WO2010103260A1 - Vessel for transport of liquefied natural gas or liquefied co2 - Google Patents

Vessel for transport of liquefied natural gas or liquefied co2 Download PDF

Info

Publication number
WO2010103260A1
WO2010103260A1 PCT/GB2010/000409 GB2010000409W WO2010103260A1 WO 2010103260 A1 WO2010103260 A1 WO 2010103260A1 GB 2010000409 W GB2010000409 W GB 2010000409W WO 2010103260 A1 WO2010103260 A1 WO 2010103260A1
Authority
WO
WIPO (PCT)
Prior art keywords
vessel
liquefied
natural gas
container
lng
Prior art date
Application number
PCT/GB2010/000409
Other languages
French (fr)
Inventor
Michael Newman
Original Assignee
Ram Lng Holdings Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ram Lng Holdings Limited filed Critical Ram Lng Holdings Limited
Priority to EP10707640A priority Critical patent/EP2429892A1/en
Publication of WO2010103260A1 publication Critical patent/WO2010103260A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/14Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed pressurised
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B2025/087Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid comprising self-contained tanks installed in the ship structure as separate units

Definitions

  • the invention relates to a vessel for transport of liquefied natural gas (LNG) or liquefied CO 2 .
  • the invention also relates to a method of adapting a vessel to make it suitable for the transportation of liquefied natural gas (LNG) or liquefied CO 2 .
  • Liquefied natural gas is natural gas cooled down to its boiling point temperature of approximately -160 0 C at atmospheric pressure to reach cryogenic liquid condition. LNG is produced to enable the efficient storage and transport of natural gas. LNG is stored and transported in cryogenic containers.
  • the LNG can be converted back to natural gas by a process called regasification
  • a cryogenic container is a thermally-insulated container for storing or transporting liquefied gases at cryogenic temperatures and at pressure, generally atmospheric.
  • a cryogenic container includes an inner vessel for containing the cryogenic fluid e.g. LNG, and an outer vessel for insulating the cryogenic fluid from the environment.
  • the inner vessel includes a superconductive layer comprising a material that is superconducting at the temperature of the cryogenic fluid. This superconductive layer forms a magnetic field around the cryogenic container that repels electromagnetic energy, including thermal energy from the environment, keeping the cryogenic fluid at low temperatures.
  • Other cryogenic container systems are also available for the transport of LNG.
  • CNG compressed natural gas
  • PLNG pressurised liquefied natural gas
  • Natural gas, for export as LNG, is sourced from an offshore or onshore natural gas field, a coal mine, biogas facility or a diversion of flare-gas.
  • the gas is delivered to a liquefaction plant (LNG plant) located on site or at the export port.
  • LNG plant liquefaction plant
  • the first, and dominant, approach utilises purpose built vessels having hull structures specially designed for transportation of LNG.
  • LNG vessels or tankers are double-hulled ships designed and insulated to prevent leakage or rupture.
  • the LNG is stored in a special containment system within the inner hull of the vessel and can be generally described in either of two categories: independent tanks, generally self-supporting and constructed of aluminium alloy, and membrane tanks which rely entirely on the surrounding hull structure and are in intimate contact therewith.
  • the most common containment system for the transport of LNG is self- supporting spherical tanks constructed from aluminium.
  • the spherical shape of such tanks enables stresses and fatigue life of the structure to be predicted with a high degree of accuracy.
  • the tanks are positioned half below and half above the deck.
  • the protruding half of the tank is covered by a steel dome when in transit and typically four or five large tanks are placed in line in a ship.
  • the hull must be specially designed in parts with high grade steel so as to prevent cracking should the contents of the tank escape which increases the cost of the structure.
  • An alternative to spherical tanks are prismatic tanks.
  • Such tanks are also self-supporting and are shaped to follow the contours of the specially designed hull of the vessel and are located therein.
  • Such free standing tanks make better use of the hull space than spherical tanks but it is harder to predict the effect of stress and fatigue because of their irregular shape.
  • membrane systems which, use the inner wall of the hull as an integral part of the tank structure.
  • a membrane system will comprise an inner membrane wall defining the tank surrounded by an insulating layer to maintain the temperature of the tank contents.
  • the insulation bears the load of the tank and is directly supported by the inner wall of the ship's hull.
  • membrane tanks require materials that are more expensive than aluminium alloy for the inner wall of the tank.
  • the thin membrane wall may be made of the material Invar which has almost no thermal contraction and the insulation provided by way of plywood boxes filled with Perlite.
  • the tanks are permanently fixed to the vessel and must be located at least partly in the ship hull for stability and to effectively utilise the hull capacity of the vessel.
  • the majority of new vessels are for large capacity transportation of LNG, typically in the range of 120,000 m 3 - 140,000 m 3 , but some more than 200000m 3 .
  • LNG carriers of this type are specially certified for carriage of LNG and dock at specialised LNG terminals for loading and unloading due to the large volumes, and associated safety risk, of LNG onboard.
  • Utilising the hull capacity in this way is logical as it allows a greater volume of LNG to be carried by a vessel and thereby provide an efficient mode of LNG transportation.
  • a second less common approach to the marine transport of LNG is by way of freight or cargo transport.
  • the LNG is placed in an appropriate container, an ISO LNG cargo container or a trailer mounted LNG tank, at an LNG plant and transported to an export port by truck.
  • Either the ISO container is transferred to a cargo ship or the truck and/or trailer is loaded onto the vessel.
  • the ISO container is secured at the corners with locking devices.
  • LNG containing tanks are classified as 'dangerous goods' and typically can only be stored on deck and not in the hull. Generally an area is designated on the deck for 'special' cargo and the LNG containing containers are stored there. This significantly reduces the flexibility of an operator to carry such containers.
  • the containers are usually loaded and removed using cranes located at the port.
  • the containers are then transported to the LNG storage facility by truck where the LNG is unloaded.
  • the ISO containers are loaded and unloaded using cranes thus necessitating container port infrastructure to enable the LNG to be transported.
  • the containers In order to retrieve the LNG stored in the ISO containers or trailer mounted tanks the containers must first be unloaded from the ship and the LNG extracted at a specialised facility for this purpose.
  • a vessel for the transportation of liquefied natural gas or liquefied CO 2 comprising at least one cryogenic container mounted to the open deck of the vessel and means for transporting liquefied natural gas or liquefied CO 2 into or out of the cryogenic container.
