EP3004468A1 - Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials - Google Patents

Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials

Info

Publication number
EP3004468A1
EP3004468A1 EP14729474.8A EP14729474A EP3004468A1 EP 3004468 A1 EP3004468 A1 EP 3004468A1 EP 14729474 A EP14729474 A EP 14729474A EP 3004468 A1 EP3004468 A1 EP 3004468A1
Authority
EP
European Patent Office
Prior art keywords
walls
foundations
foundation
building
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP14729474.8A
Other languages
German (de)
French (fr)
Other versions
EP3004468B1 (en
Inventor
Cezary Stachon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to PL14729474T priority Critical patent/PL3004468T3/en
Publication of EP3004468A1 publication Critical patent/EP3004468A1/en
Application granted granted Critical
Publication of EP3004468B1 publication Critical patent/EP3004468B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62—Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/7654—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only comprising an insulating layer, disposed between two longitudinal supporting elements, e.g. to insulate ceilings
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00—Foundations as substructures
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/165—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with elongated load-supporting parts, cast in situ
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62—Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/7675—Insulating linings for the interior face of exterior walls

Definitions

  • the method of the construction of passive foundation and, in particular, of connecting them with walls is characterised in that in order to improve the thermal insulation so as to limit the heat losses for a building or to simplify the structure or to reduce the building costs, the surface of the foundations or the contact surface of building materials/structural foundations (2) and building materials/structural walls (3) is purposefully reduced i.e. by being partly replaced with a column structure (made i.e. of reinforced concrete) (6) and partly with horizontal thermal insulation (7), whereas thermal insulation, which is an important objective of this operation, is placed under the walls of the building or between the foundation and the walls in places where the continuity of the foundations (walls) is limited/interrupted (between the columns). Horizontal insulation is therefore located under a considerable part of the walls, except for the surface of the poles.
  • the transfer of heat between the building materials (e.g. brick, concrete, foundation blocks, etc.) of the foundations and walls (of the building) largely depends on the surface area through which heat can flow to the ground.
  • the contact surface of the foundations and walls is generally approx. 20-50 cm wide; this relates only to the contact surface of building materials i.e. concrete or bricks, not the entire wall with the insulation).
  • the present solution is to reduce the area of the contact surface and replace it partly with horizontal insulation and partly with load-bearing column structure i.e. continuous footing, or possibly with a different type of structure that would reduce the area of the cross-sections of the foundations or the walls to reduce heat transfer.
  • a method of insulating foundations from the bottom is also known - application No. 390772 to the Patent Office of the Republic of Poland "Stay-in-place formwork, especially for foundation footings and walls, which simultaneously acts as thermal and damp-proof insulation that insulates the foundation particularly from the bottom, made of extruded polystyrene (XPS)".
  • XPS extruded polystyrene
  • a column structure is also known, although walls, including foundation walls, are usually made of concrete, bricks, blocks or other building materials with weak insulation parameters that enable the continuity of heat conduction from the building through the foundations of the ground, and therefore there is no critical horizontal thermal insulation between the foundations and walls. Additionally, these structures are designed for simplicity, not to reduce heat transfer.
  • the technique of micropiling also does not interrupt the continuity.
  • the differences involve the part of the foundation which is buried in the ground - not the plinth nor the method of insulation of the walls or foundations.
  • the advantages can be divided into those resulting from the reduction of heat transferred through the walls and foundations to the ground, and the technical and economic advantages due to the simplification of the house-building process.
  • the structure of a building is characterised by the continuity of its structural elements (especially foundations and walls of the building), since these structural elements (bricks, blocks, concrete) are very inefficient as thermal insulators. Walls are laid directly on the foundation (setting aside the issue of damp-proof insulation), which results in a large area of heat transfer between the walls and foundations, and in turn with the ground. In the present solution, this surface is very significantly reduced, as typical foundations traditionally extending along the entire circumference of the house and under other structural walls have been replaced with reinforced-concrete column structure (or walls with smaller sections or walls not extending along the entire length of the foundations but only as spots/sections).
  • the columns may be of any shape, including oblong or turning shapes (at corners), depending on the shape/course of the foundations (it can include foundation walls with reduced surface/cross-section areas).
  • the reduction of the surface area of the foundations (replacing walls with columns) is a very significant advantage, since the heat loss through the foundations is reduced by a factor of a few, a dozen or several dozens.
  • a weigh of an example house of 150 tons can be transferred by columns with an area of 0.1 m 2 , i.e. by 4 columns with dimensions of 10/25 cm.
  • the contact area of the foundations and the walls depends on the length of the foundations, which often exceeds 50 m (single-family detached house) and the width along which the walls are based on the foundations - i.e. 25 cm - which gives an area of 12.5 m 2 .
  • This value is more than a hundred times greater than that obtained from the calculations for the columns and heat transfer is generally proportional to that surface. Due to structural reasons, for most buildings it is necessary/reasonable to place more columns/supports than the said 4, however the heat loss reduction factor can still be in the range of several dozen.
  • the simplified construction of the foundations in particular the reduction of the costs and shortening the time constructing and insulating foundation walls is an additional advantage.
  • the entire foundation wall should be made of solid materials (blocks or concrete) and should be thermally insulated (polystyrene, aquastyr, XPS), and, in the case of low-energy and passive houses, this insulation should be located on both sides of the foundation, and damp-proof insulation or other items such as dimplet membrane should be additionally taken into account.
  • the need to use all these items can be eliminated or greatly reduced - to as little as is needed for the surface of the poles, with an area several dozen times lower.
  • the economic, technical, organisational and time-related benefits are substantial.
  • the proposed solution is primarily used in the construction of low-energy and passive single- family detached houses, as well as in the construction of other forms of single-family houses, and in traditional, multi-family, industrial, warehouse, residential, office, resort, skeleton construction and other sectors of the construction industry.
  • the method of the construction of passive foundation or of connecting them with walls is characterised in that in order in order to improve the thermal insulation so as to limit the heat losses for a building or to simplify the structure or to reduce the building costs, the surface of the foundations or the contact surface of building materials/structural foundations (2) and building materials/structural walls (3) is purposefully reduced i.e. by being partly replaced with a column structure (made i.e. of reinforced concrete) (6) and partly with horizontal thermal insulation (7), whereas thermal insulation, which is an important objective of this operation, is placed under the walls of the building or between the foundation and the walls in places where the continuity of the foundations (walls) is limited/interrupted (between the columns). Horizontal insulation is therefore located under a considerable part of the walls, except for the surface of the poles.
  • the horizontal insulation or the reduction of the surface area of the walls may be made at different heights, in particular under the building wall, but also between the continuous footing and the foundation wall, at the height of the foundation wall or the height of the building wall.
  • the method in variant 1 it is possible to completely eliminate the foundation walls and consequently their insulation and cover, and to replace the walls with a column/skeleton structure laid i.e. on continuous footing, or to reduce the amount of foundation walls, i.e. by lowering their height.
  • foundation walls are replaced with only thermal insulation or other type of partition (metal sheet or mesh, precast elements) in order to reduce the transfer of heat or the amount of rodents penetrating into the area under the floor.
  • the skeletal structure can be replaced with walls whose cross-sections are smaller, or with walls not extending along the entire length foundation but placed only as spots/sections. It is a matter of nomenclature whether these structures are defined as columns or walls.
  • the method in variant 1 can include additional reinforcements, in particular to improve the resistance to bending of the column structure.
  • the method in variant 1 it is preferable for the method in variant 1 that it can be used in connection with buildings and foundations of any shape.
  • the foundation can be of any kind i.e. as spots under the columns, without having to lay continuous footing.
  • the solution can be used for a variety of structures in the construction industry, i.e. in skeletal, metal, wood structures, or other light structures, or in industrial construction.
  • the structure of the foundations can be made of all sorts of materials including i.e. steel.
  • the cross-sections of columns or foundation walls can be of various shapes at different heights (e.g., can be conical or stepped), for example with a larger cross-section at the bottom of the column (area of contact with the footing) to provide better stability, and with a smaller cross-section at the top to transfer less heat or lower the costs of manufacturing.
  • Fig. 1 shows examples of the solutions used so far, where the wall of a building (3) is placed on a foundation (2), which is placed on a foundation footing (1). There may also be a thin layer of damp-proof insulation between these elements, but it was not added to the figure as it is irrelevant in this case.
  • the continuity of the wall (3), foundation (2) and foundation footing (1), which is in contact with the ground causes the loss of large amounts of heat, which is transferred to the ground.
  • FIG. 2 An example of the implementation of the foundations as presented in this application is shown in Fig. 2, which includes foundation footing (1), but above it there is a pillar structure (6), which transfers onto the foundation the load of the entire building, including the walls (3), which include horizontal insulation to prevent the heat from flowing into the ground. The heat is transferred through the column (6) out of the building and in the direction of the foundations and the ground. This surface, however, is many times less than the heat transfer surface of a typical foundation.
  • the horizontal insulation (7) between the wall and the foundation (especially directly against the wall) is of key importance, whereas in the case of the column structure the existing foundation wall can be replaced with any filling (8) i.e.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Electromagnetism (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Building Environments (AREA)

Abstract

The method of the construction of passive foundation and, in particular, of connecting them with walls is characterised in that in order to improve the thermal insulation so as to limit the heat losses for a building or to simplify the structure or to reduce the building costs, the surface of the foundations or the contact surface of building materials/structural foundations (2) and building materials/structural walls (3) is purposefully reduced i.e. by being partly replaced with a column structure (made i.e. of reinforced concrete) (6) and partly with horizontal thermal insulation (7), whereas thermal insulation, which is an important objective of this operation, is placed under the walls of the building or between the foundation and the walls in places where the continuity of the foundations (walls) is limited/interrupted (between the columns). Horizontal insulation is therefore located under a considerable part of the walls, except for the surface of the poles.

Description

Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials
The method of the construction of passive foundation and, in particular, of connecting them with walls is characterised in that in order to improve the thermal insulation so as to limit the heat losses for a building or to simplify the structure or to reduce the building costs, the surface of the foundations or the contact surface of building materials/structural foundations (2) and building materials/structural walls (3) is purposefully reduced i.e. by being partly replaced with a column structure (made i.e. of reinforced concrete) (6) and partly with horizontal thermal insulation (7), whereas thermal insulation, which is an important objective of this operation, is placed under the walls of the building or between the foundation and the walls in places where the continuity of the foundations (walls) is limited/interrupted (between the columns). Horizontal insulation is therefore located under a considerable part of the walls, except for the surface of the poles.
Methods of vertical insulation of foundations (including walls) - on the side of the foundation are known and widely used in the construction industry. This does not, however, insulate the entire surface of the foundations that are in contact with the ground, but only their sides.
A key issue, in particular in low-energy and passive construction industry, is the lack of horizontal thermal insulation of bottom parts of walls or foundations, since these constitute virtually one continuous plane of the flow of heat from the building to the ground. This is due to the fact that the foundations carry the load of the entire building, whereas insulation materials (XPS, Styrodur, etc.) are not strong enough to transfer this load (and thus cannot function as horizontal insulation under the entire structure of the building).
It should be noted, however, that the transfer of heat between the building materials (e.g. brick, concrete, foundation blocks, etc.) of the foundations and walls (of the building) largely depends on the surface area through which heat can flow to the ground. The contact surface of the foundations and walls is generally approx. 20-50 cm wide; this relates only to the contact surface of building materials i.e. concrete or bricks, not the entire wall with the insulation).
The present solution is to reduce the area of the contact surface and replace it partly with horizontal insulation and partly with load-bearing column structure i.e. continuous footing, or possibly with a different type of structure that would reduce the area of the cross-sections of the foundations or the walls to reduce heat transfer.
A method of insulating foundations from the bottom is also known - application No. 390772 to the Patent Office of the Republic of Poland "Stay-in-place formwork, especially for foundation footings and walls, which simultaneously acts as thermal and damp-proof insulation that insulates the foundation particularly from the bottom, made of extruded polystyrene (XPS)". This solution, however, does not provide adequate strength and cannot be used with majority of buildings. Moreover, apart from the bottom insulation of the foundation, it is also possible to reduce, as proposed in this application, the contact surface of the foundations and walls and thus reduce the heat transfer between the foundations and walls. The proposed solution is also much cheaper and easier to implement.
A column structure is also known, although walls, including foundation walls, are usually made of concrete, bricks, blocks or other building materials with weak insulation parameters that enable the continuity of heat conduction from the building through the foundations of the ground, and therefore there is no critical horizontal thermal insulation between the foundations and walls. Additionally, these structures are designed for simplicity, not to reduce heat transfer.
The technique of micropiling also does not interrupt the continuity. In this technique, in contrast to traditional foundations, the differences involve the part of the foundation which is buried in the ground - not the plinth nor the method of insulation of the walls or foundations.
The technique of implementing horizontal damp-proof insulation between the foundations and walls is also known and widely used. This insulation, however, does not meet the requirements of thermal insulation. In the present solution, horizontal thermal insulation plays an important role. It can also function as a water and damp-proof (polystyrene, aquastyr, XPS) insulation, as well as the discontinuity of materials that draw water. Regardless of the present proposal for thermal insulation, it may also be used as water and damp-proof insulation.
Advantages
In general, the advantages can be divided into those resulting from the reduction of heat transferred through the walls and foundations to the ground, and the technical and economic advantages due to the simplification of the house-building process.
The advantages related to the reduced heat transfer through the wall and the foundations to the ground are due to the large reduction of the area of the contact surface (continuity) of the structural elements of the walls and the structural elements of the foundations.
In traditional construction industry, the structure of a building is characterised by the continuity of its structural elements (especially foundations and walls of the building), since these structural elements (bricks, blocks, concrete) are very inefficient as thermal insulators. Walls are laid directly on the foundation (setting aside the issue of damp-proof insulation), which results in a large area of heat transfer between the walls and foundations, and in turn with the ground. In the present solution, this surface is very significantly reduced, as typical foundations traditionally extending along the entire circumference of the house and under other structural walls have been replaced with reinforced-concrete column structure (or walls with smaller sections or walls not extending along the entire length of the foundations but only as spots/sections). This structure has a much smaller surface area through which heat transfer occurs, however, due to the excellent strength of concrete, it is sufficient to transfer the entire load of the building to the continuous footing or a foundation of different type. The columns may be of any shape, including oblong or turning shapes (at corners), depending on the shape/course of the foundations (it can include foundation walls with reduced surface/cross-section areas). The reduction of the surface area of the foundations (replacing walls with columns) is a very significant advantage, since the heat loss through the foundations is reduced by a factor of a few, a dozen or several dozens. Assuming concrete strength of 15 MPa (or 150 kg/cm2), a weigh of an example house of 150 tons can be transferred by columns with an area of 0.1 m2, i.e. by 4 columns with dimensions of 10/25 cm. By default, the contact area of the foundations and the walls depends on the length of the foundations, which often exceeds 50 m (single-family detached house) and the width along which the walls are based on the foundations - i.e. 25 cm - which gives an area of 12.5 m2. This value is more than a hundred times greater than that obtained from the calculations for the columns and heat transfer is generally proportional to that surface. Due to structural reasons, for most buildings it is necessary/reasonable to place more columns/supports than the said 4, however the heat loss reduction factor can still be in the range of several dozen.
The simplified construction of the foundations, in particular the reduction of the costs and shortening the time constructing and insulating foundation walls is an additional advantage. Typically, the entire foundation wall should be made of solid materials (blocks or concrete) and should be thermally insulated (polystyrene, aquastyr, XPS), and, in the case of low-energy and passive houses, this insulation should be located on both sides of the foundation, and damp-proof insulation or other items such as dimplet membrane should be additionally taken into account. The need to use all these items can be eliminated or greatly reduced - to as little as is needed for the surface of the poles, with an area several dozen times lower. The economic, technical, organisational and time-related benefits are substantial.
Application
The proposed solution is primarily used in the construction of low-energy and passive single- family detached houses, as well as in the construction of other forms of single-family houses, and in traditional, multi-family, industrial, warehouse, residential, office, resort, skeleton construction and other sectors of the construction industry.
The present solution can be applied in different variants. Basically, the method of the construction of passive foundation or of connecting them with walls is characterised in that in order in order to improve the thermal insulation so as to limit the heat losses for a building or to simplify the structure or to reduce the building costs, the surface of the foundations or the contact surface of building materials/structural foundations (2) and building materials/structural walls (3) is purposefully reduced i.e. by being partly replaced with a column structure (made i.e. of reinforced concrete) (6) and partly with horizontal thermal insulation (7), whereas thermal insulation, which is an important objective of this operation, is placed under the walls of the building or between the foundation and the walls in places where the continuity of the foundations (walls) is limited/interrupted (between the columns). Horizontal insulation is therefore located under a considerable part of the walls, except for the surface of the poles.
It is preferable for the method in variant 1 that the horizontal insulation or the reduction of the surface area of the walls may be made at different heights, in particular under the building wall, but also between the continuous footing and the foundation wall, at the height of the foundation wall or the height of the building wall.
It is preferable for the method in variant 1 that it is possible to completely eliminate the foundation walls and consequently their insulation and cover, and to replace the walls with a column/skeleton structure laid i.e. on continuous footing, or to reduce the amount of foundation walls, i.e. by lowering their height.
It is preferable for the method in variant 1 that foundation walls are replaced with only thermal insulation or other type of partition (metal sheet or mesh, precast elements) in order to reduce the transfer of heat or the amount of rodents penetrating into the area under the floor. It is preferable for the method in variant 1 that the skeletal structure can be replaced with walls whose cross-sections are smaller, or with walls not extending along the entire length foundation but placed only as spots/sections. It is a matter of nomenclature whether these structures are defined as columns or walls.
It is preferable for the method in variant 1 that it can include additional reinforcements, in particular to improve the resistance to bending of the column structure.
It is preferable for the method in variant 1 that it can be used in connection with buildings and foundations of any shape.
It is preferable for the method in variant 1 that the foundation can be of any kind i.e. as spots under the columns, without having to lay continuous footing.
It is preferable for the method in variant 1 that the solution can be used for a variety of structures in the construction industry, i.e. in skeletal, metal, wood structures, or other light structures, or in industrial construction.
It is preferable for the method in variant 1 that the structure of the foundations can be made of all sorts of materials including i.e. steel.
It is preferable for the method in variant 1 that the cross-sections of columns or foundation walls can be of various shapes at different heights (e.g., can be conical or stepped), for example with a larger cross-section at the bottom of the column (area of contact with the footing) to provide better stability, and with a smaller cross-section at the top to transfer less heat or lower the costs of manufacturing.
Description of the figures
Fig. 1 shows examples of the solutions used so far, where the wall of a building (3) is placed on a foundation (2), which is placed on a foundation footing (1). There may also be a thin layer of damp-proof insulation between these elements, but it was not added to the figure as it is irrelevant in this case. On the outside of the building there is thermal insulation of the walls (5), in some cases also thermal insulation of the foundations (4), whereas sometimes thermal insulation of the foundations is added on the inside of the building to provide additional insulation. The continuity of the wall (3), foundation (2) and foundation footing (1), which is in contact with the ground (this is also often the case for the foundation wall) causes the loss of large amounts of heat, which is transferred to the ground.
An example of the implementation of the foundations as presented in this application is shown in Fig. 2, which includes foundation footing (1), but above it there is a pillar structure (6), which transfers onto the foundation the load of the entire building, including the walls (3), which include horizontal insulation to prevent the heat from flowing into the ground. The heat is transferred through the column (6) out of the building and in the direction of the foundations and the ground. This surface, however, is many times less than the heat transfer surface of a typical foundation. The horizontal insulation (7) between the wall and the foundation (especially directly against the wall) is of key importance, whereas in the case of the column structure the existing foundation wall can be replaced with any filling (8) i.e. condensed dirt (ground), thermal insulation (without load-bearing structure), or with metal sheet or mesh (protection against intrusion of rodents into the house), precast elements or other components. For the reasons of strength, it is recommended to add a strong structural beam in the lower part of the building wall (3), which will be attached to the pillar (6). The side insulation of foundation walls is limited in this case only to the surface of the column. Foundation walls with cross-sections smaller than the existing ones, or walls that do not extend along the entire length of the foundations only as spots/sections can be used instead of columns. It is a matter of nomenclature whether these are defined as columns or skeletal structures or as walls with smaller cross-sections.

Claims

Claims
1. The method of the construction of passive foundation and, in particular, of connecting them with walls is characterised in that in order to improve the thermal insulation so as to limit the heat losses for a building or to simplify the structure or to reduce the building costs, the surface of the foundations or the contact surface of building materials/structural foundations and building materials/structural walls is purposefully reduced i.e. by being partly replaced with a column structure (made i.e. of reinforced concrete) and partly with horizontal thermal insulation, whereas thermal insulation, which is an important objective of this operation, is placed under the walls of the building or between the foundation and the walls in places where the continuity of the foundations (walls) is limited/interrupted (between the columns). Horizontal insulation is therefore located under a considerable part of the walls, except for the surface of the poles.
2. The method according to claim 1 is characterised in that the horizontal insulation or the reduction of the surface area of the walls may be made at different heights, in particular under the building wall, but also between the continuous footing and the foundation wall, at the height of the foundation wall or the height of the building wall.
3. The method according to claim 1 is characterised in that it is possible to completely eliminate the foundation walls and consequently their insulation and cover, and to replace the walls with a column/skeleton structure laid i.e. on continuous footing, or to reduce the amount of foundation walls, i.e. by lowering their height.
4. The method according to claim 1 is characterised in that foundation walls are replaced with only thermal insulation or other type of partition (metal sheet or mesh, precast elements) in order to reduce the transfer of heat or the amount of rodents penetrating into the area under the floor.
5. The method according to claim 1 is characterised in that the skeletal structure can be replaced with walls whose cross-sections are smaller, or with walls not extending along the entire length foundation but placed only as spots/sections. It is a matter of nomenclature whether these structures are defined as columns or walls.
6. The method of constructing foundations according to claim I is characterised in that it can include additional reinforcements, in particular to improve the resistance to bending of the column structure.
7. The method of constructing foundations according to claim I is characterised in that it can be used in connection with buildings and foundations of any shape.
8. The method of constructing foundations according to claim I is characterised in that the foundation can be of any kind i.e. as spots under the columns, without having to lay continuous footing.
9. The method of constructing foundations according to claim I is characterised in that the solution can be used for a variety of structures in the construction industry, i.e. in skeletal, metal, wood structures, or other light structures, or in industrial construction.
10. The method of constructing foundations according to claim I is characterised in that the structure of the foundations can be made of all sorts of materials including i.e. steel.
11. The method of constructing foundations according to claim I is characterised in that the cross- sections of columns or foundation walls can be of various shapes at different heights (e.g., can be conical or stepped), for example with a larger cross-section at the bottom of the column (area of contact with the footing) to provide better stability, and with a smaller cross-section at the top to transfer less heat or lower the costs of manufacturing.
EP14729474.8A 2013-05-06 2014-05-06 Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials Active EP3004468B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL14729474T PL3004468T3 (en) 2013-05-06 2014-05-06 Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PL403772A PL403772A1 (en) 2013-05-06 2013-05-06 Method for constructing passive foundations, limiting heat loss from the building, use of materials and the cost of implementing
PCT/PL2014/000049 WO2014182184A1 (en) 2013-05-06 2014-05-06 Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials

Publications (2)

Publication Number Publication Date
EP3004468A1 true EP3004468A1 (en) 2016-04-13
EP3004468B1 EP3004468B1 (en) 2017-09-13

Family

ID=50928208

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14729474.8A Active EP3004468B1 (en) 2013-05-06 2014-05-06 Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials

Country Status (7)

Country Link
US (1) US20160083959A1 (en)
EP (1) EP3004468B1 (en)
EA (1) EA201592112A1 (en)
ES (1) ES2651365T3 (en)
HU (1) HUE035369T2 (en)
PL (2) PL403772A1 (en)
WO (1) WO2014182184A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL421973A1 (en) * 2017-06-21 2019-01-02 Stachoń Cezary Method for erecting a building walls, method for erecting a building, a building wall and the building
JP6889077B2 (en) * 2017-09-21 2021-06-18 トヨタホーム株式会社 Insulation foundation structure and its construction method
JP7892589B2 (en) * 2023-03-17 2026-07-21 ミサワホーム株式会社 building

