CN107143064A - One kind interval steel pipe and combined concrete shear wall system - Google Patents
One kind interval steel pipe and combined concrete shear wall system Download PDFInfo
- Publication number
- CN107143064A CN107143064A CN201710567206.6A CN201710567206A CN107143064A CN 107143064 A CN107143064 A CN 107143064A CN 201710567206 A CN201710567206 A CN 201710567206A CN 107143064 A CN107143064 A CN 107143064A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- shear wall
- interval
- wall system
- lacing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 101
- 239000010959 steel Substances 0.000 title claims abstract description 101
- 239000004567 concrete Substances 0.000 title claims abstract description 32
- 239000000463 material Substances 0.000 claims abstract description 5
- 239000011440 grout Substances 0.000 claims description 6
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 239000011178 precast concrete Substances 0.000 claims description 3
- 238000009408 flooring Methods 0.000 abstract description 5
- 238000005266 casting Methods 0.000 abstract description 3
- 238000013461 design Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
- E04B2/60—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention provides one kind interval steel pipe and combined concrete shear wall system, including the shear wall skeleton being made up of the steel pipe and the batten plate of lateral arrangement being vertically equally spaced, template is respectively arranged with along the both sides in shear wall skeleton extension direction;Wherein, batten plate is located between steel pipe and along the height bearing of trend spaced set of steel pipe;Wherein, the inner chamber of steel pipe is cast with grouting material.By the combination of steel pipe and batten plate, steel pipe arranged for interval is formed, is used between steel pipe and casting concrete is reproduced after template, form shear wall;Rectangular steel pipe arranged for interval so that floor beam, plate can be penetrated continuously at the position without steel pipe so that more preferably, building globality is stronger for flooring horizontal force.
Description
Technical field
It is specially a kind of interval steel pipe and combined concrete shear wall the present invention relates to building, civil engineering technical field
System.
Background technology
At present, China proposes higher Compulsory Feature to house assembling.Although continuous steel pipe beam shear wall is
Progressively popularization and application at home, but the steel using amount of steel pipe bundle is bigger than normal, such as 4 millimeter thicknesss of slab more as primary structure member redundancy
Continuous steel pipe beam shear wall can reach 84 kilograms/square meter per square meter steel using amount.Although continuous steel pipe bundle shear wall scheme is built
Building percentage of usable dwelling area has 5% or so increase, but comprehensive cost has more compared to the complete cast-in-place reinforced concrete shear wall of tradition and often put down
300 yuan to 500 yuan of rice.
In addition, continuous steel pipe bundle shear wall, has cut off floor arrangement of reinforcement, floor bar, which has arrived wall, to be disconnected, or
Scene is welded with steel plate wall, reduces the continuity of floor.
The content of the invention
It is an object of the invention to provide one kind interval steel pipe and combined concrete shear wall system, principle is simple, makes
Convenient, cost is low, easy construction, while making the modulus between batten plate and template mutually unify, further improves the assembling of wall
And standardization.
To achieve the above object, interval steel pipe proposed by the present invention and combined concrete shear wall system, including by vertical
The shear wall skeleton that the steel pipe and the batten plate of lateral arrangement being equally spaced are constituted, along the both sides point in shear wall skeleton extension direction
Template is not provided with it;
Wherein, the batten plate is located between steel pipe and along the height bearing of trend spaced set of steel pipe;
Wherein, the inner chamber of the steel pipe is cast with grouting material.
Further, in the interval steel pipe with combined concrete shear wall system, being set in steel pipe top and bottom
Have on continuous top connecting plate and bottom connecting plate, and top connecting plate and bottom connecting plate respectively with steel pipe opposite position
It is provided with grout hole.
Further, in the interval steel pipe and combined concrete shear wall system, the batten plate includes be arrangeding in parallel
Lacing I, lacing II, and between lacing I, lacing II be provided with reservation member.
