EP3717197A1 - Anlage zur herstellung von beschichteten kunststoffbauteilen sowie verfahren hierzu - Google Patents
Anlage zur herstellung von beschichteten kunststoffbauteilen sowie verfahren hierzuInfo
- Publication number
- EP3717197A1 EP3717197A1 EP18778848.4A EP18778848A EP3717197A1 EP 3717197 A1 EP3717197 A1 EP 3717197A1 EP 18778848 A EP18778848 A EP 18778848A EP 3717197 A1 EP3717197 A1 EP 3717197A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- coating
- plastic
- components
- production
- manufacturing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B16/00—Spray booths
- B05B16/20—Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/0053—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor combined with a final operation, e.g. shaping
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/17—Component parts, details or accessories; Auxiliary operations
- B29C45/1769—Handling of moulded articles or runners, e.g. sorting, stacking, grinding of runners
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C64/00—Additive manufacturing, i.e. manufacturing of three-dimensional [3D] objects by additive deposition, additive agglomeration or additive layering, e.g. by 3D printing, stereolithography or selective laser sintering
- B29C64/10—Processes of additive manufacturing
- B29C64/188—Processes of additive manufacturing involving additional operations performed on the added layers, e.g. smoothing, grinding or thickness control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C64/00—Additive manufacturing, i.e. manufacturing of three-dimensional [3D] objects by additive deposition, additive agglomeration or additive layering, e.g. by 3D printing, stereolithography or selective laser sintering
- B29C64/30—Auxiliary operations or equipment
- B29C64/379—Handling of additively manufactured objects, e.g. using robots
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B33—ADDITIVE MANUFACTURING TECHNOLOGY
- B33Y—ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- B33Y40/00—Auxiliary operations or equipment, e.g. for material handling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/04—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
- B05B13/0431—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with spray heads moved by robots or articulated arms, e.g. for applying liquid or other fluent material to three-dimensional [3D] surfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/04—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
- B05B13/0447—Installation or apparatus for applying liquid or other fluent material to conveyed separate articles
- B05B13/0457—Installation or apparatus for applying liquid or other fluent material to conveyed separate articles specially designed for applying liquid or other fluent material to three-dimensional [3D] surfaces of the work, e.g. by using several moving spray heads
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/0053—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor combined with a final operation, e.g. shaping
- B29C2045/0079—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor combined with a final operation, e.g. shaping applying a coating or covering
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B33—ADDITIVE MANUFACTURING TECHNOLOGY
- B33Y—ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- B33Y10/00—Processes of additive manufacturing
Definitions
- the invention relates to a plant for the production of coated components and to a process for producing coated components.
- the components produced by the production machine are first set manually on goods carriers suitable for coating and are brought to an intermediate storage for buffering. Since it is usually the case that the coating system can work continuously and the production machine has to be serviced more frequently, a larger number of components is initially produced. As soon as a sufficient number of components is available for the subsequently to be operated coating system, the coating process for this type of components can be started.
- a disadvantage of this procedure is that a lot of manual working time is required for placing the components on the coating carrier, the intermediate buffers of the components require a correspondingly large-sized buffer store, a corresponding waiting time is required and, in addition, a number of coating goods carriers in the buffer store is stored, which can not be used otherwise and must also be regularly freed from the coating.
- the plant according to the invention for the production of coated components comprises a first production apparatus and at least one second production apparatus for the production of components, for example in additive manufacturing processes and / or by injection molding.
- the system comprises a coating device for surface treatment of components.
- a coating device for surface treatment of components may, for example, be a paint shop in which a paint coat is applied to the components. This may be, for example, a wet paint or a powder paint. Of course, other types of coatings for a suitable surface finishing are possible.
- the coating device has a first coating line, which is assigned to the first production device, and at least one second coating line, which is assigned to the second manufacturing device.
- first coating line which is assigned to the first production device
- second coating line which is assigned to the second manufacturing device.
- two or more coating lines or vice versa for two or more production devices three or more coating lines - in a sense in a matrix arrangement - are provided. This may be due to the throughput of the particular device - coating line or manufacturing device.
