CN108265828A - Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system - Google Patents
Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system Download PDFInfo
- Publication number
- CN108265828A CN108265828A CN201810225430.1A CN201810225430A CN108265828A CN 108265828 A CN108265828 A CN 108265828A CN 201810225430 A CN201810225430 A CN 201810225430A CN 108265828 A CN108265828 A CN 108265828A
- Authority
- CN
- China
- Prior art keywords
- steel
- column
- plate
- concrete
- steel tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 138
- 239000010959 steel Substances 0.000 title claims abstract description 138
- 239000004567 concrete Substances 0.000 title claims abstract description 74
- 238000003466 welding Methods 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/30—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/185—Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810225430.1A CN108265828B (en) | 2018-03-19 | 2018-03-19 | Assembled steel pipe concrete beam column encloses and protects integrated system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810225430.1A CN108265828B (en) | 2018-03-19 | 2018-03-19 | Assembled steel pipe concrete beam column encloses and protects integrated system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108265828A true CN108265828A (en) | 2018-07-10 |
CN108265828B CN108265828B (en) | 2023-10-27 |
Family
ID=62775238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810225430.1A Active CN108265828B (en) | 2018-03-19 | 2018-03-19 | Assembled steel pipe concrete beam column encloses and protects integrated system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108265828B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295994A (en) * | 2018-11-06 | 2019-02-01 | 重庆大学 | A kind of full assembled composite structure wind-power tower basis |
CN109296073A (en) * | 2018-11-24 | 2019-02-01 | 沈阳建筑大学 | Novel fabricated beam-column connection |
CN109339238A (en) * | 2018-11-16 | 2019-02-15 | 华侨大学 | A kind of prefabricated assembled profile steel concrete column splicing node structure and its construction method |
CN109881776A (en) * | 2019-02-26 | 2019-06-14 | 中国人民解放军军事科学院国防工程研究院工程防护研究所 | A kind of assembling prefabricated reinforced concrete tubular column structure and construction method |
CN114908870A (en) * | 2022-05-13 | 2022-08-16 | 西安建筑科技大学 | Novel assembled reinforced concrete beam column node |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090038263A1 (en) * | 2005-09-29 | 2009-02-12 | Bernard Douet | Composite pillar for junction connections on constructions and building frames |
RU2499103C1 (en) * | 2012-05-05 | 2013-11-20 | Открытое акционерное общество Центральный научно-исследовательский и проектный институт жилых и общественных зданий (ОАО "ЦНИИЭП жилища") | Method for manufacturing of cast in place and precast node of pillar connection with crossbar |
KR101372643B1 (en) * | 2013-08-07 | 2014-03-11 | 장민우 | Formless composite beam and manufacturing method thereof |
CN203583672U (en) * | 2013-11-13 | 2014-05-07 | 大连海事大学 | Fabricated concrete filled steel tubular column-steel beam node connecting structure |
CN104847052A (en) * | 2015-04-29 | 2015-08-19 | 华侨大学 | Earthquake damage replaceable combination column structure |
JP2016098586A (en) * | 2014-11-23 | 2016-05-30 | 株式会社安藤・間 | Reinforced concrete column-steel beam joint member and manufacturing method thereof and building construction method |
CN106381926A (en) * | 2016-10-28 | 2017-02-08 | 湖南大学 | Detachable assembly type splicing node for reinforced concrete columns |
CN208137134U (en) * | 2018-03-19 | 2018-11-23 | 沈阳建筑大学 | Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system |
-
2018
- 2018-03-19 CN CN201810225430.1A patent/CN108265828B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090038263A1 (en) * | 2005-09-29 | 2009-02-12 | Bernard Douet | Composite pillar for junction connections on constructions and building frames |
RU2499103C1 (en) * | 2012-05-05 | 2013-11-20 | Открытое акционерное общество Центральный научно-исследовательский и проектный институт жилых и общественных зданий (ОАО "ЦНИИЭП жилища") | Method for manufacturing of cast in place and precast node of pillar connection with crossbar |
KR101372643B1 (en) * | 2013-08-07 | 2014-03-11 | 장민우 | Formless composite beam and manufacturing method thereof |
CN203583672U (en) * | 2013-11-13 | 2014-05-07 | 大连海事大学 | Fabricated concrete filled steel tubular column-steel beam node connecting structure |
JP2016098586A (en) * | 2014-11-23 | 2016-05-30 | 株式会社安藤・間 | Reinforced concrete column-steel beam joint member and manufacturing method thereof and building construction method |
CN104847052A (en) * | 2015-04-29 | 2015-08-19 | 华侨大学 | Earthquake damage replaceable combination column structure |
CN106381926A (en) * | 2016-10-28 | 2017-02-08 | 湖南大学 | Detachable assembly type splicing node for reinforced concrete columns |
CN208137134U (en) * | 2018-03-19 | 2018-11-23 | 沈阳建筑大学 | Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295994A (en) * | 2018-11-06 | 2019-02-01 | 重庆大学 | A kind of full assembled composite structure wind-power tower basis |
CN109339238A (en) * | 2018-11-16 | 2019-02-15 | 华侨大学 | A kind of prefabricated assembled profile steel concrete column splicing node structure and its construction method |
CN109296073A (en) * | 2018-11-24 | 2019-02-01 | 沈阳建筑大学 | Novel fabricated beam-column connection |
CN109881776A (en) * | 2019-02-26 | 2019-06-14 | 中国人民解放军军事科学院国防工程研究院工程防护研究所 | A kind of assembling prefabricated reinforced concrete tubular column structure and construction method |
CN114908870A (en) * | 2022-05-13 | 2022-08-16 | 西安建筑科技大学 | Novel assembled reinforced concrete beam column node |
Also Published As
Publication number | Publication date |
---|---|
CN108265828B (en) | 2023-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108265828A (en) | Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system | |
WO2018214477A1 (en) | Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor | |
CN105804283B (en) | Full assembly concrete-filled steel tube frame combined shear wall construction | |
CN107143064A (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN106703197B (en) | A kind of large span multilayer anti-seismic frame structure system and its construction method | |
CN206971471U (en) | One kind interval steel pipe and combined concrete shear wall system | |
CN105569222A (en) | Vertical connection technology for precast assembled large panel shear walls with concealed supports | |
CN2931627Y (en) | Framework and wall panel combination floor | |
CN208137134U (en) | Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system | |
CN212176185U (en) | Vertical connection structure of heat preservation assembled arrangement of reinforcement brickwork wall | |
CN209468856U (en) | A kind of assembly concrete column beam connecting node | |
CN108412036B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN108625491B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam L shape connecting node | |
CN201433465Y (en) | Outer shear wall, board and shear wall interlayer connection node | |
CN106638956A (en) | Concrete wallboard and ribbed slab dry type connection node | |
CN209369029U (en) | Novel fabricated beam-column connection | |
CN203394094U (en) | Reinforced and reconstructed masonry structure using external gallery bridge and external elevator | |
CN206408743U (en) | A kind of assembly concrete node | |
CN207633583U (en) | A kind of connection structure of prefabricated post and prefabricated partition wall | |
CN205677076U (en) | A kind of building frame | |
CN109296074A (en) | A kind of assembly concrete column beam connecting node | |
CN206034685U (en) | Integrated system is gone along with sb. to guard him to structure of wide post husked kaoliang of dry -type link pack formula concrete | |
CN203769123U (en) | Energy-saving anti-seismic hollow wall masonry structure with horse-toothed core columns and core beams hidden inside | |
CN103953133A (en) | Energy-saving anti-seismic hollow wall masonry structure internally concealing combed joint core columns and core beams and manufacturing method thereof | |
CN219909365U (en) | Anti-seismic connecting structure based on village and town building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Yannian Inventor after: Wu Xian Inventor after: Tian Yao Inventor after: Hui Guochen Inventor before: Wu Xian Inventor before: Tian Yao Inventor before: Zhang Yannian Inventor before: Hui Guochen |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230718 Address after: 608-1 352, Shenshui Road, Shenhe District, Shenyang, Liaoning 110015 Applicant after: Zhang Yannian Address before: 110168 No. 9 Hunnan East Road, Hunnan District, Shenyang City, Liaoning Province Applicant before: SHENYANG JIANZHU University |
|
GR01 | Patent grant | ||
GR01 | Patent grant |