The content of the invention
It is an object of the invention to provide a kind of steam-pressing aero-concrete integral heat insulation wallboard and its production technology, to reach
Can fundamentally solve wall crazing leakage problems, and take into account high-strength light, insulation, impervious waterproof, fire protection flame retarding, every
Sound noise reduction, it is green, construction it is convenient, prolonged resistance to old, economical and practical the advantages that, can be used crane once sling, construction speed
It hurry up, climate conditionality is small, saves labour, can effectively shorten construction period, saves construction cost, and can improve and build
Build the purpose of quality.
Steam-pressing aero-concrete integral heat insulation wallboard provided by the present invention, including autoclaved aerated concrete slab, reinforcing bar mix
Solidifying native frame, steel pin or/and bolt, heat-insulation layer, it is characterised in that the side of described autoclaved aerated concrete slab is provided with recessed
Groove, opposite side are provided with projection, and groove is adapted with projection;Or the both sides of autoclaved aerated concrete slab are provided with symmetrically
Pore-forming groove;Or the both sides of autoclaved aerated concrete slab are plane;Described autoclaved aerated concrete slab using it is horizontal dress,
The mode for erecting dress or vertical and horizontal mixing installation is assembled into wallboard, and both sides wallboard and its middle heat-insulation layer are assembled into heat-insulation wall plate;
Described reinforced concrete frame is made up of concrete-placing reinforcing steel bar cylinder mould, and reinforced concrete frame is consolidated by steel pin or/and bolt
Surely it is connected to around heat-insulation wall plate;When described autoclaved aerated concrete slab erects dress, one is set every one piece or several pieces
Ribs;Heat-insulation layer is set up in described ribs and at least side of reinforced concrete frame.
Steam-pressing aero-concrete integral heat insulation wallboard provided by the present invention, using one piece or the steam pressurized coagulation of polylith
Native plate is assembled to be made, and autoclaved aerated concrete slab surface quality is good, does not ftracture, be light porous, be green, and has well
The performance of fire resisting, fire prevention, sound insulation, heat-insulated, insulation etc., after being assembled into wallboard, links together with heat-insulation layer, forms insulated wall
Plate, reinforced concrete frame are fixedly connected on around heat-insulation wall plate by steel pin or/and bolt, become one it is steam pressurized
Concrete integral heat insulation wallboard;Ribs can be with the intensity and endurance of heat-insulation wall plate.Meanwhile steam pressurized coagulation of the invention
Native integral wall is assembled in factory, its indoor environment temperature, humidity etc. can manual control, can manually carry out industry on a small quantity
Change production line balance, transport after production to job site, directly installed using crane.
Therefore, the present invention, which has, can fundamentally solve wall crazing leakage problems, and take into account high-strength light, thermal insulation separation
Hot, impervious waterproof, fire protection flame retarding, sound insulation and noise reduction, it is green, construction it is convenient, prolonged resistance to old, economical and practical the advantages that, can make
Once to be sling with crane, construction speed is fast, and climate conditionality is small, saves labour, can effectively shorten construction period,
Construction cost is saved, and the good effect of construction quality can be improved.
Embodiment
As shown in Fig. 1,2,3,4,7,8,9, steam-pressing aero-concrete integral heat insulation wallboard provided by the present invention, including steam
Pressing aero-concrete plate 1, reinforced concrete frame 2, steel pin or/and bolt 3, heat-insulation layer 4, the one of autoclaved aerated concrete slab 1
Side sets fluted 1a, and opposite side is provided with raised 1b, and groove 1a is adapted with raised 1b;Or autoclaved aerated concrete slab 1
Both sides be provided with symmetrical pore-forming groove 1c;Or the both sides of autoclaved aerated concrete slab 1 are plane;It is steam pressurized
Concrete slab 1 is assembled into wallboard 5 by the way of horizontal dress, perpendicular dress or vertical and horizontal mixing installation, and wallboard 5 and heat-insulation layer 4 are assembled into
Heat-insulation wall plate 6;The both sides of heat-insulation wall plate 6 are wallboard 5, and intermediate course is heat-insulation layer 4;Reinforced concrete frame 2 is poured by concrete
Build rebar cylinder mould 13 to be made, heat-insulation layer 4 is set up at least side of reinforced concrete frame 2, and reinforced concrete frame 2 is by steel pin
Or/and bolt 3 is fixedly connected on around heat-insulation wall plate 6;When autoclaved aerated concrete slab 1 erects dress, every one piece or several
The junction of block autoclaved aerated concrete slab 1 sets a ribs 9;During 1 horizontal dress of autoclaved aerated concrete slab, every a section
Or the junction of a few section autoclaved aerated concrete slabs 1 sets a ribs 9.
One piece either polylith autoclaved aerated concrete slab 1 by the way of horizontal dress, perpendicular dress or vertical and horizontal mixing installation
When being assembled into wallboard face 4, in order that the groove 1a of the side of autoclaved aerated concrete slab 1 and adjacent autoclaved aerated concrete slab 1
The raised 1b of side is more mutually adapted, the raised 1b of opposite side is recessed with another adjacent side of autoclaved aerated concrete slab 1
The assembled gap that groove 1a is more mutually adapted between autoclaved aerated concrete slab 1 is filled using binding agent 8, and binding agent 8 can
So as to overall wallboard face 4 is more combined between polylith autoclaved aerated concrete slab 1;In order that autoclaved aerated concrete slab 1
The symmetrical pore-forming groove 1c and adjacent assembled autoclaved aerated concrete slab 1 in both sides pore-forming groove 1c be mutually adapted,
A through hole is formed, binding agent 8 is poured in its through hole, flexible connection will be made between adjacent autoclaved aerated concrete slab 1, into
Hole groove 1c can be triangle, rectangle, half elliptic, semicircle, square, it is trapezoidal in any one, be correspondingly formed
Fill orifice be any one in rhombus, square/rectangle, ellipse, circle, rectangle, hexagon;Or in steam pressure
Two side planes of aerated concrete panel 1 smear binding agent 8, it is carried out assembly with adjacent autoclaved aerated concrete slab 1.
Reinforced concrete frame 2 can be totally enclosed or open, such as when wallboard face 4 is provided with doorway 12
When, then the bottom on doorway is unable to pouring reinforcement concrete frame 2, i.e. reinforced concrete frame 2 is open.
At least side of above-mentioned reinforced concrete frame 2 and ribs 9 is provided with heat-insulation layer 4.During casting concrete,
Heat-insulation layer 4 is cast in reinforced concrete frame 2 and ribs 9.Heat-insulation layer 4 can be set up in side, can also be in its both sides
Set up heat-insulation layer 4.The thickness of heat-insulation layer 4 can cause with the variable thickness of heat-insulation layer 4 in two layers of wallboard 5.
Further, I-shaped support 7 is provided with the heat-insulation layer among the wallboard of both sides, I-shaped support 7 can support guarantor
Warm layer, prevent it from being oppressed by the wallboard of both sides.When I-shaped support 7 supports 703 by top braces 701, connecting pole 702 and bottom
When assembling, connecting pole 702 is provided with screw thread, and top braces 701 and bottom support 703 are provided with the spiral shell with connecting pole 702
Line thinks the screw thread of adaptation, and its top braces 701 and bottom support 703 are located at the both sides of heat-insulation layer respectively, and connecting pole 702, which passes through, to be protected
Warm layer 4, the both ends of connecting pole 702 are fixedly connected by screw thread with top braces 701, bottom support 703;
When I-shaped support 7 is assembled by top braces 701, connecting bolt 704 and bottom support 703, spiral shell is connected
Bolt 704 is provided with screw thread, and top braces 701 and bottom support 703 are provided with wants the spiral shell that is adapted to the screw thread of connecting bolt 704
Line, its top braces 701 and bottom support 703 are located at the both sides of heat-insulation layer respectively, and connecting bolt 704 is through heat-insulation layer 4 and steams
Pressing aero-concrete plate 1, the both ends of connecting bolt 704 are separately fixed on autoclaved aerated concrete slab 1 by screw thread and nut;Work
Font support 7 is preferred with uniformly dividing in heat-insulation layer 4.
Above-mentioned heat-insulation layer 4 is rock cotton board, mineral wool, perlite, ceramics, cement board, polyurathamc plate, can sent out
Property XPS(Eps plates)Or extrusion moulding type polystyrene heat insulating board(Xps warming plates)In any one, heat-insulation layer 4
Thickness be 3cm-30cm.Both heat-insulating property can be met, weight, cost-effective requirement can be met again.
The thickness of above-mentioned autoclaved aerated concrete slab 1 is 5cm-30cm, is highly 40cm-600cm;Armored concrete side
The width of frame 2 is 13cm -90cm.The width of reinforced concrete frame 2 be equal to both sides autoclaved aerated concrete slab 1 thickness and
The thickness sum of heat-insulation layer 4, it can also be slightly larger than or be slightly less than the thickness and heat-insulation layer 4 of both sides autoclaved aerated concrete slab 1
Thickness sum.
The above-mentioned gap between autoclaved aerated concrete slab 1 is filled using binding agent 8, in the assembly of wallboard 5
The alkaline-resisting grid cloth that width is 8cm-50cm is pasted at gap.Alkaline-resisting grid cloth can prevent the gap of the assembling part of wallboard face 4 from opening
Split., can be when designing and producing autoclaved aerated concrete slab 1, in autoclaved aerated concrete slab for the surfacing in wallboard face 4
The alkaline-resisting grid cloth that width is 5cm or so, depth is 5mm or so is reserved respectively and pastes space in 1 both sides of the edge;It can not also set
Put alkaline-resisting grid cloth and paste space, alkaline-resisting grid cloth is pasted directly at the assembled gap in wallboard face 4.
Above-mentioned sets in the side of the autoclaved aerated concrete slab 1 adjacent with ribs 9 or both sides every 10cm-30cm
Put a row or multi-row steel pin or/and bolt 3, one end of steel pin or/and bolt 3 is fixed on 5cm- in autoclaved aerated concrete slab 1
30cm, the other end are cast in 4cm-20cm in ribs 9.Ribs 9 can be prevented because polylith autoclaved aerated concrete slab 1 is spelled
Dress, the intensity and endurance of its junction can decline.
Either it is staggered side by side a row or more every 10cm-30cm around the wallboard 5 of the above-mentioned both sides of heat-insulation layer 4
It is 5cm-30cm that one end of row's steel pin or/and bolt 3, steel pin or/and bolt 3, which is fixed on length in wallboard 5, and the other end is cast in
Length is 4cm-20cm in reinforced concrete frame 2.The wallboard 5 of both sides can be set face-to-face, can also stagger setting, i.e.,
Can be with the plate stitch of autoclaved aerated concrete slab 1 of the autoclaved aerated concrete slab 1 of a framed side wallboard 5 and another framed side wallboard 5 to plate stitch pair
Full cry and put, can also plate stitch plate face is staggered placement.Accordingly, steel pin or/and bolt 3 can be arranged side by side, can also be wrong
Open up and put.
The top of above-mentioned wallboard 5 is provided with 2-5 steel suspension hook 10, and the lower end of steel suspension hook 10 is welded on ribs 9
On interior rebar cylinder mould, or it is cast in reinforced concrete frame 2.Steel hook 10 lower end be connected to in ribs 9,
Wherein connect with welding and be preferred on the reinforcing bar in ribs 9 especially, steel links up with the 10 length 10cm- in ribs 9
100cm.Autoclaved aerated concrete slab 1 horizontal can fill, can erect dress, can anyhow mix and is assembled into wallboard 5, autoclaved aerated concrete slab 1
The ribs 9 of junction has transverse direction, also have it is vertical, steel hook 10 lower end be preferred with being welded on vertical ribs 9.Steel
The quantity of system hook 10 is consistent with the quantity of vertical ribs 9, i.e., a steel is respectively provided with every vertical ribs 9 and is hung
Hook 10;When wallboard 5 is assembled by autoclaved aerated concrete slab 1, or junction between autoclaved aerated concrete slab 1 is not poured
When building ribs 9, the lower end of steel hook 10 can be cast in reinforced concrete frame 2.The gib head of steel hook 10 can
With exposed in the outside of reinforced concrete frame 2, exposed gib head is cut away when constructing at the scene.Steel hook 10
The lifting that can transport or construct is convenient.
As shown in figure 5, the size of above-mentioned wallboard 5 is to be processed manufacture in factory according to construction wall design size,
When need wallboard 5 install water, electricity, socket, switch, with power port etc. when, then in processing and fabricating autoclaved aerated concrete slab 1,
Autoclaved aerated concrete slab 1 it is reserved, pipeline 11 is set, pipeline 11 can also be set in wallboard face 4;The surface of wallboard 5 with
The corresponding position of spool is provided with socket, switch and power distribution cabinet opening.
As shown in fig. 6, above-mentioned heat-insulation wall plate 6, when needing in the installation door of heat-insulation wall plate 6, window, then needs in insulated wall
Plate 6 is reserved, is provided with doorway 12, window 13;In order to prevent doorway 12, window 13 from being deformed in transport or work progress,
The both sides doorjamb and top frame on doorway 12 pour the armored concrete that a layer thickness is 3cm-20cm, and the bottom on doorway 12 increases
If support bar, it can prevent doorway 8 is stressed to coerce and deform;The surrounding of window 13 pours the steel that a layer thickness is 3cm-10cm
Reinforced concrete;Or armored concrete pre-embedded block 14 is provided with heat-insulation wall plate 6, doorway 12, window 13 install angle steel or
Band steel 15 is reinforced, and can increase doorway 12, the intensity and endurance of window 13, distortion preventing.
The surface of above-mentioned heat-insulation wall plate 6 is provided with decorative layer, and decorative layer can be mortar, gypsum, putty, coating, breast
In shellac varnish, wallpaper, wall paper, insulation material, ceramic tile any one or it is a variety of.If heat-insulation wall plate 6 be arranged on toilet or
Kitchen, then it can carry out water-proofing treatment.
The surface of above-mentioned heat-insulation wall plate 6 is provided with diaphragm, and diaphragm is in brown paper, plastic sheeting, rubber film
Any one or it is a variety of can prevent in transport or work progress, damage heat-insulation wall plate 6.
As shown in Figure 10, the production technology of steam-pressing aero-concrete integral heat insulation wallboard provided by the present invention, including with
Lower step:
The making of template:
According to building, if the design requirement of building is, it is necessary to make more large-sized integral wall, with regard to manufacturing and designing one
The template consistent with integral wall size, the bottom of template and all round closure, upper end open.
The assembly of autoclaved aerated concrete slab, the arrangement of pipeline, doorway window it is reserved:
According to building, such as the design requirement of building, you can know to set in the relevant position of integral wall in advance and strengthen
Rib 9, pipeline 11, doorway 12, window 13, during the assembly of autoclaved aerated concrete slab 1, its relevant position is reserved.Pipe
It line 11 such as water pipe, electric wire, data wire, can in advance slot again assembled, first assembled can also slot again;Doorway 12, window 13
It is assembled again that well cutting can be shifted to an earlier date, first assembled can also be cut again.
Binding agent 8 is applied in first piece of groove 1a of autoclaved aerated concrete slab 1, by second piece of autoclaved aerated concrete slab 1
Raised 1b adaptations corresponding with first piece of groove 1a of autoclaved aerated concrete slab 1, and in the bottom of autoclaved aerated concrete slab 1
Prop up up and down the changing of the relative positions, make first piece of autoclaved aerated concrete slab 1 side binding agent 8 fully with second piece of steam pressurized coagulation
Native plate 1 combines, and two pieces of autoclaved aerated concrete slabs 1 are assembled into wallboard 5;Or the both sides of autoclaved aerated concrete slab 1 are mutually right
The pore-forming groove 1c of title and adjacent assembled autoclaved aerated concrete slab 1 pore-forming groove 1c are mutually adapted, and form a through hole,
Binding agent 8 is poured in its through hole, flexible connection will be made between two pieces of adjacent autoclaved aerated concrete slabs 1, be assembled into wall
Plate 5;Or two side planes of autoclaved aerated concrete slab 1 apply binding agent 8 respectively, with adjacent autoclaved aerated concrete slab 1
Plane pastes connection respectively, is assembled into wallboard 5;
By that analogy, polylith autoclaved aerated concrete slab 1 can be assembled into wallboard 5;
Slotted on autoclaved aerated concrete slab 1 or wallboard 5, pipeline 11 in arrangement;
Cut on autoclaved aerated concrete slab 1 or wallboard 5, doorway 12, window 13 are set, in doorway 12, window 13
Position, without the assembly of autoclaved aerated concrete slab 1, it is reserved go out, the position of window;
The alkaline-resisting grid cloth that width is 8cm-50cm is pasted at the assembled gap of wallboard 5.
The making of heat-insulation wall plate:
Pipeline will be set, one layer of wallboard 5 of doorway window is placed in template, heat-insulation layer 4 is laid on wallboard 5
Afterwards, then on heat-insulation layer 4 another layer of wallboard 5 is laid, forms heat-insulation wall plate 6.
Every one piece or the reserved space for pouring ribs 9 of several pieces of autoclaved aerated concrete slabs 1;Heat-insulation wall plate 6 with
The casting space of reserved steel bar concrete frame 2 between template periphery.
I-shaped support 7 is uniformly divided in heat-insulation layer 4.When use is by top braces 701, connecting pole 702 and bottom
During the I-shaped support 7 that support 703 assembles, top braces 701 and bottom support 703 are located at the two of heat-insulation layer respectively
Side, connecting pole 702 pass through heat-insulation layer 4, and the both ends of connecting pole 702 are by screw thread and top braces 701, the company of fixation of bottom support 703
Connect;When using the I-shaped support 7 assembled by top braces 701, connecting bolt 704 and bottom support 703, by top
Support 701 and bottom support 703 are located at the both sides of heat-insulation layer respectively, and connecting bolt 704 passes through heat-insulation layer 4 and steam pressurized coagulation
Native plate 1, the both ends of connecting bolt 704 are separately fixed on autoclaved aerated concrete slab 1 by screw thread and nut.
The making of ribs, reinforced concrete frame pour:
In stepA row or multi-row is set every 10cm-30cm around the wallboard 5 of the assembled both sides of heat-insulation wall plate 6
It is 10cm-35cm that one end of steel pin or/and bolt 3, steel pin or/and bolt 3, which is fixed on length in wallboard 5, the other end it is exposed
Outer length is 4cm-20cm;
The one or both sides of the autoclaved aerated concrete slab 1 adjacent with ribs 9 every 10cm-30cm set a row or
One end of multiple rows of steel pin or/and bolt 3, steel pin or/and bolt 3 is fixed on 5cm-30cm in autoclaved aerated concrete slab 1, another
End is cast in 4cm-20cm in ribs 9;
The steel pin that rebar cylinder mould 13 is bundled in the reserved space for pouring ribs 5 and reinforced concrete frame 2 or/
On bolt 3, ribs 9 can be arranged between one piece of autoclaved aerated concrete slab 1 and wallboard 5, one piece of steam pressurized coagulation
Between native plate 1 and another piece of autoclaved aerated concrete slab 1, between wallboard 5 and wallboard 5;
In the reinforced concrete frame 2 and the side of ribs 9 that pour in advance or both sides laying one layer of heat preservation layer 4;
Steel hook 10 is welded on rebar cylinder mould 13, by concreting in template, concrete with it is exposed in wall
Steel pin or/and bolt outside plate 5 pour to form reinforced concrete frame 2, and concrete and rebar cylinder mould 13 pours to form ribs
9, the hook head portions of steel hook 10 are exposed outside concrete, the integral heat insulation surfaces of wall screeding and compaction that will be poured.
The demoulding:After normal temperature conserves 7 days, template is removed.
Make decorative layer, protective layer:In stepIntegral wall surface decorated, it is brushing mortar, gypsum, greasy
In son, coating, emulsion paint, wallpaper, wall paper, insulation material, ceramic tile any one or it is a variety of.
In stepIntegral wall surface covering protection film.
Steel hook 10 is hung using crane, steam-pressing aero-concrete integral wall is sling into vertical be stored or shipped to and applied
Work in-site installation.
Above-mentioned steam-pressing aero-concrete integral wall is transported to job site, hanging steel hook 10 using crane hangs
To the floor of required installation, reinforced concrete frame 2 is directly connected in the steel tank of H-type groove steel or I-shaped channel-section steel, so
Agent is pasted in after-pouring concrete or addition;Can also be by the reinforcing bar in reinforced concrete frame 2 and H-type groove steel or I-shaped
Channel-section steel welds together.
If installation is improper, when need to remove, reinforced concrete frame 2 need to only be removed, the ribs 9 in wallboard 5 is torn open
Remove, binding agent excision, its autoclaved aerated concrete slab 1 can reuse.