Production method for continuous casting of vertical tube blanks Download PDF

Info

Publication number
CN102672121B
CN102672121B CN201210124034.2A CN201210124034A CN102672121B CN 102672121 B CN102672121 B CN 102672121B CN 201210124034 A CN201210124034 A CN 201210124034A CN 102672121 B CN102672121 B CN 102672121B
Authority
CN
China
Prior art keywords
crystallizer
molten steel
hollow bloom
dummy bar
tundish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210124034.2A
Other languages
Chinese (zh)
Other versions
CN102672121A (en
Inventor
谢东钢
王西林
周士凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Heavy Machinery Research Institute Co Ltd
Original Assignee
China National Heavy Machinery Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Heavy Machinery Research Institute Co Ltd filed Critical China National Heavy Machinery Research Institute Co Ltd
Priority to CN201210124034.2A priority Critical patent/CN102672121B/en
Publication of CN102672121A publication Critical patent/CN102672121A/en
Application granted granted Critical
Publication of CN102672121B publication Critical patent/CN102672121B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

The invention discloses a production method for continuous casting of vertical tube blanks. The method comprises the following steps: pouring molten steel in a steel ladle into a middle ladle, transferring to a crystallizer, and cooling the molten steel in the crystallizer to form a hollow tube blank with a certain blank wall thickness; when the molten steel in the crystallizer reaches a certain level, starting a vibrator and starting a support roller device, driving the support roller device to pull a dummy bar to move down, and driving the dummy bar to pull down and pull out the hollow tube blank; and driving a cutting machine to cut the hollow tube blank according to needs, and driving an oblique discharge system to discharge the tube blanks. The production method achieves the purpose of continuous casting of hollow tube blanks, reduces the production cost, saves resources and increases the yield, and fills in the blank of the technology at home and abroad.

Description

A kind of production method of vertical pipe continuous casting
Technical field
The present invention relates to metallurgical technology field, particularly a kind of production method of vertical pipe continuous casting.
Background technology
At present, also there is no to produce continuously the conticaster of hollow bloom both at home and abroad.The mode of production of tradition pipe has the solid and hollow bloom of die casting, continuous casting square billet and the solid pipe of circle base, centrifugally cast pipe and pipe.Need be to solid heating of pipe blank, perforation with solid pipe rolling seamless steel pipe.Die casting hollow bloom and its mode of production of centrifugal casting pipe all can not be produced hollow bloom continuously, and its production cost is high, wastes energy, and yields poorly.
Summary of the invention
In order to overcome the defect of prior art, the object of the present invention is to provide a kind of production method of vertical pipe continuous casting, can produce continuously hollow bloom, reduce production costs, economize on resources, improve output.
In order to achieve the above object, the technical solution that the present invention adopts is:
A production method for vertical pipe continuous casting, comprises the following steps:
Step 1, connection device: steel ladle 1 is connected with tundish 3 by long nozzle 2, molten steel induction heating apparatus 12 is installed on tundish 3, tundish 3 is connected with the crystallizer 5 of cored bar tubular type by two submersed nozzles 4, submersed nozzle inserts in crystallizer, submersed nozzle tapping hole is apart from crystallizer 200mm~250mm suitable for reading, crystallizer 5 be externally connected to vibrating device 6, the below of crystallizer 5 is vertically installed with secondary cooling zone group 8, in the roll gap of secondary cooling zone group 8, be installed with dummy bar 7, the head of dummy bar 7 inserts in crystallizer 5, support roller device 9 clamps the bottom of dummy bar 7,
Step 2, fill molten steel steel ladle 1 by long nozzle 2; Molten steel is injected in tundish 3; The molten steel induction heating apparatus 12 of tundish 3, to its heating, ensures that molten steel overheat is 10 ℃~50 ℃, and the time of staying of molten steel in tundish is within 10~15 minutes, to make inclusion floating in molten steel; By submersed nozzle 4, be injected in crystallizer 5, molten steel is the hollow bloom with liquid core in the interior cooling formation of crystallizer 5;
Step 3, the molten steel in crystallizer 5 are during apart from the about 100mm in copper plate of crystallizer top, vibrating device 6 and support roller device 9 start simultaneously, vibrating device 6 vibrates by sine or non-sinusoidal cuve together with crystallizer 5, and its frequency is that 40~240 beats/min, amplitude are ± 2~5mm; Support roller device 9 holder drawing spindle blades 7 and hollow bloom move downward, casting speed: 0.1~0.2mm/min; When band liquid core hollow bloom is drawn out after crystallizer 5, enter secondary cooling zone group 8,8 pairs of hollow blooms of secondary cooling zone group play a supportive role and the hollow bloom of using crystallizer band liquid core solidifies completely; When hollow bloom arrives cutting machine 10, cutting machine 10 starts to cut hollow bloom, after having cut, hollow bloom and dummy bar 7 depart from, and dummy bar 7 transports by oblique knockout system 11, cutting hollow bloom and transporting in the process of dummy bar 7, support roller device 9 is pushed down the downward throwing of hollow bloom always, and after reaching scale, cutting machine 10 cuts hollow bloom again, after having cut, hollow bloom transports by oblique knockout system.
Feature of the present invention is:
1. adopt vertical casting machine to produce continuously hollow bloom, output is high, cost is low, save the energy.
2. tundish 3 is established molten steel induction heating apparatus to control molten steel overheat purify hot metal, and two cover submersed nozzles 4 are arranged symmetrically with and make molten steel evenly smooth in crystallizer in crystallizer 5.
3. adopt the tube type mold 5 of cored bar to make pipe hollow in the interior formation of crystallizer 5.Can change plug according to required aperture, the inner water flowing of plug is cooling, is also provided with the cold gas pipeline of cooling pipe endoporus in plug, and plug skin is provided with self-lubricating material and prevents pipe inner casing and plug bonding.
4. adopt the online adjustable amplitude of hydraulic vibration device 6, frequency and angle of deviation, selection be applicable to cast model of vibration and the vibration parameters of pipe.
5. crystallizer 5 and secondary cooling zone 8 are equipped with curdled appearance and the solidified structure that electromagnetic agitation is improved pipe.
6. the online flame cutting machine technology of pipe is used in conjunction with.
Problem that can not continuous pouring hollow bloom before the invention solves, has reduced production cost, has economized on resources, improved output, has filled up the blank of domestic and international technique.
Accompanying drawing explanation
Fig. 1 is that vertical tube billet continuous casting machine-dummy bar 7 is at the interior schematic diagram of crystallizer 5.
Fig. 2 is the basket pouring schematic diagram with heater.
Fig. 3 is two submersed nozzle cast schematic diagrames.
Fig. 4 is that dummy bar 7 departs from schematic diagram with hollow bloom.
Fig. 5 is that cutting machine 10 is by scale cutting hollow bloom schematic diagram.
Specific implementation method
Below in conjunction with accompanying drawing, the present invention is described in further detail.
A production method for vertical pipe continuous casting, comprises the following steps:
Step 1, with reference to Fig. 1, 2, 3, first connection device: steel ladle 1 is connected with tundish 3 by long nozzle 2, molten steel induction heating apparatus 12 is installed on tundish 3, tundish 3 is connected with the crystallizer 5 of cored bar tubular type by two submersed nozzles 4, submersed nozzle inserts in crystallizer, submersed nozzle tapping hole is apart from crystallizer 200mm~250mm suitable for reading, crystallizer 5 be externally connected to vibrating device 6, the below of crystallizer 5 is vertically installed with secondary cooling zone group 8, in the roll gap of secondary cooling zone group 8, be installed with dummy bar 7, the head of dummy bar 7 inserts in crystallizer 5, support roller device 9 clamps the bottom of dummy bar 7,
Step 2, with reference to Fig. 4, fill the steel ladle 1 of molten steel by long nozzle 2; Molten steel is injected in tundish 3; The molten steel induction heating apparatus 12 of tundish 3, to its heating, ensures that molten steel overheat is 10 ℃~50 ℃, and the time of staying of molten steel in tundish is within 10~15 minutes, to make inclusion floating in molten steel; By submersed nozzle 4, be injected in crystallizer 5, molten steel is the hollow bloom with liquid core in the interior cooling formation of crystallizer 5;
Step 3, with reference to Fig. 5, molten steel in crystallizer 5 is during apart from the about 100mm in copper plate of crystallizer top, vibrating device 6 and support roller device 9 start simultaneously, and vibrating device 6 vibrates by sine or non-sinusoidal cuve together with crystallizer 5, and its frequency is that 40~240 beats/min, amplitude are ± 2~5mm; Support roller device 9 holder drawing spindle blades 7 and hollow bloom move downward, casting speed: 0.1~0.2mm/min; When band liquid core hollow bloom is drawn out after crystallizer 5, enter secondary cooling zone group 8,8 pairs of hollow blooms of secondary cooling zone group play a supportive role and the hollow bloom of using crystallizer band liquid core solidifies completely; When hollow bloom arrives cutting machine 10, cutting machine 10 starts to cut hollow bloom, after having cut, hollow bloom and dummy bar 7 depart from, and dummy bar 7 transports by oblique knockout system 11, cutting hollow bloom and transporting in the process of dummy bar 7, support roller device 9 is pushed down the downward throwing of hollow bloom always, and after reaching scale, cutting machine 10 cuts hollow bloom again, after having cut, hollow bloom transports by oblique knockout system.
Important technological parameters of the present invention
Pipe external diameter: Φ 800mm
Pipe internal diameter: Φ 300mm, Φ 400mm, Φ 500mm
Pipe scale: 5000~8000mm
Casting steel grade: Fine Steel Casting iron, steel alloy, pipe line steel, stainless steel etc.
Length of mould: 900mm
Casting machine metallurgical length :~6000mm
Casting machine annual production: 10~150,000 tons.

Claims (1)

1. a production method for vertical pipe continuous casting, is characterized in that, comprises the following steps:
Step 1, connection device: steel ladle (1) is connected with tundish (3) by long nozzle (2), molten steel induction heating apparatus (12) is installed on tundish (3), tundish (3) is connected with the crystallizer (5) of cored bar tubular type by two submersed nozzles (4), submersed nozzle inserts in crystallizer, submersed nozzle tapping hole is apart from crystallizer 200mm~250mm suitable for reading, crystallizer (5) be externally connected to vibrating device (6), the below of crystallizer (5) is vertically installed with secondary cooling zone group (8), in the roll gap of secondary cooling zone group (8), be installed with dummy bar (7), the head of dummy bar (7) inserts in crystallizer (5), support roller device (9) clamps the bottom of dummy bar (7),
Step 2, fill molten steel steel ladle (1) by long nozzle (2); Molten steel is injected in tundish (3); The molten steel induction heating apparatus (12) of tundish (3), to its heating, ensures that molten steel overheat is 10 ℃~50 ℃, and the time of staying of molten steel in tundish is within 10~15 minutes, to make inclusion floating in molten steel; By submersed nozzle (4), be injected in crystallizer (5), molten steel in crystallizer (5) cooling formation with the hollow bloom of liquid core;
Step 3, the molten steel in crystallizer (5) are during apart from the about 100mm in copper plate of crystallizer top, vibrating device (6) and support roller device (9) start simultaneously, vibrating device (6) vibrates by sine or non-sinusoidal cuve together with crystallizer (5), and its frequency is that 40~240 beats/min, amplitude are ± 2~5mm; Support roller device (9) holder drawing spindle blade (7) and hollow bloom move downward, casting speed: 0.1~0.2mm/min; When band liquid core hollow bloom is drawn out after crystallizer (5), enter secondary cooling zone group (8), secondary cooling zone group (8) plays a supportive role to hollow bloom and the hollow bloom of using crystallizer band liquid core solidifies completely; When hollow bloom arrives cutting machine (10), cutting machine (10) starts to cut hollow bloom, after having cut, hollow bloom and dummy bar (7) depart from, dummy bar (7) transports by oblique knockout system (11), cutting hollow bloom and transporting in the process of dummy bar (7), support roller device (9) is pushed down the downward throwing of hollow bloom always, after reaching scale, cutting machine (10) cuts hollow bloom again, after having cut, hollow bloom transports by oblique knockout system.
CN201210124034.2A 2012-04-25 2012-04-25 Production method for continuous casting of vertical tube blanks Expired - Fee Related CN102672121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210124034.2A CN102672121B (en) 2012-04-25 2012-04-25 Production method for continuous casting of vertical tube blanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210124034.2A CN102672121B (en) 2012-04-25 2012-04-25 Production method for continuous casting of vertical tube blanks

Publications (2)

Publication Number Publication Date
CN102672121A CN102672121A (en) 2012-09-19
CN102672121B true CN102672121B (en) 2014-11-05

Family

ID=46805044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210124034.2A Expired - Fee Related CN102672121B (en) 2012-04-25 2012-04-25 Production method for continuous casting of vertical tube blanks

Country Status (1)

Country Link
CN (1) CN102672121B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103567400A (en) * 2013-10-30 2014-02-12 芜湖新兴铸管有限责任公司 Continuous-casting slag-washing structure
CN105710325A (en) * 2016-04-14 2016-06-29 北京北冶功能材料有限公司 Vertical multi-strand vacuum high-temperature alloy continuous casting device and application method
CN110125348B (en) * 2019-04-29 2021-02-26 中冶南方连铸技术工程有限责任公司 Round billet continuous casting and drawing process method
CN110666115A (en) * 2019-11-04 2020-01-10 中冶京诚工程技术有限公司 Crystallizer and vertical hollow round billet continuous casting machine
CN114632917B (en) * 2022-03-18 2023-09-08 重庆钢铁股份有限公司 Method for online treatment of inner blank shell of crystallizer by continuous casting machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3150659A1 (en) * 1981-02-11 1982-09-02 Gerhard E. 44012 Avon Lake Ohio Schwarz Manufacturing method and apparatus for the continuous casting of round hollow billets with a rolling mandrel and an internal rolling method
SU1214316A1 (en) * 1984-07-27 1986-02-28 Научно-Исследовательский И Проектно-Технологический Институт Машиностроения Machine for continuous casting of hollow ingots
CN2887490Y (en) * 2006-01-10 2007-04-11 李铁铎 Vertical jointless steel tube hollow tube blank continuous casting machine
CN201308979Y (en) * 2008-06-19 2009-09-16 沈阳东方钢铁有限公司 Hollow round billet continuous caster
CN102303102A (en) * 2011-09-30 2012-01-04 中冶南方工程技术有限公司 Continuous casting process and continuous casting machine for extra-thick plate blank

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3150659A1 (en) * 1981-02-11 1982-09-02 Gerhard E. 44012 Avon Lake Ohio Schwarz Manufacturing method and apparatus for the continuous casting of round hollow billets with a rolling mandrel and an internal rolling method
SU1214316A1 (en) * 1984-07-27 1986-02-28 Научно-Исследовательский И Проектно-Технологический Институт Машиностроения Machine for continuous casting of hollow ingots
CN2887490Y (en) * 2006-01-10 2007-04-11 李铁铎 Vertical jointless steel tube hollow tube blank continuous casting machine
CN201308979Y (en) * 2008-06-19 2009-09-16 沈阳东方钢铁有限公司 Hollow round billet continuous caster
CN102303102A (en) * 2011-09-30 2012-01-04 中冶南方工程技术有限公司 Continuous casting process and continuous casting machine for extra-thick plate blank

Also Published As

Publication number Publication date
CN102672121A (en) 2012-09-19

Similar Documents

Publication Publication Date Title
CN102672121B (en) Production method for continuous casting of vertical tube blanks
CN102303102B (en) Continuous casting process and continuous casting machine for extra-thick plate blank
CN104070145A (en) Manufacturing tooling and efficient production method of large height-diameter ratio circular casting billet
CN202270944U (en) Extra-thick slab casting machine
CN102896285B (en) A kind of thin strap continuous casting casting method and device
CN101905298B (en) Device and method for manufacturing copper or copper alloy slab
CN104249149B (en) A kind of channel-type sensing heating tundish and its casting method
CN101433948B (en) Round billet continuous casting machine with especially big sectional plane
CN202571226U (en) Production mechanism for hollow billet continuous casting
CN205236991U (en) Prepare device of big high specification quality aluminum alloy ingot casting
CN110666115A (en) Crystallizer and vertical hollow round billet continuous casting machine
CN102527960A (en) Novel crystallizer for horizontal continuous casting
CN105983670B (en) A kind of compound method for intervening improvement Inner Quality of Billet
CN109894590A (en) A kind of continuous casting installation for casting and method of major diameter copper alloy tube
CN102672120A (en) Production device for continuous casting of vertical tube blanks
CN109692942A (en) Improve the device and method of vacuum downhill casting molding ingot quality using ultrasonic wave
CN201304475Y (en) Continuous casting device for producing round billet with diameter being more than or equal to Phi 800 mm on straight-form conticaster
CN102019391B (en) Steel pipe continuous casting equipment
CN201353635Y (en) Round billet conticaster with extra large section
CN103691902A (en) Device and process for centrifugal continuous casting of metal
CN208322024U (en) Vertical continuous casting production equipment for ultra-large round billets
CN108436046A (en) Vertical continuous casting production equipment and method for ultra-large round billets
CN101244450A (en) Method and apparatus for manufacturing hollow copper alloy casting ingot
CN202877498U (en) Continuous casting device of copper pipe for crystallizer
CN104722729A (en) Nucleus projection device and nucleus projection method for improvement in internal quality of continuous casting blanks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105