- the respective timing of the first and at least the second coating line corresponds to the timing of the associated first and second production device. It is also possible to combine different production machines with at least one coating line, wherein the timing can be adapted in each case. This significantly reduces waiting or dead times of the entire system.
- the first or / and the second production device is an injection molding device and / or an additive manufacturing device.
- the injection molding apparatus can be designed primarily for the production of plastic components.
- the additive manufacturing device also referred to as 3D printing, in the present case stands for a process in which a component is constructed on the basis of three-dimensional design data by, for example, a layered deposition of material. Different materials such as metals, plastics and composite materials can be used.
- one or more manufacturing devices are designed as additive manufacturing devices and the manufacturing process is designed such that a printing process produces several components that are distributed over at least two coating lines.
- the versatility in manufacturing can be exploited by means of additive manufacturing and different components can be produced in one printing operation.
- the different coatings necessary for different components may be realized by two or more coating lines.
- Additive manufacturing devices often operate by means of a layered construction of the component to be manufactured. This can occur due to the layered structure unwanted bumps on the surface of the component.
- a surface treatment of the finished component by annealing, by blasting processes and / or carried out by grinding operations.
- existing support structures may be removed, edges rounded, surfaces polished or / and generally prepared for a subsequent coating. This may also include operations such as suction, blow-off, washing, brushing, chemical surface pretreatment and / or plasma treatment.
- the at least one coating line is designed to coat plastic parts.
- the first coating line and the at least second coating line coating device components such as an air supply, an air discharge, a Be Anlagenungsmaterialzu- drive, a coating material removal, a robot, for example, for handling and / or surface treatment tasks such as coating, ionization , etc., or parts of the coating booth outer shell together. So you need it Shareable components are kept only once per coating device. This reduces the cost price of the coating device and thus the entire system.
- the plant comprises an automatic feeding device assigned to the production devices for feeding the components onto a coating conveyor system by means of which the components can be conveyed to the coating device and through the respective coating installation.
- the components can be connected to a coating article carrier - for example, placed on top of it or placed on it - and held with this coating article carrier during a part of the subsequent treatment, for example drying.
- the automated loading device enables further automation of the system. In conjunction with the synchronized timing of the production devices and the coating line, this results in particularly short coating times.
- an automatic removal of the manufactured components and the transfer to the task device by means of a removal robot can be provided.
- separating steps may take place by means of such a robot or another robot, for example by means of an image recognition device.
- a transfer between individual treatment stations can be done with the help of suitable handling stations such as multi-axis robots with suitable grippers or by suitable conveyors.
- a particularly advantageous system results if a feeding device is arranged in each case between at least one production device and at least one associated coating device. This allows a particularly simple and accurate coordination of the respective timing of the production devices with the coating lines.
- the plant comprises a device for tempering the components, the tempering device being upstream of the coating device or downstream.
- a temperature control such as, for example, a heating of the components and / or a cooling can take place.
- a conversion device for converting the components from the coating product carrier to a temperature-control carrier is arranged between the coating device and the temperature-control device.
- the converting device can supply only one coating line or both coating lines and thus convert the components to a product carrier that is suitable for tempering.
- a coating article carrier can be provided for the components and a transfer device for converting the components with the coating product carrier from the coating delivery system to a tempering conveyor system can be arranged between the coating device and the temperature control device.
- the conversion of a component together with the coating article carrier has the advantage, on the one hand, that there is no need to transfer the coated component from the coating article carrier to another article carrier between the coating device and the temperature control device. It reduces the risk of damaging a possibly not yet fully fixed coating or, for example, a still shock-sensitive coating.
- a reduction of that amount of material can be achieved, which must be cleaned again, especially after coating and tempering.
- the object is also achieved by a method for producing coated components according to the independent method claim.
- the method according to the invention comprises the steps of: producing a first component with a first production device; Producing a second component with a second manufacturing device; Placing the components on a conveyor system, for example with goods carriers; Conveying the first components - for example on the goods carriers - by means of the conveyor system through a first coating line of a coating installation and coating the components in the at least one coating line; Conveying the second components - for example on the goods carriers - by means of the conveyor system through the first or a second coating line of the coating installation and coating of the components in the first or second coating line.
