection solution cavity size eliminated inside and outside solution cavity, prevents the big face of punching Product, which pierces through Upper Plate of Karst Cave and forms moment solution cavity and inhale, to flow, and causes immense pressure inside and outside outer steel pile casting poor, and then casing is caused to deform And periphery layer of sand collapses.Aperture moisturizing filling solution cavity is opened using geological prospecting brill in advance, high degree slows down outer steel pile casting water Head is lost speed, avoids moment from forming immense pressure inside and outside casing poor.It takes inside and outside the measures balance external steel pile casting such as moisturizing simultaneously Pressure.The method largely reduces the deformation of outer steel pile casting, the collapsing of periphery layer of sand and bottom spillage.
Six, the small stroke of block stamp is gently hammered into shape, slow puncture breaks Upper Plate of Karst Cave or drill Upper Plate of Karst Cave, to prevent outer steel pile casting spillage, It uses diameter for the slow punching of small stroke of 0.5~1m of block stamp of 2.1m, restores normal punching speed after entering rock stratum 0.5m. Geologic information is compareed, gradually slows down punching speed when about 0.5m when close to Upper Plate of Karst Cave ground, prevents the moment of breakdown top plate Block stamp falls through to be generated enormous impact force and is broken hammer to wirerope.1.5m is less than for thickness or has the solution cavity of crack and interlayer Top plate, drilled using churning driven or the every 40cm spacing in periphery in outer steel pile casting along top plate uniformly drill after light block stamp hit It wears.
Seven, it mentions hammer to portal, hang into interior steel pile casting, the positioning of interior steel pile casting is using the form marked on outer steel pile casting: Before mentioning hammer and portalling, hole center is determined by the way of hanging cross hairs, and make a mark on outer steel pile casting, according to making Label and interior steel pile casting diameter, determine in horizontal distance between steel pile casting and mark point, it is fixed in the label spot welding of outer steel pile casting Position steelframe, after interior steel pile casting is in place, backfill clay, slabstone and bagged cement are filled into solution cavity top, later again punching to solution cavity Bottom, it is repeated multiple times until determining that solution cavity has been filled with.
Eight, the punching of block stamp pinch shock filler enters solution cavity bottom plate 1m.
Nine, interior sinking steel protecting canister to solution cavity bottom plate enters bottom plate 1m.
Ten, after interior sinking steel protecting canister is in place, diameter is used instead as 1.8m and rushes pile monkey by normal process punching to pile foundation of bridge pier Designed elevation.
Double steel pile castings of the invention include outer steel pile casting and interior steel pile casting, wherein the diameter of outer steel pile casting is 2500mm, wall Thick 15mm, the diameter of interior steel pile casting are 2200mm, wall thickness 10mm.Gap between inside and outside steel pile casting is filled using C30 Underwater Concrete, It fills from Upper Plate of Karst Cave face to cushion cap base surface.Outer steel pile casting enters Upper Plate of Karst Cave 0.2m, for riverbank (the 5 of the present embodiment Axis) pile foundation, be higher by original ground 0.5m, for the pile foundation of river levee (6 axis of the present embodiment), be higher by one-shot job steel platform (because In the pile foundation of river levee construction, one-shot job steel platform is set) 0.3m.Outer steel pile casting shield used when being using punching pile driving construction Cylinder achievees the purpose that save material.
In the step 4, the consolidation thickness that throwing bagged cement and wire netting fragment are formed is 1.5m.
In the step 7, cylindrical body that throwing slabstone and clay amount are formed with the area of a circle of a height of diameter in hole multiplied by hole height 1.5 times of calculating, the ratio of slabstone, clay and bagged cement is 6:3:1;It is deep to reach burial for throwing bagged cement in outer steel pile casting Spend 1.5m.
In addition, in the present invention, the pile foundation solution cavity sequence of construction of the same cushion cap is the pile foundation of first construction Upper Plate of Karst Cave thickness, The thin pile foundation of Upper Plate of Karst Cave of constructing again.
Solution cavity distribution situation list
5 axis, 6 axis bridge pier part pile foundation karst cave treatment lists
Wherein, the cylindrical body that the slabstone in solution cavity and clay amount are formed with the area of a circle of a height of diameter in hole multiplied by hole height 1.5 times of calculating, the ratio of slabstone, clay and bagged cement are 6:3:1, then the project amount of slabstone is 4015.23m3, the work of clay Journey amount is 2007.61m3, the project amount of bagged cement is 669.21m3.The project amount of solution cavity slabstone, clay and bagged cement is temporary Calmly, it is settled accounts when clearing by the project amount actually occurred.
Outer steel pile casting enters Upper Plate of Karst Cave 0.2m, for 5 axis pile foundations, is higher by original ground 0.5m, for 6 axis pile foundations, is higher by Operation steel platform 0.3m.Changing the increased outer steel pile casting project amount of 5 axis, 6 axis pile foundations is 118.994t.
Gap between inside and outside steel pile casting is filled using C30 Underwater Concrete, is filled from Upper Plate of Karst Cave face to cushion cap base surface, Its project amount is 101.67m3.Throwing bagged cement reaches burying depth 1.5m in outer steel pile casting, and bagged cement amount is 55.2t.
Karst cave treatment in pile foundation construction confirms the engineering design by understanding the geological condition in engineering location in detail Pile foundation type the position that solution cavity occurs is grasped, and substantially infer it according to pile foundation stake position geology, pile foundation type, hydrological data Range, filling situation and property, formulate suitable arrangement and method for construction and construction technology safeguard.
The principle of karst cave treatment mainly includes following aspect in pile foundation construction:
(1) to ensure the detailed exploration of every pile, to select corresponding arrangement and method for construction to provide foundation;
(2) soil test, the physical parameters such as detection bulk density, porosity, water content are carried out to the filler of processing solution cavity;
(3) corresponding karst cave treatment scheme and forming hole method will be designed to every pile.
Double steel pile castings of the invention add throwing clay slabstone processing pile foundation of bridge pier solution cavity construction method in outer sinking steel protecting canister When to Upper Plate of Karst Cave, throwing bagged cement and wire netting fragment, for blocking the gap between outer steel pile casting and Upper Plate of Karst Cave, with Prevent external drift sand from entering in casing;Upper Plate of Karst Cave is worn out using small bore, solution cavity is filled up by small bore water filling, it is molten to eliminate Differential water pressures and detection solution cavity size inside and outside hole, take the measures balance external steel pile casting external and internal pressure such as moisturizing, largely subtract Few outer steel pile casting deformation, the collapsing of periphery layer of sand and bottom spillage and so on.Double steel pile castings of the invention add throwing glutinous Native slabstone processing pile foundation of bridge pier solution cavity construction method has technical feasibility, economical rationality, simple process, easy to operate, construction peace Full advantage meets the developing direction of modern engineering technology, has biggish promotion prospect.
The above is a preferred embodiment of the present invention, cannot limit the right model of the present invention with this certainly It encloses, it is noted that for those skilled in the art, without departing from the principle of the present invention, may be used also To make several improvement and variation, these, which improve and change, is also considered as protection scope of the present invention.

Claims (7)

1. a kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, it is characterised in that: including following Step:
One, outer steel pile casting vibration-sunk;
Two, block stamp punching;
Three, alternately operating is up to outer sinking steel protecting canister to Upper Plate of Karst Cave 0.2m;
Four, it mentions hammer to portal, throwing bagged cement and wire netting fragment, small stroke block stamp mix, and mention hammer and portal, and it is small to stand observation 24 When;
Five, small bore wears out Upper Plate of Karst Cave, fills up solution cavity by small bore water filling;
Six, the small stroke of block stamp is gently hammered into shape, slow breakdown breaks Upper Plate of Karst Cave or drills Upper Plate of Karst Cave;
Seven, it mentions hammer to portal, hangs into interior steel pile casting, backfill clay, slabstone and bagged cement, be filled into solution cavity top, later again Punching is repeated multiple times until determining that solution cavity has been filled with to solution cavity bottom;
Eight, the punching of block stamp pinch shock filler enters solution cavity bottom plate 1m;
Nine, interior sinking steel protecting canister to solution cavity bottom plate enters bottom plate 1m.
Ten, designed elevation of the continuation punching to pile foundation of bridge pier.
2. double steel pile castings as described in claim 1 add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, feature Be: outer steel pile casting casing used when being using punching pile driving construction, the diameter of outer steel pile casting are 2500mm, wall thickness 15mm, the diameter of interior steel pile casting are 2200mm, wall thickness 10mm;
Gap between the interior steel pile casting and outer steel pile casting is filled using C30 Underwater Concrete, is filled from Upper Plate of Karst Cave face to cushion cap Base surface;
When the outer steel pile casting enters Upper Plate of Karst Cave 0.2m, for the pile foundation on riverbank, outer steel pile casting is higher by original ground 0.5m, for The pile foundation of river levee, outer steel pile casting are higher by one-shot job steel platform 0.3m.
3. double steel pile castings as described in claim 1 add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, feature Be: in the step 4: the consolidation thickness that the throwing bagged cement and wire netting fragment are formed is 1.5m.
4. double steel pile castings as described in claim 1 add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, feature Be: in the step 5: water filling fills up solution cavity observation and all goes well the broken Upper Plate of Karst Cave of backlash breakdown, fills the water for eliminating solution cavity Inside and outside differential water pressures and detection solution cavity size.
5. double steel pile castings as described in claim 1 add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, feature Be: in the step 6: 1.5m is less than for thickness or has the Upper Plate of Karst Cave of crack and interlayer, drilled using churning driven or In outer steel pile casting along the every 40cm spacing in the periphery of top plate uniformly drill after light block stamp puncture.
6. double steel pile castings as described in claim 1 add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, feature It is: in the step 7:
1.5 times of calculating of the cylindrical body that throwing slabstone and clay amount are formed with the area of a circle of a height of diameter in hole multiplied by hole height, slabstone, The ratio of clay and bagged cement is 6:3:1.
7. double steel pile castings as described in claim 1 add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method, feature Be: the pile foundation solution cavity sequence of construction of the same cushion cap is the pile foundation of Upper Plate of Karst Cave thickness of first constructing, then Upper Plate of Karst Cave of constructing is thin Pile foundation.
CN201810684229.XA 2018-06-28 2018-06-28 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method Pending CN108978642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810684229.XA CN108978642A (en) 2018-06-28 2018-06-28 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810684229.XA CN108978642A (en) 2018-06-28 2018-06-28 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method

Publications (1)

Publication Number Publication Date
CN108978642A true CN108978642A (en) 2018-12-11

Family

ID=64539198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810684229.XA Pending CN108978642A (en) 2018-06-28 2018-06-28 A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method

Country Status (1)

Country Link
CN (1) CN108978642A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055948A (en) * 2019-04-29 2019-07-26 华东交通大学 A kind of big Treatment Methods of Karst Foundation of depth and device
CN110512594A (en) * 2019-08-20 2019-11-29 北京建材地质工程有限公司 The simple and easy method of churning driven opportunity cavity pore-forming
CN111021949A (en) * 2019-10-28 2020-04-17 中国一冶集团有限公司 Drilling method for improving impact drilling on sand layer and mud rock layer
CN111549775A (en) * 2020-05-29 2020-08-18 贵州建工集团第一建筑工程有限责任公司 Hole pile construction method under karst geological condition
CN112523205A (en) * 2020-11-24 2021-03-19 中铁大桥局集团第五工程有限公司 Pile foundation construction method for easy-collapse thick covering layer opening karst cave geology
CN113605434A (en) * 2021-09-06 2021-11-05 中铁二十二局集团第二工程有限公司 Bridge pile foundation construction method for high-speed railway karst
CN114934538A (en) * 2022-04-13 2022-08-23 中铁三局集团广东建设工程有限公司 Karst bridge pile foundation construction process
CN115110520A (en) * 2022-04-27 2022-09-27 中国建筑第七工程局有限公司 Construction method of bridge pile foundation on highway
CN115162319A (en) * 2022-07-25 2022-10-11 福建冶地恒元建设有限公司 Water plugging treatment device and method for seepage holes in underground karst cave wall in cast-in-place pile construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202298612U (en) * 2011-09-26 2012-07-04 中交第二航务工程局有限公司 Steel casing used in construction of pile foundation in pebble cover layer super karst growth area
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN206752456U (en) * 2017-04-11 2017-12-15 中铁航空港集团第二工程有限公司 Airway double steel pile castings in underground are worn under pile foundation
CN107938676A (en) * 2017-11-21 2018-04-20 重庆建工市政交通工程有限责任公司 A kind of pile base construction method for passing through full packing type solution cavity
CN108049395A (en) * 2017-12-12 2018-05-18 广州市城市规划勘测设计研究院 A kind of anti-collapse impact holing construction method in complex karst place

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202298612U (en) * 2011-09-26 2012-07-04 中交第二航务工程局有限公司 Steel casing used in construction of pile foundation in pebble cover layer super karst growth area
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN206752456U (en) * 2017-04-11 2017-12-15 中铁航空港集团第二工程有限公司 Airway double steel pile castings in underground are worn under pile foundation
CN107938676A (en) * 2017-11-21 2018-04-20 重庆建工市政交通工程有限责任公司 A kind of pile base construction method for passing through full packing type solution cavity
CN108049395A (en) * 2017-12-12 2018-05-18 广州市城市规划勘测设计研究院 A kind of anti-collapse impact holing construction method in complex karst place

