CN202270944U - Extra-thick slab casting machine - Google Patents

Extra-thick slab casting machine Download PDF

Info

Publication number
CN202270944U
CN202270944U CN2011203747066U CN201120374706U CN202270944U CN 202270944 U CN202270944 U CN 202270944U CN 2011203747066 U CN2011203747066 U CN 2011203747066U CN 201120374706 U CN201120374706 U CN 201120374706U CN 202270944 U CN202270944 U CN 202270944U
Authority
CN
China
Prior art keywords
roller
way
strand
tundish
blank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203747066U
Other languages
Chinese (zh)
Inventor
幸伟
马春武
徐永斌
邵远敬
叶理德
李智
杜斌
卢志文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN2011203747066U priority Critical patent/CN202270944U/en
Application granted granted Critical
Publication of CN202270944U publication Critical patent/CN202270944U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Continuous Casting (AREA)

Abstract

The utility model relates to an extra-thick slab casting process and a continuous casting machine. An extra-thick slab is produced through a vertical casting machine employing a continuous casting method, the problem that a casting blank is too thick to be bent and straightened is solved, the production flow is shortened, the production efficiency is improved, and the production cost is reduced. Meanwhile, due to the adoption of the vertical casting machine, bending and straightening deformation is absent, nonmetallic impurities in liquid steel float upwards easily, and the cleanness of the casting blank is improved. A continuous temperature measuring device and a tundish heating device are arranged in a tundish; the degree of superheat of the liquid steel in the tundish can be stably controlled at the temperature of between 10 and 30 DEG C; and undercooling or overheating pouring is avoided under the condition of low drawing speed. A solidification tail end of the casting blank and a dummy bar are subjected to a soft reduction process, and the problems of center segregation and center porosity in the casting blank are solved. Due to the adoption of modes of vertical cutting and inclined ejection, the casting blank and the dummy bar are reliably output and fed.

Description

A kind of extra-thick plate blank conticaster
Technical field
The utility model relates to the above extra-thick plate blank conticaster in extra-thick plate blank continuous casting technology field, particularly thickness 400mm.
Background technology
Along with market is also increasing to the demand of slab and special heavy plate, slab and special heavy plate have been widely used in fields such as shipbuilding, pressure vessel, boiler, offshore drilling platform, petroleum and natural gas pipeline, nuclear power station, large bridge, mould at present.At present, produce slab and special heavy plate blank and mainly still adopt die casting method., be raw material basically all for example, adopt the production method of two pyrogene materials, obtain enough compression ratios to guarantee steel plate with the large steel ingot for the steel plate more than the 100mm.When but die casting was produced, owing to adopt steel ingot to cool off naturally, setting time was long, and there are mass defects such as shrinkage cavity, micro-pore, V-type segregation or reverse V-shaped segregation simultaneously in production link many (two pyrogene materials).Therefore the special heavy plate die casting is produced and is existed production efficiency low, and energy consumption is big, and the low and quality of lumber recovery remains problems such as further improvement.
And continuous casting is more suitable for producing special heavy plate from shortening production procedure, the angle of enhancing productivity, save energy and reduce the cost.But traditional continuous casting also is difficult to produce the high-quality super-thick steel plate at present owing to influenced by pourable size restriction and center segregation, micro-pore, middle qualitative factor such as loose.Therefore, how to come production high-quality special heavy plate with the method for continuous casting is the focus of continuous casting worker research always.The large extra thick plate blank of thickness 400~800mm particularly; Because the strand dimensions is big, conventional at present straight arc casting machine does not also possess corresponding bending straightening equipment, adopts straight arc casting machine simultaneously; Straight section short and band liquid chip bending and aligning are difficult to guarantee slab quality.And adopt the vertical bending type casting machine to have the strand bending difficulty after solidifying entirely, be easy to generate surface and internal soundness defective.
Summary of the invention
The technical problem that the utility model will solve is: overcome above-mentioned technological deficiency and a kind of extra-thick plate blank conticaster is provided, effectively improve the quality of production, and can shorten production procedure, enhance productivity, thereby reduce production costs.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is:
A kind of extra-thick plate blank conticaster; It is characterized in that said casting machine is vertical, mainly comprise ladle, tundish, crystallizer, electromagnetic mixing apparatus, mould vibration device, nip rolls, cooling water nozzle, light screwdown gear, top pinch roll device, bottom pinch roll device, connect base dolly, first tumble roller-way, flame cutting machine, tiltedly pull out blank roller way, second tumble roller-way, go out blank roller way and dummy bar; The long nozzle of ladle below is connected with tundish, and tundish is communicated with the crystallizer of below through submersed nozzle, and crystallizer arranged outside electromagnetic mixing apparatus, mould vibration device are arranged at below, crystallizer bottom; Dummy bar adopts the dress formula that goes up; A plurality of folder rods are formed vertical guide section along vertical, and are positioned at the mould vibration device below, and it is descending to drive strand according to the setting pulling rate; A plurality of cooling water nozzles evenly are arranged at intervals at and respectively press from both sides between the rod, vertically form secondary cooling zone along vertical guide section; At two cold-zone ends the light screwdown gear of roll-type is set; The top pinch roll device of spaced and parallel is set below vertical guide section, and is used for the strand after the clamping cutting and the descending below of delivering to of strand connect the bottom pinch roll device on the base dolly; Up and down between the pinch roll apparatus, top pinch roll device below is provided with can be along the flame cutting machine of throwing direction back and forth movement, the cut direction of flame cutting machine is vertical with the strand down direction; First tumble roller-way original position vertically be positioned at the bottom pinch roll device below, with first tumble roller-way be provided with becoming the inclination angle toward the top tiltedly pull out blank roller way, tiltedly pull out the blank roller way upper end and dock through hinged rotation and second roller-way of tumbling; Second tumble roller-way horizontal tilted position horizontally disposedly go out blank roller way and dock with peripheral; Connect the base dolly along the operation of each roller-way, connect the base dolly and be provided with and pinch and driven roller.
Be provided with continuous temperature measurement device and heater in the described tundish.
Described light screwdown gear is for adopting the light screwdown gear of dynamically gently depressing of roll-type.
Described secondary cooling zone adopts the dynamic water allocation system.
Dark 25~the 40m of the foundation pit of said casting machine.
Adopt above-mentioned conticaster to produce extra-thick plate blank, mainly may further comprise the steps through the method for continuous pouring:
After the molten steel process double refining stove refining that step 1, converter are produced, the ladle that the good molten steel of refining is housed is transported to panoramic table, after panoramic table turns to pouring position, with the long nozzle injection tundish of molten steel through ladle bottom; The tundish molten steel is injected into molten steel in the crystallizer by submersed nozzle and goes;
Step 2, molten steel solidify in crystallizer and form the base shell, outside crystallizer, use electromagnetic mixing apparatus that molten steel is stirred; After the shell thickness of crystallizer hypomere exit strand is 10~20mm, opens mould vibration device and start driving roller-way throwing simultaneously; Make the strand of band liquid core get into vertical guide section, strand is walking downwards on one side, in secondary cooling zone continue to solidify on one side, carry out electromagnetic agitation simultaneously;
Dress formula dummy bar in step 3, the employing before the cast, is put into dummy bar, with the crystallizer bottom lock from the crystallizer top; In the casting process, to drive strand descending according to setting pulling rate through driven roller control strand, after dummy bar and strand disengagement, by the roller-way of tumbling dummy bar sent into and tiltedly pulled out the dummy bar storing place that ground was pulled out and be placed on to blank roller way; Adopt the light screwdown gear of roll-type dynamically gently to depress to improve the strand center segregation simultaneously at casting blank solidification end.
Step 4, strand connecing on the base dolly below descending the delivering in vertical cutting back are carried out secondary cut after the dolly roller-way is transported to the periphery.
In the above-mentioned steps four, treat that strand solidifies the back fully and carries out vertical cutting with flame cutting machine, the cut direction of flame cutting machine is vertical with the strand direction of travel, simultaneously can be along throwing direction back and forth movement; Strand after the cutting is through the clamping of bottom pinch roll device; According to command speed descending deliver to the below connect on the base dolly; Connect the base dolly and be provided with and pinch and driven roller, after strand arrives and connects the base dolly, then along with vertical first roller-way of tumbling fascinates; Inclination becomes certain inclination angle with vertical direction gradually along clockwise direction; When first tumble roller-way with tiltedly pull out blank roller way to after connecting, strand moves upward through the traction stay cord, arrives second and tumbles on the roller-way along tiltedly pulling out blank roller way; Make strand along with second roller-way of tumbling moves to level along clockwise direction through fulcrum rotation, then with strand deliver to second tumble that the roller-way level docks go out to carry out secondary cut on the blank roller way.
In the above-mentioned steps one, be provided with continuous temperature measurement device and heater in the tundish and be controlled at 10~30 ℃ with superheat of liquid steel in the tundish is stable.
In the above-mentioned steps two, pulling rate is controlled at 0.05~0.8m/min.
In the above-mentioned steps two, pulling rate is controlled at 0.05~0.08m/min or 0.08~0.2m/min or 0.1~0.2m/min or 0.2~0.3m/min, perhaps 0.5~0.8m/min.
In above-mentioned each step, described secondary cooling zone adopts the dynamic water allocation system that each nozzle is supplied water.
The utlity model has following characteristics:
Select for use the vertical casting machine to adopt the method for continuous casting to produce extra-thick plate blank, it is blocked up and problem that can't bending straightening shortens production procedure simultaneously to have solved strand, enhances productivity, and has reduced production cost; Simultaneously, owing to adopt vertical casting machine not have the bending straightening distortion, can avoid the generation of internal fissure, the slab top margin does not have field trash yet to be assembled, and also helps the come-up of non-metallic inclusion in the molten steel, improves the strand cleannes.
Be provided with continuous temperature measurement device and tundish heater in the tundish; Can control that molten steel overheat is stable in the tundish is controlled at 10-30 ℃; Under low pulling rate condition (0.08~0.8m/min), avoided cold or crossed hot pouring, guaranteed that extra-thick plate blank has good internal soundness.
Casting blank solidification end is implemented dynamically gently to depress, solved quality problems such as the inner center segregation of strand, center porosity.
To vertical casting machine, adopt vertical cutting and tiltedly pulled out the mode of base, guarantee the output of strand and send into, guaranteed the direct motion of producing, and production efficiency is provided.
Description of drawings
Fig. 1 is the structural representation of an embodiment of the utility model.
Each Reference numeral is corresponding as follows among the figure: ladle 1, continuous temperature measurement device 2, heater 3, tundish 4, crystallizer 5, electromagnetic mixing apparatus 6, mould vibration device 7, nip rolls 8, cooling water nozzle 9, gently screwdown gear 10, top pinch roll device 11, bottom pinch roll device 12, connect base dolly 13, first tumble roller-way 14, flame cutting machine 15, tiltedly pull out blank roller way 16, second tumble roller-way 17, go out blank roller way 18.
The specific embodiment
Below in conjunction with embodiment the utility model is described further, but does not limit the utility model.
The extra-thick plate blank conticaster of the utility model; It is characterized in that said casting machine is vertical, mainly comprise ladle 1, tundish 4, crystallizer, electromagnetic mixing apparatus 6, mould vibration device 7, nip rolls 8, cooling water nozzle 9, light screwdown gear 10, top pinch roll device 11, bottom pinch roll device 12, connect base dolly 13, first tumble roller-way 14, flame cutting machine 15, tiltedly pull out blank roller way 16, second tumble roller-way 17, go out blank roller way 18; The long nozzle of ladle below is connected with tundish, and tundish is communicated with the crystallizer of below through submersed nozzle, and crystallizer arranged outside electromagnetic mixing apparatus 6, mould vibration device 7 are arranged at below, crystallizer bottom; The vertical guide section that a plurality of folder rods 8 are formed is positioned at mould vibration device 7 belows; Evenly at interval a plurality of cooling water nozzles 9 are set, and each nozzle vertically forms secondary cooling zone along vertical guide section between each folder rod; At two cold-zone ends the light screwdown gear 10 of roll-type is set; Top pinch roll device 11 is set below vertical guide section; Top pinch roll device 11 belows are provided with can be along the flame cutting machine 15 of throwing direction back and forth movement; Top pinch roll device 11 down interval is provided with the bottom pinch roll device 12 corresponding with it, bottom pinch roll device 12 be used for the strand after the clamping cutting and strand delivered to according to command speed is descending below connect the base dolly; First roller-way 14 of tumbling vertically is positioned at the below of bottom pinch roll device 12; With the 14 one-tenth inclination angles of roller-way of tumbling in first of original position be provided with toward above tiltedly pull out blank roller way 16, tiltedly pull out blank roller way 16 upper ends and dock through hinged rotation and second of the original position roller-way 17 of tumbling; Second tumbles, and horizontal level and the casting machine of roller-way 17 is peripheral horizontally disposedly goes out blank roller way 18 and dock; Connect base dolly 13 along each roller-way 14 operation.
Be provided with continuous temperature measurement device 2 and heater 3 in the described tundish 4.
The cut direction of flame cutting machine 15 is vertical with the strand direction of travel.
Described light screwdown gear adopts dynamically gently to be depressed.
Connecing base dolly 13 is provided with and pinches and driven roller.
Described secondary cooling zone adopts the dynamic water allocation system.
Dark 25~the 40m of the foundation pit of said casting machine.
Concrete continuous casting process is referring to following specific embodiment:
Embodiment 1:
It is the extra-thick plate blank of 2000 * 600mm that the continuous casting process of present embodiment is implemented the production cross dimensions, and kind is a DH40 production platform steel.From converter come out 100~200t molten steel through the refining of double refining stove after, the ladle that the good molten steel of refining is housed is transported to panoramic table, after panoramic table turns to pouring position, inject ladle 1, molten steel injects tundish 4 through the long nozzle of ladle 1 bottom.The extra-thick plate blank continuous casting adopts vertical casting machine, and the dark 25~40m of the foundation pit of casting machine because the pulling rate of extra-thick plate blank continuous casting is lower, is provided with continuous temperature measurement device 2 and heater 3 in the tundish 4, and superheat of liquid steel is stabilized in 10~30 ℃ in the control tundish 4.
After submersed nozzle and crystallizer centering installed; Molten steel injects the water mold 5 by the dummy bar shutoff after opening stopper; Molten steel solidifies gradually along crystallizer 5 inner peripheral wall and forms the base shell, outside crystallizer 5, uses 6 pairs of molten steel of electromagnetic mixing apparatus to stir.After the base shell of crystallizer 5 hypomere exit strands has certain thickness, to open mould vibration device 7 and start driving roller-way throwing simultaneously, pulling rate is controlled at 0.1~0.2m/min or 0.2~0.3m/min or 0.1~0.3m/min.Make the strand of band liquid core get into the vertical guide section that a plurality of folder rods 8 are formed; Strand is walking downwards on one side; The atomized water that a plurality of cooling water nozzle 9 nozzles that evenly are provided with at interval along guide section spray in secondary cooling zone is on one side forced to continue to solidify in the cooling procedure; Adopt the dynamic water allocation system in two cold-zones, carry out two cold-zone electromagnetic agitation simultaneously.
Itself and strand are thrown off after stretching out top pinch roll device 11 when dummy bar is descending, dummy bar is sent into tiltedly pulled out the dummy bar storing place that ground was pulled out and be placed on to blank roller way 16 by first roller-way 14 of tumbling; Adopt light screwdown gear 10 dynamically gently to depress, to improve the strand center segregation at casting blank solidification end.
Treat that strand solidifies the back fully and cuts with flame cutting machine 15, flame cutting machine keeps identical speeds with the strand pulling rate along the throwing direction, and cut direction is vertical with the strand down direction, and cutting is returned after accomplishing; Strand after the cutting is through 12 clampings of bottom pinch roll device; According to command speed descending deliver to the below connect on the base dolly 13; Connect base dolly 13 and be provided with and pinch and driven roller, after strand arrives and connects base dolly 13, then along with vertical first of the original position roller-way 14 of tumbling that is positioned at fascinates; Inclination becomes certain inclination angle with vertical direction gradually along clockwise direction; When first the tumble roller-way 14 arrives tilted position and tiltedly pulls out after 16 pairs of blank roller ways connect, strand moves upward through the traction stay cord, arrives and is positioned at second of original position and tumbles on the roller-way 17 along tiltedly pulling out blank roller way 16; Through fulcrum rotation make strand along with second tumble roller-way 17 move to along clockwise direction second tumble roller-way 17 levels tilted position, then with strand deliver to second tumble that roller-way 17 levels dock go out to carry out secondary cut on the blank roller way 18.
Embodiment 2:
It is the extra-thick plate blank of 2100 * 700mm that the continuous casting process of present embodiment is implemented the production cross dimensions, and kind is the 16MnR tank plate.From converter come out 180~250t molten steel through the refining of double refining stove after, the ladle that the good molten steel of refining is housed is transported to panoramic table, after panoramic table turns to pouring position, inject ladle 1, molten steel injects tundish 4 through the long nozzle of ladle 1 bottom.The extra-thick plate blank continuous casting adopts vertical casting machine, and the dark 25~40m of the foundation pit of casting machine because the pulling rate of extra-thick plate blank continuous casting is lower, is provided with continuous temperature measurement device 2 and heater 3 in the tundish, controls the interior superheat of liquid steel of tundish at 10~30 ℃.
After submersed nozzle and crystallizer centering installed; Molten steel injects the water mold 5 by the dummy bar shutoff after opening stopper; Molten steel solidifies gradually along crystallizer 5 inner peripheral wall and forms the base shell, outside crystallizer 5, uses 6 pairs of molten steel of electromagnetic mixing apparatus to stir.After the base shell of crystallizer 5 hypomere exit strands has certain thickness, to open mould vibration device 7 and start driving roller-way throwing simultaneously, pulling rate is controlled at 0.08~0.2m/min or 0.05~0.08m/min or 0.1~0.2m/min.Make the strand of band liquid core get into the vertical guide section that a plurality of folder rods 8 are formed; Strand is walking downwards on one side; The atomized water that a plurality of cooling water nozzle 9 nozzles that evenly are provided with at interval along guide section spray in secondary cooling zone is on one side forced to continue to solidify in the cooling procedure; Adopt the dynamic water allocation system in two cold-zones, carry out two cold-zone electromagnetic agitation simultaneously.
Itself and strand are thrown off after stretching out top pinch roll device 11 when dummy bar is descending, adopt light screwdown gear 10 dynamically gently to depress at casting blank solidification end, will be to improve the strand center segregation; Dummy bar is sent into tiltedly pulled out the dummy bar storing place that ground was pulled out and be placed on to blank roller way 16 by first roller-way 14 of tumbling.
Treat that strand solidifies the back fully and cuts with flame cutting machine 15, flame cutting machine 15 keeps identical speeds with the strand pulling rate along the throwing direction, and cut direction is vertical with the strand down direction, and cutting is returned after accomplishing; Strand after the cutting is through 12 clampings of bottom pinch roll device; According to command speed descending deliver to the below connect on the base dolly 13; Connect base dolly 13 and be provided with and pinch and driven roller, after strand arrives and connects base dolly 13, then along with vertical first roller-way 14 of tumbling fascinates; Inclination becomes certain inclination angle with vertical direction gradually along clockwise direction; When first tumble roller-way 14 with tiltedly pull out after 16 pairs of blank roller ways connect, strand moves upward through the traction stay cord, arrives second and tumbles on the roller-way 17 by tiltedly pulling out blank roller way 16; Make strand along with second roller-way 17 of tumbling moves to level along clockwise direction through fulcrum rotation, then with strand deliver to second tumble that roller-way 17 levels dock go out to carry out secondary cut on the blank roller way 18.
By on can find out that select for use vertical casting machine to adopt the method for continuous casting and produce extra-thick plate blank, it is blocked up and problem that can't bending straightening shortens production procedure simultaneously to have solved strand, enhances productivity, and has reduced production cost; Simultaneously, owing to adopt vertical casting machine not have the bending straightening distortion, can avoid the generation of internal fissure, the slab top margin does not have field trash yet to be assembled, and also helps the come-up of non-metallic inclusion in the molten steel, improves the strand cleannes.
Be provided with continuous temperature measurement device and tundish heater in the vertical casting machine tundish; Can control that molten steel overheat is stable in the tundish is controlled at 10-30 ℃; (under 0.08~0.8m/min) condition, avoided cold or crossed hot pouring, guaranteed that extra-thick plate blank had good internal soundness at low pulling rate.
Vertical casting machine implements gently to depress technology to casting blank solidification end and dummy bar, solved quality problems such as the inner center segregation of strand, center porosity.
The above disclosed preferred embodiment that is merely the utility model; Certainly can not limit the interest field of the utility model with this; Therefore the equivalence of being done according to the utility model claim changes, the protection domain that still belongs to the utility model like change that technological parameter or device are made and improvement.

Claims (5)

1. extra-thick plate blank conticaster; It is characterized in that said casting machine is vertical, mainly comprise ladle, tundish, crystallizer, electromagnetic mixing apparatus, mould vibration device, nip rolls, cooling water nozzle, light screwdown gear, top pinch roll device, bottom pinch roll device, connect base dolly, first tumble roller-way, flame cutting machine, tiltedly pull out blank roller way, second tumble roller-way, go out blank roller way and dummy bar; The long nozzle of ladle below is connected with tundish, and tundish is communicated with the crystallizer of below through submersed nozzle, and crystallizer arranged outside electromagnetic mixing apparatus, mould vibration device are arranged at below, crystallizer bottom; Dummy bar adopts the dress formula that goes up; A plurality of folder rods are formed vertical guide section along vertical, and are positioned at the mould vibration device below, and it is descending to drive strand according to the setting pulling rate; A plurality of cooling water nozzles evenly are arranged at intervals at and respectively press from both sides between the rod, vertically form secondary cooling zone along vertical guide section; At two cold-zone ends the light screwdown gear of roll-type is set; The top pinch roll device of spaced and parallel is set below vertical guide section, and is used for the strand after the clamping cutting and the descending below of delivering to of strand connect the bottom pinch roll device on the base dolly; Up and down between the pinch roll apparatus, top pinch roll device below is provided with can be along the flame cutting machine of throwing direction back and forth movement, the cut direction of flame cutting machine is vertical with the strand down direction; First tumble roller-way original position vertically be positioned at the bottom pinch roll device below, with first tumble roller-way be provided with becoming the inclination angle toward the top tiltedly pull out blank roller way, tiltedly pull out the blank roller way upper end and dock through hinged rotation and second roller-way of tumbling; Second tumble roller-way horizontal tilted position horizontally disposedly go out blank roller way and dock with peripheral; Connect the base dolly along the operation of each roller-way, connect the base dolly and be provided with and pinch and driven roller.
2. conticaster according to claim 1 is characterized in that being provided with in the described tundish continuous temperature measurement device and heater.
3. conticaster according to claim 1 and 2 is characterized in that described light screwdown gear is for adopting the light screwdown gear of dynamically gently depressing of roll-type.
4. conticaster according to claim 3 is characterized in that described secondary cooling zone adopts the water system that can carry out dynamic water allocation to each nozzle.
5. according to claim 1 or 2 or 4 described conticasters, it is characterized in that the dark 25~40m of foundation pit of said casting machine.
CN2011203747066U 2011-09-30 2011-09-30 Extra-thick slab casting machine Expired - Lifetime CN202270944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203747066U CN202270944U (en) 2011-09-30 2011-09-30 Extra-thick slab casting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203747066U CN202270944U (en) 2011-09-30 2011-09-30 Extra-thick slab casting machine

Publications (1)

Publication Number Publication Date
CN202270944U true CN202270944U (en) 2012-06-13

Family

ID=46191330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203747066U Expired - Lifetime CN202270944U (en) 2011-09-30 2011-09-30 Extra-thick slab casting machine

Country Status (1)

Country Link
CN (1) CN202270944U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303102A (en) * 2011-09-30 2012-01-04 中冶南方工程技术有限公司 Continuous casting process and continuous casting machine for extra-thick plate blank
CN104226950A (en) * 2014-09-04 2014-12-24 广州中国科学院工业技术研究院 Continuous casting blank edge shaping method and device
CN105026073A (en) * 2013-03-15 2015-11-04 株式会社Posco Casting equipment and casting method using same
CN105598399A (en) * 2016-01-26 2016-05-25 中国重型机械研究院股份公司 Production method of ultra-thickness casting blank
CN107214313A (en) * 2017-05-26 2017-09-29 响水恒生不锈钢铸造有限公司 A kind of continuous casting producing method for reducing steel billet lobe
CN107876718A (en) * 2017-11-20 2018-04-06 辽宁科技大学 For simulating the experimental provision and experimental method of special heavy plate slow-set
CN112355262A (en) * 2020-11-09 2021-02-12 湖南工程学院 Control device for slab continuous casting dynamic soft reduction
CN113426970A (en) * 2021-06-11 2021-09-24 一重集团大连工程技术有限公司 Vertical semi-continuous production device and production process of large round billets with phi of 1000 mm-2000 mm

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303102A (en) * 2011-09-30 2012-01-04 中冶南方工程技术有限公司 Continuous casting process and continuous casting machine for extra-thick plate blank
CN105026073A (en) * 2013-03-15 2015-11-04 株式会社Posco Casting equipment and casting method using same
CN105026073B (en) * 2013-03-15 2018-02-23 株式会社Posco Casting Equipment and the casting method using the Casting Equipment
CN104226950A (en) * 2014-09-04 2014-12-24 广州中国科学院工业技术研究院 Continuous casting blank edge shaping method and device
CN105598399A (en) * 2016-01-26 2016-05-25 中国重型机械研究院股份公司 Production method of ultra-thickness casting blank
CN107214313A (en) * 2017-05-26 2017-09-29 响水恒生不锈钢铸造有限公司 A kind of continuous casting producing method for reducing steel billet lobe
CN107876718A (en) * 2017-11-20 2018-04-06 辽宁科技大学 For simulating the experimental provision and experimental method of special heavy plate slow-set
CN112355262A (en) * 2020-11-09 2021-02-12 湖南工程学院 Control device for slab continuous casting dynamic soft reduction
CN113426970A (en) * 2021-06-11 2021-09-24 一重集团大连工程技术有限公司 Vertical semi-continuous production device and production process of large round billets with phi of 1000 mm-2000 mm

Similar Documents

Publication Publication Date Title
CN102303102B (en) Continuous casting process and continuous casting machine for extra-thick plate blank
CN202270944U (en) Extra-thick slab casting machine
CN100560250C (en) On the circular-arc type continuous casting machine of R12~14m, produce the continuous casting process of super large standard round billet
CN104259415A (en) Continuous casting method of continuous-cast round billets
CN109663892B (en) Progressive solidification forming device for large cast ingot or casting blank
CN104399929A (en) Method for reducing longitudinal division of weather-proof steel continuously cast slab
CN104259413A (en) Continuous casting system and process producing large-specification elliptical billets
CN102896285B (en) A kind of thin strap continuous casting casting method and device
KR20150048202A (en) Method and device for continuous thin strip casting
CN101219464A (en) Continuous casting crystallizer capable of controlling liquid level flow field and wave motion
CN101433948B (en) Round billet continuous casting machine with especially big sectional plane
CN102672121B (en) Production method for continuous casting of vertical tube blanks
CN102303104A (en) Method for controlling narrow side bulging in continuous casting of ultra-thick plate blanks
CN112743053B (en) Crystallizer for solving peritectic steel continuous casting slab surface cracks and control method
CN201353635Y (en) Round billet conticaster with extra large section
CN103464705A (en) Electromagnetic flow control method for slowing fluctuation of liquid level of crystallizer
CN201304475Y (en) Continuous casting device for producing round billet with diameter being more than or equal to Phi 800 mm on straight-form conticaster
CN104480380B (en) A kind of moulding process being applicable to prepare water-cooling metal centrifugal ductile iron pipe
CN208322024U (en) Vertical continuous casting production equipment for ultra-large round billets
CN201644735U (en) Submerged nozzle provided with lead-in device for square billet continuous casting crystallizer
CN103691902A (en) Device and process for centrifugal continuous casting of metal
CN202571226U (en) Production mechanism for hollow billet continuous casting
CN102806330B (en) Method for improving inner quality of continuous casting billet with thick and large section
CN205254067U (en) Accuse temperature conticaster device
CN108436046A (en) Vertical continuous casting production equipment and method for ultra-large round billets

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120613

Effective date of abandoning: 20130918

AV01 Patent right actively abandoned

Granted publication date: 20120613

Effective date of abandoning: 20130918

RGAV Abandon patent right to avoid regrant