EP2974810A1 - Casting equipment and casting method using same - Google Patents
Casting equipment and casting method using same Download PDFInfo
- Publication number
- EP2974810A1 EP2974810A1 EP14762821.8A EP14762821A EP2974810A1 EP 2974810 A1 EP2974810 A1 EP 2974810A1 EP 14762821 A EP14762821 A EP 14762821A EP 2974810 A1 EP2974810 A1 EP 2974810A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- casting
- slab
- unit
- molten steel
- solidification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005266 casting Methods 0.000 title claims abstract description 218
- 238000000034 method Methods 0.000 title claims abstract description 77
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 150
- 239000010959 steel Substances 0.000 claims abstract description 150
- 238000007711 solidification Methods 0.000 claims abstract description 114
- 230000008023 solidification Effects 0.000 claims abstract description 114
- 238000009434 installation Methods 0.000 claims description 43
- 238000003756 stirring Methods 0.000 claims description 42
- 238000012546 transfer Methods 0.000 claims description 19
- 230000004308 accommodation Effects 0.000 claims description 10
- 239000000463 material Substances 0.000 abstract description 41
- 230000007547 defect Effects 0.000 abstract description 8
- 230000002708 enhancing effect Effects 0.000 abstract description 6
- 238000005204 segregation Methods 0.000 abstract description 6
- 238000003908 quality control method Methods 0.000 abstract 2
- 230000000052 comparative effect Effects 0.000 description 11
- 238000005096 rolling process Methods 0.000 description 11
- 238000009749 continuous casting Methods 0.000 description 9
- 238000005242 forging Methods 0.000 description 9
- 238000004519 manufacturing process Methods 0.000 description 9
- 239000013078 crystal Substances 0.000 description 5
- 238000001816 cooling Methods 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 4
- 238000010438 heat treatment Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000006698 induction Effects 0.000 description 3
- 239000000047 product Substances 0.000 description 3
- 229910000746 Structural steel Inorganic materials 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 2
- 230000005672 electromagnetic field Effects 0.000 description 2
- 238000005188 flotation Methods 0.000 description 2
- 238000011017 operating method Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000007670 refining Methods 0.000 description 2
- 238000009628 steelmaking Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/128—Accessories for subsequent treating or working cast stock in situ for removing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
- B22D11/041—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds for vertical casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/10—Supplying or treating molten metal
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/10—Supplying or treating molten metal
- B22D11/11—Treating the molten metal
- B22D11/114—Treating the molten metal by using agitating or vibrating means
- B22D11/115—Treating the molten metal by using agitating or vibrating means by using magnetic fields
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/1213—Accessories for subsequent treating or working cast stock in situ for heating or insulating strands
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/122—Accessories for subsequent treating or working cast stock in situ using magnetic fields
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/124—Accessories for subsequent treating or working cast stock in situ for cooling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/14—Plants for continuous casting
- B22D11/141—Plants for continuous casting for vertical casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
- B22D11/20—Controlling or regulating processes or operations for removing cast stock
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D7/00—Casting ingots, e.g. from ferrous metals
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D7/00—Casting ingots, e.g. from ferrous metals
- B22D7/06—Ingot moulds or their manufacture
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D9/00—Machines or plants for casting ingots
- B22D9/003—Machines or plants for casting ingots for top casting
Definitions
- the present invention relates to a casting installation and a casting method using the same, and more particularly, to a casting installation that may easily produce a slab for an extremely thick steel material and enhance quality, yielding percentage, and productivity of the slab and to a casting method using the same.
- an extremely thick steel material has a thickness of at least 100 mm, and internal quality such as porosity and mechanical properties such as impact and toughness of the extremely thick steel material are managed with a thickness reduction ratio (slab thickness/product thickness) limited according to an intended use.
- a thickness reduction ratio slab thickness/product thickness
- an extremely thick steel material having the thickness reduction ratio of 4 or more and pressure steel and wind power structural steel requires the thickness reduction ratio of 3 or more.
- an extremely thick steel material may be produced through predetermined post-processes such as forging and rolling of an ingot or slab produced by a continuous casting process.
- the ingot process i.e., the former method
- the ingot is produced into an extremely thick steel material product by a forging process or is subject to an additional rolling process.
- the extremely thick steel material requiting a high thickness reduction ratio regards the internal quality as an important factor, a slab mostly cast in an ingot is subjected to a forging operation and then produced through a rolling process.
- producing an extremely thick steel material by using a slab cast in an ingot may correspond to the production of an extremely thick steel material having a high thickness reduction ratio and has an advantage for the production of a small-lot in consideration of a demand characteristic of the extremely thick steel material.
- the slab produced by using the ingot process requires cutting of an unsound region for removing the unsound region generated around a riser and a main riser.
- deterioration in yielding percentage of the slab is caused due to cutting of upper and lower regions of the slab, so that production costs for producing the extremely thick steel material is increased.
- the extremely thick steel material is produced by the continuous casting process, i.e., the latter method
- the extremely thick steel material is produced by a method of rolling a slab subject to a continuous cast.
- the latter method is excellent in yielding process and thus superior to the ingot process in terms of production costs when compared to the ingot process, there is a problem in that a thickness of the extremely thick steel material is also limited due to a limited slab thickness when steel products requiring a high thickness reduction ratio are produced.
- the extremely thick steel material is relatively thick compared to a normal slab, it takes a long time until the slab is completely solidified after being cast.
- a slab for an extremely thick steel material thicker than a general slab produced by a general caster is produced by a conventional casting method in which molten steel is continuous cast and cut, solidification is completed to an inside of the slab and thus the installation of the caster becomes very long for a cutting process, which leads to enlargement of the installation, resulting in consumption of enormous initial cost in terms of production costs.
- the present invention provides a casting installation easily producing a slab for an extremely thick steel material and to a casting method using the same.
- the present invention also provides to a casting installation capable of enhancing quality and yielding percentage of a slab and to a casting method using the same.
- the present invention also provides to a casting installation capable of enhancing productivity of a slab and efficiency of a process installation and to a casting method using the same.
- a casting installation includes: a casting unit defining a passage through which molten steel passes and for casting the molten steel into a slab; and a solidification unit including: a support unit disposed spaced apart from the casting unit and receiving the slab from the casting unit and disposed on at least any one place of sides of the slab to support the slab; and a first quality controller provided on an outside of the slab to induce solidification of the slab.
- the first quality controller may include: a first stirrer disposed in proximity to an outside of the slab and able to elevate in a longitudinal direction of the slab; a second stirrer provided spaced apart below the first stirrer and able to elevate in the longitudinal direction of the slab; and a first heater installed so as to be able to move forward and backward in a region directly above the slab and configured to heat an upper portion of the slab.
- the first stirrer may have coils wound around the slab and disposed in the form of a circle.
- the casting unit may include: an accommodation unit having a space in which the molten steel is accommodated; a drawing machine drawing the slab from the accommodation unit to a lower portion; and a second quality controller provided on an outside of the passage.
- the accommodation unit may include a mold configured to form the passage through which the molten steel supplied to a tundish passes, and the mold may be formed so that the slab has a thickness of 800 mm or less and a width of 2000 mm or less.
- the second quality controller may include: a stirring unit including at least one stirrer disposed on an outside of the mold and configured to stir at least any one of the molten steel and unsolidified molten steel inside the slab; a second heater installed so as to be able to move forward and backward in a region directly below the mold and configured to heat an upper portion of the slab.
- the stirring unit may include: a third stirrer disposed in proximity to the mold and able to elevate in a drawing direction of the slab; a fourth stirrers provided spaced apart below the third stirrer and able to elevate in the drawing direction of the slab.
- the third stirrer may have coils wound around the mold or the slab and disposed in the form of a circle.
- a pusher for separating the slab from the drawing machine may be provided to the casting unit and the pusher may be installed so as to be able to reciprocally move forward and backward toward the solidification unit.
- a transfer unit transferring the slab from the casting unit to the solidification unit or from the solidification unit to an outside of the solidification unit may be provided.
- a casting method includes: providing molten steel to prepare casting; casting the molten steel in a casting unit allowing a passage through which the molten steel passes to be opened or closed; transferring a slab produced through the casting to a solidification unit; and transferring the slab to a post-process after solidification of the slab is completed.
- the casting of the molten steel may be repeated in the casting unit after the slab is transferred to the solidification unit.
- the transferring the slab to the solidification unit may be performed while the molten steel is transferred to the casting unit so that preparing the casting is performed.
- the solidification of the slab may be completed in the casting unit or after the slab is transferred to the solidification unit.
- the molten steel may be cast at a casting rate 0.3m per minute or less.
- a casting installation and a casting method using the same it is possible to improve yielding percentage of a slab produced by a continuous casting. That is, when a slab cast in a casting unit is solidified in a casting unit or a solidification unit, the length of a pipe generated at an upper portion of the slab is reduced to enhance yielding percentage of the slab by delaying solidification of the upper portion of the slab by using a second heater or a first heater.
- molten steel remaining in a mold is stirred to enhance inner quality during casting and unsolidified molten steel in slab is stirred after a casting is completed, so that the equiaxed crystal ratio in the slab may be enhanced, segregation and porosity may be reduced, and an internal defect such as a pipe occurring at an edge end of the slab may be reduced.
- FIG. 1 illustrates a view of a casting installation according to an embodiment of the present invention.
- FIG. 2 illustrates a flow chart of a casting method according to an embodiment of the present invention.
- FIG. 3 illustrates a view of an operating state of a casting installation according to a casting method in FIG. 2 .
- FIGS. 3A to 3F illustrate changes in the casting installation working to produce slab.
- a casting installation 1 as an installation to produce a slab for an extremely thick steel material includes a casting unit 1a defining a passage through which molten steel passes and for casting the molten steel into a slab; and a solidification unit 1b including: a support unit 500 disposed spaced apart from the casting unit 1a and receiving the slab from the casting unit 1a and disposed on at least any one place of sides of the slab to support the slab; and a first quality controller 600 provided on an outside of the slab to induce solidification of the slab.
- the casting unit 1a as a section in which continuous casting of refined molten steel is carried out includes: an accommodation unit 100 accommodating the molten steel; a drawing machine 200 drawing the slab from the accommodation unit 100 to a lower portion; and a second quality controller 300 provided on an outside of the passage through which the molten steel passes.
- the accommodation unit 100 defines a space accommodating molten steel before the casting of the molten steel and includes a ladle 120 accommodating molten steel, a tundish 140 receiving the molten steel from the ladle 120, and a mold 160 disposed spaced apart below the tundish 140.
- the ladle 120 is a container for accommodating molten steel after refining is completed and may be produced in various hollow shapes having an internal space capable of accommodating the molten steel. In general, the ladle 120 may be provided in plurality to increase the circulation rate of a continuous casting installation.
- the tundish 140 is produced in the shape of a hollow container capable of accommodating the molten steel supplied from the ladle 120.
- An outlet discharging molten steel is formed in the bottom of the tundish 140, so that the molten steel accommodated in the tundish 140 may be discharged to the outside through the outlet.
- the molten steel accommodated in the tundish 140 stays inside the tundish 140 for a period of time, thus being poured into the mold 160 after flotation of inclusion contained in the molten steel.
- the mold 160 is provided for shaping the molten steel poured from the tundish 140 in an appropriate size to produce a slab, thus defining width and thickness of a passage through which the molten steel passes.
- the mold 160 of the present invention may be formed such that a slab has a thickness of 800 mm or less and a width of 2000 mm or less in order to cope with the size of a slab for an extremely thick steel material. That is, use of the mold 160 having a greatly increased thickness compared to a mold of a conventional casting installation allows a slab subjected to forging and rolling processes to have a thickness used for the extremely thick steel material.
- a guide roll 170 guiding a slab having an initial shell to the outside of the mold 160 through the mold 160, a cooling nozzle (not shown) cooling the slab guided from the guide roll 170, and a vibrator (not shown) transmitting vibration to the mold 160 so that the slab inside the mold is easily drawn to the outside of the mold 160.
- a guide roll 170 guiding a slab having an initial shell to the outside of the mold 160 through the mold 160
- a cooling nozzle (not shown) cooling the slab guided from the guide roll 170
- a vibrator not shown transmitting vibration to the mold 160 so that the slab inside the mold is easily drawn to the outside of the mold 160.
- the drawing machine 200 as a machine for drawing a slab from the accommodation unit 100 to a lower portion, includes: a surface plate 220 which is initially disposed inside the mold and receives molten steel to prevent the molten steel from spilling downwards from the mold 160 and connects the primary solidified slab to an actuator 240, and the actuator 240 drawing the slab to the lower portion.
- the surface plate 220 is provided for connecting a slab to the actuator 240, and a plate having a specific-shaped surface is used for easy connection to the slab.
- a plate having a specific-shaped surface is used for easy connection to the slab.
- the present invention does not limit the shape and the material of the surface plate 220, it is preferable that the surface plate 200 is made of such a material that does not lead to deformation which may be caused by to a slab of a high temperature when being in contact with the slab.
- the actuator 240 is a device for lowering the surface plate 220, and a slab connected to the surface plate 220 may be drawn downwards by lowering the surface plate 220 connected to the actuator 240.
- the actuator 240 may employ a device capable of descending to a lower portion when the slab is drawn and ascending at an initial stage of casting so that the surface plate 220 is positioned inside the mold 160. That is, a device capable of descending and ascending may be used as the actuator 240.
- the second quality controller 300 is provided for improving quality of a slab drawn from the drawing machine 200 and includes: a stirring unit 320 including at least one stirrer disposed on an outside of the mold 160 and configured to stir at least any one of molten steel in the mold 160 and unsolidified molten steel inside the slab; and a second heater 340 installed so as to be able to move forward and backward in a region directly below the mold 160 and configured to heat an upper portion of the slab.
- the stirring unit 320 is a device having at least one stirrer on an outside of the mold 160 to improve quality of a slab and includes: a third stirrer 322 disposed in proximity to the mold 160 and able to elevate in a drawing direction of the slab; and a fourth stirrer 324 provided spaced apart below the third stirrer 322 and able to elevate in the drawing direction of the slab. That is, the stirring unit 320 stirs at least any one of molten steel accommodated in a molten state in the mold 160 and unsolidified molten steel in the produced slab to perform grain refinement on a slab, thereby being capable of improving quality of the slab.
- the third stirrer 322 is disposed spaced apart at a predetermined distance from a side of the mold 160, and stirs molten steel accommodated in the mold 160 during the casting.
- the third stirrer 322 descends by a predetermined distance along with a slab to stir unsolidified molten steel inside the slab. That is, when molten steel is poured to the mold 160, the third stirrer 322 applies an electromagnetic field to the molten steel from a side of the mold 160 to stir the molten steel, and when pouring of the molten steel into the mold 160 is completed, the third stirrer 322 may stir unsolidified molten steel inside a slab while descending to a lower portion along with the slab.
- An electromagnetic stirrer may be used as the third stirrer 322.
- the electromagnetic stirrer being able to be used as the third stirrer 322 typically has a low frequency (Hz) band corresponding to a frequency enough to stir molten steel in a molten state.
- the fourth stirrer 324 is provided spaced apart at a predetermined distance below the third stirrer 322, and elevates in a drawing direction of a slab to stir unsolidified molten steel in the slab.
- a final electromagnetic stirrer (FEMS) may be used as the fourth stirrer 324.
- the fourth stirrer 324 is disposed in a relatively lower portion compared to the third stirrer 322, and it is preferable to use a stirring device having a higher frequency (Hz) than the third stirrer 322 in order to stir molten steel existing inside a solidified region in a lower portion of a slab (a lower portion from the center with respect to a longitudinal direction of a slab) in which solidification has progressed to some extent.
- Hz frequency
- the stirring unit 320 stirs solidified molten steel in the mold and unsolidified molten steel in the slab, thereby being capable of enhancing the equiaxed crystal ratio in slab and reducing segregation and porosity.
- the present invention does not limit a stirring region of a slab stirred by the third and fourth stirrers 322 and 324 and an elevating width of the stirrers, and various moving ranges may be applicable according to casting conditions.
- the second heater 340 is a device disposed outside of the mold 160 and installed so as to be able to move forward and backward in a region directly below the mold (a path in a drawing direction of a slab) to heat an upper portion of the cast slab (tail portion).
- a method according to induction heating was employed.
- the second heater 340 indirectly heats the upper side of a slab by using an electromagnetic field generated in an induction heating coil by power supply, and is wound so as to surround the slab while being spaced apart at a predetermined interval from four directional sides of the slab.
- the second heater 340 preferably uses an induction coil having a shape corresponding to a cross-section of the slab, but not limited thereto, may be wound in various forms.
- a pusher 400 may be provided to the casting unit 1a so as to transfer a slab to the solidification unit 1b after casting of molten steel is completed.
- the pusher 400 is a device disposed in a position facing the solidification unit 1b of sides of the casting unit 1a and pushing a side of a slab and separating the slab from the drawing machine 200 to deliver the slab towards the solidification unit 1b.
- a device capable of reciprocally moving a predetermined distance may be used for the pusher 400, and for example, a stepping motor, an actuator, a solenoid, or the like may be used.
- a piston reciprocally moves while being inserted and ejected into/from a cylinder, thus being able to push the slab toward the solidification unit 1b and then return back to an original position.
- a device delivering the slab of the casting unit 1a to the solidification unit 1b is not limited to the pusher 400 and may be a variety of devices.
- the solidification unit 1b is a section receiving a slab so as to solidify the slab cast from the above described casting unit 1a and includes: a support unit 500 disposed on at least any one side of the slab to support the slab; and a first quality controller 600 provided on an outside of the slab to induce solidification of the slab.
- the solidification unit 1b receives the slab from a section spaced apart at a predetermined distance from the casting unit 1a, completes solidification of the slab, and then transfers the slab to a post-process (for example, forging or rolling).
- the support unit 500 is provided so that the slab is stably positioned in the solidification unit 1b and includes: a support block 520 disposed in contact with the bottom of the slab; and a support frame 540 disposed surrounding a portion of a side of the slab.
- the configuration of the support unit 500 is not limited thereto, but the slab may be supported by a variety of devices and methods within the extent not interfering with the movement of the first quality controller 600.
- the supporting block 520 uses a block in a shape similar to the surface plate 220 of the casting unit 1a.
- the support block 520 plays a role of supporting a lower portion of the slab disposed in the solidification unit 1b in a drawing direction, i.e. a longitudinal direction.
- the support frame 540 may be disposed spaced apart at a predetermined distance from a side of the slab and surrounding a portion of a side of the slab so as to suppress and prevent the slab disposed in the longitudinal direction from falling, as illustrated in an enlarged view in FIG. 1 .
- the first quality controller 600 as a device provided on an outside of a slab and to ensure slab quality includes: a first stirrer 620 disposed in proximity to an outside of the slab and able to elevate in a longitudinal direction of the slab; a second stirrer 640 provided spaced apart below the first stirrer 620 and able to elevate in the longitudinal direction of the slab; and a first heater 660 configured to heat an upper portion of the slab. That is, since solidification of the slab which is naturally cooled is not completed, the first quality controller 600 may be provided with a device the same as or similar to the casting unit 1a to continue a treatment process for improving slab quality.
- the first stirrer 620 as a device for stirring unsolidified molten steel in a slab delivered to the solidification unit 1b is disposed spaced apart at a predetermined distance from the slab.
- the first stirrer 620 may be installed so as to be able to elevate in such a way that the first stirrer 620 descends to be disposed on a side of the slab when the slab is delivered to the solidification unit 1b with the first stirrer 620 being disposed at the same height as or a similar height to the third stirrer 322.
- the first stirrer 620 is disposed in an upper portion outside of the slab. That is, the first stirrer 620 is disposed above the center of the slab with respect to a longitudinal direction of the slab.
- an electromagnetic stirrer (EMS) similar to the third stirrer 322 may be used.
- the first stirrer 620 uses a device similar to the third stirrer 322, the first and third stirrers 620 and 322 may be different in the size of a frequency generated thereby or the operating time thereof from each other. That is, the third stirrer 322 stirs molten steel in the mold 160 or molten steel in an initial slab subjected to solidification, and thus uses a frequency less than about 1 Hz.
- the third stirrer 322 operates during the following processes: pouring of molten steel into the mold 160, casting the molten steel into a slab, and transferring of the slab to the solidification unit 1b.
- the first stirrer 620 due to a characteristic of the slab transferred to the solidification unit 1b, the slab is not provided with the mold and forms a thicker solidified shell compared to the slab cast in the casting unit. Therefore, the first stirrer 620 uses a frequency of up to 5 Hz and operates until the casting of the slab is completed so that the magnetic field of the first stirrer 620 passes through the thickened solidified shell to stir unsolidified molten steel in the slab.
- solidification of a slab occurs in a wide variety of forms according to casting situations and casting conditions, so that the third and first stirrers 322 and 620 may use a frequency in a range of 0 to 5 Hz according to various operation patterns.
- the first stirrer 620 disposed in the solidification unit 1b in FIG. 3D stirs unsolidified molten steel in the slab to equalize temperatures of unsolidified molten steel in the slab during solidification of the slab in the solidification unit 1a, thus being able to operate very efficiently in reducing pipe defects inside the slab in such a way that the first heater 660 heats an upper side of the slab to prevent an upper portion of the slab from being pre-solidified.
- 3F stirs unsolidified molten steel in the slab to equalize temperatures of unsolidified molten steel in the slab during solidification of the slab in the casting unit 1a, thus being able to operate very efficiently in reducing pipe defects inside the slab in such a way that the second heater heats an upper side of the slab to prevent an upper portion of the slab from being pre-solidified.
- the second stirrer 640 is provided spaced apart at a predetermined distance below the first stirrer 620 and installed so as to elevate in a longitudinal direction of a slab to stir unsolidified molten steel in the slab. That is, the second stirrer 640 is disposed below the center of the slab with respect to a longitudinal direction of the slab.
- the second stirrer 640 may use a final electromagnetic stirrer (FEMS) similar to the fourth stirrer 324 so as to stir unsolidified molten steel in a lower region outside of the slab
- the second and fourth stirrers 640 and 324 may be different in the size of a frequency generated thereby or the operating time thereof from each other.
- the fourth stirrer 322 uses a frequency of up to about 3 Hz so as to stir unsolidified molten steel in the slab which is being solidified in the casting unit 1a.
- the fourth stirrer 324 operates before the slab cast in the casting unit 1a is transferred to the solidification unit 1b.
- the second stirrer 640 due to a characteristic of the slab transferred to the solidification unit 1b, the slab forms a thicker solidified shell compared to the slab cast in the casting unit. Therefore, the second stirrer 640 uses a frequency of up to 6 Hz and operates until the casting of the slab is completed.
- solidification of a slab occurs in a wide variety of forms according to casting situations and casting conditions, so that the fourth and second stirrers 324 and 640 may use a frequency in a range of 0 to 6 Hz according to various operation patterns.
- the first and second stirrers 620 and 640 are provided in plurality to respectively stir unsolidified molten steel in different regions of the slab
- an apparatus and a method for stirring unsolidified molten steel in the slab in the solidification unit 1b are not limited thereto. That is, the embodiment may be modified to various methods and apparatus shapes in such a way that a single stirrer is provided and a whole region from an upper portion to a lower portion of the slab may be stirred while the frequency of the stirrer is being changed.
- the first and second stirrers 620 and 640 stir molten steel until solidification of the slab transferred to the solidification unit 1b is completed, thus being able to enhance the equiaxed crystal ratio in the slab and improve slab quality by reducing segregation and porosity as in the stirring unit 320 of the casting unit 1a.
- the first heater 660 is a device installed so as to be able to move forward and backward in a direct upper region of slab for heating an upper portion of the slab in an outside of the slab and configured to heat an upper portion (tail portion) of the slab transferred to the solidification unit 1b. Since the first heater 660 has similar configuration and effect as in the second heater 340, a detailed description thereof will not be repeated.
- the above described casting installation 1 may include a transfer unit which transfers the slab from the casting unit 1a to the solidification unit 1b and/or from the solidification unit 1b to the outside of the solidification unit 1b, i.e. a post-process.
- the transfer unit 700 is a device disposed on one side of the solidification unit 1b and formed so as to be able to move forward and backward toward the casting unit or the solidification unit to transfer the slab.
- the transfer unit 700 includes: a tilting unit 720 for tilting the slab in contact with the slab in the casting unit 1a or transferring the slab from the casting unit 1a to the solidification unit 1b; and a driving unit 740 controlling operation of the tilting unit 720.
- the tilting unit 720 is disposed on one side of the slab and transfers the slab while being tilted or moved forward and backward by the driving unit, and the support block 520 of the solidification unit 1b is connected to transfer the slab. That is, the slab may be transferred from the casting unit 1a to the solidification unit 1b in such a way that one side of the tilting unit 720 is connected to the support block 520 supporting the slab and the slab is disposed on the support block 520.
- the tilting unit 720 is tilted with the slab being in contact with one side of the tilting unit 720 and the slab may be seated on the tilting unit disposed in the transferring direction.
- a roller 725 may be mounted to easily transfer the slab.
- the driving unit 740 controls operation of the tilting unit 720, and may allow the tilting unit 720 to move forward and backward so that the tilting unit 720 approaches or recedes from the casting unit 1a.
- the driving unit 740 allows the tilting unit 720 to be tilted and communicate with a roller table 800 guiding the tilting unit 720 and the slab to a post-process.
- a device such as the pusher 400 of the casting unit 1a capable of reciprocally moving a predetermined distance may be used for the driving unit 740, and for example, when an actuator is used, the tilting unit 720 may be connected to an end of a piston so as to enable angle adjustment.
- the device and operating method used for the transfer unit 700 are not limited thereto, and various devices and methods capable of easily transferring the slab may be used when the slab is transferred from the casting unit 1a to the solidification unit 1b or from the solidification unit 1b to a post-process.
- a casting method includes: providing molten steel to prepare casting; casting the molten steel in a casting unit allowing a passage through which the molten steel passes to be opened or closed; and transferring a slab produced through the casting to a solidification unit.
- molten steel after refining is completed is accommodated in a ladle 120 and then transferred to the casting unit so as to start casting.
- the molten steel transferred to the casting unit is supplied to the tundish 140 from the ladle 120, flotation of inclusion is then performed in the tundish 140 for a period of time, and the molten steel is then poured to the mold, thereby performing the process in the casting unit 1a (S100).
- preparation of the casting is competed in a condition in which the surface plate 220 is positioned in a mold to prevent molten steel poured to the mold 160 from being discharged to the outside (S120).
- slab is produced (S140).
- the third stirrer 322 is operated to stir molten steel in the mold.
- the slab is produced in a size of a maximum thickness of 800 mm, a maximum width of 2000 mm, and cast at a casting rate of 0.3m per minute or less.
- a reason why the slab is cast at a low casting rate of 0.3 m per minute is that suppressing occurrence of segregation to secure internal quality by casting at a slow casting rate and seeming a sufficient thickness of the solidified shell during casting are required as a solidification rate of a slab for the extremely thick steel material is slow unlike a general slab.
- the third stirrer 322 While the casting is in progress, the third stirrer 322 continually stirs molten steel in the mold and the fourth stirrer 324 continually stirs unsolidified molten steel inside the slab so that solidification proceeds by characteristic of thick slab.
- the third and fourth stirrers 322 and 324 may refine a structure of slab by continuously stirring molten steel to enhance quality and equiaxed crystal ratio of slab.
- the slab S1 located in the casting unit 1a is separated from the surface plate by the pusher 400 and supported by the transfer unit 700 to move to the solidification unit (S200).
- the slab S1 may be transferred to the solidification unit 1b in a state solidification of a surface is advanced to a degree of no deformation.
- the stirring unit 329 moving upper and lower portions in the casting and solidifying slab returns to its original position so as not to interfere with transfer of the slab S 1.
- a process of finally completing solidification of the slab S1 proceeds in the solidification unit 1b (S300). That is, since the slab S1 is solidified in the solidification unit 1b, a casting process may be performed in the casting unit 1a.
- the first quality controller 600 provided in the solidification unit 1b descends or ascends to be disposed spaced apart from an outside of slab. That is, as illustrated in FIG. 3 , the first and second stirrers 620 and 640 are disposed outside of the slab for stirring unsolidified molten steel inside the slab S1 to operate until solidification of the slab S1 is completed.
- the first heater 660 indirectly heats an upper portion of the slab inside each of regions to solidifying the upper portion of slab while heat is suppressed from being released from a side of the upper portion of the slab as much as possible. This may suppress or prevent unsolidified region of an upper portion of the slab from being pre-solidified by indirectly heating a side of an upper portion of the slab to minimize a solidification shrinkage defect such as a pipe. Thus, yielding percentage of slab is enhanced to improve yielding percentage of a final slab.
- FIGS. 3A to 3F is not limited to a number of times and may be repeated.
- a process of the casting unit 1a is re-processed in the casting unit 1a and produces another slab S2 to be able to be repeated until obtaining required quantity while the slab S1 is transferred to the solidification unit to perform a process of the casting unit (slab solidification process).
- the slab Se in the casting unit 1a may finish solidification in the casting unit 1a without being transferred to the solidification unit 1b. That is, the slab Se finishes solidification by using the second quality controller 300 provided in the casting unit 1a and then may be transferred to a post-process (S360).
- the second heater 340 of the casting unit 1a indirectly heats an upper portion of the slab Se to perform a role of the first heater 660 of the solidification unit 1b.
- the last produced slab Se may be transferred to a post-process after being transferred to the solidification unit 1b and then completing a solidification process as similarly as the previously produced slabs S1 and S2.
- a position of the final slab Se is not limited.
- Table 1 shows the results of changes in slab thickness and yielding percentage of a finally produced slab in a variety of process conditions for producing the extremely thick steel material.
- the slab thickness of the initial stage indicates the thickness of the slab when an additional post-process is not performed on the slab of a completed cast.
- the slab thickness of the middle stage indicates the thickness of the slab after a forging process beating or pressing the slab and
- the slab thickness of the final stage indicates the thickness of the slab after a rolling process.
- Each of the slabs (Comparative Example 1, Comparative Example 2, Example) shown in Table 1 are slabs produced as a slab for the extremely thick steel material after undergone a casting process and then at least any one of a forging or a rolling process, and Table 1 may show following results as below.
- the slab in Comparative Example 1 is produced through an ingot process, thus being able to be obtained by supplying molten steel to a mold and cooling the molten steel.
- the slab produced as above has an initial thickness of about 1500 mm.
- the slab finally has a thickness of about 178 mm after undergone a forging and rolling process so as to form a thickness for the extremely thick steel material.
- a total yielding percentage has a low value of about 52%.
- the Slab in Comparative Example 2 is produced through a normal casting installation, thus being able to be produced by continuously pouring and solidifying molten steel supplied from a steelmaking plant to a mold.
- the slab in Comparative Example 2 is produced through a normal casting installation, thus being able to be produced by continuously pouring and solidifying molten steel supplied from a steelmaking plant to a mold.
- the slab produced as above has very high yielding percentage of about 95 %.
- the slab is produced to have an initial thickness of about 450 mm, thus having a thickness about 150 mm after a rolling process is completed.
- the slab is limited to have a thickness of about 150 mm when used for the extremely thick steel material.
- the slab in Example is produced through a casting installation according to an embodiment of the present invention, thus being produced through the slab having a maximum thickness of about 800 mm and a maximum width of about 2000 mm.
- the slab in Example produced to have an initial thickness of about 800 mm and may be confirmed to finally have a thickness of about 178 mm after undergone a forging and rolling process.
- the slab in Example is confirmed to have a yielding percentage of about 89 %.
- the slab in Example has a yielding percentage significantly enhanced by about 40 % when compared to the slab of Comparative Example 1 and a thickness suitable for the extremely thick steel material when compared to the slab in Comparative Example 2. That is, the slab produced by the installation in Example may solve problems of a slab produced through an ingot casting and a conventional continuous casting.
- the extremely thick steel material produced according to the embodiment was not observed to have a surface defect (for example, a corner crack) identified by a naked eye and segregation generated inside the slab as macro quality achieved equiaxed crystal ratio of 100 % by applying a molten steel stirrer to the slab. Accordingly, it may be confirmed that the extremely thick steel material produced according to the embodiment of the present invention is improved.
- the extremely thick steel material may be easily produced and quality and yielding percentage of the slab finally produced may be improved.
- the slab produced in a casting unit is transferred to the solidification unit and then solidification of the slab is completed through the first quality controller and pre-solidification of an upper portion of the slab is suppressed or prevented to reduce formation of pipe, quality of the slab may be enhanced. Therefore, since cutting unsound region that is a problem of an ingot casting is not performed due to improved slab quality, yielding percentage of the slab may be enhanced.
- next slab may be cast in the casting unit while the slab is transferred to the solidification unit and then solidified in the solidification unit, a problem of a batch process such as a conventional continuous casting may be solved.
- productivity of the slab may be increased.
- the slab produced in a last casting process is not transferred to the solidification unit and solidification of the slab may be completed through the second quality controller provided in the casting unit.
- process efficiency may be improved.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
Abstract
Description
- The present invention relates to a casting installation and a casting method using the same, and more particularly, to a casting installation that may easily produce a slab for an extremely thick steel material and enhance quality, yielding percentage, and productivity of the slab and to a casting method using the same.
- In general, an extremely thick steel material has a thickness of at least 100 mm, and internal quality such as porosity and mechanical properties such as impact and toughness of the extremely thick steel material are managed with a thickness reduction ratio (slab thickness/product thickness) limited according to an intended use. For example, as marine structural steel, there is required an extremely thick steel material having the thickness reduction ratio of 4 or more and pressure steel and wind power structural steel requires the thickness reduction ratio of 3 or more.
- Currently, an extremely thick steel material may be produced through predetermined post-processes such as forging and rolling of an ingot or slab produced by a continuous casting process. When an extremely thick steel material is produced by the ingot process, i.e., the former method, the ingot is produced into an extremely thick steel material product by a forging process or is subject to an additional rolling process. In particular, since the extremely thick steel material requiting a high thickness reduction ratio regards the internal quality as an important factor, a slab mostly cast in an ingot is subjected to a forging operation and then produced through a rolling process.
- As such, producing an extremely thick steel material by using a slab cast in an ingot may correspond to the production of an extremely thick steel material having a high thickness reduction ratio and has an advantage for the production of a small-lot in consideration of a demand characteristic of the extremely thick steel material. However, the slab produced by using the ingot process requires cutting of an unsound region for removing the unsound region generated around a riser and a main riser. Thus, deterioration in yielding percentage of the slab is caused due to cutting of upper and lower regions of the slab, so that production costs for producing the extremely thick steel material is increased.
- Meanwhile, when an extremely thick steel material is produced by the continuous casting process, i.e., the latter method, in general, the extremely thick steel material is produced by a method of rolling a slab subject to a continuous cast. Although the latter method is excellent in yielding process and thus superior to the ingot process in terms of production costs when compared to the ingot process, there is a problem in that a thickness of the extremely thick steel material is also limited due to a limited slab thickness when steel products requiring a high thickness reduction ratio are produced.
- Further, since the extremely thick steel material is relatively thick compared to a normal slab, it takes a long time until the slab is completely solidified after being cast. When a slab for an extremely thick steel material thicker than a general slab produced by a general caster is produced by a conventional casting method in which molten steel is continuous cast and cut, solidification is completed to an inside of the slab and thus the installation of the caster becomes very long for a cutting process, which leads to enlargement of the installation, resulting in consumption of enormous initial cost in terms of production costs.
- In addition, since possibility in which an internal defect of the slab occurs is high compared to an ingot material, there is a high possibility in which an internal defect in a continuous cast slab may remain in the extremely thick steel material. In addition, since a continuous cast installation for producing a slab is optimized for mass production, there is a disadvantageous problem in terms of production of a small-lot.
- Thus, development of new installation and process is urgently required for producing a slab for extremely thick steel material having a high thickness reduction ratio, the slab being not easy to be produced in a general casting installation. That is, required is an installation and process which is capable of enhancing internal quality and yielding percentage same as or better than an ingot slab in terms of steel quality, is advantageous in producing various kinds of small-lot extremely thick steel materials in terms of production, and is capable of enhancing productivity compared to the production of the ingot slab.
- The present invention provides a casting installation easily producing a slab for an extremely thick steel material and to a casting method using the same.
- The present invention also provides to a casting installation capable of enhancing quality and yielding percentage of a slab and to a casting method using the same.
- The present invention also provides to a casting installation capable of enhancing productivity of a slab and efficiency of a process installation and to a casting method using the same.
- A casting installation according to an embodiment of the present invention includes: a casting unit defining a passage through which molten steel passes and for casting the molten steel into a slab; and a solidification unit including: a support unit disposed spaced apart from the casting unit and receiving the slab from the casting unit and disposed on at least any one place of sides of the slab to support the slab; and a first quality controller provided on an outside of the slab to induce solidification of the slab.
- The first quality controller may include: a first stirrer disposed in proximity to an outside of the slab and able to elevate in a longitudinal direction of the slab; a second stirrer provided spaced apart below the first stirrer and able to elevate in the longitudinal direction of the slab; and a first heater installed so as to be able to move forward and backward in a region directly above the slab and configured to heat an upper portion of the slab.
- The first stirrer may have coils wound around the slab and disposed in the form of a circle.
- The casting unit may include: an accommodation unit having a space in which the molten steel is accommodated; a drawing machine drawing the slab from the accommodation unit to a lower portion; and a second quality controller provided on an outside of the passage.
- The accommodation unit may include a mold configured to form the passage through which the molten steel supplied to a tundish passes, and the mold may be formed so that the slab has a thickness of 800 mm or less and a width of 2000 mm or less.
- The second quality controller may include: a stirring unit including at least one stirrer disposed on an outside of the mold and configured to stir at least any one of the molten steel and unsolidified molten steel inside the slab; a second heater installed so as to be able to move forward and backward in a region directly below the mold and configured to heat an upper portion of the slab.
- The stirring unit may include: a third stirrer disposed in proximity to the mold and able to elevate in a drawing direction of the slab; a fourth stirrers provided spaced apart below the third stirrer and able to elevate in the drawing direction of the slab.
- The third stirrer may have coils wound around the mold or the slab and disposed in the form of a circle.
- A pusher for separating the slab from the drawing machine may be provided to the casting unit and the pusher may be installed so as to be able to reciprocally move forward and backward toward the solidification unit.
- A transfer unit transferring the slab from the casting unit to the solidification unit or from the solidification unit to an outside of the solidification unit may be provided.
- A casting method according to an embodiment of the present invention includes: providing molten steel to prepare casting; casting the molten steel in a casting unit allowing a passage through which the molten steel passes to be opened or closed; transferring a slab produced through the casting to a solidification unit; and transferring the slab to a post-process after solidification of the slab is completed.
- The casting of the molten steel may be repeated in the casting unit after the slab is transferred to the solidification unit.
- When the casting of the molten steel is repeated, the transferring the slab to the solidification unit may be performed while the molten steel is transferred to the casting unit so that preparing the casting is performed.
- When the casting of the molten steel is a single casting, that is one time casting, the solidification of the slab may be completed in the casting unit or after the slab is transferred to the solidification unit.
- The molten steel may be cast at a casting rate 0.3m per minute or less.
- According to a casting installation and a casting method using the same according to embodiments of the present invention, it is possible to improve yielding percentage of a slab produced by a continuous casting. That is, when a slab cast in a casting unit is solidified in a casting unit or a solidification unit, the length of a pipe generated at an upper portion of the slab is reduced to enhance yielding percentage of the slab by delaying solidification of the upper portion of the slab by using a second heater or a first heater.
- In addition, molten steel remaining in a mold is stirred to enhance inner quality during casting and unsolidified molten steel in slab is stirred after a casting is completed, so that the equiaxed crystal ratio in the slab may be enhanced, segregation and porosity may be reduced, and an internal defect such as a pipe occurring at an edge end of the slab may be reduced.
- In addition, according to the present invention, it is possible to continuously cast another slab in a casting unit during a process in which solidification of a slab is performed in a solidification unit. Thus, since a process required for solidification of an extremely thick steel material may be completed in the solidification unit, a casting of molten steel may not stop, thus capable of improving productivity of a slab and efficiency of a process installation.
-
-
FIG. 1 illustrates a view of a casting installation according to an embodiment of the present invention. -
FIG. 2 illustrates a flow chart of a casting method according to an embodiment of the present invention. -
FIG. 3 illustrates a view of an operating state of a casting installation according to a casting method inFIG. 2 . - Hereinafter, specific embodiments will be described in detail with reference to the accompanying drawings. The present invention may, however, be embodied in different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the present invention to those skilled in the art. Like reference numerals refer to like elements throughout.
-
FIG. 1 illustrates a view of a casting installation according to an embodiment of the present invention.FIG. 2 illustrates a flow chart of a casting method according to an embodiment of the present invention.FIG. 3 illustrates a view of an operating state of a casting installation according to a casting method inFIG. 2 .FIGS. 3A to 3F illustrate changes in the casting installation working to produce slab. - Refereing to
FIG. 1 , acasting installation 1 as an installation to produce a slab for an extremely thick steel material according to an embodiment of the present invention includes acasting unit 1a defining a passage through which molten steel passes and for casting the molten steel into a slab; and asolidification unit 1b including: a support unit 500 disposed spaced apart from thecasting unit 1a and receiving the slab from thecasting unit 1a and disposed on at least any one place of sides of the slab to support the slab; and a first quality controller 600 provided on an outside of the slab to induce solidification of the slab. - The
casting unit 1a as a section in which continuous casting of refined molten steel is carried out includes: anaccommodation unit 100 accommodating the molten steel; adrawing machine 200 drawing the slab from theaccommodation unit 100 to a lower portion; and asecond quality controller 300 provided on an outside of the passage through which the molten steel passes. - The
accommodation unit 100 defines a space accommodating molten steel before the casting of the molten steel and includes aladle 120 accommodating molten steel, a tundish 140 receiving the molten steel from theladle 120, and amold 160 disposed spaced apart below the tundish 140. - The
ladle 120 is a container for accommodating molten steel after refining is completed and may be produced in various hollow shapes having an internal space capable of accommodating the molten steel. In general, theladle 120 may be provided in plurality to increase the circulation rate of a continuous casting installation. - The tundish 140 is produced in the shape of a hollow container capable of accommodating the molten steel supplied from the
ladle 120. An outlet discharging molten steel is formed in the bottom of thetundish 140, so that the molten steel accommodated in thetundish 140 may be discharged to the outside through the outlet. The molten steel accommodated in thetundish 140 stays inside thetundish 140 for a period of time, thus being poured into themold 160 after flotation of inclusion contained in the molten steel. - The
mold 160 is provided for shaping the molten steel poured from thetundish 140 in an appropriate size to produce a slab, thus defining width and thickness of a passage through which the molten steel passes. Themold 160 of the present invention may be formed such that a slab has a thickness of 800 mm or less and a width of 2000 mm or less in order to cope with the size of a slab for an extremely thick steel material. That is, use of themold 160 having a greatly increased thickness compared to a mold of a conventional casting installation allows a slab subjected to forging and rolling processes to have a thickness used for the extremely thick steel material. - Meanwhile, there may be provided a
guide roll 170 guiding a slab having an initial shell to the outside of themold 160 through themold 160, a cooling nozzle (not shown) cooling the slab guided from theguide roll 170, and a vibrator (not shown) transmitting vibration to themold 160 so that the slab inside the mold is easily drawn to the outside of themold 160. In the present invention, it is not necessary to particularly limit the configuration of theguide roll 170, the cooling nozzle, and the vibrator, but various configurations and operating methods thereof are already widely known to those skilled in the art, so that a detailed description thereof will be omitted. - The
drawing machine 200 as a machine for drawing a slab from theaccommodation unit 100 to a lower portion, includes: asurface plate 220 which is initially disposed inside the mold and receives molten steel to prevent the molten steel from spilling downwards from themold 160 and connects the primary solidified slab to anactuator 240, and theactuator 240 drawing the slab to the lower portion. - The
surface plate 220 is provided for connecting a slab to theactuator 240, and a plate having a specific-shaped surface is used for easy connection to the slab. Although the present invention does not limit the shape and the material of thesurface plate 220, it is preferable that thesurface plate 200 is made of such a material that does not lead to deformation which may be caused by to a slab of a high temperature when being in contact with the slab. - The
actuator 240 is a device for lowering thesurface plate 220, and a slab connected to thesurface plate 220 may be drawn downwards by lowering thesurface plate 220 connected to theactuator 240. Theactuator 240 may employ a device capable of descending to a lower portion when the slab is drawn and ascending at an initial stage of casting so that thesurface plate 220 is positioned inside themold 160. That is, a device capable of descending and ascending may be used as theactuator 240. - The
second quality controller 300 is provided for improving quality of a slab drawn from the drawingmachine 200 and includes: a stirringunit 320 including at least one stirrer disposed on an outside of themold 160 and configured to stir at least any one of molten steel in themold 160 and unsolidified molten steel inside the slab; and asecond heater 340 installed so as to be able to move forward and backward in a region directly below themold 160 and configured to heat an upper portion of the slab. - The stirring
unit 320 is a device having at least one stirrer on an outside of themold 160 to improve quality of a slab and includes: athird stirrer 322 disposed in proximity to themold 160 and able to elevate in a drawing direction of the slab; and afourth stirrer 324 provided spaced apart below thethird stirrer 322 and able to elevate in the drawing direction of the slab. That is, the stirringunit 320 stirs at least any one of molten steel accommodated in a molten state in themold 160 and unsolidified molten steel in the produced slab to perform grain refinement on a slab, thereby being capable of improving quality of the slab. - As illustrated in
FIG. 1 , thethird stirrer 322 is disposed spaced apart at a predetermined distance from a side of themold 160, and stirs molten steel accommodated in themold 160 during the casting. When the casting starts, thethird stirrer 322 descends by a predetermined distance along with a slab to stir unsolidified molten steel inside the slab. That is, when molten steel is poured to themold 160, thethird stirrer 322 applies an electromagnetic field to the molten steel from a side of themold 160 to stir the molten steel, and when pouring of the molten steel into themold 160 is completed, thethird stirrer 322 may stir unsolidified molten steel inside a slab while descending to a lower portion along with the slab. An electromagnetic stirrer (EMS) may be used as thethird stirrer 322. The electromagnetic stirrer being able to be used as thethird stirrer 322 typically has a low frequency (Hz) band corresponding to a frequency enough to stir molten steel in a molten state. - The
fourth stirrer 324 is provided spaced apart at a predetermined distance below thethird stirrer 322, and elevates in a drawing direction of a slab to stir unsolidified molten steel in the slab. A final electromagnetic stirrer (FEMS) may be used as thefourth stirrer 324. Thefourth stirrer 324 is disposed in a relatively lower portion compared to thethird stirrer 322, and it is preferable to use a stirring device having a higher frequency (Hz) than thethird stirrer 322 in order to stir molten steel existing inside a solidified region in a lower portion of a slab (a lower portion from the center with respect to a longitudinal direction of a slab) in which solidification has progressed to some extent. - Thus, the stirring
unit 320 stirs solidified molten steel in the mold and unsolidified molten steel in the slab, thereby being capable of enhancing the equiaxed crystal ratio in slab and reducing segregation and porosity. Meanwhile, the present invention does not limit a stirring region of a slab stirred by the third andfourth stirrers - The
second heater 340 is a device disposed outside of themold 160 and installed so as to be able to move forward and backward in a region directly below the mold (a path in a drawing direction of a slab) to heat an upper portion of the cast slab (tail portion). In this embodiment, a method according to induction heating (electromagnetic heater, EMH) was employed. Thesecond heater 340 indirectly heats the upper side of a slab by using an electromagnetic field generated in an induction heating coil by power supply, and is wound so as to surround the slab while being spaced apart at a predetermined interval from four directional sides of the slab. Thus, thesecond heater 340 preferably uses an induction coil having a shape corresponding to a cross-section of the slab, but not limited thereto, may be wound in various forms. - Meanwhile, a
pusher 400 may be provided to thecasting unit 1a so as to transfer a slab to thesolidification unit 1b after casting of molten steel is completed. - The
pusher 400 is a device disposed in a position facing thesolidification unit 1b of sides of thecasting unit 1a and pushing a side of a slab and separating the slab from the drawingmachine 200 to deliver the slab towards thesolidification unit 1b. A device capable of reciprocally moving a predetermined distance may be used for thepusher 400, and for example, a stepping motor, an actuator, a solenoid, or the like may be used. As an example, when an actuator is used as thepusher 400, a piston reciprocally moves while being inserted and ejected into/from a cylinder, thus being able to push the slab toward thesolidification unit 1b and then return back to an original position. A device delivering the slab of thecasting unit 1a to thesolidification unit 1b is not limited to thepusher 400 and may be a variety of devices. - The
solidification unit 1b is a section receiving a slab so as to solidify the slab cast from the above described castingunit 1a and includes: a support unit 500 disposed on at least any one side of the slab to support the slab; and a first quality controller 600 provided on an outside of the slab to induce solidification of the slab. Thesolidification unit 1b receives the slab from a section spaced apart at a predetermined distance from thecasting unit 1a, completes solidification of the slab, and then transfers the slab to a post-process (for example, forging or rolling). - The support unit 500 is provided so that the slab is stably positioned in the
solidification unit 1b and includes: asupport block 520 disposed in contact with the bottom of the slab; and asupport frame 540 disposed surrounding a portion of a side of the slab. However, the configuration of the support unit 500 is not limited thereto, but the slab may be supported by a variety of devices and methods within the extent not interfering with the movement of the first quality controller 600. - The supporting
block 520 uses a block in a shape similar to thesurface plate 220 of thecasting unit 1a. Thesupport block 520 plays a role of supporting a lower portion of the slab disposed in thesolidification unit 1b in a drawing direction, i.e. a longitudinal direction. - The
support frame 540 may be disposed spaced apart at a predetermined distance from a side of the slab and surrounding a portion of a side of the slab so as to suppress and prevent the slab disposed in the longitudinal direction from falling, as illustrated in an enlarged view inFIG. 1 . - The first quality controller 600 as a device provided on an outside of a slab and to ensure slab quality includes: a
first stirrer 620 disposed in proximity to an outside of the slab and able to elevate in a longitudinal direction of the slab; asecond stirrer 640 provided spaced apart below thefirst stirrer 620 and able to elevate in the longitudinal direction of the slab; and afirst heater 660 configured to heat an upper portion of the slab. That is, since solidification of the slab which is naturally cooled is not completed, the first quality controller 600 may be provided with a device the same as or similar to thecasting unit 1a to continue a treatment process for improving slab quality. - The
first stirrer 620 as a device for stirring unsolidified molten steel in a slab delivered to thesolidification unit 1b is disposed spaced apart at a predetermined distance from the slab. Thefirst stirrer 620 may be installed so as to be able to elevate in such a way that thefirst stirrer 620 descends to be disposed on a side of the slab when the slab is delivered to thesolidification unit 1b with thefirst stirrer 620 being disposed at the same height as or a similar height to thethird stirrer 322. Thefirst stirrer 620 is disposed in an upper portion outside of the slab. That is, thefirst stirrer 620 is disposed above the center of the slab with respect to a longitudinal direction of the slab. An unsolidified region in an upper portion of the slab, which is stirred by thefirst stirrer 620, is subjected to relatively less progressed solidification than a lower portion of the slab, so that a large amount of unsolidified molten steel is included in the slab compared to the lower portion of the slab. Thus, an electromagnetic stirrer (EMS) similar to thethird stirrer 322 may be used. - Meanwhile, although the
first stirrer 620 uses a device similar to thethird stirrer 322, the first andthird stirrers third stirrer 322 stirs molten steel in themold 160 or molten steel in an initial slab subjected to solidification, and thus uses a frequency less than about 1 Hz. Thethird stirrer 322 operates during the following processes: pouring of molten steel into themold 160, casting the molten steel into a slab, and transferring of the slab to thesolidification unit 1b. In the case of thefirst stirrer 620, due to a characteristic of the slab transferred to thesolidification unit 1b, the slab is not provided with the mold and forms a thicker solidified shell compared to the slab cast in the casting unit. Therefore, thefirst stirrer 620 uses a frequency of up to 5 Hz and operates until the casting of the slab is completed so that the magnetic field of thefirst stirrer 620 passes through the thickened solidified shell to stir unsolidified molten steel in the slab. However, solidification of a slab occurs in a wide variety of forms according to casting situations and casting conditions, so that the third andfirst stirrers first stirrer 620 disposed in thesolidification unit 1b inFIG. 3D stirs unsolidified molten steel in the slab to equalize temperatures of unsolidified molten steel in the slab during solidification of the slab in thesolidification unit 1a, thus being able to operate very efficiently in reducing pipe defects inside the slab in such a way that thefirst heater 660 heats an upper side of the slab to prevent an upper portion of the slab from being pre-solidified. Similarly, thethird stirrer 322 disposed in thecasting unit 1a inFIG. 3F stirs unsolidified molten steel in the slab to equalize temperatures of unsolidified molten steel in the slab during solidification of the slab in thecasting unit 1a, thus being able to operate very efficiently in reducing pipe defects inside the slab in such a way that the second heater heats an upper side of the slab to prevent an upper portion of the slab from being pre-solidified. - The
second stirrer 640 is provided spaced apart at a predetermined distance below thefirst stirrer 620 and installed so as to elevate in a longitudinal direction of a slab to stir unsolidified molten steel in the slab. That is, thesecond stirrer 640 is disposed below the center of the slab with respect to a longitudinal direction of the slab. Although thesecond stirrer 640 may use a final electromagnetic stirrer (FEMS) similar to thefourth stirrer 324 so as to stir unsolidified molten steel in a lower region outside of the slab, the second andfourth stirrers fourth stirrer 322 uses a frequency of up to about 3 Hz so as to stir unsolidified molten steel in the slab which is being solidified in thecasting unit 1a. Thefourth stirrer 324 operates before the slab cast in thecasting unit 1a is transferred to thesolidification unit 1b. In the case of thesecond stirrer 640, due to a characteristic of the slab transferred to thesolidification unit 1b, the slab forms a thicker solidified shell compared to the slab cast in the casting unit. Therefore, thesecond stirrer 640 uses a frequency of up to 6 Hz and operates until the casting of the slab is completed. However, solidification of a slab occurs in a wide variety of forms according to casting situations and casting conditions, so that the fourth andsecond stirrers - Meanwhile, in the embodiment, although the first and
second stirrers solidification unit 1b are not limited thereto. That is, the embodiment may be modified to various methods and apparatus shapes in such a way that a single stirrer is provided and a whole region from an upper portion to a lower portion of the slab may be stirred while the frequency of the stirrer is being changed. - Thus, the first and
second stirrers solidification unit 1b is completed, thus being able to enhance the equiaxed crystal ratio in the slab and improve slab quality by reducing segregation and porosity as in the stirringunit 320 of thecasting unit 1a. - Meanwhile, in the case of the third and
first stirrers mold 160 or the slab were disposed in the form of a circle to perform rotation-type stirring on unsolidified molten steel in the mold or the slab. - The
first heater 660 is a device installed so as to be able to move forward and backward in a direct upper region of slab for heating an upper portion of the slab in an outside of the slab and configured to heat an upper portion (tail portion) of the slab transferred to thesolidification unit 1b. Since thefirst heater 660 has similar configuration and effect as in thesecond heater 340, a detailed description thereof will not be repeated. - The above described casting
installation 1 may include a transfer unit which transfers the slab from thecasting unit 1a to thesolidification unit 1b and/or from thesolidification unit 1b to the outside of thesolidification unit 1b, i.e. a post-process. - The
transfer unit 700 is a device disposed on one side of thesolidification unit 1b and formed so as to be able to move forward and backward toward the casting unit or the solidification unit to transfer the slab. Thetransfer unit 700 includes: a tiltingunit 720 for tilting the slab in contact with the slab in thecasting unit 1a or transferring the slab from thecasting unit 1a to thesolidification unit 1b; and adriving unit 740 controlling operation of thetilting unit 720. - The
tilting unit 720 is disposed on one side of the slab and transfers the slab while being tilted or moved forward and backward by the driving unit, and the support block 520 of thesolidification unit 1b is connected to transfer the slab. That is, the slab may be transferred from thecasting unit 1a to thesolidification unit 1b in such a way that one side of thetilting unit 720 is connected to thesupport block 520 supporting the slab and the slab is disposed on thesupport block 520. When the slab is transferred from thesolidification unit 1b to the outside of the solidification unit, thetilting unit 720 is tilted with the slab being in contact with one side of thetilting unit 720 and the slab may be seated on the tilting unit disposed in the transferring direction. On a side in which thetilting unit 720 contacts the slab, aroller 725 may be mounted to easily transfer the slab. - The driving
unit 740 controls operation of thetilting unit 720, and may allow thetilting unit 720 to move forward and backward so that thetilting unit 720 approaches or recedes from thecasting unit 1a. In addition, the drivingunit 740 allows thetilting unit 720 to be tilted and communicate with a roller table 800 guiding thetilting unit 720 and the slab to a post-process. A device such as thepusher 400 of thecasting unit 1a capable of reciprocally moving a predetermined distance may be used for thedriving unit 740, and for example, when an actuator is used, thetilting unit 720 may be connected to an end of a piston so as to enable angle adjustment. - In this way, in this embodiment, although the method and device as described above are used for the
transfer unit 700 transferring the slab, the device and operating method used for thetransfer unit 700 are not limited thereto, and various devices and methods capable of easily transferring the slab may be used when the slab is transferred from thecasting unit 1a to thesolidification unit 1b or from thesolidification unit 1b to a post-process. - Hereinafter, a casting method using the above-described casting installation will be described.
- Referring to
FIG. 2 , a casting method according to an embodiment of the present invention includes: providing molten steel to prepare casting; casting the molten steel in a casting unit allowing a passage through which the molten steel passes to be opened or closed; and transferring a slab produced through the casting to a solidification unit. - First, molten steel after refining is completed is accommodated in a
ladle 120 and then transferred to the casting unit so as to start casting. The molten steel transferred to the casting unit is supplied to thetundish 140 from theladle 120, flotation of inclusion is then performed in thetundish 140 for a period of time, and the molten steel is then poured to the mold, thereby performing the process in thecasting unit 1a (S100). As illustrated inFIG. 3 , preparation of the casting is competed in a condition in which thesurface plate 220 is positioned in a mold to prevent molten steel poured to themold 160 from being discharged to the outside (S120). - After the preparation of the cast is completed, as illustrated in
FIG. 3B , as thedrawing machine 200 operates to lower thesurface plate 220 down and a slab S1 connected to thesurface plate 220 is drawn downwards to start the casting, slab is produced (S140). Before the casting starts, thethird stirrer 322 is operated to stir molten steel in the mold. The slab is produced in a size of a maximum thickness of 800 mm, a maximum width of 2000 mm, and cast at a casting rate of 0.3m per minute or less. By a characteristic of an extremely thick steel material, themold 160 in which a slab has an increased thickness needs to be used so as to obtain a final product having an increased thickness. A reason why the slab is cast at a low casting rate of 0.3 m per minute is that suppressing occurrence of segregation to secure internal quality by casting at a slow casting rate and seeming a sufficient thickness of the solidified shell during casting are required as a solidification rate of a slab for the extremely thick steel material is slow unlike a general slab. - While the casting is in progress, the
third stirrer 322 continually stirs molten steel in the mold and thefourth stirrer 324 continually stirs unsolidified molten steel inside the slab so that solidification proceeds by characteristic of thick slab. Thus, the third andfourth stirrers - When the casting is complete on the
casting unit 1a (S160), the slab S1 located in thecasting unit 1a is separated from the surface plate by thepusher 400 and supported by thetransfer unit 700 to move to the solidification unit (S200). When a pushing force is delivered to the slab S1 by thepusher 400, the slab S1 may be transferred to thesolidification unit 1b in a state solidification of a surface is advanced to a degree of no deformation. Meanwhile, the stirring unit 329 moving upper and lower portions in the casting and solidifying slab returns to its original position so as not to interfere with transfer of theslab S 1. - After the slab is transferred to the
solidification unit 1b, a process of finally completing solidification of the slab S1 proceeds in thesolidification unit 1b (S300). That is, since the slab S1 is solidified in thesolidification unit 1b, a casting process may be performed in thecasting unit 1a. When solidification of the slab S1 starts, the first quality controller 600 provided in thesolidification unit 1b descends or ascends to be disposed spaced apart from an outside of slab. That is, as illustrated inFIG. 3 , the first andsecond stirrers - In a process of solidifying the slab, the
first heater 660 indirectly heats an upper portion of the slab inside each of regions to solidifying the upper portion of slab while heat is suppressed from being released from a side of the upper portion of the slab as much as possible. This may suppress or prevent unsolidified region of an upper portion of the slab from being pre-solidified by indirectly heating a side of an upper portion of the slab to minimize a solidification shrinkage defect such as a pipe. Thus, yielding percentage of slab is enhanced to improve yielding percentage of a final slab. - Thus, when solidification of the slab is completed in the solidified
portion 1b, S340, as illustrated inFIG. 3E , the slab is tilted by thetilting unit 720 of thetransfer unit 700 and thetilting unit 720 of thetransfer unit 700 is connected to the roller table 800 disposed in vicinity of thetransfer unit 700 and the slab is transferred to a post-process along the roller table 800. - Thus, the process of
FIGS. 3A to 3F is not limited to a number of times and may be repeated. As illustrated (b) inFIG. 2 , after a process of thecasting unit 1a is completed, a process of thecasting unit 1a is re-processed in thecasting unit 1a and produces another slab S2 to be able to be repeated until obtaining required quantity while the slab S1 is transferred to the solidification unit to perform a process of the casting unit (slab solidification process). - When the process of the
casting unit 1a no longer proceeds after repeating the above described process, that is, the last slab Se is produced in thecasting unit 1a after the slab S2 inFIG. 3E is transferred to thesolidification unit 1b, the slab Se in thecasting unit 1a may finish solidification in thecasting unit 1a without being transferred to thesolidification unit 1b. That is, the slab Se finishes solidification by using thesecond quality controller 300 provided in thecasting unit 1a and then may be transferred to a post-process (S360). Thesecond heater 340 of thecasting unit 1a indirectly heats an upper portion of the slab Se to perform a role of thefirst heater 660 of thesolidification unit 1b. However, the last produced slab Se may be transferred to a post-process after being transferred to thesolidification unit 1b and then completing a solidification process as similarly as the previously produced slabs S1 and S2. Thus, a position of the final slab Se is not limited. - Hereinafter, effects of the present invention will be described in more detail through experimental examples.
- Table 1 shows the results of changes in slab thickness and yielding percentage of a finally produced slab in a variety of process conditions for producing the extremely thick steel material.
-
[Table 1] Slab thickness (mm) Yielding percentage (%) Initial stage Middle stage Final stage Comparative Example 1 1500 300 178 52 Comparative Example 2 450 - 150 95 Example 800 300 178 89 - Herein, the slab thickness of the initial stage indicates the thickness of the slab when an additional post-process is not performed on the slab of a completed cast. In addition, the slab thickness of the middle stage indicates the thickness of the slab after a forging process beating or pressing the slab and, the slab thickness of the final stage indicates the thickness of the slab after a rolling process.
- Each of the slabs (Comparative Example 1, Comparative Example 2, Example) shown in Table 1 are slabs produced as a slab for the extremely thick steel material after undergone a casting process and then at least any one of a forging or a rolling process, and Table 1 may show following results as below.
- The slab in Comparative Example 1 is produced through an ingot process, thus being able to be obtained by supplying molten steel to a mold and cooling the molten steel. The slab produced as above has an initial thickness of about 1500 mm. Then, the slab finally has a thickness of about 178 mm after undergone a forging and rolling process so as to form a thickness for the extremely thick steel material. However, it may be confirmed that a total yielding percentage has a low value of about 52%.
- The Slab in Comparative Example 2 is produced through a normal casting installation, thus being able to be produced by continuously pouring and solidifying molten steel supplied from a steelmaking plant to a mold.
- The slab in Comparative Example 2 is produced through a normal casting installation, thus being able to be produced by continuously pouring and solidifying molten steel supplied from a steelmaking plant to a mold. The slab produced as above has very high yielding percentage of about 95 %. However, in a generally used casting installation, the slab is produced to have an initial thickness of about 450 mm, thus having a thickness about 150 mm after a rolling process is completed. Thus, it may be confirmed that the slab is limited to have a thickness of about 150 mm when used for the extremely thick steel material.
- The slab in Example is produced through a casting installation according to an embodiment of the present invention, thus being produced through the slab having a maximum thickness of about 800 mm and a maximum width of about 2000 mm. Thus, the slab in Example produced to have an initial thickness of about 800 mm and may be confirmed to finally have a thickness of about 178 mm after undergone a forging and rolling process. In addition, since the casting installation is separated into a casting unit and a solidification unit and a process for preventing pre-solidification of an upper portion of the slab is performed, the slab in Example is confirmed to have a yielding percentage of about 89 %.
- As such, the slab in Example has a yielding percentage significantly enhanced by about 40 % when compared to the slab of Comparative Example 1 and a thickness suitable for the extremely thick steel material when compared to the slab in Comparative Example 2. That is, the slab produced by the installation in Example may solve problems of a slab produced through an ingot casting and a conventional continuous casting.
- In addition, the extremely thick steel material produced according to the embodiment was not observed to have a surface defect (for example, a corner crack) identified by a naked eye and segregation generated inside the slab as macro quality achieved equiaxed crystal ratio of 100 % by applying a molten steel stirrer to the slab. Accordingly, it may be confirmed that the extremely thick steel material produced according to the embodiment of the present invention is improved.
- As described above, according to the embodiment of the present invention, since a continuous casting installation is separated into the casting unit and the solidification unit and the slab in which casting is completed in the casting unit is transferred to the solidification unit and the slab in which solidification is completed in the solidification unit is transferred to a post-process, the extremely thick steel material may be easily produced and quality and yielding percentage of the slab finally produced may be improved.
- More specifically, since the slab produced in a casting unit is transferred to the solidification unit and then solidification of the slab is completed through the first quality controller and pre-solidification of an upper portion of the slab is suppressed or prevented to reduce formation of pipe, quality of the slab may be enhanced. Therefore, since cutting unsound region that is a problem of an ingot casting is not performed due to improved slab quality, yielding percentage of the slab may be enhanced.
- In addition, since the next slab may be cast in the casting unit while the slab is transferred to the solidification unit and then solidified in the solidification unit, a problem of a batch process such as a conventional continuous casting may be solved. Thus, as a result, productivity of the slab may be increased. Further, the slab produced in a last casting process is not transferred to the solidification unit and solidification of the slab may be completed through the second quality controller provided in the casting unit. Thus, process efficiency may be improved.
- The present invention will now be described more fully with reference to the accompanying drawings, in which exemplary embodiments of the invention are shown. The present invention is limited not thereto and but by Claims. Moreover, various changes and modifications within the scope not departing from the basic principles of the present invention are possible to those skilled in the art of the present invention.
Claims (15)
- A casting installation comprising:a casting unit defining a passage through which molten steel passes and for casting the molten steel into a slab; anda solidification unit comprising:a support unit disposed spaced apart from the casting unit and receiving the slab from the casting unit and disposed on at least any one place of sides of the slab to support the slab; anda first quality controller provided on an outside of the slab to induce solidification of the slab.
- The casting installation of claim 1, wherein the first quality controller comprises:a first stirrer disposed in proximity to an outside of the slab and able to elevate in a longitudinal direction of the slab;a second stirrer provided spaced apart below the first stirrer and able to elevate in the longitudinal direction of the slab; anda first heater installed so as to be able to move forward and backward in a region directly above the slab and configured to heat an upper portion of the slab.
- The casting installation of claim 2, wherein the first stirrer has coils wound around the slab and disposed in the form of a circle.
- The casting installation of claim 1, wherein the casting unit comprises:an accommodation unit having a space in which the molten steel is accommodated;a drawing machine drawing the slab from the accommodation unit to a lower portion; anda second quality controller provided on an outside of the passage.
- The casting installation of claim 4, wherein the accommodation unit comprises a mold configured to form the passage through which the molten steel supplied to a tundish passes, and the mold is formed so that the slab has a thickness of 800 mm or less and a width of 2000 mm or less.
- The casting installation of claim 4, wherein the second quality controller comprises:a stirring unit comprising at least one stirrer disposed on an outside of the mold and configured to stir at least any one of the molten steel and unsolidified molten steel inside the slab; anda second heater installed so as to be able to move forward and backward in a region directly below the mold and configured to heat an upper portion of the slab.
- The casting installation of claim 6, wherein the stirring unit comprises:a third stirrer disposed in proximity to the mold and able to elevate in a drawing direction of the slab; anda fourth stirrer provided spaced apart below the third stirrer and able to elevate in the drawing direction of the slab.
- The casting installation of claim 7, wherein the third stirrer has coils wound around the mold or the slab and disposed in the form of a circle.
- The casting installation of claim 1, wherein a pusher for separating the slab from the drawing machine is provided to the casting unit and the pusher is installed so as to be able to reciprocally move forward and backward toward the solidification unit.
- The casting installation of claim 1, wherein a transfer unit transferring the slab from the casting unit to the solidification unit or from the solidification unit to an outside of the solidification unit is provided.
- A casting method comprising:providing molten steel to prepare casting;casting the molten steel in a casting unit allowing a passage through which the molten steel passes to be opened or closed;transferring a slab produced through the casting to a solidification unit; andtransferring the slab to a post-process after solidification of the slab is completed.
- The casting method of claim 11, wherein the casting of the molten steel is repeated in the casting unit after the slab is transferred to the solidification unit.
- The casting method of claim 12, wherein, when the casting of the molten steel is repeated, the transferring the slab to the solidification unit is performed while the molten steel is transferred to the casting unit so that preparing the casting is performed.
- The casting method of claim 11, wherein when the casting of the molten steel is a single casting, that is one time casting, the solidification of the slab is completed in the casting unit or after the slab is transferred to the solidification unit.
- The casting method of claim 11, wherein the molten steel is cast at a casting rate 0.3m per minute or less.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130027910A KR101511723B1 (en) | 2013-03-15 | 2013-03-15 | Casting apparatus and method using it |
PCT/KR2014/002153 WO2014142597A1 (en) | 2013-03-15 | 2014-03-14 | Casting equipment and casting method using same |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2974810A1 true EP2974810A1 (en) | 2016-01-20 |
EP2974810A4 EP2974810A4 (en) | 2016-09-28 |
EP2974810B1 EP2974810B1 (en) | 2018-07-25 |
Family
ID=51537132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14762821.8A Active EP2974810B1 (en) | 2013-03-15 | 2014-03-14 | Casting equipment and casting method using same |
Country Status (9)
Country | Link |
---|---|
US (1) | US20160023269A1 (en) |
EP (1) | EP2974810B1 (en) |
JP (1) | JP6055114B2 (en) |
KR (1) | KR101511723B1 (en) |
CN (1) | CN105026073B (en) |
BR (1) | BR112015020565B1 (en) |
ES (1) | ES2693560T3 (en) |
TR (1) | TR201815354T4 (en) |
WO (1) | WO2014142597A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017137094A1 (en) * | 2016-02-12 | 2017-08-17 | Rotelec Sa | Apparatus and method for casting ingots |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT515244A2 (en) * | 2013-12-30 | 2015-07-15 | Inteco Special Melting Technologies Gmbh | Method for producing long ingots of large cross section |
KR101642904B1 (en) * | 2014-10-20 | 2016-08-10 | 주식회사 포스코 | Semi-continuous casting equipment of vertical type and casting method therewith |
KR101755400B1 (en) | 2015-09-16 | 2017-07-27 | 주식회사 포스코 | Semi-continuous casting equipment of vertical type |
CN105568134A (en) * | 2016-01-05 | 2016-05-11 | 江阴兴澄特种钢铁有限公司 | Steel for carbon hub bearing of microalloying car and production method thereof |
EP3427863A1 (en) * | 2017-07-11 | 2019-01-16 | INTECO melting and casting technologies GmbH | Method and system for the production of cast blocks from metal |
CN108672668A (en) * | 2018-03-29 | 2018-10-19 | 马鞍山钢铁股份有限公司 | The method and its control device of casting blank solidification institutional framework in a kind of control casting process |
CN108436046B (en) * | 2018-05-23 | 2023-11-24 | 中冶京诚工程技术有限公司 | Vertical continuous casting production equipment and method for oversized round billet |
CN108817332B (en) * | 2018-06-26 | 2020-04-21 | 辽宁科技大学 | Method for controlling solidification quality of large-specification medium-high alloy steel vertical continuous casting billet |
CN109317631B (en) * | 2018-10-30 | 2020-08-07 | 武汉钢铁有限公司 | Production method for improving texture uniformity of continuous casting square billet |
KR102596672B1 (en) * | 2020-08-11 | 2023-11-01 | 박성철 | Refrigerator for grain having improved cooling efficiency by cooling aid material |
CN113426970B (en) * | 2021-06-11 | 2023-02-03 | 一重集团大连工程技术有限公司 | Vertical semi-continuous production device and production process of large round billets with phi of 1000 mm-2000 mm |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3620285A (en) | 1969-03-21 | 1971-11-16 | Olsson International | Slab casting apparatus |
US3667534A (en) | 1971-03-11 | 1972-06-06 | Sumitomo Metal Ind | Steel ingot making method |
JPS59218247A (en) * | 1983-05-25 | 1984-12-08 | Mitsubishi Heavy Ind Ltd | Continuous casting method |
JPS61212457A (en) * | 1985-03-18 | 1986-09-20 | Kobe Steel Ltd | Vertical type continuous casting installation for slab having large section |
JPS6340656A (en) * | 1986-08-02 | 1988-02-22 | Sumitomo Metal Ind Ltd | Continuous caster for cast slab having large section |
JP3104467B2 (en) * | 1993-04-22 | 2000-10-30 | 神鋼電機株式会社 | Vacuum melting continuous casting device capable of multipurpose casting |
JPH0740019A (en) * | 1993-07-28 | 1995-02-10 | Kawasaki Steel Corp | Method for reducing center segregation in cast slab in continuous casting for steel |
JP3146904B2 (en) * | 1995-02-07 | 2001-03-19 | 株式会社神戸製鋼所 | Vertical continuous casting method for large section slabs |
CN1226471A (en) * | 1999-01-04 | 1999-08-25 | 刘定平 | Process for rolling thick metal plates and sectional materials with hot moulds and fluid pouring with magnet suspension temperature reducing |
JP4774632B2 (en) * | 2001-05-31 | 2011-09-14 | 大同特殊鋼株式会社 | Slab, vertical die casting method and vertical die casting apparatus |
CN101443144A (en) * | 2006-05-16 | 2009-05-27 | Sms迪马格股份公司 | Method and strand-guiding device for guiding a cast strand |
JP5116265B2 (en) * | 2006-07-13 | 2013-01-09 | 新日鐵住金ステンレス株式会社 | Austenitic stainless rolled steel sheet excellent in strength and ductility and method for producing the same |
KR100981566B1 (en) * | 2007-12-18 | 2010-09-10 | 주식회사 포스코 | Manufacturing Method of A Ferrite Stainless Steel and Continuous Casting Apparatus for the Same |
US20090242165A1 (en) * | 2008-03-25 | 2009-10-01 | Beitelman Leonid S | Modulated electromagnetic stirring of metals at advanced stage of solidification |
KR20100025929A (en) * | 2008-08-28 | 2010-03-10 | 현대제철 주식회사 | Crack prevention system of thin slab in continuous casting |
KR101053975B1 (en) * | 2009-01-21 | 2011-08-04 | 주식회사 포스코 | Vertical semicontinuous casting device and casting method using the same |
KR101149373B1 (en) * | 2009-12-24 | 2012-05-30 | 주식회사 포스코 | Apparatus for casting of vertical type and method for casting using it |
KR101272712B1 (en) | 2010-12-28 | 2013-06-10 | 주식회사 포스코 | Continuous casting method and apparatus |
TWI496633B (en) | 2011-04-13 | 2015-08-21 | Sms Siemag Ag | Verfahren und vertikalstranggiessanlage zum herstellen von dicken brammen aus einer metallischen schmelze |
CN202270944U (en) * | 2011-09-30 | 2012-06-13 | 中冶南方工程技术有限公司 | Extra-thick slab casting machine |
-
2013
- 2013-03-15 KR KR1020130027910A patent/KR101511723B1/en active IP Right Grant
-
2014
- 2014-03-14 EP EP14762821.8A patent/EP2974810B1/en active Active
- 2014-03-14 JP JP2015553667A patent/JP6055114B2/en active Active
- 2014-03-14 ES ES14762821.8T patent/ES2693560T3/en active Active
- 2014-03-14 TR TR2018/15354T patent/TR201815354T4/en unknown
- 2014-03-14 WO PCT/KR2014/002153 patent/WO2014142597A1/en active Application Filing
- 2014-03-14 US US14/776,797 patent/US20160023269A1/en not_active Abandoned
- 2014-03-14 CN CN201480010997.7A patent/CN105026073B/en active Active
- 2014-03-14 BR BR112015020565A patent/BR112015020565B1/en active IP Right Grant
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017137094A1 (en) * | 2016-02-12 | 2017-08-17 | Rotelec Sa | Apparatus and method for casting ingots |
Also Published As
Publication number | Publication date |
---|---|
WO2014142597A1 (en) | 2014-09-18 |
KR101511723B1 (en) | 2015-04-13 |
BR112015020565B1 (en) | 2020-02-04 |
JP2016503730A (en) | 2016-02-08 |
EP2974810B1 (en) | 2018-07-25 |
KR20140113040A (en) | 2014-09-24 |
JP6055114B2 (en) | 2016-12-27 |
TR201815354T4 (en) | 2018-11-21 |
CN105026073B (en) | 2018-02-23 |
BR112015020565A2 (en) | 2017-07-18 |
CN105026073A (en) | 2015-11-04 |
ES2693560T3 (en) | 2018-12-12 |
EP2974810A4 (en) | 2016-09-28 |
US20160023269A1 (en) | 2016-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2974810B1 (en) | Casting equipment and casting method using same | |
CN106457371B (en) | The semi-continuous casting of steel band | |
US9700936B2 (en) | Method and plant for the production of long ingots having a large cross-section | |
CN113426970B (en) | Vertical semi-continuous production device and production process of large round billets with phi of 1000 mm-2000 mm | |
JP2018526225A (en) | Vertical casting equipment and vertical casting method using the same | |
JP7043217B2 (en) | How to cast active metal | |
JP5741402B2 (en) | Continuous casting method for circular section slabs | |
KR101642905B1 (en) | Semi-continuous casting method of vettical type | |
CN107159860B (en) | Continuous casting machine | |
KR101254110B1 (en) | Continuous Casting Apparatus for Manufacturing Double-layered Metal Slab | |
JP5029324B2 (en) | Steel continuous casting method | |
JPH07144255A (en) | Vertical semicontinuous casting device for large cross section cast slab and carrying out method of cast slab | |
JP7087749B2 (en) | Continuous metal casting method | |
KR101565517B1 (en) | Casting apparatus | |
KR101261425B1 (en) | A controlling apparatus for container height and the method thereof | |
CN210188431U (en) | Progressive solidification forming device for large cast ingot or cast blank | |
KR20150103889A (en) | Casting method of slab | |
JP2651754B2 (en) | Continuous casting mold of multilayer slab | |
JP2001162352A (en) | Method of manufacturing small lot of steel slabs and apparatus thereof | |
KR20230109164A (en) | Casting control of in-mold large-scale steel ingots using inductively variable power and variable frequency | |
JPS61212457A (en) | Vertical type continuous casting installation for slab having large section | |
CN113523208A (en) | Composite continuous casting machine and production method thereof | |
JPS58187237A (en) | Production of large sized steel ingot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150723 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602014029182 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: B22D0011120000 Ipc: B22D0007000000 |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20160829 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B22D 7/00 20060101AFI20160823BHEP Ipc: B22D 11/115 20060101ALI20160823BHEP Ipc: B22D 11/128 20060101ALI20160823BHEP Ipc: B22D 11/041 20060101ALI20160823BHEP Ipc: B22D 9/00 20060101ALI20160823BHEP Ipc: B22D 11/12 20060101ALI20160823BHEP Ipc: B22D 11/14 20060101ALI20160823BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20170530 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20180131 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1021220 Country of ref document: AT Kind code of ref document: T Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014029182 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180725 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2693560 Country of ref document: ES Kind code of ref document: T3 Effective date: 20181212 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181025 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181025 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181125 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181026 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602014029182 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
26 | Opposition filed |
Opponent name: DANIELI & C. OFFICINE MECCANICHE SPA Effective date: 20190424 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190314 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190314 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181125 Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190314 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1021220 Country of ref document: AT Kind code of ref document: T Effective date: 20180725 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140314 |
|
APBM | Appeal reference recorded |
Free format text: ORIGINAL CODE: EPIDOSNREFNO |
|
APBP | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2O |
|
APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
APAW | Appeal reference deleted |
Free format text: ORIGINAL CODE: EPIDOSDREFNO |
|
APBQ | Date of receipt of statement of grounds of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA3O |
|
APBQ | Date of receipt of statement of grounds of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA3O |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180725 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602014029182 Country of ref document: DE Owner name: POSCO CO., LTD, POHANG-SI, KR Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR Ref country code: DE Ref legal event code: R081 Ref document number: 602014029182 Country of ref document: DE Owner name: POSCO CO., LTD, POHANG- SI, KR Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR Ref country code: DE Ref legal event code: R081 Ref document number: 602014029182 Country of ref document: DE Owner name: POSCO HOLDINGS INC., KR Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20221027 AND 20221102 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: POSCO HOLDINGS INC. Effective date: 20230303 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: PC Ref document number: 1021220 Country of ref document: AT Kind code of ref document: T Owner name: POSCO CO., LTD, KR Effective date: 20230228 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602014029182 Country of ref document: DE Owner name: POSCO CO., LTD, POHANG-SI, KR Free format text: FORMER OWNER: POSCO HOLDINGS INC., SEOUL, KR Ref country code: DE Ref legal event code: R081 Ref document number: 602014029182 Country of ref document: DE Owner name: POSCO CO., LTD, POHANG- SI, KR Free format text: FORMER OWNER: POSCO HOLDINGS INC., SEOUL, KR |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20231222 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240105 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20231220 Year of fee payment: 11 Ref country code: GB Payment date: 20240105 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20240110 Year of fee payment: 11 Ref country code: IT Payment date: 20231220 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240411 Year of fee payment: 11 |
|
APBU | Appeal procedure closed |
Free format text: ORIGINAL CODE: EPIDOSNNOA9O |