Method of Driving Sheet Piles into a Rock Substratum

Info

Publication number
GB2008653A
GB2008653A GB7840525A GB7840525A GB2008653A GB 2008653 A GB2008653 A GB 2008653A GB 7840525 A GB7840525 A GB 7840525A GB 7840525 A GB7840525 A GB 7840525A GB 2008653 A GB2008653 A GB 2008653A
Authority
GB
United Kingdom
Prior art keywords
substratum
piles
rock
sheet pile
rock substratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB7840525A
Other versions
GB2008653B (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE2747937A external-priority patent/DE2747937C2/en
Priority claimed from DE19782809098 external-priority patent/DE2809098C2/en
Application filed by Individual filed Critical Individual
Publication of GB2008653A publication Critical patent/GB2008653A/en
Application granted granted Critical
Publication of GB2008653B publication Critical patent/GB2008653B/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/16Loosening of soil or rock, under water

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Processing Of Solid Wastes (AREA)
  • Revetment (AREA)

Abstract

Problems arise when erecting a sheet pile on rock substratum and subsequently anchoring the piles. If a channel is blasted, this has the draw- back that the over burden has to be initially cleared prior to blasting and then replaced subsequently. In addition, the piles when secured in the blasted channel when refilled with concrete and the anchors in the rock substratum are not as securely supported as piles driven into normal substratum. A method of erecting sheet pile and a method of anchoring the sheet pile is disclosed where the substratum is shattered by blasting sufficiently to allow the piles and the anchors, which are also piles, to be driven into the rock substratum. Each method involves drilling bore holes 2 and inserting a water tight charged container 10 into these and determining the volume of charge 12 relative to container volume such that the rock substratum 6 surrounding a bore hole after detonation is not significantly damaged in its external form but has a shattered internal structure allowing pile driving. <IMAGE>
GB7840525A 1977-10-26 1978-10-13 Method of driving sheet piles into a rock substratum Expired GB2008653B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE2747937A DE2747937C2 (en) 1977-10-26 1977-10-26 Method for driving sheet piles into a rock substrate
DE19782809098 DE2809098C2 (en) 1978-03-03 1978-03-03 Method of driving the lower end of a sheet pile pile into a non-pile-driving rock bedrock

Publications (2)

Publication Number Publication Date
GB2008653A true GB2008653A (en) 1979-06-06
GB2008653B GB2008653B (en) 1982-02-03

Family

ID=25772964

Family Applications (1)

Application Number Title Priority Date Filing Date
GB7840525A Expired GB2008653B (en) 1977-10-26 1978-10-13 Method of driving sheet piles into a rock substratum

Country Status (15)

Country Link
JP (1) JPS5932622B2 (en)
AT (1) AT361858B (en)
CA (1) CA1090149A (en)
CH (1) CH634369A5 (en)
CS (1) CS681078A3 (en)
FR (1) FR2407297A1 (en)
GB (1) GB2008653B (en)
HK (1) HK32482A (en)
HU (1) HU178951B (en)
MY (1) MY8300214A (en)
NO (1) NO154730C (en)
RO (1) RO81057A (en)
SE (1) SE432001B (en)
SG (1) SG49082G (en)
YU (1) YU39634B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0228416U (en) * 1988-08-15 1990-02-23

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR457564A (en) * 1913-05-07 1913-09-20 Constant Rostenne Pillar foundation process
FR698619A (en) * 1929-07-19 1931-02-02 Construction and driving process for concrete piles
DE644992C (en) * 1935-09-05 1937-05-19 Wilhelm Hanebeck Dipl Ing Method for driving iron or steel sheet piles
DE1259254B (en) * 1963-12-13 1968-01-18 Bauunternehmung Mast G M B H Device for producing an in-situ concrete pile
DE2208616A1 (en) * 1972-02-24 1973-09-06 Herbert Dahlhaus METHOD OF LAYING DOWN PILING PILES IN AN ALTERNATE ARRANGEMENT WITH THE FORMATION OF SHEET PILS

Also Published As

Publication number Publication date
SG49082G (en) 1983-07-08
CH634369A5 (en) 1983-01-31
GB2008653B (en) 1982-02-03
FR2407297B1 (en) 1983-11-18
MY8300214A (en) 1983-12-31
FR2407297A1 (en) 1979-05-25
NO783611L (en) 1979-04-27
CS681078A3 (en) 1992-02-19
HK32482A (en) 1982-07-23
JPS5932622B2 (en) 1984-08-09
SE432001B (en) 1984-03-12
YU39634B (en) 1985-03-20
SE7811079L (en) 1979-04-27
AT361858B (en) 1981-04-10
ATA733178A (en) 1980-08-15
NO154730B (en) 1986-09-01
JPS54109203A (en) 1979-08-27
RO81057B (en) 1983-01-30
HU178951B (en) 1982-07-28
NO154730C (en) 1986-12-10
RO81057A (en) 1983-02-01
YU248978A (en) 1983-01-21
CA1090149A (en) 1980-11-25

Similar Documents

Publication Publication Date Title
GB1293967A (en) Apparatus for driving members, such as anchors, or piles, into soil, earth, sediment or like materials
SU946409A3 (en) Method for driving lower ends of sheet piles into base soil in erecting sheet piling wall
GB862630A (en) Method of and apparatus for the construction of piles cast in situ from concrete
GB561765A (en) Improvements in piles and foundations
GB2008653A (en) Method of Driving Sheet Piles into a Rock Substratum
CA1212252A (en) Method of driving steel profiles into a rock substratum
GB1020660A (en) Methods for installing nondisplacement sand drains
GB749979A (en) Improved pile anchorage of submerged structures
SU861471A1 (en) Method of windening pile
JPS56111722A (en) Driving method for steel-pipe pile
KR100254734B1 (en) Blasting process for sinking cellular block into the ground under water
JPS56135621A (en) Sand pile construction work in underwater ground
SU984279A1 (en) Method for blowing-up soils with upper season-frost layer
SU1308763A1 (en) Method of constructing solid concrete lining in drilled shafts and wells
SU898080A1 (en) Mine shaft sinking method
SU866101A1 (en) Method of setting charge into unstable rock for simulating seismic action
SU1652593A1 (en) Method for fixing anchor in rocks
JPS5740022A (en) Expanded head pile construction work
SU850801A1 (en) Sagging soil compacting method
JPS5719422A (en) Fixing method of net in process covering slope with net
RU2005190C1 (en) Method of grappling anchor in rocks
SU132163A1 (en) The method of penetration of vertical shafts
RU2241098C1 (en) Method for increasing load-bearing capacity of cast-in-place pile
SU606927A1 (en) Method of forming ground anchor
JPS5545910A (en) Pile pulling method

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee