CN107761998A - The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor - Google Patents
The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor Download PDFInfo
- Publication number
- CN107761998A CN107761998A CN201710979886.2A CN201710979886A CN107761998A CN 107761998 A CN107761998 A CN 107761998A CN 201710979886 A CN201710979886 A CN 201710979886A CN 107761998 A CN107761998 A CN 107761998A
- Authority
- CN
- China
- Prior art keywords
- shear wall
- steel joist
- heat insulating
- fixed
- insulating decorative
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention proposes the heat preservation decoration integrative shear wall assembly system that a kind of steel joist is fixed with outer armor, including shear wall skeleton, heat insulating decorative board and tightening device, it is characterized in that, there are some heat insulating decorative boards in the shear wall skeleton topping laying, plate stitch is reserved between the adjacent heat insulating decorative board, the tightening device is provided with drawknot bolt, and the drawknot bolt passes through the plate stitch and the heat insulating decorative board is fixed on the shear wall skeleton.In the present invention, shear wall skeleton realizes connection with the heat insulating decorative board as template before placing concrete, heat insulating decorative board is set to double as construction formwork, exterior armor then causes swollen mould power when heat insulating decorative board has stronger resistance concreting, so that shear wall more assembling, and it is easy to connect reliable.
Description
Technical field
The present invention relates to industry and residential construction area, and in particular to the insulation and decoration that a kind of steel joist is fixed with outer armor
Integrated shear wall assembly system.
Background technology
At present, China proposes higher Compulsory Feature to house assembling.Although continuous steel pipe beam shear wall is
Progressively popularization and application at home, the steel using amount of steel pipe bundle is bigger than normal, adds the holistic cost of shear wall, meanwhile, steel pipe bundle conduct
Primary structure member redundancy is more, causes a large amount of wastes of steel.
In addition, the plug-in heat insulating decorative board of traditional shear wall, it usually needs primary and secondary skeletal frame leveling, process are installed using connector
Complexity, and cost is very high.
The content of the invention
In order to solve the above technical problems, the heat preservation decoration integrative that a kind of steel joist proposed by the present invention is fixed with outer armor
Shear wall assembly system, including shear wall skeleton, heat insulating decorative board and tightening device, have in the shear wall skeleton topping laying
Some heat insulating decorative boards, plate stitch are reserved between the adjacent heat insulating decorative board, the tightening device is provided with drawknot bolt, institute
State drawknot bolt and pass through the plate stitch and the heat insulating decorative board is fixed on the shear wall skeleton.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
The shear wall skeleton is by along the spaced steel joist of wall length direction and between connected steel joist and along the steel
Keel vertical direction interval batten plate composition arranged in pairs.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
The connecting hole for drawknot bolt access is provided with the batten plate, is transversely provided between a pair of batten plates tapped
Sleeve, and the both ends of the sleeve are relative with the connecting hole connects.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
The tightening device includes the exterior armor set up by vertical keel and lateral keel and in vertical keel or lateral keel
End set have the drawknot bolt.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
Vertical keel provided with the drawknot bolt is provided with cushion block in the end of lateral keel.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
When vertically adjacent to plate stitch is reserved between the heat insulating decorative board, vertically adjacent to the vertical keel between interlaced arrangement;Or
Person between the horizontally adjacent heat insulating decorative board when being reserved with plate stitch, interlaced arrangement between the horizontally adjacent lateral keel.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
The heat insulating decorative board includes the heat-insulation layer and architectural surface set gradually, and the heat-insulation layer is integrally formed with the architectural surface
Or interfixed by some stone material crab-bolts, wherein, the stone material crab-bolt is extended in the shear wall skeleton.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
The slit width of the plate stitch is 10~20mm.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
Packed layer is provided with the plate stitch, thermal insulation mortar or rock wool are provided with the packed layer, the filling layer surface is sealed by structure glue
Close.
Further, in the heat preservation decoration integrative shear wall assembly system that described steel joist and outer armor are fixed,
The shear wall skeleton cast concrete formation is concrete shear force wall.
Compared with prior art, beneficial effects of the present invention:Shear wall skeleton is pouring with the heat insulating decorative board as template
Connection is realized before filling concrete, heat insulating decorative board is doubled as construction formwork, it is stronger that exterior armor then make it that heat insulating decorative board has
Resistance concreting when swollen mould power so that shear wall more assembling, and easy to connect reliable.
Brief description of the drawings
Fig. 1 is the heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor in one embodiment of the invention
Structural representation;
Fig. 2 is the scheme of installation of heat insulating decorative board and shear wall skeleton in one embodiment of the invention;
Fig. 3 is the structural representation of heat insulating decorative board in one embodiment of the invention.
In Fig. 1 into Fig. 3,1- shear wall skeletons, 2- heat insulating decorative boards, 3- tightening devices, 11- steel joists, 12- batten plates,
121- connecting holes, 122- sleeves, 21- heat-insulation layers, 22- architectural surfaces, 23- plate stitch, 24- stone material crab-bolts, 31- drawknot bolts, 32-
Exterior armor, 33- cushion blocks, 321- vertical keels, 322- lateral keels.
Embodiment
The steel joist of the present invention is filled with the heat preservation decoration integrative shear wall that outer armor is fixed below in conjunction with schematic diagram
Match system is described in more detail, and which show the preferred embodiments of the present invention, it should be appreciated that those skilled in the art can
To change invention described herein, and still realize the advantageous effects of the present invention.Therefore, description below is appreciated that pair
In the widely known of those skilled in the art, and it is not intended as limitation of the present invention.
As shown in Fig. 1 Fig. 3, the present invention proposes a kind of steel joist and sheared with the heat preservation decoration integrative that outer armor is fixed
Wall assembly system, including shear wall skeleton 1, the heat insulating decorative board 2 and by exterior armor built by steel joist 11 and batten plate 12
32 and the tightening device 3 that forms of drawknot bolt 31 so that shear wall skeleton 1 and heat insulating decorative board 2 pour mixed in shear wall skeleton 1
Connection is realized before solidifying soil, described heat insulating decorative board 2 is doubled as construction formwork, and as the heat insulating decorative board 2 of construction formwork
The drawknot bolt 31 being connected with shear wall skeleton 1, pass through upper and lower or left and right heat insulating decorative board 2 plate stitch 23 and connect, concrete
After pouring, screw rod is dismountable.Shear wall integration assembly system proposed by the present invention will be hereafter described in detail.
As shown in figure 1, the heat preservation decoration integrative shear wall assembly system that steel joist 11 is fixed with outer armor, including shearing
Wall skeleton 1, heat insulating decorative board 2 and tightening device 3, there are some heat insulating decorative boards in the topping laying of shear wall skeleton 1
2, plate stitch 23 is reserved between the adjacent heat insulating decorative board 2, and the tightening device 3 is provided with drawknot bolt 31, the drawknot bolt
31, which pass through the plate stitch 23, is fixed on the heat insulating decorative board 2 on the shear wall skeleton 1.
(shear wall skeleton 1)
As depicted in figs. 1 and 2, the shear wall skeleton 1 is by along the spaced steel joist 11 of wall length direction and setting
Formed between connected steel joist 11 and along the vertical direction interval of steel joist 11 batten plate 12 arranged in pairs.The steel dragon of use
Bone 11 is hollow square keel, and its cross section is square or rectangle.
Wherein, the connecting hole 121 for the drawknot bolt 31 access is provided with the batten plate 12;A pair of batten plates 12
Between be transversely provided with tapped sleeve 122, and the both ends of the sleeve 122 are relative with the connecting hole 121 connects.Above-mentioned company
Hole 121 is connect as circular or ellipse.
(tightening device 3)
As depicted in figs. 1 and 2, the tightening device 3 includes what is set up by vertical keel 321 and lateral keel 322
Exterior armor 32 and there is the drawknot bolt 31 in the end set of vertical keel 321 or lateral keel 322.Provided with the drawknot
Cushion block 33 is provided with the vertical keel 321 of bolt 31 or the end of lateral keel 322, can be with to strengthen the rigidity of junction
Using wood block filler or backing metal.Further, in order that the uniform force of heat insulating decorative board 2, when vertically adjacent to the insulation
When being reserved with plate stitch 23 between decorative panel 2, vertically adjacent to the vertical keel 321 between interlaced arrangement;Or when horizontally adjacent
When being reserved with plate stitch 23 between the heat insulating decorative board 2, interlaced arrangement between the horizontally adjacent lateral keel 322.
(heat insulating decorative board 2)
As shown in Figures 1 to 3, the heat insulating decorative board 2 includes the heat-insulation layer 21 and architectural surface 22 set gradually, the guarantor
Warm layer 21 is integrally formed with the architectural surface 22 or interfixed by some stone material crab-bolts 24, wherein, the stone material crab-bolt 24
Extend in the shear wall skeleton 1.The quantity of stone material crab-bolt 24 is calculated according to the stressing conditions of heat insulating decorative board 2 and determined, is cut
It is concrete shear force wall that power wall skeleton 1, which pours into a mould concrete aftershaping, and stone material crab-bolt 24 stretches into concrete shear within the walls, with coagulation
Native shear wall is poured in one.
The heat insulating decorative board 2 lays installation along shear wall skeleton 1 from the bottom to top, and between the adjacent heat insulating decorative board 2
Plate stitch 23 is reserved with, the slit width of the plate stitch 23 is 10~20mm, it is therefore preferable to standard slit width 15mm.Stay-bolt passes through plate stitch
23, shear wall skeleton 1 and heat insulating decorative board 2 are fixed on one.
For further lifting wall thermal insulating and fire protecting performance, the plate stitch 23 is interior to be provided with packed layer, is set in the packed layer
There are thermal insulation mortar or rock wool etc., the filling layer surface possible constructions glue closing.Using A level fire proofing material joint fillings, so that
Wall thermal insulating and fire protecting performance have been lifted.
In the present invention, the exterior armor 32 of heat insulating decorative board 2 is strengthened, according to the size of heat insulating decorative board 2, shear wall
The design connecting hole 121 such as height and the vertical keel 321 of armor or the spacing of lateral keel 322, it is ensured that during concreting,
The heat insulating decorative board 2 for also serving as construction formwork will not craze and transfiguration.
Specifically, the heat preservation decoration integrative shear wall assembling that steel joist 11 proposed by the present invention is fixed with outer armor is
System, newly-laid concrete lateral pressure is considered during strength checking and topples over load caused by concrete, is pressed《Construction handbook》Coagulation
Soil acts on the maximum lateral pressure of template, is calculated by following equation, and takes smaller value therein;
F=γ H
Wherein, the force density of γ, γ c-- concrete;The presetting period of t-- newly-laid concretes;β1-- additive influences
Correction factor;β2-- concrete slump influences correction factor;The poring rate of V-- concrete;H-- concrete lateral pressures calculate
Opening position is to newly-laid concrete top surface total height.
By the high 4 meters of calculations of wall, liftoff 1.5 meters of high form lateral pressures
F2=25x (4-1.5)=62.5kN/m2
Template size (size of heat insulating decorative board 2) is calculated by 0.45x0.8m, and the lateral pressure on decorative panel is:
F=1.4x36.43x0.45x0.8=18.36kN
Assuming that 4 drawknot bolts 31 of every piece of template, the power each born are
F=18.36/4=4.59kN
The 4 M10 bolts of drawknot bolt 31.
To sum up, the heat preservation decoration integrative shear wall fixed in steel joist provided in an embodiment of the present invention and outer armor assembles
In system, shear wall skeleton realizes connection with the heat insulating decorative board as template before placing concrete, makes heat insulating decorative board
As construction formwork, exterior armor then causes swollen mould power when heat insulating decorative board has stronger resistance concreting so that cuts
Power wall more assembling, and it is easy to connect reliable.
The preferred embodiments of the present invention are above are only, any restrictions effect is not played to the present invention.Belonging to any
Those skilled in the art, in the range of technical scheme is not departed from, to the invention discloses technical scheme and
Technology contents make the variation such as any type of equivalent substitution or modification, belong to the content without departing from technical scheme, still
Belong within protection scope of the present invention.
Claims (10)
1. the heat preservation decoration integrative shear wall assembly system that a kind of steel joist is fixed with outer armor, including shear wall skeleton, guarantor
Warm decorative panel and tightening device, it is characterised in that have some heat insulating decorative boards, phase in the shear wall skeleton topping laying
Plate stitch is reserved between the adjacent heat insulating decorative board, the tightening device is provided with drawknot bolt, and the drawknot bolt passes through the plate
The heat insulating decorative board is fixed on the shear wall skeleton by seam.
2. the heat preservation decoration integrative shear wall assembly system that steel joist according to claim 1 is fixed with outer armor, its
Be characterised by, the shear wall skeleton by along the spaced steel joist of wall length direction and between connected steel joist simultaneously
Along steel joist vertical direction interval batten plate composition arranged in pairs.
3. the heat preservation decoration integrative shear wall assembly system that steel joist according to claim 2 is fixed with outer armor, its
It is characterised by, the connecting hole for drawknot bolt access is provided with the batten plate, is transversely provided between a pair of batten plates
Tapped sleeve, and the both ends of the sleeve are relative with the connecting hole connects.
4. the heat preservation decoration integrative shear wall assembly system that steel joist according to claim 1 is fixed with outer armor, its
Be characterised by, the tightening device include the exterior armor set up by vertical keel and lateral keel and in vertical keel or
The end set of lateral keel has the drawknot bolt.
5. the heat preservation decoration integrative shear wall assembly system that steel joist according to claim 4 is fixed with outer armor, its
It is characterised by, vertical keel provided with the drawknot bolt or cushion block is provided with the end of lateral keel.
6. the heat preservation decoration integrative shear wall assembly system that steel joist according to claim 1 is fixed with outer armor, its
Be characterised by, when vertically adjacent to plate stitch is reserved between the heat insulating decorative board, vertically adjacent to the vertical keel between hand over
Mistake arrangement;Or when being reserved with plate stitch between the horizontally adjacent heat insulating decorative board, between the horizontally adjacent lateral keel
Interlaced arrangement.
7. the heat preservation decoration integrative shear wall assembly system that steel joist according to claim 1 is fixed with outer armor, its
It is characterised by, the heat insulating decorative board includes the heat-insulation layer and architectural surface set gradually, the heat-insulation layer and the decorative cover
Layer is integrally formed or interfixed by some stone material crab-bolts, wherein, the stone material crab-bolt is extended in the shear wall skeleton.
8. the steel joist according to any one in claim 1~7 shears with the heat preservation decoration integrative that outer armor is fixed
Wall assembly system, it is characterised in that the slit width of the plate stitch is 10~20mm.
9. the steel joist according to any one in claim 1~7 shears with the heat preservation decoration integrative that outer armor is fixed
Wall assembly system, it is characterised in that packed layer is provided with the plate stitch, thermal insulation mortar or rock wool, institute are provided with the packed layer
Filling layer surface is stated to be closed by structure glue.
10. the steel joist according to any one in claim 1~7 shears with the heat preservation decoration integrative that outer armor is fixed
Wall assembly system, it is characterised in that the shear wall skeleton cast concrete formation is concrete shear force wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710979886.2A CN107761998A (en) | 2017-10-19 | 2017-10-19 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710979886.2A CN107761998A (en) | 2017-10-19 | 2017-10-19 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107761998A true CN107761998A (en) | 2018-03-06 |
Family
ID=61269020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710979886.2A Pending CN107761998A (en) | 2017-10-19 | 2017-10-19 | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107761998A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397235A (en) * | 2019-07-26 | 2019-11-01 | 青岛科瑞新型环保材料集团有限公司 | The heat preservation decoration integrative system and its construction technology of steel pipe bundle shear wall structure |
CN112575915A (en) * | 2020-12-12 | 2021-03-30 | 中冶天工集团有限公司 | Method for installing rock wool heat preservation template integrated combined wallboard |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0610428A (en) * | 1992-06-26 | 1994-01-18 | Kanegafuchi Chem Ind Co Ltd | Method for constructing concrete wall equipped with heat insulating panel |
JP2005264491A (en) * | 2004-03-17 | 2005-09-29 | Toyo Tire & Rubber Co Ltd | Outside heat insulation method |
CN101260693A (en) * | 2007-03-09 | 2008-09-10 | 刘文博 | Cast-in-situ light weight composite wall and its architecture construction method |
CN202767293U (en) * | 2012-07-12 | 2013-03-06 | 泰安市当代建筑设计咨询有限公司 | Cast-in-place foam concrete external wall free of form removal |
CN204163228U (en) * | 2014-10-22 | 2015-02-18 | 湖南省西湖建筑集团有限公司 | Air-entrained concrete building block heat preservation composite wall |
CN104818784A (en) * | 2015-05-13 | 2015-08-05 | 中国建筑技术集团有限公司 | Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof |
CN205134946U (en) * | 2015-09-23 | 2016-04-06 | 中建三局第三建设工程有限责任公司 | Fixed structure of outer wall wall post template |
CN206329034U (en) * | 2016-12-20 | 2017-07-14 | 福建建工集团有限责任公司 | The attachment structure of swollen mould is prevented at a kind of concrete wall column free face construction joint |
CN107143135A (en) * | 2017-06-28 | 2017-09-08 | 常华北 | Structure-integrated insulation and decoration exterior sheathing and its external wall construction method |
CN107143064A (en) * | 2017-07-12 | 2017-09-08 | 上海欧本钢结构有限公司 | One kind interval steel pipe and combined concrete shear wall system |
CN207700444U (en) * | 2017-10-19 | 2018-08-07 | 上海欧本钢结构有限公司 | Steel joist and the fixed heat preservation decoration integrative shear wall assembly system of outer armor |
-
2017
- 2017-10-19 CN CN201710979886.2A patent/CN107761998A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0610428A (en) * | 1992-06-26 | 1994-01-18 | Kanegafuchi Chem Ind Co Ltd | Method for constructing concrete wall equipped with heat insulating panel |
JP2005264491A (en) * | 2004-03-17 | 2005-09-29 | Toyo Tire & Rubber Co Ltd | Outside heat insulation method |
CN101260693A (en) * | 2007-03-09 | 2008-09-10 | 刘文博 | Cast-in-situ light weight composite wall and its architecture construction method |
CN202767293U (en) * | 2012-07-12 | 2013-03-06 | 泰安市当代建筑设计咨询有限公司 | Cast-in-place foam concrete external wall free of form removal |
CN204163228U (en) * | 2014-10-22 | 2015-02-18 | 湖南省西湖建筑集团有限公司 | Air-entrained concrete building block heat preservation composite wall |
CN104818784A (en) * | 2015-05-13 | 2015-08-05 | 中国建筑技术集团有限公司 | Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof |
CN205134946U (en) * | 2015-09-23 | 2016-04-06 | 中建三局第三建设工程有限责任公司 | Fixed structure of outer wall wall post template |
CN206329034U (en) * | 2016-12-20 | 2017-07-14 | 福建建工集团有限责任公司 | The attachment structure of swollen mould is prevented at a kind of concrete wall column free face construction joint |
CN107143135A (en) * | 2017-06-28 | 2017-09-08 | 常华北 | Structure-integrated insulation and decoration exterior sheathing and its external wall construction method |
CN107143064A (en) * | 2017-07-12 | 2017-09-08 | 上海欧本钢结构有限公司 | One kind interval steel pipe and combined concrete shear wall system |
CN207700444U (en) * | 2017-10-19 | 2018-08-07 | 上海欧本钢结构有限公司 | Steel joist and the fixed heat preservation decoration integrative shear wall assembly system of outer armor |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110397235A (en) * | 2019-07-26 | 2019-11-01 | 青岛科瑞新型环保材料集团有限公司 | The heat preservation decoration integrative system and its construction technology of steel pipe bundle shear wall structure |
CN112575915A (en) * | 2020-12-12 | 2021-03-30 | 中冶天工集团有限公司 | Method for installing rock wool heat preservation template integrated combined wallboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7908807B2 (en) | Insulated concrete form system | |
CN207582663U (en) | Connecting elements between concrete folding plate and shear wall Side fascia | |
CN107143064A (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN108797847A (en) | A kind of assembled steel frame wall filled with masonry structural system and its construction method | |
CN107476491A (en) | Fill concrete wallboard and its manufacture method in a kind of prefabricated thermal insulation | |
CN104878836B (en) | A kind of prefabricated house and its construction method | |
CN206971471U (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN206016011U (en) | A kind of steel plate concrete composite beam panel structure system | |
CN105672562B (en) | Steam-pressing aero-concrete integral heat insulation wallboard and its production technology | |
CN107700667A (en) | A kind of precast floor slab and girder steel lower flange connecting node | |
CN206693432U (en) | Fabricated shear wall and fabric structure | |
CN208934190U (en) | A kind of assembled steel frame wall filled with masonry structural system | |
CN207314655U (en) | Fill concrete wallboard in a kind of prefabricated thermal insulation | |
CN107761998A (en) | The heat preservation decoration integrative shear wall assembly system that steel joist is fixed with outer armor | |
CN207700444U (en) | Steel joist and the fixed heat preservation decoration integrative shear wall assembly system of outer armor | |
CN206467824U (en) | A kind of assembly concrete frame wall filled with masonry | |
CN104727481B (en) | Factorial praluction energy-conserving construction wall and preparation method | |
CN209429323U (en) | A kind of prefabricated overlapping coupled shear walls | |
CN208830503U (en) | The compound plate cast-in-place concrete exterior wall heat-preserving wall of steel wire net rack | |
CN107366385A (en) | A kind of thermal insulation structure post and its construction method | |
CN104563329A (en) | Load-bearing heat-preserving integrated shear wall structure | |
CN103758256B (en) | A kind of decorative heat preservation composite wall and preparation method thereof | |
CN206800616U (en) | A kind of prefabricated luffer boards that float | |
CN206110422U (en) | Prefabricated sound insulation floor that keeps warm of lattice formula | |
CN206110331U (en) | Prefabricated assembly building of lightweight steel construction lightweight concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |