CN104947648A - Deep replacement dynamic compaction gravel pile foundation reinforcement method - Google Patents

Deep replacement dynamic compaction gravel pile foundation reinforcement method Download PDF

Info

Publication number
CN104947648A
CN104947648A CN201510366590.4A CN201510366590A CN104947648A CN 104947648 A CN104947648 A CN 104947648A CN 201510366590 A CN201510366590 A CN 201510366590A CN 104947648 A CN104947648 A CN 104947648A
Authority
CN
China
Prior art keywords
pile
dynamic
pipe
driver
rammed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510366590.4A
Other languages
Chinese (zh)
Inventor
赵福民
张一萍
陈景辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Machine Construction Group Co ltd
Original Assignee
Shaanxi Construction Machine Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Machine Construction Group Co ltd filed Critical Shaanxi Construction Machine Construction Group Co ltd
Priority to CN201510366590.4A priority Critical patent/CN104947648A/en
Publication of CN104947648A publication Critical patent/CN104947648A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种深层置换强夯碎石桩地基加固方法,包括如下步骤:第一步,将桩机的桩管(5)在桩位上就位对中桩尖(6);第二步,开动桩机的振动锤(3)振动向下沉孔;第三步:用桩机的料斗(1)从进料口(4)第一次灌料;第四步:桩机的桩管(5)提升,强夯扩孔,形成强夯碎石墩;第五步:用料斗(1)从进料口(4)补充灌料;第六步:重复第四步和第五步,直至强夯碎石墩达到桩顶标高。本发明可有效将强夯夯能通过桩管引入地基深处,避免了置换强夯施工工艺和振动碎石桩的工艺缺点,质量高,效益好,工期短,地基加固效果更好。

The invention discloses a ground reinforcement method for deep displacement dynamic rammed stone piles, which comprises the following steps: the first step is to place the pile tube (5) of the pile driver on the pile position and center the pile point (6); the second step The first step is to start the vibratory hammer (3) of the pile driver to vibrate to the sinkhole; the third step: use the hopper (1) of the pile driver to fill the material from the feed port (4) for the first time; the fourth step: the pile of the pile driver The pipe (5) is lifted, and the hole is reamed by dynamic tamping to form a dynamic tamping crushed stone pier; the fifth step: use the hopper (1) to replenish the filling material from the feed port (4); the sixth step: repeat the fourth and fifth steps , until the strongly compacted gravel pier reaches the pile top level. The invention can effectively introduce the dynamic tamping energy into the deep foundation through the pile pipe, avoids the disadvantages of the displacement dynamic tamping construction technology and the vibrating gravel pile, and has high quality, good benefit, short construction period and better foundation reinforcement effect.

Description

深层置换强夯碎石桩地基加固方法Foundation reinforcement method of deep displacement dynamic rammed stone piles

技术领域:Technical field:

本发明属于建筑工程技术领域,具体涉及一种深层置换强夯碎石桩地基加固方法。The invention belongs to the technical field of construction engineering, and in particular relates to a foundation reinforcement method for deep displacement dynamic rammed stone piles.

背景技术:Background technique:

干振碎石桩施工工艺及强夯置换施工工艺均为沿海沿江淤泥质土、填土区等软弱土地基常见的挤密复合地基处理方法,但两种方法各有其优点与缺陷,在实际工程应用中有所限制。如强夯置换法中地基土孔隙水对夯能损耗过大,夯能影响深度较小,设备在软弱地基上行走困难,强夯拔锤困难,振动碎石桩在饱和淤泥质土中下料困难,容易产生缩颈等通病,成桩桩径小质量差等缺点。The dry-vibration crushed stone pile construction technology and the dynamic compaction replacement construction technology are common compaction composite foundation treatment methods for soft soil foundations such as muddy soil and fill areas along the coast, but the two methods have their own advantages and disadvantages. There are limitations in engineering applications. For example, in the dynamic ramming replacement method, the pore water in the foundation soil has too much loss of ramming energy, the impact of ramming energy on the depth is small, it is difficult for the equipment to walk on the weak foundation, it is difficult to pull out the hammer of the dynamic ramming, and the vibrating gravel pile is unloaded in the saturated muddy soil Difficult, prone to common problems such as necking, piles with small pile diameters and poor quality.