Further, in the interval steel pipe and combined concrete shear wall system, the reservation member is hollow circuit cylinder
The reserved column piece of type.
Further, in the interval steel pipe with being provided with interior in combined concrete shear wall system, in the reserved column piece
Screw thread, and in being respectively equipped with bolt access aperture on the corresponding lacing I of reserved column piece bearing of trend, lacing II, the bolt is accessed
The corresponding template in hole be provided with through hole, in bolt access aperture, through hole be provided with fastening bolt.
Further, in the interval steel pipe and combined concrete shear wall system, in the reserved column piece extension side
Pick out reserved screw rod on to corresponding lacing I, lacing II respectively, the corresponding template of the reserved screw rod is provided with through hole, described
Reserved screw rod accesses the through hole and is connected with a nut.
Further, in the interval steel pipe and combined concrete shear wall system, the steel pipe is hollow long strip type
Rod member, the steel tube section is enclosed type section.
Further, in the interval steel pipe and combined concrete shear wall system, the enclosed type rectangular cross-section,
Square is circular.
Further, in the interval steel pipe and combined concrete shear wall system, the template is aluminum alloy pattern plate, punching block
Plate, plank sheathing or precast concrete form.
Compared with prior art, the beneficial effects of the invention are as follows:
1. by the continuous arranged for interval of steel pipe, steel pipe belongs to market conventional products, without steel construction processing factory additional customized,
Fished pipe need to only be bought and carry out secondary operation.
2. setting up batten plate between steel pipe, metope is set to form entirety.Steel pipe spacing can be determined according to design so that wall size
Flexibility greatly increase.
3. two free ends of steel pipe are respectively provided with connecting plate, and open up grout hole at position corresponding with steel pipe, it is easy to coagulation
Soil is poured, while being also convenient for the wall connecting of levels.
4. steel pipe arranged for interval so that floor beam, plate can be penetrated continuously at the position without steel pipe, make flooring horizontal force more
Good, the globality of building is stronger.
5. the template between steel pipe on wall, by the reservation member on batten plate, is joined directly together with template.Pass through cleverly chi
Very little design so that the spacing of these reservation members meets the requirement of modulus, further improves wall assembling and standardization.
Brief description of the drawings
Fig. 1 is interval steel pipe and combined concrete shear wall system structure diagram in one embodiment of the invention;
Fig. 2 is joint steel pipe batten plate structural representation in one embodiment of the invention;
Fig. 3 is Fig. 2 top view;
Fig. 4 is model sheetinstallat structural representation in one embodiment of the invention.
Embodiment
The interval steel pipe of the present invention is carried out with combined concrete shear wall system below in conjunction with schematic diagram more detailed
Description, which show the preferred embodiments of the present invention, it should be appreciated that those skilled in the art can change described here
Invention, and still realize the advantageous effects of the present invention.Therefore, description below is appreciated that for those skilled in the art's
It is widely known, and it is not intended as limitation of the present invention.
It is an object of the invention to provide a kind of new building shear walls design, manufacture and construction method --- an inter-species
Every steel pipe and combined concrete shear wall system.The combined shear wall system of the present invention is a kind of beyond tradition steel pipe bundle shearing
Wall, it is adaptable to the structure stress wall in assembling building, by the combination of steel pipe and batten plate, forms steel pipe arranged for interval,
Used between steel pipe and casting concrete is reproduced after template, form shear wall;Rectangular steel pipe arranged for interval so that floor beam, plate exist
Position without steel pipe can be penetrated continuously so that more preferably, building globality is stronger for flooring horizontal force.
Specifically, as shown in Figures 1 to 4, interval steel pipe proposed by the present invention and combined concrete shear wall system, including
Steel pipe 1, batten plate 2, template 3, grout hole 5 etc..Wherein, steel pipe 1 is hollow long strip type rod member, and the section of steel pipe 1 is enclosed type section
Face, such as rectangle, square or circular, it is therefore preferable to rectangular or square.Template 3 can use aluminum alloy pattern plate, steel form, plank sheathing
Or precast concrete form, the template 3, which has, also serves as insulation, the effect of decoration.
As shown in figure 1, being the shear wall bone being made up of vertical spaced apart steel pipe 1 and the batten plate 2 being arranged laterally at a spacing
Frame 100, template 3 is respectively arranged with along the both sides in the extension direction of shear wall skeleton 100.
Wherein, the interior intracavitary of steel pipe 1 is cast with grouting material, the spacing of steel pipe 1 can according to design it needs to be determined that so that wall chi
Very little flexibility is greatly increased.Such as steel pipe width 200mm, and steel pipe clear spacing 300mm, you can 500mm is made a list
Member, two units are exactly 1 meter, are not only convenient for design, and consider very reasonable from loading angle.Most of all, between steel pipe 1
Every arrangement so that floor beam, plate can be penetrated continuously at the position without steel pipe, make flooring horizontal force more preferably, the globality of building
It is stronger.
Wherein, batten plate 2 is located between steel pipe 1 and along the height bearing of trend spaced set of steel pipe 1, and the spacing is generally
300~600mm, batten plate 2 is used to connect two adjacent steel pipes 1, so that metope forms entirety, is set on batten plate 2
There is reservation member 4.Directly template 3 can be arranged on shear wall skeleton 100 by the reservation member 4 of batten plate 2.Reservation member 4 is mixed
Solidifying soil is stayed in wall after pouring, and can be used as connection when next step construction heat-insulating and decorative wall panels.By cleverly
Size design so that the spacing of these reservation members 4 meets the requirement of modulus, further improves wall assembling and standardization.
Above-mentioned batten plate 2 includes lacing I21, the lacing II22 be arrangeding in parallel, and between lacing I21, lacing II22
Reservation member 4.The reservation member 4 is generally the reserved column piece of hollow cylinder shape.
For the ease of installation of the template 3 on shear wall skeleton 100, the structure of reserved column piece 4 can use following two
Form:
Reserved column structure one:Internal thread is provided with reserved column piece 4, and in the corresponding lacing of the reserved bearing of trend of column piece 4
Bolt access aperture is respectively equipped with I21, lacing II22.Through hole is provided with the corresponding template 3 of bolt access aperture, in bolt access
Fastening bolt 8 is provided with hole, through hole.Template 3 is arranged on shear wall skeleton 100 (as shown in Figure 4) by fastening bolt 8.
Reserved column structure two:Picked out respectively on the corresponding lacing I21 of the reserved bearing of trend of column piece 4, lacing II22 reserved
Screw rod (not shown), is provided with through hole in the corresponding template of reserved screw rod, the through hole in the reserved screw rod access template 3, so
Template 3 is arranged on shear wall skeleton 100 by a nut afterwards.
The top of steel pipe 1 and bottom are provided with continuous top connecting plate 6 and bottom connecting plate 7, and the He of top connecting plate 6
Grout hole 5 is provided with the opposite position of steel pipe 1 respectively on bottom connecting plate 7, is easy to pouring for the grouting materials such as concrete, simultaneously
The wall of levels can also be easy to be connected.The opening of general grout hole 5 and the section of steel pipe 1 match.
In addition, the template 3 on the outside of shear wall skeleton can be installed before wall lifting on ground, in shear wall skeleton
Side template 3 can successively be installed again after wall lifting, have more turnovers thereby using the template on the inside of shear wall skeleton
Number of times, it is further cost-effective.
To sum up, in interval steel pipe and combined concrete shear wall system provided in an embodiment of the present invention, by steel pipe with
The combination of batten plate, forms steel pipe arranged for interval, is used between steel pipe and casting concrete is reproduced after template, form shear wall;Square
Shape steel pipe arranged for interval so that floor beam, plate can be penetrated continuously at the position without steel pipe so that flooring horizontal force more preferably, is built
Build globality stronger.
The preferred embodiments of the present invention are above are only, any restriction effect is not played to the present invention.Belonging to any
Those skilled in the art, in the range of technical scheme is not departed from, to the invention discloses technical scheme and
Technology contents make the variation such as any type of equivalent substitution or modification, belong to the content without departing from technical scheme, still
Belong within protection scope of the present invention.
Claims (9)
1. one kind interval steel pipe and combined concrete shear wall system, it is characterised in that including the steel by being vertically equally spaced
The shear wall skeleton that pipe and the batten plate of lateral arrangement are constituted, template is respectively arranged with along the both sides in shear wall skeleton extension direction;
Wherein, the batten plate is located between steel pipe and along the height bearing of trend spaced set of steel pipe;
Wherein, the inner chamber of the steel pipe is cast with grouting material.
2. interval steel pipe according to claim 1 and combined concrete shear wall system, it is characterised in that in steel pipe top
And bottom be provided with continuous top connecting plate and bottom connecting plate, and top connecting plate and bottom connecting plate respectively with steel pipe
Opposite position is provided with grout hole.
3. interval steel pipe according to claim 1 and combined concrete shear wall system, it is characterised in that the batten plate bag
The lacing I be arrangeding in parallel, lacing II are included, and provided with reservation member between lacing I, lacing II.
4. interval steel pipe according to claim 3 and combined concrete shear wall system, it is characterised in that the reservation member
For the reserved column piece of hollow cylinder shape.
5. interval steel pipe according to claim 4 and combined concrete shear wall system, it is characterised in that the reserved post
It is provided with internal thread in part, and in being respectively equipped with bolt access aperture, institute on the corresponding lacing I of reserved column piece bearing of trend, lacing II
The corresponding template of bolt access aperture is stated provided with through hole, in being provided with fastening bolt in bolt access aperture, through hole.
6. interval steel pipe according to claim 4 and combined concrete shear wall system, it is characterised in that in described reserved
Pick out reserved screw rod on the corresponding lacing I of column piece bearing of trend, lacing II respectively, the corresponding template of the reserved screw rod is provided with
Through hole, the reserved screw rod accesses the through hole and is connected with a nut.
7. interval steel pipe and combined concrete shear wall system according to claim 1, it is characterised in that the steel pipe is
Hollow long strip type rod member, the steel tube section is enclosed type section.
8. interval steel pipe according to claim 7 and combined concrete shear wall system, it is characterised in that the enclosed type
Rectangular cross-section, square or circle.
9. interval steel pipe and combined concrete shear wall system according to claim 1, it is characterised in that the template is
Aluminum alloy pattern plate, steel form, plank sheathing or precast concrete form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710567206.6A CN107143064A (en) | 2017-07-12 | 2017-07-12 | One kind interval steel pipe and combined concrete shear wall system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710567206.6A CN107143064A (en) | 2017-07-12 | 2017-07-12 | One kind interval steel pipe and combined concrete shear wall system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107143064A true CN107143064A (en) | 2017-09-08 |
Family
ID=59776096
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710567206.6A Pending CN107143064A (en) | 2017-07-12 | 2017-07-12 | One kind interval steel pipe and combined concrete shear wall system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143064A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107761998A (en) * | 2017-10-19 | 2018-03-06 | 上海欧本钢结构有限公司 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
CN108252405A (en) * | 2018-03-30 | 2018-07-06 | 郑勤民 | A kind of prefabricated steel reinforced concrete cavity shear wall assembled architecture and its method of construction |
CN108678247A (en) * | 2018-05-16 | 2018-10-19 | 江南大学 | A kind of prefabricated assembled light floor and its manufacturing method |
CN110195482A (en) * | 2019-06-06 | 2019-09-03 | 上海欧本钢结构有限公司 | A kind of combined type shear wall formwork and shear wall construction process |
CN110485597A (en) * | 2019-06-06 | 2019-11-22 | 上海欧本钢结构有限公司 | A kind of construction process of shear wall assembly template and shear wall |
CN110924557A (en) * | 2019-11-22 | 2020-03-27 | 苏州科技大学 | Aluminum alloy framework building structure wall capable of being assembled and connected and preparation method thereof |
CN111051625A (en) * | 2019-03-13 | 2020-04-21 | 鞠楠 | Energy-conserving combination wall of assembled lightweight steel construction |
CN112282122A (en) * | 2020-10-16 | 2021-01-29 | 合力建设有限公司 | Steel construction composite wall of house |
CN112282121A (en) * | 2020-11-20 | 2021-01-29 | 浙江汉林建筑设计有限公司 | Prefabricated built-in corrugated steel plate reinforced concrete combined shear wall and construction process |
CN114232846A (en) * | 2021-12-28 | 2022-03-25 | 中建八局天津建设工程有限公司 | Combined formwork structure of concrete wall and construction method thereof |
CN114658140A (en) * | 2022-04-14 | 2022-06-24 | 北京工业大学 | Built-in lattice column type double-steel-plate shear wall and mounting method thereof |
CN114856036A (en) * | 2022-05-28 | 2022-08-05 | 南通装配式建筑与智能结构研究院 | Recycled concrete ribbed diaphragm shell concrete shear wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003027462A (en) * | 2001-07-16 | 2003-01-29 | Sumitomo Constr Co Ltd | Construction method of underground continuous wall, and construction method of underground structure |
CN103615072A (en) * | 2013-11-25 | 2014-03-05 | 广西大学 | Steel-encased concrete steel column with built-in spiral stirrup |
CN104818784A (en) * | 2015-05-13 | 2015-08-05 | 中国建筑技术集团有限公司 | Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof |
CN205134946U (en) * | 2015-09-23 | 2016-04-06 | 中建三局第三建设工程有限责任公司 | Fixed structure of outer wall wall post template |
CN205242701U (en) * | 2015-10-28 | 2016-05-18 | 中国建筑东北设计研究院有限公司 | Lattice formula shaped steel concrete shear force wall by batten plate connection |
CN206971471U (en) * | 2017-07-12 | 2018-02-06 | 上海欧本钢结构有限公司 | One kind interval steel pipe and combined concrete shear wall system |
-
2017
- 2017-07-12 CN CN201710567206.6A patent/CN107143064A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003027462A (en) * | 2001-07-16 | 2003-01-29 | Sumitomo Constr Co Ltd | Construction method of underground continuous wall, and construction method of underground structure |
CN103615072A (en) * | 2013-11-25 | 2014-03-05 | 广西大学 | Steel-encased concrete steel column with built-in spiral stirrup |
CN104818784A (en) * | 2015-05-13 | 2015-08-05 | 中国建筑技术集团有限公司 | Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof |
CN205134946U (en) * | 2015-09-23 | 2016-04-06 | 中建三局第三建设工程有限责任公司 | Fixed structure of outer wall wall post template |
CN205242701U (en) * | 2015-10-28 | 2016-05-18 | 中国建筑东北设计研究院有限公司 | Lattice formula shaped steel concrete shear force wall by batten plate connection |
CN206971471U (en) * | 2017-07-12 | 2018-02-06 | 上海欧本钢结构有限公司 | One kind interval steel pipe and combined concrete shear wall system |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107761998A (en) * | 2017-10-19 | 2018-03-06 | 上海欧本钢结构有限公司 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
CN108252405A (en) * | 2018-03-30 | 2018-07-06 | 郑勤民 | A kind of prefabricated steel reinforced concrete cavity shear wall assembled architecture and its method of construction |
CN108252405B (en) * | 2018-03-30 | 2024-02-20 | 郑勤民 | Prefabricated steel-concrete cavity shear wall assembled building and construction method thereof |
CN108678247A (en) * | 2018-05-16 | 2018-10-19 | 江南大学 | A kind of prefabricated assembled light floor and its manufacturing method |
CN111051625B (en) * | 2019-03-13 | 2021-03-23 | 鞠楠 | Energy-conserving combination wall of assembled lightweight steel construction |
CN111051625A (en) * | 2019-03-13 | 2020-04-21 | 鞠楠 | Energy-conserving combination wall of assembled lightweight steel construction |
CN110485597A (en) * | 2019-06-06 | 2019-11-22 | 上海欧本钢结构有限公司 | A kind of construction process of shear wall assembly template and shear wall |
CN110195482A (en) * | 2019-06-06 | 2019-09-03 | 上海欧本钢结构有限公司 | A kind of combined type shear wall formwork and shear wall construction process |
CN110924557A (en) * | 2019-11-22 | 2020-03-27 | 苏州科技大学 | Aluminum alloy framework building structure wall capable of being assembled and connected and preparation method thereof |
CN112282122A (en) * | 2020-10-16 | 2021-01-29 | 合力建设有限公司 | Steel construction composite wall of house |
CN112282121A (en) * | 2020-11-20 | 2021-01-29 | 浙江汉林建筑设计有限公司 | Prefabricated built-in corrugated steel plate reinforced concrete combined shear wall and construction process |
CN114232846A (en) * | 2021-12-28 | 2022-03-25 | 中建八局天津建设工程有限公司 | Combined formwork structure of concrete wall and construction method thereof |
CN114658140A (en) * | 2022-04-14 | 2022-06-24 | 北京工业大学 | Built-in lattice column type double-steel-plate shear wall and mounting method thereof |
CN114856036A (en) * | 2022-05-28 | 2022-08-05 | 南通装配式建筑与智能结构研究院 | Recycled concrete ribbed diaphragm shell concrete shear wall |
CN114856036B (en) * | 2022-05-28 | 2024-02-06 | 南通装配式建筑与智能结构研究院 | Recycled concrete ribbed membrane shell concrete shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107143064A (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN206971471U (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN206957041U (en) | Piecemeal assembling type outer wall plate and its connecting structure | |
CN107227822A (en) | Building post and its construction technology that a kind of steel pipe is combined with batten plate | |
CN205954995U (en) | Coincide wallboard structure with inside and outside double -deck heat preservation is insulated against heat | |
CN104179250B (en) | Light-board house system and construction method thereof | |
CN206016309U (en) | A kind of overall assembled building system | |
CN105863111A (en) | Embedded prefabricated concrete shear wall anti-bending steel frame structure | |
CN106381923A (en) | Multilayer architectural structure adopting prefabricated panel and construction method thereof | |
CN104878836B (en) | A kind of prefabricated house and its construction method | |
CN107700667A (en) | A kind of precast floor slab and girder steel lower flange connecting node | |
CN108265828A (en) | Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system | |
CN106760036A (en) | A kind of prefabricated steel combined concrete shear wall | |
CN104790555B (en) | Light steel keel and lightweight concrete prefabricated combining wall and construction method thereof | |
CN108867880A (en) | A kind of assembled steel Reinforced Concrete Buildings | |
CN104818784B (en) | Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof | |
CN107299718A (en) | The precast floor slab and its mounting process of light weight energy-conserving and environment-protective | |
CN108412036B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN207003719U (en) | A kind of prefabricated steel faced wall with steel bar girder | |
CN102418382A (en) | Profile steel space lattice assembly integrated box-type structure for small high-rise energy-saving residential building | |
CN203080733U (en) | External built-mold and internal masonry building structure system | |
CN109680868A (en) | Complete prefabricated ribbed plate exterior wall single storey industry workshop | |
CN201649291U (en) | Box house | |
CN106638956A (en) | Concrete wallboard and ribbed slab dry type connection node | |
CN107605101A (en) | A kind of heat-preserving load-bearing one steel concrete combined special-shaped column and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170908 |
|
RJ01 | Rejection of invention patent application after publication |