FR3063369B1 - Dispositif de gestion de l'isolement et procede de gestion de l'isolement - Google Patents

Dispositif de gestion de l'isolement et procede de gestion de l'isolement Download PDF

Info

Publication number
FR3063369B1
FR3063369B1 FR1851684A FR1851684A FR3063369B1 FR 3063369 B1 FR3063369 B1 FR 3063369B1 FR 1851684 A FR1851684 A FR 1851684A FR 1851684 A FR1851684 A FR 1851684A FR 3063369 B1 FR3063369 B1 FR 3063369B1
Authority
FR
France
Prior art keywords
components
target area
insulation management
information
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
FR1851684A
Other languages
English (en)
Other versions
FR3063369A1 (fr
Inventor
Kei Takakura
Susumu Naito
Hidehiko Kuroda
Hiroki Shiba
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Energy Systems and Solutions Corp filed Critical Toshiba Corp
Publication of FR3063369A1 publication Critical patent/FR3063369A1/fr
Application granted granted Critical
Publication of FR3063369B1 publication Critical patent/FR3063369B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0265Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion
    • G05B13/027Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric the criterion being a learning criterion using neural networks only
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0286Modifications to the monitored process, e.g. stopping operation or adapting control
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/004Artificial life, i.e. computing arrangements simulating life
    • G06N3/006Artificial life, i.e. computing arrangements simulating life based on simulated virtual individual or collective life forms, e.g. social simulations or particle swarm optimisation [PSO]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/04Architecture, e.g. interconnection topology
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/08Learning methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32339Object oriented modeling, design, analysis, implementation, simulation language
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/04Architecture, e.g. interconnection topology
    • G06N3/048Activation functions

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Software Systems (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Mathematical Physics (AREA)
  • Computing Systems (AREA)
  • Molecular Biology (AREA)
  • Automation & Control Theory (AREA)
  • Computational Linguistics (AREA)
  • Biophysics (AREA)
  • Biomedical Technology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Manufacturing & Machinery (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Primary Health Care (AREA)
  • Medical Informatics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

Un dispositif de gestion de l'isolement (1) comprenant : une base de données (2) configurée de manière à mémoriser des informations qui se rapportent à une usine construite avec une pluralité de composants (26), les informations comprenant une relation entre la pluralité de composants (26) ; un récepteur configuré de manière à recevoir une désignation des informations de zone cible définissant une zone cible sur l'usine ; un analyseur configuré de manière à analyser une pluralité de profils d'états respectifs de la pluralité de composants (26) en liaison avec un changement d'état d'au moins l'un de la pluralité de composants (26) dans la zone cible, sur la base des informations mémorisées dans la base de données; des circuits d'apprentissage approfondi (9) configurés de manière à extraire au moins un profil spécifique à partir de la pluralité de profils analysés par l'analyseur en tant que profil d'extraction ; un générateur de plan (17) configuré de manière à produire un plan de travail sur la base du profil d'extraction ; et une interface de sortie (18) configurée de manière à délivrer le plan de travail produit par le générateur de plan.
FR1851684A 2017-02-27 2018-02-27 Dispositif de gestion de l'isolement et procede de gestion de l'isolement Active FR3063369B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017034494A JP6789848B2 (ja) 2017-02-27 2017-02-27 アイソレーション管理システムおよびアイソレーション管理方法
JP2017034494 2017-02-27

Publications (2)

Publication Number Publication Date
FR3063369A1 FR3063369A1 (fr) 2018-08-31
FR3063369B1 true FR3063369B1 (fr) 2023-12-01

Family

ID=61783751

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1851684A Active FR3063369B1 (fr) 2017-02-27 2018-02-27 Dispositif de gestion de l'isolement et procede de gestion de l'isolement

Country Status (8)