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张庆来: "探讨岩溶地质钻孔灌注桩施工的处理与预防", 《地质·勘察·测绘》 *
邱平: "《探索与研究》", 31 July 2004 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055948A (en) * 2019-04-29 2019-07-26 华东交通大学 A kind of big Treatment Methods of Karst Foundation of depth and device
CN110512594A (en) * 2019-08-20 2019-11-29 北京建材地质工程有限公司 The simple and easy method of churning driven opportunity cavity pore-forming
CN111021949A (en) * 2019-10-28 2020-04-17 中国一冶集团有限公司 Drilling method for improving impact drilling on sand layer and mud rock layer
CN111549775A (en) * 2020-05-29 2020-08-18 贵州建工集团第一建筑工程有限责任公司 Hole pile construction method under karst geological condition
CN112523205A (en) * 2020-11-24 2021-03-19 中铁大桥局集团第五工程有限公司 Pile foundation construction method for easy-collapse thick covering layer opening karst cave geology
CN113605434A (en) * 2021-09-06 2021-11-05 中铁二十二局集团第二工程有限公司 Bridge pile foundation construction method for high-speed railway karst
CN114934538A (en) * 2022-04-13 2022-08-23 中铁三局集团广东建设工程有限公司 Karst bridge pile foundation construction process
CN115110520A (en) * 2022-04-27 2022-09-27 中国建筑第七工程局有限公司 Construction method of bridge pile foundation on highway
CN115162319A (en) * 2022-07-25 2022-10-11 福建冶地恒元建设有限公司 Water plugging treatment device and method for seepage holes in underground karst cave wall in cast-in-place pile construction
CN115162319B (en) * 2022-07-25 2024-01-30 福建冶地恒元建设有限公司 Device and method for treating water seepage Kong Dushui of underground karst cave wall in construction of cast-in-place pile

Similar Documents

Publication Publication Date Title
CN108978642A (en) A kind of double steel pile castings add throwing clay slabstone to handle pile foundation of bridge pier solution cavity construction method
Zhang et al. Performance of braced excavation in residual soil with groundwater drawdown
CN103243747B (en) Deviation rectifying method of prestressed concrete pipe pile foundation
Cui et al. Protection of neighbour buildings due to construction of shield tunnel in mixed ground with sand over weathered granite
Lee et al. Forensic diagnosis of a shield tunnel failure
Wang et al. Research on deformation law of deep foundation pit of station in core region of saturated soft loess based on monitoring
Xu et al. Shanghai center project excavation induced ground surface movements and deformations
Wang et al. Analysis of deep foundation pit construction monitoring in a metro station in Jinan city
Yang et al. Deformation of deep and large foundation pit in soft soil of Fuzhou Subway
CN114413839B (en) Device and method for monitoring complete stacking section of up-down stacking type tunnel
Yao et al. Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings
CN110245426B (en) Finite element refined simulation method for pipe gallery structure pipe jacking construction
Gao et al. Influence of Benoto bored pile construction on nearby existing tunnel: A case study
Ding et al. Analysis of the field monitoring data on soil movements and adjacent building settlement due to shield tunnelling
Yu et al. Analysis of excavating foundation pit to nearby bridge foundation
CN208563317U (en) A kind of karst cave treatment structure for pile foundation of bridge pier different height
CN103334451A (en) Underneath-passing channel formed between high-speed rail piers through secant pile walls and method thereof
CN108894213A (en) A kind of artificial digging pile passes through the construction method of rich water drifting sand layer
Hsiung A case record of bored tunnels in sand based on the Kaohsiung mass rapid transit system project
Liu et al. Correlation between railway subgrade settlement and shield tunneling construction
CN109611114A (en) Crouch the Underground Space Excavation method of existing tunnel under a kind of soil rock compound stratum
Wu et al. Comparison and selection of reinforcement schemes for shield tunnelling close crossing high-speed railway viaduct group
Aye et al. Diaphragm wall support deep-excavations for underground space in Bangkok subsoil
Neher et al. Numerical modeling of a diaphragm wall production process in Rotterdam compared to monitoring data
Jin-Wei et al. Deformation monitoring and numerical simulation of retaining structure in subway station deep foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211

RJ01 Rejection of invention patent application after publication