EP2566633B1 - Operating method for a production line with prediction of the command speed - Google Patents
Operating method for a production line with prediction of the command speed Download PDFInfo
- Publication number
- EP2566633B1 EP2566633B1 EP11710447.1A EP11710447A EP2566633B1 EP 2566633 B1 EP2566633 B1 EP 2566633B1 EP 11710447 A EP11710447 A EP 11710447A EP 2566633 B1 EP2566633 B1 EP 2566633B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- production line
- control computer
- strip
- point
- command
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000011017 operating method Methods 0.000 title claims description 39
- 238000004519 manufacturing process Methods 0.000 title claims 47
- 238000005096 rolling process Methods 0.000 claims description 43
- 238000004590 computer program Methods 0.000 claims description 8
- 230000003111 delayed effect Effects 0.000 claims description 3
- 238000001816 cooling Methods 0.000 description 77
- 238000000034 method Methods 0.000 description 22
- 230000006870 function Effects 0.000 description 21
- 238000013459 approach Methods 0.000 description 11
- 239000002826 coolant Substances 0.000 description 7
- 230000006978 adaptation Effects 0.000 description 6
- 230000008859 change Effects 0.000 description 6
- 238000010438 heat treatment Methods 0.000 description 6
- 239000012809 cooling fluid Substances 0.000 description 5
- 238000011144 upstream manufacturing Methods 0.000 description 5
- 230000001133 acceleration Effects 0.000 description 4
- 238000012935 Averaging Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 239000000110 cooling liquid Substances 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 239000007921 spray Substances 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000006698 induction Effects 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 229910001369 Brass Inorganic materials 0.000 description 1
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 238000013528 artificial neural network Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 238000009529 body temperature measurement Methods 0.000 description 1
- 239000010951 brass Substances 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012821 model calculation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/74—Temperature control, e.g. by cooling or heating the rolls or the product
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
- C21D11/005—Process control or regulation for heat treatments for cooling
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
- C21D8/0221—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the working steps
- C21D8/0226—Hot rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2261/00—Product parameters
- B21B2261/20—Temperature
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
- B21B2275/04—Roll speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
- B21B2275/06—Product speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/46—Roll speed or drive motor control
Definitions
- the present invention further relates to a computer program comprising machine code which is directly executable by a control computer for a finishing train for rolling a strip and whose execution by the control computer causes the control computer to operate the finishing train according to such an operating method.
- the present invention further relates to a control computer for a finishing train for rolling a belt, wherein the control computer is configured to operate the finishing train according to such an operating method.
- the present invention further relates to a finishing train for rolling a belt equipped with such a control computer.
- a hot strip mill consists of at least one finishing train and one downstream of the finishing train cooling section.
- the finishing train may be preceded by a roughing train - alternatively or in addition to the cooling section - or the finishing train may be preceded by a casting device.
- the finishing train has a number of rolling stands.
- the number of rolling stands can be determined as needed. As a rule, there are several rolling stands, for example four to seven rolling stands. In individual cases, however, only a single rolling stand can be present. For each roll stand - regardless of their number - a setpoint decrease is specified for every rolling pass to be performed. If several rolling stands are available, generally further input and / or outlet-side desired trains are specified. If only a single roll stand is present, input and / or outlet side predetermined tension can be specified. However, this is not mandatory.
- One of the targets to be met on a hot strip mill is the final rolling temperature, that is, the temperature at which the strip exits the finishing train.
- the final rolling temperature another variable describing the energy content of the strip at this location may also be used, for example, the enthalpy.
- the target size should be kept as far as possible over the entire length of the tape.
- the target size may alternatively be constant or vary along the length of the band.
- the guide speed of the finishing train is usually adjusted accordingly.
- the guide speed is a speed, from which - possibly in conjunction with the to be set in the finishing line Stichabtments and Sollseen - the occurring within the finishing line strip and roller peripheral velocities are clearly determined.
- it may be a fictitious speed of the tape head or the speed of the first rolling stand of the finishing train.
- the guide speed can be defined, for example, as a function as a location of the tape head.
- actuators act - as well as cooling devices of the cooling section - only locally on the tape. In the context of the present invention, however, the presence of these other actuators is of minor importance.
- Crucial factors are the conduction velocity (or a variable which is characteristic of the conduction velocity, for example the mass flow) and their determination.
- the finishing train is usually arranged downstream of a cooling section.
- the strip In the cooling section, the strip is cooled in a defined manner to a reel temperature (or enthalpy).
- the speed at which the belt passes through the cooling section is determined by the guide speed.
- the adjustment of the required for the individual band points Abkühlverdocument carried out in that the tape points are tracked away and control valves of the cooling devices of the cooling section, which adjust the flow of coolant flow, are controlled in a timely manner.
- the control valves have in practice considerable delay times, which are often in the order of several seconds. In order to be able to control the control valves in good time, it is therefore necessary to be on time knowing in advance when a certain band point is within the control of a particular cooling device. In order to calculate exactly when a certain band point enters this influence area and when it exits from it, it is necessary to know not only the instantaneous value of the master speed, but also the future course of the master speed, at least within the delay time of the control valves. In addition, the cycle time as such, ie the time required by the respective band point for passing through the cooling section, also influences the reel temperature. The cycle time is - of course - influenced by the course of the conduction velocity.
- 09 171 068.1 (Filing date 23.09.2009) describes a model predictive control, which regulates a finishing train and a cooling section together by means of a forecast.
- the mass flow is predicted.
- This approach requires coolant quantities output by actuators of the cooling section, to determine the mass flow. Furthermore, the mass flow is always readjusted immediately. Therefore, this approach does not solve the problem of reliably determining a conduction velocity history in advance.
- the object of the present invention is to provide opportunities to be able to reliably determine, in a reliable manner, even before the arrival of a band point in the finishing train, the guide variable not only for this band point, but also for band points entering the finishing line after this band point.
- control computer can, for example, carry out a weighted or unweighted averaging.
- control computer to determine the effective actual size and the effective target size make a weighted or unweighted averaging.
- the target function additionally receives a penalty, by means of which changes in the guide speed are punished.
- the actual size and the desired size of the points already entered the finishing line are received for each master in their determination only if these tape points at the time for which the respective guide is determined, not from the finishing train have leaked.
- the actual and nominal values of all band points, which are located at the time when the determined band point enters the finishing train in the finishing train can be included in the determination of the reference variable for a specific band point.
- control computer compares the expected energy content with the actual energy content and tracks the control values
- control computer tracks the guiding variables
- control computer takes into account the changed course of the characteristic variable when determining expectation variables.
- control computer carries out the tracking for all already determined control variables.
- control computer automatically tracks only those reference variables which were determined for band points which have a minimum distance at the time of tracking from the entrance of the finishing train.
- This procedure is particularly advantageous if the control computer or another control device uses the determined control variables to determine at least one further control variable and the further control variable is delayed by a dead time and acts only locally on the belt. This procedure is optimal if the minimum distance is determined in such a way that a time difference corresponding to the minimum distance is at least as long as the dead time.
- control computer can - of course - adapt the determination rule for as yet unidentified control variables as such.
- adaptation result can already be used to determine further parameters of the same Band or only when determining reference values for subsequent bands.
- the two last-mentioned procedures - keyword "tracking already determined parameters" on the one hand and "adapting the determination rule" on the other hand for example, be coupled to each other such that the control computer includes a model of the finishing train, is determined by means of which temperature for a band point on the outlet side of the finishing train is expected when the respective band point upstream of the finishing train has a given temperature and passes through the finishing train while the finishing train is operated at a given guide speed.
- the model can be adapted immediately. This corresponds to the adaptation of the investigation rule.
- the guide variable is newly determined using the adapted model of the finishing train. In terms of approach, this corresponds to tracking the already determined parameters.
- a smooth transition from the originally determined control variables to the newly determined control parameters can take place.
- the operating method according to the invention already represents a considerable advance over the prior art even if the prediction horizon is relatively small, for example three to five band points. Its full superiority shows the operating method according to the invention, however, in particular when the first band point and the part of the second band points, for which their respective Leitiere was determined before the arrival of the first band point in the finishing train, a prediction horizon corresponding to at least as large as the dead time is, with the other manipulated variable acts on the tape. This applies in particular in cooperation with the tracking of the already determined control variables, if the tracking is also tuned to the said dead time.
- control computer chains together the determined guiding variables or the corresponding guiding speeds by a spline, so that a guiding-speed course resulting from the linking is continuous and differentiable.
- the control computer preferably executes the determination of the control variables online or in real time as part of a precalculation.
- the object of the invention is further achieved by a computer program of the type mentioned.
- the computer program is designed in this case such that the control computer executes an operating method with all steps of an operating method according to the invention.
- control computer for a finishing train for rolling a belt which is designed such that it carries out such an operating method during operation.
- the object is further achieved by a finishing train for rolling a belt, which is equipped with such a control computer.
- a hot strip mill comprises at least one finishing train 1.
- a band 2 is to be rolled.
- the band 2 is usually a metal band, for example a steel band.
- the band may be made of copper, brass, aluminum or another metal.
- the finishing train 1 has to roll the belt 2 a rolling mill 3 or - as in FIG. 1 shown - several rolling stands 3 on. Shown in FIG. 1 three such stands 3.
- the actual number of rolling stands 3 can be three, as shown. Alternatively, it may be different from three, in particular larger. As a rule, the number of rolling stands 3 is four to eight, in particular 5 to 7.
- the rolling stands 3 in FIG. 1 only the work rolls shown (2-high). In general, the rolling stands 3 include in addition to the work rolls back-up rolls (4-high), sometimes additionally also intermediate rolls (6-high).
- the finishing train 1 may comprise a heating device 4, for example an induction furnace. If the heating device 4 is present, it is usually located at the entrance of the finishing train 1. Alternatively or additionally - as with intermediate stand cooling devices - 3 heaters may be present between the rolling stands. The heater 4, if present, is considered within the scope of the present invention as part of the finishing train 1. As an alternative or in addition to the heating device 4, the finishing train 1 may have interstitial cooling devices 5. If the inter-frame cooling devices 5 present are each inter-frame cooling device 5 of two of the rolling stands 3 eingabelt. If they are present, they are part of the finishing train 1. Each intermediate stand cooling device 5 has at least one control valve 5 'and at least one spray nozzle 5 ".
- the finishing train 1 may further be downstream of a cooling section 6. If the cooling section 6 is present, it has cooling devices 7. Each cooling device 7 has at least one control valve 7 'and at least one spray nozzle 7 ".
- the strip 2 is cooled with a liquid cooling medium (usually water with or without admixtures).
- a liquid cooling medium usually water with or without admixtures.
- the finishing train 1 is further equipped with a control computer 8.
- the control computer 8 is used at least to control the finishing train 1, so the rolling stands 3 and - if present - the heater 4 and the interstand cooling devices 5.
- the control computer 8 also control other facilities, such as the cooling section 6 and their cooling devices 7.
- the Cooling section 6 are controlled by another controller 8 '.
- the mode of operation of the control computer 8 is determined by a computer program 9 which is supplied to the control computer 8, for example via a mobile data carrier 10.
- the mobile data carrier 10 can be configured as required, for example as a CD-ROM, as a USB memory stick or as an SD memory card.
- the computer program 9 stored in machine-readable form, for example in electronic form.
- the computer program 9 comprises machine code 11 with which the control computer 8 is programmed and which can be processed directly by the control computer 8.
- the processing of the machine code 11 by the control computer 8 causes the control computer 8 to operate the finishing train 1 in accordance with an operating method which will be explained in more detail below.
- Programming with the computer program 9 thus effects a corresponding configuration of the control computer 8.
- control computer 8 In the context of the operating procedure, the control computer 8 must comply with FIG. 2 in a step S1 for a first band point 12 of the band 2, a number of second band points 13 of the band 2 and a number of third band points 13 'of the band 2 each an actual size G and a target size G * be known, and at the latest to one Time at which the first band point 12 is still in front of the finishing train 1.
- the second band points 13 are all behind the first band point 12, so they run after the first band point 12 in the finishing train 1 a.
- the third band points 13 'enter the finishing train 1 before the first band point 12.
- the FIGS. 3 to 6 show corresponding embodiments.
- each band point 12, 13, 13 ' is characteristic of the energy content which the respective band point 12, 13, 13' has at a location xE in front of the finishing train 1.
- the actual size G is thus at the location xE in front of the finishing train 1 based.
- the location xE can be determined as needed. In particular, it may be according to FIG. 1 to act at a location immediately before the first device 4, 3 of the finishing train 1, by means of which - directly or indirectly - the temperature of the belt 2 is affected. It is still possible that a temperature measuring device is arranged at this location. In general, however, the temperature measuring device 14 is arranged upstream of the location Xe.
- the desired value G * of each band point 12, 13, 13 ' is characteristic of the energy content which the respective band point 12, 13, 13' should have at a location xA behind the finishing train 1.
- the desired values G * are therefore related to the location xA behind the finishing train 1.
- the location xA can be determined as required, analogously to the location xE in front of the finishing train 1. For example, it may be the location of a temperature measuring device 15 downstream of the finishing train 1, but upstream of the cooling section 6.
- the type of the actual size G and the target size G * can be determined as needed. As a rule, these are the corresponding temperatures. Alternatively, an enthalpy in particular comes into question.
- location always refers to a location which is stationary with respect to the finishing train 1.
- band point in contrast, always refers to a point which is stationary relative to the band 2.
- Distances between the band points 12, 13, 13 'from one another are not determined by their geometric distances in the context of the present invention, since these distances are determined by change the rolling of the belt 2 in the finishing train 1. The distances are defined rather by the mass which is located between the belt points 12, 13, 13 '.
- the band points 12, 13, 13 ' may, based on the mass of the band 2 located between them, be equidistant.
- the band points 12, 13, 13 ' can be defined by the fact that - for example by means of the temperature measuring device 14 - in each case a measured value for the actual quantity G is detected in equidistant time steps.
- the time interval between two successive band points 12, 13, 13 ' is generally between 100 ms and 500 ms, typically between 150 ms and 300 ms. For example, it may be 200 ms.
- step S2 the control computer 8 determines - of course, before the arrival of the first band point 12 in the finishing train - for the first band point 12 on the basis of a determination rule a Leitiere L *.
- step S3 the control computer 8 determines at least for a part of the second band points 13 also on the basis of a determination rule a respective control variable L *.
- the control computer 8 also executes step S3 before entering the first strip point 12 into the finishing train 1.
- Steps S2 and S3 of FIG. 2 usually form a unit in practice.
- the separate illustration in FIG. 2 is merely a better illustration of the present invention.
- control computer 8 determines in the context of step S3 for all second band points 13, which - starting from the first band point 12 - are within a predetermined prediction horizon H, whose master size L *. If, therefore, in the context of step S3 for a particular second band point 13, its reference variable L * is determined, as a rule, for all other second band points 13 which lie between the first band point 12 and the specific second band point 13, their respective reference variable L * determined.
- the determined guiding variables L * are respectively characteristic of the guiding speed vL of which the control computer 8 operates the finishing train 1 when the belt point 12, 13, for which the respective guiding variable L * was determined, enters the finishing train 1.
- the guide speed vL can be, for example be the speed at which the tape 2 enters the finishing train 1. Alternatively, it may be the speed with which the belt 2 leaves the finishing train 1. Other sizes - for example, a determination of the mass flow or a roller speed or a roller peripheral speed - are conceivable. It is crucial that all of the strip and roll peripheral speeds occurring in the finishing train 1 are uniquely determined by the guide speed vL, possibly in conjunction with stitch acceptments and debit trains.
- a step S4 the control computer 8 determines, if necessary, the corresponding guide speeds vL on the basis of the control variables L *.
- the control computer 8 operates the finishing train 1 in accordance with the guide speeds vL determined in step S4.
- the control computer 8 thus always sets the guide speed vL in such a way that the finishing line 1 is currently operated at the guide speed vL, which corresponds to the guide variable L * of the strip point 12, 13 currently entering the finishing line 1.
- the determination rule for determining the guiding variables L * is in each case specific to the respective band point 12, 13.
- the determined value of the reference variable L * for a particular band point 12, 13 can not therefore be readily determined by the value of the reference variable L * for another band point 12, 13 are closed.
- the actual size G and the desired size G * of the corresponding band point 12, 13 enter into the determination rule for the reference variable L * for a specific band point 12, 13.
- FIG. 7 shows an example of a snapshot of the finishing train 1, while the band 2 is rolled in the finishing train 1.
- the band points P5 to P30 in the finishing train 1 are currently the band points P5 to P30 in the finishing train 1.
- the band points P1 to P4 have already left the finishing train 1 in this case, so have exited the finishing train 1 again.
- the band points P31 to P35 are still in front of the finishing train 1.
- the band point P31 occurs in this case next in the finishing train 1 a.
- the band points P32, P33, P34 and P35 enter the finishing train 1 in succession.
- the actual and target variables G, G * are known up to and including the band point P35.
- the determination of the guide quantity L * for the band point P4 must have been completed one time clock before the point in time when the band point P1 entered the finishing train 1.
- the determination of the guiding quantity L * for the band point P30 is sufficient for the determination of the guiding quantity L * for the band point P30 to take into account the actual and nominal quantities G, G * of the band points P5 to P30, ie those band points which, according to the illustration of FIG FIG. 7 currently located in the finishing mill 1.
- the guiding variables L * are determined for the band points P31 to P35.
- the band point P31 corresponds in the representation of FIG. 7 the determination of the guide quantities L * for these band points P31 to P35 must be completed at the latest at the time of the occurrence of the band point P27 to P31 in the finishing train 1 at the latest.
- the band points P1 to P30 correspond to the third band points 13 '.
- the finishing train 1 are usually at the same time a plurality of band points 12, 13, 13 '.
- Typical numerical values lie between 10 and 200, for example between 50 and 100. It is possible to take into account only a few band points 12, 13, 13 'of the band points 12, 13, 13' which are currently in the finishing train 1 at a particular time, for example, every second or every fourth band point 12, 13, 13 '. This approach leads to a reduced computational effort and still delivers acceptable results.
- the actual and nominal values G, G * of all band points 12, 13, 13 ' are taken into account for the determination of the reference variable L * for a specific band point 12, 13, which at the time of entry of that band point 12, 13, whose control variable L * is determined to be in the finishing train 1 already in the finishing mill 1.
- the illustration shown is of course purely exemplary.
- the number of (third) band points 13 'located in the finishing train 1 is purely exemplary.
- the number of (second) band points 13 whose lead variable L * is predicted is purely exemplary.
- the prediction horizon H is purely exemplary. In particular, in practical applications, the prediction horizon H can be several seconds, ie at a time cycle of, for example, 200 ms per measured value acquisition of the actual quantity G a correspondingly five times the number of band points 12, 13. In some cases even a prediction horizon H of up to one minute and more is possible. which corresponds to a prediction horizon H of 300 band points and more at a time interval of 200 ms from band to band point.
- control computer 8 in step S1 of FIG. 2 the actual and nominal values G, G * are known for all band points 12, 13, 13 'of the (entire) band 2. In this case, it is possible that the control computer 8 passes through the steps S2 and S3 only once and in steps S2 and S3 - so to speak in one stroke - determines the guiding variables L * for all band points 12, 13, 13 'of the band 2. In this case the control computer 8 executes the determination of the control variables L * on the basis of a prediction online.
- control computer 8 in the context of step S1 of FIG. 2 the actual and nominal quantities G, G * are known for all band points 12, 13, 13 'of the entire band 2, he in steps S2 and S3 of FIG. 2 but always determined only for some of the band points 12, 13, 13 'whose guiding variables L *.
- steps S2 and S3 are as in FIG. 2 indicated by dashed lines, incorporated in a loop.
- the control computer 8 executes the determination of the control variables L * in real time with the control of the finishing train 1.
- the control computer 8 determines the guiding variables L * by the prediction horizon H, so to speak.
- step S1 is included in the loop with. Also in this case, the control computer 8 executes the determination of the control variables L * in real time.
- the control computer 8 will only know the actual and nominal values G, G * of band points 12, 13 during a certain passage of the loop, which are not yet in the finishing train 1 occurred.
- the actual and target variables G, G * of the band points 13 ', which have already entered the finishing train 1, are known to the control computer 8 in this case, however, on the basis of earlier loop passes. In this case, it is only necessary for the control computer 8 to "remember" the "old" actual and target variables G, G *.
- control computer 8 selects according to FIG. 8 in a step S11 first one of the band points 12, 13, whose actual and desired size G, G * the control computer 8 are already known. For example, the control computer 8 selects the band point P31 of FIG FIG. 7 ,
- the control computer 8 determines all band points 12, 13, 13 ', whose actual and desired values G, G * are included in the determination of the control variable L * for the band point 12, 13, which the control computer 8 has selected in step S11 , For example, the control computer 8 - see FIG. 7 - Determine the band points P6 to P31 for the band point P31. In an analogous manner, the control computer would determine the band points P7 to P32 for the band point P32 in step S12, for the band point P33 the band points P8 to P33, etc.
- step S13 the control computer 8 selects one of the band points 12, 13, 13 'determined in step S12.
- step S14 the control computer 8 determines a single-wire size 1 * for the tape point 12, 13, 13 'selected in step S13-for example for the tape point P6. Only the actual size G and the target size G * of the band point 12, 13, 13 'selected in step S13 are included in the determination of the individual wire size 1 *. The respective Einzelleitulate 1 * is therefore related to this one band point 12, 13, 13 '.
- the Einzelleitiere 1 * determines a corresponding conduction velocity vL.
- the control computer 8 assumes that the considered in step S14 band point 12, 13, 13 'passes through the finishing train 1 and the finishing train 1 during the entire passage of the considered band point 12, 13, 13' through the finishing line 1 - ie from the time of Entering the finishing train 1 until it leaves the finishing train 1 - is constantly operated at this guide speed vL, which is determined by the corresponding individual wire size 1 *.
- an energy content is expected for the considered band point 12, 13, 13 'at the location xA, to which the nominal value G * of the considered band point 12, 13, 13' is related.
- the control computer 8 determines this expected energy content.
- the determination of the expected energy content can be determined by the control computer 8, for example by means of a finishing road model. Suitable finishing models are known as such. They are used, for example, to determine the expected final rolling temperature, see the already mentioned DE 103 21 791 A1 ,
- the expected energy content is characterized by a corresponding expected quantity GE.
- the expectation variable GE can alternatively be the temperature or the enthalpy, analogous to the actual and set values G, G *.
- the control computer 8 determines the Einzelleitiere 1 * for the considered band point 12, 13, 13 'in step S14 such that the expected size GE with the target size G * for the considered band point 12, 13, 13' matches.
- step S15 the control computer 8 checks whether it has already performed step S14 for all band points 12, 13, 13 'to be used. If this is not the case, the control computer 8 returns to step S13. In the renewed execution of step S13 of course, the control computer 8 selects another, previously not considered band point 12, 13, 13 ', which enters into the determination of the sought Leitiere L *, for example, the band point P7.
- step S15 determines in step S15 that it has already determined all the required individual line sizes 1 *
- the control computer 8 proceeds to a step S16.
- step S16 the control computer 8 determines the reference variable L * for all single-element sizes 1 *, which it has determined during the repeated execution of step S14
- the control computer 8 may form the weighted or unweighted mean value of the individual line sizes 1 *.
- step S17 the control computer 8 checks whether it has already carried out the steps S11 to S16 for all band points 12, 13 whose guide variables L * are to be calculated. If this is not the case, the control computer 8 returns to step S11. Of course, the control computer 8 selects another band point 12, 13 which has not yet been considered. Otherwise, the method of FIG FIG. 8 completed.
- step S21 the control computer 8 uses the actual variables G of the band points 12, 13, 13 'determined in step S12 to determine an effective actual variable G'.
- the control computer 8 determines an effective setpoint G '* in step S22 on the basis of the setpoint values G * of the band points 12, 13, 13' determined in step S12.
- the control computer 8 in steps S21 and S22 a weighted or unweighted Averaging. Regardless of which approach is taken, however, the procedures of steps S21 and S22 should correspond.
- step S23 the control computer 8 determines the reference variable L * for the band point 12, 13 selected in step S11.
- the master variable L * determined in step S23 corresponds to a corresponding master speed vL. If the selected in step S11 band point 12, 13 at the location xE, to which the actual size G of the selected in step S11 band point 12, 13, the effective actual size G 'would have and the control computer 8, the finishing line 1 during the entire run of the band point 12, 13 selected in step S11 would operate at this guide speed vL, an actual energy content would be expected for this band point 12, 13 at the location xA, to which the setpoint G * of the band point 12, 13 selected in step S11 is related which is characterized by an expected quantity GE. The control computer 8 determines the control variable L * in step S23 such that the determined expectation variable GE agrees with the effective setpoint G '*. The determination of the expected variable GE can - analogous to the procedure of step S14 of FIG. 8 - By means of a corresponding, known per se finishing road model.
- a step S32 the control computer 8 determines a respective expectation variable GE for the band points 12, 13 considered in step S31.
- the expected values GE determined in step S32 are in each case characteristic of the expected energy content of the respective band point 12, 13 which is expected for the respective band point 12, 13, if the respective band point 12, 13 is the finishing line 1 in accordance with the scheduled course of the guide speed vL - As defined by the sequence of the guiding variables L * - goes through.
- the expected energy contents GE are each related to the location xA, to which the desired quantities G * for the band points 12, 13 are related.
- the control computer 8 forms an objective function Z. At least the amounts of the differences of the expectation variables GE from the corresponding desired variables G * enter into the objective function Z.
- the objective function Z may include a sum, corresponding to the representation in FIG FIG. 10
- each summand is the square of the difference of an expected quantity GE from the corresponding target size G *.
- indices i, j were used because the indices i and j run over different areas.
- ⁇ i and ⁇ j are - in principle arbitrary, non-negative - weighting factors.
- control computer 8 varies the applied guiding variables L * with the aim of optimizing the target function Z according to the embodiment above. With a correspondingly different design of the objective function Z, maximizing would also be possible.
- the procedures of the FIG. 8 and 9 are applicable regardless of whether in a single execution of steps S2 and S3 of FIG. 2 only a few guiding variables L * are determined or whether the guiding variables L * for all band points 12, 13, 13 'of the band 2 are determined in advance.
- the procedure of FIG. 10 on the other hand, meaningful results are usually only obtained if the prediction horizon H covers the entire band 2 or, if the band 2 is long enough, is sufficiently large.
- the effective finishing line length is determined by the maximum number of tape points 12, 13, 13 'simultaneously located in the finishing train 1.
- expectation quantities GE must be determined.
- the determination of the expected quantities GE takes place - from the point of view - by means of a model of the finishing train 1, which models the thermal processes (heat conduction and heat transfer, possibly also phase transformations and microstructure) in the finishing train 1.
- models are known per se, see the DE 103 21 791 A1 ,
- control computer 8 it is possible to use such a model as such also in steps S14, S23 and S32.
- the control computer 8 according to the representation of FIG. 11 in a step S41 in advance - that is, before the determination of the control variables L * - created a data field.
- the control computer 8 deposits in the data field in a step S42 for a multiplicity of possible guide speeds vL and possible actual variables G, which expectation variable GE results for the respective possible actual variable G and the respective possible guide speed vL. Because in this case, the control computer 8 in the context of the appropriately configured steps S2 and S3 of FIG. 2 (or the steps S14, S23 and S32) determine the guiding variables L * for the band points 12, 13 using the data field. In the procedure according to FIG.
- control computer 8 determines the Einzelleitieren l * using the data field, so that the use of the data field is indirect nature.
- the respective control variable L * is determined directly.
- the data field is used to determine the respectively resulting expected quantities GE.
- the nature of the integration of the data field in the procedures of FIG. 8 and 9 is immediately apparent, since the actual size G the Control computer 8 is known and the relationship between the possible conduction velocity vL and the expectation variable GE is unambiguous (the larger the given actual size G is the conduction velocity vL, the greater the expected energy content of the corresponding band point 12, 13, 13 ').
- the data field is also in connection with the approach of FIG. 10 applicable. For it is possible to form in the first and, as a rule, already very good approximation for a specific band point 12, 13, 13 'the mean value of all guiding variables G * or of all guiding speeds vL with which the finishing train 1 during the passage of the relevant band point 12, 13, 13 'is operated by the finishing train 1. This mean value can be regarded as the effective guide speed vL.
- the data field can thus be evaluated at this point in order to determine the expectation variable GE for the corresponding band point 12, 13, 13 '.
- the data field can be designed as needed. For example, it can be a pure interpolation field with, for example, 5, 8, 10, ... interpolation points per dimension. In this case, it is possible to interpolate between individual support points linearly or nonlinearly (for example by means of splines). Alternatively, the data field may be formed, for example, as a neural network.
- the location xE is located in front of the finishing train 1, to which the actual quantities G are related, but behind the temperature measuring device 14. It is therefore necessary to convert the measured quantities into the actual quantities G (which refer to the location xE). This is relatively easy, since only an air gap must be calculated. Input values for the air gap are the temperature value measured by means of the temperature measuring device 14 and the time which accumulates for the respective band point 12, 13, 13 'until the corresponding band point 12, 13, 13' projects the location xE reached the finishing train 1. The time is given for each band point 12, 13, 13 'by the conduction velocities of the upstream band points 12, 13, 13'.
- the finishing train 1 has neither an input-side heating device 4 nor inter-frame cooling devices 5. If the heating device 4 and / or the inter-frame cooling devices 5 are present, the operating method according to the invention can be adapted accordingly. The necessary adjustments will be explained below in connection with a single inter-frame cooling device 5. However, the corresponding embodiments are readily applicable to embodiments of the finishing train 1, which has more than one inter-frame cooling device 5 and / or an input-side heater 4, the heater 4 may be provided alternatively or in addition to the inter-frame cooling devices 5.
- the finishing train 1 has a single intermediate-frame cooling device 5, for example between the second and the third rolling stand 3 as shown in FIG. 1 .
- the model of the finishing mill 1 - this is immediately and without further ado - divided into three submodels, which in FIG. 12 are referred to as partial model TM1, partial model TM2 and partial model TM3.
- the partial model TM1 is similar in design to a model of a finishing train 1, as previously assumed, ie a model of a finishing train 1 without interstand cooling devices. It models the behavior of the belt 2 in the finishing train 1 to ahead of the inter-frame cooling device 5.
- the partial model TM1 receives as input variables the actual size G of a band point 12, 13, 13 'and the leading speed vL and the corresponding Leit ein.
- the submodel TM1 supplies as output variable an expectation variable TE which corresponds to an expected energy content with which the corresponding band point 12, 13, 13 'enters the inter-frame cooling device 5.
- the partial model TM1 is two-dimensional, because it has two input variables, namely the actual size G and the guide speed vL.
- the partial model TM2 models the inter-frame cooling device 5 as such. It receives as input quantities the expected quantity TE delivered by the partial model TM1, the guide speed vL, with which the respective strip point 12, 13, 13 'passes through the intermediate stand cooling device 5 and a coolant quantity M, given as such, with which the strip 2 is acted upon per unit of time ,
- the amount M of cooling fluid per unit time is preferably defined as a function of the amount of material of the belt 2, which has already passed the inter-frame cooling device 5.
- the amount M of cooling fluid per unit of time may be defined, for example, as a function of the respective band point 12, 13, 13 ', which is just entering the inter-frame cooling device 5.
- the partial model TM2 thus has three input variables, in contrast to a model of a finishing train 1 without interstand cooling devices.
- the setting up of a corresponding three-dimensional data field for the three-dimensional partial model Depending on the computing power available, TM2 may still be possible.
- partial model TM2 is preferably split into two submodels TM2 ', TM2 ", which are multiplicatively linked with one another, because with sufficient accuracy, a three-dimensional function f, which displays an expected variable TA behind the inter-frame cooling device 5 as a function of expected size TE before the intermediate structure Cooling device 5, the guide speed vL and the amount M of cooling liquid per unit time, are shown as the product of a two-dimensional function g and a one-dimensional function h
- the function g is in this case of the expected value TE, which is supplied by the partial model TM1, and the The function h depends only on the quantity M of cooling liquid per unit of time, so it can be used
- the submodel TM3 has the same structure as the submodel TM1. It models the part of the finishing train 1 which is arranged behind the intermediate stand cooling device 5.
- the submodels TM1 to TM3 are connected to each other and concatenated with each other, so that the outputs of the one submodel TM1, TM2 input variables of the next model TM2, TM3 are.
- the dimensionality of the modeling problem can already be considerably reduced, namely to the consideration of a three-dimensional and two-dimensional problems.
- the complexity can be further reduced. In particular, by reducing the complexity of the three-dimensional problem, the real-time and on-line capability is maintained even when the inter-frame cooling devices 5 and / or the heater 4 are present.
- the guiding variables L * can therefore be calculated on condition that the course of the amount M of cooling fluid per unit time is given.
- the quantity M can then be varied for each intermediate-structure cooling device 5 in order to obtain the expected energy contents of the band points 12, 13, 13 'as far as possible from the corresponding desired energy contents the band points 12, 13, 13 'approximate.
- the determination of the correct quantities M takes place completely analogously to the determination of the correct quantities of cooling liquid for the cooling devices 7 of the cooling section 6.
- control computer 8 it is possible for the control computer 8 to control the finishing train 1 without detecting a measured quantity GM which is characteristic of the actual energy content of the band points 12, 13, 13 'behind the finishing train 1.
- the control computer 8 counteracts a corresponding temperature measurement take, which was detected by the temperature measuring device 15.
- control computer 8 determines according to FIG. 13 in a step S52 for at least a portion of the band points 12, 13, 13 '- preferably for all band points 12, 13, 13' - in each case an expected quantity GE '.
- the control computer determines 8 for each band point 12, 13, 13 'whose expectation size GE' while the respective band point 12, 13, 13 'passes through the finishing train 1.
- the control computer 8 it is alternatively possible for the control computer 8 to determine the corresponding expectation variable GE 'before the respective band point 12, 13, 13' passes through the finishing train 1.
- Each such expected expectation variable GE ' is characteristic of the energy content which is expected for the respective band point 12, 13, 13' at the location xA, to which the desired quantities G * are related.
- the control computer 8 determines the expected quantities GE 'using the Leit Anlagensverlaufs, with which the respective band point 12, 13, 13' actually passes through the finishing train 1.
- the control computer 8 compares the energy content according to the measured variable GM and the energy content according to the corresponding expected variable GE 'with each other. Depending on the comparison of step S53, the control computer 8 automatically carries out at least a part of the control variables in a step S54 L *, which has already been determined by the control computer 8 at the time of the comparison.
- step S54 refers only to those control variables L *, which are indeed already determined at this time, but are still pending execution.
- the step S54 is thus carried out only for guiding variables L * which were determined for band points 12, 13 which have not yet entered the finishing train 1 at the time of the tracking.
- the first tracking variable L * can be tracked by 10% of its change, the second tracking variable by 20% of its change, the third tracking variable L * by 30% of its change, etc.
- step S54 it is possible that the control computer 8 in a step S55 on the basis of the comparison, the determination rule for determining the control variables L * as such adapted. This ensures that future determined control variables L *, which are not yet determined at the time of the comparison of step S53, are determined in an improved manner.
- the adaptation of the determination rule may include in particular an adaptation of the model of the finishing train 1 and here in particular of the heat transfer model.
- the adaptation can take place, for example, by adding an offset to the actual quantities G before they are used as the input variable of the data field.
- the leading velocity vL may be scaled by a factor and / or added to an offset before being used as the input of the data field.
- an offset can be added to the expected variable GE, GE 'respectively determined using the data field.
- the real-time capability of the operating method according to the invention is maintained in this simplified way of adapting the model of the finishing train 1.
- step S54 It is possible in the context of step S54 to track all the control variables L * which have already been determined at this time, but have not yet been executed, that is to say, for example, the master variable L * for the (first) band point 12 entering the finishing train 1 next.
- the control computer 8 automatically performs only those guiding variables L * determined for (second) belt points 13 which at the time of tracking from the entrance of the finishing train 1 have a minimum distance MIN (see FIG. 14 ) exhibit.
- the prediction horizon H is determined by the second band point 13, whose master size L * is already determined and which has the greatest distance from the finishing line 1 from the second band points 13 whose guiding variables L * have already been determined. It may be expedient if the control computer 8 automatically uses the comparison to track only those reference variables L * which were determined for second band points 13 which have the minimum distance MIN at the time of tracking from the entrance of the finishing train 1. This will be described below in connection with FIG. 7 be illustrated.
- the control computer 8 determines the temperature for the band point P2 at the exit of the finishing train 1 (ie at location xA) is expected. This corresponds to the step S52 of FIG. 13 , The control computer 8 continues to receive from the temperature measuring device 15, the actual temperature, which is measured for the band point P2. This corresponds to the step S51 of FIG. 13 , Assume that the comparison of step S53 gives a deviation. Despite the deviation of the control computer 8 leaves - for example - the already determined guiding variables L * for the band points P31 to P34 unchanged.
- step S53 Based on the comparison of step S53 in step S54, it only traces the reference variable L * of the band point P35.
- the control variables L * for subsequent band points P36, P37,..., Which are not yet determined at this time, are determined by the control computer 8 on the basis of a determination rule which it adapts in step S55 on the basis of the comparison of step S53.
- the finishing train 1 is usually downstream of a cooling section 6.
- the cooling section 6 has cooling devices 7.
- Each cooling device has (at least) one control valve 7 'and a number of spray nozzles 7 "assigned to the respective control valve 7'
- the amount of cooling fluid delivered locally to the belt 2 is set by means of the respective control valve 7 '
- the control valves 7' react relatively Calculated from the time at which a control valve 7 'is controlled with a changed manipulated variable S until the time at which the changed control affects the belt 2, there is a dead time T, which is often in the range of seconds
- the course of the guide speed vL also influences the passage time of the belt points 12, 13, 13 'through the cooling section 6.
- control device 8' which controls the cooling devices 7 of the cooling section 6, not only knows the current value of the guide speed vL, but also their future course. Only then can the control device 8 'of the cooling section 6 react in good time to future changes in the guide speed vL.
- the control device 8 'of the cooling section 6 must therefore use the control variable L * - and also future upcoming control variables L * - to determine the manipulated variables S for the control valves 7', when the correct amounts of coolant are applied to the "right" places of the belt 2 should. This of course also applies in an analogous form when the control of the cooling section 6 is carried out by the control computer 8.
- the characteristic variable course should be used in the determination of the manipulated variables S for the inter-frame cooling devices 5 in order to be able to react in good time to future changes in the guide speed vL.
- the prediction horizon H is according to FIG. 14 at least that way is large as the above-explained dead time T.
- the prediction horizon H is even greater than the dead time T. If, for example - see FIG. 7 - The dead time T corresponds to the band points P31 to P33, the prediction horizon H should extend over more than two band points, for example according to the representation of FIG. 7 over four band points.
- the minimum distance MIN, within which the tracking of the control variables L * is suppressed, should be at least as long as the dead time T, for example according to FIG. 7 amount to three band points.
- the guiding variables L * are determined point by point for the individual band points 12, 13.
- the step S4 is formed in the form of a step S61.
- the control computer 8 chains the determined control variables L * to each other by a spline, so that the chaining results in a control variable course that is continuous and differentiable.
- the so-defined Leit Anlagensverlauf is continuous and differentiable.
- step S62 the control computer 8 determines the corresponding point-specific guide speeds vL on the basis of the guide variables L * determined on a point-by-point basis. In this case, the control computer 8 chains the corresponding guide speeds vL by a spline to each other, so that the chaining results in a continuous and differentiable conduction velocity course.
- Steps S61 and S62 are alternative to each other. They are therefore both in FIG. 15 represented, however, both drawn only dashed.
- the above-described operating method for the finishing train 1 provides - initially - guiding speeds vL until the last band point 13 of the band 2 has entered the finishing train 1.
- the guide speed vL must be defined as long as at least one band point 12, 13 is located in the finishing train 1, ie even if no further band points 12, 13 run into the finishing train 1 more. It is readily possible to expand the procedure according to the invention accordingly. It is only necessary to consider within the control computer 8 in addition to the band points 12, 13, 13 'for the physically existing band 2 virtual band points, which are attached to the first-mentioned band points. Also for these virtual band points, a corresponding control variable L * is determined. The virtual band points, however, neither an actual size G nor a target size G * is assigned, so that the virtual band points themselves do not contribute to the determination of the corresponding guiding variables L *.
- the Leitiere L * was further explained in each case in conjunction with the band points 12, 13, which run into the finishing train 1 at certain times. However, this is not to be understood as meaning that the corresponding guiding variables L * are permanently assigned to the corresponding band points 12, 13. The decisive factor is therefore only the assignment of the respective control variable L * at a certain point in time, wherein the time is defined by the fact that the corresponding band point 12, 13 at this time in the finishing train 1 enters.
- the present invention has many advantages.
- an improved - even significantly improved - accuracy with which the cooling section 6 can be controlled So it is possible, for example, both a final rolling temperature (at the outlet of the finishing train 1) and a reel temperature (at the outlet of the cooling section 6) to comply with high accuracy.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Physics & Mathematics (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Control Of Metal Rolling (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Multi-Process Working Machines And Systems (AREA)
- Control By Computers (AREA)
- General Factory Administration (AREA)
Description
Die vorliegende Erfindung betrifft ein Betriebsverfahren für eine Fertigstraße zum Walzen eines Bandes,
- wobei einem Steuerrechner für die Fertigstraße spätestens zu einem Zeitpunkt, zu dem ein erster Bandpunkt des Bandes sich noch vor der Fertigstraße befindet, für den ersten Bandpunkt eine Istgröße und eine Sollgröße bekannt sind,
- wobei die Istgröße für den Ist-Energieinhalt des ersten Bandpunktes und Sollgröße für den Soll-Energieinhalt des ersten Bandpunktes charakteristisch sind,
- wobei die Istgröße auf einen Ort vor der Fertigstraße bezogen ist und die Sollgröße auf einen Ort hinter der Fertigstraße bezogen ist,
- wobei der Steuerrechner vor dem Einlaufen des ersten Bandpunktes in die Fertigstraße für den ersten Bandpunkt anhand einer Ermittlungsvorschrift eine Leitgröße ermittelt,
- wobei die Leitgröße dafür charakteristisch ist, mit welcher Leitgeschwindigkeit der Steuerrechner die Fertigstraße zum Zeitpunkt des Einlaufens des ersten Bandpunktes in die Fertigstraße betreibt,
- wobei der Steuerrechner anhand der Leitgröße die Leitgeschwindigkeit ermittelt und die Fertigstraße zum Zeitpunkt des Einlaufens des ersten Bandpunktes in die Fertigstraße mit der Leitgeschwindigkeit betreibt,
- wobei in die Ermittlungsvorschrift für die Leitgröße die Istgröße und die Sollgröße des in die Fertigstraße eintretenden Bandpunktes eingehen.
- wherein a control computer for the finishing train, at the latest at a time at which a first band point of the band is still in front of the finishing train, for the first band point, an actual size and a nominal size are known,
- the actual size being characteristic of the actual energy content of the first band point and nominal size of the target energy content of the first band point,
- wherein the actual size is related to a location in front of the finishing train and the target size is related to a location behind the finishing train,
- wherein the control computer ascertains a reference variable before the first band point enters the finishing train for the first band point on the basis of a determination rule,
- the guide variable being characteristic of the rate at which the control computer operates the finishing train at the time of entry of the first strip point into the finishing train,
- wherein the control computer determines the guide speed on the basis of the guide variable and operates the finishing train at the time of the entry of the first strip point into the finishing train at the guide speed,
- wherein the actual size and the nominal size of the strip point entering the finishing line are included in the determination rule for the guide variable.
Die vorliegende Erfindung betrifft weiterhin ein Computerprogramm, das Maschinencode umfasst, der von einem Steuerrechner für eine Fertigstraße zum Walzen eines Bandes unmittelbar abarbeitbar ist und dessen Abarbeitung durch den Steuerrechner bewirkt, dass der Steuerrechner die Fertigstraße gemäß einem derartigen Betriebsverfahren betreibt.The present invention further relates to a computer program comprising machine code which is directly executable by a control computer for a finishing train for rolling a strip and whose execution by the control computer causes the control computer to operate the finishing train according to such an operating method.
Die vorliegende Erfindung betrifft weiterhin einen Steuerrechner für eine Fertigstraße zum Walzen eines Bandes, wobei der Steuerrechner derart ausgebildet ist, dass er die Fertigstraße gemäß einem derartigen Betriebsverfahren betreibt.The present invention further relates to a control computer for a finishing train for rolling a belt, wherein the control computer is configured to operate the finishing train according to such an operating method.
Die vorliegende Erfindung betrifft weiterhin eine Fertigstraße zum Walzen eines Bandes, die mit einem derartigen Steuerrechner ausgestattet ist.The present invention further relates to a finishing train for rolling a belt equipped with such a control computer.
Die oben genannten Gegenstände sind beispielsweise aus der
Aus
Eine Warmbandstraße besteht in der Regel zumindest aus einer Fertigstraße und einer der Fertigstraße nachgeordneten Kühlstrecke. Gegebenenfalls kann - alternativ oder zusätzlich zur Kühlstrecke - der Fertigstraße eine Vorstraße vorgeordnet sein oder kann der Fertigstraße eine Gießeinrichtung vorgeordnet sein.As a rule, a hot strip mill consists of at least one finishing train and one downstream of the finishing train cooling section. Optionally, the finishing train may be preceded by a roughing train - alternatively or in addition to the cooling section - or the finishing train may be preceded by a casting device.
Die Fertigstraße weist eine Anzahl von Walzgerüsten auf. Die Anzahl an Walzgerüsten kann nach Bedarf bestimmt sein. In der Regel sind mehrere Walzgerüste vorhanden, beispielsweise vier bis sieben Walzgerüste. In Einzelfällen kann jedoch auch nur ein einziges Walzgerüst vorhanden sein. Für jedes Walzgerüst - unabhängig von deren Anzahl - wird bei jedem durchzuführenden Walzstich eine Sollstichabnahme vorgegeben. Falls mehrere Walzgerüste vorhanden sind, werden weiterhin in der Regel ein- und/oder auslaufseitige Sollzüge vorgegeben. Falls nur ein einziges Walzgerüst vorhanden ist, kann ein- und/oder auslaufseitiger Sollzug vorgegeben sein. Dies ist jedoch nicht zwingend erforderlich.The finishing train has a number of rolling stands. The number of rolling stands can be determined as needed. As a rule, there are several rolling stands, for example four to seven rolling stands. In individual cases, however, only a single rolling stand can be present. For each roll stand - regardless of their number - a setpoint decrease is specified for every rolling pass to be performed. If several rolling stands are available, generally further input and / or outlet-side desired trains are specified. If only a single roll stand is present, input and / or outlet side predetermined tension can be specified. However, this is not mandatory.
Eine der Zielgrößen, die bei einer Warmbandstraße eingehalten werden sollen, ist die Endwalztemperatur, das heißt die Temperatur, mit der das Band aus der Fertigstraße ausläuft. Alternativ zur Endwalztemperatur kann auch eine andere, den Energieinhalt des Bandes an diesem Ort beschreibende Größe verwendet werden, beispielsweise die Enthalpie. Die Zielgröße soll möglichst über die gesamte Länge des Bandes eingehalten werden. Die Zielgröße kann alternativ konstant sein oder über die Länge des Bandes variieren.One of the targets to be met on a hot strip mill is the final rolling temperature, that is, the temperature at which the strip exits the finishing train. Alternatively to the final rolling temperature, another variable describing the energy content of the strip at this location may also be used used, for example, the enthalpy. The target size should be kept as far as possible over the entire length of the tape. The target size may alternatively be constant or vary along the length of the band.
Zum Erreichen der Zielgröße wird in der Regel die Leitgeschwindigkeit der Fertigstraße entsprechend eingestellt. Die Leitgeschwindigkeit ist eine Geschwindigkeit, aus der - gegebenenfalls in Verbindung mit den in der Fertigstraße einzustellenden Stichabnahmen und Sollzügen - die innerhalb der Fertigstraße auftretenden Band- und Walzenumfangsgeschwindigkeiten eindeutig ermittelbar sind. Beispielsweise kann es sich um eine fiktive Geschwindigkeit des Bandkopfes oder um die Drehzahl des ersten Walzgerüsts der Fertigstraße handeln. Die Leitgeschwindigkeit kann beispielsweise als Funktion als Ortes des Bandkopfes definiert sein.To achieve the target size, the guide speed of the finishing train is usually adjusted accordingly. The guide speed is a speed, from which - possibly in conjunction with the to be set in the finishing line Stichabtnahmen and Sollzügen - the occurring within the finishing line strip and roller peripheral velocities are clearly determined. For example, it may be a fictitious speed of the tape head or the speed of the first rolling stand of the finishing train. The guide speed can be defined, for example, as a function as a location of the tape head.
Als weitere Stellglieder können gegebenenfalls Zwischengerüst-Kühleinrichtungen und/oder ein der Fertigstraße vorgeordneter Induktionsofen vorhanden sein. Diese Stellglieder wirken - ebenso wie Kühleinrichtungen der Kühlstrecke - nur lokal auf das Band. Im Rahmen der vorliegenden Erfindung ist das Vorhandensein dieser weiteren Stellglieder jedoch von untergeordneter Bedeutung. Entscheidend kommt es auf die Leitgeschwindigkeit (oder eine für die Leitgeschwindigkeit charakteristische Größe, beispielsweise den Massenfluss) und deren Ermittlung an.Intermediate stand cooling devices and / or an induction furnace arranged upstream of the finishing train may optionally be present as further actuators. These actuators act - as well as cooling devices of the cooling section - only locally on the tape. In the context of the present invention, however, the presence of these other actuators is of minor importance. Crucial factors are the conduction velocity (or a variable which is characteristic of the conduction velocity, for example the mass flow) and their determination.
Wie bereits erwähnt, ist der Fertigstraße in der Regel eine Kühlstrecke nachgeordnet. In der Kühlstrecke wird das Band in definierter Weise auf eine Haspeltemperatur (bzw. -enthalpie) abgekühlt. Die Geschwindigkeit, mit der das Band die Kühlstrecke durchläuft, ist durch die Leitgeschwindigkeit festgelegt. Die Einstellung der für die einzelnen Bandpunkte geforderten Abkühlverläufe erfolgt dadurch, dass die Bandpunkte wegverfolgt werden und Stellventile der Kühleinrichtungen der Kühlstrecke, welche den Kühlmittelmengenfluss einstellen, zeitrichtig angesteuert werden.As already mentioned, the finishing train is usually arranged downstream of a cooling section. In the cooling section, the strip is cooled in a defined manner to a reel temperature (or enthalpy). The speed at which the belt passes through the cooling section is determined by the guide speed. The adjustment of the required for the individual band points Abkühlverläufe carried out in that the tape points are tracked away and control valves of the cooling devices of the cooling section, which adjust the flow of coolant flow, are controlled in a timely manner.
Die Stellventile weisen in der Praxis erhebliche Verzögerungszeiten auf, die oftmals in der Größenordnung von mehreren Sekunden liegen. Um die Stellventile rechtzeitig vorher ansteuern zu können, ist es daher erforderlich, rechtzeitig vorher zu wissen, wann ein bestimmter Bandpunkt sich im Einflussbereich einer bestimmten Kühleinrichtung befindet. Um genau berechnen zu können, wann ein bestimmter Bandpunkt in diesen Einflussbereich eintritt und wann er aus ihm austritt, ist es erforderlich, nicht nur den Momentanwert der Leitgeschwindigkeit zu kennen, sondern auch den zukünftigen Verlauf der Leitgeschwindigkeit, zumindest im Rahmen der Verzögerungszeit der Stellventile. Darüber hinaus beeinflusst auch die Durchlaufzeit als solche, also die Zeit, die der jeweilige Bandpunkt zum Durchlaufen der Kühlstrecke benötigt, die Haspeltemperatur. Auch die Durchlaufzeit wird - selbstverständlich - durch den Verlauf der Leitgeschwindigkeit beeinflusst.The control valves have in practice considerable delay times, which are often in the order of several seconds. In order to be able to control the control valves in good time, it is therefore necessary to be on time knowing in advance when a certain band point is within the control of a particular cooling device. In order to calculate exactly when a certain band point enters this influence area and when it exits from it, it is necessary to know not only the instantaneous value of the master speed, but also the future course of the master speed, at least within the delay time of the control valves. In addition, the cycle time as such, ie the time required by the respective band point for passing through the cooling section, also influences the reel temperature. The cycle time is - of course - influenced by the course of the conduction velocity.
Im Stand der Technik ist bekannt, den Leitgeschwindigkeitsverlauf auf vereinfachte Weise zu ermitteln. Beispielsweise wird ein Anfangswert vorgegeben, mit dem der Bandkopf die Fertigstraße durchlaufen soll. Weiterhin wird eine Beschleunigungsrampe vorgegeben, über die das Band auf eine Endgeschwindigkeit beschleunigt wird, sobald der Bandkopf aus der Fertigstraße ausgelaufen ist. Diese Vorgehensweise erweist sich in der Praxis als untauglich, um eine vorgegebene Sollendwalztemperatur (bzw. einen entsprechenden Temperaturverlauf) mit hoher Genauigkeit einzuhalten.In the prior art it is known to determine the Leitgeschwindigkeitsverlauf in a simplified manner. For example, an initial value is specified with which the tape head is to pass through the finishing train. Furthermore, an acceleration ramp is specified, via which the belt is accelerated to a final speed as soon as the tape head has left the finishing train. In practice, this procedure proves to be unsuitable for maintaining a predetermined desired final rolling temperature (or a corresponding temperature profile) with high accuracy.
Im Stand der Technik ist weiterhin bekannt, die (tatsächliche) Endwalztemperatur zu erfassen und die Leitgeschwindigkeit im Sinne einer Minimierung der Abweichung der tatsächlichen Endwalztemperatur von der vorgegebenen Sollendwalztemperatur nachzuführen. Diese Nachführung kann mittels eines klassischen oder - wie beispielsweise in der
Diese Vorgehensweise erweist sich in der Praxis zwar in der Regel als geeignet, eine vorgegebene Sollendwalztemperatur (bzw. einen entsprechenden Verlauf) mit hoher Genauigkeit einzuhalten. Jedoch ist bei dieser Vorgehensweise nicht vorhersagbar, in welche Richtung und um welchen Wert die Leitgeschwindigkeit im nächsten Regelschritt tatsächlich variieren wird. Die etwaige Prädiktion ist mehr ein Raten als ein echtes Ermitteln.Although in practice this procedure usually proves to be suitable for maintaining a predetermined desired final rolling temperature (or a corresponding course) with high accuracy. However, in this approach, it is not predictable in which direction and by which value the conduction velocity will actually vary in the next control step. The possible prediction is more of a guess than a real determination.
Darüber hinaus wäre die Prädiktion selbst dann, wenn sie korrekt bzw. zumindest in etwa korrekt wäre, bei der Lehre der
In der älteren, am Anmeldetag der vorliegenden Erfindung noch nicht veröffentlichten europäischen Patentanmeldung
Aus der
- wobei einem Steuerrechner für die Fertigstraße spätestens zu einem Zeitpunkt, zu dem ein erster Bandpunkt des Bandes sich noch vor der Fertigstraße befindet, für den ersten Bandpunkt und eine Anzahl von dritten Bandpunkten des Bandes jeweils eine Istgröße und eine Sollgröße bekannt sind,
- wobei für jeden Bandpunkt die jeweilige Istgröße für den Ist-Energieinhalt des jeweiligen Bandpunktes und die jeweilige Sollgröße für den Sollenergieinhalt des jeweiligen Bandpunktes charakteristisch sind,
- wobei für jeden Bandpunkt die jeweilige Istgröße auf einen Ort vor der Fertigstraße bezogen ist und die jeweilige Sollgröße auf einen Ort hinter der Fertigstraße bezogen ist,
- wobei die dritten Bandpunkte vor dem ersten Bandpunkt in die Fertigstraße einlaufen.
- wherein a control computer for the finishing train is known at the latest at a time at which a first band point of the band is still in front of the finishing train, for the first band point and a number of third band points of the band respectively an actual size and a nominal size
- wherein for each band point the respective actual variable for the actual energy content of the respective band point and the respective nominal value for the nominal energy content of the respective band point are characteristic,
- wherein for each band point the respective actual size is related to a location in front of the finishing train and the respective nominal value is related to a location behind the finishing train,
- wherein the third band points run into the finishing train before the first band point.
Die Aufgabe der vorliegenden Erfindung besteht darin, Möglichkeiten zu schaffen, auf zuverlässige Weise bereits vor dem Einlaufen eines Bandpunktes in die Fertigstraße die Leitgröße nicht nur für diesen Bandpunkt, sondern auch für nach diesem Bandpunkt in die Fertigstraße einlaufende Bandpunkte realitätsgetreu ermitteln zu können.The object of the present invention is to provide opportunities to be able to reliably determine, in a reliable manner, even before the arrival of a band point in the finishing train, the guide variable not only for this band point, but also for band points entering the finishing line after this band point.
Die Aufgabe wird durch ein Betriebsverfahren für eine Fertigstraße mit den Merkmalen des Anspruchs 1 gelöst. Vorteilhafte Ausgestaltungen des Betriebsverfahrens sind Gegenstand der abhängigen Ansprüche 2 bis 14.The object is achieved by an operating method for a finishing train with the features of
Erfindungsgemäß ist vorgesehen,
- dass einem Steuerrechner für die Fertigstraße spätestens zu einem Zeitpunkt, zu dem ein erster Bandpunkt des Bandes sich noch vor der Fertigstraße befindet, für den ersten Bandpunkt, eine Anzahl von zweiten Bandpunkten und eine Anzahl von dritten Bandpunkten des Bandes jeweils eine Istgröße und eine Sollgröße bekannt sind,
- dass für jeden Bandpunkt die jeweilige Istgröße für den Ist-Energieinhalt des jeweiligen Bandpunktes und die jeweilige Sollgröße für den Soll-Energieinhalt des jeweiligen Bandpunktes charakteristisch sind,
- dass für jeden Bandpunkt die jeweilige Istgröße auf einen Ort vor der Fertigstraße bezogen ist und die jeweilige Sollgröße auf einen Ort hinter der Fertigstraße bezogen ist,
- dass die zweiten Bandpunkte nach dem ersten Bandpunkt und die dritten Bandpunkte vor dem ersten Bandpunkt in die Fertigstraße einlaufen,
- dass der Steuerrechner vor dem Einlaufen des ersten Bandpunktes in die Fertigstraße für den ersten Bandpunkt und zumindest einen Teil der zweiten Bandpunkte anhand einer für den jeweiligen Bandpunkt spezifischen Ermittlungsvorschrift jeweils eine Leitgröße ermittelt,
- dass die jeweilige Leitgröße dafür charakteristisch ist, mit welcher Leitgeschwindigkeit der Steuerrechner die Fertigstraße zum Zeitpunkt des Einlaufens des jeweiligen Bandpunktes in die Fertigstraße betreibt,
- dass der Steuerrechner anhand der für den jeweiligen Bandpunkt ermittelten Leitgröße die jeweilige Leitgeschwindigkeit ermittelt und die Fertigstraße zum Zeitpunkt des Einlaufens des jeweiligen Bandpunktes in die Fertigstraße mit der jeweiligen Leitgeschwindigkeit betreibt und
- dass für die jeweilige Leitgröße in deren Ermittlungsvorschrift die Istgröße und die Sollgröße des zu diesem Zeitpunkt jeweils in die Fertigstraße eintretenden Bandpunktes sowie die Istgröße und die Sollgröße mindestens eines zu diesem Zeitpunkt bereits in die Fertigstraße eingetretenen Bandpunktes eingehen.
- that a control computer for the finishing train at the latest at a time at which a first band point of the tape is still in front of the finishing train, for the first band point, a number of second band points and a number of third band points of the band are each an actual size and a nominal size known,
- that for each band point the respective actual variable for the actual energy content of the respective band point and the respective nominal value for the target energy content of the respective band point are characteristic,
- that for each band point the respective actual size is related to a location in front of the finishing train and the respective nominal value is related to a location behind the finishing train,
- that the second band points after the first band point and the third band points before the first band point run into the finishing train,
- that the control computer ascertains a reference variable before the first band point enters the finishing train for the first band point and at least a part of the second band points on the basis of a determination rule specific to the respective band point,
- that the respective guide variable is characteristic of the guiding speed with which the control computer operates the finishing train at the time of entry of the respective strip point into the finishing train,
- the control computer determines the respective guide speed on the basis of the guide variable determined for the respective band point and operates the finishing train at the time of entry of the respective band point into the finishing train at the respective guide speed and
- that the actual size and the nominal size of the band point entering the finishing line at this point in time as well as the actual size and the nominal size of at least one band point that has already entered the finishing line at this point in time are received for the respective reference variable.
Beispielsweise kann vorgesehen sein,
- dass der Steuerrechner jede der Leitgrößen anhand einer Vielzahl von Einzelleitgrößen ermittelt,
- dass jede Einzelleitgröße jeweils auf einen der Bandpunkte bezogen ist, dessen Ist- und Sollgröße in die Ermittlung der jeweiligen Leitgröße eingehen,
- dass der Steuerrechner für jeden Bandpunkt dessen Einzelleitgröße derart ermittelt, dass eine jeweilige Erwartungsgröße mit der korrespondierenden Sollgröße übereinstimmt, und
- dass die jeweilige Erwartungsgröße für einen erwarteten Energieinhalt charakteristisch ist, den der jeweilige Bandpunkt an dem Ort hinter der Fertigstraße, auf den die jeweils korrespondierende Sollgröße bezogen ist, annehmen würde, wenn der Steuerrechner die Fertigstraße während des gesamten Durchlaufs des jeweiligen Bandpunktes durch die Fertigstraße mit einer mit der Einzelleitgröße korrespondierenden Leitgeschwindigkeit betreiben würde.
- that the control computer determines each of the guide variables on the basis of a plurality of individual guide sizes,
- each individual item size is related in each case to one of the band points whose actual and nominal size are included in the determination of the respective reference variable,
- that the control computer determines for each band point whose Einzelleitgröße such that a respective expected size matches the corresponding desired size, and
- the respective expectation variable is characteristic for an expected energy content which the respective band point would assume at the location behind the finishing train to which the respective corresponding nominal value is related if the control computer instructs the finishing train through the finishing line during the entire passage of the respective band point would operate at a Leitgeschwindigkeit corresponding to the Einzelleitgröße.
Zum Ermitteln der jeweiligen Leitgröße anhand der jeweiligen Vielzahl von Einzelleitgrößen kann der Steuerrechner beispielsweise eine gewichtete oder ungewichtete Mittelwertbildung vornehmen.In order to determine the respective guide variable on the basis of the respective multiplicity of individual guide sizes, the control computer can, for example, carry out a weighted or unweighted averaging.
Alternativ kann vorgesehen sein, dass der Steuerrechner für jeden Bandpunkt, für den er dessen Leitgröße ermittelt,
- anhand der Istgrößen, die in die Ermittlung der Leitgröße für den jeweiligen Bandpunkt eingehen, eine effektive Istgröße und anhand der Sollgrößen, die in die Ermittlung der Leitgröße für den jeweiligen Bandpunkt eingehen, eine effektive Sollgröße ermittelt,
- eine Erwartungsgröße ermittelt, die für einen erwarteten Energieinhalt charakteristisch ist, den der jeweilige Bandpunkt an dem Ort hinter der Fertigstraße, auf den die effektive Sollgröße bezogen ist, annehmen würde, wenn der Steuerrechner die Fertigstraße während des gesamten Durchlaufs des jeweiligen Bandpunktes durch die Fertigstraße mit einer mit der Leitgröße für den jeweiligen Bandpunkt korrespondierenden Leitgeschwindigkeit betreiben würde, und
- die Leitgröße derart ermittelt, dass die Erwartungsgröße an dem Ort hinter der Fertigstraße, auf den die effektive Sollgröße bezogen ist, die effektive Sollgröße aufweist.
- Based on the actual quantities, which are included in the determination of the guide value for the respective band point, an effective actual size and on the basis of the nominal values, which are included in the determination of the guide variable for the respective band point, an effective target value,
- determines an expected quantity characteristic of an expected energy content which the respective band point would assume at the location behind the finishing train to which the effective target value is related, if the control computer reports the finishing line through the finishing line during the entire passage of the respective band point one would operate with the guide variable for the respective band point corresponding conduction velocity, and
- determines the Leitgröße such that the expected size at the location behind the finishing train to which the effective target size is related, the effective target size.
Auch hier kann der Steuerrechner zum Ermitteln der effektiven Istgröße und der effektiven Sollgröße eine gewichtete oder ungewichtete Mittelwertbildung vornehmen.Again, the control computer to determine the effective actual size and the effective target size make a weighted or unweighted averaging.
Ebenso kann alternativ vorgesehen sein,
- dass der Steuerrechner zum Ermitteln der Leitgrößen die Leitgrößen zunächst als vorläufige Werte ansetzt,
- dass der Steuerrechner für den ersten Bandpunkt und zumindest einen Teil der zweiten und dritten Bandpunkte eine jeweilige Erwartungsgröße ermittelt,
- dass jede Erwartungsgröße für einen erwarteten Energieinhalt charakteristisch ist, den der jeweilige Bandpunkt an dem Ort hinter der Fertigstraße, auf den die jeweils korrespondierende Sollgröße bezogen ist, annehmen würde, wenn der Steuerrechner die Fertigstraße während des gesamten Durchlaufs des jeweiligen Bandpunktes durch die Fertigstraße mit Leitgeschwindigkeiten betreiben würde, die mit den angesetzten Leitgrößen korrespondieren, und
- dass der Steuerrechner die angesetzten Leitgrößen variiert, so dass eine Zielfunktion optimiert wird, in die die Beträge der Differenzen der Erwartungsgrößen von den korrespondierenden Sollgrößen eingehen.
- that the control computer initially determines the guide values as provisional values for determining the guide values,
- the control computer determines a respective expectation variable for the first band point and at least part of the second and third band points,
- each expectation quantity is characteristic of an expected energy content which the respective band point would assume at the location behind the finishing train to which the corresponding target size is related, if the control computer sweeps the finishing train through the finishing line at full speeds throughout the respective band point would operate, which correspond to the set parameters, and
- that the control computer varies the set guide values, so that a target function is optimized, in which the amounts of the differences of the expectation quantities of the corresponding target values are received.
Bei der letztgenannten Alternative ist vorzugsweise vorgesehen, dass in die Zielfunktion zusätzlich auch ein Strafterm eingeht, mittels dessen Änderungen der Leitgeschwindigkeit bestraft werden.In the case of the latter alternative, it is preferably provided that the target function additionally receives a penalty, by means of which changes in the guide speed are punished.
Unabhängig davon, welche der drei oben genannten Alternativen ergriffen wird, ist das erfindungsgemäße Betriebsverfahren immer noch sehr rechenintensiv. Zur Reduzierung des Rechenaufwands ist vorzugsweise vorgesehen,
- dass der Steuerrechner vorab ein Datenfeld erstellt, in dem der Steuerrechner für eine Vielzahl von möglichen Leitgeschwindigkeiten und möglichen Istgrößen die sich für die jeweilige mögliche Istgröße bei der jeweiligen möglichen Leitgeschwindigkeit ergebende Erwartungsgröße hinterlegt, und
- dass der Steuerrechner die Leitgrößen für die Bandpunkte unter Verwendung des Datenfeldes ermittelt.
- in that the control computer prepares in advance a data field in which the control computer stores the expected variable resulting for the respective possible actual variable at the respective possible guide speed for a multiplicity of possible guide speeds and possible actual variables, and
- the control computer determines the guide values for the band points using the data field.
Das Betriebsverfahren, so wie es bisher beschrieben worden ist, arbeitet bereits recht gut. Es kann dadurch noch weiter verbessert werden, dass der Steuerrechner
- zumindest für einen Teil der Bandpunkte eine jeweilige Erwartungsgröße ermittelt, die für einen erwarteten Energieinhalt charakteristisch ist, der für den jeweiligen Bandpunkt an dem Ort hinter der Fertigstraße, auf den die jeweils korrespondierende Sollgröße bezogen ist, auf Grund der Leitgeschwindigkeiten, mit denen der Steuerrechner die Fertigstraße während des gesamten Durchlaufs des jeweiligen Bandpunkts durch die Fertigstraße betreibt, erwartet wird,
- nach dem Durchlauf des jeweiligen Bandpunktes durch die Fertigstraße eine Messgröße entgegen nimmt, die für einen Ist-Energieinhalt des jeweiligen Bandpunktes an dem Ort hinter der Fertigstraße, auf den die korrespondierende Sollgröße bezogen ist, charakteristisch ist, und
- anhand eines Vergleichs des erwarteten Energieinhalts mit dem Ist-Energieinhalt selbsttätig ein Modell der Fertigstraße (1) adaptiert und
- das Modell der Fertigstraße dadurch adaptiert, dass er bei der Verwendung des Datenfeldes auf die Istgrößen einen Offset addiert, die Leitgeschwindigkeiten mit einem Skalierungsfaktor skaliert und/oder auf sie einen Offset addiert und/oder auf die unter Verwendung des Datenfeldes ermittelten Erwartungsgrößen einen Offset addiert.
- determines at least for a part of the band points a respective expectation variable, which is characteristic of an expected energy content, for the respective band point at the place behind the finishing train, to which the respective corresponding target size is related, due to the conduction velocities, with which the control computer the Mill is operated through the finishing train during the entire run of the respective strip
- after the passage of the respective band point through the finishing train receives a measured variable, which for an actual energy content of the respective band point at the place is characteristic behind the finishing train, to which the corresponding nominal value is related, and
- automatically adapted a model of the finishing train (1) on the basis of a comparison of the expected energy content with the actual energy content and
- adapted the model of the finishing train by adding an offset to the actual values when using the data field, scaling the guide speeds with a scaling factor and / or adding an offset thereto and / or adding an offset to the expected quantities determined using the data field.
In einer bevorzugten Ausgestaltung der vorliegenden Erfindung gehen für jede Leitgröße in deren Ermittlung die Istgröße und die Sollgröße der bereits in die Fertigstraße eingetretenen Punkte nur dann ein, wenn diese Bandpunkte zu dem Zeitpunkt, für den die jeweilige Leitgröße ermittelt wird, noch nicht aus der Fertigstraße ausgetreten sind. Insbesondere können in die Ermittlung der Leitgröße für einen bestimmten Bandpunkt die Ist- und Sollgrößen aller Bandpunkte eingehen, die sich zum Zeitpunkt des Eintretens des bestimmten Bandpunkts in die Fertigstraße in der Fertigstraße befinden.In a preferred embodiment of the present invention, the actual size and the desired size of the points already entered the finishing line are received for each master in their determination only if these tape points at the time for which the respective guide is determined, not from the finishing train have leaked. In particular, the actual and nominal values of all band points, which are located at the time when the determined band point enters the finishing train in the finishing train, can be included in the determination of the reference variable for a specific band point.
Das Betriebsverfahren, so wie es bisher beschrieben worden ist, arbeitet bereits recht gut. Es kann dadurch noch weiter verbessert werden, dass der Steuerrechner zumindest für einen Teil der Bandpunkte
- eine jeweilige Erwartungsgröße ermittelt, die für einen erwarteten Energieinhalt charakteristisch ist, der für den jeweiligen Bandpunkt an dem Ort hinter der Fertigstraße, auf den die jeweils korrespondierende Sollgröße bezogen ist, auf Grund der Leitgeschwindigkeiten, mit denen der Steuerrechner die Fertigstraße während des gesamten Durchlaufs des jeweiligen Bandpunkts durch die Fertigstraße betreibt, erwartet wird,
- nach dem Durchlauf des jeweiligen Bandpunktes durch die Fertigstraße eine Messgröße entgegen nimmt, die für einen Ist-Energieinhalt des jeweiligen Bandpunktes an dem Ort hinter der Fertigstraße, auf den die korrespondierende Sollgröße bezogen ist, charakteristisch ist, und
- anhand eines Vergleichs des erwarteten Energieinhalts mit dem Ist-Energieinhalt selbsttätig zumindest einen Teil der bereits ermittelten Leitgrößen nachführt.
- determining a respective expectation variable characteristic of an expected energy content corresponding to the respective band point at the location behind the finishing train to which the respective corresponding target quantity is related, based on the conduction velocities with which the control computer controls the finishing train during the entire run of the each band point through the finishing train is expected,
- after the passage of the respective band point through the finishing train receives a measured variable, which for an actual energy content of the respective band point at the place is characteristic behind the finishing train, to which the corresponding nominal value is related, and
- based on a comparison of the expected energy content with the actual energy content automatically tracks at least a portion of the already determined guide variables.
Wenn der Steuerrechner den erwarteten Energieinhalt mit dem Ist-Energieinhalt vergleicht und die Leitgrößen nachführt, ist es möglich, dass der Rechner den Vergleich für alle Bandpunkte nacheinander ausführt. Es ist jedoch hinreichend, den Vergleich für einen Teil der Bandpunkte durchzuführen, beispielsweise für jeden dritten oder jeden zehnten Bandpunkt.When the control computer compares the expected energy content with the actual energy content and tracks the control values, it is possible for the computer to perform the comparison for all band points one after the other. However, it is sufficient to perform the comparison for a part of the band points, for example every third or every tenth band point.
Wenn der Steuerrechner die Leitgrößen nachführt, berücksichtigt der Steuerrechner selbstverständlich bei der Ermittlung von Erwartungsgrößen den geänderten Leitgrößenverlauf.Of course, when the control computer tracks the guiding variables, the control computer takes into account the changed course of the characteristic variable when determining expectation variables.
Es ist möglich, dass der Steuerrechner das Nachführen für alle bereits ermittelten Leitgrößen vornimmt. Vorzugsweise ist jedoch vorgesehen, dass der Steuerrechner anhand des Vergleichs selbsttätig nur diejenigen Leitgrößen nachführt, die für Bandpunkte ermittelt wurden, die zum Zeitpunkt des Nachführens vom Eingang der Fertigstraße einen Mindestabstand aufweisen. Diese Vorgehensweise ist insbesondere dann von Vorteil, wenn der Steuerrechner oder eine andere Steuereinrichtung die ermittelten Leitgrößen zur Ermittlung mindestens einer weiteren Stellgröße verwendet und die weitere Stellgröße um eine Totzeit verzögert und nur lokal auf das Band wirkt. Optimal ist diese Vorgehensweise, wenn der Mindestabstand derart bestimmt ist, dass eine mit dem Mindestabstand korrespondierende Zeitdifferenz mindestens so groß wie die Totzeit ist.It is possible that the control computer carries out the tracking for all already determined control variables. Preferably, however, it is provided that, based on the comparison, the control computer automatically tracks only those reference variables which were determined for band points which have a minimum distance at the time of tracking from the entrance of the finishing train. This procedure is particularly advantageous if the control computer or another control device uses the determined control variables to determine at least one further control variable and the further control variable is delayed by a dead time and acts only locally on the belt. This procedure is optimal if the minimum distance is determined in such a way that a time difference corresponding to the minimum distance is at least as long as the dead time.
Zusätzlich zum Nachführen bereits ermittelter Leitgrößen kann der Steuerrechner - selbstverständlich - die Ermittlungsvorschrift für noch nicht ermittelte Leitgrößen als solche adaptieren. Das Adaptionsergebnis kann, je nach Lage des Einzelfalls, bereits bei der Ermittlung weiterer Leitgrößen desselben Bandes oder erst bei der Ermittlung von Leitgrößen für nachfolgende Bänder berücksichtigt werden.In addition to tracking already determined control variables, the control computer can - of course - adapt the determination rule for as yet unidentified control variables as such. Depending on the situation of the individual case, the adaptation result can already be used to determine further parameters of the same Band or only when determining reference values for subsequent bands.
Die beiden zuletzt genannten Vorgehensweisen - Stichwort "Nachführen bereits ermittelter Leitgrößen" einerseits und "Adaptieren der Ermittlungsvorschrift" andererseits können beispielsweise derart miteinander verkoppelt sein, dass der Steuerrechner ein Modell der Fertigstraße umfasst, mittels dessen ermittelt wird, welche Temperatur für einen Bandpunkt auslaufseitig der Fertigstraße erwartet wird, wenn der jeweilige Bandpunkt einlaufseitig der Fertigstraße eine gegebene Temperatur aufweist und die Fertigstraße durchläuft, während die Fertigstraße mit einer gegebenen Leitgeschwindigkeit betrieben wird. In diesem Fall kann das Modell sofort adaptiert werden. Dies entspricht dem Adaptieren der Ermittlungsvorschrift. Sodann wird für mindestens eine der bereits ermittelten Leitgrößen die Leitgröße unter Verwendung des adaptierten Modells der Fertigstraße neu ermittelt. Dies entspricht vom Ansatz her dem Nachführen der bereits ermittelten Leitgrößen. Gegebenenfalls kann ein weicher Übergang von den ursprünglich ermittelten Leitgrößen zu den neu ermittelten Leitgrößen erfolgen.The two last-mentioned procedures - keyword "tracking already determined parameters" on the one hand and "adapting the determination rule" on the other hand, for example, be coupled to each other such that the control computer includes a model of the finishing train, is determined by means of which temperature for a band point on the outlet side of the finishing train is expected when the respective band point upstream of the finishing train has a given temperature and passes through the finishing train while the finishing train is operated at a given guide speed. In this case, the model can be adapted immediately. This corresponds to the adaptation of the investigation rule. Then, for at least one of the guide variables already determined, the guide variable is newly determined using the adapted model of the finishing train. In terms of approach, this corresponds to tracking the already determined parameters. Optionally, a smooth transition from the originally determined control variables to the newly determined control parameters can take place.
Das erfindungsgemäße Betriebsverfahren stellt bereits dann einen erheblichen Fortschritt gegenüber dem Stand der Technik dar, wenn der Prädiktionshorizont relativ klein ist, beispielsweise drei bis fünf Bandpunkte beträgt. Seine volle Überlegenheit zeigt das erfindungsgemäße Betriebsverfahren jedoch insbesondere dann, wenn der erste Bandpunkt und der Teil der zweiten Bandpunkte, für die deren jeweilige Leitgröße vor dem Einlaufen des ersten Bandpunktes in die Fertigstraße ermittelt wurde, einem Prädiktionshorizont entsprechen, der mindestens so groß wie die Totzeit ist, mit der die weitere Stellgröße auf das Band wirkt. Dies gilt insbesondere im Zusammenwirken mit dem Nachführen der bereits ermittelten Leitgrößen, wenn das Nachführen ebenfalls auf die genannte Totzeit abgestimmt ist.The operating method according to the invention already represents a considerable advance over the prior art even if the prediction horizon is relatively small, for example three to five band points. Its full superiority shows the operating method according to the invention, however, in particular when the first band point and the part of the second band points, for which their respective Leitgröße was determined before the arrival of the first band point in the finishing train, a prediction horizon corresponding to at least as large as the dead time is, with the other manipulated variable acts on the tape. This applies in particular in cooperation with the tracking of the already determined control variables, if the tracking is also tuned to the said dead time.
In einer bevorzugten Ausgestaltung der vorliegenden Erfindung ist weiterhin vorgesehen, dass der Steuerrechner die ermittelten Leitgrößen oder die entsprechenden Leitgeschwindigkeiten durch einen Spline aneinander kettet, so dass ein sich durch die Verkettung ergebender Leitgeschwindigkeitsverlauf stetig und differenzierbar ist. Der sich ergebende Vorteil besteht in einem sanfteren und gleichmäßigeren Betrieb der Fertigstraße. Dies gilt ganz besonders, wenn der sich ergebende Leitgrößenverlauf nicht nur differenzierbar ist, sondern stetig differenzierbar ist.In a preferred embodiment of the present invention, it is further provided that the control computer chains together the determined guiding variables or the corresponding guiding speeds by a spline, so that a guiding-speed course resulting from the linking is continuous and differentiable. The resulting advantage is a smoother and more uniform operation of the finishing train. This is especially true if the resulting guide variable course is not only differentiable, but is constantly differentiable.
Der Steuerrechner führt das Ermitteln der Leitgrößen vorzugsweise im Rahmen einer Vorausberechnung online oder in Echtzeit aus.The control computer preferably executes the determination of the control variables online or in real time as part of a precalculation.
Die erfindungsgemäße Aufgabe wird weiterhin durch ein Computerprogramm der eingangs genannten Art gelöst. Das Computerprogramm ist in diesem Fall derart ausgestaltet, dass der Steuerrechner ein Betriebsverfahren mit allen Schritten eines erfindungsgemäßen Betriebsverfahrens ausführt.The object of the invention is further achieved by a computer program of the type mentioned. The computer program is designed in this case such that the control computer executes an operating method with all steps of an operating method according to the invention.
Die Aufgabe wird weiterhin durch einen Steuerrechner für eine Fertigstraße zum Walzen eines Bandes gelöst, der derart ausgebildet ist, dass er im Betrieb ein derartiges Betriebsverfahren ausführt.The object is further achieved by a control computer for a finishing train for rolling a belt, which is designed such that it carries out such an operating method during operation.
Die Aufgabe wird weiterhin durch eine Fertigstraße zum Walzen eines Bandes gelöst, die mit einem derartigen Steuerrechner ausgestattet ist.The object is further achieved by a finishing train for rolling a belt, which is equipped with such a control computer.
Weitere Vorteile und Einzelheiten ergeben sich aus der nachfolgenden Beschreibung von Ausführungsbeispielen in Verbindung mit den Zeichnungen. Es zeigen in Prinzipdarstellung:
- FIG 1
- schematisch eine Warmbandstraße,
- FIG 2
- ein Ablaufdiagramm,
- FIG 3 bis 6
- beispielhaft verschiedene Zustände einer Fertigstraße,
- FIG 7
- beispielhaft eine Momentaufnahme der Fertigstraße,
- FIG 8 bis 11
- Ablaufdiagramme,
- FIG 12
- ein Modell der Fertigstraße,
- FIG 13
- ein Ablaufdiagramm,
- FIG 14
- ein Zeitdiagramm und
- FIG 15
- ein Ablaufdiagramm.
- FIG. 1
- schematically a hot strip mill,
- FIG. 2
- a flow chart,
- FIGS. 3 to 6
- exemplary different states of a finishing train,
- FIG. 7
- an example of a snapshot of the finishing train,
- FIGS. 8 to 11
- Flowcharts,
- FIG. 12
- a model of the finishing train,
- FIG. 13
- a flow chart,
- FIG. 14
- a time chart and
- FIG. 15
- a flowchart.
Gemäß
Die Fertigstraße 1 weist zum Walzen des Bandes 2 ein Walzgerüst 3 oder - wie in
Die Fertigstraße 1 kann eine Heizeinrichtung 4 aufweisen, beispielsweise einen Induktionsofen. Wenn die Heizeinrichtung 4 vorhanden ist, befindet sie sich in der Regel am Eingang der Fertigstraße 1. Alternativ oder zusätzlich können - analog zu Zwischengerüstkühleinrichtungen - auch zwischen den Walzgerüsten 3 Heizeinrichtungen vorhanden sein. Die Heizeinrichtung 4 wird, falls sie vorhanden ist, im Rahmen der vorliegenden Erfindung als Bestandteil der Fertigstraße 1 angesehen. Alternativ oder zusätzlich zur Heizeinrichtung 4 kann die Fertigstraße 1 Zwischengerüstkühleinrichtungen 5 aufweisen. Wenn die Zwischengerüstkühleinrichtungen 5 vorhanden sind, ist jede Zwischengerüstkühleinrichtung 5 von zwei der Walzgerüste 3 eingegabelt. Sie sind, falls sie vorhanden sind, Bestandteil der Fertigstraße 1. Jede ZwischengerüstKühleinrichtung 5 weist je mindestens ein Stellventil 5' und mindestens eine Spritzdüse 5" auf.The finishing
Der Fertigstraße 1 kann weiterhin eine Kühlstrecke 6 nachgeordnet sein. Wenn die Kühlstrecke 6 vorhanden ist, weist sie Kühleinrichtungen 7 auf. Jede Kühleinrichtung 7 weist je mindestens ein Stellventil 7' und mindestens eine Spritzdüse 7" auf.The finishing
Sowohl mittels der Zwischengerüstkühleinrichtungen 5 als auch mittels der Kühleinrichtungen 7 wird das Band 2 mit einem flüssigen Kühlmedium (in der Regel Wasser mit oder ohne Beimischungen) gekühlt. Der Unterschied zwischen den Zwischengerüstkühleinrichtungen 5 und den Kühleinrichtungen 7 der Fertigstraße 6 besteht darin, dass die Kühleinrichtungen 7 hinter dem letzten Walzgerüst 3 der Fertigstraße 1 angeordnet sind, die Zwischengerüstkühleinrichtungen 5 zwischen je zwei der Walzgerüste 3.Both by means of the intermediate
Gemäß
Die Wirkungsweise des Steuerrechners 8 wird durch ein Computerprogramm 9 bestimmt, das dem Steuerrechner 8 - beispielsweise über einen mobilen Datenträger 10 - zugeführt wird. Der mobile Datenträger 10 kann nach Bedarf ausgestaltet sein, beispielsweise als CD-ROM, als USB-Memorystick oder als SD-Speicherkarte. Auf dem Datenträger 10 ist das Computerprogramm 9 in maschinenlesbarer Form gespeichert, beispielsweise in elektronischer Form.The mode of operation of the control computer 8 is determined by a computer program 9 which is supplied to the control computer 8, for example via a
Das Computerprogramm 9 umfasst Maschinencode 11, mit dem der Steuerrechner 8 programmiert ist und der von dem Steuerrechner 8 unmittelbar abarbeitbar ist. Das Abarbeiten des Maschinencodes 11 durch den Steuerrechner 8 bewirkt, dass der Steuerrechner 8 die Fertigstraße 1 gemäß einem Betriebsverfahren betreibt, das nachfolgend näher erläutert wird. Das Programmieren mit dem Computerprogramm 9 bewirkt also eine entsprechende Ausgestaltung des Steuerrechners 8.The computer program 9 comprises machine code 11 with which the control computer 8 is programmed and which can be processed directly by the control computer 8. The processing of the machine code 11 by the control computer 8 causes the control computer 8 to operate the finishing
Im Rahmen des Betriebsverfahrens müssen dem Steuerrechner 8 gemäß
Aus den nachfolgenden Erläuterungen wird ersichtlich werden, dass dem Steuerrechner 8 die Istgrößen G und die Sollgrößen G* für den ersten Bandpunkt 12, die zweiten Bandpunkte 13 und die dritten Bandpunkte 13' nicht alle zur gleichen Zeit bekannt werden müssen. Es wird aber ebenfalls ersichtlich werden, dass das Bekannwerden abgeschlossen sein muss, bevor der erste Bandpunkt 12 in die Fertigstraße 1 einläuft.It will be apparent from the explanations below that the actual value G and the setpoint G * for the
Die zweiten Bandpunkte 13 befinden sich alle hinter dem ersten Bandpunkt 12, laufen also nach dem ersten Bandpunkt 12 in die Fertigstraße 1 ein. Die dritten Bandpunkte 13' laufen vor dem ersten Bandpunkt 12 in die Fertigstraße 1 ein. Die
Die Istgröße G jedes Bandpunktes 12, 13, 13' ist für den Energieinhalt charakteristisch, den der jeweilige Bandpunkt 12, 13, 13' an einem Ort xE vor der Fertigstraße 1 aufweist. Die Istgröße G ist somit auf den Ort xE vor der Fertigstraße 1 bezogen. Der Ort xE kann nach Bedarf bestimmt sein. Insbesondere kann es sich gemäß
Die Sollgröße G* jedes Bandpunktes 12, 13, 13' ist für den Energieinhalt charakteristisch, den der jeweilige Bandpunkt 12, 13, 13' an einem Ort xA hinter der Fertigstraße 1 aufweisen soll. Die Sollgrößen G* sind daher auf den Ort xA hinter der Fertigstraße 1 bezogen. Der Ort xA kann - analog zum Ort xE vor der Fertigstraße 1 - nach Bedarf bestimmt sein. Beispielsweise kann es sich um den Ort einer Temperaturmesseinrichtung 15 handeln, die der Fertigstraße 1 nachgeordnet, der Kühlstrecke 6 jedoch vorgeordnet ist.The desired value G * of each
Die Art der Istgröße G und der Sollgröße G* kann nach Bedarf bestimmt sein. In der Regel handelt es sich um entsprechende Temperaturen. Alternativ kommt insbesondere eine Enthalpie in Frage.The type of the actual size G and the target size G * can be determined as needed. As a rule, these are the corresponding temperatures. Alternatively, an enthalpy in particular comes into question.
Der guten Ordnung halber sei erwähnt, dass der Begriff "Ort" sich nachfolgend stets auf einen Ort bezieht, der bezüglich der Fertigstraße 1 ortsfest ist. Der Begriff Bandpunkt" bezieht sich im Gegensatz hierzu stets auf einen Punkt, der bezüglich des Bandes 2 ortsfest ist. Abstände der Bandpunkte 12, 13, 13' voneinander sind im Rahmen der vorliegenden Erfindung nicht durch ihre geometrischen Abstände bestimmt, da sich diese Abstände durch das Walzen des Bandes 2 in der Fertigstraße 1 ändern. Die Abstände sind vielmehr definiert durch die Masse, die sich zwischen den Bandpunkten 12, 13, 13' befindet.For the sake of good order, it should be mentioned that the term "location" below always refers to a location which is stationary with respect to the finishing
Die Bandpunkte 12, 13, 13' können, bezogen auf die zwischen ihnen befindliche Masse des Bandes 2, äquidistant sein. Alternativ können die Bandpunkte 12, 13, 13' dadurch definiert sein, dass - beispielsweise mittels der Temperaturmesseinrichtung 14 - in zeitlich äquidistanten Schritten jeweils ein Messwert für die Istgröße G erfasst wird. Der zeitliche Abstand zwischen zwei aufeinander folgenden Bandpunkten 12, 13, 13' liegt in der Regel zwischen 100 ms und 500 ms, typisch zwischen 150 ms und 300 ms. Beispielsweise kann er bei 200 ms liegen.The band points 12, 13, 13 'may, based on the mass of the
In einem Schritt S2 ermittelt der Steuerrechner 8 - selbstverständlich vor dem Einlaufen des ersten Bandpunktes 12 in die Fertigstraße - für den ersten Bandpunkt 12 anhand einer Ermittlungsvorschrift eine Leitgröße L*. In einem Schritt S3 ermittelt der Steuerrechner 8 zumindest für einen Teil der zweiten Bandpunkte 13 ebenfalls anhand einer Ermittlungsvorschrift eine jeweilige Leitgröße L*. Auch den Schritt S3 führt der Steuerrechner 8 vor dem Einlaufen des ersten Bandpunktes 12 in die Fertigstraße 1 aus.In a step S2, the control computer 8 determines - of course, before the arrival of the
Die Schritte S2 und S3 von
Vorzugsweise ermittelt der Steuerrechner 8 im Rahmen des Schrittes S3 für alle zweiten Bandpunkte 13, die - ausgehend vom ersten Bandpunkt 12 - innerhalb eines vorbestimmten Prädiktionshorizontes H liegen, deren Leitgröße L*. Wenn also im Rahmen des Schrittes S3 für einen bestimmten zweiten Bandpunkt 13 dessen Leitgröße L* ermittelt wird, wird in der Regel auch für alle anderen zweiten Bandpunkte 13, die zwischen dem ersten Bandpunkt 12 und dem bestimmten zweiten Bandpunkt 13 liegen, deren jeweilige Leitgröße L* ermittelt.Preferably, the control computer 8 determines in the context of step S3 for all second band points 13, which - starting from the first band point 12 - are within a predetermined prediction horizon H, whose master size L *. If, therefore, in the context of step S3 for a particular
Die ermittelten Leitgrößen L* sind jeweils dafür charakteristisch, mit welcher Leitgeschwindigkeit vL der Steuerrechner 8 die Fertigstraße 1 betreibt, wenn der Bandpunkt 12, 13, für den die jeweilige Leitgröße L* ermittelt wurde, in die Fertigstraße 1 einläuft. Die Leitgeschwindigkeit vL kann beispielsweise die Geschwindigkeit sein, mit der das Band 2 in die Fertigstraße 1 einläuft. Alternativ kann es sich um die Geschwindigkeit handeln, mit der das Band 2 aus der Fertigstraße 1 ausläuft. Auch andere Größen - beispielsweise eine Bestimmung des Massenflusses oder eine Walzendrehzahl oder eine Walzenumfangsgeschwindigkeit - sind denkbar. Entscheidend ist, dass durch die Leitgeschwindigkeit vL - gegebenenfalls in Verbindung mit Stichabnahmen und Sollzügen - alle in der Fertigstraße 1 auftretenden Band- und Walzenumfangsgeschwindigkeiten eindeutig bestimmt sind.The determined guiding variables L * are respectively characteristic of the guiding speed vL of which the control computer 8 operates the finishing
In einem Schritt S4 ermittelt der Steuerrechner 8, falls erforderlich, anhand der Leitgrößen L* die entsprechenden Leitgeschwindigkeiten vL. In einem Schritt S5 betreibt der Steuerrechner 8 die Fertigstraße 1 entsprechend den im Schritt S4 ermittelten Leitgeschwindigkeiten vL. Der Steuerrechner 8 stellt die Leitgeschwindigkeit vL also stets derart ein, dass zu jedem Zeitpunkt die Fertigstraße 1 gerade mit der Leitgeschwindigkeit vL betrieben wird, die mit der Leitgröße L* des momentan in die Fertigstraße 1 eintretenden Bandpunktes 12, 13 korrespondiert.In a step S4, the control computer 8 determines, if necessary, the corresponding guide speeds vL on the basis of the control variables L *. In a step S5, the control computer 8 operates the finishing
Die Ermittlungsvorschrift zum Ermitteln der Leitgrößen L* ist jeweils spezifisch für den jeweiligen Bandpunkt 12, 13. Aus dem ermittelten Wert der Leitgröße L* für einen bestimmten Bandpunkt 12, 13 kann also nicht ohne weiteres auf den Wert der Leitgröße L* für einen anderen Bandpunkt 12, 13 geschlossen werden. Insbesondere gehen in die Ermittlungsvorschrift für die Leitgröße L* für einen bestimmten Bandpunkt 12, 13 zunächst die Istgröße G und die Sollgröße G* des entsprechenden Bandpunktes 12, 13 ein. Zusätzlich gehen in die jeweilige Ermittlungsvorschrift die Istgrößen G und die Sollgrößen G* mindestens eines weiteren Bandpunktes 12, 13, 13' ein, der zu dem Zeitpunkt, zu dem der betrachtete Bandpunkt 12, 13 in die Fertigstraße 1 eintritt, bereits in die Fertigstraße 1 eingetreten ist. Dieser Sachverhalt wird nachfolgend in Verbindung mit
Man nehme an, entsprechend der Darstellung von
Bei der in
- die Istgröße G und die Sollgröße G* für den Bandpunkt P4 und
- die Istgröße und die Sollgröße G, G* für mindestens einen der Bandpunkte P1, P2 und P3.
- the actual size G and the target size G * for the band point P4 and
- the actual size and the target size G, G * for at least one of the band points P1, P2 and P3.
Unter der Annahme, dass der Prädiktionshorizont H vier Bandpunkten entspricht, muss die Ermittlung der Leitgröße L* für den Bandpunkt P4 einen Zeittakt vor dem Zeitpunkt des Eintretens des Bandpunktes P1 in die Fertigstraße 1 abgeschlossen gewesen sein.Assuming that the prediction horizon H corresponds to four band points, the determination of the guide quantity L * for the band point P4 must have been completed one time clock before the point in time when the band point P1 entered the finishing
In analoger Weise sind in die Ermittlung der Leitgröße L* für den Bandpunkt P7 eingegangen
- die Ist- und die Sollgröße G, G* für den Bandpunkt P7 und
- die Ist- und die Sollgröße G, G* für mindestens einen der Bandpunkte P1 bis P6.
- the actual and the desired size G, G * for the band point P7 and
- the actual and the desired size G, G * for at least one of the band points P1 to P6.
Diese Ermittlung muss spätestens zum Zeitpunkt des Eintretens des Bandpunktes P3 abgeschlossen gewesen sein.This determination must have been completed at the latest at the time of the occurrence of the band point P3.
Der Bandpunkt P30 ist derjenige Bandpunkt, der gerade in die Fertigstraße 1 eingetreten ist. In die Ermittlung der Leitgröße L*, die spätestens zum Zeitpunkt des Eintretens des Bandpunktes P26 abgeschlossen gewesen sein muss, sind eingegangen
- die Ist- und die Sollgröße G, G* für den Bandpunkt P30 und
- die Ist- und die Sollgröße G, G* für mindestens einen der Bandpunkte P1 bis P29.
- the actual and the target size G, G * for the band point P30 and
- the actual and the desired size G, G * for at least one of the band points P1 to P29.
In aller Regel ist es für die Ermittlung der Leitgröße L* für den Bandpunkt P30 ausreichend, die Ist- und Sollgrößen G, G* der Bandpunkte P5 bis P30 zu berücksichtigen, also diejenigen Bandpunkte, die sich gemäß der Darstellung von
In analoger Weise werden die Leitgrößen L* für die Bandpunkte P31 bis P35 bestimmt. Der Bandpunkt P31 entspricht in der Darstellung von
In die Ermittlung der Leitgröße L* für den Bandpunkt P31 gehen ein
- die Ist- und die Sollgröße G, G* für den Bandpunkt P31 und
- die Ist- und Sollgrößen G, G* für mindestens einen der Bandpunkte P1 bis P30, vorzugsweise für mindestens einen der Bandpunkte P6 bis P30.
- the actual and the desired size G, G * for the band point P31 and
- the actual and desired values G, G * for at least one of the band points P1 to P30, preferably for at least one of the band points P6 to P30.
Letzteres gilt insbesondere deshalb, weil die Bandpunkte P1 bis P5 zu dem Zeitpunkt, zu dem der Bandpunkt P31 in die Fertigstraße 1 eintritt, bereits wieder aus der Fertigstraße 1 ausgetreten sind.The latter applies in particular because the band points P1 to P5 have already exited the finishing
In analoger Weise können auch die Leitgrößen L* für die Bandpunkte P32 bis P35 bestimmt werden. Beispielsweise für den Bandpunkt P35 gehen in die Ermittlung für dessen Leitgröße L* ein
- die Ist- und die Sollgröße G, G* für den Bandpunkt P35 und
- die Ist- und Sollgrößen G, G* für mindestens einen der Bandpunkte P1 bis P34.
- the actual and the desired size G, G * for the band point P35 and
- the actual and desired quantities G, G * for at least one of the band points P1 to P34.
Die Ist- und Sollgrößen G, G* für die Bandpunkte P1 bis P9 können hierbei unberücksichtigt bleiben, da die Bandpunkte P1 bis P9 zu dem Zeitpunkt, zu dem der Bandpunkt P35 in die Fertigstraße 1 eintritt, bereits wieder aus der Fertigstraße 1 ausgetreten sind.The actual and target variables G, G * for the band points P1 to P9 can hereby be disregarded since the band points P1 to P9 have already exited the finishing
Für die übrigen Bandpunkte P32, P33 und P34 gelten analoge Ausführungen.For the other band points P32, P33 and P34 analogue versions apply.
In einer bevorzugten Ausgestaltung der vorliegenden Erfindung wird für jeden in die Fertigstraße 1 eintretenden Bandpunkt 12, 13 - beispielsweise für den Bandpunkt P31 gemäß
In der Fertigstraße 1 befinden sich in der Regel gleichzeitig eine Vielzahl von Bandpunkten 12, 13, 13'. Typische Zahlenwerte liegen zwischen 10 und 200, beispielsweise zwischen 50 und 100. Es ist möglich, von den Bandpunkten 12, 13, 13' die sich zu einem bestimmten Zeitpunkt gerade in der Fertigstraße 1 befinden, nur einige Bandpunkte 12, 13, 13' zu berücksichtigen, beispielsweise jeden zweiten oder jeden vierten Bandpunkt 12, 13, 13'. Diese Vorgehensweise führt zu einem reduzierten Rechenaufwand und liefert dennoch akzeptable Ergebnisse. Vorzugsweise werden für die Ermittlung der Leitgröße L* für einen bestimmten Bandpunkt 12, 13 jedoch die Ist- und Sollgrößen G, G* aller Bandpunkte 12, 13, 13' berücksichtigt, die sich zum Zeitpunkt des Eintretens desjenigen Bandpunktes 12, 13, dessen Leitgröße L* ermittelt wird, in die Fertigstraße 1 bereits in der Fertigstraße 1 befinden.In the finishing
Die in
Es ist möglich, dass dem Steuerrechner 8 im Schritt S1 von
Alternativ ist es möglich, dass dem Steuerrechner 8 zwar im Rahmen des Schrittes S1 von
Wie in
In dem Fall, dass auch der Schritt S1 in die Schleife mit eingebunden ist, werden dem Steuerrechner 8 bei einem bestimmten Durchlauf der Schleife nur die Ist- und Sollgrößen G, G* von Bandpunkten 12, 13 bekannt, welche noch nicht in die Fertigstraße 1 eingetreten sind. Die Ist- und Sollgrößen G, G* der Bandpunkte 13', welche bereits in die Fertigstraße 1 eingelaufen sind, sind dem Steuerrechner 8 in diesem Fall jedoch auf Grund von früheren Schleifendurchläufen bekannt. Es ist in diesem Fall also lediglich erforderlich, dass der Steuerrechner 8 sich die "alten" Ist- und Sollgrößen G, G* "merkt".In the event that the step S1 is also involved in the loop, the control computer 8 will only know the actual and nominal values G, G * of band points 12, 13 during a certain passage of the loop, which are not yet in the finishing
Zum Ermitteln der Leitgrößen L* für einen bestimmten Bandpunkt 12, 13 - also zur Implementierung der Schritte S2 und S3 von
In einer ersten möglichen Ausgestaltung der Schritte S2 und S3 von
In einem Schritt S12 ermittelt der Steuerrechner 8 alle Bandpunkte 12, 13, 13', deren Ist- und Sollgrößen G, G* in die Ermittlung der Leitgröße L* für den Bandpunkt 12, 13 eingehen, den der Steuerrechner 8 im Schritt S11 selektiert hat. Beispielsweise kann der Steuerrechner 8 - siehe
In einem Schritt S13 selektiert der Steuerrechner 8 einen der im Schritt S12 ermittelten Bandpunkte 12, 13, 13'. In einem Schritt S14 ermittelt der Steuerrechner 8 für den im Schritt S13 selektierten Bandpunkt 12, 13, 13' - beispielsweise für den Bandpunkt P6 - eine Einzelleitgröße 1*. In die Ermittlung der Einzelleitgröße 1* gehen nur die Istgröße G und die Sollgröße G* des im Schritt S13 selektierten Bandpunktes 12, 13, 13' ein. Die jeweilige Einzelleitgröße 1* ist daher auf diesen einen Bandpunkt 12, 13, 13' bezogen.In a step S13, the control computer 8 selects one of the band points 12, 13, 13 'determined in step S12. In a step S14, the control computer 8 determines a single-
Die Einzelleitgröße 1* bestimmt eine korrespondierende Leitgeschwindigkeit vL. Der Steuerrechner 8 nimmt an, dass der im Schritt S14 betrachtete Bandpunkt 12, 13, 13' die Fertigstraße 1 durchläuft und die Fertigstraße 1 während des gesamten Durchlaufs des betrachteten Bandpunkts 12, 13, 13' durch die Fertigstraße 1 - also von dem Zeitpunkt des Einlaufens in die Fertigstraße 1 bis zum Zeitpunkt des Auslaufens aus der Fertigstraße 1 - konstant mit dieser Leitgeschwindigkeit vL betrieben wird, die durch die entsprechende Einzelleitgröße 1* bestimmt ist. In diesem Fall wird für den betrachteten Bandpunkt 12, 13, 13' am Ort xA, auf den die Sollgröße G* des betrachteten Bandpunktes 12, 13, 13' bezogen ist, ein Energieinhalt erwartet. Der Steuerrechner 8 ermittelt diesen erwarteten Energieinhalt. Die Ermittlung des erwarteten Energieinhalts kann vom Steuerrechner 8 beispielsweise mittels eines Fertigstraßenmodells ermittelt werden. Geeignete Fertigstraßenmodelle sind als solche bekannt. Sie werden beispielsweise zur Ermittlung der erwarteten Endwalztemperatur eingesetzt, siehe die bereits genannte
Der erwartete Energieinhalt ist durch eine entsprechende Erwartungsgröße GE charakterisiert. Die Erwartungsgröße GE kann alternativ die Temperatur oder die Enthalpie sein, analog zu den Ist- und Sollgrößen G, G*. Der Steuerrechner 8 ermittelt die Einzelleitgröße 1* für den betrachteten Bandpunkt 12, 13, 13' im Schritt S14 derart, dass die Erwartungsgröße GE mit der Sollgröße G* für den betrachteten Bandpunkt 12, 13, 13' übereinstimmt.The expected energy content is characterized by a corresponding expected quantity GE. The expectation variable GE can alternatively be the temperature or the enthalpy, analogous to the actual and set values G, G *. The control computer 8 determines the
In einem Schritt S15 prüft der Steuerrechner 8, ob er den Schritt S14 bereits für alle heranzuziehenden Bandpunkte 12, 13, 13' ausgeführt hat. Wenn dies nicht der Fall ist, geht der Steuerrechner 8 zum Schritt S13 zurück. Bei der erneuten Ausführung des Schrittes S13 selektiert der Steuerrechner 8 selbstverständlich einen anderen, bisher noch nicht betrachteten Bandpunkt 12, 13, 13', der in die Ermittlung der gesuchten Leitgröße L* eingeht, beispielsweise den Bandpunkt P7.In a step S15, the control computer 8 checks whether it has already performed step S14 for all band points 12, 13, 13 'to be used. If this is not the case, the control computer 8 returns to step S13. In the renewed execution of step S13 of course, the control computer 8 selects another, previously not considered
Wenn der Steuerrechner 8 im Schritt S15 feststellt, das er bereits alle erforderlichen Einzelleitgrößen 1* ermittelt hat, geht der Steuerrechner 8 zu einem Schritt S16 über. Im Schritt S16 ermittelt der Steuerrechner 8 anhand aller Einzelleitgrößen 1*, die er im Rahmen des wiederholten Abarbeitens des Schrittes S14 ermittelt hat, die Leitgröße L* für den im Schritt S11 selektierten Bandpunkt 12, 13. Beispielsweise kann der Steuerrechner 8 den gewichteten oder ungewichteten Mittelwert der Einzelleitgrößen 1* bilden.If the control computer 8 determines in step S15 that it has already determined all the required
In einem Schritt S17 prüft der Steuerrechner 8, ob er die Schritte S11 bis S16 bereits für alle Bandpunkt 12, 13 ausgeführt hat, deren Leitgrößen L* berechnet werden sollen. Wenn dies nicht der Fall ist, geht der Steuerrechner 8 zum Schritt S11 zurück. Dort selektiert der Steuerrechner 8 selbstverständlich einen anderen, bisher noch nicht betrachteten Bandpunkt 12, 13. Anderenfalls ist das Verfahren von
Die Vorgehensweise von
Alternativ zur Vorgehensweise von
Im Schritt S21 ermittelt der Steuerrechner 8 anhand der Istgrößen G der im Schritt S12 ermittelten Bandpunkte 12, 13, 13' eine effektive Istgröße G'. In analoger Weise ermittelt der Steuerrechner 8 im Schritt S22 anhand der Sollgrößen G* der im Schritt S12 ermittelten Bandpunkte 12, 13, 13' eine effektive Sollgröße G'*. Beispielsweise kann der Steuerrechner 8 in den Schritten S21 und S22 eine gewichtete oder ungewichtete Mittelwertbildung vornehmen. Unabhängig davon, welche Vorgehensweise ergriffen wird, sollten die Vorgehensweisen der Schritte S21 und S22 jedoch miteinander korrespondieren.In step S21, the control computer 8 uses the actual variables G of the band points 12, 13, 13 'determined in step S12 to determine an effective actual variable G'. In an analogous manner, the control computer 8 determines an effective setpoint G '* in step S22 on the basis of the setpoint values G * of the band points 12, 13, 13' determined in step S12. For example, the control computer 8 in steps S21 and S22 a weighted or unweighted Averaging. Regardless of which approach is taken, however, the procedures of steps S21 and S22 should correspond.
Im Schritt S23 ermittelt der Steuerrechner 8 die Leitgröße L* für den im Schritt S11 selektierten Bandpunkt 12, 13.In step S23, the control computer 8 determines the reference variable L * for the
Die im Schritt S23 ermittelte Leitgröße L* korrespondiert mit einer entsprechenden Leitgeschwindigkeit vL. Wenn der im Schritt S11 selektierte Bandpunkt 12, 13 an den Ort xE, auf den die Istgröße G des im Schritt S11 selektierten Bandpunktes 12, 13 bezogen ist, die effektive Istgröße G' aufweisen würde und der Steuerrechner 8 die Fertigstraße 1 während des gesamten Durchlaufs des im Schritt S11 selektierten Bandpunktes 12, 13 mit dieser Leitgeschwindigkeit vL betreiben würde, würde für diesen Bandpunkt 12, 13 am Ort xA, auf den die Sollgröße G* des im Schritt S11 selektierten Bandpunktes 12, 13 bezogen ist, ein Ist-Energieinhalt erwartet werden, der durch eine Erwartungsgröße GE charakterisiert ist. Der Steuerrechner 8 ermittelt die Leitgröße L* im Schritt S23 derart, dass die ermittelte Erwartungsgröße GE mit der effektiven Sollgröße G'* übereinstimmt. Die Ermittlung der Erwartungsgröße GE kann - analog zur Vorgehensweise des Schrittes S14 von
Alternativ zu den Vorgehensweisen der
- Gemäß
FIG 10 setzt der Steuerrechner 8 in einem Schritt S31 die Leitgrößen L*, die er ermitteln soll, - also die Leitgrößen L* für den erstenBandpunkt 12 und für zumindest einen Teil der zweiten Bandpunkte 13 - zunächst als vorläufige Werte an.
- According to
FIG. 10 the control computer 8 sets in a step S31 the guiding variables L *, which it is to determine, ie the guiding quantities L * for thefirst band point 12 and for at least a part of the second band points 13, first as provisional values.
In einem Schritt S32 ermittelt der Steuerrechner 8 für die im Schritt S31 betrachteten Bandpunkte 12, 13 eine jeweilige Erwartungsgröße GE. Die im Schritt S32 ermittelten Erwartungsgrößen GE sind jeweils für den erwarteten Energieinhalt des jeweils korrespondierenden Bandpunktes 12, 13 charakteristisch, der für den jeweiligen Bandpunkt 12, 13 erwartet wird, wenn der jeweilige Bandpunkt 12, 13 die Fertigstraße 1 entsprechend dem angesetzten Verlauf der Leitgeschwindigkeit vL - wie er durch die Abfolge der Leitgrößen L* definiert ist - durchläuft. Die erwarteten Energieinhalte GE sind jeweils auf den Ort xA bezogen, auf den die Sollgrößen G* für die Bandpunkte 12, 13 bezogen sind.In a step S32, the control computer 8 determines a respective expectation variable GE for the band points 12, 13 considered in step S31. The expected values GE determined in step S32 are in each case characteristic of the expected energy content of the
In einem Schritt S33 bildet der Steuerrechner 8 eine Zielfunktion Z. In die Zielfunktion Z gehen zumindest die Beträge der Differenzen der Erwartungsgrößen GE von den korrespondierenden Sollgrößen G* ein. Beispielsweise kann die Zielfunktion Z eine Summe enthalten, wobei entsprechend der Darstellung in
Es ist möglich, die obenstehend beschriebene Zielfunktion Z so zu verwenden, wie sie bisher beschrieben wurde. Vorzugsweise gehen in die Zielfunktion Z jedoch weitere Größen ein. Insbesondere kann in die Zielfunktion Z zusätzlich ein Strafterm eingehen, mittels dessen Änderungen der Leitgeschwindigkeit vL bestraft werden. Beispielsweise kann die Zielfunktion Z also folgende Form aufweisen:
In den beiden Summen wurden hierbei verschiedene Indizes i, j verwendet, weil die Indizes i und j über verschiedene Bereiche laufen. αi und βj sind - prinzipiell beliebig wählbare, nicht negative - Wichtungsfaktoren.In the two sums, different indices i, j were used because the indices i and j run over different areas. α i and β j are - in principle arbitrary, non-negative - weighting factors.
In einem Schritt S34 variiert der Steuerrechner 8 die angesetzten Leitgrößen L* mit dem Ziel, die Zielfunktion Z zu optimieren, gemäß der oben stehenden Ausgestaltung zu minimieren. Bei entsprechender anderer Gestaltung der Zielfunktion Z käme auch ein Maximieren in Frage.In a step S34, the control computer 8 varies the applied guiding variables L * with the aim of optimizing the target function Z according to the embodiment above. With a correspondingly different design of the objective function Z, maximizing would also be possible.
Die Vorgehensweisen der
Sowohl im Rahmen der Vorgehensweise von
Es ist möglich, ein derartiges Modell als solches auch in den Schritten S14, S23 und S32 zu verwenden. Bevorzugt ist jedoch, dass der Steuerrechner 8 entsprechend der Darstellung von
Durch die Verwendung des Datenfeldes ist eine erhebliche Beschleunigung erreichbar. Denn auch das Datenfeld muss zwar im Rahmen einer Vorabberechnung, also wenn das heiße Band 2 zum Walzen in der Fertigstraße 1 schon bereit steht, ermittelt werden. Das Datenfeld kann also nicht offline ermittelt werden. Vielmehr muss das Datenfeld online ermittelt werden, also nachdem die Banddaten dem Steuerrechner 8 vorgegeben worden sind. Es stehen für die Ermittlung des Datenfeldes daher nur wenige Sekunden zur Verfügung. Dennoch tritt eine erhebliche Beschleunigung auf. Denn im Rahmen des Datenfeldes müssen nur relativ wenige Werte mittels des Modells der Fertigstraße 1 vollständig durchgerechnet werden, beispielsweise für je 10 mögliche Istgrößen G und je 10 mögliche Leitgeschwindigkeiten vL, so dass die Modellrechnung für insgesamt 100 Werte durchgeführt werden muss. Dies ist aber immer noch erheblich schneller, als später im Rahmen der Schritte S14, S23, S32 stets für jeden einzelnen Bandpunkt 12, 13, 13' mittels des Modells der Fertigstraße 1 dessen Erwartungsgröße GE zu ermitteln.By using the data field, a considerable acceleration can be achieved. For even the data field must indeed be determined within the framework of a preliminary calculation, that is, when the
Die Art der Einbindung des Datenfeldes in die Vorgehensweisen der
Das Datenfeld kann nach Bedarf ausgebildet sein. Beispielsweise kann es sich um ein reines Stützstellenfeld mit beispielsweise 5, 8, 10, ... Stützstellen je Dimension handeln. Zwischen einzelnen Stützstellen kann in diesem Fall linear oder nicht linear (beispielsweise mittels Splines) interpoliert werden. Alternativ kann das Datenfeld beispielsweise als neuronales Netz ausgebildet sein.The data field can be designed as needed. For example, it can be a pure interpolation field with, for example, 5, 8, 10, ... interpolation points per dimension. In this case, it is possible to interpolate between individual support points linearly or nonlinearly (for example by means of splines). Alternatively, the data field may be formed, for example, as a neural network.
Wenn die Istgröße G auf einer gemessenen Größe basiert, beispielsweise mittels der Temperaturmesseinrichtung 14 erfasst wird, ist es möglich, die gemessenen Größen direkt zu verarbeiten. In der Regel befindet sich der Ort xE vor der Fertigstraße 1, auf den die Istgrößen G bezogen sind, jedoch hinter der Temperaturmesseinrichtung 14. Es ist daher erforderlich, die gemessenen Größen in die Istgrößen G (die auf den Ort xE bezogen sind) umzurechnen. Dies ist relativ einfach möglich, da lediglich eine Luftstrecke durchgerechnet werden muss. Eingangswerte für die Luftstrecke sind der mittels der Temperaturmesseinrichtung 14 gemessene Temperaturwert sowie die Zeit, die für den jeweiligen Bandpunkt 12, 13, 13' anfällt, bis der entsprechende Bandpunkt 12, 13, 13' den Ort xE vor der Fertigstraße 1 erreicht. Die Zeit ergibt sich für jeden Bandpunkt 12, 13, 13' durch die Leitgeschwindigkeiten der vorgeordneten Bandpunkte 12, 13, 13'.If the actual size G is based on a measured quantity, for example detected by the
Es entsteht somit ein rückgekoppeltes Problem. Zur Lösung dieses Problems wird zunächst ein vorläufiger Verlauf der Leitgeschwindigkeit vL angesetzt. Unter der Annahme, dass dieser angesetzte Verlauf zutrifft, werden die Istgrößen G ermittelt, die auf den Ort xE vor der Fertigstraße 1 bezogen sind. Mit den nunmehr ermittelten Istgrößen G wird der Verlauf der Leitgeschwindigkeit vL ermittelt. Der ermittelte Verlauf der Leitgeschwindigkeit vL wird wiederum herangezogen, um die Istgrößen G neu zu ermitteln. In der Praxis zeigt sich, dass die Vorgehensweise sehr schnell konvergiert. In der Regel sind nur wenige Iterationen erforderlich - beispielsweise drei bis fünf Iterationen -, um zu hinreichend stabilen Ergebnissen zu gelangen.This creates a feedback problem. To solve this problem, a preliminary course of the guide speed vL is initially set. Assuming that this set course applies, the actual quantities G are determined, which are related to the location xE before the finishing
Im Rahmen der bisherigen Erläuterungen der vorliegenden Erfindung wurde angenommen, dass die Fertigstraße 1 weder eine eingangsseitige Heizeinrichtung 4 noch Zwischengerüst-Kühleinrichtungen 5 aufweist. Falls die Heizeinrichtung 4 und/ oder die Zwischengerüst-Kühleinrichtungen 5 vorhanden sind, kann das erfindungsgemäße Betriebsverfahren entsprechend angepasst werden. Die erforderlichen Anpassungen werden nachfolgend in Verbindung mit einer einzigen Zwischengerüst-Kühleinrichtung 5 erläutert. Die entsprechenden Ausführungen sind jedoch ohne weiteres auch bei Ausgestaltungen der Fertigstraße 1 anwendbar, die mehr als eine Zwischengerüst-Kühleinrichtung 5 und/oder eine eingangsseitige Heizeinrichtung 4 aufweist, wobei die Heizeinrichtung 4 alternativ oder zusätzlich zu den Zwischengerüst-Kühleinrichtungen 5 vorhanden sein kann.In the context of the previous explanations of the present invention, it has been assumed that the finishing
Man nehme also an, die Fertigstraße 1 weise eine einzige Zwischengerüst-Kühleinrichtung 5 auf, beispielsweise zwischen dem zweiten und dem dritten Walzgerüst 3 gemäß der Darstellung von
Das Teilmodell TM1 entspricht vom Ansatz her einem Modell einer Fertigstraße 1, wie es bisher angenommen wurde, also einem Modell einer Fertigstraße 1 ohne Zwischengerüst-Kühleinrichtungen. Es modelliert das Verhalten des Bandes 2 in der Fertigstraße 1 bis vor die Zwischengerüst-Kühleinrichtung 5. Das Teilmodell TM1 erhält als Eingangsgrößen die Istgröße G eines Bandpunktes 12, 13, 13' und dessen Leitgeschwindigkeit vL bzw. den entsprechenden Leitgeschwindigkeitsverlauf. Das Teilmodell TM1 liefert als Ausgangsgröße eine Erwartungsgröße TE, die einem erwarteten Energieinhalt entspricht, mit dem der entsprechende Bandpunkt 12, 13, 13' in die Zwischengerüst-Kühleinrichtung 5 einläuft. Das Teilmodell TM1 ist zweidimensional, denn es weist zwei Eingangsgrößen auf, nämlich die Istgröße G und die Leitgeschwindigkeit vL.The partial model TM1 is similar in design to a model of a finishing
Das Teilmodell TM2 modelliert die Zwischengerüst-Kühleinrichtung 5 als solche. Es erhält als Eingangsgrößen die vom Teilmodell TM1 gelieferte Erwartungsgröße TE, die Leitgeschwindigkeit vL, mit der der betreffende Bandpunkt 12, 13, 13' die Zwischengerüstkühleinrichtung 5 durchläuft und eine - als solche gegebene - Kühlmittelmenge M, mit der das Band 2 pro Zeiteinheit beaufschlagt wird. Die Menge M an Kühlflüssigkeit pro Zeiteinheit ist vorzugsweise als Funktion der Materialmenge des Bandes 2 definiert, welche die Zwischengerüst-Kühleinrichtung 5 bereits passiert hat. Alternativ kann die Menge M an Kühlflüssigkeit pro Zeiteinheit beispielsweise als Funktion des betreffenden Bandpunktes 12, 13, 13' definiert sein, der gerade in die Zwischengerüst-Kühleinrichtung 5 einläuft.The partial model TM2 models the
Das Teilmodell TM2 weist also - im Gegensatz zu einem Modell einer Fertigstraße 1 ohne Zwischengerüst-Kühleinrichtungen - drei Eingangsgrößen auf. Das Aufstellen eines entsprechenden dreidimensionalen Datenfeldes für das dreidimensionale Teilmodell TM2 kann - je nach zur Verfügung stehender Rechenleistung - noch möglich sein. Vorzugsweise wird das Teilmodell TM2 jedoch in zwei Untermodelle TM2', TM2" aufgespalten, die multiplikativ miteinander verknüpft sind. Denn mit hinreichender Genauigkeit kann eine dreidimensionale Funktion f, welche eine Erwartungsgröße TA hinter der Zwischengerüst-Kühleinrichtung 5 als Funktion der Erwartungsgröße TE vor der Zwischengerüst-Kühleinrichtung 5, der Leitgeschwindigkeit vL und der Menge M an Kühlflüssigkeit pro Zeiteinheit angibt, als Produkt einer zweidimensionalen Funktion g und einer eindimensionalen Funktion h dargestellt werden. Die Funktion g ist hierbei von dem Erwartungswert TE, der vom Teilmodell TM1 geliefert wird, und der Leitgeschwindigkeit vL abhängig. Die Funktion h ist nur von der Menge M an Kühlflüssigkeit pro Zeiteinheit abhängig. Es kann also angesetzt werden
Hierbei bezeichnen
- TA die Erwartungsgröße für den Energieinhalt des betrachteten Bandpunktes 12, 13, 13' hinter der Zwischengerüst-
Kühleinrichtung 5, - TE die Erwartungsgröße für den Energieinhalt des betrachteten Bandpunktes 12, 13, 13' vor der Zwischengerüst-
Kühleinrichtung 5, - vL die Leitgeschwindigkeit und
- M die Menge an Kühlflüssigkeit, die pro Zeiteinheit auf
das Band 2 aufgebracht wird.