发明内容:Invention content:

本发明的目的在于克服上述两种施工工艺的缺点,综合两种工艺的优点,提供了一种深层置换强夯碎石桩地基加固方法。The purpose of the present invention is to overcome the shortcomings of the above two construction techniques, and combine the advantages of the two techniques to provide a deep replacement dynamic rammed gravel pile foundation reinforcement method.

为达到上述目的,本发明采用如下的技术方案予以实现:In order to achieve the above object, the present invention adopts following technical scheme to realize:

深层置换强夯碎石桩地基加固方法,包括如下步骤:The method for strengthening the foundation of deep replacement dynamic rammed stone piles includes the following steps:

第一步,将桩机的桩管在桩位上就位对中桩尖;The first step is to place the pile tube of the pile driver on the pile position and center the pile tip;

第二步,开动桩机的振动锤振动向下沉孔;In the second step, start the vibrating hammer of the pile driver to vibrate to the sinkhole;

第三步:用桩机的料斗从进料口第一次灌料;The third step: use the hopper of the pile driver to fill the material from the feed port for the first time;

第四步:桩机的桩管提升,强夯扩孔,形成强夯碎石墩;Step 4: The pile tube of the pile driver is lifted, and the hole is reamed by dynamic compaction to form a dynamic compacted gravel pier;

第五步:用料斗从进料口补充灌料;Step 5: Use the hopper to supplement the filling from the feed port;

第六步:重复第四步和第五步,直至强夯碎石墩达到桩顶标高。Step 6: Repeat steps 4 and 5 until the strongly compacted gravel pier reaches the pile top level.

本发明进一步的改进在于,第一步的具体步骤如下:将桩机的桩尖放置在验收合格的桩位上,桩机移动,桩机的桩管对中桩尖。The further improvement of the present invention is that the specific steps of the first step are as follows: the pile tip of the pile driver is placed on the accepted pile position, the pile driver moves, and the pile pipe of the pile driver is centered on the pile tip.

本发明进一步的改进在于,第二步的具体步骤如下:桩机的桩管在自由状态下对正桩位,利用桩机的夯锤及桩管自重静压1-2m后,开动桩机的振动锤振动向下沉孔,直至设计深度。The further improvement of the present invention is that the specific steps of the second step are as follows: the pile pipe of the pile driver aligns the pile position in a free state, and after utilizing the tamper of the pile driver and the dead weight of the pile pipe for 1-2m static pressure, start the pile driver. The vibratory hammer vibrates down the sinkhole to the design depth.

本发明进一步的改进在于,利用夯击夯锤辅助向下沉孔,直至设计深度。A further improvement of the present invention lies in that the ramming hammer is used to assist in sinking down the hole until the design depth is achieved.

本发明进一步的改进在于,第三步的具体步骤如下:停止振动,用桩机的料斗从进料口第一次灌料。The further improvement of the present invention is that the specific steps of the third step are as follows: stop the vibration, and use the hopper of the pile driver to fill the material from the feed port for the first time.

本发明进一步的改进在于,第四步的具体步骤如下:启动振动锤,先振动再开始拔出部分桩管,然后边振动边拔出桩管,拔出桩管1米后启动夯锤夯击,然后一边夯击一边拔出桩管,进而形成强夯碎石墩。The further improvement of the present invention is that the specific steps of the fourth step are as follows: start the vibrating hammer, vibrate first and then start to pull out part of the pile pipe, then pull out the pile pipe while vibrating, and start the rammer to ram after pulling out the pile pipe for 1 meter , and then pull out the pile tube while tamping, and then form a strongly rammed gravel pier.

本发明进一步的改进在于,第五步的具体步骤如下:第一次灌料经夯锤夯击后在桩管下方形成小段强夯碎石墩后,停止振动锤和夯锤,用料斗从进料口补充灌料。The further improvement of the present invention is that the specific steps of the fifth step are as follows: after the first filling material is rammed by the rammer to form a small section of strong rammed stone pier under the pile pipe, stop the vibrating hammer and the rammer, and use the hopper Feed port supplement filling.

本发明进一步的改进在于,第五步的具体步骤如下:重复第四步和第五步,直至强夯碎石墩达到桩顶标高。A further improvement of the present invention is that the specific steps of the fifth step are as follows: repeat the fourth step and the fifth step until the pile top elevation is reached by the dynamic rammed gravel pier.

相对于其它复合地基加固施工工艺比较,本发明具有以下特点和优势:Compared with other composite foundation reinforcement construction techniques, the present invention has the following characteristics and advantages:

1、本发明中夯锤在桩管内进行管内碎石强夯扩孔,没有地基土孔隙水对强夯能量的损耗,强夯夯能影响直接作用于地基深处,有着置换深度大,碎石墩成桩效果好,桩径较大,密实度高的优点。1. In the present invention, the rammer performs dynamic compaction and reaming of crushed stones in the pile pipe, without the loss of foundation soil pore water to the dynamic compaction energy, and the dynamic compaction can directly affect the depth of the foundation, with a large displacement depth and large crushed stones. The pile-forming effect of the pier is good, the pile diameter is large, and the compactness is high.

2、本发明对地基土有振动挤密和重锤管内夯实和满夯动力加固的三重加固效果。2. The present invention has triple reinforcement effects of vibration compaction, internal tamping in the heavy hammer tube and full tamping dynamic reinforcement for the foundation soil.

3、本发明置换强夯与振动碎石桩两种地基处理方法有机的结合起来,最大程度的发扬优势互补的特点,从而达到高质量,低造价,工期短的目的。3. The two ground treatment methods of displacement dynamic ramming and vibrating gravel piles of the present invention are organically combined, and the characteristics of complementary advantages are maximized to achieve the goals of high quality, low cost, and short construction period.

综上所述,本发明振动桩管成桩,管内多次碎石灌料,管内重锤强夯拔管,夯锤在地基深层进行置换强夯,形成桩径大,密实度高的置换碎石墩。总之,本发明以“振动桩管成桩,管内强夯扩孔”为特点,在一个工艺过程中同时融合置换强夯和振动碎石桩两种地基加固工艺,有效的综合了两种工艺方法的优点,避免了各自的缺点,可以达到良好的地基处理效果。To sum up, the vibrating pile tube of the present invention is formed into a pile, and gravel is poured in the tube for many times, and the tube is pulled out by heavy hammer dynamic ramming in the tube. stone pier. In a word, the present invention is characterized by "vibrating piles into piles, dynamic tamping and reaming inside the pipes", and combines the two ground reinforcement techniques of replacement dynamic ramming and vibrating gravel piles in one process, effectively integrating the two techniques. Advantages, to avoid their own shortcomings, can achieve a good foundation treatment effect.

附图说明:Description of drawings:

图1为本发明深层置换强夯碎石桩地基加固方法的工艺流程图。Fig. 1 is a process flow chart of the deep replacement dynamic tamping gravel pile foundation reinforcement method of the present invention.

图中:1-料斗,2-夯锤,3-振动锤,4-进料口,5-管,6-桩尖。In the figure: 1-hopper, 2-rammer, 3-vibration hammer, 4-feed inlet, 5-pipe, 6-pile tip.

具体实施方式:Detailed ways:

以下结合附图和实施例对本发明做进一步的详细描述。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

如图1所示,本发明深层置换强夯碎石桩地基加固方法,包括如下步骤:As shown in Figure 1, the method for strengthening the foundation of the deep replacement dynamic rammed stone pile of the present invention comprises the following steps:

第一步:将桩机的桩管5在桩位上就位对中桩尖6,具体步骤如下:将桩机的桩尖6放置在验收合格的桩位上,桩机移动,桩机的桩管5对中桩尖6,其中,机架必须水平稳固,垂直度满足要求。The first step: place the pile tube 5 of the pile driver on the pile position and center the pile tip 6, the specific steps are as follows: place the pile tip 6 of the pile driver on the pile position that has passed the acceptance check, the pile driver moves, and the pile driver's The pile pipe 5 is aligned with the pile tip 6, wherein the frame must be horizontally stable and the verticality meets the requirements.