- the first or / and second production device may be, for example, an injection molding device and / or an additive manufacturing device.
- the components are, for example, plastic components, in particular injection-molded components or / and plastic components produced by additive manufacturing.
- a surface treatment may be carried out prior to coating in the sense of smoothing the production-related asperities or cleaning of the components.
- This may include the use of temperature-controlled processes, abrasive treatment processes, chemical surface treatment or / and physical processes such as plasma treatment.
- the production of a component and the associated coating of the component can be timed to one another such that no intermediate storage of the component has to take place.
- the additive manufacturing of components currently requires a longer production time for comparable component sizes and geometries than other production methods such as injection molding. Therefore, for a comparable flow of components, multiple manufacturing devices are needed to populate a coating line that is set up for a different manufacturing process and associated component flows.
- various production methods can also be combined to optimally utilize an existing coating line and to avoid unnecessary idling times.
- an in-mold coating method is used and / or in additive manufacturing, the base color of the component varies, ie that a basic color of the component can be determined during the production.
- the associated coating lines for a subsequent coating of such a component then serve the refinement / remuneration of the surfaces produced, which already have the desired color.
- a tempering or evaporation or curing of the components or the coating of the components produced thereon can take place.
- a coating line such as a Lackierline per injection molding machine and / or at least one additive manufacturing device (SD printer).
- the timing of the respective coating line is tuned to the timing of the injection molding machine or the 3D printer. Handling is only automatic. There is no buffer between the injection molding machines, the 3D printers and the coating lines.
- the transport element can be changed before the dryer / oven. The components are then automatically transferred to dryer carriers after the coating carriers have evaporated. These are on the dryer racks. This results in at least two goods transport holder circles, at least one for the coating per se and at least one for dryer / oven and possibly a subsequent further processing, for example during assembly.
- the number of (individual) to be painted coating carrier can be reduced, including the number of associated coating racks, to which the goods carriers can be attached for a conveying operation , BRIEF DESCRIPTION OF THE DRAWINGS
- Figure 1 in a schematic representation of a first embodiment of a system for
- Figure 2 is a schematic representation of a second embodiment of a plant for the production of plastic components.
- FIG. 1 illustrates in a schematic representation of a first embodiment of a system 10 for the production of plastic components such as vehicle components (bumpers, grille, mirrors, etc.).
- the installation 10 comprises two injection molding machines, namely a first injection molding machine 12 and a second injection molding machine 14, which are indicated only schematically.
- the injection molding machines 12, 14 inject a liquefied plastic under pressure into an injection mold.
- the plastics may be, for example, thermoplastics, thermosets or elastomers.
- the two injection molding machines 12, 14 are shown as identical machines. It is also conceivable that the one injection molding machine has a different structure and possibly also a different throughput than the other injection molding machine. Alternatively, it may be to machines for additive manufacturing instead of injection molding machines. There may also be injection molding machines and machines for additive manufacturing together in the plant. Due to the different production times, more than two machines can be provided for the additive production of plastic components.
- the first injection molding machine 12 provides plastic components 121 of a first type A and the second injection molding machine 14 second plastic components 141 of a second type B ago. It may be that the first type A differs in shape, size, texture or otherwise from the type B. It may also be that both types A and B are the same, but the throughput of the two injection molding machines 12, 14 is different.
- additive production devices also together with injection molding machines, instead of the injection molding machines.
- injection molding machines instead of the injection molding machines.
- consideration can be given to the greatly differing production speeds by the provision of two or more coating lines, without having to provide additional buffering.
- the different components for a component can be produced in different production technologies and divided according to the different production speeds on the respective associated coating lines.
- Each of the two injection molding machines 12, 14 is associated with a feeding device 16, 18.
- the feeding devices 16, 18 take the plastic components 121, 141 produced by the injection molding machines 12, 14 and place them on the coated goods carriers 20.
- identical coating carrier carriers 20 are used both for the plastic components 121 of the first injection molding machine 12 and for the plastic components 141 of the second injection molding machine 14 provided. But it could also be that due to the nature of the respective plastic component different coating carrier must be used.
- the feeding devices 16, 18 operate automatically, are clocked with the respective injection molding machine 12, 14 and usually require no operation.
- the feeding devices 16, 18 can also carry out singling operations, in particular in the case of additive manufacturing, if necessary by means of image recognition.
- Each task tion 16, 18 and thus also in the present embodiment, each injection molding machine 12, 14 is associated with a coating system 30 in the form of a Lackierline 22, 24, each by means of a transport device 26, 28 with the coated article carriers 20 (carry the injection molded components 121, 141 produced) be charged.
- the Lackierlinien 22, 24 are part of a paint shop 30 and are independently prepared and clocked.
- the painting lines 22, 24 can be adapted to the respective requirements of the associated injection molding machines 12, 14 and the corresponding plastic components 121, 141.
- the steps required for coating the plastic components such as deburring, grinding, cleaning, pretreatment, coating, evaporation, repeated coating, etc. are performed.
- the pretreatment may in particular also include the smoothing of the surface, which may be necessary in particular after an additive manufacturing, with the already mentioned methods or the additional cleaning after the additive manufacturing steps or close to the smoothing, in order to obtain a clean surface with optimal adhesive properties for the following To create coating.
- the painting lines 22, 24 can be completely separated from each other and separately controllable and operable. However, it may also be advantageously provided that the two coating lines 22, 24 have jointly usable components.
- the Lackierlinien 22, 24 have a common air conditioning, a common power supply or a common Lackiermaterialworks and optionally also be controlled accordingly together.
- the transport devices 26, 28 are coupled in the embodiment shown here to a common converter 32, which performs a conversion of the plastic components 121, 141 on Temperierwarenong 34.
- the temperature control carrier can be, for example, an individual product carrier for the individual component.
- the goods carriers can then additionally be placed on paint racks.
- the use of goods carriers offers the advantage that the coating article carriers 20, for example, can be cleaned, for example delustered, in a much simpler manner by fixing them in a significantly simpler manner before the undesirably applied coating is fixed.
- the coated plastic components 121, 141 fed to a furnace 36.
- the plastic components 121, 141 subjected to a tempering step, which causes a fixation of the coating, for example by heating.
- a tempering step which causes a fixation of the coating, for example by heating.
- other processing steps can be performed. This is shown symbolically in FIG. 1 by the further processing station 38.
- Figure 2 illustrates in a schematic representation a second embodiment of a system 200.
- Features of the system 200 which are the same or comparable to features of the system described in Figure 1, are not explained again to avoid repetition and again denoted by the same reference numerals.
- the system 200 is also designed for the production of plastic components and also includes two injection molding machines 12, 14, which produce plastic components 212, 214.
- the plastic components 212, 214 are fed by means of feeders 16, 18 on transport devices 26, 28.
- the plastic components 212, 214 are connected to product carriers 220, 222 for a plurality of work steps during and during transport.
- the connection can be made, for example, by laying on, plugging, hanging, gluing, screwing, etc. As can be seen from FIG.
- the plastic components 212, 214 also remain after the coating process and a transfer from the conveyor system 26, 28, which conveys to the paint shop 30 and through the paint shop 30, to the conveyor, which the plastic components 212 , 214 to the furnace 36, connected to the goods carriers 220, 222.
- FIG. 3 is a flow chart illustrating an example method according to the invention.
- the procedure involves the following steps: A first injection molded part with a first injection molding device and a second injection molded part with a second injection molding device are produced (S1).
- S1 A first injection molded part with a first injection molding device and a second injection molded part with a second injection molding device are produced (S1).
- S1 A first injection molded part with a first injection molding device and a second injection molded part with a second injection molding device are produced (S1).
- S1 A first injection molded part with a first injection molding device and a second injection molded part with a second injection molding device are produced (S1).
- S1 The separate production of injection molded parts with separate injection molding devices allows, for example, a separate timing for different components. Instead of one of the two injection molding devices and additive manufacturing devices for the production of components may be present.
- the injection-molded parts / components are placed on a conveyor system with goods carriers.
- the conveyor system is designed to convey the first injection-molded parts / components on the product carriers through a first coating line of a coating system and the second injection-molded parts / components on the product carriers through a second coating line (S3).
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Robotics (AREA)
- Injection Moulding Of Plastics Or The Like (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
Description
Claims
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102017121615 | 2017-09-18 | ||
| DE102017127181.3A DE102017127181A1 (de) | 2017-09-18 | 2017-11-17 | Anlage zur Herstellung von beschichteten Kunststoffbauteilen sowie Verfahren hierzu |
| PCT/EP2018/075255 WO2019053300A1 (de) | 2017-09-18 | 2018-09-18 | Anlage zur herstellung von beschichteten kunststoffbauteilen sowie verfahren hierzu |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP3717197A1 true EP3717197A1 (de) | 2020-10-07 |
Family
ID=65526899
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP18778848.4A Withdrawn EP3717197A1 (de) | 2017-09-18 | 2018-09-18 | Anlage zur herstellung von beschichteten kunststoffbauteilen sowie verfahren hierzu |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20200215730A1 (de) |
| EP (1) | EP3717197A1 (de) |
| CN (1) | CN111356567A (de) |
| DE (1) | DE102017127181A1 (de) |
| WO (1) | WO2019053300A1 (de) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110948778B (zh) * | 2019-12-10 | 2020-08-25 | 天津柯林洁仕达自动化装备技术有限公司 | 一种汽车保险杠由注塑至喷涂全过程智能化生产系统 |
| CN113703408A (zh) * | 2021-08-27 | 2021-11-26 | 和能人居科技(天津)集团股份有限公司 | 一种板材涂覆生产线控制方法及生产线 |
| CN115106231B (zh) * | 2022-07-15 | 2024-08-16 | 嘉兴敏胜汽车零部件有限公司 | 高耐划伤格栅加工用注塑成型装置 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3620175A1 (de) * | 1986-06-14 | 1987-12-17 | Kloeckner Ferromatik Desma | Spritzgiessmaschine mit mindestens zwei plastifizier- und einspritzeinheiten |
| JPH04153930A (ja) * | 1990-10-15 | 1992-05-27 | Matsushita Electric Ind Co Ltd | 光ディスクの製造方法およびその装置 |
| JPH04271032A (ja) * | 1991-02-26 | 1992-09-28 | Matsushita Electric Ind Co Ltd | 光ディスクの作製方法 |
| JP3674168B2 (ja) * | 1996-08-05 | 2005-07-20 | セイコーエプソン株式会社 | 光ディスク製造システム |
| RU2350463C2 (ru) * | 2004-02-03 | 2009-03-27 | Линде Акциенгезельшафт | Устройство для нанесения покрытий на поверхность изделий |
| DE102006016200A1 (de) * | 2006-04-06 | 2007-10-11 | Krauss-Maffei Kunststofftechnik Gmbh | Verfahren und Vorrichtung zur Herstellung von mehrkomponentigen Kunststoff-Formteilen |
| DE102007063163B4 (de) * | 2007-12-19 | 2009-12-10 | Karl-Heinz Fehr | Beschichtungsanlage |
| GB2458963B (en) * | 2008-04-05 | 2012-06-06 | Trade Fabrication Systems Ltd | A method for manufacturing a coated timber panel |
| JP5611027B2 (ja) * | 2010-12-24 | 2014-10-22 | 小島プレス工業株式会社 | 樹脂製品の製造システム |
| CN103183211B (zh) * | 2011-12-28 | 2015-08-12 | 富泰华工业(深圳)有限公司 | 加工模组 |
| AT514019B1 (de) * | 2013-04-02 | 2015-02-15 | Engel Austria Gmbh | Verfahren und Vorrichtung zur Herstellung eines Spritzgussteils |
| US10479006B2 (en) * | 2013-10-16 | 2019-11-19 | Otto Männer Innovation GmbH | Injection molding and assembly apparatus and method of molding and assembling a plurality of two different molded parts |
-
2017
- 2017-11-17 DE DE102017127181.3A patent/DE102017127181A1/de not_active Withdrawn
-
2018
- 2018-09-18 EP EP18778848.4A patent/EP3717197A1/de not_active Withdrawn
