EP2228294A1 - Gefäß zum Transport von verflüssigtem Erdgas - Google Patents

Gefäß zum Transport von verflüssigtem Erdgas Download PDF

Info

Publication number
EP2228294A1
EP2228294A1 EP09154599A EP09154599A EP2228294A1 EP 2228294 A1 EP2228294 A1 EP 2228294A1 EP 09154599 A EP09154599 A EP 09154599A EP 09154599 A EP09154599 A EP 09154599A EP 2228294 A1 EP2228294 A1 EP 2228294A1
Authority
EP
European Patent Office
Prior art keywords
vessel
lng
container
containers
natural gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09154599A
Other languages
English (en)
French (fr)
Inventor
Michael Newman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAM LNG Holdings Ltd
Original Assignee
RAM LNG Holdings Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RAM LNG Holdings Ltd filed Critical RAM LNG Holdings Ltd
Priority to EP09154599A priority Critical patent/EP2228294A1/de
Priority to EP10707640A priority patent/EP2429892A1/de
Priority to PCT/GB2010/000409 priority patent/WO2010103260A1/en
Publication of EP2228294A1 publication Critical patent/EP2228294A1/de
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B2025/087Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid comprising self-contained tanks installed in the ship structure as separate units

Definitions

  • the invention relates to a vessel for transport of liquefied natural gas (LNG).
  • the invention also relates to a method of adapting a vessel to make it suitable for the transportation of liquefied natural gas (LNG).
  • Liquefied natural gas is natural gas cooled down to its boiling point temperature of approximately -160 °C at atmospheric pressure to reach cryogenic liquid condition. LNG is produced to enable the efficient storage and transport of natural gas. LNG is stored and transported in cryogenic containers. The LNG can be converted to natural gas by a process called regasification (vapourisation) and is typically used for fuel for domestic or industrial use and power generation.
  • a cryogenic container is a thermally-insulated container for storing or transporting liquefied gases at cryogenic temperatures and at pressure, generally atmospheric.
  • a cryogenic container includes an inner vessel for containing the cryogenic fluid e.g. LNG, and an outer vessel for insulating the cryogenic fluid from the environment.
  • the inner vessel includes a superconductive layer comprising a material that is superconducting at the temperature of the cryogenic fluid. This superconductive layer forms a magnetic field around the cryogenic container that repels electromagnetic energy, including thermal energy from the environment, keeping the cryogenic fluid at low temperatures.
  • Other cryogenic container systems are also available for the transport of LNG.
  • Natural gas, for export as LNG, is sourced from an offshore or onshore natural gas field, a coal mine, biogas facility or a diversion of flare-gas.
  • the gas is delivered to a liquefaction plant (LNG plant) located on site or at the export port.
  • LNG plant liquefaction plant
  • the first, and dominant, approach utilises purpose built vessels having hull structures specially designed for transportation of LNG.
  • LNG vessels or tankers are double-hulled ships designed and insulated to prevent leakage or rupture.
  • the LNG is stored in a special containment system within the inner hull of the vessel and can be generally described in either of two categories: independent tanks, generally self-supporting and constructed of aluminium alloy, and membrane tanks which rely entirely on the surrounding hull structure and are in intimate contact therewith.
  • the most common containment system for the transport of LNG is self-supporting spherical tanks constructed from aluminium.
  • the spherical shape of such tanks enables stresses and fatigue life of the structure to be predicted with a high degree of accuracy.
  • the tanks are positioned half below and half above the deck.
  • the protruding half of the tank is covered by a steel dome when in transit and typically four or five large tanks are placed in line in a ship.
  • the hull must be specially designed in parts with high grade steel so as to prevent cracking should the contents of the tank escape which increases the cost of the structure.
  • spherical tanks An alternative to spherical tanks are prismatic tanks. Such tanks are also self-supporting and are shaped to follow the contours of the specially designed hull of the vessel and are located therein. Such free standing tanks make better use of the hull space than spherical tanks but it is harder to predict the effect of stress and fatigue because of their irregular shape.
  • membrane systems which, use the inner wall of the hull as an integral part of the tank structure.
  • a membrane system will comprise an inner membrane wall defining the tank surrounded by an insulating layer to maintain the temperature of the tank contents.
  • the insulation bears the load of the tank and is directly supported by the inner wall of the ship's hull.
  • membrane tanks require materials that are more expensive than aluminium alloy for the inner wall of the tank.
  • the thin membrane wall may be made of the material Invar which has almost no thermal contraction and the insulation provided by way of plywood boxes filled with Perlite.
  • a second less common approach to the marine transport of LNG is by way of freight or cargo transport.
  • the LNG is placed in an appropriate container, an ISO LNG cargo container or a trailer mounted LNG tank, at an LNG plant and transported to an export port by truck.
  • Either the ISO container is transferred to a cargo ship or the truck and/or trailer is loaded onto the vessel.
  • the ISO container is secured at the corners with locking devices.
  • LNG containing tanks are classified as 'dangerous goods' and typically can only be stored on deck and not in the hull. Generally an area is designated on the deck for 'special' cargo and the LNG containing containers are stored there. This significantly reduces the flexibility of an operator to carry such containers.
  • the containers are usually loaded and removed using cranes located at the port.
  • the containers are then transported to the LNG storage facility by truck where the LNG is unloaded.
  • the ISO containers are loaded and unloaded using cranes thus necessitating container port infrastructure to enable the LNG to be transported.
  • the containers In order to retrieve the LNG stored in the ISO containers or trailer mounted tanks the containers must first be unloaded from the ship and the LNG extracted at a specialised facility for this purpose.
  • a vessel for the transportation of liquefied natural gas comprising at least one cryogenic container mounted to the open deck of the vessel and means for transporting liquefied natural gas into or out of the cryogenic container.
  • the vessel according to the invention is particularly advantageous as it can be manufactured at low cost because it does not require a specially adapted hull. Such a vessel is therefore particularly suitable for transporting smaller volumes of LNG. Further, by providing the cryogenic containers on the open deck the containers are made easily accessible and means such as a compressor or a pump for loading and unloading the LNG can be provided on the vessel itself, therefore, facilitating the transport of LNG to locations where little or no port infrastructure is in place. In addition, there is the opportunity to economically design and build suitable vessels that maximise the open deck area to enable greater volume of LNG to be transported using the proposed method.
  • the open deck area referred to herein is the deck of the hull and exposed to the outside, generally the main deck of the vessel. This main deck may need to be strengthened to support the cryogenic container(s) and auxiliary equipment.
  • a method of modifying a vessel to make it suitable for the transportation of liquefied natural gas comprising, mounting at least one cryogenic container to the open deck of the vessel and providing the vessel with means for transporting liquefied natural gas into and out of the container.
  • existing vessels can, therefore, be retrofitted very easily without substantial modification of the original structure to incorporate the cryogenic containers and a means for loading and unloading the LNG to or from the containers.
  • Vessels having the LNG stored exclusively in cryogenic containers mounted on the open deck have the further advantage that the unused hull area may be utilised for the transport of other cargo.
  • such vessels are safer than those known in the prior art because there is less danger of natural gas vapour becoming trapped in the hold where it could cause fire or explosion if accidentally ignited.
  • the vessel comprises a ship 1 as illustrated in Figure 1 a.
  • the ship has a length over all (LOA) of 124m and a length at the water line (LWL) of 118m, breadth 22.6m, depth 9.5m (to the main deck 2), draft (the distance from the bottom of the hull to the waterline) 4.0m and a volumetric displacement of about 8000t.
  • the hull comprises a typical full form for seagoing ships with similar dimensions.
  • the particulars of the mid ship section are vertical side, round bilge and flat bottom. As will be appreciated, other dimensions and designs of ship are possible depending on the cargo capacity and other performance requirements.
  • the general arrangement of the ship includes cargo storage 3 at the main deck 2, accommodation aft 4, machinery room 5, and ballast tanks 6-1 to 6-7 in double bottom, poop deck and forecastle.
  • the compartments 7-1 to 7-5 under the main deck 2 in the cargo area 3 are void and are separated by watertight bulkheads 8-1 to 8-4. Access is arranged to the compartments 7-1 to 7-5 via the main deck.
  • the ship has permanent fresh water ballast in the double bottom ballast tanks 6-3, 6-4 and 6-5.
  • the other tanks 6-2 and 6-3 and the aft and fore tanks 6-1 and 6-7 will utilize seawater and only be used when extra ballast is required.
  • Cargo vents 9-1 and 9-2 extend vertically upwards from the cargo storage 3 to a height of 6m.
  • the vents 9-1 and 9-1 are positioned horizontally at least 25m from the accommodation at the aft of the ship and from the forecastle respectively for safety reasons.
  • Figure 1b shows an overhead view of the ship of Figure 1 a.
  • the vessel comprises 12 outsized cylindrical cryogenic containers 3-1 to 3-12 (24.5m long and 5.5m diameter) and ten standard 20' cylindrical ISO cryogenic containers 3-13 to 3-22 mounted to the open deck.
  • the distance between the edge of cargo containers 3-1, 3-5 and 3-9 and 3-4, 3-8 and 3-12 and the ship side is 800mm and the distance between cargo containers 3-1 to 3-22 is 500mm in order to provide access to the piping and valves of the containers.
  • the outsized containers 3-1 to 3-12 are arranged in rows of four across the width of the main deck with their longitudinal axis parallel to that of the vessel whereas the ISO containers 3-13 to 3-22 are arranged in rows of five at the fore of the vessel. In this way the surface area of the main deck is utilised in an efficient manner.
  • a cargo loading and unloading area 10 is located on the main deck near midship.
  • the loading and unloading area 10 preferably contains equipment including at least two cargo pumps (for pumping LNG to and from the containers), two cooling pumps, two compressors (for compressing natural gas vapour), two hose davits (mechanical arms for raising and lowering hose and other equipment onto the ship) and cargo manifold comprising an arrangement of valves and connections required to pump the LNG to and from the containers.
  • the manifold is arranged so that each cargo pump can load or discharge LNG from each container.
  • Figure 2 shows a cross section of the ship shown in figures 1 a and 1b showing the ends of containers 3-1 to 3-4 in cross-section.
  • the outsized containers are comprised of a stainless steel inner tank 3-1 a supported by a carbon steel outer vessel 3-1b.
  • the container is hermetically sealed during transportation and comprises a multi-laminar insulating layer to prevent heating of the LNG stored therein.
  • the containers 3-1 to 3-22 are preferably mounted to the surface of the vessel by mechanical s ea fastenings but any conventional fastening means or container locks known in the art for securing cargo to the surface of a marine vessel could be used.
  • the fastener system chosen should be that that is best suited to the acceleration of the ship.
  • the containers 3-1 to 3-22 may be permanently fixed to the deck of the ship by welding.
  • the containers in this embodiment are designed for partial filling, and for 8bar internal pressure permitting approximately 40 days of storage without venting.
  • Figure 3 shows the details of the manifold and pump arrangement 10 located on the main deck of the ship and utilised to pump LNG to and from the containers 3-1 to 3-22.
  • the ship manifold is shown connected to the lines of example container 3-1.
  • the manifold comprises two LNG transfer pumps 11 and 12 are fitted at main deck for LNG loading and discharging.
  • the pumps are preferably horizontal centrifugal pumps suitable for cryogenic liquid transfer with a capacity of 300 m 3 /h at 2.5 bar each.
  • Two additional spray pumps 13 and 14 are provided that are operable to cool the system before starting of the cargo pumps 11 and 12 which are connected to the lines used for loading and discharging LNG.
  • the LNG container 3-1 is provided with a vapour line 3-1 c, vent line 3-1 d, liquid line (for carrying LNG) 3-1 e, a pressure gauge 3-1 f, level gauge 3-1g and two safety valves 3-1 h.
  • This permits vapour generated during loading of the LNG containers 3-1 to 3-22 to be led back to onshore storage, for example, a truck. Further, it also permits vapour to be returned to the LNG containers 3-1 to 3-22 when unloading LNG.
  • two multipurpose single stage compressors 15 and 16 are provided which are operable to increase the return vapour pressure as necessary.
  • the LNG transfer lines 3-1 d, 3-1 e and 3-1f comprise pipes of stainless steel having thermal insulation to thermally isolate the pipes from the adjacent hull and container support structure.
  • a vaporizer 17 is provided that is operable for vaporising liquid LNG stored in the container into gaseous form.
  • the vapourizer 17 essentially behaves as a compressor, increasing vapour pressure for offloading. It can be used to start the offloading process by taking some of the LNG and generating a vapour push back to the container thus aiding the unloading of the LNG. Then the compressors are picked up and the unloading is continued without further use of the vapourizer. When compressors are not available the vapourizer can be used in the unloading process.
  • the LNG is intended to be carried at ambient pressure although at the end of a voyage the pressure will be increased slightly due to gas boil off.
  • the LNG transfer from the ship containers to the shore will be carried out by flexible hoses connected to main vent, vapour and liquid lines 18, 19 and 20 respectively.
  • any LNG remaining in the deck lines and hoses can be drained by blowing the liquid into the ships with N 2 via blow line 21.
  • the vessel is preferably equipped with a suitable number of pressurised nitrogen containers (not shown).
  • the LNG enters the system via liquid line 30-1 and travels along liquid line 30-2 to line 30-3 and the pumps 11 and 12. From there it is pumped along liquid line 30-4 to line 20 and then to the cryogenic container via line 3-1 e.
  • the vapour that is generated exits the container through line 3-1c to vapour line 19, and then to the vapour exit line 40-1 via line 40-3.
  • Compressors 15 and 16 can be used to maintain the pressure in the system during this process.
  • Unloading utilising the pumps 11 and 12 comprises the LNG travelling along liquid lines 3-1 e from the container to liquid line 20. It is pumped by way of pumps 11 and 12 via line 30-3 from line 20 to line 30-1 via line 30-2 and to onshore storage.
  • the vapour generated is beneficially used to keep the containers vapourized and enters the system from onshore via line 40-1. It travels through lines 40-3, vapour line 20 to line 3-1 c where it enters the cryogenic container.
  • Loading and unloading can also be accomplished utilising the compressors 15,16 only.
  • vaporised natural gas is taken from onshore though vapour lines 40-1 and 40-2. It then travels via line 40-3 to compressors 15 and 16 and from there to the container via lines 40-4, line 19 and line 3-1 c.
  • the vapour may travel via the vaporizer 17.
  • the provision of vaporised natural gas to the cryogenic container pushes the LNG therein contained onshore via liquid lines 3-1 e, the stripping line and line 30-1.
  • Loading using compressors only, although not a preferred option, from a truck for example can be accomplished as follows, In this embodiment, the onboard compressors and onshore pumps are utilised.
  • the vapour contained in the cryogenic container exits the container via lines 3-1 c and line 19 to enter the compressor line 40-3. Exiting via compressors 15 and 16, the vapour travels onshore through line 40-1.
  • the LNG is transported onto the ship via line30-1 from onshore and to the cryogenic container via lines 20 and 3-1 e.
  • the system is cooled before loading or offloading through use of pumps 13 and 14 which should be connected to the loading/unloading lines.
  • the system can be cooled through use of the compressors 15 and 16, provided the flow of vapour can be controlled, or a small vapourizer.
  • the LNG is loaded from trucks using truck pumps and unloaded using the ship cargo pumps 11 and 12. Vapour generated in the system during the loading will be lead to the trucks and during unloading the vapour generated in the onshore storage will be lead back to the cryogenic containers onboard the vessel. This will keep the containers vapourized until they are loaded again.
  • the compressors 15 and 16 are provided to increase vapour pressure if required.
  • the vessel is a cargo ship it will be appreciated that other types of marine vessel are possible.
  • the marine vessel could be a barge with the cryogenic containers and cargo manifold provided on the deck of the barge.
  • a suitable tug boat could be used to transport the barge to a desired location for the loading or unloading of LNG.
  • the cargo manifold comprises cargo loading pumps 11 and 12, cooling pumps 13 and 14 and compressors 15 and 16.
  • the manifold only comprises compressors 15 and 16 and LNG transfer is achieved with the assistance of onshore pumps in combination with the transfer means provided by compressors 15 and 16 on the vessel.
  • onshore pumps are utilized at least one compressor and one small pump for cooling should be provided on the vessel.
  • the number and size of compressors and pumps on the vessel dictates the speed of loading and unloading and is influenced by, amongst others, the onshore facilities available and the available deck space.
  • cryogenic containers of other shapes e.g. spherical, rectangular, square, prismatic etc, may be considered. Cylindrical cryogenic containers are preferred as they are the most efficient from a structural, volumetric and manufacturing standpoint.
  • the cylindrical cryogenic containers are mounted with their longitudinal axis parallel to the longitudinal axis of the vessel. This provides the most efficient use of space in this embodiment.
  • the cryogenic tanks may be provided in any orientation e.g. they may be mounted with their longitudinal axis at right angles to the longitudinal axis. The preferred orientation of containers will be such that maximises storage of LNG on the open deck area.
  • cryogenic containers are mounted on the open deck of the vessel in the embodiment described herein.
  • the containers may however be provided with a steel framework that permits the containers to be stacked on top of each other.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
EP09154599A 2009-03-09 2009-03-09 Gefäß zum Transport von verflüssigtem Erdgas Withdrawn EP2228294A1 (de)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP09154599A EP2228294A1 (de) 2009-03-09 2009-03-09 Gefäß zum Transport von verflüssigtem Erdgas
EP10707640A EP2429892A1 (de) 2009-03-09 2010-03-09 Gefäss für den transport von flüssigerdgas oder flüssigem co2
PCT/GB2010/000409 WO2010103260A1 (en) 2009-03-09 2010-03-09 Vessel for transport of liquefied natural gas or liquefied co2

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP09154599A EP2228294A1 (de) 2009-03-09 2009-03-09 Gefäß zum Transport von verflüssigtem Erdgas

Publications (1)

Publication Number Publication Date
EP2228294A1 true EP2228294A1 (de) 2010-09-15

Family

ID=40996742

Family Applications (2)

Application Number Title Priority Date Filing Date
EP09154599A Withdrawn EP2228294A1 (de) 2009-03-09 2009-03-09 Gefäß zum Transport von verflüssigtem Erdgas
EP10707640A Withdrawn EP2429892A1 (de) 2009-03-09 2010-03-09 Gefäss für den transport von flüssigerdgas oder flüssigem co2

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP10707640A Withdrawn EP2429892A1 (de) 2009-03-09 2010-03-09 Gefäss für den transport von flüssigerdgas oder flüssigem co2

Country Status (2)

Country Link
EP (2) EP2228294A1 (de)
WO (1) WO2010103260A1 (de)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012121401A (ja) * 2010-12-07 2012-06-28 Mitsubishi Heavy Ind Ltd 船舶
US8375876B2 (en) 2010-12-04 2013-02-19 Argent Marine Management, Inc. System and method for containerized transport of liquids by marine vessel
EP2607224A1 (de) * 2011-12-23 2013-06-26 Technolog GmbH Handels- und Beteiligungsgesellschaft Für Technologie Schwimmkörper, insbesondere Containerschiff
EP2749807A1 (de) * 2012-12-27 2014-07-02 Shell Internationale Research Maatschappij B.V. Flüssigkeitszuführungsanordnung, schwimmendes Transportschiff, Verfahren zur Montage einer Flüssigkeitszuführungsanordnung und Verfahren zur Übertragung einer Flüssigkeit
WO2014120080A1 (en) 2013-01-29 2014-08-07 Keppel Offshore & Marine Technology Centre Pte Ltd Lng carrier construction method
EP2540611B1 (de) 2010-02-24 2015-09-30 Samsung Heavy Ind. Co., Ltd. Schwimmende lng-station
WO2016120540A1 (fr) * 2015-01-30 2016-08-04 Gaztransport Et Technigaz Installation de stockage et de transport d'un fluide cryogénique embarquée sur un navire
WO2016192808A1 (en) * 2015-06-05 2016-12-08 Gva Consultants Ab Marine vessel comprising lg handling system
WO2019105529A1 (de) * 2017-11-28 2019-06-06 TECHNOLOG GmbH Handels- und Beteiligungsgesellschaft für Technologie Mobiles container-tankmodul
WO2022026971A1 (en) 2020-07-27 2022-02-03 Exxonmobil Upstream Research Company Container systems and methods for using the same

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10168003B2 (en) * 2015-02-24 2019-01-01 Wartsila Finland Oy Valve system for an LNG tank
WO2019038364A2 (en) * 2017-08-23 2019-02-28 Englemer B.V.B.A. METHOD AND SYSTEM FOR DRAINING A LIQUID GAS TRANSFER PIPE
JP7346276B2 (ja) * 2019-12-19 2023-09-19 三菱造船株式会社 船舶
US11559774B2 (en) 2019-12-30 2023-01-24 Marathon Petroleum Company Lp Methods and systems for operating a pump at an efficiency point
US11247184B2 (en) 2019-12-30 2022-02-15 Marathon Petroleum Company Lp Methods and systems for spillback control of in-line mixing of hydrocarbon liquids
US11607654B2 (en) 2019-12-30 2023-03-21 Marathon Petroleum Company Lp Methods and systems for in-line mixing of hydrocarbon liquids
CA3103413C (en) 2019-12-30 2023-04-25 Marathon Petroleum Company Lp Methods and systems for inline mixing of hydrocarbon liquids based on density or gravity
US12012883B2 (en) 2021-03-16 2024-06-18 Marathon Petroleum Company Lp Systems and methods for backhaul transportation of liquefied gas and CO2 using liquefied gas carriers
US11655940B2 (en) 2021-03-16 2023-05-23 Marathon Petroleum Company Lp Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel
US11578638B2 (en) 2021-03-16 2023-02-14 Marathon Petroleum Company Lp Scalable greenhouse gas capture systems and methods
US11578836B2 (en) 2021-03-16 2023-02-14 Marathon Petroleum Company Lp Scalable greenhouse gas capture systems and methods
US11447877B1 (en) 2021-08-26 2022-09-20 Marathon Petroleum Company Lp Assemblies and methods for monitoring cathodic protection of structures
US12043905B2 (en) 2021-08-26 2024-07-23 Marathon Petroleum Company Lp Electrode watering assemblies and methods for maintaining cathodic monitoring of structures
US12129559B2 (en) 2021-08-26 2024-10-29 Marathon Petroleum Company Lp Test station assemblies for monitoring cathodic protection of structures and related methods
US11686070B1 (en) 2022-05-04 2023-06-27 Marathon Petroleum Company Lp Systems, methods, and controllers to enhance heavy equipment warning
US12012082B1 (en) 2022-12-30 2024-06-18 Marathon Petroleum Company Lp Systems and methods for a hydraulic vent interlock
US12043361B1 (en) 2023-02-18 2024-07-23 Marathon Petroleum Company Lp Exhaust handling systems for marine vessels and related methods
US12006014B1 (en) 2023-02-18 2024-06-11 Marathon Petroleum Company Lp Exhaust vent hoods for marine vessels and related methods
US12087002B1 (en) 2023-09-18 2024-09-10 Marathon Petroleum Company Lp Systems and methods to determine depth of soil coverage along a right-of-way

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000036334A1 (en) * 1998-12-18 2000-06-22 Exxonmobil Upstream Research Company Displacement gas for unloading lng from containers
US20020053573A1 (en) * 1999-03-23 2002-05-09 Bowen Ronald R. Systems and methods for producing and storing pressurized liquefied natural gas
US20030190199A1 (en) * 1999-06-16 2003-10-09 Brian Snowdon Pneumatic conveying
US7237391B1 (en) * 2003-07-10 2007-07-03 Atp Oil & Gas Corporation Method for processing and transporting compressed natural gas
US20070253797A1 (en) * 2004-09-01 2007-11-01 Pierre-Armand Thomas Method and Installation for Loading and Unloading Compressed Natural Gas

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000036334A1 (en) * 1998-12-18 2000-06-22 Exxonmobil Upstream Research Company Displacement gas for unloading lng from containers
US20020053573A1 (en) * 1999-03-23 2002-05-09 Bowen Ronald R. Systems and methods for producing and storing pressurized liquefied natural gas
US20030190199A1 (en) * 1999-06-16 2003-10-09 Brian Snowdon Pneumatic conveying
US7237391B1 (en) * 2003-07-10 2007-07-03 Atp Oil & Gas Corporation Method for processing and transporting compressed natural gas
US20070253797A1 (en) * 2004-09-01 2007-11-01 Pierre-Armand Thomas Method and Installation for Loading and Unloading Compressed Natural Gas

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9764802B2 (en) 2010-02-24 2017-09-19 Samsung Heavy Ind. Co., Ltd. Floating type LNG station
EP2540611B1 (de) 2010-02-24 2015-09-30 Samsung Heavy Ind. Co., Ltd. Schwimmende lng-station
US8375876B2 (en) 2010-12-04 2013-02-19 Argent Marine Management, Inc. System and method for containerized transport of liquids by marine vessel
JP2012121401A (ja) * 2010-12-07 2012-06-28 Mitsubishi Heavy Ind Ltd 船舶
EP2607224A1 (de) * 2011-12-23 2013-06-26 Technolog GmbH Handels- und Beteiligungsgesellschaft Für Technologie Schwimmkörper, insbesondere Containerschiff
WO2013091772A1 (de) 2011-12-23 2013-06-27 TECHNOLOG GmbH Schwimmkörper, insbesondere containerschiff
CN104159816A (zh) * 2011-12-23 2014-11-19 技术贸易及参与有限责任公司 浮体、尤其集装箱船
EP2749807A1 (de) * 2012-12-27 2014-07-02 Shell Internationale Research Maatschappij B.V. Flüssigkeitszuführungsanordnung, schwimmendes Transportschiff, Verfahren zur Montage einer Flüssigkeitszuführungsanordnung und Verfahren zur Übertragung einer Flüssigkeit
AU2013377134B2 (en) * 2013-01-29 2017-08-31 Keppel Offshore & Marine Technology Centre Pte Ltd LNG carrier construction method
WO2014120080A1 (en) 2013-01-29 2014-08-07 Keppel Offshore & Marine Technology Centre Pte Ltd Lng carrier construction method
US10668996B2 (en) 2013-01-29 2020-06-02 Keppel Offshore & Marine Technology Centre Pte Ltd LNG carrier construction method
AU2016211087B2 (en) * 2015-01-30 2017-10-26 Gaztransport Et Technigaz Apparatus for storing and transporting a cryogenic fluid on-board a ship
CN107429880A (zh) * 2015-01-30 2017-12-01 气体运输技术公司 用于在船上储存和运输低温流体的装置
JP2018506002A (ja) * 2015-01-30 2018-03-01 ギャズトランスポルト エ テクニギャズ 極低温流体を船上で貯蔵しかつ輸送するための装置
US9915397B2 (en) 2015-01-30 2018-03-13 Gaztransport Et Technigaz Apparatus for storing and transporting a cryogenic fluid on-board a ship
CN107429880B (zh) * 2015-01-30 2019-04-05 气体运输技术公司 用于在船上储存和运输低温流体的装置
WO2016120540A1 (fr) * 2015-01-30 2016-08-04 Gaztransport Et Technigaz Installation de stockage et de transport d'un fluide cryogénique embarquée sur un navire
WO2016192808A1 (en) * 2015-06-05 2016-12-08 Gva Consultants Ab Marine vessel comprising lg handling system
WO2019105529A1 (de) * 2017-11-28 2019-06-06 TECHNOLOG GmbH Handels- und Beteiligungsgesellschaft für Technologie Mobiles container-tankmodul
CN111386395A (zh) * 2017-11-28 2020-07-07 天迈技术贸易及参与有限责任公司 移动式容器-罐模块
CN111386395B (zh) * 2017-11-28 2022-03-29 天迈技术贸易及参与有限责任公司 移动式容器-罐模块
WO2022026971A1 (en) 2020-07-27 2022-02-03 Exxonmobil Upstream Research Company Container systems and methods for using the same

Also Published As

Publication number Publication date
WO2010103260A1 (en) 2010-09-16
EP2429892A1 (de) 2012-03-21

Similar Documents

Publication Publication Date Title
EP2228294A1 (de) Gefäß zum Transport von verflüssigtem Erdgas
KR102138969B1 (ko) 가스 처리 시스템 및 이를 포함하는 액화가스 운반선
US9545980B2 (en) Ultra large marine floating system
KR101653892B1 (ko) 외부 컨테이너들을 구비하는 해양에 설치된 지지체
US3213632A (en) Ship for transporting liquefied gases and other liquids
AU2007295937A1 (en) Boil off gas management during ship-to-ship transfer of LNG
NO331660B1 (no) Anordning for flytende produksjon av LNG og fremgangsmate for a konvertere et LNG-skip til en slik anordning
US20160031531A1 (en) LNG Ship or LPG Ship
NO324883B1 (no) Fartoy
CN110099843B (zh) 气体燃料推进集装箱运输船
KR20180095724A (ko) 천연가스 액화 선박
KR101148063B1 (ko) 부유식 계류 장치
KR101378797B1 (ko) Lng 운송선의 하역 시스템
US4004535A (en) Vessel comprising a hull for transporting cooled liquefield gas
US7240499B1 (en) Method for transporting compressed natural gas to prevent explosions
KR20190024342A (ko) 컨테이너 운반선 및 컨테이너 운반선의 연료공급시스템
WO2015082628A1 (en) Floating vessel with trough deck
KR102677388B1 (ko) 선박
KR102488377B1 (ko) 선박
KR102469938B1 (ko) 선박
KR20230040143A (ko) 액화수소 저장용기를 포함하는 해상 운송 수단
KR20230062284A (ko) 가스 저장 시스템 및 이를 포함하는 선박
KR20230040144A (ko) 액화수소 저장용기를 포함하는 해상 운송 수단
KR20230040140A (ko) 액화수소 저장용기를 포함하는 해상 운송 수단
KR20230040145A (ko) 액화수소 저장용기 및 이를 포함하는 해상 운송 수단

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

AKY No designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: R108

Effective date: 20110419

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20110316