Country Link
US (1) US20180246478A1 (fr)
JP (1) JP6789848B2 (fr)
KR (2) KR20180099469A (fr)
CN (1) CN108508852B (fr)
CA (1) CA2996576A1 (fr)
FR (1) FR3063369B1 (fr)
GB (1) GB2561073B (fr)
RU (1) RU2678146C1 (fr)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10949595B2 (en) * 2017-06-22 2021-03-16 Semiconductor Energy Laboratory Co., Ltd. Layout design system and layout design method
JP7141320B2 (ja) * 2018-12-05 2022-09-22 株式会社日立製作所 強化学習支援装置、保守計画立案装置、及び強化学習支援方法
JP7179600B2 (ja) * 2018-12-07 2022-11-29 株式会社東芝 アイソレーション管理装置、方法及びプログラム
JP7118916B2 (ja) * 2019-03-20 2022-08-16 株式会社東芝 アイソレーション作業の計画立案支援装置、方法及びプログラム
CN110221926B (zh) * 2019-05-27 2021-11-16 中国电建集团华东勘测设计研究院有限公司 一种高拱坝浇筑进度仿真的隔离计算管理方法
JP7548099B2 (ja) * 2021-03-26 2024-09-10 横河電機株式会社 解析装置、解析方法およびプログラム
CN115098626B (zh) * 2022-06-10 2024-08-09 中核核电运行管理有限公司 一种核电厂隔离信息精准匹配方法
CN116308887B (zh) * 2023-05-12 2023-08-11 北京迅巢科技有限公司 一种智能配电集成平台模型构建方法

Family Cites Families (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1019723B (zh) * 1985-06-11 1992-12-30 三菱电机株式会社 开关装置的电气联锁回路
JPH0646528B2 (ja) 1989-02-08 1994-06-15 富士電機株式会社 多相無接点接触器
JPH02213943A (ja) * 1989-02-15 1990-08-27 Hitachi Ltd 装置の監視診断方法
JPH02299001A (ja) * 1989-05-12 1990-12-11 Toshiba Corp 制御対象同定方法
JPH04199309A (ja) * 1990-11-29 1992-07-20 Hitachi Ltd 計装制御系保守支援装置
JP3058462B2 (ja) * 1991-03-01 2000-07-04 中部電力株式会社 母線点検用電力供給経路推論装置
JP3231403B2 (ja) * 1992-07-22 2001-11-19 株式会社東芝 母線用自動アイソレーション装置
JPH10319180A (ja) * 1997-05-14 1998-12-04 Toshiba Corp プラント異常時復旧支援システム
KR100380308B1 (ko) * 2000-12-12 2003-04-16 한국전기연구원 신경회로망을 이용한 동기 차단기의 개폐 제어장치
JP4059014B2 (ja) * 2001-06-19 2008-03-12 富士電機システムズ株式会社 プラントの最適運用方法及びプラントの最適設計方法
JP3619998B2 (ja) * 2002-01-04 2005-02-16 富士通株式会社 保守管理システム、方法及びプログラム
CN1648922A (zh) * 2005-03-03 2005-08-03 南京科远控制工程有限公司 企业管控一体化管理信息控制方法
JP2008181283A (ja) 2007-01-24 2008-08-07 Toshiba Corp 誤アイソレーション防止装置
JP5268400B2 (ja) * 2008-03-18 2013-08-21 株式会社東芝 工程管理システム
JP5308991B2 (ja) 2009-10-30 2013-10-09 株式会社日立製作所 保守作業計画支援方法及びシステム
DE102012023424B4 (de) * 2012-11-29 2019-08-14 Kostal Industrie Elektrik Gmbh Energieverteilungsanlage mit einer Steuervorrichtung
US10539934B2 (en) * 2014-03-17 2020-01-21 General Electric Technology Gmbh Outage and switch management for a power grid system
KR20150118456A (ko) * 2014-04-14 2015-10-22 엘에스산전 주식회사 감시 장치의 부분방전 진단 방법
CN104156766A (zh) * 2014-07-28 2014-11-19 山东山大世纪科技有限公司 针对高压开关动作时间智能记忆与自学习系统的应用
CN104538222B (zh) * 2014-12-27 2016-09-28 中国西电电气股份有限公司 基于人工神经网络的高压开关选相控制器及方法
US20160241031A1 (en) * 2015-02-18 2016-08-18 Nec Laboratories America, Inc. Dynamic probability-based power outage management system
US10243397B2 (en) * 2015-02-20 2019-03-26 Lifeline IP Holdings, LLC Data center power distribution
US10164431B2 (en) * 2015-03-17 2018-12-25 General Electric Technology Gmbh Outage management and prediction for a power grid system
US10089204B2 (en) * 2015-04-15 2018-10-02 Hamilton Sundstrand Corporation System level fault diagnosis for the air management system of an aircraft
KR101541808B1 (ko) * 2015-04-30 2015-08-04 한국해양과학기술원 딥러닝 알고리즘을 이용한 해상교통관제 전문가 시스템 및 그 제어 방법
US20170032245A1 (en) * 2015-07-01 2017-02-02 The Board Of Trustees Of The Leland Stanford Junior University Systems and Methods for Providing Reinforcement Learning in a Deep Learning System
CN104951905A (zh) * 2015-07-16 2015-09-30 中国神华能源股份有限公司 一种设备动态台账管理系统
JP6174669B2 (ja) * 2015-07-31 2017-08-02 ファナック株式会社 複数の製造機械を有する製造セルを制御するセルコントロールシステム、生産システム、制御方法及び制御プログラム
JP6106226B2 (ja) * 2015-07-31 2017-03-29 ファナック株式会社 ゲインの最適化を学習する機械学習装置及び機械学習装置を備えた電動機制御装置並びに機械学習方法
JP6240689B2 (ja) * 2015-07-31 2017-11-29 ファナック株式会社 人の行動パターンを学習する機械学習装置、ロボット制御装置、ロボットシステム、および機械学習方法
CN105321039B (zh) * 2015-09-24 2022-03-01 国家电网公司 一种隔离开关在线监测数据管理系统及方法
US9536191B1 (en) * 2015-11-25 2017-01-03 Osaro, Inc. Reinforcement learning using confidence scores
CN105787557B (zh) * 2016-02-23 2019-04-19 北京工业大学 一种计算机智能识别的深层神经网络结构设计方法