第二步:开动桩机的振动锤3振动向下沉孔,具体步骤如下:桩机的桩管5在自由状态下对正桩位,利用桩机的夯锤2及桩管5自重静压1-2m后,开动桩机的振动锤3振动向下沉孔,同时利用夯击夯锤2辅助向下沉孔,直至设计深度。Second step: start the vibration hammer 3 of the pile driver to vibrate to the sinking hole, the specific steps are as follows: the pile pipe 5 of the pile driver is aligned with the pile position in a free state, and the tamper 2 of the pile driver and the pile pipe 5 are used for self-weight static pressure After 1-2m, start the vibrating hammer 3 of the pile driver to vibrate down the sinkhole, and at the same time use the tamping hammer 2 to assist the sinkhole until the designed depth.

第三步:停止振动,用桩机的料斗1从进料口4第一次灌料。需要注意的是,第一次灌料应防止过少填料时,夯锤2夯击时击穿桩底,而落锤失控。The third step: stop the vibration, and use the hopper 1 of the pile driver to fill the material from the feed port 4 for the first time. It should be noted that when the first filling material is too little, the rammer 2 will break through the bottom of the pile when it is rammed, and the falling hammer will lose control.

第四步:桩机的桩管5提升,强夯扩孔,形成强夯碎石墩,具体步骤如下:启动振动锤3,先振动再开始拔出部分桩管5,然后边振动边拔出桩管5,拔出桩管51米后启动夯锤2夯击,然后一边夯击一边拔出桩管5,进而形成强夯碎石墩。The fourth step: the pile tube 5 of the pile driver is lifted, and the hole is reamed by dynamic compaction to form a dynamic compaction gravel pier. The specific steps are as follows: start the vibrating hammer 3, vibrate first and then start to pull out part of the pile tube 5, and then pull out while vibrating Pile pipe 5, after pulling out the pile pipe 51 meters, start the rammer 2 to ram, then pull out the pile pipe 5 while ramming, and then form a strongly compacted gravel pier.

第五步:用料斗1从进料口4补充灌料,具体步骤如下:第一次灌料经夯锤2夯击后在桩管5下方形成小段强夯碎石墩后,停止振动锤3和夯锤2,用料斗1从进料口4补充灌料。Step 5: Use the hopper 1 to replenish the filling material from the feed port 4. The specific steps are as follows: After the first filling material is rammed by the rammer 2, a small section of strong compacted gravel pier is formed under the pile pipe 5, and the vibrating hammer 3 is stopped. And rammer 2, use hopper 1 to replenish filling material from feed port 4.

第六步:重复第四步和第五步,直至强夯碎石墩达到桩顶标高。Step 6: Repeat steps 4 and 5 until the strongly compacted gravel pier reaches the pile top level.

实施例Example

1)平整场地,清理地下障碍物,以保证场地平整度符合桩机施工行走要求。1) Level the site and clear underground obstacles to ensure that the site levelness meets the requirements for pile driver construction.

2)试验性施工:大面积施工前应选择有代表性的地点进行成桩工艺试验,试验施工应当检验施工时夯击能量、碎石投放量、充盈系数等施工参数及沉桩可行性2) Experimental construction: Before large-scale construction, a representative site should be selected for pile-forming process tests. During the test construction, construction parameters such as tamping energy, amount of crushed stones, filling coefficient and other construction parameters and the feasibility of pile sinking should be inspected.

3)根据地段的地基、桩径及桩长情况,选择合适的机械设备。可选用振动沉桩机进行改造,加配卷扬、重力夯锤,并设有二次投料口。3) According to the foundation, pile diameter and pile length of the lot, select the appropriate mechanical equipment. A vibratory pile sinker can be used for transformation, with a winch, a gravity rammer, and a secondary feeding port.

4)桩机就位:桩尖6放置在桩位上,桩机就位时,机架必须水平稳固,桩管垂直对中桩尖。4) The pile driver is in place: the pile point 6 is placed on the pile position. When the pile driver is in place, the frame must be horizontal and stable, and the pile pipe is vertically aligned with the pile point.

