EP2251702A1 - Verdrahtungs-Prüfvorrichtung - Google Patents
Verdrahtungs-Prüfvorrichtung Download PDFInfo
- Publication number
- EP2251702A1 EP2251702A1 EP09006104A EP09006104A EP2251702A1 EP 2251702 A1 EP2251702 A1 EP 2251702A1 EP 09006104 A EP09006104 A EP 09006104A EP 09006104 A EP09006104 A EP 09006104A EP 2251702 A1 EP2251702 A1 EP 2251702A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- phase
- inverter
- voltage
- conductor
- neutral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/165—Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
- G01R19/16533—Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application
- G01R19/16538—Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application in AC or DC supplies
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/16—Measuring asymmetry of polyphase networks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/40—Testing power supplies
- G01R31/42—AC power supplies
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/55—Testing for incorrect line connections
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/66—Testing of connections, e.g. of plugs or non-disconnectable joints
- G01R31/67—Testing the correctness of wire connections in electric apparatus or circuits
Definitions
- the invention relates to a wiring tester for testing a wiring of an inverter, in particular a photovoltaic inverter, for converting a DC voltage into a three-phase AC voltage with a network, wherein the inverter is designed for connection to the low-voltage three-phase system with line-side conductor voltages against a neutral conductor.
- Three-phase inverters of this type must be electrically connected by an installer to the network to be connected.
- the different phases and the neutral conductor must be connected to the network correspondingly. Cabling may cause wiring errors.
- testers z. B. from the DD 053 803 B1 with which a capacitor is connected in pulses between an earth-fault-prone phase and the protective conductor, the current flowing there being measured.
- parts subject to earth fault can be determined in the three-phase network.
- Other test equipment eg. B. in the DE 10 2006 009 360 B3 , determine a rotating field direction. In this case, a capacitor between phase and neutral is also used.
- the invention has for its object to find a solution with a network connection and wiring errors when connecting to the network of a three-phase inverter can be tested in a simple manner.
- test device allows automated detection of installation errors in the installation of a PV inverter, so that the installer can check the power connection in a comfortable and simple way.
- the tester may be integrated in the inverter, e.g. B. housed in the inverter housing or be an external circuit, for. B. in the form of an external tester.
- This test is carried out with few measuring points and a simple measuring circuit, with few components are required to obtain a mass-production-compatible and cost-effective solution.
- Errors such as a missing connection of one or two phases, an interchange of a phase and neutral and a missing neutral occur.
- the invention is based on the assumption that the sum of the line voltages in the three-phase system is zero when all the conductors are correctly connected. If one of the conductor voltages is missing due to incorrect wiring, the voltage sum is not equal to zero.
- the installer is output via a display an error message that a network connection failure.
- the cases 2, 3 and 5 can be clearly identified. Only one size is needed for monitoring.
- the additional component is inserted between a phase of the inverter and the neutral terminal in the inverter.
- a current flows through this phase, the component and the neutral conductor back into the network. If the neutral conductor is present, voltage unbalance is not possible because the neutral point is defined by the neutral conductor.
- the inserted device generates an imbalance, which is detected by the measurement of the line voltages.
- the neutral point shifts so that the voltage across the device is different than the voltage present when the neutral conductor is properly wired. Due to this voltage deviation, the absence of the neutral conductor can be detected. Since all strand or conductor voltages are measured for the summation, no additional effort is required for this voltage measurement.
- the additional component is a passive component.
- a capacitor is provided for cost, loss and complexity reasons. This can be dimensioned so that at nominal operation with mains voltage only a small capacitive current between the phase and the neutral conductor of the Three-phase network flows, but is sufficient for an asymmetry of the conductor voltages.
- a resistor is conceivable. It would also be possible to connect the capacitor via a switch exclusively for the test. For this purpose, an additional control would be required.
- error case 1 In order to determine a correct connection of the inverter to the three-phase network, it is provided (error case 1) that are symmetrically connected to all phases capacitors, which are preferably connected in a star shape.
- the additional capacitor is connected in parallel with one of the capacitors.
- a particularly preferred development of the invention is characterized in that two series-connected relay contacts are arranged between the inverter and the network for each phase, wherein a voltage measurement is carried out for each phase between the first and the second relay contact of the phase.
- a standard-compliant galvanic isolation can be achieved to the network, which is also given when one of two relays a contact is welded.
- at least one capacitor, in particular all capacitors is arranged between a relay contact and a connection terminal.
- the figure shows a wiring test apparatus 1 for checking a wiring of an inverter 2, in particular, a photovoltaic inverter.
- the inverter 2 is designed for connection to a low-voltage three-phase network 3 with line-side conductor voltages u 1 , u 2 , u 3 and with a neutral conductor N. There are three phase voltages u 1 , u 2 , u 3 , z. B. u 1 against N conductor. These are measured.
- a measuring circuit 4 for measuring the line voltages u 1 , u 2 , u 3 is present.
- an average value is calculated from the sum of the instantaneous values of the conductor voltages u 1 , u 2 , u 3 . This is averaged over a network period. An error message is output when this sum voltage exceeds a threshold voltage for a predetermined time.
- the preferred embodiment uses the measurement of the line-side conductor or phase voltages, which are already necessary for a functional test of network relays. In this case, the amount of the sum of the instantaneous values is formed. This is averaged over a network period.
- U SumHW k u 1 k + u 2 k + u 3 k
- U sum U SumHW k + U SumHW ⁇ k - 1 / N mains period
- the installer is output via a display an error message that a network connection failure.
- capacitors C1, C2 and C3 are symmetrically connected in a star shape to all phases L1, L2, L3.
- the additional capacitor CN is connected in parallel with the capacitor C3.
- relay contacts 1a, 1b, 1c are connected in series for each phase L1-L3 with connection terminals 2a, 2b, 2c.
- a voltage measurement u 1 ).
- the capacitors C1, C2, C3 and CN are the network side wired to the relay contacts 1a, 1b, 1 c.
- operational amplifier circuits are used to measure the line voltages u 1 , u 2 , u 3 .
- the summation of the line voltages u 1 - u 3 can be done by a signal processor.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Inverter Devices (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
Description
- Die Erfindung betrifft eine Verdrahtungs-Prüfvorrichtung zum Prüfen einer Verdrahtung eines Wechselrichters, insbesondere eines Photovoltaikwechselrichters, zur Umwandlung einer Gleichspannung in eine dreiphasige Wechselspannung mit einem Netz, wobei der Wechselrichter zum Anschluss an das Niederspannungsdrehstromnetz mit netzseitigen Leiterspannungen gegen einen Neutralleiter ausgeführt ist. Dreiphasige Wechselrichter dieser Art müssen von einem Installateur mit dem anzuschließenden Netz elektrisch verbunden werden. Hierbei müssen die verschiedenen Phasen und der Neutralleiter mit dem Netz korrespondierend angeschlossen werden. Bei der Verkabelung können jedoch Verdrahtungsfehler entstehen.
- Aus der
DE 692 19 055 T2 ist eine automatische Lokalisierung von einphasigen Erdungsfehlern in einem Mittelspannungsnetz bekannt. Hierbei werden Nullströme gemessen und eine Vektorsumme gebildet. Es erfolgt eine Überwachung der Phasenverschiebung der Einzelströme und der Vektorsumme. - Um Erdschlüsse in Hochspannungsnetzen mit einer Resonanzpunkterdung und einer Petersenspule zu erkennen, wird in der
DE 10 2004 008 994 B4 vorgeschlagen, eine Spannungsunsymmetrie zur Fehlererkennung zu nutzen. - Bekannt sind auch Prüfgeräte, z. B. aus der
DD 053 803 B1 DE 10 2006 009 360 B3 , stellen eine Drehfeldrichtung fest. Hierbei wird ebenfalls ein Kondensator zwischen Phase und Neutralleiter eingesetzt. - Aus der
DE 101 39 860 A1 ist ein Verfahren zur Erkennung eines fehlerhaften Anschlusses eines dreiphasigen Geräts bekannt. Anschlussfehler werden mittels dq-Transformation erkannt. - Um bei Schuko-Steckdosen fehlende oder vertauschte Anschlüsse prüfen zu können, wird in der
DE 32 48 008 A1 eine Prüfschaltung für Anschlussfehler vorgeschlagen. - Eine Isolationsüberwachungsschaltung mit einem kapazitiven Teiler ist aus der
WO 2008 152 466 A2 bekannt. - Der Erfindung liegt die Aufgabe zugrunde, eine Lösung zu finden, mit der ein Netzanschluss sowie Verdrahtungsfehler beim Anschluss an das Netz eines dreiphasigen Wechselrichters in einfacher Weise geprüft werden können.
- Diese Aufgabe wird durch eine Vorrichtung mit den Merkmalen des Anspruches 1 gelöst.
- Durch die Erfindung ist eine Überwachung des korrekten Anschlusses an das Niederspannungs-Drehstromnetz mit Neutralleiter leicht möglich.
- Insbesondere ermöglicht die erfindungsgemäße Prüfvorrichtung, Installationsfehler bei der Montage eines PV-Wechselrichters automatisiert aufzudecken, sodass der Installateur auf eine komfortable und einfache Art den Netzanschluss überprüfen kann. Die Prüfvorrichtung kann in dem Wechselrichter integriert sein, z. B. in dem Wechselrichtergehäuse untergebracht sein oder eine externe Schaltung sein, z. B. in Form eines externen Prüfgeräts.
- Diese Prüfung erfolgt mit wenigen Messpunkten und einer einfachen Messschaltung, wobei wenig Bauelemente erforderlich sind, um eine großserientaugliche und kostengünstige Lösung zu erhalten.
- Bei der Verdrahtung des dreiphasigen Wechselrichters können folgende
- Fehler, wie ein fehlender Anschluss einer oder zweier Phasen, eine Vertauschung von einer Phase und Neutralleiter und ein fehlender Neutralleiter auftreten.
- Insgesamt können fünf Fehlerfälle auftreten.
- Fall 1:
- Kein korrekter Anschluss des Drehstromnetzes an den Wechselrichter.
- Fall 2:
- Eine Phase des Drehstromnetzes ist nicht am Wechselrichter angeschlossen.
- Fall 3:
- Zwei Phasen des Drehstromnetzes sind nicht am Wechselrichter angeschlossen.
- Fall 4:
- Der Neutralleiter des Drehstromnetzes ist nicht am Wechselrichter angeschlossen.
- Fall 5:
- Eine Phase und der Neutralleiter des Drehstromnetzes sind vertauscht am Wechselrichter angeschlossen.
- Die Erfindung beruht auf der Grundlage, dass die Summe der Leiterspannungen im Drehstromsystem Null ist, wenn alle Leiter korrekt angeschlossen sind. Fehlt einer der Leiterspannungen durch falsche Verdrahtung, so ist die Spannungssumme ungleich null.
- Wenn die Größe USum für eine bestimmte Zeit tFehler über eine Schwelle von UFehler liegt, wird dem Installateur über eine Anzeige eine Fehlermeldung ausgegeben, dass ein Netzanschlussfehler vorliegt.
- Nach diesem Grundsatz können die Fehlerfälle Fall 2, Fall 3 und Fall 5 eindeutig identifiziert werden. Es wird nur eine Größe zur Überwachung benötigt.
- Zur Erkennung des fehlenden Neutralleiters bzw. im Fall 4 wird erfindungsgemäß das zusätzliche Bauelement zwischen einer Phase des Wechselrichters und dem Neutralleiteranschluss im Wechselrichter eingefügt. Bei Anschluss des Neutralleiters des Drehstromnetzes an den Wechselrichter fließt ein Strom über diese Phase, das Bauelement und den Neutralleiter zurück ins Netz. Bei vorhandenem Neutralleiter ist keine Spannungsunsymmetrie möglich, da der Sternpunkt durch den Neutralleiter festgelegt ist.
- Wird der Neutralleiter jedoch nicht angeschlossen, kann der Strom über das zusätzliche Bauelement und dem Neutralleiter nicht zurück ins Netz fließen. In diesem Fall erzeugt das eingefügte Bauelement eine Unsymmetrie, die durch die Messung der Leiterspannungen erkannt wird. Bei dieser Unsymmetrie verschiebt sich der Sternpunkt, sodass die Spannung am Bauelement unterschiedlich ist zu der Spannung, die bei korrekter Verdrahtung des Neutralleiters vorhanden ist. Durch diese Spannungsabweichung kann das Fehlen des Neutralleiters erkannt werden. Da für die Summenbildung alle Strang- bzw. Leiterspannungen gemessen werden, ist für diese Spannungsmessung kein zusätzlicher Aufwand erforderlich.
- Weitere vorteilhafte Ausgestaltungen der Erfindung sind in den Unteransprüchen gekennzeichnet.
- In einer vorteilhaften Weiterbildung der erfindungsgemäßen Vorrichtung ist vorgesehen, dass das zusätzliche Bauelement ein passives Bauelement ist.
- Als Bauelement ist aus Kosten-, Verlust- und Komplexitätsgründen zweckmäßigerweise ein Kondensator vorgesehen. Dieser kann so dimensioniert sein, dass bei Nennbetrieb mit Netzspannung nur ein geringer kapazitiver Strom zwischen der Phase und dem Neutralleiter des Drehstromnetzes fließt, jedoch ausreichend ist für eine Unsymmetrie der Leiterspannungen. Als Alternative zu einem Kondensator ist ein Widerstand denkbar. Möglich wäre auch den Kondensator über einen Schalter ausschließlich für den Test zuzuschalten. Hierzu wäre eine zusätzliche Ansteuerung erforderlich.
- Um einen korrekten Anschluss des Wechselrichters an das Drehstromnetz festzustellen, ist vorgesehen (Fehlerfall 1), dass symmetrisch an allen Phasen Kondensatoren angeschlossen sind, wobei diese vorzugsweise sternförmig geschaltet sind. Der zusätzliche Kondensator ist parallel zu einem der Kondensatoren geschaltet.
- Eine besonders bevorzugte Weiterbildung der Erfindung zeichnet sich dadurch aus, dass zwischen dem Wechselrichter und dem Netz für jede Phase zwei in Reihe geschaltete Relaiskontakte angeordnet sind, wobei für jede Phase zwischen dem ersten und dem zweiten Relaiskontakt der Phase eine Spannungsmessung erfolgt. Hierdurch kann eine normgerechte galvanische Trennung zum Netz hin erreicht werden, die auch dann gegeben ist, wenn bei einem von zwei Relais ein Kontakt verschweißt ist. Hierbei ist wenigstens ein Kondensator, insbesondere alle Kondensatoren, zwischen einem Relaiskontakt und einer Anschlussklemme angeordnet.