- TA the expected size for the energy content of the considered
12, 13, 13 'behind theband point inter-frame cooling device 5, - TE the expected size for the energy content of the considered
12, 13, 13 'in front of theband point inter-frame cooling device 5, - vL the guide speed and
- M is the amount of cooling fluid applied to the
belt 2 per unit of time.
Das Teilmodell TM3 ist vom Ansatz her ebenso aufgebaut wie das Teilmodell TM1. Es modelliert den Teil der Fertigstraße 1, der hinter der Zwischengerüstkühleinrichtung 5 angeordnet ist.The submodel TM3 has the same structure as the submodel TM1. It models the part of the finishing
Die Teilmodelle TM1 bis TM3 werden aneinander geschaltet und miteinander verkettet, so dass die Ausgangsgrößen des einen Teilmodells TM1, TM2 Eingangsgrößen des jeweils nächsten Modells TM2, TM3 sind. Durch das Verketten der Teilmodelle TM1 bis TM3 miteinander kann bereits die Dimensionalität des Modellierungsproblems erheblich reduziert werden, nämlich auf die Betrachtung eines dreidimensionalen und zweier zweidimensionaler Probleme. Durch die Aufspaltung des dreidimensionalen Problems - Stichwort Teilmodell TM2 - in eine eindimensionale und eine zweidimensionale Funktion kann die Komplexität noch weiter reduziert werden. Insbesondere durch diese Reduzierung der Komplexität des dreidimensionalen Problems bleibt die Echtzeit- und Onlinefähigkeit auch dann erhalten, wenn die Zwischengerüst-Kühleinrichtungen 5 und/oder die Heizeinrichtung 4 vorhanden sind.The submodels TM1 to TM3 are connected to each other and concatenated with each other, so that the outputs of the one submodel TM1, TM2 input variables of the next model TM2, TM3 are. By concatenating the partial models TM1 to TM3 with one another, the dimensionality of the modeling problem can already be considerably reduced, namely to the consideration of a three-dimensional and two-dimensional problems. By splitting the three-dimensional problem - keyword partial model TM2 - into a one-dimensional and a two-dimensional function, the complexity can be further reduced. In particular, by reducing the complexity of the three-dimensional problem, the real-time and on-line capability is maintained even when the
Wenn die Zwischengerüst-Kühleinrichtungen 5 und/oder die Heizeinrichtung 4 vorhanden sind, können also unter der Voraussetzung, dass der Verlauf der Menge M an Kühlflüssigkeit pro Zeiteinheit gegeben ist, die Leitgrößen L* berechnet werden. In einem zweiten Schritt kann sodann - bei nunmehr bekanntem Verlauf der Leitgrößen L* - für jede Zwischengerüst-Kühleinrichtung 5 die Menge M variiert werden, um die erwarteten Energieinhalte der Bandpunkte 12, 13, 13' so weit wie möglich an die entsprechenden Soll-Energieinhalte der Bandpunkte 12, 13, 13' anzunähern. Die Ermittlung der korrekten Mengen M erfolgt völlig analog zur Ermittlung der korrekten Mengen an Kühlflüssigkeit für die Kühleinrichtungen 7 der Kühlstrecke 6.If the
Es ist möglich, dass der Steuerrechner 8 die Fertigstraße 1 steuert, ohne eine Messgröße GM zu erfassen, die für den tatsächlichen Energieinhalt der Bandpunkte 12, 13, 13' hinter der Fertigstraße 1 charakteristisch ist. In einer bevorzugten Ausgestaltung der vorliegenden Erfindung hingegen nimmt der Steuerrechner 8 - in diesem Fall selbstverständlich nach dem Durchlauf der jeweiligen Bandpunkte 12, 13, 13' durch die Fertigstraße 1 - gemäß
Weiterhin ermittelt der Steuerrechner 8 gemäß
In dem Fall, dass das Modell der Fertigstraße 1 - unabhängig von der genauen Art des Modells der Fertigstraße 1 - fehlerfrei ist, entsprechen die im Schritt S52 ermittelten Ist-Energieinhalte der Bandpunkte 12, 13, 13' exakt den tatsächlichen Energieinhalten, die durch die entsprechenden Messgrößen GM bestimmt sind. In vielen Fällen ist das Modell der Fertigstraße 1 jedoch fehlerhaft. Die Gründe hierfür können vielfältiger Natur sein. Beispielsweise kann die Modellierung zu einfach angesetzt sein oder es kann das Modell einen systematischen Fehler aufweisen, beispielsweise der Wärmeübergang falsch modelliert sein. In einem Schritt S53 vergleicht der Steuerrechner 8 daher den Energieinhalt gemäß der Messgröße GM und den Energieinhalt gemäß der korrespondierenden Erwartungsgröße GE' miteinander. In Abhängigkeit von dem Vergleich des Schrittes S53 führt der Steuerrechner 8 in einem Schritt S54 selbsttätig zumindest einen Teil derjenigen Leitgrößen L* nach, die der Steuerrechner 8 zum Zeitpunkt des Vergleichs bereits ermittelt hat.In the case that the model of the finishing train 1 - regardless of the exact nature of the model of the finishing train 1 - is error-free, the actual energy contents of the band points 12, 13, 13 'determined in step S52 exactly correspond to the actual energy contents determined by the corresponding measured quantities GM are determined. In many cases, however, the model of finishing
Das Nachführen der Leitgrößen L* bezieht sich im Rahmen des Schrittes S54 selbstverständlich nur auf diejenigen Leitgrößen L*, die zu diesem Zeitpunkt zwar bereits ermittelt sind, aber noch zur Ausführung anstehen. Der Schritt S54 wird also nur für Leitgrößen L* durchgeführt, die für Bandpunkte 12, 13 ermittelt wurden, die zum Zeitpunkt des Nachführens noch nicht in die Fertigstraße 1 eingelaufen sind.The tracking of the control variables L * in the context of step S54, of course, refers only to those control variables L *, which are indeed already determined at this time, but are still pending execution. The step S54 is thus carried out only for guiding variables L * which were determined for band points 12, 13 which have not yet entered the finishing
Es ist möglich, alle nachgeführten Leitgrößen L* sofort in vollem Umfang nachzuführen. Bevorzugt ist jedoch, einen sanfteren Übergang vorzunehmen. Beispielsweise kann die erste nachgeführte Leitgröße L* um 10 % ihrer Änderung nachgeführt werden, die zweite nachgeführte Leitgröße um 20 % ihrer Änderung, die dritte nachgeführte Leitgröße L* um 30 % ihrer Änderung usw..It is possible to track all tracked variables L * immediately in their entirety. However, it is preferred to make a smoother transition. For example, the first tracking variable L * can be tracked by 10% of its change, the second tracking variable by 20% of its change, the third tracking variable L * by 30% of its change, etc.
Alternativ oder zusätzlich zum Vorhandensein des Schrittes S54 ist es möglich, dass der Steuerrechner 8 in einem Schritt S55 auf Grund des Vergleichs die Ermittlungsvorschrift zum Ermitteln der Leitgrößen L* als solches adaptiert. Dadurch wird erreicht, dass zukünftig ermittelte Leitgrößen L*, die zum Zeitpunkt des Vergleichs des Schrittes S53 noch nicht ermittelt sind, auf verbesserte Weise ermittelt werden. Das Adaptieren der Ermittlungsvorschrift kann insbesondere ein Adaptieren des Modells der Fertigstraße 1 und hier insbesondere des Wärmeübergangsmodells umfassen.Alternatively or in addition to the presence of step S54, it is possible that the control computer 8 in a step S55 on the basis of the comparison, the determination rule for determining the control variables L * as such adapted. This ensures that future determined control variables L *, which are not yet determined at the time of the comparison of step S53, are determined in an improved manner. The adaptation of the determination rule may include in particular an adaptation of the model of the finishing
Insbesondere, wenn die Erwartungsgrößen GE, GE' mittels des oben stehend erwähnten Datenfeldes ermittelt werden, ist es möglich, das Adaptieren des Modells der Fertigstraße 1 für das Band 2, das die Fertigstraße 1 momentan durchläuft, auf vereinfachte Weise vorzunehmen. Denn in diesem Fall kann das Adaptieren beispielsweise dadurch erfolgen, dass auf die Istgrößen G ein Offset addiert wird, bevor sie als Eingangsgröße des Datenfeldes verwendet werden. Alternativ oder zusätzlich kann die Leitgeschwindigkeit vL mit einem Faktor skaliert werden und/oder auf sie ein Offset addiert werden, bevor sie als Eingangsgröße des Datenfeldes verwendet wird. Alternativ oder zusätzlich kann auf die jeweils unter Verwendung des Datenfeldes ermittelte Erwartungsgröße GE, GE' ein Offset addiert werden. Insbesondere die Echtzeitfähigkeit des erfindungsgemäßen Betriebsverfahrens bleibt bei dieser vereinfachten Art der Adaptierung des Modells der Fertigstraße 1 erhalten.In particular, if the expectation quantities GE, GE 'are determined by means of the above-mentioned data field, it is possible to carry out the adaptation of the model of the
Es ist möglich, im Rahmen des Schrittes S54 alle Leitgrößen L* nachzuführen, die zu diesem Zeitpunkt bereits ermittelt, aber noch nicht ausgeführt sind, also beispielsweise auch die Leitgröße L* für den als nächstes in die Fertigstraße 1 eintretenden (ersten) Bandpunkt 12. Vorzugsweise führt der Steuerrechner 8 anhand des Vergleichs des Schrittes S53 selbsttätig jedoch nur diejenigen Leitgrößen L* nach, die für (zweite) Bandpunkte 13 ermittelt wurden, die zum Zeitpunkt des Nachführens vom Eingang der Fertigstraße 1 einen Mindestabstand MIN (siehe
Denn wie in
Gemäß der Darstellung von
- die Bandpunkte P1 bis P4 bereits aus der Fertigstraße 1 ausgetreten,
- befinden sich die Bandpunkte P5, P6, P7 ... P30 in
der Fertigstraße 1, - tritt der Bandpunkt P31 als nächstes in
die Fertigstraße 1 ein und - erstreckt sich der Prädiktionshorizont H, ausgehend vom Bandpunkt P31, bis zum Bandpunkt P35.
- the belt points P1 to P4 have already left the finishing
train 1, - are the band points P5, P6, P7 ... P30 in the finishing
train 1, - enters the band point P31 next in the
finishing line 1 and - extends the prediction horizon H, starting from the band point P31, to the band point P35.
Anhand der Isttemperatur beispielsweise des Bandpunkts P2 vor der Fertigstraße 1 und anhand des Leitgeschwindigkeitsverlaufs, mit dem der Bandpunkt P2 die Fertigstraße 1 durchlaufen hat, ermittelt der Steuerrechner 8 die Temperatur, die für den Bandpunkt P2 am Ausgang der Fertigstraße 1 (also am Ort xA) erwartet wird. Dies entspricht dem Schritt S52 von
Es mag in Einzelfällen zwar zulässig sein, auch die Leitgrößen L* der Bandpunkte P31 bis P34 ebenfalls zu ändern. In diesem Fall erfolgt die Änderung der entsprechenden Leitgrößen L* aber nicht auf Grund des Vergleiches des Schrittes S53, sondern auf Grund eines übergeordneten Steuereingriffs, der dem Steuerrechner 8 von einer anderen Steuereinrichtung - beispielsweise der Steuereinrichtung 8' - oder von einer Bedienperson vorgegeben wird.It may be permissible in individual cases to also change the guiding variables L * of the band points P31 to P34 as well. In this case, however, the change of the corresponding control variables L * does not take place on the basis of the comparison of step S53, but on the basis of a higher-level control intervention which is specified to the control computer 8 by another control device - for example the control device 8 '- or by an operator.
Wie bereits erwähnt, ist der Fertigstraße 1 in der Regel eine Kühlstrecke 6 nachgeordnet. Die Kühlstrecke 6 weist Kühleinrichtungen 7 auf. Jede Kühleinrichtung weist (mindestens) ein Stellventil 7' und eine Anzahl dem jeweiligen Stellventil 7' zugeordneter Spritzdüsen 7" auf. Mittels des jeweiligen Stellventils 7' wird eingestellt, wie viel Kühlflüssigkeit lokal auf das Band 2 abgegeben wird. Die Stellventile 7' reagieren relativ träge. Gerechnet von dem Zeitpunkt, zu dem ein Stellventil 7' mit einer geänderten Stellgröße S angesteuert wird bis zu dem Zeitpunkt, zu dem die geänderte Ansteuerung sich auf das Band 2 auswirkt, liegt eine Totzeit T, die oftmals im Sekundenbereich liegt. Totzeiten von zwei bis fünf Sekunden sind durchaus üblich. Weiterhin beeinflusst der Verlauf der Leitgeschwindigkeit vL auch die Durchlaufzeit der Bandpunkte 12, 13, 13' durch die Kühlstrecke 6. Es ist daher erforderlich, dass die Steuereinrichtung 8', welche die Ansteuerung der Kühleinrichtungen 7 der Kühlstrecke 6 vornimmt, nicht nur den momentanen Wert der Leitgeschwindigkeit vL kennt, sondern auch deren zukünftigen Verlauf. Denn nur dann kann die Steuereinrichtung 8' der Kühlstrecke 6 rechtzeitig vorher auf zukünftig anstehende Veränderungen der Leitgeschwindigkeit vL reagieren. Die Steuereinrichtung 8' der Kühlstrecke 6 muss also die Leitgröße L* - und zwar auch zukünftig anstehende Leitgrößen L* - zur Ermittlung der Stellgrößen S für die Stellventile 7' verwenden, wenn die korrekten Kühlmittelmengen auf die "richtigen" Stellen des Bandes 2 aufgebracht werden sollen. Dies gilt selbstverständlich in analoger Form auch dann, wenn die Steuerung der Kühlstrecke 6 vom Steuerrechner 8 vorgenommen wird.As already mentioned, the finishing
In dem Fall, dass Zwischengerüst-Kühleinrichtungen 5 vorhanden sind, treten bei den Zwischengerüst-Kühleinrichtungen 5 analoge Totzeiten auf. Auch hier sollte daher der Leitgrößenverlauf bei der Ermittlung der Stellgrößen S für die Zwischengerüst-Kühleinrichtungen 5 mit verwendet werden, um rechtzeitig vorher auf zukünftig anstehende Veränderungen der Leitgeschwindigkeit vL reagieren zu können. Vorzugsweise ist daher der Prädiktionshorizont H gemäß
Aus im Wesentlichen gleich gelagerten Gründen sollte der Mindestabstand MIN, innerhalb dessen das Nachführen der Leitgrößen L* unterdrückt wird, mindestens so groß wie die Totzeit T sein, beispielsweise gemäß
Die Leitgrößen L* werden vom Ansatz her punktuell für die einzelnen Bandpunkte 12, 13 ermittelt. Zum Ermitteln eines kontinuierlichen Leitgeschwindigkeitsverlaufs ist gemäß
Alternativ zum Schritt S61 könnte ein Schritt S62 vorhanden sein. Im Schritt S62 ermittelt der Steuerrechner 8 anhand der punktuell ermittelten Leitgrößen L* die korrespondierenden punktuellen Leitgeschwindigkeiten vL. In diesem Fall kettet der Steuerrechner 8 die entsprechenden Leitgeschwindigkeiten vL durch einen Spline aneinander, so dass sich durch die Verkettung ein stetiger und differenzierbarer Leitgeschwindigkeitsverlauf ergibt.Alternatively to step S61, a step S62 could be present. In step S62, the control computer 8 determines the corresponding point-specific guide speeds vL on the basis of the guide variables L * determined on a point-by-point basis. In this case, the control computer 8 chains the corresponding guide speeds vL by a spline to each other, so that the chaining results in a continuous and differentiable conduction velocity course.
Die Schritte S61 und S62 sind alternativ zueinander. Sie sind daher zwar beide in
Das obenstehend beschriebene Betriebsverfahren für die Fertigstraße 1 liefert - zunächst - Leitgeschwindigkeiten vL, bis der letzte Bandpunkt 13 des Bandes 2 in die Fertigstraße 1 eingelaufen ist. Die Leitgeschwindigkeit vL muss jedoch definiert sein, so lange sich mindestens ein Bandpunkt 12, 13 in der Fertigstraße 1 befindet, also auch dann, wenn keine weiteren Bandpunkte 12, 13 mehr in die Fertigstraße 1 einlaufen. Es ist ohne weiteres möglich, die erfindungsgemäße Vorgehensweise entsprechend zu erweitern. Es ist lediglich erforderlich, innerhalb des Steuerrechners 8 zusätzlich zu den Bandpunkten 12, 13, 13' für das physikalisch vorhandene Band 2 virtuelle Bandpunkte zu berücksichtigen, die an die erstgenannten Bandpunkte angehängt werden. Auch für diese virtuellen Bandpunkte wird eine entsprechende Leitgröße L* ermittelt. Den virtuellen Bandpunkten ist jedoch weder eine Istgröße G noch eine Sollgröße G* zugeordnet, so dass die virtuellen Bandpunkte selbst nicht zur Ermittlung der entsprechenden Leitgrößen L* beitragen.The above-described operating method for the finishing
Im Rahmen der Erläuterung der vorliegenden Erfindung wurde weiterhin die Leitgröße L* jeweils in Verbindung mit den Bandpunkten 12, 13 erläutert, die zu bestimmten Zeitpunkten in die Fertigstraße 1 einlaufen. Dies ist jedoch nicht so zu verstehen, dass die entsprechenden Leitgrößen L* den entsprechenden Bandpunkten 12, 13 fest zugeordnet sind. Denn die entsprechende Leitgröße L* wirkt global auf das gesamte Band 2. Entscheidend ist daher lediglich die Zuordnung der jeweiligen Leitgröße L* zu einem bestimmten Zeitpunkt, wobei der Zeitpunkt dadurch definiert ist, dass der entsprechende Bandpunkt 12, 13 zu diesem Zeitpunkt in die Fertigstraße 1 einläuft.As part of the explanation of the present invention, the Leitgröße L * was further explained in each case in conjunction with the band points 12, 13, which run into the finishing
Die vorliegende Erfindung weist viele Vorteile auf. Insbesondere wird es ermöglicht, einen Leitgrößen- bzw. Leitgeschwindigkeitsverlauf vorherzusagen, der später im Betrieb der Fertigstraße 1 auch tatsächlich eingehalten wird. Damit verbunden ergibt sich eine verbesserte Genauigkeit beim Einhalten des Sollenergieinhalts am Auslauf der Fertigstraße 1 und darüber hinaus auch eine verbesserte - sogar erheblich verbesserte - Genauigkeit, mit der die Kühlstrecke 6 gesteuert werden kann. So ist es möglich, beispielsweise sowohl eine Endwalztemperatur (am Auslauf der Fertigstraße 1) als auch eine Haspeltemperatur (am Auslauf der Kühlstrecke 6) hochgenau einzuhalten.The present invention has many advantages. In particular, it is possible to predict a Leitgrößen- or Leitgeschwindigkeitsverlauf, which is also observed later in the operation of the finishing
Die obige Beschreibung dient ausschließlich der Erläuterung der vorliegenden Erfindung. Der Schutzumfang der vorliegenden Erfindung soll hingegen ausschließlich durch die beigefügten Ansprüche bestimmt sein.The above description is only for explanation of the present invention. The scope of the present invention, however, is intended to be determined solely by the appended claims.
Claims (17)
- Operating method for a production line (1) for rolling a strip (2),- wherein an actual value G and a setpoint value G* for the first strip point (12), a number of second strip points (13) and a number of third strip points (13') of the strip (2) are known in each case to a control computer (8) for the production line (1) at the latest at a time point when said first strip point (12) of the strip (2) is still situated in front of the production line (1),- wherein the respective actual value G is characteristic of the actual energy content of the respective strip point (12, 13, 13') and the respective setpoint value G* is characteristic of the setpoint energy content of the respective strip point (12, 13, 13'), this applying to each strip point (12, 13, 13'),- wherein the respective actual value G relates to a location xE in front of the production line (1) and the respective setpoint value G* relates to a location xA behind the production line (1), this applying to each strip point (12, 13, 13'),- wherein the third strip points are fed into the production line before the first strip point,
characterised in that
the second strip points are fed into the production line after the first strip point,- wherein the control computer (8) determines a command variable L* in each case for the first strip point (12) and at least a subset of the second strip points (13) on the basis of a determining rule that is specific to the respective strip point (12, 13) and before the first strip point (12) is fed into the production line (1),- wherein the respective command variable L* is characteristic of the command speed vL at which the control computer (8) operates the production line (1) at the time point when the respective strip point (12, 13) is fed into the production line (1),- wherein the control computer (8) determines the respective command speed vL on the basis of the command variable L* that has been determined for the respective strip point (12, 13), and operates the production line (1) at the respective command speed vL at the time point when the respective strip point (12, 13) is fed into the production line (1), and- wherein the actual value G and the setpoint value G* of the strip point (12, 13) currently entering the production line (1) at this time point, and the actual value G and the setpoint value G* of at least one strip point (12, 13) that has already entered the production line (1) at this time point, are input into the determining rule for the respective command variable L*. - Operating method according to claim 1,
characterised in that- the control computer (8) determines each of the command variables L* on the basis of a multiplicity of individual command variables l*,- each individual command variable l* relates in each case to one of the strip points (12, 13, 13') whose actual value and setpoint value G, G* are input into the determination of the respective command variable L*,- the control computer (8) determines the respective individual command variable l* for each strip point (12, 13, 13') in such a way that a respective expected value GE matches the corresponding setpoint value G*, and- the respective expected value GE is characteristic of an expected energy content that the respective strip point (12, 13, 13') would assume, at that location xA behind the production line (1) to which the currently corresponding setpoint value G* relates, if the control computer (8) were to operate the production line (1) at a command speed vL corresponding to the individual command variable l* during the entire passage of the respective strip point (12, 13, 13') through the production line (1). - Operating method according to claim 1,
characterised in that
for each strip point (12, 13) whose command variable L* is determined by the control computer (8), said control computer (8)- determines an effective actual value G' on the basis of the actual values G that are input into the determination of the command variable L* for the respective strip point (12, 13), and determines an effective setpoint value G'* on the basis of the setpoint values G* that are input into the determination of the command variable L* for the respective strip point (12, 13),- determines an expected value GE that is characteristic of an expected energy content which the respective strip point (12, 13) would assume, at that location xA behind the production line (1) to which the effective setpoint value G'* relates, if the control computer (8) were to operate the production line (1) at a command speed vL corresponding to the command variable L* for the respective strip point (12, 13) during the entire passage of the respective strip point (12, 13) through the production line (1), and- determines the command variable L* in such a way that the expected value at that location xA behind the production line (1) to which the effective setpoint value G'* relates has the effective setpoint value G'*. - Operating method according to claim 1,
characterised in that- when determining the command variables L*, the control computer (8) initially estimates the command variables L* as provisional values,- the control computer (8) determines a respective expected value GE for the first strip point (12) and at least a subset of the second and third strip points (13, 13'),- each expected value GE is characteristic of an expected energy content that the respective strip point (12, 13, 13') would assume, at that location xA behind the production line (1) to which the currently corresponding setpoint value G* relates, if the control computer (8) were to operate the production line (1) at command speeds vL corresponding to the estimated command variables L* during the entire passage of the respective strip point (12, 13, 13') through the production line (1), and- the control computer (8) varies the estimated command variables L*, thereby optimising a target function Z into which the amounts of the differences between the expected values GE and the corresponding setpoint values G* are input. - Operating method according to claim 4,
characterised in that
a penalty term by means of which changes to the command speed vL are penalised is additionally input into the target function Z. - Operating method according to one of the claims 2 to 5,
c h a r a c t e r i s e d in that- the control computer (8) creates a data field beforehand, in which, for a multiplicity of possible command speeds vL and possible actual values G, the control computer (8) stores the expected value GE that is produced for the respective possible actual value G in the case of the respective possible command speed vL, and- the control computer (8) determines the command variables L* for the strip points (12, 13) using the data field. - Operating method according to claim 6,
characterised in that
the control computer (8)- determines, for at least a subset of the strip points (12, 13, 13'), a respective expected value GE' which is characteristic of an expected energy content that is expected for the respective strip point (12, 13, 13'), at that location xA behind the production line (1) to which the currently corresponding setpoint value G* relates, as a result of the command speeds vL at which the control computer (8) operates the production line (1) during the entire passage of the respective strip point (12, 13, 13') through the production line (1),- receives, after the passage of the respective strip point (12, 13, 13') through the production line (1), a measured value GM which is characteristic of an actual energy content of the respective strip point (12, 13, 13') at that location xA behind the production line (1) to which the corresponding setpoint value G* relates,- automatically adapts a model of the production line (1) on the basis of a comparison between the expected energy content and the actual energy content, and- adapts the model of the production line (1) by adding an offset to the actual values G when the data field is used, scaling the command speeds vL using a scaling factor and/or adding an offset to said command speeds vL and/or adding an offset to the expected values GE, GE' that were determined using the data field. - Operating method according to one of the preceding claims,
characterised in that
the actual value G and the setpoint value G* of those strip points (12, 13, 13') that have already entered the production line (1) are only input into the determination of each command variable L* if these strip points (12, 13, 13') have not yet left the production line (1) at the time point for which the respective command variable L* is determined. - Operating method according to one of the preceding claims,
characterised in that
for at least a subset of the strip points (12, 13, 13'), the control computer (8)- determines a respective expected value GE' which is characteristic of an expected energy content that is expected for the respective strip point (12, 13, 13'), at that location xA behind the production line (1) to which the currently corresponding setpoint value G* relates, as a result of the command speeds vL at which the control computer (8) operates the production line (1) during the entire passage of the respective strip point (12, 13, 13') through the production line (1),- receives, after the passage of the respective strip point (12, 13, 13') through the production line (1), a measured value GM which is characteristic of an actual energy content of the respective strip point (12, 13, 13') at that location xA behind the production line (1) to which the corresponding setpoint value G* relates, and- automatically corrects at least a subset of the already determined command variables L* on the basis of a comparison between the expected energy content and the actual energy content. - Operating method according to claim 9,
characterised in that
on the basis of the comparison, the control computer (8) automatically corrects only those command variables L* that were determined for the strip points (12, 13) having a minimal distance MIN from the entrance to the production line (1) at the time point of the correction. - Operating method according to claim 10,
characterised in that- the control computer (8) or another control device (8') uses the determined command variables L* to determine at least one further actuating variable S, that- said further actuating variable S is delayed by a dead time T and acts only locally on the strip (2), and that- the minimal distance MIN is specified such that a time difference corresponding to the minimal distance MIN is at least as long as the dead time T. - Operating method according to one of the preceding claims,
characterised in that- the control computer (8) or another control device (8') uses the determined command variables L* to determine at least one further actuating variable S, that- said further actuating variable S is delayed by a dead time T and acts only locally on the strip (2), and that- the first strip point (12) and that subset of the second strip points (13) for which the respective command variable L* was determined before the first strip point (12) was fed into the production line (1) correspond to a prediction horizon H that is at least as long as the dead time T. - Operating method according to one of the preceding claims,
characterised in that
the control computer (8) concatenates the determined command variables L* or the corresponding command speeds vL by means of a spline, such that a command-speed profile produced by the concatenation is constant and differentiable. - Operating method according to one of the preceding claims,
characterised in that
the control computer (8) performs the determination of the command variables L* in the context of a precalculation online or in real time. - Computer program comprising machine code (11), which can be directly executed by a control computer (8) for a production line (1) for rolling a strip (2) and whose execution by the control computer (8) causes the control computer (8) to operate the production line (1) in accordance with an operating method having all the steps of an operating method according to one of the preceding claims.
- Control computer for a production line (1) for rolling a strip (2),
characterised in that
the control computer is so designed as to operate the production line (1) in accordance with an operating method having all the steps of an operating method according to one of the claims 1 to 14. - Production line for rolling a strip (2),
characterised in that
the production line is equipped with a control computer (8) according to claim 16.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11710447.1A EP2566633B1 (en) | 2010-05-06 | 2011-03-09 | Operating method for a production line with prediction of the command speed |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10162135A EP2386365A1 (en) | 2010-05-06 | 2010-05-06 | Operational method for a finishing train with prediction of transport speed |
EP11710447.1A EP2566633B1 (en) | 2010-05-06 | 2011-03-09 | Operating method for a production line with prediction of the command speed |
PCT/EP2011/053513 WO2011138067A2 (en) | 2010-05-06 | 2011-03-09 | Operating method for a production line with prediction of the command speed |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2566633A2 EP2566633A2 (en) | 2013-03-13 |
EP2566633B1 true EP2566633B1 (en) | 2015-04-29 |
Family
ID=42782051
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10162135A Withdrawn EP2386365A1 (en) | 2010-05-06 | 2010-05-06 | Operational method for a finishing train with prediction of transport speed |
EP11710447.1A Active EP2566633B1 (en) | 2010-05-06 | 2011-03-09 | Operating method for a production line with prediction of the command speed |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10162135A Withdrawn EP2386365A1 (en) | 2010-05-06 | 2010-05-06 | Operational method for a finishing train with prediction of transport speed |
Country Status (6)
Country | Link |
---|---|
US (1) | US9630227B2 (en) |
EP (2) | EP2386365A1 (en) |
CN (1) | CN102939173B (en) |
BR (1) | BR112012028373A2 (en) |
RU (1) | RU2545872C2 (en) |
WO (1) | WO2011138067A2 (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20070622L (en) * | 2007-08-17 | 2009-04-15 | Outokumpu Oy | Method and device for checking evenness during cooling of a strip made of stainless steel |
EP2386365A1 (en) | 2010-05-06 | 2011-11-16 | Siemens Aktiengesellschaft | Operational method for a finishing train with prediction of transport speed |
EP2527054A1 (en) * | 2011-05-24 | 2012-11-28 | Siemens Aktiengesellschaft | Operating method for a mill train |
EP2527053A1 (en) * | 2011-05-24 | 2012-11-28 | Siemens Aktiengesellschaft | Operating method for a mill train |
DE102013221710A1 (en) | 2013-10-25 | 2015-04-30 | Sms Siemag Aktiengesellschaft | Aluminum hot strip rolling mill and method for hot rolling an aluminum hot strip |
EP2873469A1 (en) | 2013-11-18 | 2015-05-20 | Siemens Aktiengesellschaft | Operating method for a cooling section |
EP2898963A1 (en) * | 2014-01-28 | 2015-07-29 | Siemens Aktiengesellschaft | Cooling section with dual cooling to a particular target value |
US9897984B2 (en) * | 2014-08-05 | 2018-02-20 | Mitsubishi Electric Research Laboratories, Inc. | Model predictive control with uncertainties |
EP3009205B1 (en) | 2014-10-14 | 2018-12-26 | Primetals Technologies Germany GmbH | Consideration of a reference speed when determining a transport speed |
JP6172129B2 (en) * | 2014-12-09 | 2017-08-02 | Jfeスチール株式会社 | Hot rolling strip finishing method |
EP3202502A1 (en) * | 2016-02-04 | 2017-08-09 | Primetals Technologies Germany GmbH | Strip position control |
RU2655398C2 (en) * | 2016-08-26 | 2018-05-28 | Антон Владимирович Шмаков | Method of rolled products production |
AT519995B1 (en) * | 2017-05-29 | 2021-04-15 | Andritz Ag Maschf | Process for regulating the winding temperature of a metal strip |
CN112139260B (en) * | 2019-06-26 | 2022-11-18 | 宝山钢铁股份有限公司 | Hot rolling reversible pass rolling temperature drop control method |
DE102019217966A1 (en) | 2019-11-21 | 2021-05-27 | Sms Group Gmbh | Setting a run-out temperature of a metal strip running out of a rolling train |
CN115161445B (en) * | 2022-06-30 | 2024-02-27 | 武汉大学 | Method for optimizing medium-frequency induction heating local postweld heat treatment parameters of 9% Cr hot-strength steel pipeline |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62158825A (en) * | 1985-12-28 | 1987-07-14 | Nippon Steel Corp | Method for cooling hot rolled steel plate |
JPS63168211A (en) * | 1986-12-27 | 1988-07-12 | Sumitomo Metal Ind Ltd | Temperature control method for hot rolling process |
GB9317928D0 (en) * | 1993-08-26 | 1993-10-13 | Davy Mckee Poole | Rolling of metal strip |
IT1267916B1 (en) * | 1994-03-31 | 1997-02-18 | Danieli Off Mecc | PROCEDURE FOR THE PRODUCTION OF BELT STARTING FROM THIN SLABS AND RELATIVE PLANT |
FR2773271B1 (en) | 1997-12-31 | 2000-02-25 | Thomson Multimedia Sa | ELECTROMAGNETIC WAVE TRANSMITTER / RECEIVER |
JP2000210708A (en) * | 1999-01-21 | 2000-08-02 | Toshiba Corp | Rolling material temperature control method and rolling material temperature controller in roll mill outlet side |
RU2184632C2 (en) | 2000-07-27 | 2002-07-10 | Морозов Андрей Андреевич | Method for controlling cooling conditions of rolled pieces |
DE10156008A1 (en) * | 2001-11-15 | 2003-06-05 | Siemens Ag | Control method for a finishing train upstream of a cooling section for rolling hot metal strip |
CN1329133C (en) * | 2003-02-25 | 2007-08-01 | 西门子公司 | Method for regulating the temperature of a metal strip, especially for rolling a metal hot strip in a finishing train |
EP1624982B2 (en) * | 2003-02-25 | 2011-06-15 | Siemens Aktiengesellschaft | Method for regulating the temperature of a metal strip, especially for rolling a metal hot strip in a finishing train |
DE10321791A1 (en) * | 2003-05-14 | 2004-12-30 | Siemens Ag | Process for controlling and/or regulating the temperature of a metal strip, especially in a finishing train, comprises comparing a theoretical temperature gradient with an actual temperature gradient to acquire adjusting signals |
DE102007050891A1 (en) * | 2007-10-24 | 2009-04-30 | Siemens Ag | Adaptation of a controller in a rolling mill based on the scattering of an actual size of a rolling stock |
EP2386365A1 (en) | 2010-05-06 | 2011-11-16 | Siemens Aktiengesellschaft | Operational method for a finishing train with prediction of transport speed |
-
2010
- 2010-05-06 EP EP10162135A patent/EP2386365A1/en not_active Withdrawn
-
2011
- 2011-03-09 BR BR112012028373A patent/BR112012028373A2/en not_active IP Right Cessation
- 2011-03-09 EP EP11710447.1A patent/EP2566633B1/en active Active
- 2011-03-09 US US13/696,376 patent/US9630227B2/en active Active
- 2011-03-09 WO PCT/EP2011/053513 patent/WO2011138067A2/en active Application Filing
- 2011-03-09 CN CN201180022850.6A patent/CN102939173B/en active Active
- 2011-03-09 RU RU2012152449/02A patent/RU2545872C2/en active
Also Published As
Publication number | Publication date |
---|---|
BR112012028373A2 (en) | 2017-06-13 |
CN102939173A (en) | 2013-02-20 |
WO2011138067A3 (en) | 2011-12-29 |
CN102939173B (en) | 2015-11-25 |
RU2545872C2 (en) | 2015-04-10 |
US9630227B2 (en) | 2017-04-25 |
EP2566633A2 (en) | 2013-03-13 |
EP2386365A1 (en) | 2011-11-16 |
US20130054003A1 (en) | 2013-02-28 |
RU2012152449A (en) | 2014-06-20 |
WO2011138067A2 (en) | 2011-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2566633B1 (en) | Operating method for a production line with prediction of the command speed | |
EP3411162B1 (en) | Strip position control | |
DE10156008A1 (en) | Control method for a finishing train upstream of a cooling section for rolling hot metal strip | |
EP2697002B1 (en) | Control method for a mill train | |
EP2456897B1 (en) | Method for controlling and/or regulating an induction oven for a roller assembly, control and/or regulating device for a roller assembly and roller assembly for producing rolled goods | |
EP2697001A1 (en) | Control method for a rolling train | |
EP2712332B1 (en) | Method for controlling a hot strip rolling line | |
DE102006047718A1 (en) | Method for tracking the physical condition of a hot plate or hot strip as part of the control of a plate rolling mill for processing a hot plate or hot strip | |
EP1596999B2 (en) | Method for regulating the temperature of a metal strip, especially in a cooling path | |
EP2431104A1 (en) | Method for determining the temperature and geometry of a hot rolled metal strip in a finishing train in real time | |
WO2015124363A1 (en) | Simple pre-control of a wedge-type roll-gap adjustment of a roughing stand | |
EP2603332A1 (en) | Method for determining control variables of a rolling train comprising a plurality of roll stands for rolling a metal strip | |
EP2790846B1 (en) | Method for processing milled goods in a hot rolling mill | |
EP2480351B1 (en) | Control method for a processing line for a stretched rolling stock | |
EP3194087B1 (en) | Width adjustment in a finishing train | |
EP3642372B1 (en) | Method for operating an annealing surface | |
EP3494239B1 (en) | Method for operating an annealing furnace for annealing a metal strip | |
EP3974073B1 (en) | Rolling taking into account frequency behaviour | |
EP3002068A1 (en) | Roller train with model-assisted advance control for cooling breaks | |
WO2024094475A1 (en) | Rolling of steel with measured detection of the phase transition | |
WO2023285078A1 (en) | Making an allowance for state-dependent density when solving a thermal conductivity equation | |
EP4101553A1 (en) | Cooling of a rolled stock upstream of a finishing train of a hot rolling plant | |
DE10321792A1 (en) | Process for controlling and/or regulating the temperature of a metal strip in a metallurgical installation comprises comparing a temperature gradient to an actual temperature gradient to determine adjusting signals for a cooling path |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20121026 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20141015 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 724154 Country of ref document: AT Kind code of ref document: T Effective date: 20150515 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502011006718 Country of ref document: DE Effective date: 20150603 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502011006718 Country of ref document: DE Owner name: PRIMETALS TECHNOLOGIES GERMANY GMBH, DE Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20150429 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150729 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150831 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: PRIMETALS TECHNOLOGIES GERMANY GMBH |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: TP Owner name: PRIMETALS TECHNOLOGIES GERMANY GMBH, DE Effective date: 20151021 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150730 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150829 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502011006718 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: RO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150429 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
26N | No opposition filed |
Effective date: 20160201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160309 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20160309 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160309 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160309 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 724154 Country of ref document: AT Kind code of ref document: T Effective date: 20160309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160309 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110309 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150429 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 502011006718 Country of ref document: DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240320 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20240301 Year of fee payment: 14 Ref country code: SE Payment date: 20240320 Year of fee payment: 14 Ref country code: IT Payment date: 20240329 Year of fee payment: 14 Ref country code: FR Payment date: 20240327 Year of fee payment: 14 |