5)振动向下沉孔5) Vibration down the sink hole

机械就位合格后,桩管5在自由状态下对正桩位,利用夯锤及桩管自重静压1-2m后开动振动锤3振动下沉,且宜收紧加压钢丝绳提高桩管5效率,并且可以利用夯锤辅助沉孔,直至设计深度。其中,桩管5深度以设计要求的起算面计算,在桩管5和桩架上应做相应标识,控制桩长。After the mechanical position is qualified, the pile tube 5 is aligned to the pile position in a free state, and the vibrating hammer 3 is started to vibrate and sink after using the rammer and the pile tube's self-weight static pressure for 1-2m, and the pressurized steel wire rope should be tightened to raise the pile tube 5 Efficiency and can be assisted by a tamper to counterbore to the design depth. Wherein, the depth of the pile tube 5 is calculated based on the calculation plane required by the design, and corresponding marks should be made on the pile tube 5 and the pile frame to control the pile length.

6)第一次灌料6) The first filling

桩管5至设计深度时,停振灌料。根据管径、成桩后碎石墩直径及充盈系数,计算每延米碎石灌入量,及每次灌料量和拔管高度。第一次灌料应防止过少填料时,夯锤夯击时击穿桩底,而落锤失控。When the pile pipe 5 reaches the design depth, stop the vibration filling. According to the diameter of the pipe, the diameter of the gravel pier after pile formation and the filling coefficient, the amount of gravel per linear meter, the amount of each filling and the height of pipe removal are calculated. The first filling should prevent the rammer from breaking through the bottom of the pile when there is too little filling, and the hammer falling out of control.

7)桩管提升并夯击扩桩7) The pile tube is lifted and rammed to expand the pile

先振动再开始拔管,边振动边拔出桩管5,拔出桩管5至1米后启动夯锤2夯击,然后一边夯击一边提升桩管5。需要注意的是,初始夯击时,不宜夯击能过高,防止夯锤失控,应逐步提高能量,满足设计要求的桩径填料量即可。此外,还要严格按工艺性试桩提供的技术参数及成桩步骤控制拔管高度和拔管速度,确保桩管内有足够的碎石,保证桩身的连续性。不应出现拔空现象,随时检查桩管内料面高度。并且,在饱和的淤泥或淤泥质软土中成桩时穿越软弱土层过程中减少拔管高度,同时严格控制在软弱土层中的拔管速度。Vibrate first and then start pulling out the pipe, pull out the pile pipe 5 while vibrating, start the rammer 2 to tamp after pulling out the pile pipe 5 to 1 meter, and then promote the pile pipe 5 while tamping. It should be noted that during the initial tamping, the tamping energy should not be too high to prevent the rammer from getting out of control, and the energy should be gradually increased to meet the pile diameter filling amount required by the design. In addition, it is necessary to strictly follow the technical parameters provided by the technological test pile and the pile-forming steps to control the height and speed of the pipe removal, so as to ensure that there is enough gravel in the pile pipe to ensure the continuity of the pile body. There should be no hollowing out, and the height of the material surface in the pile tube should be checked at any time. And, when forming a pile in saturated silt or muddy soft soil, reduce the extubation height in the process of crossing the soft soil layer, and strictly control the extubation speed in the soft soil layer.

8)重复灌料提升扩孔直至强夯碎石墩达到桩顶标高8) Repeat the grouting, lifting and reaming until the strongly compacted gravel pier reaches the pile top elevation

确认扩桩直径后,提升夯锤加料,再次继续提升桩管5,再次夯击,周而复始至桩顶成桩,并控制好桩顶标高。需要注意的是,桩管拔出地面时,单桩最后一次加料必须将设计碎石用量全部用完。严格控制单桩投料量,经计算后用料斗计数使单桩投料量大于设计成孔计算体积和充盈系数的乘积。After confirming the diameter of the expanded pile, raise the rammer to feed materials, continue to raise the pile tube 5 again, and tamp again, and repeat until the top of the pile is formed into a pile, and the elevation of the top of the pile is well controlled. It should be noted that when the pile pipe is pulled out of the ground, the designed amount of gravel must be used up for the last feeding of the single pile. Strictly control the feeding amount of the single pile, and use the hopper to count after calculation to make the feeding amount of the single pile larger than the product of the calculated volume of the designed hole and the filling coefficient.

9)成孔移机:移动机具,至下一桩施工。9) Hole transfer machine: move the machine tool to the next pile construction.

为减少桩距较近(小于3倍桩径)时连续施工对地基土的扰动和成桩的影响,相邻桩应间隔跳跃施工,减少扰动影响。In order to reduce the impact of continuous construction on the disturbance of foundation soil and pile formation when the pile distance is relatively close (less than 3 times the pile diameter), adjacent piles should be constructed by jumping at intervals to reduce the impact of disturbance.

