EP2718520B1 - Ensemble de fixation pour des éléments de tours en béton - Google Patents

Ensemble de fixation pour des éléments de tours en béton Download PDF

Info

Publication number
EP2718520B1
EP2718520B1 EP12727836.4A EP12727836A EP2718520B1 EP 2718520 B1 EP2718520 B1 EP 2718520B1 EP 12727836 A EP12727836 A EP 12727836A EP 2718520 B1 EP2718520 B1 EP 2718520B1
Authority
EP
European Patent Office
Prior art keywords
reinforcement
socket
section
passive
active
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP12727836.4A
Other languages
German (de)
English (en)
Other versions
EP2718520A2 (fr
Inventor
Miguel Ángel FERNÁNDEZ GÓMEZ
José Emilio JIMENO CHUECA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inneo Torres SL
Esteyco SAP
Original Assignee
Inneo Torres SL
Esteyco SAP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inneo Torres SL, Esteyco SAP filed Critical Inneo Torres SL
Publication of EP2718520A2 publication Critical patent/EP2718520A2/fr
Application granted granted Critical
Publication of EP2718520B1 publication Critical patent/EP2718520B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4114Elements with sockets
    • E04B1/4121Elements with sockets with internal threads or non-adjustable captive nuts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/16Prestressed structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Definitions

  • the present invention relates to a socket-projection fixing assembly, internally reinforced, for a horizontal wet joint between two cylindrical prefabricated concrete sections for a wind turbine tower, or between a cylindrical prefabricated concrete section and a concrete foundation for a wind turbine tower.
  • a socket-projection fixing assembly internally reinforced, for a horizontal wet joint between two cylindrical prefabricated concrete sections for a wind turbine tower, or between a cylindrical prefabricated concrete section and a concrete foundation for a wind turbine tower.
  • the principal sector of application of the invention is therefore the building sector, particularly concrete structures, in the renewable or green power generating industry, specifically wind power.
  • Said cylindrical sections may in turn be pre-formed by curved elements or voussoirs which are joined side by side, thus creating vertical joints, until a section is closed.
  • Said horizontal joints are normally wet joints, i.e. they normally comprise material which is applied in a liquid or plastic form in the ring, and is left to cure until the corresponding successive sections are fastened together in a substantially hermetic manner.
  • the ring is the space in the shape of a circular crown which is located between the two facing edges of successive sections.
  • said horizontal wet joints are often supplemented by internally reinforced, socket-projection fixing devices, i.e. fixing devices with reinforcement arranged essentially inside said sections and distributed between two successive sections so that it is embedded in the concrete of one of said successive sections and accommodated in a duct of the other of said successive sections and anchored thereto to secure both sections together.
  • socket-projection fixing devices i.e. fixing devices with reinforcement arranged essentially inside said sections and distributed between two successive sections so that it is embedded in the concrete of one of said successive sections and accommodated in a duct of the other of said successive sections and anchored thereto to secure both sections together.
  • Said internal reinforcement may be a passive reinforcement which is simply stretched and anchored to improve to some extent the behaviour of the joint when said joint is subjected to tension, but which increases the length of the erection process because it requires a minimum time for setting of the anchoring mass of a horizontal wet joint before forming the next horizontal wet joint; or said internal reinforcement may be an active reinforcement which is anchored and stretched to improve substantially the behaviour of the joint when said joint is subjected to tension, but which requires additional installation operations.
  • the voussoir or the section having the reinforcement partially embedded therein is called a male voussoir or male section
  • the voussoir or the section having a space for accommodation in said portion projecting from the male voussoir or the male section is called the female voussoir or female section.
  • a voussoir or section having both reinforcements partially embedded in it and ducts for receiving reinforcements partially embedded in another voussoir or section is called a mixed voussoir or section.
  • document ES 1060629 U discloses sheaths 4 previously fastened to the concrete of a lower section, which sheaths 4 receive bars 5 partially embedded in the concrete of an upper section so that they have a portion which projects outside said upper section, said sheaths 4 being filled with mortar.
  • bars 5 reinforcement
  • the reinforcement is passive, not stretched, and normally in the form of a corrugated bar which acts once the mortar has set.
  • document EP 2253782 A1 discloses a system of connection between two adjacent prefabricated sections 2, one of said sections 2 being provided internally with a pretensioned cable 4 (reinforcement) partially embedded in the concrete with a portion 4a of cable projecting outside of it and housed in a duct 24 provided in the other of said sections 2, which has a face which includes an enlargement 21 which leads duct 24 to an outlet through which said portion 4a emerges and is anchored by a stop 22.
  • the reinforcement is active and is stretched, after its installation, in order to compress the concrete, and which may be in the form of a bar (or bolt) or cable.
  • the object of the invention is therefore to provide an internally reinforced, socket-projection fixing assembly for a horizontal wet joint between two cylindrical prefabricated sections of concrete for a wind turbine tower, which involves the least possible number of additional operations and which extends to the least possible extent the duration of the process of erecting said tower.
  • an internally reinforced, socket-projection fixing assembly for a horizontal wet joint for a wind turbine tower which comprises at least one socket-projection fixing device with an active internal reinforcement and at least one socket-projection fixing device with a passive internal reinforcement so that said active internal reinforcement and said passive internal reinforcement each include a portion (hereinafter referred to as "embedded portion") which is embedded in a first section of said cylindrical prefabricated sections, and a portion (hereinafter referred to as "projecting portion”) which projects from said first section and is housed in a duct in a second section of said cylindrical prefabricated sections, wherein said active internal reinforcement includes means of tightening which are arranged in said projecting portion of said active internal reinforcement and against a supporting surface of one of said cylindrical prefabricated sections so that said active internal reinforcement is anchored to said supporting surface and stretched by means of said tightening means, and wherein said passive internal reinforcement includes cured material which is arranged at least partially around said projecting portion of said passive internal reinforcement and adhered to the inside of the passive reinforcement
  • At least one of said first and second sections may be formed by voussoirs.
  • Said tightening means may comprise a nut which is threaded onto a threaded end of said active internal reinforcement and which is tightened optionally with the insertion of an anchor plate and/or a curable levelling and/or supporting material against said supporting surface.
  • a partial pre-tensioning is preferably used in said horizontal wet joint, i.e. said active internal reinforcement is stretched so that it exerts a force which pre-compresses said horizontal wet joint and prevents the de-compression of said horizontal wet joint for applied loads below a predetermined load threshold, which is in turn lower than the maximum design load. From said load threshold, i.e. for applied loads higher than said load threshold and up to said maximum operating load, the de-compression of the joint may takes place and said passive internal reinforcement then interacts by resisting the tensions to which the joint may be subjected.
  • said socket-projection fixing assembly internally reinforced, according to the invention, comprises a number of socket-projection fixing devices with active internal reinforcement which is at the same time a multiple of the number of voussoirs in the first section, a multiple of the number of voussoirs in the second section and a divisor of the total number of socket-projection fixing devices, i.e. by including both socket-projection fixing devices with an active reinforcement and socket-projection fixing devices with a passive reinforcement.
  • Such an arrangement provides an even distribution of the socket-projection fixing devices with an active internal reinforcement, and an identical distribution of the socket-projection fixing devices in each voussoir forming each of said first and second sections.
  • said tightening means comprise an anchor plate and said second section is arranged above said first section
  • said anchor plate may then comprise one or more bores which may act as venting ducts for the air outlet during the insertion of curable material in said active reinforcement duct or in a sheath arranged inside said active reinforcement duct.
  • said second section preferably has a working facing which includes a hole in correspondence with the distal end of said projecting portion of said active internal reinforcement, said hole having a depth such that it extends at least to said active reinforcement duct in correspondence with said distal end of said projecting portion of said active internal reinforcement, with dimensions such that said tightening means can be housed inside said hole, thus allowing both the application of said tightening means to said distal end of said projecting portion of said active internal reinforcement and the anchoring and tensioning of said active internal reinforcement by means of said tightening means.
  • said supporting surface is located in the inner wall of said hole.
  • said tightening means comprise an anchor plate
  • said supporting surface of said hole is preferably formed with a suitable flatness to allow direct support of the anchor plate on said supporting surface without the need for intermediate parts or products such as levelling and supporting mortars, and consequently to allow the immediate at least partial tightening of the tightening means during the installation process, although curable materials for said supporting face may of course be used additionally or alternatively.
  • said passive reinforcement duct may include a sheath, possibly corrugated, which receives said projecting portion of said passive internal reinforcement, and which is filled with curable material (mortar, resin or similar).
  • said passive reinforcement duct may include a sheath, possibly corrugated, which receives said projecting portion of said passive internal reinforcement, and said second section may have a working facing which includes a hole in correspondence with the distal end of said projecting portion of said passive internal reinforcement, said hole having a depth such that it at least extends to said passive reinforcement duct in correspondence with said distal end of said projecting portion of said passive internal reinforcement, and said sheath having an extension which extends along said hole until it reaches at least the inlet of said hole.
  • Said sheath may then be filled with a curable material (mortar, resin or similar) via said filling hole and said extension, which provides the fixing of said passive internal reinforcement in the sheath and anchorage by adhesion of said passive internal reinforcement.
  • a curable material mortar, resin or similar
  • the ring formed between said cylindrical prefabricated sections may also be filled with a curable material (mortar, resin or similar) via said filling hole and said extension.
  • Said hole does preferably not open to the facing opposite the working facing, and said working facing is preferably the facing orientated towards the inner space enclosed by said second section.
  • the combination of active internal reinforcement and hole provides, during the installation, convenient access to the active reinforcement via the existing hole. This allows the immediate, simple anchorage of the active reinforcement by means of said tightening means in order to minimise its influence on the times for the process of installation of the corresponding tower.
  • the hole may finally be filled with curable material (grout material or similar), thereby embedding the entire active internal reinforcement with the tightening means, and providing reliable, permanent protection basically without any maintenance of any of the parts, particularly protection against corrosion of the metal parts which are normally used in the tightening means of active reinforcements.
  • said hole is filled with said curable material, preferably until a curable material surface is flush with the surface surrounding the prefabricated section in order to eliminate as far as possible any structural discontinuity.
  • a sheath is provided in said active reinforcement duct for said projecting portion of said active reinforcement, said sheath can then be filled with a curable material (mortar, resin or similar).
  • the combination of active/passive internal reinforcement and hole may also make it easier to ensure that the vertical development of said active/passive internal reinforcement (and hence the vertical development of the associated duct) is not parallel with the generating line of said cylindrical prefabricated sections. It is known that the cylindrical sections for the erection of wind turbine towers may be tapered in the ascending direction to provide an essentially conical tower.
  • said cylindrical prefabricated sections will be generated by a generatrix inclined towards the axis of revolution in the ascending direction, and to facilitate the insertion of said projecting portion of said active/passive internal reinforcement in said corresponding duct during an operation of vertical lowering of one of said cylindrical prefabricated sections onto another section, said active/passive internal reinforcement may not be parallel with the generatrix, preferably being parallel with the vertical axis of revolution.
  • the combination of active/passive internal reinforcement and hole may also make it easier for said active/passive internal reinforcement to be arranged essentially centred in the thickness of said cylindrical prefabricated sections.
  • the duct will have a specific geometry depending on the characteristics of each case.
  • the duct may then have a curved vertical development.
  • a socket-projection fixing assembly which has socket-projection fixing devices with a passive reinforcement and socket-projection fixing devices with an active reinforcement, an optimum balance may be achieved between structural efficiency and the speed of installation and fixing. If only socket-projection fixing devices with passive reinforcement are used, the installation can be made very quickly by assembling succeeding sections without waiting for the curable material to set. However, safety during the installation is then relatively low, as is the structural efficiency in the final situation. If only socket-projection fixing devices with active reinforcement are used, the installation may be made relatively safer by anchoring at least some of the reinforcements as the sections are assembled, and the structural efficiency in the final situation will be high once all the tightening means are finally tightened.
  • the speed of installation is relatively slow and the space required to house the active reinforcement is relatively large.
  • the installation of the corresponding tightening means for anchorage in the corresponding holes provides, with minimum tightening torque, a provisional fastening of the sections immediately after installing one tower section on the other, which secures the joint until the process of filling with curable material is completed. Once said curable material reaches its specified strength, stretching of the active reinforcements may commence.
  • sealing profiles can be arranged to contain the curable material intended to seal the joint.
  • These sealing profiles are normally two essentially circumferential profiles arranged concentrically on the upper edge of the lower section of the joint, one of which is arranged in the vicinity of the inner facing of the sections of the joint and the other of which is arranged in the vicinity of the outer facing of the sections of the joint.
  • the socket-projection fixing assembly according to the invention may include a translucent sealing profile which allows visual inspection of the feed of the curable material during the process of filling the joint, facilitating inspection and monitoring of the filling operation.
  • the socket-projection fixing assembly according to the invention may include a thixotropic (highly viscous) curable material which does not require sealing profiles.
  • the socket-projection fixing assembly according to the invention may include sectorisation means for the ring, i.e. means which form separate compartments along the perimeter of the ring and which enclose one or more socket-projection fixing devices of the socket-projection fixing assembly according to the invention, in order to allow separate phases of filling of the ring and hence greater control of the filling operation.
  • Said sectorisation means may be profiles similar to said sealing profiles arranged simply in the radial direction instead of in the circumferential direction.
  • the invention also relates to a process of installing a socket-projection fixing assembly as previously described, which includes the steps of:
  • Said procedure for installing a socket-projection fixing assembly according to the invention also includes the application of a curable material to the ring formed between said first and second cylindrical sections, preferably in step d).
  • a protective cover is optionally used for the distal end of at least one reinforcement, in the shape of a cone, which also enables said protective cover to act as a guiding mechanism and as a mechanism of separation between the reinforcement and the duct of said female parts, preferably in the form of a sheath.
  • distal is intended to indicate a position that is relatively further from the point at which the embedded portion and the projecting portion of the corresponding reinforcement coincide
  • proximal is intended to indicate a position relatively closer to the point at which the embedded portion and the projecting portion of the corresponding reinforcement coincide.
  • Figure 1 shows a wind turbine tower 1 which has four successive cylindrical concrete prefabricated sections 2, 2', 2'', 2'''.
  • a respective horizontal wet joint 3, 3', 3" is formed between each couple of successive sections, which joint comprises a respective socket-projection fixing assembly according to the invention, i.e. said tower includes three horizontal wet joints 3, 3', 3" and three socket-projection fixing assemblies according to the invention (said socket-projection fixing assemblies according to the invention not shown in Figure 1 ).
  • FIG. 2 shows a cross-sectional view of said tower 1 in correspondence with the lower horizontal wet joint 3 between a lower section 2 and an upper section 2', to illustrate the respective socket-projection fixing assembly according to the invention and lower section 2.
  • Said socket-projection fixing assembly according to the invention of said lower horizontal wet joint 3 comprises, in this specific example, thirty six socket-projection fixing devices with a passive internal reinforcement 7 (only one of which is referenced in Figure 2 for the sake of clarity) and twelve socket-projection fixing devices with an active internal reinforcement 8 (only one of which is referenced in Figure 2 for the sake of clarity).
  • Said lower section 2 is formed by four voussoirs 5, which means that the number of devices with an active reinforcement 8 is at the same time a multiple of the number of voussoirs 5 in lower section 2 and the divisor of the total number of devices.
  • the number of devices with an active reinforcement 8 is also a multiple of the number of voussoirs 6 in upper section 2', upper section 2' being formed for this purpose by 1, 2, 3, 4, 6 or 12 voussoirs 6.
  • Figure 3 shows a longitudinal section of tower 1 which illustrates said device with a passive reinforcement 7 (cross-section I-I) and a longitudinal section of tower 1 which illustrates said device with active reinforcement 8 (cross-section II-II).
  • FIG. 3 cross-section I-I, shows a device with a passive reinforcement 7 for fixing a lower voussoir 5 prefabricated on a concrete base for the erection of wind turbine towers and an upper voussoir 6 prefabricated on a concrete base for the erection of wind turbine towers.
  • Said passive reinforcement 7, in the form of a corrugated bar, is partially embedded in said lower voussoir 5 so that said passive reinforcement 7 has a lower portion actually embedded in said lower voussoir 5 and an upper portion which projects from said lower voussoir 5.
  • Said upper portion of said passive reinforcement 7 is housed in a duct 10 of passive reinforcement made in said upper voussoir 6.
  • One face of said upper voussoir 6 includes a hole 11 in correspondence with the distal end of said upper portion of said passive reinforcement 7, said hole 11 having a curved development until it reaches said duct 10 of passive reinforcement in correspondence with said distal end of said upper portion of said passive reinforcement 7.
  • Said hole 11 enables a filling material to be inserted in the form of mortar 12, which fills said hole 11, said duct 10 of passive reinforcement and ring 17 formed between said lower voussoir 5 and upper voussoir 6, said passive reinforcement 7 being anchored to said upper voussoir 6.
  • Figure 3 cross-section II-II, shows a device with active reinforcement 8 for fixing said lower voussoir 5 and said upper voussoir 6.
  • Said active reinforcement 8 in the form of a bar or bolt with threaded ends, is partially embedded in said lower voussoir 5 so that said active reinforcement 8 has a lower portion actually embedded in said lower voussoir 5 and an upper portion which projects from said lower voussoir 5.
  • Said upper portion of said active reinforcement 8 is housed in a duct 9 of active reinforcement made in said upper voussoir 6.
  • One face of said upper voussoir 6 includes a hole 11 in correspondence with the threaded distal end of said upper portion of said active reinforcement 8, said hole 11 having a depth such that it extends to said duct 9 of active reinforcement in correspondence with said threaded distal end of said upper portion of said active reinforcement 8.
  • Said hole 11 provides access to a plurality of tightening means 14, 16 applied to said threaded distal end of said upper portion of said active reinforcement 8 against one face supporting face 15 of said hole 11.
  • Said tightening means comprise a nut 14 and a plate 16, said nut 14 being threaded onto said threaded distal end of said upper portion of said active reinforcement 8 and said plate 16 being inserted between said nut 14 and said supporting face 15, said plate 16 also having a plurality of drain ducts 19 which provide a fluid communication between said duct 9 of active reinforcement and said hole 11.
  • Said device with active reinforcement 8 also comprises a plurality of anchoring means 4 applied in a fixed manner to the threaded distal end of said lower portion of said active reinforcement 8 and a sheath 13 arranged around said lower portion of said active reinforcement 8 so that said active reinforcement 8 can be expanded or shrunk inside said sheath 13 and inside said active reinforcement duct 9 by the actuation of said nut 14 for stretching said active reinforcement 8.
  • Said hole 11 also enables a filling material to be inserted in the form of mortar 12, which fills said hole 11, said active reinforcement duct 9 and ring 17 formed between said lower voussoir 5 and upper voussoir 6.
  • the horizontal wet joint 3 includes two sealing profiles 20 which delimit said ring 17 and contain said mortar 12.
  • Figure 4 shows a longitudinal section I'-I' of a socket-projection fixing device with passive internal reinforcement 7 as an alternative to the device in Figure 3 , cross-section I-I, and a longitudinal section II'-II' of a socket-projection fixing device with active internal reinforcement 8 as an alternative to the device in Figure 3 , cross-section II-II.
  • section I'-I' shows a device with passive reinforcement 7 for fixing a lower voussoir 5 prefabricated on a concrete base for the erection of wind turbine towers and an upper voussoir 6 prefabricated on a concrete base for the erection of wind turbine towers.
  • Said passive reinforcement 7, in the form of a corrugated bar, is partially embedded in said upper voussoir 6 so that said passive reinforcement 7 has an upper portion actually embedded in said upper voussoir 6 and a lower portion which projects from said upper voussoir 6.
  • Said lower portion of said passive reinforcement 7 is housed in a passive reinforcement duct 10 made in said lower voussoir 5.
  • the upper edge of said lower voussoir 5 includes a hole 11 in correspondence with the proximal end of said lower portion of said passive reinforcement 7, said hole 11 having an inclined development until it reaches laterally said passive reinforcement duct 10 in correspondence with said proximal end of said lower portion of said passive reinforcement 7.
  • Said hole 11 facilitates the insertion of a filling material in the form of mortar 12, which fills said hole 11, said passive reinforcement duct 10 and ring 17 formed between said lower voussoir 5 and voussoir 6, said passive reinforcement 7 being anchored to said lower voussoir 5.
  • the distal end of said passive reinforcement duct 10 has a drain duct 19 which provides a fluid communication between said passive reinforcement duct 10 and the surrounding area.
  • the purpose of said drain duct 19 at the basis of said passive reinforcement duct 10 is to allow the complete drainage of water from said passive reinforcement duct 10 before filling with mortar. It will generally be plugged before proceeding with filling with said mortar 12.
  • FIG. 4 section II'-II', shows a device with active reinforcement 8 for fixing said lower voussoir 5 and said upper voussoir 6.
  • Said lower portion of said active reinforcement 8 is housed in an active reinforcement duct 9 made in said lower voussoir 5.
  • One face of said lower voussoir 5 includes a hole 11 in correspondence with the distal end of said lower portion of said active reinforcement 8, said hole 11 having a depth such that it extends to said active reinforcement duct 9 in correspondence with said distal end of said lower portion of said active reinforcement 8.
  • Said hole 11 provides access to a plurality of tightening means applied to said distal end of said lower portion of said active reinforcement 8 against one supporting face of said hole 11.
  • Said tightening means are similar to tightening means 14, 16 of the device shown in Figure 3 , cross-section II-II, and consist of an anchor plate and a clamp with a key for anchoring the cable.
  • Said hole 11 also enables to inject a filling material in the form of mortar 12, which fills said hole 11.
  • a filling material in the form of mortar 12 may also be filled with mortar from said hole 11.
  • Said mortar 12 may also be intruded through a separate ring 17.
  • the horizontal wet joint represented may have a radially inclined development and includes a sealing profile 20 which delimits said ring 17 close to the lowest end of said development so as to contain such mortar 12.
  • Figure 5 shows a longitudinal section of an assembly of the socket-projection fixing device with passive internal reinforcement and the socket-projection fixing device with active internal reinforcement as an alternative to the socket-projection fixing devices shown in Figure 3 .
  • Figure 5 shows a device with two passive reinforcements 7, 7' and an active reinforcement 8 for fixing a lower voussoir 5 prefabricated on a concrete base for the erection of wind turbine towers and an upper voussoir 6 prefabricated on a concrete base for the erection of wind turbine towers.
  • One of said passive reinforcements 7, in the form of a fork, is partially embedded in said lower voussoir 5 so that said passive reinforcement 7 has a lower portion actually embedded in said lower voussoir 5 and an upper portion which projects from said lower voussoir 5.
  • Said upper portion of said passive reinforcement 7 is housed in a duct which is in this case in the form of cavity 10 made in said upper voussoir 6.
  • Another of said passive reinforcements 7', in the form of a fork is partially embedded in said lower voussoir 6 so that said passive reinforcement 7' has an upper portion actually embedded in said upper voussoir 6 and a lower portion which projects from said upper voussoir 6.
  • Said lower portion of said passive reinforcement 7' is housed in a duct which is in this case in the form of cavity 10' made in said lower voussoir 5.
  • Said passive reinforcements 7, 7' are juxtaposed laterally and said cavities 10, 10' are located symmetrically relative to the plane of the horizontal wet joint shown.
  • Said passive reinforcements, 7, 7' also include four rods 23 located horizontally against the trough of said passive reinforcements 7, 7' to improve the anchoring of said passive reinforcements 7, 7' to mortar 12.
  • Said active reinforcement 8 in the form of a pre-tensioning cable, is partially embedded in said upper voussoir 6 so that said active reinforcement 8 has an upper portion actually embedded in said upper voussoir 6 and a lower portion which projects from said upper voussoir 6.
  • Said lower portion of said active reinforcement 8 is housed in a active reinforcement duct 9 made in said lower voussoir 5 in correspondence with said cavity 10'.
  • One face of said lower voussoir 5 includes a hole 11 in correspondence with the threaded distal end of said lower portion of said active reinforcement 8, said hole 11 having a depth such that it extends to said active reinforcement duct 9 in correspondence with said distal end of said lower portion of said active reinforcement 8.
  • Said hole 11 provides access to a plurality of tightening means applied to said threaded distal end of said lower portion of said active reinforcement 8 against a support face of said hole 11.
  • Said tightening means are similar to means 14, 16 for anchoring the device shown in Figure 3 , cross-section II-II, and consist of an anchor plate and a clamp with key for anchoring the cable
  • said mortar 12 Since said active reinforcement duct 9 is made in said lower voussoir 5 in correspondence with said cavity 10', said mortar 12 also fills said active reinforcement duct 9. It must be noted that said active reinforcement 8 is sheathed so that it does not adhere to mortar 12 and can be subsequently tightened after said mortar 12 has set
  • the horizontal wet joint shown also includes a sealing profile 20 which delimits said ring 17 at the radial end of said ring 17 opposing said cavities 10, 10'.
  • Figure 6 shows a longitudinal section of an additional assembly of the socket-projection fixing device with passive internal reinforcement and the socket-projection fixing device with active internal reinforcement as an alternative to the socket-projection fixing devices in Figure 3 .
  • Figure 6 shows a device with two passive reinforcements 7, 7' and an active reinforcement 8 for fixing a lower voussoir 5 prefabricated on a concrete base for the erection of wind turbine towers and an upper voussoir 6 prefabricated on a concrete base for the erection of wind turbine towers.
  • One of said passive reinforcements 7, in the form of a fork, is partially embedded in said lower voussoir 5 so that said passive reinforcement 7 has a lower portion actually embedded in said lower voussoir 5 and an upper portion which projects from said lower voussoir 5.
  • Said upper portion of said passive reinforcement 7 is housed in a passive reinforcement duct 10 made in said upper voussoir 6.
  • Another of said passive reinforcements 7', in the form of a fork, is partially embedded in said upper voussoir 6 so that said passive reinforcement 7' has an upper portion actually embedded in said upper voussoir 6 and a lower portion which projects from said upper voussoir 6.
  • Said lower portion of said passive reinforcement 7' is housed in a passive reinforcement duct 10' made in said lower voussoir 5.
  • Said passive reinforcements 7, 7' are juxtaposed laterally and said ducts 10, 10' are located symmetrically in relation to the plane of the horizontal wet joint shown.
  • Said active reinforcement 8 in the form of a bar or bolt with threaded ends, is partially embedded in said lower voussoir 5 so that said active reinforcement 8 has a lower portion actually embedded in said lower voussoir 5 and an upper portion which projects from said lower voussoir 5.
  • Said upper portion of said active reinforcement 8 is housed in an active reinforcement duct 9 made in said upper voussoir 6 in correspondence with said ducts 10, 10'.
  • One face of said upper voussoir 6 includes a hole 11 in correspondence with the threaded distal end of said upper portion of said active reinforcement 8, said hole 11 having a depth such that it extends to said active reinforcement duct 9 in correspondence with said threaded distal end of said upper portion of said active reinforcement 8.
  • Said hole 11 provides access to a plurality of tightening means 14, 16 applied to said threaded distal end of said upper portion of said active reinforcement 8 against a supporting face 15 of said hole 11.
  • Said tightening means are similar to means 14, 16 for tightening the device in Figure 3 , cross-section II-II, and consist of an anchor plate and a clamp with a key for anchoring the cable.
  • Said device with active reinforcement 8 also comprises a plurality of anchoring means 4 applied in a fixed manner to the threaded distal end of said lower portion of said active reinforcement 8 and a sheath 13 arranged around said lower portion of said active reinforcement 8 so that said active reinforcement 8 can be expanded or shrunk inside said sheath 13 and inside said active reinforcement duct 9 by actuating said nut 14 for tightening said active reinforcement 8.
  • Said hole 11 also allows the introduction of a filling material in the form of mortar 12 which, since said active reinforcement duct 9 is made in said upper voussoir 6 in correspondence with said ducts 10, 10', it fills said hole 11, said active reinforcement duct 9, said ducts 10, 10' and ring 17 formed between said lower voussoir 5 and upper voussoir 6, said active reinforcement 8 being anchored to said upper voussoir 6 also by said mortar 12 and said passive reinforcements 7, 7' being anchored to both lower voussoir 5 and upper voussoir 6. It must be noted that said active reinforcement 8 is sheathed so that it does not adhere to mortar 12 and can be tightened later when said mortar 12 has set.
  • the horizontal wet joint shown includes two sealing profiles 20 which delimit said ring 17, which profiles contain said mortar 12.
  • devices with an active reinforcement and devices with a passive reinforcement of any type may be used in the same horizontal wet joint, combining them whether they are of the same type or of a different type.

Claims (17)

  1. Un assemblage de fixation à emboîture en projection, intérieurement renforcé, pour un joint humide horizontal (3) formé entre deux sections cylindriques en béton préfabriqué (2, 2'), pour une tour d'éolienne, cet assemblage comprend au moins un dispositif de fixation à emboîture en projection avec renfort interne actif (8), pour que ledit renfort interne actif (8) comprenne une portion encastrée qui est encastrée dans une première section (2, 2') desdites sections cylindriques, et une portion en projection qui se projette à partir de ladite première section (2, 2') et est logée dans un conduit (9, 10) dans une seconde section (2', 2) desdites sectioris cylindriques, par lequel ledit renfort interne actif (8) comprend des moyens de serrage (14, 16) qui sont disposés dans ladite portion en projection dudit renfort interne actif (8) et contre une surface de support (15) de l'une (2, 2') desdites sections cylindriques pour que ledit renfort interne actif (8) soit ancré à ladite surface de support (15) et soit serré au moyen desdits moyens de serrage (14, 16), caractérisé en ce que ledit assemblage comprend en outre au moins un dispositif de fixation à emboîture en projection avec renfort interne passif (7) pour que ledit renfort interne passif (7) comprenne une portion encastrée qui est encastrée dans une première section (2, 2') desdites sections cylindriques, et une portion en projection qui se projette à partir de ladite première section (2, 2') et est logée dans un conduit (9, 10) dans une seconde section (2', 2) desdites sections cylindriques, et en ce que ledit renfort interne passif (7) comprend un matériau durci (12) qui est disposé au moins partiellement autour de ladite portion en projection dudit renfort interne passif (7) et adhère à l'intérieur du conduit de renfort passif (10) dans lequel est disposée ladite portion en projection dudit renfort interne passif (7).
  2. L'assemblage de fixation à emboîture en projection selon la revendication 1, caractérisé en ce qu'au moins l'une (2, 2') desdites première et seconde sections est formée par des voussoirs (5, 6).
  3. L'assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes, caractérisé en ce que lesdites sections cylindriques (2, 2') comprennent des voussoirs (5, 6) et en ce que ledit assemblage de fixation à emboîture en projection comprend un certain nombre de dispositifs de fixation à emboîture en projection avec renfort interne actif (8), qui est en même temps un multiple du nombre de voussoirs (5, 6) dans la première section, un multiple du nombre de voussoirs (6, 5) dans la seconde section et le diviseur du nombre total de dispositifs de fixation à emboîture en projection avec renfort interne actif (8) et avec renfort passif (7).
  4. L'assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes, caractérisé en ce que lesdits moyens de serrage comprennent un écrou (14) qui est vissé sur une extrémité filetée dudit renfort interne actif (8) et qui est serré contre ladite surface de support (15).
  5. L'assemblage de fixation à emboîture en projection selon la revendication 4, caractérisé en ce que ledit écrou (14) est serré contre ladite surface de support (15) avec l'insertion d'une plaque d'ancrage (16) et/ou d'un matériau durcissable (12).
  6. L'assemblage de fixation à emboîture en projection selon la revendication 4, caractérisé en ce que ledit écrou (14) est serré contre ladite surface de support (15) avec l'insertion d'une plaque d'ancrage (16), en ce que ladite seconde section (2, 2') est disposée au-dessus de ladite première section (2', 2), et en ce que ladite plaque d'ancrage (16) comprend au moins un alésage (19) qui sert de tuyau de drainage pour la sortie d'air.
  7. L'assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes, caractérisé en ce que ledit conduit de renfort passif (10) reçoit ladite portion en projection dudit renfort interne passif (7) et en ce que ledit conduit de renfort passif (10) est rempli avec du matériau durcissable (12).
  8. L'assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes, caractérisé en ce que ladite seconde section (2, 2') possède un parement de travail qui comprend au moins un orifice (11) en correspondance avec l'extrémité distale d'une portion en projection d'un renfort interne actif (8), ledit orifice (11) ayant une profondeur telle qu'il s'étend au moins jusqu'au conduit de renfort interne actif associé (9) en correspondance avec ladite extrémité distale de ladite portion en projection dudit renfort interne actif (8) et présentant des dimensions telles qu'elles permettent aux moyens de serrage associés (14, 16) d'être logés à l'intérieur dudit orifice (11).
  9. L'assemblage de fixation à emboîture en projection selon la revendication 8, caractérisé en ce que la surface de support associée (15) est située sur la paroi interne dudit orifice (11).
  10. L'assemblage de fixation à emboîture en projection selon la revendication 7, caractérisé en ce que ladite seconde section (2, 2') est disposée au-dessus de ladite première section (2', 2) et en ce que ladite seconde section (2, 2') possède un parement de travail qui comprend au moins un orifice (11) en correspondance avec l'extrémité distale d'une portion en projection d'un renfort interne passif (7), ledit orifice (11) ayant une profondeur telle qu'il s'étend au moins jusqu'au conduit de renfort passif associé (10) en correspondance avec ladite extrémité distale de ladite portion en projection dudit renfort interne passif (7).
  11. L'assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes 8 à 10, caractérisé en ce que ledit orifice (11) n'est pas ouvert du côté du parement faisant face au parement de travail.
  12. L'assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes 8 à 11, caractérisé en ce que ledit parement de travail est le parement orienté en direction de l'espace interne clos par ladite seconde section (2, 2').
  13. Un procédé pour installer un assemblage de fixation à emboîture en projection selon n'importe laquelle des revendications précédentes, qui comprend les étapes consistant à :
    a) fournir une première section cylindrique préfabriquée en béton pour une tour d'éolienne et une seconde section cylindrique préfabriquée en béton (2', 2) pour une tour d'éolienne (1),
    b) installer lesdites première et seconde sections cylindriques (2, 2') dans une relation coaxiale réciproque pour que lesdites portions en projection (7, 8) desdits renforts internes et lesdits conduits associés (10, 9) soient l'un en face de l'autre et soient alignés l'un par rapport à l'autre,
    c) rapprocher l'une de l'autre lesdites première et seconde sections cylindriques pour que lesdites portions en projection desdits renforts internes (7, 8) soient logées dans lesdits conduits associés (10, 9) jusqu'à ce que lesdites première et seconde sections cylindriques (2, 2') soient adjacentes l'une à l'autre,
    d) appliquer lesdits moyens de serrage (14, 16) au(x) renfort(s) actif(s) (8),
    e) appliquer le matériau durcissable (12) au(x) renfort(s) passif(s) (7),
    f) étirer le(s) renfort(s) actif(s) (8) en serrant lesdits moyens de serrage (14, 16) ;
    par lequel dans l'étape f) le(s)dit(s) renfort(s) actif(s) (8) sont serrés en serrant lesdits moyens de serrage (14, 16) pour que ledit joint humide horizontal (3) soit soumis à une pré-tension partielle.
  14. Le procédé d'installation selon la revendication 13, caractérisé en ce qu'il comprend également l'application d'un matériau durcissable (12) à une bague (17) formée entre lesdites première et seconde sections cylindriques (2, 2').
  15. Le procédé d'installation selon la revendication 13, caractérisé en ce que ladite étape d) comprend également l'application d'un matériau durcissable (12) à une bague (17) formée entre lesdites première et seconde sections cylindriques (2, 2').
  16. Le procédé d'installation selon n'importe laquelle des revendications 13 à 15, caractérisé en ce que ladite étape c) comprend également l'utilisation d'une couverture de protection pour l'extrémité distale d'au moins un renfort (7, 8).
  17. Le procédé d'installation selon la revendication 16, caractérisé en ce que ladite couverture de protection est de forme conique.
EP12727836.4A 2011-06-09 2012-06-08 Ensemble de fixation pour des éléments de tours en béton Active EP2718520B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES201130961A ES2401787B2 (es) 2011-06-09 2011-06-09 Montaje machihembrado de fijación
PCT/EP2012/060947 WO2012168467A2 (fr) 2011-06-09 2012-06-08 Ensemble de fixation à saillie-cavité

Publications (2)

Publication Number Publication Date
EP2718520A2 EP2718520A2 (fr) 2014-04-16
EP2718520B1 true EP2718520B1 (fr) 2016-02-10

Family

ID=46317367

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12727836.4A Active EP2718520B1 (fr) 2011-06-09 2012-06-08 Ensemble de fixation pour des éléments de tours en béton

Country Status (11)

Country Link
US (1) US20140298737A1 (fr)
EP (1) EP2718520B1 (fr)
AR (1) AR086661A1 (fr)
AU (1) AU2012266226A1 (fr)
BR (2) BR112013031626A2 (fr)
CA (1) CA2838413A1 (fr)
ES (1) ES2401787B2 (fr)
MX (1) MX340205B (fr)
UY (1) UY34119A (fr)
WO (1) WO2012168467A2 (fr)
ZA (1) ZA201400035B (fr)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2471641B1 (es) * 2012-12-21 2015-04-07 Acciona Windpower, S.A. Dovela prefabricada de hormigón, torre de aerogenerador que comprende dicha dovela, aerogenerador que comprende dicha torre y procedimiento de montaje de dicho aerogenerador
DE102013211750A1 (de) * 2013-06-21 2014-12-24 Wobben Properties Gmbh Windenergieanlage und Windenergieanlagen-Fundament
FR3009318B1 (fr) * 2013-07-30 2015-09-11 Soletanche Freyssinet Procede d'edification d'un ouvrage en elements prefabriques en beton et ouvrage associe
PT2846040T (pt) * 2013-09-06 2018-06-06 youWINenergy GmbH Unidade de torre para uma instalação de turbina eólica
ES2543371B1 (es) * 2014-02-18 2016-02-09 Inneo Torres, S.L. Junta vertical de unión entre dovelas de torres eólicas en tramos constituidos por dos dovelas
ES2547584B1 (es) 2014-03-07 2016-07-12 Esteyco S.A.P. Medios de anclaje con cable para una junta horizontal, y procedimiento de anclaje con cable para una junta horizontal
ES2545038B1 (es) * 2014-03-07 2016-04-26 Inneo Torres, S.L. Sistema constructivo para torres eólicas
DE102014209857A1 (de) 2014-05-23 2015-11-26 Wobben Properties Gmbh Windenergieanlagen-Turm und Verfahren zum Errichten eines Windenergieanlagen-Turms
CA2964327A1 (fr) * 2014-10-30 2016-05-06 Byo Towers, S.L. Procede d'installation d'une tour creuse en beton constituee de plus d'un segment et tour creuse en beton correspondante
FR3029231B1 (fr) * 2014-12-01 2016-12-30 Lafarge Sa Section en beton
CN106567809A (zh) * 2016-10-08 2017-04-19 霍尔果斯新国金新能源科技有限公司 混凝土塔筒组件及其组装方法
EP3612691A1 (fr) * 2017-04-18 2020-02-26 Soletanche Freyssinet Procédé de fabrication de segments de béton préfabriqués pour une tour
DK3502466T3 (da) * 2017-12-19 2021-12-13 Nordex Energy Spain Sau Vindmølletårn med armeringselementer
EP3670899B1 (fr) * 2018-12-21 2024-03-13 Nordex Energy Spain, S.A.U. Procédé d'assemblage d'une éolienne et éolienne assemblée selon ledit procédé
EP3845354A3 (fr) 2019-12-10 2021-09-15 Wobben Properties GmbH Procédé de fabrication de segments pour une tour, segment précontraint, anneau de tour, tour, éolienne ainsi que dispositif de précontrainte
EP4019769A1 (fr) * 2020-12-23 2022-06-29 Siemens Gamesa Renewable Energy A/S Ensemble de couplage et procédé de commande d'un monopieu
EP4343083A1 (fr) * 2022-09-26 2024-03-27 Nordex Energy Spain, S.A.U. Segment en béton d'une section d'une tour d'éolienne, moule conçu pour couler un tel segment en béton et procédé d'assemblage d'une éolienne comprenant un tel segment en béton

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH658492A5 (de) * 1982-12-13 1986-11-14 Brun Ag Elementwerk Behaelter aus vorgefertigten betonelementen und seine herstellung.
DE3523747A1 (de) * 1985-07-03 1987-01-15 Paul Larsen Roenne A S Behaelter mit einer ringfoermigen, auf einer bodenplatte errichteten abschlusswand
DE3723883A1 (de) * 1987-07-18 1989-01-26 Zerna Schultz Und Partner Inge Spannbetontraeger
US5630301A (en) * 1995-05-25 1997-05-20 Harris P/T, A Division Of Harris Steel Limited Anchorage assembly and method for post-tensioning in pre-stressed concrete structures
KR20010036486A (ko) * 1999-10-08 2001-05-07 박상일 다단계 긴장식 프리스트레스트 거더의 설계 방법 및 거더의 제조방법
ITMI20022119A1 (it) * 2002-10-04 2004-04-05 Benito Zambelli Dispositivo per il collegamento di una trave a pilastri,
ES1060629Y (es) * 2005-06-20 2006-02-01 Inneo21 S L Estructura perfeccionada de juntas entre placas de torres modulares para turbinas eolicas y otras aplicaciones
US7765764B2 (en) * 2005-08-08 2010-08-03 Sergio Zambelli Device for connecting beams and pillars or similar structural elements
EP1767729A1 (fr) * 2005-09-23 2007-03-28 Sika Technology AG Structure de tour
ES2326010B2 (es) * 2006-08-16 2011-02-18 Inneo21, S.L. Estructura y procedimiento de montaje de torres de hormigon para turbinas eolicas.
PT103562B (pt) * 2006-09-13 2008-08-14 Alexandre Francisco Mal Aragao Torres em betão polimérico para geradores eólicos e outras grandes aplicações estruturais
JP4874152B2 (ja) * 2007-04-03 2012-02-15 戸田建設株式会社 プレキャスト工法による変断面塔状構造物
AP2620A (en) * 2007-05-07 2013-03-18 Ericsson Telefon Ab L M Antenna tower structure with installation shaft
DE102007031065B4 (de) * 2007-06-28 2011-05-05 Nordex Energy Gmbh Windenergieanlagenturm
JP5389051B2 (ja) * 2008-02-05 2014-01-15 テレフオンアクチーボラゲット エル エム エリクソン(パブル) 中空コンクリート要素の製造方法
DE102009016893B4 (de) * 2009-04-08 2011-12-08 Nordex Energy Gmbh Verankerungsbauteil für einen Windenergieanlagenturm
DK2631393T3 (en) * 2009-05-19 2015-10-19 Pacadar Sa Tower for a wind turbine
US8511013B2 (en) * 2009-09-03 2013-08-20 General Electric Company Wind turbine tower and system and method for fabricating the same
IT1396433B1 (it) * 2009-11-16 2012-11-23 Rolic Invest Sarl Impianto eolico per la generazione di energia elettrica e metodo per realizzare un pilone del suddetto impianto eolico.

Also Published As

Publication number Publication date
ES2401787B2 (es) 2014-01-21
MX2013014370A (es) 2014-04-30
BR102012013858A2 (pt) 2013-07-30
EP2718520A2 (fr) 2014-04-16
WO2012168467A3 (fr) 2013-03-21
CA2838413A1 (fr) 2012-12-13
AR086661A1 (es) 2014-01-15
ES2401787A2 (es) 2013-04-24
BR112013031626A2 (pt) 2016-12-06
WO2012168467A2 (fr) 2012-12-13
UY34119A (es) 2013-01-31
ZA201400035B (en) 2015-04-29
ES2401787R1 (es) 2013-07-04
MX340205B (es) 2016-06-30
AU2012266226A1 (en) 2014-01-09
US20140298737A1 (en) 2014-10-09

Similar Documents

Publication Publication Date Title
EP2718520B1 (fr) Ensemble de fixation pour des éléments de tours en béton
US7805895B2 (en) Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts
AU2011267375B2 (en) Tower comprising an adapter piece and method for producing a tower comprising an adapter piece
CN102374134B (zh) 带有转接区段的塔架
EP2310595B1 (fr) Procédé pour l'assemblage d'une tour et tour
CA2585534A1 (fr) Adaptateur de pylone, methode de construction d'une fondation de pylone, et fondation de pylone
CN109184737A (zh) 可让压吸能的隧道预应力约束充填衬砌支护体系及工艺
CN211573533U (zh) 一种可适应围岩大变形的隧道约束充填型衬砌结构
US9175492B2 (en) Wind generator tower and process for assembly thereof
EP3118393B1 (fr) Moyens d'ancrage à câble pour joint horizontal et procédé d'ancrage à câble pour joint horizontal
CN108643454A (zh) 一种体内单束密封的预应力群锚体系及其施工方法
EP2788565B1 (fr) Ensemble joint horizontal situé entre deux parties de tour d'éolienne télescopique et procédé d'installation correspondant
EP3502466B1 (fr) Tour de turbine éolienne comportant des éléments de renfort
CN111287907B (zh) 混凝土塔筒的施工方法
ES2459591B1 (es) Montaje machihembrado de fijación

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20131226

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150806

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: INNEO TORRES, S.L.

Owner name: ESTEYCO S.A.P.

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 774736

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160215

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012014687

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20160210

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20160210

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 774736

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160610

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160613

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012014687

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602012014687

Country of ref document: DE

26N No opposition filed

Effective date: 20161111

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160510

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20160608

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20170228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160630

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170103

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160608

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120608

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160630

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160210

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20200609

Year of fee payment: 9

Ref country code: TR

Payment date: 20200516

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20200608

Year of fee payment: 9

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210609

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210630