- 2018-09-18 CN CN201880059031.0A patent/CN111356567A/zh active Pending
- 2018-09-18 US US16/647,543 patent/US20200215730A1/en not_active Abandoned
- 2018-09-18 WO PCT/EP2018/075255 patent/WO2019053300A1/de not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| CN111356567A (zh) | 2020-06-30 |
| US20200215730A1 (en) | 2020-07-09 |
| DE102017127181A1 (de) | 2019-03-21 |
| WO2019053300A1 (de) | 2019-03-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2080606B1 (de) | Verfahren zum Umrüsten einer Blasmaschine | |
| EP3354352B1 (de) | Beschichtungsanlage und verfahren zum betreiben einer beschichtungsanlage | |
| DE102017007752A1 (de) | Vorrichtung und Verfahren zum Reinigen einer Linse | |
| EP3717197A1 (de) | Anlage zur herstellung von beschichteten kunststoffbauteilen sowie verfahren hierzu | |
| EP2024102B1 (de) | Vorrichtung und verfahren zum lackieren von felgen | |
| EP2520374A1 (de) | Verfahren und Vorrichtung zum Lackieren | |
| EP2153909A2 (de) | Bearbeitungskonzept | |
| DE102007063163B4 (de) | Beschichtungsanlage | |
| EP3315276B1 (de) | Verfahren zur herstellung von verbundwerkstücken und fertigungsanlage zur anwendung der verfahren | |
| DE4032719A1 (de) | Einrichtung zum auftragen von produkten, wie farben oder lacke, mit hilfe von spritzpistolen auf unregelmaessig geformte teile | |
| EP2219844A1 (de) | Giessmachinensystem und verfahren zur herstellung von metall/kunststoff-hybridbauteilen | |
| EP0405164B1 (de) | Anlage und Verfahren zur Herstellung von pulverbeschicheten, flachen Teilen, insbesondere flachen Blechteilen | |
| DE102019109976B4 (de) | Modulare Beschichtungsanlage und Verfahren zum Beschichten mindestens eines Bauteils | |
| EP4490085B1 (de) | Steuerungskonzept für linearelektroantrieb-förderer | |
| DE102011078538B4 (de) | Vorrichtung zum Auftragen von Klebstoff und zum Herstellen von Bauteilen mit einer beflockten Oberfläche | |
| DE4017361A1 (de) | Anlage und verfahren zur herstellung von pulverbeschichteten, flachen teilen, insbesondere flachen blechteilen | |
| EP3129229B1 (de) | Verfahren und fertigungssystem zum kaschieren von interieurkomponenten von fahrzeugen | |
| DE102022106642A1 (de) | Beschickungsvorrichtung für Beschichtungsmaterial | |
| EP3009247B1 (de) | Vorrichtung und verfahren zur verarbeitung eines lagenartigen materials | |
| DE10325530A1 (de) | Verfahren zur Herstellung mit Formteilen sowie Vorrichtung zur Durchführung des Verfahrens | |
| DE69402543T2 (de) | Vorrichtung zur herstellung von körpern an festen arbeitsplätzen, die um eine geschlossene, kreisförmige fördereinrichtung angeordnet sind und der die körper zugeführt wurden | |
| DE102019214802A1 (de) | Beschichtervorrichtung für die Verwendung in einem additiven Fertigungsverfahren, Fertigungsanlage für die Verwendung in einem additiven Fertigungsverfahren sowie ein Gehäuse für eine Beschichtervorrichtung für die Verwendung in einem additiven Fertigungsverfahren | |
| DE102014226573A1 (de) | Direktdruckverfahren | |
| EP4401916B1 (de) | Verfahren und vorrichtung zum fügen und umformen von flachmaterialien | |
| EP0519300A1 (de) | Verfahren und Vorrichtung zum elektrostatischen allseitigen Beschichten flacher Werkstücke mit Pulverlack |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20200227 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
| 18W | Application withdrawn |
Effective date: 20201216 |