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4524553A (en) * 1983-05-19 1985-06-25 Hacker John H Thermal insulated building slab
US20050262786A1 (en) * 2002-03-06 2005-12-01 Messenger Harold G Concrete foundation wall with a low density core and carbon fiber and steel reinforcement
US7530203B1 (en) * 2004-11-05 2009-05-12 Swa Holding Company, Inc. Pre-cast concrete wall with truss ledge
US8429876B2 (en) * 2009-08-27 2013-04-30 Eugenio Santiago Aburto Concrete rib construction method

Also Published As

Publication number Publication date
EA201592112A1 (en) 2016-03-31
ES2651365T3 (en) 2018-01-25
HUE035369T2 (en) 2018-05-02
US20160083959A1 (en) 2016-03-24
EP3004468B1 (en) 2017-09-13
PL403772A1 (en) 2014-11-10
WO2014182184A1 (en) 2014-11-13
PL3004468T3 (en) 2018-02-28

Similar Documents

Publication Publication Date Title
US7913469B2 (en) Concrete load-bearing wall with compound heat-insulating layer
CN104878836B (en) A kind of prefabricated house and its construction method
CN103924797A (en) Country prefabricated steel structure residence system and construction method thereof
CN107143064A (en) One kind interval steel pipe and combined concrete shear wall system
CN105178427A (en) Method for integrally forming and building houses
EP3004468B1 (en) Method of constructing passive foundations that reduce heat loss of a building, as well as the costs and consumption of materials
CN110158762A (en) Prefabricated steel structure frame supports room
CN105064612A (en) Steel-concrete combined special-shaped column with thermal insulating and load bearing integrated and preparation method thereof
CN101469559B (en) Composite heat insulating walling and mounting method thereof
KR100539333B1 (en) Drain board structure for under ground basement
CN205134531U (en) Shaped steel and steel -concrete structure system thereof
CN204343487U (en) A kind of cast-in-situ thermal-insulated bearing wall
JP5054217B2 (en) Concrete container house
KR101148413B1 (en) Water discharge improve prop beam structures
CN206189620U (en) Existing building is from load -bearing and insulating integration system
CN109779135A (en) Steel construction assembled ecological house wallboard and installation method
KR101457070B1 (en) Precast concrete slab of Inver-Teed Rib
CN107605101A (en) A kind of heat-preserving load-bearing one steel concrete combined special-shaped column and its construction method
CN210887608U (en) Assembled reinforced concrete structure
CN202627564U (en) Prefabricated composite plate wall post-concreting frame shear structure building
CN203729464U (en) Decorative thermal insulation composite wall
KR200380424Y1 (en) Drain board structure for under ground basement
CN113846862A (en) Ring-beam structural column reinforced masonry structure and transverse wall steel tie-rod structural connection and its construction method
CN105257057B (en) A kind of circular coal yard steel-concrete combined structure coal-stopping wall and its construction method
CN106381938A (en) Self-bearing heat-insulating integrated system for existing building and construction method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20151204

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RAX Requested extension states of the european patent have changed

Extension state: BA

Payment date: 20151204

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170105

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20170329

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 928270

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014014565

Country of ref document: DE

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2651365

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20180125

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 928270

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

REG Reference to a national code

Ref country code: HU

Ref legal event code: HC9C

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E035369

Country of ref document: HU

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20170403224

Country of ref document: GR

Effective date: 20180420

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180113

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014014565

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

26N No opposition filed

Effective date: 20180614

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180506

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180506

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20190627

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180506

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170913

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200507

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200507

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200506

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20210527

Year of fee payment: 8

Ref country code: NL

Payment date: 20210519

Year of fee payment: 8

Ref country code: RO

Payment date: 20210426

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20210519

Year of fee payment: 8

Ref country code: BE

Payment date: 20210519

Year of fee payment: 8

Ref country code: GB

Payment date: 20210525

Year of fee payment: 8

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20220601

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220531

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220506

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220506

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220506

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220506

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20240523

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20250521

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20250627

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20250528

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20251205

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20260422

Year of fee payment: 13