CN205712590U - A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post - Google Patents
A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post Download PDFInfo
- Publication number
- CN205712590U CN205712590U CN201620590057.6U CN201620590057U CN205712590U CN 205712590 U CN205712590 U CN 205712590U CN 201620590057 U CN201620590057 U CN 201620590057U CN 205712590 U CN205712590 U CN 205712590U
- Authority
- CN
- China
- Prior art keywords
- shear wall
- connecting plate
- plate
- steel tube
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 82
- 239000010959 steel Substances 0.000 title claims abstract description 82
- 210000003205 Muscles Anatomy 0.000 claims abstract description 31
- 238000004873 anchoring Methods 0.000 claims abstract description 30
- 238000009826 distribution Methods 0.000 claims abstract description 29
- 238000003466 welding Methods 0.000 claims description 8
- 239000003351 stiffener Substances 0.000 claims description 6
- 239000002689 soil Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 13
- 230000000694 effects Effects 0.000 description 11
- 230000003014 reinforcing Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003313 weakening Effects 0.000 description 1
Abstract
The utility model discloses the attachment structure of a kind of fabricated shear wall and Prefabricated concrete-filled steel tube post, including steel core concrete column, connecting plate, anchoring installing plate and precast shear wall;Some horizontal distribution muscle it are extended with on described precast shear wall;One end of described connecting plate is inserted in steel core concrete column, and described connecting plate passes through to be welded and fixed with the steel pipe of concrete filled steel tube, and described anchoring installing plate is arranged on described connecting plate free end;Described anchoring installing plate is vertically arranged with described connecting plate;Some through holes that described horizontal distribution muscle is run through it are provided with on described anchoring installing plate.Structure of the present utility model all can be pre-machined, to job site assembly, it is not necessary to uses large-scale auxiliary tools, and construction is simple, and efficiency is high, cost-effective.
Description
Technical field
This utility model belongs to construction technical field of structures, is specifically related to a kind of fabricated shear wall and prefabricated steel pipe
The attachment structure of concrete column.
Background technology
At present the connection between prefabricated assembled steel core concrete column and shear wall is connected the most by the following method:
1, the horizontal distribution muscle of shear wall is directly welded in steel pipe walls, connects into entirety;The method needs site welding
Connecing, reinforcing bar is big compared with secret emissary's difficulty of construction, it is more difficult to ensure welding quality, increases the duration;Steel pipe walls easily is produced to weaken by welding to be made
With, and under horizontal applied force, reinforcing bar can weaken the steel pipe confinement effect effect to concrete to the pulling force of steel pipe walls.
2, on steel pipe, weld horizontal closes U-shaped reinforcing bar, the horizontal distribution muscle of shear wall is made horizontal enclosed type simultaneously,
Again by the U-shaped closing muscle on closed stirrup overlap joint steel pipe and the closing horizontal distribution muscle of precast shear wall, finally at overlap joint
Angle point inserts and vertically retrains muscle so that it is be integrally formed.The method needs in-site installation closed stirrup, to the vertical company retraining reinforcing bar
Connect prescription higher, increase the duration.
3, on steel pipe column, the vertical junction steel plate of two panels is welded, at junction steel plate interior welds shear connector, at reinforcing bar
The end of concrete shear force wall arranges U-shaped closing horizontal distribution muscle, by integral with junction steel plate overlap joint after-pouring for shear wall.Should
During method lifting, U-shaped horizontal distribution muscle easily collides with connector, and limiting precast shear wall can only level lift, it is impossible to meet
The technological requirement of fabricated construction.
Utility model content
In order to overcome above-mentioned shear wall big with Prefabricated concrete-filled steel tube post connection construction difficulty, it is difficult to ensure construction quality,
The technological deficiencies such as efficiency of construction is low, this utility model provides a kind of easy to assembly, fabricated shear wall that efficiency of construction is high with pre-
The attachment structure of steel core concrete column processed.
In order to solve the problems referred to above, this utility model is achieved by techniques below scheme:
Fabricated shear wall described in the utility model and the attachment structure of Prefabricated concrete-filled steel tube post, including concrete filled steel tube
Post, connecting plate, anchoring installing plate and precast shear wall;Some horizontal distribution muscle it are extended with on described precast shear wall;Described
One end of connecting plate is inserted in described steel core concrete column, and described connecting plate is welded and fixed with steel pipe walls, described anchoring installing plate
It is connected with the free end of described connecting plate;Described anchoring installing plate is vertically arranged with described connecting plate;
Some through holes that described horizontal distribution muscle is run through it are provided with on described anchoring installing plate.
Further, one end that described connecting plate is arranged in steel pipe is at least provided with one piece of anchor plate, described anchor plate
Playing reinforcement anchorage effect after casting concrete, described anchor plate is vertically arranged with described connecting plate.
Further, described anchor plate is two pieces.
Further, being provided with ribbed stiffener between described connecting plate and anchoring installing plate, described ribbed stiffener will by welding
Connecting plate and the fixing connection of anchoring installing plate.
Further, described through hole is the groove being arranged on described anchoring installing plate edge.
Further, the end of described horizontal distribution muscle is provided with crab-bolt or bolt anchor head or horizontal distribution muscle end is curved
Hook or horizontal distribution muscle is that vertical closing is U-shaped.
Further, the cross section of described steel pipe concrete pipe is square or circular or T-shaped.
Further, described connecting plate and described anchoring installing plate are steel plate, and described connecting plate, anchoring installing plate are logical
Cross the combination shaped steel such as steel plate or hot rolled H-shaped or I-steel to process, reduce welding job, improve efficiency of construction, save into
This.
Compared with prior art, the beneficial effects of the utility model are:
Connecting plate is extend in steel core concrete column by this utility model, relatively direct by horizontal distribution muscle or junction steel plate
It is welded on steel pipe column, this method avoid the weakening to steel pipe walls confinement effect effect of the horizontal loading of shear wall, directly will
Horizontal force is transformed into the pressure of coupled columns inner concrete, increases structural safety deposit;It is simultaneously connected with plate and stretches in steel pipe column, to steel pipe
Post plays ribbing effect, strengthens the effect of contraction of steel pipe walls, the most reasonable.Structure of the present utility model all can add in advance
Work completes, to job site assembly, it is not necessary to use large-scale auxiliary tools, and construction is simple, and efficiency is high, cost-effective.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail, wherein:
Fig. 1 is the main body signal of fabricated shear wall described in the utility model and the attachment structure of Prefabricated concrete-filled steel tube post
Figure;
Fig. 2 is the front view of fabricated shear wall described in the utility model and the attachment structure of Prefabricated concrete-filled steel tube post;
Fig. 3 is the top view of fabricated shear wall described in the utility model and the attachment structure of Prefabricated concrete-filled steel tube post.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is illustrated, it will be appreciated that described herein excellent
Select embodiment to be merely to illustrate and explain this utility model, being not used to limit this utility model.
As shown in FIG. 1 to 3, fabricated shear wall described in the utility model is tied with the connection of Prefabricated concrete-filled steel tube post
Structure, including steel core concrete column 6, connecting plate 1, anchoring installing plate 3 and precast shear wall 8, described precast shear wall 8 is stretched
Go out to have some horizontal distribution muscle 9.One end of described connecting plate 1 is inserted in described steel core concrete column 6, and described connecting plate can lead to
Cross prepackage mode, install together with steel pipe in place after pour again;Or when plant produced connector of steel tube, connecting plate is pre-
Pour in being embedded in steel pipe.Described connecting plate 1 and steel pipe are by being welded and fixed.
Described connecting plate 1 one end in steel core concrete column is at least provided with an anchor plate 2, and described anchor plate 2 is pre-buried
In concrete seven in steel core concrete column 6, described anchor plate 2 is vertically arranged with described connecting plate 1.Institute in the present embodiment
Stating anchor plate 2 is two pieces, but anchor plate of the present utility model 2 is not limited to two pieces, can arrange one piece according to the actual needs
Anchor plate, three pieces of anchor plates, four pieces of anchor plates, five pieces of anchor plates etc..
Described anchoring installing plate 3 is connected with the free end of described connecting plate 1;Described anchoring installing plate 3 and described connecting plate 1
It is vertically arranged.
Some through holes that described horizontal distribution muscle 9 is run through it are provided with on described anchoring installing plate 3, in the present embodiment,
Described through hole is the groove 4 being arranged on described anchoring installing plate 3 edge.Due to the restriction of construction environment, described shear wall is general
It is all by the way of vertical lifting, be arranged on design attitude, before lifting, by the horizontal distribution muscle on shear wall 8 outside wall
Horizontal buckling certain angle, lifts shear wall 8 to design attitude, is stretched by horizontal distribution muscle, is set in described groove 4
?.The end of described horizontal distribution muscle 9 is provided with crab-bolt 10, it is also possible to arrange bolt anchor head or the end by horizontal distribution muscle
End bending or horizontal distribution muscle are that vertical closing is U-shaped.Have only to arrange, so that the end of horizontal cloth muscle, the portion being engaged with concrete
Part, makes the power of reinforcing bar be effectively transmitted in concrete, thus promotes the bonding strength of shear wall and steel core concrete column.
Being provided with ribbed stiffener 5 between described connecting plate 1 and anchoring installing plate 3, described ribbed stiffener 5 is by welding and connecting plate
1 connection fixing with anchoring installing plate 3.
The cross section of steel pipe concrete pipe 6 described in the present embodiment is square, but steel pipe concrete pipe of the present utility model
Cross section be not limited to square, it is also possible to be other the geometry such as circular or T-shaped.
Described connecting plate 1 and described anchoring installing plate 3 are steel plate, or described connecting plate, anchoring installing plate and anchor
Gu plate can directly use combination shaped steel to process, such as the H profile steel pricked by heat, I-steel etc., reduce welding sequence, improve
Efficiency of construction.
Connecting plate is extend in steel core concrete column by this utility model, and welds anchor plate in inside end, to ordinary steel
Pipe concrete column has ribbing effect, increases the constraint of steel pipe coupled columns inner concrete, and junction steel plate and anchor plate the most only connect work
With, also play compound action effect, improve the mechanical property of confined concrete filled tubular columns.And it is relatively direct by horizontal distribution
Reinforcing bar or junction steel plate are welded on steel pipe column, and steel pipe walls Confinement effect is cut by the horizontal loading that this method avoid shear wall
Weak, directly horizontal force is transformed into the pressure of coupled columns inner concrete, increases structural safety deposit, the most reasonable.
This utility model construction time, only need before lifting outside metope, break horizontal distribution muscle into two with one's hands, do not affect production and
Under traffic condition, this step also can precast plant complete;Lift in place after horizontal distribution muscle broken be back to origin-location, and this position
Put in the groove being just embedded into reinforcing bar anchor slab.Erecting bed only needs a horizontal distribution muscle to break to groove position, uses instrument device
Tool is simple;Other links the most all complete in element precast factory, can reduce in-site installation personnel, save cost of labor and other machines
Tool cost.And technique is simple, simple operation, it is possible to save duration cost significantly.
Fabricated shear wall described in the present embodiment sees existing with other structure of the attachment structure of Prefabricated concrete-filled steel tube post
There is technology.
The above, be only preferred embodiment of the present utility model, not this utility model is made any in form
Restriction, therefore every without departing from technical solutions of the utility model content, implement above according to technical spirit of the present utility model
Any amendment, equivalent variations and the modification that example is made, all still falls within the range of technical solutions of the utility model.
Claims (9)
1. a fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post, it is characterised in that: include concrete filled steel tube
Post, connecting plate, anchoring installing plate and precast shear wall;Some horizontal distribution muscle it are extended with on described precast shear wall;Described
One end of connecting plate is inserted in described steel core concrete column, and described connecting plate is welded and fixed with steel pipe walls;Described anchoring installing plate
It is connected with the free end of described connecting plate;Described anchoring installing plate is vertically arranged with described connecting plate;On described anchoring installing plate
It is provided with some through holes that described horizontal distribution muscle is run through.
The most according to claim 1, fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post, described connecting plate sets
Put one end in steel pipe to be vertically arranged with described connecting plate at least provided with one piece of anchor plate, described anchor plate.
The most according to claim 2, fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post, described anchor plate is
Two pieces.
The attachment structure of fabricated shear wall and Prefabricated concrete-filled steel tube post the most according to claim 1, described connecting plate with
Being provided with ribbed stiffener between anchoring installing plate, described ribbed stiffener is fixed by welding be connected with connecting plate and anchoring installing plate.
The most according to claim 1, fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post, described through hole is for setting
Put the groove at described anchoring installing plate edge.
6. according to the attachment structure of fabricated shear wall described in any one of claim 1 to 5 Yu Prefabricated concrete-filled steel tube post, described
The end of horizontal distribution muscle is provided with crab-bolt or bolt anchor head or horizontal distribution muscle end hook or horizontal distribution muscle is vertical
Close U-shaped.
Fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post, described steel tube concrete the most according to claim 6
The cross section of soil pipe is square or circular or T-shaped.
The attachment structure of fabricated shear wall and Prefabricated concrete-filled steel tube post the most according to claim 7, described connecting plate and
Described anchoring installing plate is steel plate.
Fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post, described connecting plate, anchor the most according to claim 8
Gu installing plate is for processing by steel plate or hot rolled H-shaped or I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620590057.6U CN205712590U (en) | 2016-06-15 | 2016-06-15 | A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620590057.6U CN205712590U (en) | 2016-06-15 | 2016-06-15 | A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712590U true CN205712590U (en) | 2016-11-23 |
Family
ID=57306873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620590057.6U Expired - Fee Related CN205712590U (en) | 2016-06-15 | 2016-06-15 | A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712590U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948510A (en) * | 2017-03-20 | 2017-07-14 | 北京建筑大学 | A kind of fabricated shear wall |
CN108442571A (en) * | 2018-03-22 | 2018-08-24 | 河海大学 | Assembled assembled wall |
CN108571169A (en) * | 2018-06-15 | 2018-09-25 | 河南绿建建筑科技有限公司 | Prefabrication steel concrete overlapped shear wall assembled architecture construction method |
CN111636562A (en) * | 2020-05-27 | 2020-09-08 | 安徽富煌钢构股份有限公司 | Assembled high-rise steel structure house double steel plate concrete combined shear wall frame structure |
-
2016
- 2016-06-15 CN CN201620590057.6U patent/CN205712590U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948510A (en) * | 2017-03-20 | 2017-07-14 | 北京建筑大学 | A kind of fabricated shear wall |
CN108442571A (en) * | 2018-03-22 | 2018-08-24 | 河海大学 | Assembled assembled wall |
CN108571169A (en) * | 2018-06-15 | 2018-09-25 | 河南绿建建筑科技有限公司 | Prefabrication steel concrete overlapped shear wall assembled architecture construction method |
CN111636562A (en) * | 2020-05-27 | 2020-09-08 | 安徽富煌钢构股份有限公司 | Assembled high-rise steel structure house double steel plate concrete combined shear wall frame structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205712590U (en) | A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post | |
CN104631659B (en) | Prefabricated assembled band steel plate concealed bracings overlaid plate type concrete coupled shear wall | |
CN205653923U (en) | Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom | |
CN102433938B (en) | Hooped steel reinforced concrete beam-column joint of core area U-shaped column | |
CN205742613U (en) | A kind of prefabricated assembled overlapped shear wall structure connected by high-strength bolt | |
CN103556749A (en) | Hanging flexible connection of precast concrete infill wall | |
CN101457548A (en) | Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same | |
CN104878854A (en) | Prefabricated shear wall horizontal abutted seam buckle welding built-up connection device | |
CN203487664U (en) | Prefabricated concrete filled wall suspension type flexible connection | |
CN105863111A (en) | Embedded prefabricated concrete shear wall anti-bending steel frame structure | |
CN105781010A (en) | Compound wallboard and integrated precast structure thereof | |
CN109372129A (en) | The novel full assembly concrete frame joint of one kind and its construction method | |
CN109372130A (en) | The novel full assembly concrete shaped section steel frame node of one kind and its construction method | |
CN106245931A (en) | The underpinning device of load bearing wall and construction method in brick mix structure | |
CN205954921U (en) | Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area | |
CN102477799B (en) | Masonry structure integrity reinforcing method | |
CN104196023B (en) | A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device | |
CN208534081U (en) | A kind of reconstruction structure of old building constructional column | |
CN108729541B (en) | Connect beam type Building block construction method | |
CN203271106U (en) | Profile steel anchoring device of cantilever scaffold | |
CN101105077A (en) | Method for connecting reinforced concrete structures | |
CN106703306B (en) | Precast concrete parapet component and connection structure thereof | |
CN102912928B (en) | Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method | |
CN102071747A (en) | Joint of square steel tube concrete column and reinforced concrete floor and production method thereof | |
CN103437493A (en) | Connecting node of prefabricated reinforced concrete beam and construction method of connecting node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20210615 |
|
CF01 | Termination of patent right due to non-payment of annual fee |