Also Published As

Publication number Publication date
GB201802549D0 (en) 2018-04-04
KR20200074936A (ko) 2020-06-25
CA2996576A1 (fr) 2018-08-27
KR20180099469A (ko) 2018-09-05
JP2018142060A (ja) 2018-09-13
FR3063369A1 (fr) 2018-08-31
CN108508852A (zh) 2018-09-07
RU2678146C1 (ru) 2019-01-23
GB2561073A (en) 2018-10-03
CN108508852B (zh) 2021-08-03
JP6789848B2 (ja) 2020-11-25
US20180246478A1 (en) 2018-08-30
GB2561073B (en) 2020-10-14

Similar Documents

Publication Publication Date Title
FR3063369B1 (fr) Dispositif de gestion de l'isolement et procede de gestion de l'isolement
EA201792358A1 (ru) Системы, устройства и способы для анализа и мониторинга текучей среды
MY197612A (en) Method and device for processing service calling information
SG11201908394WA (en) System, Method, And Computer Program For Analyzing Operation Of Fluid Control Device
Milzarek Numerical methods and second order theory for nonsmooth problems
CN103823852A (zh) 数据库服务器日志的处理方法和装置
Lorentzen A statistical analysis of sea temperature data: A statistical analysis of sea temperature data
TR202008283A2 (tr) Otomati̇k madde akişi anali̇z ve si̇müle yöntemi̇
Sánchez Quintero A proposal of quality indicators to self-assessment and accreditation of undergraduate programs in management
Farías Nazel Marketing Strategies Used by Chilean Enterprises to Increase customer lifetime value
PL420039A1 (pl) Metoda pozyskiwania informacji i pomocy prawnej
TH1701001416A (fr)
Abdullah The role of marketing information system in strategic marketing decisions
Pangestyo et al. The Cost Comparative Analysis of Steel Frame Bridge Installation Work Methodology Between Using Cranes and Using Launching Gantry in Muara Karang Combined Cycle Power Plant 400-500 Mw Project
Adamovova Saving lives is a hard work: emotion regulation in the work of paramedics
SUNIL et al. SCHOOL COMMUNITY PARTNERSHIOS IN RURAL KERALA; A CRITICAL ANALYSIS
Tanti The The Effect of Work Discipline and Work Motivation on Employee Performance at Jamu Jago Joyokusumo Herbal Medicine Factory
Sinabutar et al. The Analysis of Company Performance of PT. YC YEC Indonesia by Using Balance Score Card Method to Dealing with ASEAN Economics Community
Merhav Comments on" Identifying Functional Thermodynamics in Autonomous Maxwellian Ratchets"(arXiv: 1507.01537 v2)
Jafari et al. New approach in dendro-genetic method for identification of beech tree variability
Rajila et al. AN EXPLORATORY STUDY ON MINORITY STUDENT SUPPORT SERVICES AT UNDER GRADUATE LEVEL IN KERALA
Koltsidopoulos Papatzimos et al. Towards automated and integrated data collection-standardising workflow processes for the offshore wind industry
Azeez et al. The impact of high-intensity hostile to 200 m in some Almngert Albayukimyatah training
Alwis et al. The Impact of Job Related Antecedents on Employees' Intention to Stay of Operational Level Employees in Aegis Services Lanka (Pvt) Limited
Salahat et al. Multi-modal image registration for robotic aerial inspection using mutual information

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

PLSC Publication of the preliminary search report

Effective date: 20210924

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7