10)满夯:强夯置换后整个场地进行低能量满夯,夯击时点与点之间宜搭接1/4锤径,满夯击数不少于2击。10) Full tamping: After the replacement of dynamic tamping, low-energy full tamping should be carried out on the entire site, and 1/4 of the hammer diameter should be overlapped between points during tamping, and the number of full tamping should not be less than 2 blows.

上述质量控制重点为单桩投料量,经计算后用料斗计数使单桩投料量大于设计成孔计算体积和充盈系数的乘积。The above-mentioned quality control focuses on the feeding amount of the single pile. After calculation, the feeding amount of the single pile is counted by the hopper to make the feeding amount of the single pile larger than the product of the calculated volume of the designed hole and the filling coefficient.

综上所述,相对于其它复合地基加固施工工艺比较,本发明具有以下特点和优势:In summary, compared with other composite foundation reinforcement construction techniques, the present invention has the following characteristics and advantages:

(1)本发明中夯锤在桩管内进行管内碎石强夯扩孔,没有地基土孔隙水对强夯能量的损耗,强夯夯能影响直接作用于地基深处,有着置换深度大,碎石墩成桩效果好,桩径较大,密实度高的优点。(1) In the present invention, the rammer carries out dynamic ramming and reaming of crushed stones in the pile pipe, without the loss of foundation soil pore water to the dynamic ramming energy, and the dynamic ramming can directly affect the depth of the foundation, and has a large displacement depth, crushing Stone piers have good pile-forming effect, large pile diameter and high compactness.

(2)本发明对地基土有振动挤密、桩管内夯实和满夯动力加固的三重加固效果。(2) The present invention has triple reinforcement effects of vibration compaction, internal tamping in pile pipes and full tamping dynamic reinforcement for foundation soil.

(3)本发明置换强夯与振动碎石桩两种地基处理方法有机的结合起来,最大程度的发扬优势互补的特点,从而达到高质量,低造价,工期短的目的。(3) The two foundation treatment methods of the present invention, the displacement dynamic compaction and the vibrating gravel pile, are organically combined, and the characteristics of complementary advantages are developed to the greatest extent, so as to achieve the goals of high quality, low cost and short construction period.

综上所述,本发明振动桩管成桩,管内多次碎石灌料,管内重锤强夯拔管,夯锤在地基深层进行置换强夯,形成桩径大,密实度高的置换碎石墩。To sum up, the vibrating pile tube of the present invention is formed into a pile, and gravel is poured in the tube for many times, and the tube is pulled out by heavy hammer dynamic ramming in the tube. stone pier.

Claims (8)

1.深层置换强夯碎石桩地基加固方法,其特征在于,包括如下步骤:1. The method for strengthening the foundation of a deep displacement dynamic rammed stone pile, is characterized in that it comprises the following steps: 第一步,将桩机的桩管(5)在桩位上就位对中桩尖(6);In the first step, the pile pipe (5) of the pile driver is put in place on the pile position and the pile tip (6) is centered; 第二步,开动桩机的振动锤(3)振动向下沉孔;In the second step, the vibration hammer (3) of the driving pile driver vibrates to the sinkhole; 第三步:用桩机的料斗(1)从进料口(4)第一次灌料;The third step: use the hopper (1) of the pile driver to fill the material from the feed port (4) for the first time; 第四步:桩机的桩管(5)提升,强夯扩孔,形成强夯碎石墩;The fourth step: the pile pipe (5) of the pile driver is lifted, and the hole is reamed by dynamic compaction to form a dynamic compaction gravel pier; 第五步:用料斗(1)从进料口(4)补充灌料;Step 5: Use the hopper (1) to supplement the filling from the feed port (4); 第六步:重复第四步和第五步,直至强夯碎石墩达到桩顶标高。Step 6: Repeat steps 4 and 5 until the strongly compacted gravel pier reaches the pile top level. 2.根据权利要求1所述的深层置换强夯碎石桩地基加固方法,其特征在于,第一步的具体步骤如下:将桩机的桩尖(6)放置在验收合格的桩位上,桩机移动,桩机的桩管(5)对中桩尖(6)。2. deep displacement dynamic tamping gravel pile foundation reinforcement method according to claim 1, is characterized in that, the concrete steps of the first step are as follows: the pile point (6) of pile driver is placed on the pile position of acceptance, The pile driver moves, and the pile pipe (5) of the pile driver is centered on the pile tip (6). 3.根据权利要求2所述的深层置换强夯碎石桩地基加固方法,其特征在于,第二步的具体步骤如下:桩机的桩管(5)在自由状态下对正桩位,利用桩机的夯锤(2)及桩管(5)自重静压1-2m后,开动桩机的振动锤(3)振动向下沉孔,直至设计深度。3. deep displacement dynamic tamping gravel pile foundation reinforcement method according to claim 2, is characterized in that, the concrete steps of second step are as follows: the pile pipe (5) of pile driver aligns pile position under free state, utilizes After the tamper (2) of the pile driver and the pile pipe (5) are statically pressed by weight for 1-2m, the vibration hammer (3) of the pile driver is driven to vibrate to the sinkhole until the design depth. 4.根据权利要求3所述的深层置换强夯碎石桩地基加固方法,其特征在于,利用夯击夯锤(2)辅助向下沉孔,直至设计深度。4. The method for strengthening the foundation of deep replacement dynamic rammed stone piles according to claim 3, characterized in that, the ramming hammer (2) is used to assist the sinkhole until the design depth is reached. 5.根据权利要求3所述的深层置换强夯碎石桩地基加固方法,其特征在于,第三步的具体步骤如下:停止振动,用桩机的料斗(1)从进料口(4)第一次灌料。5. The method for strengthening the foundation of deep replacement dynamic rammed stone piles according to claim 3, characterized in that, the specific steps of the third step are as follows: stop the vibration, and use the hopper (1) of the pile driver from the feed port (4) First time priming. 6.根据权利要求5所述的深层置换强夯碎石桩地基加固方法,其特征在于,第四步的具体步骤如下:启动振动锤(3),先振动再开始拔出部分桩管(5),然后边振动边拔出桩管(5),拔出桩管(5)1米后启动夯锤(2)夯击,然后一边夯击一边拔出桩管(5),进而形成强夯碎石墩。6. The deep replacement dynamic rammed gravel pile foundation reinforcement method according to claim 5, characterized in that, the concrete steps of the fourth step are as follows: start the vibrating hammer (3), vibrate first and then start to pull out part of the pile pipe (5 ), then pull out the pile pipe (5) while vibrating, pull out the pile pipe (5) for 1 meter and then start the rammer (2) for tamping, then pull out the pile pipe (5) while tamping, and then form a strong compaction Gravel pier. 7.根据权利要求6所述的深层置换强夯碎石桩地基加固方法,其特征在于,第五步的具体步骤如下:第一次灌料经夯锤(2)夯击后在桩管(5)下方形成小段强夯碎石墩后,停止振动锤(3)和夯锤(2),用料斗(1)从进料口(4)补充灌料。7. The deep replacement dynamic rammed stone pile foundation reinforcement method according to claim 6, characterized in that, the concrete steps of the fifth step are as follows: after the first filling material is rammed by the rammer (2), it is placed in the pile tube ( 5) After forming a small section of strongly compacted crushed stone pier below, stop the vibrating hammer (3) and the rammer (2), and use the hopper (1) to replenish the filling material from the feed port (4). 8.根据权利要求7所述的深层置换强夯碎石桩地基加固方法,其特征在于,第五步的具体步骤如下:重复第四步和第五步,直至强夯碎石墩达到桩顶标高。8. The method for strengthening the foundation of deep replacement dynamic rammed stone piles according to claim 7, characterized in that the specific steps of the fifth step are as follows: repeat the fourth and fifth steps until the rammed stone pier reaches the top of the pile elevation.
CN201510366590.4A 2015-06-26 2015-06-26 Deep replacement dynamic compaction gravel pile foundation reinforcement method Pending CN104947648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510366590.4A CN104947648A (en) 2015-06-26 2015-06-26 Deep replacement dynamic compaction gravel pile foundation reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510366590.4A CN104947648A (en) 2015-06-26 2015-06-26 Deep replacement dynamic compaction gravel pile foundation reinforcement method

Publications (1)

Publication Number Publication Date
CN104947648A true CN104947648A (en) 2015-09-30

Family

ID=54162670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510366590.4A Pending CN104947648A (en) 2015-06-26 2015-06-26 Deep replacement dynamic compaction gravel pile foundation reinforcement method

Country Status (1)

Country Link
CN (1) CN104947648A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869128A (en) * 2017-04-07 2017-06-20 东南大学 Treatment bottom is soft layer, top is liquefaction soil layers ground stake machine and method
CN108643172A (en) * 2018-04-02 2018-10-12 济南城建集团有限公司 Silt geology vibro-replacement stone compacting pile construction method
CN112459051A (en) * 2020-11-09 2021-03-09 中国瑞林工程技术股份有限公司 Construction method for solving problem of excessive irrigation and sediment of pile foundation in karst area
CN114150651A (en) * 2021-12-03 2022-03-08 中交第二航务工程勘察设计院有限公司 Composite foundation reinforcing method for strong ramming combined immersed tube compacted gravel pile
CN114525774A (en) * 2022-02-10 2022-05-24 江西省中蔚建设集团有限公司 Foundation reinforcement construction method
CN115062384A (en) * 2022-06-27 2022-09-16 中交第三航务工程局有限公司 Calculation method for filling coefficient of gravel pile

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869128A (en) * 2017-04-07 2017-06-20 东南大学 Treatment bottom is soft layer, top is liquefaction soil layers ground stake machine and method
CN108643172A (en) * 2018-04-02 2018-10-12 济南城建集团有限公司 Silt geology vibro-replacement stone compacting pile construction method
CN112459051A (en) * 2020-11-09 2021-03-09 中国瑞林工程技术股份有限公司 Construction method for solving problem of excessive irrigation and sediment of pile foundation in karst area
CN114150651A (en) * 2021-12-03 2022-03-08 中交第二航务工程勘察设计院有限公司 Composite foundation reinforcing method for strong ramming combined immersed tube compacted gravel pile
CN114525774A (en) * 2022-02-10 2022-05-24 江西省中蔚建设集团有限公司 Foundation reinforcement construction method
CN115062384A (en) * 2022-06-27 2022-09-16 中交第三航务工程局有限公司 Calculation method for filling coefficient of gravel pile
CN115062384B (en) * 2022-06-27 2025-06-17 中交第三航务工程局有限公司 A method for calculating the filling coefficient of gravel pile

Similar Documents

Publication Publication Date Title
CN102080373B (en) Construction method for jointly treating collapsibility of loess foundation by using DDC (Downhole Dynamic Compaction) pile and pile foundation
CN101781888B (en) Vibration sinking tube compacted gravel-concrete combined pile and construction method thereof
CN103821139B (en) A kind of rammer expands carrier strength core multiple elements design stake and reinforced soft soil ground construction method
CN102733376B (en) Composite pile and its construction method
WO2021072941A1 (en) Method for replacing and reinforcing coastal silt soft soil foundation by performing two-time dynamic rubble compaction
CN101798809B (en) Non-borrow composite underreamed pile constructing method
CN102277867A (en) Construction method for collapsible loess foundation
CN102296588B (en) Construction Technology of Underwater Compacting Sand Pile
CN102011399A (en) PHC pile-based multiple high jet pedestal pile construction method
CN100375820C (en) Concrete pile construction method
CN102733378A (en) Construction method of concrete pile
CN103074882A (en) Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles
CN108643172A (en) Silt geology vibro-replacement stone compacting pile construction method
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN103790148A (en) Combined treatment construction method for collapsible loess foundation
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN106836205B (en) The Macadam Pile Construction method suitable for saturated soft soil
CN202108039U (en) Cylindrical compound concrete macadam placepile
CN102312439A (en) Device and method for treating liquefied foundation with vibrating hammer tube
CN103615002B (en) A kind of expansion end broken stone pile pile steel pipe and construction method
CN110144872B (en) Horizontal dynamic consolidation drainage device and construction method
CN104652407B (en) A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof
CN203383205U (en) Carrier pile and rammed bulb pile device thereof
CN203741824U (en) Rammed carrier strong core multi-component composite pile
CN101899827A (en) Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150930