- Ein Ausführungsbeispiel wird anhand der Zeichnung näher erläutert, wobei weitere vorteilhafte Weiterbildungen der Erfindung und Vorteile derselben beschrieben sind.
- Die Figur zeigt eine Verdrahtungs-Prüfvorrichtung 1 zum Prüfen einer Verdrahtung eines Wechselrichters 2, insbesondere eines Photovoltaikwechselrichters.
- Der Wechselrichter 2 ist zum Anschluss an ein Niederspannungs-drehstromnetz 3 mit netzseitigen Leiterspannungen u1, u2, u3 sowie mit einem Neutralleiter N ausgeführt. Vorhanden sind drei Strangspannungen u1, u2, u3, z. B. u1 gegen N-Leiter. Diese werden gemessen. Hierfür ist eine Messschaltung 4 zur Messung der Leiterspannungen u1, u2, u3 vorhanden. Erfindungsgemäß wird ein Mittelwert aus der Summe der Augenblickswerte der Leiterspannungen u1, u2, u3 berechnet. Diese wird über eine Netzperiode gemittelt. Eine Fehlermeldung wird dann ausgegeben, wenn diese Summenspannung für eine vorgegebene Zeit eine Schwellspannung überschreitet.
-
- Wenn die Größe USum für eine bestimmte Zeit tFehler über eine Schwelle von UFehler liegt, wird dem Installateur über eine Anzeige eine Fehlermeldung ausgegeben, dass ein Netzanschlussfehler vorliegt.
- Dadurch können direkt folgende Fehlerfälle erkannt werden:
- Eine Phase des Drehstromnetzes ist nicht am Wechselrichter angeschlossen.
- Zwei Phasen des Drehstromnetzes sind nicht am Wechselrichter angeschlossen.
- Eine Phase und der Neutralleiter des Drehstromnetzes sind vertauscht am Wechselrichter angeschlossen.
- Es wird nur eine Größe zur Überwachung benötigt.
- Wie die Figur veranschaulicht, ist zwischen L3 und dem Neutralleiter N ein zusätzliches passives Bauelement, und zwar ein Kondensator CN geschaltet. Dadurch entsteht bei fehlendem Neutralleiteranschluss eine Spannungsunsymmetrie. Diese ist durch die Messung der Leiterspannungen feststellbar, sodass eine Fehlermeldung auch bei fehlendem Neutralleiteranschluss ausgegeben wird.
- Zudem sind drei Kondensatoren C1, C2 und C3 symmetrisch an allen Phasen L1, L2, L3 sternförmig angeschlossen. Der zusätzliche Kondensator CN ist parallel dem Kondensator C3 geschaltet.
- Zwischen dem Wechselrichter 2 und dem Netz 3 sind für jede Phase L1-L3 mit Anschlussklemmen 2a, 2b, 2c in Reihe geschaltete Relaiskontakte 1a, 1 b, 1 c angeordnet. Für jede Phase erfolgt zwischen dem Relaiskontakt, z. B. 1a und der Klemme 2a eine Spannungsmessung (u1).
- Die Kondensatoren C1, C2, C3 und CN sind netzseitig auf den Relaiskontakten 1a, 1b, 1 c verdrahtet.
- Vorzugsweise werden zur Messung der Leiterspannungen u1, u2, u3 nicht gezeigte Operationsverstärkerschaltungen eingesetzt. Die Summenbildung der Leiterspannungen u1 - u3 kann durch einen Signalprozessor erfolgen.
-
- 1
- Verdrahtungs-Prüfvorrichtung
- 2
- Wechselrichter
- 3
- Niederspannungsdrehstromnetz
- 4
- Messschaltung
- 5
- Relaiskontakt
- L1-L3
- Phasen
- N
- Neutralleiter
- u1-u3
- Leiterspannungen
- C1-C3
- Kondensatoren
- CN
- zusätzlicher Kondensator
- 1a-1c
- Relaiskontakte
- 2a-2c
- Anschlussklemmen vom Wechselrichter zum Niederspannungsnetz
Claims (11)
- Verdrahtungs-Prüfvorrichtung (1) zum Prüfen einer Verdrahtung eines Wechselrichters (2), insbesondere eines Photovoltaikwechselrichters, zur Umwandlung einer Gleichspannung in eine dreiphasige Wechselspannung, wobei der Wechselrichter (2) zum Anschluss an ein Niederspannungsdrehstromnetz (3) mit netzseitigen Leiterspannungen (u1, u2, u3) gegen einen Neutralleiter (N) ausgeführt ist, wobei eine Messschaltung (4) zur Messung der Leiterspannungen (u1, u2, u3) vorhanden ist, wobei ein Mittelwert aus der Summe der Augenblickswerte der Leiterspannungen (u1, u2, u3) berechnet wird und wobei eine Fehlermeldung ausgegeben wird, wenn diese Summenspannung für eine vorgegebene Zeit eine Schwellspannung überschreitet,
wobei ein zusätzliches Bauelement zwischen einer Phase (L1, L2 oder L3) und dem Neutralleiter (N) geschaltet ist, sodass bei fehlendem Neutralleiteranschluss eine Spannungsunsymmetrie entsteht, die durch die Messung der Leiterspannungen feststellbar ist, sodass eine Fehlermeldung auch bei fehlendem Neutralleiteranschluss ausgegeben wird. - Vorrichtung nach Anspruch 1,
dadurch gekennzeichnet,
dass das zusätzliche Bauelement ein passives Bauelement ist. - Vorrichtung nach Anspruch 2,
dadurch gekennzeichnet,
dass das zusätzliche Bauelement ein Kondensator ist. - Vorrichtung nach einem der Ansprüche 2 oder 3,
dadurch gekennzeichnet,
dass symmetrisch an allen Phasen (L1, L2, L3) Kondensatoren (C1, C2, C3) angeschlossen sind, - Vorrichtung nach Anspruch 4,
dadurch gekennzeichnet,
dass die Kondensatoren (C1, C2, C3) sternförmig geschaltet sind, wobei das zusätzliche Bauelement parallel zu einem der Kondensatoren (C1, C2, C3) geschaltet ist. - Vorrichtung nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet,
dass zwischen dem Wechselrichter (2) und dem Netz (3) für jede Phase (L1, L2, L3) mit Anschlussklemmen (2a, ab, 2c) in Reihe geschaltete Relaiskontakte (1 a, 1 b, 1 c) angeordnet sind, wobei für jede Phase (L1, L2, L3) zwischen dem Relaiskontakt (1a, 1 b, 1 c) und der Anschlussklemme (2a, ab, 2c) eine Spannungsmessung erfolgt. - Vorrichtung nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet,
dass wenigstens ein Kondensator (C1, C2, C3, CN) zwischen dem Relaiskontakt (1 a, 1 b, 1 c) und der Anschlussklemme (2a, ab, 2c) angeordnet ist. - Vorrichtung nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet,
dass zur Messung der Leiterspannungen (u1, u2, u3) Operationsverstärkerschaltungen eingesetzt werden. - Vorrichtung nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet,
dass die Summenbildung der Leiterspannungen (u1, u2, u3) durch einen Signalprozessor erfolgt. - Verfahren zur Erkennung von Installationsfehlern mit einer Vorrichtung nach einem der vorhergehenden Ansprüche.
- Verfahren nach Anspruch 10 zur Fehlererkennung für die Fälle,- dass eine Phase des Drehstromnetzes nicht am Wechselrichter (2) angeschlossen ist,- dass zwei Phasen des Drehstromnetzes nicht am Wechselrichter (2) angeschlossen sind,- dass der Neutralleiter (N) des Drehstromnetzes (3) nicht am Wechselrichter (2) angeschlossen ist und/oder- dass eine Phase und der Neutralleiter (N) des Drehstromnetzes (3) vertauscht sind.
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES09006104T ES2369643T3 (es) | 2009-05-05 | 2009-05-05 | Dispositivo comprobador de cableado. |
EP09006104A EP2251702B1 (de) | 2009-05-05 | 2009-05-05 | Verdrahtungs-Prüfvorrichtung |
AT09006104T ATE516506T1 (de) | 2009-05-05 | 2009-05-05 | Verdrahtungs-prüfvorrichtung |
CN201080014290.5A CN102439463B (zh) | 2009-05-05 | 2010-05-05 | 布线测试设备 |
PCT/EP2010/056077 WO2010128069A1 (en) | 2009-05-05 | 2010-05-05 | Wiring testing device |
US13/289,632 US8717038B2 (en) | 2009-05-05 | 2011-11-04 | Wiring testing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP09006104A EP2251702B1 (de) | 2009-05-05 | 2009-05-05 | Verdrahtungs-Prüfvorrichtung |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2251702A1 true EP2251702A1 (de) | 2010-11-17 |
EP2251702B1 EP2251702B1 (de) | 2011-07-13 |
Family
ID=41279464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09006104A Active EP2251702B1 (de) | 2009-05-05 | 2009-05-05 | Verdrahtungs-Prüfvorrichtung |
Country Status (6)
Country | Link |
---|---|
US (1) | US8717038B2 (de) |
EP (1) | EP2251702B1 (de) |
CN (1) | CN102439463B (de) |
AT (1) | ATE516506T1 (de) |
ES (1) | ES2369643T3 (de) |
WO (1) | WO2010128069A1 (de) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102565614A (zh) * | 2012-01-11 | 2012-07-11 | 云南电网公司 | 交流电压回路检验方法 |
FR2998726A1 (fr) * | 2012-11-23 | 2014-05-30 | Schneider Electric Ind Sas | Detecteur de rupture de neutre dans une installation electrique triphasee |
DE102015114452A1 (de) | 2015-08-31 | 2017-03-02 | Sma Solar Technology Ag | Verfahren zum Betrieb eines Wechselrichters und Wechselrichter |
DE102018109868A1 (de) * | 2018-04-24 | 2019-10-24 | Sma Solar Technology Ag | Leistungselektronische Vorrichtung, Transformatoreinrichtung und Verfahren |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103630831B (zh) * | 2012-08-29 | 2017-08-25 | 上海宝钢工业技术服务有限公司 | 接地方向保护继电器的校验系统 |
AT513866B1 (de) * | 2013-02-14 | 2015-12-15 | Fronius Int Gmbh | Verfahren zur Prüfung einer Trennstelle eines Photovoltaik-Wechselrichters und Photovoltaik-Wechselrichter |
CN103280826B (zh) * | 2013-04-19 | 2016-06-29 | 华为技术有限公司 | 逆变器并网安全检测方法及逆变器并网电路 |
KR101452634B1 (ko) * | 2013-05-20 | 2014-10-22 | 엘에스산전 주식회사 | 인버터 시스템에서 전력 케이블의 상태 검출 방법 |
CN103344874B (zh) * | 2013-06-28 | 2015-08-19 | 清华大学 | 一种有源屏蔽布线的检测电路 |
KR102215985B1 (ko) * | 2013-08-02 | 2021-02-16 | 섀플러 테크놀로지스 아게 운트 코. 카게 | 전자 정류식 전기 모터에서 결함 결정 방법 |
CN103439587B (zh) * | 2013-09-10 | 2016-03-02 | 深圳市禾望电气股份有限公司 | 三相交流电的检测方法 |
US9897647B2 (en) * | 2015-05-27 | 2018-02-20 | Eaton Corporation | Method and apparatus to commission voltage sensors and branch circuit current sensors for branch circuit monitoring systems |
US10458940B1 (en) | 2015-06-25 | 2019-10-29 | Atlas Sensors, LLC | Non-destructive instrument for detecting polymer inserts within polymer pipes fitted with a locator wire |
US9638735B2 (en) * | 2015-07-15 | 2017-05-02 | The Boeing Company | Linear variable differential transformer (LVDT) excitation wiring intermittent failure monitor |
EP3370334B1 (de) * | 2015-10-28 | 2021-08-18 | Kyocera Corporation | Leistungssteuerungsvorrichtung, steuerungsverfahren für eine leistungssteuerungsvorrichtung, leistungssteuerungssystem und steuerungsverfahren für ein leistungssteuerungssystem |
CN105652216B (zh) * | 2016-03-23 | 2018-05-29 | 哈尔滨飞机工业集团有限责任公司 | 一种直升机交流电源系统检测电路 |
FR3063185B1 (fr) * | 2017-02-20 | 2019-03-22 | Sagemcom Energy & Telecom Sas | Procede de verification du cablage d’un compteur |
GB2561821B (en) * | 2017-04-06 | 2020-02-12 | Synaptec Ltd | Multi-phase sensor module, systems and methods |
CN108444070A (zh) * | 2018-05-31 | 2018-08-24 | 奥克斯空调股份有限公司 | 包含防接错线电路的三相电源充电电路及空调器 |
US20200003809A1 (en) * | 2018-06-27 | 2020-01-02 | Schneider Electric USA, Inc. | Neutral connection detection method for 3/4 -wire active filters |
CN111521928B (zh) * | 2020-04-28 | 2023-03-31 | 阳光电源股份有限公司 | 一种三相逆变器的并网开关失效检测方法和系统 |
CN113341246B (zh) * | 2021-05-24 | 2024-02-06 | 国网陕西省电力公司西安供电公司 | 基于电容校准的消弧线圈测试装置及测试方法 |
US11955908B2 (en) * | 2021-07-28 | 2024-04-09 | Apple Inc. | Auto-configurable energy storage system |
CN116819400B (zh) * | 2023-08-29 | 2023-12-26 | 深圳市首航新能源股份有限公司 | 一种逆变器n线检测控制电路及其方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DD53803A (de) | ||||
DE3248008A1 (de) | 1982-12-22 | 1984-06-28 | Licentia Patent-Verwaltungs-Gmbh, 6000 Frankfurt | Schaltungsanordnung zur pruefung von mehrpoligen schutzkontakt-steckdosen, insbesondere von 5-poligen cee-steckdosen |
DE69219055T2 (de) | 1991-10-07 | 1997-10-16 | Electricite De France | Verfahren zur selektiven Detektion von Widerstandsdefekten in Stromverteilungsnetzwerken |
DE10139860A1 (de) | 2001-08-14 | 2003-03-13 | Bosch Gmbh Robert | Vorrichtung und Verfahren zur Anschlussüberwachung einer elektrischen Versorgungseinheit |
DE102004008994B4 (de) | 2004-02-20 | 2005-12-22 | Becker, Wolf, Dipl.-Ing. | Verfahren und Schaltungsanordnung zur Fehlerdiagnose in Hochspannungsnetzen |
WO2006126003A1 (en) | 2005-05-25 | 2006-11-30 | Cummins Generator Technologies Limited | Control system |
DE102006009360B3 (de) | 2006-03-01 | 2007-07-12 | Wupper, Horst, Prof. Dr. Ing. | Schaltungsanordnung zur elektronischen Bestimmung der Phasenfolge in Drehstromnetzen |
WO2008152466A2 (fr) | 2007-06-11 | 2008-12-18 | Valeo Systemes De Controle Moteur | Dispositif de detection de defaut d'isolement |
DE102007046921A1 (de) | 2007-09-26 | 2009-04-30 | ITF Fröschl GmbH | Messanordnung |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0681345B2 (ja) * | 1986-03-31 | 1994-10-12 | 株式会社日立製作所 | 遠方監視制御方式 |
JP3250147B2 (ja) * | 1997-10-22 | 2002-01-28 | 株式会社日立製作所 | 電力系統の周波数特性推定方法および装置 |
US6819087B2 (en) * | 2002-12-27 | 2004-11-16 | General Electric Company | Distributed resource (DR) stabilization control for microgrid applications |
US7894169B2 (en) * | 2008-06-02 | 2011-02-22 | Rockwell Automation Technologies, Inc. | High resistance ground protection employing AC drive characteristics |
-
2009
- 2009-05-05 EP EP09006104A patent/EP2251702B1/de active Active
- 2009-05-05 AT AT09006104T patent/ATE516506T1/de active
- 2009-05-05 ES ES09006104T patent/ES2369643T3/es active Active
-
2010
- 2010-05-05 WO PCT/EP2010/056077 patent/WO2010128069A1/en active Application Filing
- 2010-05-05 CN CN201080014290.5A patent/CN102439463B/zh active Active
-
2011
- 2011-11-04 US US13/289,632 patent/US8717038B2/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DD53803A (de) | ||||
DE3248008A1 (de) | 1982-12-22 | 1984-06-28 | Licentia Patent-Verwaltungs-Gmbh, 6000 Frankfurt | Schaltungsanordnung zur pruefung von mehrpoligen schutzkontakt-steckdosen, insbesondere von 5-poligen cee-steckdosen |
DE69219055T2 (de) | 1991-10-07 | 1997-10-16 | Electricite De France | Verfahren zur selektiven Detektion von Widerstandsdefekten in Stromverteilungsnetzwerken |
DE10139860A1 (de) | 2001-08-14 | 2003-03-13 | Bosch Gmbh Robert | Vorrichtung und Verfahren zur Anschlussüberwachung einer elektrischen Versorgungseinheit |
DE102004008994B4 (de) | 2004-02-20 | 2005-12-22 | Becker, Wolf, Dipl.-Ing. | Verfahren und Schaltungsanordnung zur Fehlerdiagnose in Hochspannungsnetzen |
WO2006126003A1 (en) | 2005-05-25 | 2006-11-30 | Cummins Generator Technologies Limited | Control system |
DE102006009360B3 (de) | 2006-03-01 | 2007-07-12 | Wupper, Horst, Prof. Dr. Ing. | Schaltungsanordnung zur elektronischen Bestimmung der Phasenfolge in Drehstromnetzen |
WO2008152466A2 (fr) | 2007-06-11 | 2008-12-18 | Valeo Systemes De Controle Moteur | Dispositif de detection de defaut d'isolement |
DE102007046921A1 (de) | 2007-09-26 | 2009-04-30 | ITF Fröschl GmbH | Messanordnung |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102565614A (zh) * | 2012-01-11 | 2012-07-11 | 云南电网公司 | 交流电压回路检验方法 |
CN102565614B (zh) * | 2012-01-11 | 2014-04-30 | 云南电网公司 | 交流电压回路检验方法 |
FR2998726A1 (fr) * | 2012-11-23 | 2014-05-30 | Schneider Electric Ind Sas | Detecteur de rupture de neutre dans une installation electrique triphasee |
DE102015114452A1 (de) | 2015-08-31 | 2017-03-02 | Sma Solar Technology Ag | Verfahren zum Betrieb eines Wechselrichters und Wechselrichter |
WO2017036882A1 (de) | 2015-08-31 | 2017-03-09 | Sma Solar Technology Ag | Verfahren zum betrieb eines wechselrichters und wechselrichter |
DE102018109868A1 (de) * | 2018-04-24 | 2019-10-24 | Sma Solar Technology Ag | Leistungselektronische Vorrichtung, Transformatoreinrichtung und Verfahren |
Also Published As
Publication number | Publication date |
---|---|
CN102439463B (zh) | 2014-06-18 |
US20120074953A1 (en) | 2012-03-29 |
EP2251702B1 (de) | 2011-07-13 |
US8717038B2 (en) | 2014-05-06 |
WO2010128069A1 (en) | 2010-11-11 |
ES2369643T3 (es) | 2011-12-02 |
CN102439463A (zh) | 2012-05-02 |
ATE516506T1 (de) | 2011-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2251702B1 (de) | Verdrahtungs-Prüfvorrichtung | |
DE102006037043B3 (de) | Photovoltaikanlage mit Isolationswiderstandsmessung von Solargeneratoren und Verfahren zum Betreiben derselben | |
DE102014201044B3 (de) | Isolationsüberwachungsvorrichtung zur simultanen Überwachung von Netzabschnitten eines ungeerdeten Stromversorgungssystems | |
AT517620B1 (de) | Verfahren und Prüfvorrichtung zum Prüfen einer Verdrahtung von Wandlern | |
EP2407996B1 (de) | Strommessvorrichtung in einem Wechselrichter | |
DE102018121979A1 (de) | Verfahren zur Isolationsüberwachung eines Umrichter-gespeisten Stromversorgungssystems | |
EP3631976B1 (de) | Verfahren zur erkennung eines kontaktfehlers in einer photovoltaikanlage | |
DE102011018229B4 (de) | Schaltungsanordnung und Verfahren zur Potentialtrennung eines elektrischen Geräts vom Netz | |
WO2009092509A1 (de) | Steuereinrichtung zum sicheren wiedereinschalten eines fehlerstromschutzschalters | |
WO2020011742A1 (en) | Ground fault detection circuit and apparatus | |
EP4252014B1 (de) | Überwachungsvorrichtung für den netzersatzbetrieb | |
EP0609261A1 (de) | Verfahren und einrichtung zur überprüfung eines elektrischen antriebs. | |
EP2904677B1 (de) | Schaltungsanordnung mit einem wechselrichter | |
WO2012045103A1 (de) | Detektoreinheit zum erkennen einer neutralleiterunterbrechung in einem symmetrischen mehrphasenstromnetz | |
EP2237057A1 (de) | Analysevorrichtung zur Analyse eines Stromnetzes | |
DE3429150A1 (de) | Verfahren zur feststellung des erdungszustandes von freigeschalteten elektrischen leitungen | |
DE10325389B4 (de) | Isolierungs-Prüfvorrichtung und Verfahren zur Prüfung der elektrischen Isolierung | |
BE1027538B1 (de) | Verfahren zur Verifizierung von Phasenzuordnungen | |
DE102021202583A1 (de) | Verfahren zur Überprüfung von Mehrfachbondverbindungen | |
KR101581800B1 (ko) | 과전류 계전기의 시험용 키트 장치 | |
CN106124923A (zh) | 一种三相变压器匝间故障检测线路及检测方法 | |
DE2738148C2 (de) | Einrichtung zur elektrischen Selbstprüfung und/oder zur Funktionsoder Schadensprüfung von in Prüflingen angeordneten Verdrahtungen | |
EP4092431A1 (de) | Strommessschaltkreis für einen stromrichter, stromrichterschaltkreis und stromrichter | |
DE102014218481A1 (de) | Spannungsprüfsystem | |
Leoni et al. | Some lessons learned from commissioning substation and medium voltage switchgear equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20100302 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: G01R 31/42 20060101ALI20101019BHEP Ipc: G01R 19/165 20060101AFI20101019BHEP Ipc: G01R 29/16 20060101ALI20101019BHEP Ipc: G01R 31/02 20060101ALI20101019BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAC | Information related to communication of intention to grant a patent modified |
Free format text: ORIGINAL CODE: EPIDOSCIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502009000923 Country of ref document: DE Effective date: 20110908 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20110713 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2369643 Country of ref document: ES Kind code of ref document: T3 Effective date: 20111202 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111113 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111013 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111114 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111014 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
26N | No opposition filed |
Effective date: 20120416 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502009000923 Country of ref document: DE Effective date: 20120416 |
|
BERE | Be: lapsed |
Owner name: SMA SOLAR TECHNOLOGY A.G. Effective date: 20120531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120531 Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111013 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130531 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110713 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120505 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090505 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20210531 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20210618 Year of fee payment: 13 Ref country code: AT Payment date: 20210518 Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 516506 Country of ref document: AT Kind code of ref document: T Effective date: 20220505 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220505 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20230626 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220505 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220506 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20230517 Year of fee payment: 15 Ref country code: DE Payment date: 20230519 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230522 Year of fee payment: 15 |