  • the vessel according to the invention is particularly advantageous as it can be manufactured at low cost because it does not require a specially adapted hull. Such a vessel is therefore particularly suitable for transporting smaller volumes of LNG. Further, by providing the cryogenic containers on the open deck the containers are made easily accessible and means such as a compressor or a pump for loading and unloading the LNG can be provided on the vessel itself, therefore, facilitating the transport of LNG to locations where little or no port infrastructure is in place.
  • the open deck area referred to herein is the deck of the hull and exposed to the outside, generally the main deck of the vessel. This main deck may need to be strengthened to support the cryogenic container(s) and auxiliary equipment.
  • a method of modifying a vessel to make it suitable for the transportation of liquefied natural gas or liquefied CO 2 comprising, mounting at least one cryogenic container to the open deck of the vessel and providing the vessel with means for transporting liquefied natural gas into and out of the container.
  • a method of transporting liquefied natural gas or liquefied CO 2 from a vessel according to the first aspect to a storage facility comprising utilising the means for transporting liquefied natural gas or liquefied CO 2 provided by the vessel to transport liquefied natural gas from the at least one cryogenic container of the vessel to the storage facility.
  • a method of transporting liquefied natural gas or liquefied CO 2 from a storage facility to a vessel comprising utilising the means for transporting liquefied natural gas or liquefied CO 2 provided by the vessel to transport liquefied natural gas from the storage facility to the at least one cryogenic container of the vessel.
  • Vessels having the LNG stored exclusively in cryogenic containers mounted on the open deck have the further advantage that the unused hull area may be utilised for the transport of other cargo.
  • such vessels are safer than those known in the prior art because there is less danger of natural gas vapour becoming trapped in the hold where it could cause fire or explosion if accidentally ignited.
  • Figure 1 a shows a schematic profile of a vessel in a first embodiment of the present invention
  • Figure 1 b shows a plan view of the vessel illustrated in Figure 1 a
  • Figure 2 shows a cross-section of the vessel of Figures 1a and 1b illustrating in particular the cross-sectional area of cryogenic containers mounted to the open deck
  • Figure 3 shows a schematic of apparatus suitable to be provided on the vessel of Figures 1 and 2 for loading and unloading LNG from the containers.
  • the vessel comprises a ship 1 as illustrated in Figure 1a.
  • the ship has a length over all (LOA) of 124m and a length at the water line (LWL) of 118m, breadth 22.6m, depth 9.5m (to the main deck 2), draft (the distance from the bottom of the hull to the waterline) 4.0m and a volumetric displacement of about 800Ot.
  • LWL water line
  • the hull comprises a typical full form for seagoing ships with similar dimensions.
  • the particulars of the mid ship section are vertical side, round bilge and flat bottom. As will be appreciated, other dimensions and designs of ship are possible depending on the cargo capacity and other performance requirements.
  • the general arrangement of the ship includes cargo storage 3 at the main deck 2, accommodation aft 4, machinery room 5, and ballast tanks 6-1 to 6-7 in double bottom, poop deck and forecastle.
  • the compartments 7-1 to 7-5 under the main deck 2 in the cargo area 3 are void and are separated by watertight bulkheads 8-1 to 8-4. Access is arranged to the compartments 7-1 to 7-5 via the main deck.
  • the ship has permanent fresh water ballast in the double bottom ballast tanks 6-3, 6-4 and 6-5.
  • the other tanks 6-2 and 6-3 and the aft and fore tanks 6-1 and 6-7 will utilize seawater and only be used when extra ballast is required.
  • Cargo vents 9-1 and 9-2 extend vertically upwards from the cargo storage 3 to a height of 6m.
  • the vents 9-1 and 9-1 are positioned horizontally at least 25m from the accommodation at the aft of the ship and from the forecastle respectively for safety reasons.
  • Figure 1 b shows an overhead view of the ship of Figure 1a.
  • the vessel comprises 12 outsized cylindrical cryogenic containers 3-1 to 3-12 (24.5m long and 5.5m diameter) and ten standard 20' cylindrical ISO cryogenic containers 3- 13 to 3-22 mounted to the open deck.
  • the distance between the edge of cargo containers 3-1 , 3-5 and 3-9 and 3-4, 3-8 and 3-12 and the ship side is 800mm and the distance between cargo containers 3-1 to 3-22 is 500mm in order to provide access to the piping and valves of the containers.
  • the outsized containers 3-1 to 3-12 are arranged in rows of four across the width of the main deck with their longitudinal axis parallel to that of the vessel whereas the ISO containers 3-13 to 3-22 are arranged in rows of five at the fore of the vessel. In this way the surface area of the main deck is utilised in an efficient manner.
  • a cargo loading and unloading area 10 is located on the main deck near mid-ship.
  • the loading and unloading area 10 preferably contains equipment including at least two cargo pumps (for pumping LNG to and from the containers), two cooling pumps, two compressors (for compressing natural gas vapour), two hose davits (mechanical arms for raising and lowering hose and other equipment onto the ship) and cargo manifold comprising an arrangement of valves and connections required to pump the LNG to and from the containers.
  • the manifold is arranged so that each cargo pump can load or discharge LNG from each container.
  • FIG 2 shows a cross section of the ship shown in figures 1a and 1 b showing the ends of containers 3-1 to 3-4 in cross-section.
  • the outsized containers comprise a stainless steel inner tank 3-1 a supported by a carbon steel outer vessel 3-1 b.
  • the container is hermetically sealed during transportation and comprises a multi-laminar insulating layer to prevent heating of the LNG stored therein.
  • the containers 3-1 to 3-22 are preferably mounted to the surface of the vessel by mechanical sea fastenings but any conventional fastening means or container locks known in the art for securing cargo to the surface of a marine vessel could be used.
  • the fastener system chosen should be that that is best suited to the acceleration of the ship.
  • the containers 3-1 to 3-22 may be permanently fixed to the deck of the ship by welding.
  • the containers in this embodiment are designed for partial filling, and for 8bar internal pressure permitting approximately 40 days of storage without venting.
  • Figure 3 shows the details of the manifold and pump arrangement 10 located on the main deck of the ship and utilised to pump LNG to and from the containers 3-1 to 3-22.
  • the ship manifold is shown connected to the lines of example container 3-1.
  • the manifold comprises two LNG transfer pumps 11 and 12 are fitted at main deck for LNG loading and discharging.
  • the pumps are preferably horizontal centrifugal pumps suitable for cryogenic liquid transfer with a capacity of 300 m 3 /h at 2.5 bar each.
  • Two additional spray pumps 13 and 14 are provided that are operable to cool the system before starting of the cargo pumps 11 and 12 which are connected to the lines used for loading and discharging LNG.
  • Having the pump arrangement located on the deck has the advantage that the arrangement can address LNG from any one of the containers mounted on the open deck of the vessel. This means that fewer pumps can be used when compared with a conventional transport.
  • a conventional transport would utilise a dedicated pump for each tank/container because the containers would be at least partially submerged in the hull.
  • the LNG container 3-1 is provided with a vapour line 3-1 c, vent line 3-1 d, liquid line (for carrying LNG) 3-1e, a pressure gauge 3-1f, level gauge 3-1g and two safety valves 3-1 h.
  • This permits vapour generated during loading of the LNG containers 3-1 to 3-22 to be led back to onshore storage, for example, a truck. Further, it also permits vapour to be returned to the LNG containers 3-1 to 3-22 when unloading LNG.
  • two multi-purpose single stage compressors 15 and 16 are provided which are operable to increase the return vapour pressure as necessary.
  • the LNG transfer lines 3-1 d, 3-1 e and 3-1 f comprise pipes of stainless steel having thermal insulation to thermally isolate the pipes from the adjacent hull and container support structure.
  • a vaporizer 17 is provided that is operable for vaporising liquid LNG stored in the container into gaseous form.
  • the vapourizer 17 essentially behaves as a compressor, increasing vapour pressure for offloading. It can be used to start the offloading process by taking some of the LNG and generating a vapour push back to the container thus aiding the unloading of the LNG. Then the compressors are picked up and the unloading is continued without further use of the vapourizer. When compressors are not available the vapourizer can be used in the unloading process.
  • the LNG is intended to be carried at ambient pressure although at the end of a voyage the pressure will be increased slightly due to gas boil off.
  • the LNG transfer from the ship containers to the shore will be carried out by flexible hoses connected to main vent, vapour and liquid lines 18, 19 and 20 respectively.
  • any LNG remaining in the deck lines and hoses can be drained by blowing the liquid into the ships with N 2 via blow line 21.
  • the vessel is preferably equipped with a suitable number of pressurised nitrogen containers (not shown).
  • the LNG enters the system via liquid line 30-1 and travels along liquid line 30-2 to line 30-3 and the pumps 11 and 12. From there it is pumped along liquid line 30-4 to line 20 and then to the cryogenic container via line 3-1 e.
  • the vapour that is generated exits the container through line 3-1 c to vapour line 19, and then to the vapour exit line 40-1 via line 40-3.
  • Compressors 15 and 16 can be used to maintain the pressure in the system during this process.
  • Unloading utilising the pumps 11 and 12 comprises the LNG travelling along liquid lines 3-1 e from the container to liquid line 20. It is pumped by way of pumps 11 and 12 via line 30-3 from line 20 to line 30-1 via line 30-2 and to onshore storage.
  • the vapour generated is beneficially used to keep the containers vaporized and enters the system from onshore via line 40-1. It travels through lines 40-3, vapour line 20 to line 3-1 c where it enters the cryogenic container.
  • Loading and unloading can also be accomplished utilising the compressors 15 and 16 only.
  • vaporized natural gas is taken from onshore though vapour lines 40-1 and 40-2. It then travels via line 40-3 to compressors 15 and 16 and from there to the container via lines 40-4, line 19 and line 3-1 c.
  • the vapour may travel via the vaporizer 17.
  • the provision of vaporized natural gas to the cryogenic container pushes the LNG therein contained onshore via liquid lines 3-1 e, the stripping line and line 30-1.
  • the system is cooled before loading or offloading through use of pumps 13 and 14 which should be connected to the loading/unloading lines.
  • the system can be cooled through use of the compressors 15 and 16, provided the flow of vapour can be controlled, or a small vapourizer.
  • the LNG is loaded from trucks using truck pumps and unloaded using the ship cargo pumps 11 and 12. Vapour generated in the system during the loading will be lead to the trucks and during unloading the vapour generated in the onshore storage will be lead back to the cryogenic containers onboard the vessel. This will keep the containers vaporized until they are loaded again.
  • the compressors 15 and 16 are provided to increase vapour pressure if required.
  • the vessel is a cargo ship it will be appreciated that other types of marine vessel are possible.
  • the marine vessel could be a barge with the cryogenic containers and cargo manifold provided on the deck of the barge.
  • a suitable tug boat could be used to transport the barge to a desired location for the loading or unloading of LNG.
  • the cargo manifold comprises cargo loading pumps 11 and 12, cooling pumps 13 and 14 and compressors 15 and 16.
  • the manifold only comprises compressors 15 and 16 and LNG transfer is achieved with the assistance of onshore pumps in combination with the transfer means provided by compressors 15 and 16 on the vessel.
  • onshore pumps are utilized at least one compressor and one small pump for cooling should be provided on the vessel.
  • the number and size of compressors and pumps on the vessel dictates the speed of loading and unloading and is influenced by, amongst others, the onshore facilities available and the available deck space.
  • cryogenic containers of other shapes e.g. spherical, rectangular, square, prismatic etc, may be considered. Cylindrical cryogenic containers are preferred as they are the most efficient from a structural, volumetric and manufacturing standpoint.
  • the vessel comprises outsized cylindrical cryogenic containers 3-1 to 3-12 (24.5m long and 5.5m diameter) and ten standard 20' cylindrical ISO cryogenic containers 3-13 to 3-22 mounted to the open deck.
  • cylindrical containers having a diameter of 2.4m to 10m and a length of 3m to 40m could be used.
  • Such dimensions being particularly suitable for LNG storage and providing ease of design.
  • the wall thickness of the LNG storage containers would be much less than the equivalent container for storage of CNG or PLNG thus facilitating low weight containers particularly suited to mounting on the open deck of the vessel.
  • the outsized containers comprise a stainless steel inner tank 3-1 a supported by a carbon steel outer vessel 3-1 b.
  • other materials may be used, in particular, nickel for the inner tank or stainless steel for the outer vessel.
  • the cylindrical cryogenic containers are mounted with their longitudinal axis parallel to the longitudinal axis of the vessel. This provides the most efficient use of space in this embodiment.
  • the cryogenic tanks may be provided in any orientation e.g. they may be mounted with their longitudinal axis at right angles to the longitudinal axis. The preferred orientation of containers will be such that maximises storage of LNG on the open deck area.
  • cryogenic containers are mounted on the open deck of the vessel in the embodiment described herein.
  • the containers may however be provided with a steel framework that permits the containers to be stacked on top of each other.
  • cryogenic containers can easily be configured to operate at the higher temperature suitable for maintaining CO 2 in a liquefied state having inner and outer tanks comprising material suitable for withstanding any corrosive or other damaging effects associated with CO 2 .
  • system of manifold, pumps and compressors described above could equally be configured for use with liquefied CO 2 utilising design methodologies know to those skilled in the art.
  • the LNG containers have been described as being mounted to the open deck. Mounting in this context may mean permanently affixed to the deck of the ship for example by welding or other sealing methods. In addition, however, although it is envisaged that under normal operation there would be no reason to remove the containers from the deck of the ship during loading or unloading of LNG, it is equally envisaged that the containers could be mounted to the deck via-non permanent means such as container or sea fastenings or any other fixing means known in the art.

Abstract

In accordance with the present invention there is provided a vessel for the transportation of liquefied natural gas or liquefied CO2 comprising at least one cryogenic container mounted to the open deck of the vessel and means for transporting liquefied natural gas or liquefied CO2 into or out of the cryogenic container.

Description

VESSEL FOR TRANSPORT OF LIQUEFIED NATURAL GAS OR LIQUEFIED CO,
The invention relates to a vessel for transport of liquefied natural gas (LNG) or liquefied CO2. The invention also relates to a method of adapting a vessel to make it suitable for the transportation of liquefied natural gas (LNG) or liquefied CO2.
Liquefied natural gas (LNG) is natural gas cooled down to its boiling point temperature of approximately -160 0C at atmospheric pressure to reach cryogenic liquid condition. LNG is produced to enable the efficient storage and transport of natural gas. LNG is stored and transported in cryogenic containers.
The LNG can be converted back to natural gas by a process called regasification
(vaporization) and is typically used for fuel for domestic or industrial use and power generation.
A cryogenic container is a thermally-insulated container for storing or transporting liquefied gases at cryogenic temperatures and at pressure, generally atmospheric. Typically a cryogenic container includes an inner vessel for containing the cryogenic fluid e.g. LNG, and an outer vessel for insulating the cryogenic fluid from the environment. The inner vessel includes a superconductive layer comprising a material that is superconducting at the temperature of the cryogenic fluid. This superconductive layer forms a magnetic field around the cryogenic container that repels electromagnetic energy, including thermal energy from the environment, keeping the cryogenic fluid at low temperatures. Other cryogenic container systems are also available for the transport of LNG.
This is in contrast with the transport and storage of, for example, compressed natural gas (CNG) or pressurised liquefied natural gas (PLNG). These require a tank that will hold gas or a combination of gas and liquefied gas respectively under high pressure and at temperatures much higher than for transportation of LNG. Accordingly containers for CNG or PLNG storage are required to be very strong in order to safely contain the highly pressurised gas or gas/liquid mixture. This requirement leads to thick walled CNG/PLNG containers that are much heavier than the equivalent^ sized cryogenic containers required for storing LNG.
Natural gas, for export as LNG, is sourced from an offshore or onshore natural gas field, a coal mine, biogas facility or a diversion of flare-gas. The gas is delivered to a liquefaction plant (LNG plant) located on site or at the export port.
The marine transportation of LNG is growing in use today. Although
Cabot first patented a barge to carry liquid gas in 1914 it wasn't until 1964 that the first purpose-built ship was used.
There are two traditional approaches to the marine transportation of LNG. The first, and dominant, approach utilises purpose built vessels having hull structures specially designed for transportation of LNG. Typically such LNG vessels or tankers are double-hulled ships designed and insulated to prevent leakage or rupture. The LNG is stored in a special containment system within the inner hull of the vessel and can be generally described in either of two categories: independent tanks, generally self-supporting and constructed of aluminium alloy, and membrane tanks which rely entirely on the surrounding hull structure and are in intimate contact therewith.
The most common containment system for the transport of LNG is self- supporting spherical tanks constructed from aluminium. The spherical shape of such tanks enables stresses and fatigue life of the structure to be predicted with a high degree of accuracy. In order to effectively use the capacity of the hull the tanks are positioned half below and half above the deck. The protruding half of the tank is covered by a steel dome when in transit and typically four or five large tanks are placed in line in a ship. As half of the tank is located in the ship's hull, the hull must be specially designed in parts with high grade steel so as to prevent cracking should the contents of the tank escape which increases the cost of the structure. An alternative to spherical tanks are prismatic tanks. Such tanks are also self-supporting and are shaped to follow the contours of the specially designed hull of the vessel and are located therein. Such free standing tanks make better use of the hull space than spherical tanks but it is harder to predict the effect of stress and fatigue because of their irregular shape.
An alternative to self-supporting structures are membrane systems which, use the inner wall of the hull as an integral part of the tank structure. Typically a membrane system will comprise an inner membrane wall defining the tank surrounded by an insulating layer to maintain the temperature of the tank contents. The insulation bears the load of the tank and is directly supported by the inner wall of the ship's hull. Thus, the space available inside the hull can be used to its full advantage. However, membrane tanks require materials that are more expensive than aluminium alloy for the inner wall of the tank. For example, the thin membrane wall may be made of the material Invar which has almost no thermal contraction and the insulation provided by way of plywood boxes filled with Perlite.
Common to both self-supporting and membrane systems is that the tanks are permanently fixed to the vessel and must be located at least partly in the ship hull for stability and to effectively utilise the hull capacity of the vessel. The majority of new vessels are for large capacity transportation of LNG, typically in the range of 120,000 m3 - 140,000 m3, but some more than 200000m3. LNG carriers of this type are specially certified for carriage of LNG and dock at specialised LNG terminals for loading and unloading due to the large volumes, and associated safety risk, of LNG onboard. Utilising the hull capacity in this way is logical as it allows a greater volume of LNG to be carried by a vessel and thereby provide an efficient mode of LNG transportation. However, such specially designed vessels have the disadvantage that they are potentially expensive and are only cost effective when transporting large volumes of LNG. Further, due to the large quantity of LNG they can only load or unload the LNG at specialised LNG terminals due to the strict safety requirements for dealing with such large volumes.
A second less common approach to the marine transport of LNG, is by way of freight or cargo transport. Herein the LNG is placed in an appropriate container, an ISO LNG cargo container or a trailer mounted LNG tank, at an LNG plant and transported to an export port by truck. Either the ISO container is transferred to a cargo ship or the truck and/or trailer is loaded onto the vessel. Typically, the ISO container is secured at the corners with locking devices. However LNG containing tanks are classified as 'dangerous goods' and typically can only be stored on deck and not in the hull. Generally an area is designated on the deck for 'special' cargo and the LNG containing containers are stored there. This significantly reduces the flexibility of an operator to carry such containers. At the destination the containers are usually loaded and removed using cranes located at the port. The containers are then transported to the LNG storage facility by truck where the LNG is unloaded. The ISO containers are loaded and unloaded using cranes thus necessitating container port infrastructure to enable the LNG to be transported. In order to retrieve the LNG stored in the ISO containers or trailer mounted tanks the containers must first be unloaded from the ship and the LNG extracted at a specialised facility for this purpose.
Both of the traditional methods of LNG transport demand a developed port infrastructure to enable safe docking and loading/unloading of the LNG. In many locations world-wide such port facilities do not exist.
In a first aspect according to the invention there is provided a vessel for the transportation of liquefied natural gas or liquefied CO2 comprising at least one cryogenic container mounted to the open deck of the vessel and means for transporting liquefied natural gas or liquefied CO2 into or out of the cryogenic container. The vessel according to the invention is particularly advantageous as it can be manufactured at low cost because it does not require a specially adapted hull. Such a vessel is therefore particularly suitable for transporting smaller volumes of LNG. Further, by providing the cryogenic containers on the open deck the containers are made easily accessible and means such as a compressor or a pump for loading and unloading the LNG can be provided on the vessel itself, therefore, facilitating the transport of LNG to locations where little or no port infrastructure is in place. This is particularly advantageous when transporting LNG at low pressure because unlike CNG or PLNG (where the intrinsic high pressure can be used to move the gas out of the container) a pump or compressor is required to extract the LNG from the vessel. By providing such means on the ship it becomes possible to unload low pressure LNG even where there is no on-shore infrastructure.
In addition, there is the opportunity to economically design and build suitable vessels that maximise the open deck area to enable greater volume of LNG to be transported using the proposed method. Utilising the open deck in this manner is particularly suited to transporting LNG because of the relatively light containers required compared to those required to safely store CNG or PLNG.
The open deck area referred to herein is the deck of the hull and exposed to the outside, generally the main deck of the vessel. This main deck may need to be strengthened to support the cryogenic container(s) and auxiliary equipment.
In a further aspect of the present invention there is provided a method of modifying a vessel to make it suitable for the transportation of liquefied natural gas or liquefied CO2 comprising, mounting at least one cryogenic container to the open deck of the vessel and providing the vessel with means for transporting liquefied natural gas into and out of the container. Utilising this method, existing vessels can, therefore, be retrofitted very easily without substantial modification of the original structure to incorporate the cryogenic containers and a means for loading and unloading the LNG to or from the containers.
In a yet further aspect of the present invention there is provided a method of transporting liquefied natural gas or liquefied CO2 from a vessel according to the first aspect to a storage facility comprising utilising the means for transporting liquefied natural gas or liquefied CO2 provided by the vessel to transport liquefied natural gas from the at least one cryogenic container of the vessel to the storage facility.
In a yet further aspect of the present invention there is provided a method of transporting liquefied natural gas or liquefied CO2 from a storage facility to a vessel according to the first aspect comprising utilising the means for transporting liquefied natural gas or liquefied CO2 provided by the vessel to transport liquefied natural gas from the storage facility to the at least one cryogenic container of the vessel.
Vessels having the LNG stored exclusively in cryogenic containers mounted on the open deck have the further advantage that the unused hull area may be utilised for the transport of other cargo. In addition, such vessels are safer than those known in the prior art because there is less danger of natural gas vapour becoming trapped in the hold where it could cause fire or explosion if accidentally ignited.
Embodiments according to the present invention will now be described with reference to the accompanying drawings, in which:-
Figure 1 a shows a schematic profile of a vessel in a first embodiment of the present invention;
Figure 1 b shows a plan view of the vessel illustrated in Figure 1 a; Figure 2 shows a cross-section of the vessel of Figures 1a and 1b illustrating in particular the cross-sectional area of cryogenic containers mounted to the open deck; and
Figure 3 shows a schematic of apparatus suitable to be provided on the vessel of Figures 1 and 2 for loading and unloading LNG from the containers.
In an embodiment of the present invention the vessel comprises a ship 1 as illustrated in Figure 1a. In this embodiment the ship has a length over all (LOA) of 124m and a length at the water line (LWL) of 118m, breadth 22.6m, depth 9.5m (to the main deck 2), draft (the distance from the bottom of the hull to the waterline) 4.0m and a volumetric displacement of about 800Ot. The hull comprises a typical full form for seagoing ships with similar dimensions. The particulars of the mid ship section are vertical side, round bilge and flat bottom. As will be appreciated, other dimensions and designs of ship are possible depending on the cargo capacity and other performance requirements.
The general arrangement of the ship includes cargo storage 3 at the main deck 2, accommodation aft 4, machinery room 5, and ballast tanks 6-1 to 6-7 in double bottom, poop deck and forecastle. The compartments 7-1 to 7-5 under the main deck 2 in the cargo area 3 are void and are separated by watertight bulkheads 8-1 to 8-4. Access is arranged to the compartments 7-1 to 7-5 via the main deck.
The ship has permanent fresh water ballast in the double bottom ballast tanks 6-3, 6-4 and 6-5. The other tanks 6-2 and 6-3 and the aft and fore tanks 6-1 and 6-7 will utilize seawater and only be used when extra ballast is required. Cargo vents 9-1 and 9-2 extend vertically upwards from the cargo storage 3 to a height of 6m. The vents 9-1 and 9-1 are positioned horizontally at least 25m from the accommodation at the aft of the ship and from the forecastle respectively for safety reasons. Figure 1 b shows an overhead view of the ship of Figure 1a. The vessel comprises 12 outsized cylindrical cryogenic containers 3-1 to 3-12 (24.5m long and 5.5m diameter) and ten standard 20' cylindrical ISO cryogenic containers 3- 13 to 3-22 mounted to the open deck. The distance between the edge of cargo containers 3-1 , 3-5 and 3-9 and 3-4, 3-8 and 3-12 and the ship side is 800mm and the distance between cargo containers 3-1 to 3-22 is 500mm in order to provide access to the piping and valves of the containers. The outsized containers 3-1 to 3-12 are arranged in rows of four across the width of the main deck with their longitudinal axis parallel to that of the vessel whereas the ISO containers 3-13 to 3-22 are arranged in rows of five at the fore of the vessel. In this way the surface area of the main deck is utilised in an efficient manner.
A cargo loading and unloading area 10 is located on the main deck near mid-ship. The loading and unloading area 10 preferably contains equipment including at least two cargo pumps (for pumping LNG to and from the containers), two cooling pumps, two compressors (for compressing natural gas vapour), two hose davits (mechanical arms for raising and lowering hose and other equipment onto the ship) and cargo manifold comprising an arrangement of valves and connections required to pump the LNG to and from the containers. As will be described in more detail below, the manifold is arranged so that each cargo pump can load or discharge LNG from each container.
Figure 2 shows a cross section of the ship shown in figures 1a and 1 b showing the ends of containers 3-1 to 3-4 in cross-section. The outsized containers comprise a stainless steel inner tank 3-1 a supported by a carbon steel outer vessel 3-1 b. The container is hermetically sealed during transportation and comprises a multi-laminar insulating layer to prevent heating of the LNG stored therein. The containers 3-1 to 3-22 are preferably mounted to the surface of the vessel by mechanical sea fastenings but any conventional fastening means or container locks known in the art for securing cargo to the surface of a marine vessel could be used. The fastener system chosen should be that that is best suited to the acceleration of the ship. As a further alternative the containers 3-1 to 3-22 may be permanently fixed to the deck of the ship by welding. The containers in this embodiment are designed for partial filling, and for 8bar internal pressure permitting approximately 40 days of storage without venting.
Figure 3 shows the details of the manifold and pump arrangement 10 located on the main deck of the ship and utilised to pump LNG to and from the containers 3-1 to 3-22. In the figure the ship manifold is shown connected to the lines of example container 3-1. As shown the manifold comprises two LNG transfer pumps 11 and 12 are fitted at main deck for LNG loading and discharging. The pumps are preferably horizontal centrifugal pumps suitable for cryogenic liquid transfer with a capacity of 300 m3/h at 2.5 bar each. Two additional spray pumps 13 and 14 are provided that are operable to cool the system before starting of the cargo pumps 11 and 12 which are connected to the lines used for loading and discharging LNG. Having the pump arrangement located on the deck has the advantage that the arrangement can address LNG from any one of the containers mounted on the open deck of the vessel. This means that fewer pumps can be used when compared with a conventional transport. A conventional transport would utilise a dedicated pump for each tank/container because the containers would be at least partially submerged in the hull.
The LNG container 3-1 is provided with a vapour line 3-1 c, vent line 3-1 d, liquid line (for carrying LNG) 3-1e, a pressure gauge 3-1f, level gauge 3-1g and two safety valves 3-1 h. This permits vapour generated during loading of the LNG containers 3-1 to 3-22 to be led back to onshore storage, for example, a truck. Further, it also permits vapour to be returned to the LNG containers 3-1 to 3-22 when unloading LNG. To assist in returning the vapour to the containers two multi-purpose single stage compressors 15 and 16 are provided which are operable to increase the return vapour pressure as necessary. The LNG transfer lines 3-1 d, 3-1 e and 3-1 f comprise pipes of stainless steel having thermal insulation to thermally isolate the pipes from the adjacent hull and container support structure. In addition a vaporizer 17 is provided that is operable for vaporising liquid LNG stored in the container into gaseous form. The vapourizer 17 essentially behaves as a compressor, increasing vapour pressure for offloading. It can be used to start the offloading process by taking some of the LNG and generating a vapour push back to the container thus aiding the unloading of the LNG. Then the compressors are picked up and the unloading is continued without further use of the vapourizer. When compressors are not available the vapourizer can be used in the unloading process.
The LNG is intended to be carried at ambient pressure although at the end of a voyage the pressure will be increased slightly due to gas boil off.
The LNG transfer from the ship containers to the shore will be carried out by flexible hoses connected to main vent, vapour and liquid lines 18, 19 and 20 respectively. On completion of the LNG transfer, any LNG remaining in the deck lines and hoses can be drained by blowing the liquid into the ships with N2 via blow line 21. For this purpose the vessel is preferably equipped with a suitable number of pressurised nitrogen containers (not shown).
Loading and unloading of the container 3-1 will now be described with reference to Figure 3 in which the numerals enclosed in circles correspond to:
1 Vapor Compressor;
2 Cargo Loading Pumps;
3 Cooling Pumps;
4 Non-return Vapor Valves; 5 Non-return Liquid Valves;
6 Liquid Valves;
7 Vapor Valves; and
8 Vaporizer.
In addition, the acronyms shown correspond to:
TRV Thermal Relief Valve; SV Safety Valve; PG Pressure Gauge; and LG Level Gauge.
Considering, for example, the loading of the cryogenic containers utilising the pumps, the LNG enters the system via liquid line 30-1 and travels along liquid line 30-2 to line 30-3 and the pumps 11 and 12. From there it is pumped along liquid line 30-4 to line 20 and then to the cryogenic container via line 3-1 e. The vapour that is generated exits the container through line 3-1 c to vapour line 19, and then to the vapour exit line 40-1 via line 40-3. Compressors 15 and 16 can be used to maintain the pressure in the system during this process.
Unloading utilising the pumps 11 and 12 comprises the LNG travelling along liquid lines 3-1 e from the container to liquid line 20. It is pumped by way of pumps 11 and 12 via line 30-3 from line 20 to line 30-1 via line 30-2 and to onshore storage. The vapour generated is beneficially used to keep the containers vaporized and enters the system from onshore via line 40-1. It travels through lines 40-3, vapour line 20 to line 3-1 c where it enters the cryogenic container.
Loading and unloading can also be accomplished utilising the compressors 15 and 16 only. Considering offloading utilising compressors 15 and 16, vaporized natural gas is taken from onshore though vapour lines 40-1 and 40-2. It then travels via line 40-3 to compressors 15 and 16 and from there to the container via lines 40-4, line 19 and line 3-1 c. For faster unloading and where available the vapour may travel via the vaporizer 17. The provision of vaporized natural gas to the cryogenic container pushes the LNG therein contained onshore via liquid lines 3-1 e, the stripping line and line 30-1.
Loading using compressors only, although not a preferred option, from for example a truck can be accomplished by utilising the onboard compressors and onshore pumps. The vapour contained in the cryogenic container exits the container via lines 3-1 c and line 19 to enter the compressor line 40-3. Exiting via compressors 15 and 16, the vapour travels onshore through line 40-1. The LNG is transported onto the ship via line30-1 from onshore and to the cryogenic container via lines 20 and 3-1 e.
Ideally the system is cooled before loading or offloading through use of pumps 13 and 14 which should be connected to the loading/unloading lines. Alternately the system can be cooled through use of the compressors 15 and 16, provided the flow of vapour can be controlled, or a small vapourizer.
In a preferred embodiment the LNG is loaded from trucks using truck pumps and unloaded using the ship cargo pumps 11 and 12. Vapour generated in the system during the loading will be lead to the trucks and during unloading the vapour generated in the onshore storage will be lead back to the cryogenic containers onboard the vessel. This will keep the containers vaporized until they are loaded again. The compressors 15 and 16 are provided to increase vapour pressure if required.
Although in the above described embodiment the vessel is a cargo ship it will be appreciated that other types of marine vessel are possible. In particular, it is envisaged that the marine vessel could be a barge with the cryogenic containers and cargo manifold provided on the deck of the barge. A suitable tug boat could be used to transport the barge to a desired location for the loading or unloading of LNG.
In the above described embodiment the cargo manifold comprises cargo loading pumps 11 and 12, cooling pumps 13 and 14 and compressors 15 and 16. However, as will be appreciated other combinations of pumps and compressors could be provided depending on the transfer requirements and the facilities available-onshore. In a yet further embodiment the manifold only comprises compressors 15 and 16 and LNG transfer is achieved with the assistance of onshore pumps in combination with the transfer means provided by compressors 15 and 16 on the vessel. Assuming onshore pumps are utilized at least one compressor and one small pump for cooling should be provided on the vessel. The number and size of compressors and pumps on the vessel dictates the speed of loading and unloading and is influenced by, amongst others, the onshore facilities available and the available deck space.
Although the above described embodiment comprises cylindrical cryogenic containers, containers of other shapes e.g. spherical, rectangular, square, prismatic etc, may be considered. Cylindrical cryogenic containers are preferred as they are the most efficient from a structural, volumetric and manufacturing standpoint.
In the above described embodiment the vessel comprises outsized cylindrical cryogenic containers 3-1 to 3-12 (24.5m long and 5.5m diameter) and ten standard 20' cylindrical ISO cryogenic containers 3-13 to 3-22 mounted to the open deck. As will be appreciated, however, different containers of other dimensions could also be used. In particular, it is envisaged that cylindrical containers having a diameter of 2.4m to 10m and a length of 3m to 40m could be used. Such dimensions being particularly suitable for LNG storage and providing ease of design. In all cases the wall thickness of the LNG storage containers would be much less than the equivalent container for storage of CNG or PLNG thus facilitating low weight containers particularly suited to mounting on the open deck of the vessel.
In the above embodiment the outsized containers comprise a stainless steel inner tank 3-1 a supported by a carbon steel outer vessel 3-1 b. In other embodiments other materials may be used, in particular, nickel for the inner tank or stainless steel for the outer vessel.
In the above embodiment the cylindrical cryogenic containers are mounted with their longitudinal axis parallel to the longitudinal axis of the vessel. This provides the most efficient use of space in this embodiment. However the cryogenic tanks may be provided in any orientation e.g. they may be mounted with their longitudinal axis at right angles to the longitudinal axis. The preferred orientation of containers will be such that maximises storage of LNG on the open deck area.
The cryogenic containers are mounted on the open deck of the vessel in the embodiment described herein. The containers may however be provided with a steel framework that permits the containers to be stacked on top of each other.
Although the above embodiments have been described with reference to transportation of LNG it is envisaged that the above described vessels would also be suitable for the transportation of liquefied CO2. As will appreciated, the cryogenic containers can easily be configured to operate at the higher temperature suitable for maintaining CO2 in a liquefied state having inner and outer tanks comprising material suitable for withstanding any corrosive or other damaging effects associated with CO2. Further, it will also be appreciated that the system of manifold, pumps and compressors described above could equally be configured for use with liquefied CO2 utilising design methodologies know to those skilled in the art.
Further, in the above embodiments the LNG containers have been described as being mounted to the open deck. Mounting in this context may mean permanently affixed to the deck of the ship for example by welding or other sealing methods. In addition, however, although it is envisaged that under normal operation there would be no reason to remove the containers from the deck of the ship during loading or unloading of LNG, it is equally envisaged that the containers could be mounted to the deck via-non permanent means such as container or sea fastenings or any other fixing means known in the art.

Claims

16 CLAIMS
1. A vessel for the transportation of liquefied natural gas or liquefied CO2 comprising at least one cryogenic container mounted to the open deck of the vessel and means for transporting liquefied natural gas or liquefied CO2 into or out of the cryogenic container.
2. A vessel according to claim 1 wherein said means comprises a pump operable to pump liquid natural gas into or out of the container.
3. A vessel according to any preceding claim wherein said means comprises a compressor operable to compress natural gas vapour.
4. A vessel according to any preceding claim wherein said means is mounted on the open deck of the vessel.
5. A vessel according to any preceding claim wherein the at least one cryogenic container comprises a plurality of cryogenic containers and the means is arranged such that it can transport liquefied gas or liquefied CO2 from any one of the plurality of cryogenic containers mounted to the open deck.
6. A vessel according to any preceding claim wherein said means comprises a manifold comprising an arrangement of valves and connections configured to transport liquefied natural gas or liquefied CO2 into or out of the at least one cryogenic container.
7. A vessel according to any preceding claim wherein the manifold is configured to be connected, via a flexible hose or other means, to a storage facility not forming part of the vessel.
8. A vessel according to any preceding claim wherein the at least one cryogenic container is cylindrical. 17
9. A vessel according to claim 8 wherein the cylindrical container has a diameter of 2.4m to 10m and a length of 3m to 40m.
10. A vessel according to any preceding claim wherein said container is mounted to the open deck by sea fastenings or by welding.
11. A vessel according to any preceding claim wherein said vessel is a ship , for example, a tanker or a ferry, or wherein said vessel is a barge.
12. A vessel according to any preceding claim wherein the at least one container is mounted with its longitudinal axis parallel to the longitudinal axis of the vessel.
13. A vessel according to any preceding claim wherein the at least one cryogenic container is arranged such that they are accessible for maintenance.
14. A vessel according to at least claim 8 wherein the at least one cylindrical container comprises end caps.
15. A vessel according to any preceding claim wherein the at least one cryogenic container comprises nickel, carbon steel, stainless steel or aluminium.
16. A vessel according to any preceding claim wherein the at least one cryogenic container comprises an inner tank supported by an outer tank.
17. A vessel according to claim 16 wherein the inner tank comprises nickel or stainless steel and the outer tank comprises carbon steel or stainless steel.
18. A method of modifying a vessel to make it suitable for the transportation of liquefied natural gas or liquefied CO2 comprising:
mounting at least one cryogenic container to the open deck of the vessel; and 18
providing the vessel with means for transporting liquefied natural gas or liquefied CO2 into and out of the container.
19. A method of transporting liquefied natural gas or liquefied CO2 from a vessel according to any of claims 1 to 17 to a storage facility comprising utilising the means for transporting liquefied natural gas or liquefied CO2 provided by the vessel to transport liquefied natural gas from the at least one cryogenic container of the vessel to the storage facility.
20. A method of transporting liquefied natural gas or liquefied CO2 from a storage facility to a vessel according to any of claims 1 to 17 comprising utilising the means for transporting liquefied natural gas or liquefied CO2 provided by the vessel to transport liquefied natural gas from the storage facility to the at least one cryogenic container of the vessel.
21. A method according to claim 19 or claim 20 wherein said storage facility comprises a static or mobile onshore storage facility.
22. A method according to claim 19 or claim 20 wherein said storage facility comprises a static or mobile off-shore storage facility.
23. A method according to any of claims 19 to 22 wherein said transportation is via at least one flexible hose connected from the vessel to the storage facility.
PCT/GB2010/000409 2009-03-09 2010-03-09 Vessel for transport of liquefied natural gas or liquefied co2 WO2010103260A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP10707640A EP2429892A1 (en) 2009-03-09 2010-03-09 Vessel for transport of liquefied natural gas or liquefied co2

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP09154599A EP2228294A1 (en) 2009-03-09 2009-03-09 Vessel for transport of liquefied natural gas
EP09154599.6 2009-03-09

Publications (1)

Publication Number Publication Date
WO2010103260A1 true WO2010103260A1 (en) 2010-09-16

Family

ID=40996742

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2010/000409 WO2010103260A1 (en) 2009-03-09 2010-03-09 Vessel for transport of liquefied natural gas or liquefied co2

Country Status (2)

Country Link
EP (2) EP2228294A1 (en)
WO (1) WO2010103260A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018507990A (en) * 2015-02-24 2018-03-22 ワルトシラ フィンランド オサケユキチュア Valve system for fuel tanks, especially LNG tanks
WO2019038364A3 (en) * 2017-08-23 2019-05-16 Englemer B.V.B.A. Method and system to drain a liquid gas transfer hose
WO2021124620A1 (en) * 2019-12-19 2021-06-24 三菱造船株式会社 Ship
US11774042B2 (en) 2021-03-16 2023-10-03 Marathon Petroleum Company Lp Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel
US11794153B2 (en) 2019-12-30 2023-10-24 Marathon Petroleum Company Lp Methods and systems for in-line mixing of hydrocarbon liquids
US11807945B2 (en) 2021-08-26 2023-11-07 Marathon Petroleum Company Lp Assemblies and methods for monitoring cathodic protection of structures
US11808013B1 (en) 2022-05-04 2023-11-07 Marathon Petroleum Company Lp Systems, methods, and controllers to enhance heavy equipment warning
US11920504B2 (en) 2021-03-16 2024-03-05 Marathon Petroleum Company Lp Scalable greenhouse gas capture systems and methods

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101239352B1 (en) 2010-02-24 2013-03-06 삼성중공업 주식회사 Floating liquefied natural gas charging station
US8375876B2 (en) 2010-12-04 2013-02-19 Argent Marine Management, Inc. System and method for containerized transport of liquids by marine vessel
JP6143407B2 (en) * 2010-12-07 2017-06-07 三菱重工業株式会社 Ship
EP2607224B2 (en) * 2011-12-23 2018-08-22 Technolog GmbH Handels- und Beteiligungsgesellschaft Für Technologie Buoyant body, in particularly container ship
EP2749807A1 (en) * 2012-12-27 2014-07-02 Shell Internationale Research Maatschappij B.V. Fluid supply assemblage, a floating transportation vessel, method of assembling a fluid supply assemblage, and method of transferring a fluid
EP2951083B1 (en) 2013-01-29 2018-12-19 Keppel Offshore&Marine Technology Centre Pte Ltd Lng carrier construction method
FR3032258B1 (en) * 2015-01-30 2017-07-28 Gaztransport Et Technigaz STORAGE AND TRANSPORTATION INSTALLATION OF A CRYOGENIC FLUID EMBEDDED ON A SHIP
US20180135808A1 (en) * 2015-06-05 2018-05-17 David ANDRÉ Marine vessel comprising lg handling system
WO2019105529A1 (en) * 2017-11-28 2019-06-06 TECHNOLOG GmbH Handels- und Beteiligungsgesellschaft für Technologie Mobile container-tank module
WO2022026971A1 (en) 2020-07-27 2022-02-03 Exxonmobil Upstream Research Company Container systems and methods for using the same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000036334A1 (en) * 1998-12-18 2000-06-22 Exxonmobil Upstream Research Company Displacement gas for unloading lng from containers
US20020053573A1 (en) * 1999-03-23 2002-05-09 Bowen Ronald R. Systems and methods for producing and storing pressurized liquefied natural gas
US20030190199A1 (en) * 1999-06-16 2003-10-09 Brian Snowdon Pneumatic conveying
US7237391B1 (en) * 2003-07-10 2007-07-03 Atp Oil & Gas Corporation Method for processing and transporting compressed natural gas
US20070253797A1 (en) * 2004-09-01 2007-11-01 Pierre-Armand Thomas Method and Installation for Loading and Unloading Compressed Natural Gas

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000036334A1 (en) * 1998-12-18 2000-06-22 Exxonmobil Upstream Research Company Displacement gas for unloading lng from containers
US20020053573A1 (en) * 1999-03-23 2002-05-09 Bowen Ronald R. Systems and methods for producing and storing pressurized liquefied natural gas
US20030190199A1 (en) * 1999-06-16 2003-10-09 Brian Snowdon Pneumatic conveying
US7237391B1 (en) * 2003-07-10 2007-07-03 Atp Oil & Gas Corporation Method for processing and transporting compressed natural gas
US20070253797A1 (en) * 2004-09-01 2007-11-01 Pierre-Armand Thomas Method and Installation for Loading and Unloading Compressed Natural Gas

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018507990A (en) * 2015-02-24 2018-03-22 ワルトシラ フィンランド オサケユキチュア Valve system for fuel tanks, especially LNG tanks
WO2019038364A3 (en) * 2017-08-23 2019-05-16 Englemer B.V.B.A. Method and system to drain a liquid gas transfer hose
CN114787028B (en) * 2019-12-19 2024-01-16 三菱造船株式会社 ship
WO2021124620A1 (en) * 2019-12-19 2021-06-24 三菱造船株式会社 Ship
JP2021095050A (en) * 2019-12-19 2021-06-24 三菱造船株式会社 Ship
EP4079623A4 (en) * 2019-12-19 2023-01-25 Mitsubishi Shipbuilding Co., Ltd. Ship
JP7346276B2 (en) 2019-12-19 2023-09-19 三菱造船株式会社 ship
US11794153B2 (en) 2019-12-30 2023-10-24 Marathon Petroleum Company Lp Methods and systems for in-line mixing of hydrocarbon liquids
US11774042B2 (en) 2021-03-16 2023-10-03 Marathon Petroleum Company Lp Systems and methods for transporting fuel and carbon dioxide in a dual fluid vessel
US11920504B2 (en) 2021-03-16 2024-03-05 Marathon Petroleum Company Lp Scalable greenhouse gas capture systems and methods
US11807945B2 (en) 2021-08-26 2023-11-07 Marathon Petroleum Company Lp Assemblies and methods for monitoring cathodic protection of structures
US11808013B1 (en) 2022-05-04 2023-11-07 Marathon Petroleum Company Lp Systems, methods, and controllers to enhance heavy equipment warning
US11965317B2 (en) 2022-05-04 2024-04-23 Marathon Petroleum Company Lp Systems, methods, and controllers to enhance heavy equipment warning

Also Published As

Publication number Publication date
EP2429892A1 (en) 2012-03-21
EP2228294A1 (en) 2010-09-15

Similar Documents

Publication Publication Date Title
EP2228294A1 (en) Vessel for transport of liquefied natural gas
KR102138969B1 (en) Gas treatment system and gas carrier having the same
US9545980B2 (en) Ultra large marine floating system
KR101653892B1 (en) A support installed at sea having external containers
US20090199575A1 (en) Boil off gas management during ship-to-ship transfer of lng
WO2008076168A1 (en) Long tank fsru/flsv/lngc
CN107636380B (en) Method for cooling liquefied gases
US20160031531A1 (en) LNG Ship or LPG Ship
CN110099843B (en) Container transport ship propelled by gas fuel
KR101148063B1 (en) floating mooring apparatus
KR101378797B1 (en) Unloading System For LNG Carrier
KR20190024342A (en) Container Carrier and Fuel Gas Supply System for the Container Carrier
KR20130021926A (en) Liquefied natural gas supplying ship
WO2015082628A1 (en) Floating vessel with trough deck
KR102488377B1 (en) ship
KR102469938B1 (en) ship
KR102459475B1 (en) ship
KR102406282B1 (en) Liquefied hydrogen storage tank venting system for liquefied hydrogen vessels
KR20230040143A (en) Marine transportation means including liquid hydrogen storage container
KR20220163253A (en) ship
KR20230040140A (en) Marine transportation means including liquid hydrogen storage container
KR20230040144A (en) Marine transportation means including liquid hydrogen storage container
KR20230062284A (en) Gas storage system and ship having the same
KR20230040145A (en) Liquid hydrogen storage container and marine transportation means including the same
KR20230040142A (en) Marine transportation means including liquid hydrogen storage container

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10707640

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010707640

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE