CN205677076U - A kind of building frame - Google Patents

A kind of building frame Download PDF

Info

Publication number
CN205677076U
CN205677076U CN201620439820.5U CN201620439820U CN205677076U CN 205677076 U CN205677076 U CN 205677076U CN 201620439820 U CN201620439820 U CN 201620439820U CN 205677076 U CN205677076 U CN 205677076U
Authority
CN
China
Prior art keywords
steel pipe
column
draw
groove
building frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620439820.5U
Other languages
Chinese (zh)
Inventor
史世英
史喜珍
史喜婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Shihao Energy Saving Machinery Manufacturing Co Ltd
Original Assignee
Suzhou Shihao Energy Saving Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Shihao Energy Saving Machinery Manufacturing Co Ltd filed Critical Suzhou Shihao Energy Saving Machinery Manufacturing Co Ltd
Priority to CN201620439820.5U priority Critical patent/CN205677076U/en
Application granted granted Critical
Publication of CN205677076U publication Critical patent/CN205677076U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model relates to a kind of building frame, it is applied in the building of employing concrete filled steel tube, building frame is by column steel pipe, collar tie beam steel pipe and floor beam steel pipe build, it is arranged with connecting piece on column steel pipe, connecting piece is provided with the first draw-in groove and the second draw-in groove, first draw-in groove snaps in and ring for fixing joist steel pipe for collar tie beam steel pipe one end, second draw-in groove snaps in and fixes floor beam steel pipe for floor beam steel pipe one end, building frame of the present utility model is by column steel pipe, steel pipe on collar tie beam steel pipe and three different directions of floor beam steel pipe is bound up, thus improve bulk strength and the shock resistance of building.

Description

A kind of building frame
Technical field
This utility model relates to a kind of building frame, belongs to architecture construction technical field.
Background technology
At present, the construction in conventional house mainly includes three kinds: the first is brick mix structure, and this method of construction is at wall brick Cast collar tie beam, floor face when building first floor height, then followed by up laying bricks.Second is frame structure, and this method of construction is House foundation first lays ground floor reinforcing bar by design requirement and supports structure column and collar tie beam, the building in house with pouring template Plate face, then repeats to continue upward to build by laying bricks or stones till design height.3rd is according to every layer of house wall width, high prefabricated big-wall Plate, even first surrounds frame by monolayer height, successively lifts on house foundation.
Three of the above house building all utilizes column, collar tie beam and floor beam to build building frame, but three kinds of methods In fail to the most effectively be bound up column, collar tie beam and floor beam;
Such as Publication No.: the patent of invention of CN 104532983 A discloses the side of building by laying bricks or stones of a kind of concrete filled steel tube building Method, simply uses steel pipe bolt to be bound up by the different steel pipes as column in the method, and for collar tie beam and floor beam All fail to form effective annexation with column.
Utility model content
The technical problems to be solved in the utility model is, not enough for prior art, and proposing one can be by column steel pipe, circle The building frame that steel pipe on joist steel pipe and three different directions of floor beam steel pipe is bound up.
This utility model is that the technical scheme solving the proposition of above-mentioned technical problem is: a kind of building frame, is applied to use In the building of concrete filled steel tube, described building frame is built by column steel pipe, collar tie beam steel pipe and floor beam steel pipe, Being arranged with connecting piece on described column steel pipe, described connecting piece is provided with the first draw-in groove and the second draw-in groove, and described first draw-in groove is used Snapping in collar tie beam steel pipe one end and ring for fixing joist steel pipe, described second draw-in groove snaps in for floor beam steel pipe one end and fixes floor Joist steel pipe.
This technical scheme by arranging connecting piece in the junction of column steel pipe, collar tie beam steel pipe and floor beam steel pipe, from And the steel pipe on these three different directions is bound up so that whole construction wall structure is the most firm, the intensity of framework Higher, shock resistance good.
Technique scheme is improved to: described connecting piece is set by metal material integrally casting molding, described connecting piece The column type pipe box being provided with a circle edge of table, described column steel pipe is had in the middle part of at least one inwall to be inserted in pipe box, described first Draw-in groove and the second draw-in groove are arranged on pipe box sidewall, described first draw-in groove and the second draw-in groove all " U " fonts in opening upwards.
Metal material integrally casting molding is used to ensure that the intensity of connecting piece self.
Technique scheme is improved to: the described column steel pipe whole body offers inserts mixing in column steel pipe for note Aperture and its upper end of solidifying soil extrusion are provided with external screw thread, and described external thread diameter is less than column diameter of steel tube, described column steel pipe Lower end is provided with the female thread matched with described external screw thread.Described column steel pipe presents shoulder shape at upper external screw thread pars infrasegmentalis, When connecting piece is stretched in column steel pipe upper end, shoulder and edge of table symmetry connect;Now column steel pipe can with under the column steel pipe of upper strata End connects, and connects into entirety by the external screw thread of its female thread and lower floor's column steel pipe upper end.
In being respectively arranged at two ends with up and down of column steel pipe and external screw thread screw thread, column steel pipe can be made end to end, by twisting Tight levels column fastener for connection screw thread thus connecting piece and column steel pipe, collar tie beam steel pipe are bound up on one with floor beam steel pipe Rise, thus can constantly build column joist steel pipe support structure with the increase of building height, easy to operate;Column steel pipe is provided with aperture, when Column steel pipe can make concrete setting inside and outside steel pipe be integrated by aperture when injecting concrete.
Technique scheme is improved to: described collar tie beam steel pipe and floor beam steel pipe all whole body offers for concrete Extrude or insert the aperture of reinforcing bar, and its two ends are provided with and snap in described first draw-in groove or the fixture block of the second draw-in groove.
Aperture is offered on collar tie beam steel pipe and the floor beam steel pipe whole body, it is simple to concrete extrusion or insertion reinforcing bar are by adjacent steel pipe connecting Pick up.
Technique scheme is improved to: also including being provided with the precast wall body of through hole, described column steel pipe is arranged at logical In hole, described through-hole diameter 10-40mm bigger than column outer diameter of steel pipes, described through hole is used for injecting concrete.
By filling out concrete at through hole with setting note in foraminate column steel pipe, column steel pipe can be made to be frozen into body of wall Body.
Technique scheme is improved to: if being provided with at the column of the corner of every building construction wall and each inner-outer wall contact Dry root post steel pipe, described column steel pipe is arranged in " one " font, "L" shaped or " T " font.
Described column steel pipe stage casing is provided with adapter sleeve, and described adapter sleeve is for being connected to one by the stage casing of adjacent upright posts steel pipe Rise.
Owing to being provided with stage casing adapter sleeve between column steel pipe, so many root posts steel pipe can be provided with at column, and according to Column steel pipe can be arranged in " one " font, "L" shaped or " T " font by body of wall contact location in whole building, from And anti-seismic performance and the assembled in situ efficiency of building can be improved.
In this improvement project, column steel pipe stage casing is provided with adapter sleeve, and described adapter sleeve is predeterminable in precast wall body, then Precast wall body is lifted in place, the through hole that precast wall body is vertically communicated inserts column steel pipe and penetrates body of wall.
Technique scheme is improved to: the both sides of described column steel pipe are provided with two panels reinforced mesh and some two ends Through the horizontal company of the choosing muscle of reinforced mesh, two panels reinforced mesh is fixed together by the described horizontal company of choosing muscle according to wall thickness requirement.
Technique scheme is improved to: outside described reinforced mesh, be provided with disassembly-free heat-insulation plate, the described horizontal company of choosing muscle two End penetrate disassembly-free heat-insulation plate and with the bar connecting being arranged in disassembly-free heat-insulation plate;Said structure after concrete perfusion one The armored concrete connector of body heat insulation formwork.
This technical scheme can be used for, in the building of cast in situs body of wall, arranging disassembly-free thermal-insulation form board also outside reinforced mesh Make the horizontal company of choosing muscle stretch into heat insulation formwork and with the enhancing fastener for connection in heat insulation formwork, after column steel pipe being stretched into pipe box during lifting By mesh sheet lower end with stretch out lower floor's reinforcement welding on flooring or ground after, draw-in groove arranges collar tie beam steel pipe, floor beam steel pipe, and In two reinforced mesh, note raising reinforced concrete, assembled steel reinforced concrete connect for overall or multi-story and high-rise building And the wall column that antidetonation load-bearing shearing is strong, this wall column is divided into " L ", " T ", " one " font three kinds and is respectively used to corner, and inner-outer wall is handed over In the middle of contact and long wall.
This technical scheme applies also for batch production and builds house, first according to wall width and the high prefabricated dry wall of wall in house Body, precast wall body is provided with and plugs the vertical through holes of each column steel pipe and aperture must be bigger more than 20mm than column outer diameter of steel pipes, so After by " L ", " T ", " one " font precast wall body lifting in place, after surrounding first floor construction wall, column steel pipe is set in through-holes, Its lower end is stretched into after pipe box tightens screw thread, at the sheathed connecting piece in column steel pipe upper end, by collar tie beam steel pipe, the card of floor beam steel pipe Block inlay card enters respective card slot, arranges floor steel bar mesh sheet on Guan Liang, injects concrete, pour into a mould concrete building in each steel pipe hole Face, wherein fixture block and draw-in groove are embedded in floor concrete, and the external thread section in part pipe box and column steel pipe stretches out flooring coagulation Soil layer, then according to the most hoisting prefabricated body of wall of above-mentioned steps, until it reaches predetermined architectural height, thus can be greatly improved construction effect Rate.
Accompanying drawing explanation
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the perspective view of this utility model embodiment one;
Fig. 2 is the partial enlarged drawing in A portion in Fig. 1;
Fig. 3 is the perspective view of connecting piece in Fig. 1;
Fig. 4 is the perspective view of Fig. 1 Girth steel pipe;
Fig. 5 is the building structure schematic diagram of the building frame of Application Example one.
Fig. 6 is the building structure schematic diagram of the building frame of Application Example two.
Fig. 7 is the A portion enlarged drawing in Fig. 6.
The reference of the figures above is as follows:
Column steel pipe 1, adapter sleeve 11, external screw thread 12, collar tie beam steel pipe 2, floor beam steel pipe 3, connecting piece 4, pipe box 41, first Draw-in groove 42, the second draw-in groove 43, fixture block 5, aperture 6, reinforced mesh 7.
Detailed description of the invention
Hereinafter accompanying drawing the most in conjunction with the embodiments, is described in further detail detailed description of the invention of the present utility model, so that this Utility model technical scheme is more readily understood, grasps.
Embodiment one
As it is shown in figure 1, the present embodiment for conventional building construction defect propose one can be by column steel pipe, collar tie beam steel pipe And the building frame construction that floor beam steel pipe is bound up.
As shown in Figures 2 and 3, a kind of building frame of the present embodiment, it is applied to use the building of concrete filled steel tube In, this building frame is built by column steel pipe 1, collar tie beam steel pipe 2 and floor beam steel pipe 3, and column steel pipe 1 is arranged with connection Knot part 4, connecting piece 4 is provided with pipe box 41, is provided with a circle edge of table in the middle part of pipe box 41 inwall, and connecting piece 4 is set in by pipe box 41 On column steel pipe 1, pipe box 41 is additionally provided with and snaps in the first draw-in groove 42 of also ring for fixing joist steel pipe for collar tie beam steel pipe one end and use The second draw-in groove 43 of floor beam steel pipe is snapped in and fixes in floor beam steel pipe one end;First draw-in groove 42 and the second draw-in groove 43 are respectively provided with On pipe box 41 sidewall, and all " U " fonts in opening upwards.
In the present embodiment, column steel pipe 1 whole body offers for crowded leakage concrete or inserts the aperture 6 of reinforcing bar and its upper end Being provided with external screw thread 12, external screw thread 12 diameter is less than column diameter of steel tube, and column steel pipe 1 lower end is provided with and matches with described external screw thread 12 The female thread closed;External screw thread 12 and female thread design can make column steel pipe end to end, thus the increase with building height can not Combination is disconnected builds column steel pipe and steel tubular beam framework.
As shown in Figure 4, collar tie beam steel pipe 2 and floor beam steel pipe 3 all whole body offers for crowded leakage concrete or inserts reinforcing bar Aperture 6, and its two ends are provided with and snap in described first draw-in groove 42 or the fixture block 5 of the second draw-in groove 43.
The building frame of the present embodiment is by setting in the junction of column steel pipe 1, collar tie beam steel pipe 2 and floor beam steel pipe 3 Put connecting piece 4 to be bound up by the steel pipe of three kinds of different directions;Build Shi Kexian and column steel pipe 1 is inserted the pipe of connecting piece 4 In set 41, then the fixture block 5 of steel tubular beam is snapped in the draw-in groove of connecting piece 4, thus by column steel pipe, collar tie beam steel pipe and floor beam Steel pipe is bound up so that whole construction wall structure is the most firm, intensity is higher, shock resistance good.
As it is shown in figure 5, the building frame of the present embodiment is provided with many root posts steel pipe 1 at every root post, in column steel pipe Section is provided with adapter sleeve 11, and different according to column location in whole building, column steel pipe 1 arrangement mode is the most different, Exterior wall corner column steel pipe is arranged in "L" shaped, is arranged in " T " font at external and internal wall junction column steel pipe, and It is arranged in " one " font without column steel pipe at the body of wall at turning;Collar tie beam steel pipe 2 and floor beam steel pipe 3 are provided with reinforcing bar, thus Form the bar construction of floor face.
This embodiment is applicable to batch production and builds house, first according to wall width and the high prefabricated precast wall body of wall in house, in advance Body of wall processed is provided with and plugs the vertical through holes of each column steel pipe and aperture must be bigger more than 20mm than column outer diameter of steel pipes, then will " L ", " T ", " one " font precast wall body lift in place, after surrounding first floor construction wall, arrange column steel pipe 1 in through-holes, will Its lower end is stretched into after pipe box 41 tightens screw thread, at the sheathed connecting piece in column steel pipe 1 upper end 4, by collar tie beam steel pipe 2, floor beam steel pipe 3 Fixture block 5 inlay card enter respective card slot, Guan Liang arranges floor steel bar mesh sheet, in the aperture 6 of each steel pipe inject concrete, water Note concrete floor, wherein fixture block 5 and draw-in groove are embedded in floor concrete, the external screw thread in part pipe box 41 and column steel pipe 1 12 stretch out floor concrete layer, then according to the most hoisting prefabricated body of wall of above-mentioned steps, until it reaches predetermined architectural height.
Embodiment two
As shown in Figure 6 and Figure 7, the building frame of this embodiment be applicable to the building of cast in situs body of wall, pipe box 41 He The both sides of column steel pipe 1 are respectively provided with two panels reinforced mesh 7 and the many two ends horizontal company of the choosing muscle through reinforced mesh 7, the horizontal company of choosing muscle Require to be fixed together according to wall thickness by two panels reinforced mesh 7.
This embodiment is additionally provided with disassembly-free thermal-insulation form board outside reinforced mesh 7 and makes the horizontal company of choosing muscle stretch into heat insulation formwork also Be connected with the reinforcing steel bar in heat insulation formwork, after column steel pipe 1 being stretched into pipe box 41 during lifting by reinforced mesh 7 lower end with stretch out After lower floor's reinforcement welding on flooring or ground, draw-in groove arranges collar tie beam steel pipe 2 and floor beam steel pipe 3, and notes in two mesh sheet Raising reinforced concrete, i.e. form the connection of assembled steel reinforced concrete is used for overall or multi-story and high-rise building and antidetonation load-bearing shearing Strong wall column, this wall column is divided into " L ", " T ", " one " font three kinds and is respectively used to corner, in the middle of inner-outer wall interface point and long wall.
A kind of building frame of the present utility model is not limited to above-described embodiment.The technical side that all employing equivalents are formed Case, all falls within the protection domain of this utility model requirement.

Claims (9)

1. a building frame, be applied to use concrete filled steel tube building in, it is characterised in that: described building frame by Column steel pipe, collar tie beam steel pipe and floor beam steel pipe build, and described column steel pipe is arranged with connecting piece, described connecting piece Being provided with column pipe box the first draw-in groove and the second draw-in groove, described first draw-in groove snaps in and ring for fixing joist steel for collar tie beam steel pipe one end Pipe, described second draw-in groove snaps in and fixes floor beam steel pipe for floor beam steel pipe one end.
Building frame the most according to claim 1, it is characterised in that: described connecting piece is provided with at least one column type pipe box, Upper and lower layer column steel pipe is inserted in pipe box, and its threaded upper ends section passes through pipe box inner raised edge and the upper strata column steel stretching into pipe box Pipe female thread connects, and described first draw-in groove and the second draw-in groove are arranged on pipe box sidewall, and described first draw-in groove and the second draw-in groove are equal " U " font in opening upwards.
Building frame the most according to claim 2, it is characterised in that: the described column steel pipe whole body offers to be inserted vertical for note The aperture of the concrete extrusion in post steel pipe and its upper end are provided with external screw thread, and described external thread diameter is less than column diameter of steel tube, Described column steel pipe lower end is provided with the female thread matched with described external screw thread.
Building frame the most according to claim 3, it is characterised in that: described collar tie beam steel pipe and floor beam steel pipe all whole body is offered Have for concrete extrusion or the aperture of insertion reinforcing bar, and its two ends are equipped with and snap in described first draw-in groove or the card of the second draw-in groove Block.
5. building frame described in claim 4, it is characterised in that: also include the precast wall body being provided with through hole, described column steel pipe Being arranged in through hole, described through-hole diameter 10-40mm bigger than column outer diameter of steel pipes, described through hole is used for injecting concrete.
Building frame the most according to claim 5, it is characterised in that: the corner of every building construction wall and each inner-outer wall contact Being provided with some root post steel pipes at column, described column steel pipe is arranged in " one " font, "L" shaped or " T " font.
Building frame the most according to claim 5, it is characterised in that: the both sides of described column steel pipe are provided with two panels reinforced mesh With the horizontal company of the choosing muscle that some two ends pass reinforced mesh, two panels reinforced mesh is fixed by the described horizontal company of choosing muscle according to wall thickness requirement Link together.
Building frame the most according to claim 6, it is characterised in that: described column steel pipe stage casing is provided with adapter sleeve, described company Female connector is for linking together the stage casing of adjacent upright posts steel pipe.
Building frame the most according to claim 7, it is characterised in that: it is provided with disassembly-free heat-insulation plate, institute outside described reinforced mesh State the horizontal company's of choosing muscle two ends penetrate disassembly-free heat-insulation plate and with the bar connecting being arranged in disassembly-free heat-insulation plate.
CN201620439820.5U 2016-05-16 2016-05-16 A kind of building frame Expired - Fee Related CN205677076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620439820.5U CN205677076U (en) 2016-05-16 2016-05-16 A kind of building frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620439820.5U CN205677076U (en) 2016-05-16 2016-05-16 A kind of building frame

Publications (1)

Publication Number Publication Date
CN205677076U true CN205677076U (en) 2016-11-09

Family

ID=57437117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620439820.5U Expired - Fee Related CN205677076U (en) 2016-05-16 2016-05-16 A kind of building frame

Country Status (1)

Country Link
CN (1) CN205677076U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400960A (en) * 2016-05-16 2017-02-15 苏州市世好节能机械制造有限公司 Building framework

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400960A (en) * 2016-05-16 2017-02-15 苏州市世好节能机械制造有限公司 Building framework

Similar Documents

Publication Publication Date Title
CN205653923U (en) Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN104847014A (en) Vertical connection structure for precast concrete shear walls and construction method
CN101078216B (en) Method for embedding cement mixing soil curtain into prefabricated reinforced concrete anti-lateral-force pile
CN103711232B (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method
CN108265828A (en) Assembly concrete-filled steel tube beam column goes along with sb. to guard him integrated system
CN105569222A (en) Vertical connection technology for precast assembled large panel shear walls with concealed supports
CN109296066A (en) Assembly concrete beam column sleeve combination connecting node
CN106400960A (en) Building framework
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN108005267A (en) A kind of yi word pattern assembled stem steel plate shear force wall and its assembling constructing method
CN206956979U (en) A kind of Linear shear wall with fore-set
CN205677076U (en) A kind of building frame
CN206829416U (en) A kind of prefabricated assembled double steel pipe concrete shear force wall
CN201722813U (en) Confined masonry structure
CN105908899A (en) Core-grouted assembly-type concrete column and construction method of same
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206815328U (en) A kind of precast concrete pile
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN206360212U (en) A kind of resistance to compression factory building concrete filled steel tube column
CN204983213U (en) Dark big board shear wall structure that supports in prefabricated assembled area
CN209620275U (en) A kind of prefabricated steel column node connecting structure of assembled architecture
CN209523212U (en) Assembled isolated footing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20180516