EP2581514A1 - Zeigelstein mit einer Vielzahl von Hohlräumen - Google Patents

Zeigelstein mit einer Vielzahl von Hohlräumen Download PDF

Info

Publication number
EP2581514A1
EP2581514A1 EP12425166.1A EP12425166A EP2581514A1 EP 2581514 A1 EP2581514 A1 EP 2581514A1 EP 12425166 A EP12425166 A EP 12425166A EP 2581514 A1 EP2581514 A1 EP 2581514A1
Authority
EP
European Patent Office
Prior art keywords
height
volume
construction
lateral
construction element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12425166.1A
Other languages
English (en)
French (fr)
Inventor
Vincenzo Santoriello
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ceramica D'Arte Santoriello
Original Assignee
Ceramica D'Arte Santoriello
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceramica D'Arte Santoriello filed Critical Ceramica D'Arte Santoriello
Publication of EP2581514A1 publication Critical patent/EP2581514A1/de
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/14Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element
    • E04B2/16Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position
    • E04B2/18Walls having cavities in, but not between, the elements, i.e. each cavity being enclosed by at least four sides forming part of one single element using elements having specially-designed means for stabilising the position by interlocking of projections or inserts with indentations, e.g. of tongues, grooves, dovetails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2002/0202Details of connections
    • E04B2002/0243Separate connectors or inserts, e.g. pegs, pins or keys
    • E04B2002/0247Strips or bars

Definitions

  • the present invention is included in the field of constructions, and particularly concerns a construction element for making building structures and a system for realizing said building structures.
  • prefabricated structures comprise materials highly polluting and with a high environmental impact, thus making it impossible an organic control of ventilation within the whole building, limiting to the application of a much lower variety of finishing and coatings with respect to masonry structures.
  • Main object of the present invention is thus that of making the work of the Construction Company easier as far as costs and mounting /installing time are concerned.
  • a construction element for the construction of building structures comprising a first central volume and at least a second lateral volume, characterized in that said first and at least a second volume are adjacent and offset to each other. Furthermore, according to the invention, said first central volume has a first height and said at least a second lateral volume has a second height, said first height being smaller than said second height
  • said first central volume has a first length and said at least a second lateral volume has a second length, said first length being smaller than said second length.
  • said first central volume is centrally arranged with respect to said second height and/or with respect to said second length.
  • said construction element has a homogeneously arranged holes.
  • said homogeneous arranged hollows comprise a plurality of holes, each having a third height, the difference between said second and first height and/or the difference between said second and first length corresponding to at least the measurement of said third height.
  • said first volume has a first base
  • said at least a second volume has a second base and in that each of said holes has a third base, said first base and second base resulting substantially corresponding to twice said third base (b).
  • said first height results corresponding to four times said third height
  • said second height results corresponding to six times said third height
  • construction element comprises two second lateral volumes, arranged at the sides of said first volume.
  • At least a second lateral volume has a first acoustic finishing layer.
  • At least a second lateral volume has a second heat-absorbing finishing layer.
  • At least a second lateral volume has an incision made beforehand, suitable to facilitate creation of a cavity for passage of cables and/or tubes within the building structure.
  • the system for the construction of building structures comprises a plurality of tubular elements, preferably having a rectangular section, each suitable for placing between two central volumes of a first and a second juxtaposed construction elements, so as said second lateral volumes of said first construction element exactly match with said second lateral volumes of said second construction element.
  • tubular elements have a rectangular cross-section.
  • construction element according to the invention has a central volume 2 having a substantially parallepiped shape, with a base B and a height H, a first lateral volume 3, having a substantially parallelepiped shape, having a base B1 and a height H1, and a second lateral volume 4, having a substantially parallelepiped shape, having a base B2 and a height H2.
  • central volume 2 has two vertical rows, each one comprised of four holes 5, first lateral volume 3 has two vertical rows, each one comprised of six holes 5, with a first acoustic layer 6 and a second thermo-absorbent layer 7 juxtaposed.
  • Central volume 2 has a length L lower than lengths L1 of lateral volumes 3 and 4, so that, when a plurality of construction elements 1 is placed side by side, a space is realized about the four free sides of central volume 2.
  • system for realizing building structures according to the invention comprises a plurality of construction elements 1 and a series of tubular elements 8, having a rectangular cross-section, suitable to be inserted between two central volumes 2 of two construction elements 1 and 1' juxtaposed each other, so that lateral volumes 3 and 4 of first construction element 1 exactly match with lateral volumes 3' and 4' of second construction element 1'.
  • one side of rectangle H of said tubular elements 8 corresponds to the difference between height H1 of second 3 and third 4 lateral volume and height H of first central volume 2.
  • the other side of rectangle corresponds to the difference between length L1 of second 3 and third 4 lateral volume and length L of first central volume 2. If tubular element 8 has a squared cross-section, said differences will be equal each other.
  • amount of holes 5 realizing volumes 2, 3, and 4, as well as their proportion, are not relevant, provided that a height and/or base difference exists between two of the volumes 2, 3 and 4, so that while assembling, it is possible fitting them, being it possible inserting or not inserting between them the tubular element 8, and preventing the needing of offsetting them to prevent thermal bridges.
  • central volume 2 and one of the lateral volumes 3 or 4 can coincide, construction element being overturned each other to be assembled while realizing a bi-dimensional structure.
  • height and/or width difference between central volume and lateral volume is such not to require presence of further tubular elements 8 and, at the same time, construction elements according said embodiment of the invention do not need being offset each other, since volumes are already offset.
  • construction elements according to the invention can be full, i.e. without holes.
  • construction element according to the invention can be comprised by traditional extrusion techniques employing brick material, or by a single mold, but it is also possible applying more modern manufacturing techniques.
  • Another advantage of the present invention is due to the fact that building structures realized by using the construction element, as well as the relevant system, are mechanically resistant to horizontal stresses, since volumes 2, 3 and 4 are offset each other along every direction.
  • Still another advantage of the present invention is that structures realized by using construction elements according to the invention are provided with many functional elements, such as acoustic and/or acoustic layers 6, 7, or spaces for passage of cables or tubes.
  • Further advantage of the present invention is due to the predisposition to receive system components even after the realization of the structure, thanks to the presence of incisions along lateral volumes, facilitating creation of cavities for passage of tubes and/or cables, thus preventing the necessity of making breakages through the walls, causing possible failure of the structure and jeopardizing the final efficiency.
  • Last, but not least, advantage due to the construction elements and to the relevant construction system is, under an aesthetic point of view, possibility of coating the structure by a wide range of materials and of chromatic finishing.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Working Measures On Existing Buildindgs (AREA)
EP12425166.1A 2011-10-14 2012-10-12 Zeigelstein mit einer Vielzahl von Hohlräumen Withdrawn EP2581514A1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT000544A ITRM20110544A1 (it) 2011-10-14 2011-10-14 Elemento costruttivo per la costruzione di strutture edili e relativo sistema per la costruzione di strutture edili.

Publications (1)

Publication Number Publication Date
EP2581514A1 true EP2581514A1 (de) 2013-04-17

Family

ID=45094130

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12425166.1A Withdrawn EP2581514A1 (de) 2011-10-14 2012-10-12 Zeigelstein mit einer Vielzahl von Hohlräumen

Country Status (2)

Country Link
EP (1) EP2581514A1 (de)
IT (1) ITRM20110544A1 (de)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1784100A1 (de) * 1968-07-06 1971-07-22 Veit Dennert Kg Baustoffbetr E Hochwaermedaemmender Baustein
EP0093417A2 (de) * 1982-04-30 1983-11-09 Paul Dahm Bimsbaustoffwerke Hohlblockstein
DE29617805U1 (de) * 1996-10-14 1996-12-05 König, Siegfried, 67661 Kaiserslautern Deckenabschalstein mit integrierter Wärmedämmung
WO2000019032A1 (en) * 1998-09-30 2000-04-06 Kekanovic Milan The process of production of concrete ceramic, insulating, modular, facade type, ecological bearing wall elements
FR2952949A1 (fr) * 2009-11-26 2011-05-27 Batista Bernardo Martins Bloc de construction et procede d'isolation d'un mur utilisant ce bloc de construction.

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1784100A1 (de) * 1968-07-06 1971-07-22 Veit Dennert Kg Baustoffbetr E Hochwaermedaemmender Baustein
EP0093417A2 (de) * 1982-04-30 1983-11-09 Paul Dahm Bimsbaustoffwerke Hohlblockstein
DE29617805U1 (de) * 1996-10-14 1996-12-05 König, Siegfried, 67661 Kaiserslautern Deckenabschalstein mit integrierter Wärmedämmung
WO2000019032A1 (en) * 1998-09-30 2000-04-06 Kekanovic Milan The process of production of concrete ceramic, insulating, modular, facade type, ecological bearing wall elements
FR2952949A1 (fr) * 2009-11-26 2011-05-27 Batista Bernardo Martins Bloc de construction et procede d'isolation d'un mur utilisant ce bloc de construction.

Also Published As

Publication number Publication date
ITRM20110544A1 (it) 2013-04-15

Similar Documents

Publication Publication Date Title
CN101331281B (zh) 用于建造建筑物壁的木构件
ES2398555A1 (es) Bloque para construcción y método de construcción con dicho bloque.
KR20120011043A (ko) 하프 프리캐스트 플로어판 및 그것을 사용한 슬래브 구축 방법
US20180195281A1 (en) Construction block, a wall structure comprising the same, and a method for manufacture of said construction block and of said wall structure
CH699922B1 (it) Pannello prefabbricato per costruire una parete doppia di edifici.
JP2015523480A (ja) 鉄筋コンクリート床を構築するための焼結した発泡ポリスチレンの組み立て式要素
KR101763540B1 (ko) 샌드위치 패널을 이용한 모듈형 단열 조립체 및 그 시공방법
EP2340342B1 (de) Trägerbalken für deckenschalung
WO2009134137A2 (en) Thermally insulating building construction element assembly, and timber or lumber member for same
EP2581514A1 (de) Zeigelstein mit einer Vielzahl von Hohlräumen
CZ2011646A3 (cs) Stavebnicový systém pro presnou výstavbu
KR101376232B1 (ko) 조립식 건축용 모듈 및 이를 이용한 건축물 시공 방법
CN109914646A (zh) 陶砖装饰墙及其安装方法
KR20070084171A (ko) 거푸집 겸용 단열 패널 및 이를 이용한 건축용 거푸집
JP7016132B2 (ja) 連結式建設用ブロック
KR20110089967A (ko) 매립형 단자함체의 확장틀 구조
EP3631116B1 (de) Flaches bauelement, insbesondere zur herstellung von horizontalen gebäudestrukturen
ITTO20080430A1 (it) Metodo di costruzione modulare prefabbricato per la realizzazione di muri e contropareti, in particolare in conglomerato cementizio semplice o armato
WO2016204228A1 (ja) 建物
CH692211A5 (it) Elementi in laterizio per la costruzione di pannelli modulari per l'edilizia.
CN212376110U (zh) 一种轻钢墙体的外墙板安装结构
EP4056781A1 (de) Mehrschichtiger baustein
JP2023104108A (ja) 外壁
ITPI20090119A1 (it) Blocco per muratura con inserto in materiale isolante delimitato da linee di indebolimento.
CZ23511U1 (cs) Dvoupláštový stavební konstrukcní systém

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20131018