EP2162526A1 - Installation de biogaz avec digestion de solides et production de méthane dans une cuve de recirculation de percolat - Google Patents

Installation de biogaz avec digestion de solides et production de méthane dans une cuve de recirculation de percolat

Info

Publication number
EP2162526A1
EP2162526A1 EP07856639.5A EP07856639A EP2162526A1 EP 2162526 A1 EP2162526 A1 EP 2162526A1 EP 07856639 A EP07856639 A EP 07856639A EP 2162526 A1 EP2162526 A1 EP 2162526A1
Authority
EP
European Patent Office
Prior art keywords
percolate
fermenter
biogas plant
biogas
fermentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07856639.5A
Other languages
German (de)
English (en)
Inventor
Michael Feldmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meissner Jan A
Original Assignee
Meissner Jan A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=39154372&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2162526(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Meissner Jan A filed Critical Meissner Jan A
Publication of EP2162526A1 publication Critical patent/EP2162526A1/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M21/00Bioreactors or fermenters specially adapted for specific uses
    • C12M21/16Solid state fermenters, e.g. for koji production
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M21/00Bioreactors or fermenters specially adapted for specific uses
    • C12M21/04Bioreactors or fermenters specially adapted for specific uses for producing gas, e.g. biogas
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M23/00Constructional details, e.g. recesses, hinges
    • C12M23/44Multiple separable units; Modules
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M29/00Means for introduction, extraction or recirculation of materials, e.g. pumps
    • C12M29/02Percolation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E50/00Technologies for the production of fuel of non-fossil origin
    • Y02E50/30Fuel from waste, e.g. synthetic alcohol or diesel

Definitions

  • the present invention relates to a biogas plant, in particular a biomass power plant and a method for biogas production by the Feststoffvergärungs vide.
  • the generic biogas plant is a biogas plant for the production of biogas by the solidification process with a plurality of fermenters of the garage type and at least one percolate circulation tank (PUT), which is connected to at least one associated fermenter for receiving percolate.
  • Percolate is a liquid that exits the digestate during dry fermentation. This percolate is collected at the bottom of a fermenter and passed into the at least one percolate tank. From this at least one Perkolatumlauftank the percolate is then passed back into the fermenter, there to soak the fermentation mass, because without water, the biochemical processes can not occur.
  • This object is achieved in that the at least one PUT is connected to the biogas system and has a volume which is at least 5%, preferably at least 7%, more preferably at least 10% and in particular at least 12% of the volume of that fermenter or that fermenter with which he is connected to receive percolate.
  • the biogas plant of the present invention is thus characterized by a relatively large PUT and further characterized in that the PUT is connected to the biogas system.
  • the PUT - if present at all - designed to be much smaller than in the invention. So far, the only function of the PUT is to collect percolate and provide enough percolate to spray the contents of the fermenter so that the pumps used to pump the percolate will not suck in air. The methane formation occurs almost exclusively in the (garage) fermenters.
  • the PUT is made substantially larger than in the prior art, and it is also connected to the biogas system.
  • the inventor has recognized that with a sufficient size of the PUT a very significant methane yield can be generated in the PUT and therefore the PUT is also connected to the biogas system.
  • the acetogenic and methanogenic bacteria which process the products of the hydrogenated and acidogenic bacteria (essentially various organic acids), preferentially settle, whereby methane is also and especially produced in the PUT.
  • the PUT acts in a sense as a "methane reactor". This local separation of the stages of fermentation is only a tendency, but of course also in the garage fermenter acetogenesis and methanogenesis take place.
  • the acetogenic and methanogenic bacteria find better living conditions in the PUT than in the fermenter.
  • the methanogenic bacteria in the fermenter suffer from "acid spikes", ie a transient, sharp drop in the pH which always occurs when new fresh mass is introduced into the fermenter.
  • the reason for these acid spikes in the Guresasseauffrischung is inter alia in the course taking place AutoHydrolyse, in the acids contained in the plant material or in the residual water of the plants are dissolved in water.
  • the problem here is in particular that the methanogenic bacterial strains usually have the longest reproduction times of all bacteria involved and tend to provide the methanogenic bacteria with long reproduction times higher methane yields than those with short reproduction times. This means that the particularly methane-yielding bacteria in the fermenter would prefer a relatively long fermentation cycle, but this is not optimal for the total yield of the biomass power plant, as explained in more detail below.
  • the methanogenic bacteria can settle and multiply in conditions that are more favorable to them, thus leading to a high methane yield in the PUT.
  • a plurality of PUTs are provided which are interconnected by a percolate line, in particular a percolate ring line.
  • the ratio of fermenters to PUTs is at least 3: 1, and more preferably at least 5: 1.
  • the Perkolatzufladore coming from different fermenters are mixed together before they are introduced into a PUT.
  • the at least one PUT is arranged in a PUT cycle, in which percolate, which runs through a drain from a fermenter, must pass through at least one PUT before it is reintroduced into a fermenter.
  • percolate which runs through a drain from a fermenter
  • the percolate is introduced less acidic in the fermenter or the fermenter.
  • the at least one PUT is preferably heatable in order to be able to produce the optimum conditions for the acetogenic and methanogenic bacteria in the PUT.
  • artificial settlement areas for methanogenic bacteria are installed in the at least one PUT.
  • Such settlement areas may be formed by one or more of the following: racks in which towel, carpet or drapery-type fabrics can be hung, basket-like structures or hollow balls of acid-proof plastic, in particular those filled with smaller objects, lamellar structures made of plastic, heaps of objects with large surfaces, in particular woodchips or straw, and / or nets or other containers with openings filled with woodcarvers.
  • means are preferably provided which prevent floating of these objects, so that the settlement areas for the methanogenic bacteria are always immersed in percolate. Through these settlement areas, an increased population of methanogenic bacteria can be obtained, which significantly increases the biogas yield in the PUT.
  • a channel structure is formed in the at least one PUT such that percolate, which enters the PUT at an entrance, is guided to its exit along a flow path whose length is at least three times, preferably at least six times, the largest dimension of the PUT.
  • the acetogenic and methanogenic bacteria degrade acid so that the pH of the percolate gradually increases.
  • Through the channel structure is achieved that results in a quasi-continuous flow of percolate along the channel, so that set along the channel on average different pH values of the percolate. Specifically, this means that the pH in a channel section near the entrance to the PUT will be lower than in a channel section located near the exit of the PUT.
  • the channel structure in the PUT is designed such that the biogas which is produced in the PUT, is led to its exit into the biogas system in the channel system above the flow path of the percolate.
  • the at least one PUT accesses, in particular gas-tight closable hatches, through which it is accessible to operating personnel.
  • the PUT may have a foil roof.
  • a solid roof for example made of concrete, may be provided.
  • the PUT is then connected to a compensating gas storage for biogas.
  • a device which is suitable for producing an oxygen content of from 0.2% to 2.5%, preferably from 0.5% to 1%, in the gas atmosphere of the PUT.
  • This oxygen content allows sulfur bacteria to settle in the airspace of the PUT that biologically bind the harmful sulfur compounds (eg H 2 S, COS, CS 2 ) produced during anaerobic bacterial digestion.
  • sulfur compounds in particular hydrogen sulfide, in biogas can lead to significant problems in the use of gas. For example, corrosion on the equipment and / or on the motors due to the formation of sulfuric acid or sulfuric acids.
  • Other problems that can arise from such sulfur compounds are the acidification of the engine oil and the inhibition of the fermentation process.
  • biogas is desulphurized before the injection of methane into the natural gas grid. Desulfurization of biogas is therefore extremely advantageous for material technology and microbiological reasons.
  • artificial settlement areas for sulfur bacteria are arranged in the at least one PUT. These settlements should be arranged so that the sulfur bacteria have contact with the medium to be purified, ie the biogas, access to the oxygen in the gas atmosphere of the PUT to oxidize the sulfur, access to water for the microbiological process and access to nutrients for your own growth.
  • the settlement areas for sulfur bacteria are therefore preferably arranged such that they are temporarily wetted by the percolate in the PUT within the expected fluctuation of the level of the percolate in the PUT and are temporarily exposed to the biogas.
  • settlement areas for sulfur bacteria can be located above the percolate level in the PUT and sprayed with percolate.
  • artificial settlement areas for sulfur bacteria can also be installed in the garage fermenters as described above.
  • the biogas produced in the garage fermenter should have access to oxygen in the garage atmosphere of the garage fermenter, access to water and access to nutrients, should the additional settlement areas between the percolation nozzles and the digestate be installed.
  • This can e.g. in such a way that open containers (such as nets) filled with woodchips or other material with large surfaces are hung on the fermenter cover or placed on the fermentation mass in mat form.
  • open containers such as nets
  • the surface of the man-made settlement area is not destroyed every time a fermentation takes place, but is retained for the next fermentation cycle, which means that the population of sulfur bacteria does not have to rebuild itself over and over again Size is present from the beginning. As a result, the desulfurization performance increases again.
  • the biogas plant comprises a press, which is suitable, already angegorene fermented mass, which is retrieved in the course of a Gärmassenauffrischung from the fermenter and used as seed for the fresh mass, squeeze so that the liquid phase passed into at least one PUT and the solid phase can be mixed with the fresh mass.
  • a press which is suitable, already angegorene fermented mass, which is retrieved in the course of a Gärmassenauffrischung from the fermenter and used as seed for the fresh mass, squeeze so that the liquid phase passed into at least one PUT and the solid phase can be mixed with the fresh mass.
  • At least one outlet is provided in the bottom of the PUT, through which percolate can be discharged from the PUT, wherein the diameter of the outlet is so large that dry substance, which has settled as a silt at the bottom of the PUT, during deflation of the Percolate is flushed through the at least one outlet.
  • pipes with nozzle-like outlets can be installed around the bottom in the PUT, which stir up the silt before it is flushed away through the outlets. This reduces the effort involved in manual cleaning of the PUT or can even be completely eliminated.
  • the flow rate of the percolate along the above-mentioned flow path in the PUT is on average less than 4 cm per second, and more preferably less than 2.5 cm per second.
  • a suitable flow rate can be achieved by matching the channel structure to the percolate volume.
  • the particular advantage of the limited flow rate of the percolate is that shear forces in the percolate can be avoided, which could rupture flakes of acetogenic and methanogenic bacteria. Close proximity between the acetogenic bacteria that produce hydrogen and the methanogenic bacteria that consume hydrogen is important to the process so that they can efficiently exchange the hydrogen. Therefore, it is advantageous if the flakes of acetogenic and methanogenic bacteria are retained in the PUT.
  • the percolate persists on average four to twelve hours, preferably an average of five to seven hours in the PUT.
  • This dwelling Times in the PUT are advantageous both with regard to the methane yield in the PUT and with regard to the fermentation process in the fermenter.
  • the digestate in the fermenter is so far enriched with loose material, such as straw, that increases the ability of the digestate, percolate, increased to a capacity of at least 0.75 m 3 percolate per 1 m 2 fermenter base and day.
  • loose material such as straw
  • This temperature range provides for knowledge of the inventor, an ideal compromise between the preferred temperatures of the acetogenic and methanogenic bacteria (between 32 0 C and 42 ° C) and the preferred temperatures of the acidogenic bacteria in the fermenter is (between 25 ° C and 35 ° C), in which the percolate flows back. Overall, the best biogas yields are expected in this temperature range.
  • fermentation liquor replenishment takes place every 28 days in solid fermentation processes in garage fermenters.
  • This is the fermentation cycle time recommended, for example, by "Bio-Ferm", a solid-state fermentation equipment manufacturer, however, the inventor has recognized that plant performance can be significantly increased if the fermentation cycles significantly over the 28-day standard in the prior art
  • the inventor has carried out simulations of the gas yield as a function of the fermentation cycle times and related these to the used digestate, whereby the inventor has recognized that the capacity of the biogas plant can be drastically increased if the digestate per fermenter is changed every six to six months
  • the shortening of the fermentation cycle increases the average volume load of the fermenter of the biogas plant with fresh organic matter (volume load) .
  • the biogas plant ie the one provided by the fermenters
  • Vol the fermentation cycle time at the same power can be about 50% smaller than is the case with conventional biogas plants of the solid-state fermentation type, which drastically reduces the investment costs.
  • the number of fermenters in the biogas plant is between 12 and 24, more preferably between 16 and 20, and there are two daily Gährassenunterfrischitch made in the entire biogas plant.
  • the same day-to-day work for the refreshment of the fermentation gas, which must be carried out by the operating staff of the biogas plant, is carried out on a daily basis, so that the optimum fermentation cycle can also be practically realized.
  • the fresh mass is heated prior to introduction into the fermenter.
  • the fresh mass is subjected to a weakly aerobic prehydrolysis prior to introduction into the fermenter.
  • a weakly aerobic prehydrolysis prior to introduction into the fermenter.
  • the refreshment of the fermentation mass comprises the following steps: removing the fermentation mass from the fermenter, replacing a part of the fermentation mass with fresh mass, and
  • the fresh mass fraction is preferably 22% to 69% of the fermentation mass newly introduced into the fermenter.
  • This particularly advantageous method of restoring the odoriferous substance is suitable in turn, especially in the context of the relatively large PUTs and their function as a methane reactor.
  • the biogas plant comprises a device for the chemical, mechanical and / or thermal digestion of ligninous and / or fibrous renewable raw materials, in particular of straw.
  • straw is generally a residue which, for example, is produced in cereal production anyway and is therefore available in sufficient quantities. While most so-called energy crops grown specifically for power generation compete for limited agricultural land with crops for food and feed production, straw as a fermentation substrate is one of the few exceptions to this competition for available arable land.
  • the lignin which is indigestible for the bacteria involved in fermentation, blocks the bacteria from reaching the cellu- lose and therefore causes the fermentation process and thus the biogas production to progress only very slowly. For this reason, straw currently plays no role as a substrate in biogas production, but rather is considered useless.
  • the device for mechanical digestion comprises a device for cutting, chopping and / or grinding lignin and / or fibrous raw materials, in particular a hammer mill or straw mill.
  • the device for the digestion of lignin- and / or fibrous renewable raw materials, in particular straw comprises a device for saturated steam treatment.
  • a device for saturated steam treatment preferably comprises a pressure vessel and means adapted to generate a water vapor in the pressure vessel, with a pressure which is between 20 and 30 bar, and a temperature which is between 180 ° C and 250 ° C. Saturated steam treatment takes place at the pressures and temperatures described and typically lasts for 5 to 15 minutes. The function of the saturated steam treatment will be described using the example of wheat straw.
  • Wheat straw consists of about 40% cellulose, 23% arabinoxylan (hemicellulose) and 21% lignin, with all three major components forming a densely packed structure.
  • the main obstacle to the biochemical utilization of cellulose and hemicellulose is lignin, which is indigestible to microorganisms and blocks the bacteria from accessing cellulose and hemicellulose.
  • the ligininstructures are softened or melted, but essentially not released from the stalks during the relatively short treatment time. After the saturated steam treatment, the lignin solidifies again.
  • the lignin is thus changed primarily in its microscopic structure, but it is not dissolved out of the straws.
  • the structure of the straws remains as such. This represents a difference to the thermal pressure hydrolysis, which under fundamentally similar conditions, However, it is carried out for longer periods, and in which a real hydrolysis takes place, that is, a dissolution of previously solid or dry substances in water.
  • Thermal pressure hydrolysis dissolves the structure of the straw and results in a syrupy suspension.
  • the device for the digestion of ligninous and / or fibrous renewable raw materials comprises a container for soaking the same before the saturated steam treatment, for example in water.
  • the saturated steam treatment for example in water.
  • grinding can be carried out, for example, in a hammer mill.
  • This form of disruption mechanically destroys the lignin structures.
  • the degree of grinding therefore preferably corresponds to at least one sieve hole size of 8 mm, particularly preferably 1 mm.
  • the proportion of straw that can be ground for mechanical digestion depends on the degree of grinding. With a fine grinding degree, corresponding to a sieve hole size of 1 mm, it does not make sense to grind all the straw, because otherwise a dough-like pulp would form, which sticks to the fermentation mass and prevents percolation.
  • the straw may be cut and / or chopped to a particle length of less than 5 cm, preferably less than 2 cm. For example, this can be done at harvest time, because with modern balers straw bales can be pressed out of stalks, which are only about 4 cm long.
  • the straw can also be digested in a bale shape, which in particular substantially facilitates its transport and handling, as explained in more detail below. Since the structure is preserved, for example, of straw taps under the saturated steam treatment, even straw bales retain their shape under the saturated steam treatment and can be transported easily and efficiently after this.
  • a particular advantage of bales is furthermore that they can be layered at the bottom in a garage fermenter, which can increase the filling level of the fermenter. In principle, the filling level of the fermenter is limited by the fact that, starting at a certain height of the substrate in the fermenter, the pressure at its bottom becomes so high that the substrate becomes too compacted to allow percolate to seep through.
  • straw bale layers which are introduced into a fermenter at the bottom, are far more pressure-stable than conventional fermentation substrates. Even under the load of the overgrown digestate, the straw bale layer is still permeable to percolate, so that the usual filling level in the fermenter can still be filled up on the straw bale layer.
  • the fermenters can therefore be constructed higher than usual by the height of the straw bale position, which reduces proportionate fermenter-specific technology costs (gate, gas technology, sensors, flaps and openings, percolate nozzles, drains, piping, etc.) and the efficiency of the biogas plant as a whole elevated.
  • the straw bales are dissolved after being layered in the fermentor by removing the yarn with which they are held together.
  • the biogas plant comprises a device for dehydrating and pelleting fermentation residues, which is suitable for processing fermentation residues into fuel pellets and / or fuel briquettes.
  • the processing of fermentation residues into fuel pellets is in turn particularly attractive when ligninous and / or fibrous renewable raw materials, in particular straw, are used as the fermentation substrate.
  • the lignin contained in the digestate has the advantage that it melts during pelleting, solidifies again when cooling the pellets and thus leads to relatively solid pellets or briquettes, which are a valuable fuel.
  • the biogas plant and the device for producing fuel pellets can be structurally combined or spatially separated from one another.
  • the biogas plant preferably comprises a device for washing out or eluting the fermentation residues.
  • a device for washing out or eluting the fermentation residues By washing and elution harmful substances such as chlorine, potassium, sulfur and nitrogen from the digestate are washed out. This leads to an improved quality of the fuel pellets or briquettes, so that these, optionally with further conditioning, can obtain regular fuel quality.
  • the device for leaching is formed by a thermophil-operated digestate bunker, which is described in more detail below.
  • the dry matter of the fresh mass is straw, and more preferably at least 75% by weight. It may be pure straw or straw, which is contained in solid manure, whose dry matter is about 75% also made of straw.
  • 30 to 90% by weight of the dry substance of the fresh mass consist of pure straw, 10 to 70% by weight of solid manure, and 0 to 30% by weight of other substrates. This ensures that the fermentation residue pellets consist predominantly of straw, are easy to produce due to the relatively high lignin content and are well suited for firing.
  • the urea in the solid manure already leads to a very significant chemical digestion of the straw when it is mixed with the solid manure.
  • the device for dehydrating and pelleting the digestate preferably comprises a device for mechanically dehydrating it, in particular a screw press or a decanter.
  • a screw press With such a screw press, it is possible to reduce the water content of the fermentation residues to, for example, 45% to 55%.
  • the after treatment with In particular, the remaining water content of the screw press is low enough that it can be dried to a sufficient degree of dryness using pelletizing using the waste heat of the existing gas engines.
  • Another advantage of the mechanical dehydration is that the water is dissolved out of the digestate with dissolved therein for combustion harmful substances such as chlorine, nitrogen, sulfur, potassium chloride and / or silicates. If the fermentation residues were only dehydrated by thermal drying, a much greater proportion of these harmful substances would remain in the fermentation residues.
  • the means for dehydrating and pelletizing further comprises a drying device, which is preferably a convective belt dryer.
  • the drying device is preferably operated with waste heat from at least one gas engine of the biogas plant.
  • the belt dryer is a low temperature belt dryer whose temperature does not exceed 180 ° C, preferably 140 ° C. Due to the low temperature, no dioxins and furans are produced during drying. With such a belt dryer, the water content of the digestate can be reduced to, for example, 7 to 13%.
  • the drying device can be formed by a drum dryer with contact drying, which can also operate at temperatures not exceeding 180 ° C, preferably 140 ° C.
  • the device for dehydrating and pelleting preferably comprises a device for comminuting the at least mechanically pressed and optionally already dried fermentation residues.
  • this device is formed by a hammer mill or a straw mill.
  • the dehydrating and pelletizing device further comprises a conditioning device suitable for adding one or more of the following to the shredded and at least partially dehydrated and / or dried fermentation residues: cereal flour, molasses, starch, quicklime, steam, wood chips and / or sawdust.
  • cereal flour, molasses, starch, quicklime, steam, wood chips and / or sawdust The addition of cereal flour and / or molasses and / or starch increases the strength of the fermentation residue pellets. By steaming the mass to be pelleted, it becomes supple and can be pelleted better. An addition of quicklime improves the ash softening behavior of the pellets when they are burned.
  • the burning properties of the pellets are further improved, in particular especially with regard to burning behavior, ash formation and emissions, so that the pellets can even be used in domestic pellet heating systems.
  • a nitrogen-binding agent in particular a nitrogen reducing reducing agent, hydrated lime, oil press cake, such as those resulting from the production of rapeseed or pumpkin seed oil, calcium, magnesium and / or aluminum are added.
  • the oil press cakes increase the calorific value of the pellets, calcium, magnesium and aluminum can improve the burning behavior.
  • the device for dehydrating and pelleting preferably comprises a pelleting press which is suitable for pressing the comminuted and dehydrated fermentation mass into pellets or briquettes.
  • At least some of the said components of the dehydrating and pelleting device are connected by mechanical and / or pneumatic conveying systems.
  • An important development of the invention consists in the way in which the additional process step of digestion of ligninous and / or fibrous renewable raw materials and / or the dehydration and pelleting of digestate residues are integrated into the operation of the biogas plant.
  • the device for pelleting and the device for digesting straw are economically worthwhile, especially if the throughput of the plant or the biomass power plant is high.
  • biomass power plants for solid fermentation are usually very small as agricultural plants. They have two to six smaller fermenters and achieve an effective electrical output of only 100 to 700 kW.
  • the supply of fermentation substrate can be ensured for much larger systems, since, for example, straw accumulates in far greater quantities crops , as it is currently needed, and as it can be transported relatively economically with appropriate (large) technology even over longer distances.
  • the greater the throughput of the biogas plant the more worth the investment and operating costs for a device for dehydrating and pelleting of digestate and for means for breaking up the straw.
  • a further object is to integrate the fermentation residue pelleting described above and / or the above-described digestion of lignin-containing and / or fibrous renewable raw materials into the operating sequence of the biogas plant.
  • the device for chemical, mechanical and / or thermal digestion of lignin- and / or fibrous renewable raw materials is housed in a delivery and loading area of the biogas plant.
  • the delivery and loading area preferably comprises stationary conveyor technology, which is suitable for demanding fresh material from the delivery and loading area to a fermenter forecourt, from which a plurality of fermenters of the garage type is accessible. While in conventional biogas plants with garage fermenters, the fresh mass and the digestate are transported completely with a wheel loader, according to this further development stationary provided by the technology, through which even large quantities of fresh mass can be efficiently transported to Fermenter forecourt to be introduced from there into the fermenter.
  • Such a stationary conveyor technology also allows the entire biogas plant to be built in, thereby avoiding an unpleasant odor in the environment and making it possible to build and operate the biogas plant also in the vicinity of residential areas and in industrial areas.
  • the delivery and loading area is effectively an interface between the enclosed interior of the plant and the outside area, and is thus arranged in an outer section of the plant.
  • the fermenter forecourt is centrally located in the plant for logistical reasons. Due to the stationary conveyor technology, the fresh mass or the fermentation substrate can be brought from the delivery and loading area to the fermenter forecourt, without the need for transport vehicles that would generate exhaust gas within the housing area and would also increase the operating costs. Preferably, there is a slight underpressure in the delivery and loading area, so that even when delivering fresh mass and loading of digestate, only little air escapes to the outside, and thus the odor nuisance is minimal.
  • first conveying means are preferably provided, which are suitable for conveying fresh material from the at least one delivery bunker for fresh mass to a fresh-material bunker.
  • These first conveying means may comprise, for example, screw conveyors, elevators and conveyor belts, on which the fresh mass from different delivery bunkers are conveyed to the fresh-material bunker.
  • the delivery and loading area preferably comprises second conveying means, in particular a thrust shield, which are suitable, the fresh mass through the Frischmasse bunker through in the direction of the fermenter forecourt.
  • the fresh-material bunker has a dual function: on the one hand it serves as a transport route from the delivery area to the fermenter forecourt, on the other hand it serves as a buffer for fresh mass. It is important that the fresh mass, which was first introduced into the fresh bunker, leaves this first. This means that the fresh mass that is delivered to the fermenter forecourt is always about the same age and pre-hydrolyzed. This results in a substrate consistency, which is advantageous for the subsequent fermentation.
  • the delivery and loading area comprises in an advantageous development of a discharge point for straw, and in particular straw in bale shape.
  • a crane is preferably provided which is suitable for efficiently gripping and transporting bale material.
  • a device for chemical, mechanical and / or thermal digestion of straw is provided, which is of one of the types described above.
  • the means for digestion as described above may be formed so that the bale shape is maintained so that the pulp pretreated by digestion can be transported in bale form from the delivery and loading area to the fermenter forecourt, which greatly facilitates transport and introduction into the fermenters efficient.
  • third conveying means in particular roller conveyors or push conveyors, are provided, which are suitable for conveying individual bales or packages of bales along a bale duct to the fermenter forecourt.
  • bale material is very efficiently transported from the periphery to the fermentor forecourt by the third conveyor and bale channel, allowing high throughput with very low operating costs.
  • a converter is arranged at the fermenter front near the end of the bale channel, which is suitable to remove packages of bales from the bale channel and handed over to a wheel loader or forklift as a package.
  • suitable packages of bales for example packages of eight bales, have already been handed over to the wheel loader or forklift truck, which can then be unloaded as they are in the fermenter.
  • the delivery bunker, the fresh bunker and / or the bale duct are heatable, and advantageously by means of waste heat, which is generated by one or more gas engines.
  • waste heat which is generated by one or more gas engines.
  • the fresh mass temperature losses are compensated, which arise during the Gärmassenauffrischung the waste material. This will accelerate the reintroduction of biogas production after the refreshment of the digestate.
  • this makes the above-described weakly aerobic prehydrolysis possible, which shortens the time until complete fermentation of the fermentation mass and increases the plant output (the substrate throughput) and thus the economic efficiency.
  • a digestate bunker which is accessible from the fermenter forecourt for introducing fermentation residues.
  • the digestate bunker preferably contains stationary conveying means which are suitable for transporting fermentation residues through the digestate bunker.
  • stationary conveying means are formed by screw conveyors, which are arranged at the ends of the digestate bunker.
  • the digestate bunker is preferably sized to handle the expected amount of digestate of at least two days.
  • the digestate bunker has a fourfold function. First, it serves as a buffer for fermentation residues, and second, it provides the fermentation residue transport device from the central fermentor forecourt to the periphery.
  • the sufficient size of the digestate bunker ensures that the fermentation residues can be stored for at least two days, so that they do not have to be removed on weekends.
  • post-fermentation takes place in the digestate bunker and therefore it is connected to the biogas system. Thus, from the digestate further biogas is obtained, which would be lost in a simpler design.
  • the digestate bunker forms a device for washing out the digestate.
  • a Schütttrog for fermentation residues is preferably arranged.
  • the digestate can thus be poured directly from the fermenter forecourt into the Schütttrog; they then automatically flow to the periphery by removal at the other end, where they are dehydrated and processed into pellets.
  • the straw is already mixed with other fresh material, preferably with solid manure, days before it is introduced into the fermenter.
  • the urea present in the solid manure can in turn dissolve the lignin and make the cellulose and arabinoxylan accessible for hydrolysis. It is important that additionally or separately provided straw is chemically digested by the urea contained in the solid manure.
  • the mixing of the loose straw with the solid manure would typically take place with a greater time interval before the introduction into the fermenter, preferably a few days.
  • layers of solid manure and layers of straw can be set up alternately in the fermenter without a time advance, it also being possible for layers of other, not highly lignified, raw materials to be present therebetween.
  • the urea of the upper solid manure layer with the percolate can penetrate into the layer containing the lignin-containing straw and at least partially dissolve the two-dimensional lignin structures.
  • the acid percolate ensures that the planar lignin structures at least partially dissolve and the material biogas supplies, although not with the yield that can be achieved by the other methods described above for the digestion, in particular the saturated steam treatment and / or grinding ,
  • the inoculation material which comes together with the fresh mass back into the fermenter, by mixing by means of a mechanical press, such as a screw press, Maschinenwalst and squeezed, whereby the material is at least partially mechanically digested and also possibly integrated nutrients for the anaerobic , Bacterial fermentation be made available.
  • the screw press can be designed to be mobile, for example, be arranged on a low-loader, so that it can be driven on the fermenter forecourt to the relevant fermenter.
  • a concentration of pollutants in the percolate is prevented by a part of the circulating percolate is discharged from the percolate cycle. This is preferably done regularly.
  • the discharge of a portion of the percolate preferably takes place via the percolate ring line, the part of the percolate being discharged into the fermentation residue bunker and / or into a tank from which the percolate is subsequently disposed of.
  • Fig. 1 is an elevational view of a biomass power plant according to a development of the invention of
  • FIG. 3 is an elevational view of the biomass power plant of FIG. 1 viewed from the south;
  • FIG. 4 is an elevational view of the biomass power plant of FIG. 1 viewed from the east;
  • FIG. 5 is a cross-sectional view Fig. 6 is a plan view of the ground floor of the biomass power plant of Fig. 1,
  • Fig. 7 is an enlarged detail of the plan view of Fig. 6, a power and
  • Fig. 8 shows an enlarged detail of the plan view of Fig. 6, the one
  • FIG. 9 is a plan view of the upper floor of the biomass power plant of FIG. 1;
  • FIG. 10 is a cross-section through a garage fermenter of the biomass power plant of FIGS. 1 to 9;
  • FIG. 11 is a schematic representation of a channel structure formed within a PUT.
  • 12 is a schematic perspective view of a PUT with packing for the settlement of methanogenic and acetogenic bacteria
  • 13 shows a schematic cross-sectional representation of a PUT with settlement structures for methanogenic and acetogenic bacteria and with settling structures for sulfur bacteria
  • FIG. 14 shows a further schematic cross-sectional view of a PUT with settlement structures for methanogenic and acetogenic bacteria and with settling structures for sulfur bacteria
  • Fig. 16 is a schematic representation of the fermenter forecourt and the fermenter of
  • 17 is a block diagram of essential components of a device for dehydrating and pelleting digestate.
  • a biomass power plant (BMKW) 10 as an embodiment of a biogas plant according to a development of the invention will be described in detail.
  • 1 to 4 show four exterior views of the BMKW 10 and Fig. 5 is a cross section of the same.
  • Fig. 6 the floor plan of the ground floor of the BMKW 10 is shown.
  • Fig. 7 shows an enlarged partial area of the plan of Fig. 10, in which a power and heat generating plant of the BMKW is shown.
  • Fig. 8 shows another partial section of the plan of Fig. 6, in which a delivery and loading area is shown enlarged.
  • 9 shows a plan view of the upper floor of the BMKW 10.
  • the BMKW 10 is divided into a base section 12 and an expansion section 14.
  • the base section 12 comprises 18 garage-type fermenters arranged in two rows, in a view of Fig. 5 in a northern and a southern row. Between the two rows of fermenters 16 is a Fermentervorplatz 18, to which the gates 20 of the fermenter 16 open. It should be noted that for the sake of clarity, not all fermenter 16 and fermenter ports 20 are provided with reference numerals in the figures.
  • the base portion 12 comprises a power and heat generating system 22, which is shown enlarged in Fig. 7 and described in more detail below. It also includes the base section 12 a delivery and loading area 24, which is shown enlarged in Fig. 8 and also described in more detail below.
  • the entire base section 12 is enclosed by a hall structure to which, in particular, a fermenter forecourt (FVP) -Hallenabites 26 and a delivery and Verlade Schllade Suiteshallenabites 28 belongs, as in particular in Fig. 1, 4 and 5 is clearly visible.
  • the entire hall construction or enclosure of the base section 12 is vented through a large central ventilation system, so that there is always a slight negative pressure relative to the atmospheric pressure inside the hall construction.
  • the expansion section 14 essentially consists of 11 additional fermenters 16 'and an extension of the FVP hall section 26.
  • the expansion section 14 serves to provide, if necessary, up to 11 additional fermenters 16'.
  • the BMKW 10 has a modular design that is advantageous for achieving an optimal end configuration because the exact biogas yield depends on a variety of factors, including the nature and availability of the fresh mass, and is not theoretically accurately predictable.
  • the northern and southern fermenter rows are connected by a technology bridge 30, which can be seen in particular in FIGS. 5, 6 and 9.
  • the engineering bridge 30 straddles the FVP 18 at a height that allows wheel loaders, two of which are exemplarily shown in FIG. 5, to pass beneath it even with the bucket fully extended without it being able to contact and damage the engineering bridge.
  • the upper floor of the BMKW 10 comprises three film gas storages 32 in the base section 12 and two further film gas storages 32 'in the dismounting section 14.
  • the film gas storages 32 are good in the cross-sectional views of FIGS. 5 and 15 to recognize. They take on the manner described in more detail below the biogas, which is generated in the fermenters 16 and 16 '.
  • the upper floor comprises five percolate circulation tanks (PUT) 34 in the base section 12 and four PUTs 34 'in the expansion section 14, which are also clearly visible in the cross-sectional views of FIG.
  • PUT 34 is located above each of three fermenters 16 and receives percolate from them, which is collected at the bottom of the fermenters and pumped into the PUT 34.
  • percolate refers to the liquid, manure-like component of the fermentation substance.
  • a southern engineering room 36 and a northern engineering room 38 which are interconnected by the technology bridge 30.
  • the FVP hall section 26 and in the delivery and loading area Hall section 28 further light bands 40 are arranged.
  • the Fermentervorplatz (FVP) 18 is located in the center of the BMKW 10. It serves as a transport route for fresh mass to the respective fermenters 16, 16 'or of digestate substance from the fermenters 16, 16'. It also serves as a mixing surface on which the content of a fermenter is spread, from which about one-fifth to one-third is taken as digestate and compensated for this withdrawal and resulting from the gasification loss of mass about one-third supplemented by fresh mass and the old fermented mass is mixed.
  • This work can be performed on the FVP 18 by a large wheel loader, as shown schematically in FIG.
  • the gutter has a collecting shaft (not shown) from which the resulting liquids via a percolate loop (not shown) to one of the PUTs 34 are required.
  • the delivery and loading area 24 is shown in Fig. 8 enlarged in plan.
  • four delivery bunkers 42 are provided in the embodiment shown, which are housed by the delivery and loading area Hall section 28.
  • a truck can maneuver backwards into the hauled-in delivery bunker and tip or dump the fresh bulk cargo into the delivery bunker 42 there. Since there is a slight underpressure throughout the delivery and loading area 24, hardly any unpleasant odors leave the enclosure to the outside.
  • Each delivery bunker 42 has a downwardly tapered bottom, at the lowest point of which one or more twin flights (not shown) are provided, which requests the fresh meal horizontally to a bucket elevator (not shown) which carries the virgin mass onto a conveyor 44 , or directly to a lower conveyor belt.
  • the fresh mass is dropped into a Frischmassebunker 46. Since the fresh mass is conveyed from four or more different bunkers on the same conveyor belt 44 and thrown onto the same heap in the fresh mass bunker 46, the fresh mass is automatically mixed.
  • the Frischmassebunker 46 is an elongated chamber that connects the delivery and loading area 24 with the Fermentervorplatz 18, as can be seen in particular in Fig. 6.
  • the Frischmassebunker 46 has a floor and / or wall heating, with the fresh mass is already heated to a temperature of 42 0 C, so that the digestate within a fermenter 16, 16 ', which is supplemented by the fresh mass, is not cooled by this so that the fermentation process after closing the fermenter 16 starts again quickly and possibly even a weakly aerobic prehydrolysis can take place, which shortens the fermentation time and increases the system performance (throughput of fermentation substrate) and the efficiency of the system.
  • the fresh mass bunker 46 has a triple function. First, it serves as an intermediate or buffer for loose fresh mass.
  • the delivery and loading area 24 comprises a section for the delivery and transport of structural or bale material, in particular for straw.
  • This section for delivering and transporting bale material comprises a preparation space 48, a bale delivery space 50, a digestion area 52 and an intermediate storage 54.
  • this area of the delivery and loading area 24 will be described with reference to straw as a highly lignified, bale-shaped structural material. but it is understood that this section can also be used for delivery, processing and onward transport of other bale-shaped structural material.
  • a crane (not shown) is mounted on rails so that it can pick up and drop straw bales in each of the spaces 48-54.
  • the straw bales are delivered to the straw delivery room 50 and efficiently transported by the crane (not shown) to the intermediate storage 54.
  • the digestion region 52 Before the straw is conveyed to the fermenter forecourt 18, it is pretreated in the digestion region 52, namely digested.
  • the digestion of the straw is necessary because the straw is highly lignified, and the bacteria in the fermenter 16 due to the lignin-crusted cellulose very poorly get to the lignin trapped nutrients.
  • the straw can be digested in different ways in the digestion region 52.
  • the straw can be be mixed by being soaked in a container containing water, a water-alkali solution or a water-acid solution.
  • the soaking causes the lignin, which has largely enclosed the cellulose, to be partially dissolved.
  • the cellulose is no longer hidden behind a lignin crust, but accessible to the hydrolysis and the bacteria.
  • the straw which is used in conventional dry fermentation plants at most as a structural material, to a valuable fermentation substrate, which contributes significantly to the biogas development.
  • the straw in the digestion region 52 may be otherwise disrupted, for example, mechanically using a hammer mill or straw mill, or by being subjected to thermal pressure, i. heated to 180 ° C to 250 ° C for five to ten minutes at high pressure, for example, 20 to 30 bar.
  • thermal pressure i. heated to 180 ° C to 250 ° C for five to ten minutes at high pressure, for example, 20 to 30 bar.
  • the lignin solidifies again, but in the form of very small globules with gaps between them, which open the way for the autohydrolytic, organic acids and for the anaerobic bacteria to the nutrients of the straw.
  • Another embodiment is an extension of the thermal printing treatment in which the pressure in the corresponding container is suddenly reduced, whereby the water evaporates in the straw structures and expands very rapidly.
  • the lignin structures are torn and the nutrients for the anaerobic bacteria are exposed.
  • a roller conveyor 56 onto which individual bales of straw and / or straw bales are laid by the crane (not shown) and which conveys the straw bales to the fermentor forecourt 18 through a straw channel 58 arranged parallel to the fresh meal hopper 46 (see FIG Fig. 6).
  • both the loose fresh mass and the fresh bale mass are transported by stationary conveyor technology from the delivery and loading area 24 to the fermenter forecourt 18.
  • stationary conveyor technology makes the Frischmassebunker 46 and the straw channel 58, the connection between the central Fermentervorplatz 18 and the peripheral delivery and loading area 24 ready, and this transport is done completely in the housed BMKW 10.
  • the transport with the stationary conveyor technology is suitable for high throughputs and in particular faster, space-saving and cost-effective less expensive than a delivery with wheel loaders.
  • the straw channel 58 and the fresh-material bunker 46 terminate at a central location of the fermenter forerunner 18, so that the paths between the fermenter-front-side end of the fresh-material bunker 46 or straw channel 58 and the fermenter 16 to be supplied in FIG general are short.
  • the digestion of the straw in the digestion region 52 makes it possible to use straw as a fermentation substrate despite its high lignin content. This is extremely advantageous because straw in crop production anyway incurred, and not enough use for this exists.
  • the BMKW 10 is designed for renewable raw materials, it makes sense to grow in the vicinity of the BMKW 10 specifically for use in the BMKW 10 suitable raw materials, which, however, are generally not intended for nutrition or as feed. However, this poses a certain conflict of objectives because a certain proportion of the limited land available is always reserved for food production.
  • the use of straw as a fermentation substrate is a very attractive solution, since straw, which is produced as residue during grain production, allows the simultaneous production of food and biomass suitable for use with power plants. In addition, it is possible to produce valuable fuel pellets from straw-containing fermentation residues, as explained in more detail below.
  • straw has another advantage.
  • the filling level in fermenters is limited by the pressure at the bottom of the fermenter: this pressure must always be low enough for the fermentation substrate to still be permeable to percolate.
  • the entire usual filling level can be layered on this layer of fermentation substance, since the straw bale layer even at the pressure then permeable to Percolate is.
  • This lowermost straw layer thus represents an additional amount of fermentation substrate that can be used in a fermenter, so that the system performance (room capacity measured in new substrate per fermenter and day) is significantly increased.
  • the straw bales are placed in packages of eight straw bales on the roller conveyor 56, which are two bales wide and four bales high. These packages are transported as a whole through the straw channel 58 and at the End of Fermentervo ⁇ latz 18 by a converter (not shown) lifted and handed over to a wheel loader or forklift, which also receives the packages as a whole or in 2 parts and brings to the fermenter. From these packages can be relatively easily and quickly built said bottom straw bale layer.
  • a digestate bunker 60 is provided which extends parallel to the fresh meal bunker between the fermentor forecourt 18 and the delivery and loading area 24.
  • the digestate bunker 60 has at its Fermentervorplatz the end facing a Schütttrog 62 for digestate, which forms the entrance into the Gärrestebunker 60.
  • this Schütttrog 62 fermentation residues are tilted by a wheel loader. From there they are pressed by means of a screw conveyor into the digestate bunker 60. Due to the discontinuous reprints of more and more fermentation residues, the mass is slowly transported through the digestate bin 60 to the other end, where they are transported by further screw conveyors from the digestate bunker 60.
  • the digestate bunker 60 has a fourfold function. On the one hand, it serves as a transport path between the fermenter forecourt 18 in the center of the BMKW 10 and the delivery and loading area, with similar advantages, as they have been described with respect to the Frischmassebunker 46 and the straw channel 58. On the other hand, the digestate bunker 60 also serves as a thermophilically operated secondary fermenter and acts more or less like another fermenter. Therefore, the digestate bunker 60 is also connected to the biogas system. Third, the digestate bunker 60 serves as a buffer for fermentation residues. It is dimensioned so that it holds at least as many fermentation residues as can be produced on two days. As a fourth function, the digestate bunker forms a device for washing out the digestate. Due to the high water content in the digestate bunker harmful substances such as chlorine, nitrogen, sulfur, potassium chloride and silicates are washed out of the fermentation residues, which increases the quality of the fermentation residue pellets as fuel.
  • the digestate bin is followed by a conveyor belt 66, with which fermentation residues are first conveyed to a screw press 70 and then to a dehydrating and pelletizing device 64, which will be described separately below.
  • a screw press 70 With the screw press 70, a significant portion of the water is squeezed out of the digestate. Together with the water, a significant part of the above-mentioned substances harmful to combustion are removed from the fermentation squeezed out. This represents a significant advantage over a process in which the fermentation residues would only be thermally dried, because in that case substantially more of the harmful substances would remain in the fermentation residues.
  • the squeezed liquid phase is returned as process water in the fermentation residue bunker 60.
  • a fermenter 16 is shown in cross section.
  • the fermenter 16 is a conventional garage fermenter except that its ceiling height is higher than usual to accommodate the additional bale of straw on the ground.
  • the fermenter 16 is separated by a gate 20 from the fermenter forecourt 18.
  • the fermentation mass in fermenter 16 is designated by reference numeral 72.
  • the fermenter 16 has percolate downcomers 74 on the bottom and a manifold 76 in which the percolate from all the gutters 74 is collected.
  • the collecting channel 76 opens into a siphon shaft 78, from which the collected percolate is lifted by means of a lifting pump 80 and pumped into the percolate circulation tank 34.
  • a percolate pump 82 pumps the percolate from the percolate flow tank 34 into percolate nozzles 84 located in the area of the ceiling of the fermenter 16 to wet the digestate 72 from above.
  • a special feature of the illustrated embodiment of the invention is that the percolate circulation tank 34 is formed relatively large.
  • the Perkolatumlauftank 34 has a size of 450 m 3 and is intended to supply three fermenters 16. Each fermenter has a floor area of 245 m 2 , and with a filling height of 4.25 m, a volume of 1041 m 3 . This means that the ratio of PUT volume to fermentation volume is 14.4%.
  • Such a large percolate circulation tank acts as a kind of methane reactor in which methane is produced in large quantities. Therefore, the percolate circulation tank 34 is also connected to the biogas system. This will be explained in more detail below.
  • a level sensor prevents underflow or overflow of predetermined percolate levels.
  • the digestate of the fermenter which is the next one intended for a refreshment of the fermentation liquor, can be sprayed with the surplus immediately before emptying. Due to the partial disposal of the fermenter content, excess percolate can thus be removed.
  • all Perkolatumlauftanks 34 via a loop (not shown) connected to each other, so that excess percolate can be passed from one percolate circulation tank in another.
  • the spraying of the fermenter is automatically adjusted and this is displayed in the control room.
  • the fermenter 16 is coupled to the strong central venting system.
  • the central deaeration system can suck room air into the fermenter from the fermenter forecourt and discharge it into the central deaeration system at the end of the fermenter. This protects the wheel loader driver when refreshing the digestate 72 in the fermenter 16 from breathing in biogas or exhaust gas from the wheel loader.
  • the fermenter via the exhaust gas cooling space 31 is indirectly connected to the exhaust system of the gas engines (not shown). Before a fermenter is opened, the biogas contained therein can be displaced by exhaust gas and thus pressed into the gas reservoir 32. As a result, the biogas is not lost in the subsequent opening of the fermenter 16 by the otherwise required direct or indirect (via biofilter) discharge into the ambient air.
  • engine exhaust may in turn be introduced to displace the oxygen-rich atmosphere in the fermenter 16 so that the anaerobic digestion process starts faster, increasing plant performance.
  • the four stages of fermentation, hydrolysis, acidogenesis, acetogenesis and methanogenesis all take place in the fermenter.
  • the hydrolytic and acidogenic bacteria prefer an acidic range with a pH of 5.7 to 6.3.
  • the optimum pH of the methanogenic bacteria is between 6.7 and 7.5. If the pH falls well below this range, the methanogenic bacteria are inhibited and methane production drops drastically.
  • a particular problem is that the acidity temporarily drops significantly after a fermentation mixture, which is caused in particular by the auto-hydrolysis that always occurs in fresh material. Shortly after a booster freshening, the living conditions for the methanogenic bacteria are therefore particularly bad.
  • the methanogenic bacteria live well, reproduce well and can produce a lot of methane.
  • the methane production is at least partially shifted from the garage fermenter into the PUT, ie that a considerable proportion of methane gas is produced by the acedogenic and methanogenic bacteria in the PUT.
  • the structure is designed so that the products of the acid-fast fermentative (hydrolytic) and acidogenic bacteria are washed out by the percolate and passed into the PUT.
  • the acetogenic and methanogenic bacteria can convert these products to methane gas.
  • the acidity of the percolate decreases so that it is introduced into the fermenter after passing through the PUT at an elevated pH.
  • the hydrolytic and acidogenic bacteria in the fermenter and the acetogenic and methanogenic bacteria in the PUT each find their preferred living conditions, and hyperacidity of the fermenter is effectively avoided.
  • the acid-susceptible methanogenic bacteria can propagate undisturbed in the PUT and produce methane, unlike in the fermenter, where they are exposed to an acid spike at each boil-up refreshment. In particular, this allows a high methane yield even with relatively short fermentation cycles of about nine days.
  • methanogenesis still takes place, but to a lesser extent than without separation into fermenter and PUT.
  • the garage fermenter tends to become a hydrolysis vessel and the PUT a methane reactor, although of course also in the garage fermenter and in the percolate, which is sprayed into the garage fermenter, methanogenic bacteria are present and therefore also in the garage fermenter considerable amount of methane gas is produced.
  • Fig. 11 is a schematic sectional plan view of a PUT 34 is shown according to a development of the invention.
  • the PUT 34 comprises a mixing chamber 98 in which the percolate, which originates from six associated fermenters (F 1 to F 6 in FIG. 11), is combined and thereby mixed.
  • This has the consequence that the acidity of the individual percolate contributions compensates. For example, if the percolate from one of the six fermenters is particularly acidic just because a fermentation liquor has just taken place, this acidic peak will be substantially lessened by the less acidic percolate from the other five fermentors.
  • the fermenter 34 comprises a plurality of partitions 100, which form a channel structure through which the percolate is guided, as indicated in Fig. 11 by the arrows.
  • the channel structure is chosen so that the flow rate within the channel structure is less than 4 cm per second, preferably less than 2.5 cm per second. While the percolate flows through the channel structure, the products of the hydrolytic and acicogenous bacteria are degraded by the methanogenic and acetogenic bacteria, whereby the acidity of the percolate gradually decreases. This means that the acidity of the percolate immediately after entry into the PUT 34 is still relatively high and gradually decreases along the channel structure.
  • acetogenic and methanogenic bacterial strains involved in fermentation those that tolerate lower pH will preferentially settle near the entrance of the PUT 34, and those that are less acid resistant will tend to be in the range of the exit 102. Overall, the individual bacterial strains thus each settle where the living conditions are most favorable for them, whereby the overall methanogenesis is increased. While the acetogenic bacteria produce hydrogen, the methanogenic bacteria consume hydrogen. The most efficient way to exchange hydrogen is between acetogenic and methanogenic bacteria when they are in intimate cell contact. For this purpose, the bacteria involved form a flake structure in the PUT. So that these flakes are not destroyed by the shear forces in the percolate flow, the flow rate is kept below 4 cm per second, preferably below 2 cm per second, by a suitable choice of the channel structure.
  • FIG. 12 schematically shows a PUT 34 according to an embodiment of the invention, in which nets 104 filled with woodchips are provided as artificial settlement structures.
  • the channel structure has been omitted. It should be understood, however, that the channel structure and artificial settlement surfaces 104 are preferably combined.
  • the woodchips in the nets 104 provide a very large settlement surface for the acetogenic and methanogenic bacteria.
  • FIG. 13 shows a cross section through another PUT 34 or a channel section thereof according to a development of the invention.
  • notches 106 are formed in the PUT channel walls, into which rods or battens 108 mounted transversely to the passageway are inserted.
  • These rods or battens 108 are made of a corrosion-resistant material, such as wood.
  • These bars or battens 108 possibly in combination with underneath longitudinally extending slats or slats (not shown), serve to hold down the wood chip-filled nets 104 or other settlement bodies so that they do not float above the percolate level.
  • the atmosphere in the PUT contains 0.5 to 1% oxygen (corresponding to 2.5% to 5.5% air).
  • an inlet 112 is provided with a controllable valve 114 through which the appropriate amount of air is introduced into the PUT. Since the acetogenic and methanogenic bacteria in the percolate settle below the percolate level, the oxygen-containing atmosphere does not harm them.
  • the sulfur bacteria firstly need contact with the biogas they are supposed to clean, secondly, the already mentioned oxygen for the oxidation of sulfur, thirdly water for the microbiological process and, fourthly, nutrients for their own growth. Water and nutrients are contained in percolate.
  • the packing 110 intended for the settlement of sulfur bacteria is placed on the bars or battens 108. The level is chosen such that the fillers 110 are wetted by the percolate at a high percolate level, and are exposed to the biogas at a low percolation level. These fluctuations in the percolate level are correlated with the fermentation liquor, in which large quantities of percolate are squeezed out of the fermentation mass, which leads to an increase in the level in the PUT.
  • FIG. 13 an outlet 116 for biogas is shown in FIG. 13, which is generated in the PUT 34 and is supplied to the associated gas storage or to the gas engines.
  • a device 118 for spraying the filler body 110 with percolate is installed.
  • the device 118 includes a conduit 120 and a pump 122 through which percolate can be withdrawn from a lower portion of the PUT 34 of FIG. 14 and sprayed onto the settlement surfaces 110 through nozzles 124 on the ceiling of the PUT 34.
  • the packing 110 forming settlement areas for sulfur bacteria can be supplied with sufficient percolate, ie, water and nutrients, and moreover are exposed to the biogas atmosphere having the above-mentioned low oxygen content.
  • Fig. 15 is a schematic diagram in which six fermenters 16 and a PUT 34 are not shown to scale.
  • the percolate outlets of the fermenters 16 are connected to a percolate manifold 126.
  • the percolate passed through this percolate manifold 126 is directed to a sump 128 which functionally corresponds to the mixing chamber 98 of FIG.
  • this collecting container 128, the percolate from the six fermenters 16 shown is mixed, with acid peaks are leveled from individual fermenters.
  • the percolate is then introduced from the collection container 128 into the PUT 34, in which, for the sake of clarity, the channel structure and the packing are not shown as artificial settlement areas for bacteria.
  • the output 102 of the PUT 34 is connected to another line 130, which in turn has a branch 132 for each of the six fermenters 16. These branches 132 serve to spray percolate from the PUT 34 into the fermenters 16 through nozzles 84 (see FIG. 10) on the fermenter cover.
  • a percolate cycle is created from the six fermenters 16 via the collection container 128 into the PUT 34, and from the PUT 34 via the conduit 130 and the branches 132 again into the fermenters 26.
  • this design results in reducing the acid load contained in the percolate between leaving the fermenters 16 and re-entering the fermenters 16. This is done by forming a population of methanogenic bacteria in the PUT that produces high methane yields. Along with the population of methanogenic bacteria, acid digestion capacity increases so that higher acid peaks in fermenters 16 can be more often "digested".
  • all six fermenters 16 are connected to a biogas manifold 134, through which biogas is passed from the fermenters 16 to the gas reservoir or gas engine.
  • the PUT 34 also has an outlet 136 for biogas connected to the biogas manifold 134. Further, the PUT 34 is connected to a balance gas storage 138.
  • the PUT 34 includes a drain 140 through which percolate can be drained from the PUT 34 and discarded.
  • the percolate does not become infinitely old in the cycle shown.
  • the ability to dispose of percolate from the circulation is important so that it does not lead to undesirable concentrations of inhibitors in the percolating percolate.
  • the drain 140 is chosen to be so large that the pull created during its opening is sufficient to wash away deposits on the bottom of the PUT 34 so that it does not need to be cleaned or only rarely.
  • the PUT 34 shown in Fig. 15 is also connected via a loop 141 to other PUTs of the biogas plant 10, which in turn are connected to another group of fermentors in a similar manner, as shown in Fig. 15.
  • a balance in the percolate amount can be created between the individual PUTs 34.
  • other PUTs may temporarily replace one of the PUTs, for example, if it can not be operated for maintenance. The fermentation and Power generation operation can then be maintained undisturbed, so there is no production losses for gas and electricity.
  • the biogas plant described here is particularly suitable for the fermentation of solid manure and straw.
  • the ability of the digestate to accept percolate exceeds a capacity of 0.75 m percolate per 1 m fermenter base area and day.
  • a capacity of 0.75 m percolate per 1 m fermenter base area and day In fact, around 1 m 3 of percolate per square meter of fermenter base area and day can be absorbed. With a fermenter base area of 245 m 2 , this means that around 250 m 3 are sprayed into a fermenter per day.
  • the percolate remains in the PUT for about five hours, so the percolate is handled about five times a day.
  • the PUT 34 should thus have a liquid volume of 50 to 60 m 3 ready. Since a PUT 34 supplies six fermenters 16, the PUT 34 should have 360 m 3 available solely for taking up the percolate. However, this volume is still the volume that take the filling for the colonization of bacteria in the PUT. Preferably, the packing takes two thirds of the volume of the PUT. In addition, the PUT 34 is preferably capable of receiving percolate which is squeezed out of the fermentation mass during the fermentation. These are around 420 m 3 . Overall, therefore, the PUT 34 preferably has a volume of 1,500 m 3 . When woodchips are used as packing, the volume of the PUT is ideally 17% to 23% of the volume of the fermenter for which it is intended.
  • FIG. 16 shows schematically a plan view of the fermenter forecourt 18 with the adjacent fermenters.
  • the fermentation of the fermentation is carried out on the example of the fermenter F 11 .
  • the angegorene fermentation mass is completely removed from the fermenter F 11 and unloaded onto the fermenter forecourt 18th Of the extracted anaerobic digestate about 20% are introduced as digestate in the fermentation bunker 60, where it is subjected to secondary fermentation.
  • the remaining approximately 80% of the fermented fermented mass is pressed out using a screw press so that a liquid phase is formed. This liquid phase is introduced into one or more PUTs.
  • the pressed out fermented fermentation mass serves as so-called inoculation mass for the added fresh mass. After mixing of inoculum and fresh mass, the refreshed fermented mass is returned to the fermenter Fn.
  • the biogas plant in the base section 12 comprises 18 fermenters. Of these 18 fermenters, the fermentation mass is preferably refreshed twice daily, resulting in a fermentation cycle of nine days. This is considerably shorter than the usual fermentation cycles of about 28 days in known solidification processes. In fact, however, with such a shortened fermentation cycle, plant performance can be significantly increased, as the inventor found in computer simulations. As a result of the fact that the particularly acid-sensitive methanogenic bacteria can settle in the PUT, the now more frequently occurring acid peaks can be absorbed during the regeneration of the digestate, without the gas yield being significantly impaired.
  • the power and heat generation plant 22 is shown enlarged in FIG. It comprises four engine compartments 88a to 88d, which are each intended to set up a gas engine with a generator connected.
  • the gas engines use the dried and biologically desulphurised, but otherwise unchanged biogas as fuel.
  • each motor is supplied via a separate gas compressor which draws the biogas from the central gas reservoir 86 via overpressure and low-pressure switches, gas filters and flashback arresters (not shown) and presses them into the gas control path of the engine at a pressure of 80 to 200 mbar ,
  • the biogas is burned in the engines, converting chemical energy into mechanical energy and heat.
  • the required combustion air passes through a separate ventilation system 90a to 9Od in the respective engine room 88a to 88d.
  • a separate vent system 92a to 92d intended for each engine room 90a to 90d.
  • the amount of fresh air supplied is about six times as high as the need for combustion air.
  • the mechanical energy of the motor is converted in the connected medium voltage generators (not shown) into electrical power, which can be fed directly into a medium voltage grid.
  • the resulting heat of combustion is discharged via cooling circuits of the engines (cooling gas-air mixture, oil cooling, water cooling) (not shown) in three heat exchangers, which are connected in series with each engine.
  • cooling gas-air mixture, oil cooling, water cooling not shown
  • additional heat may be used to heat a government building (not shown). However, this only accounts for around 5% of the available heat.
  • the majority of the waste heat is used to dry fermentation residues in the dehydrogenation and pelletizer 68, which will be described in more detail below. Further heat can be fed into a BMKW's own local heating network via which, for example, neighboring commercial enterprises can be supplied.
  • the power and heat generation system 22 includes a docking station 94.
  • the docking station is equipped with the entire periphery of a generator set, in particular the gas compressor, the gas control system, the ventilation system, exhaust gas heat exchangers, exhaust mufflers, supply fresh oil, waste oil and connections the heating system.
  • This periphery can be connected via flexible connections to a mobile generator set, which can be brought in if required.
  • a gas engine fails, the gas utilization side of the shown BMKW drops to a maximum of 75% of the power, and this only for a short time, namely until the mobile replacement generator set has been procured.
  • a replacement generator set can for example be kept at a central point in Germany on a low loader for a variety of BMKWs and brought in case of need and connected.
  • the docking station 94 serves not only for unplanned failures of a generator set, but in particular for planned maintenance on one of the generator sets, so that the power of the BMKW does not have to be shut down during the maintenance measures, because the substitute generator set, which is connected to the docking station 94, takes over the work of the generator set to be maintained.
  • the power and heat generation plant 22 includes an oil storage 96.
  • Fig. 17 is a block diagram schematically illustrating the components of the digestate dehydrogenation and pelletizer 68.
  • the device 68 comprises the screw press 70 already mentioned above in connection with FIG. 8.
  • the screw press 70 is capable of dehydrating the fermentation residues that come very wet from the digestate bunker 60 to a moisture content of 45 to 55% by weight. The achievable moisture content is adjusted so that the residual moisture remaining from the waste heat of the gas engines can be dried sufficiently.
  • the resulting during pressing liquid phase is fed as process water back into the fermentation residue bunker 60. If necessary, it is cleaned or chemically worked up.
  • the solid phase is applied to the conveyor belt 66, which is shown in Fig. 8 and is symbolized by an arrow in Fig. 15.
  • a decanter can also be used.
  • a low temperature belt dryer 142 (see also FIG. 8) operatively connects to the screw press 70, during which no dioxins and furans are formed during the drying process due to the low temperature of around 120 ° C.
  • the belt dryer 142 is heated exclusively with the waste heat of the generator sets, which makes the overall process very efficient.
  • the fermentation residues fed from the conveyor belt 66 fall into a discharge hopper (not shown) from which a distributor applies it to an underlying drying belt (not shown).
  • the fermentation residues form a "carpet" on the drying belt which is driven through a drying tunnel (not shown).
  • a warm air stream ventilates the digestate carpet and dries the wet material. The drying process takes place continuously.
  • the moisture content of the fermentation residue is measured and the heat input is controlled so that the water content of the digestate is reduced to 7 to 13% by weight.
  • the aim of the regulation is inter alia that the Belt dryer always ensures the desired low moisture level of the dried fermentation residues with fluctuating parameters such as heat output, moisture of the digestate, dehydration conditions and quality of the fermentation residues.
  • a drum dryer (not shown) with contact drying may be used which also operates at sufficiently low temperatures.
  • the belt dryer 142 is designed so that the accumulated residual heat can be used as completely as possible, with particular consideration of summer heat spikes, which are not caused by the sale of e.g. can be leveled for heating purposes.
  • the belt dryer 142 is followed by a pneumatic conveying system, which is represented by the arrow 144 in the schematic representation of FIG. 15. Since the fermentation residues after drying in the belt dryer 142 are very light, a pneumatic conveyor system is preferable to a conveyor belt because less material is lost during transport and less dust is generated.
  • the Harnnermühle 146 is a conventional large capacity hammer mill known per se on rigid base frames with vibration dampers, electric door lock, storage temperature monitoring and Mahlhunttemperaturschreibung, as currently for the milling of natural substrates such as straw, corncob, alfalfa, hay, paper, wood , Hemp or jute is already in use.
  • the hammer mill 146 may alternatively be arranged between the screw press and the belt dryer. In this case, the crushing of the material takes place at an even higher moisture content of the digestate, so that less dust is formed and the associated risk of explosion is prevented.
  • a straw mill can be used.
  • the dried and comminuted fermentation residues are introduced from the hammer mill 146 via a further pneumatic or mechanical conveyor 148 into a conditioner 150.
  • the fermentation residues are mixed with suitable additives. which increases the quality of the pellets finally produced.
  • suitable additives for example, cereal flour and / or molasses and / or starch may be added to the conditioner 150, thereby increasing the strength of the fermentation residue pellets, which in turn improves combustion.
  • the fermentation residues in the conditioner 150 can be exposed to water vapor, which makes the mass smoother and easier to pelletize.
  • the fermentation residues in conditioner 150 may be added with quicklime in small amounts (eg 1 to 2% by weight) to positively influence the ash softening behavior of the pellets upon burning due to the altered ratio of calcium to potassium in the ash.
  • the fermentation residues in the conditioner 150 sawdust or wood chips can be added, by the quality of the obtained fermentation residual pellets is further increased as a fuel.
  • oil press cakes may be added which are obtained in the recovery of oil from rapeseed or pumpkin seeds and which may increase the calorific value of the fermentation residue pellets.
  • magnesium, calcium and / or aluminum can also be added. The aim of the admixture is that the fuel pellets reach standard fuel quality and / or are suitable for use as fuel in accordance with the conditions specified in the first and / or the fourth Federal Immission Control Ordinance (BImSchV).
  • the conditioner 150 is placed directly on the pelletizer 152 so that the fermentation residues processed in the conditioner 150 are introduced directly from the conditioner into the pelletizer 152 without a buffer.
  • the pelletizer 152 is formed by a pelletizing press known per se.
  • the processed fermentation mass is pressed in a pug mill at high pressure through dies, wherein the lignin contained in the digestate melts, whereby the molding compound is caked together. Behind the die, a knife cuts the pellets off, for example, 15 mm long pieces. Alternatively, however, fuel briquettes can be produced.
  • the pellets are introduced via a further, possibly mechanical conveyor 154 into a cooling device 156, in which the pellets, which have been heated during the conditioning and pelleting, can cool.
  • the pellets are transported in a storage silo 68, which is also shown in Fig. 8, in which they are stored until their removal.
  • the fermentation residue pellets are hydroscopic due to their low water content, that is, they tend to absorb water from the ambient air. Therefore, they are stored in the storage silo 68 in a very dry atmosphere and transported for example in a tank truck from the storage silo 68 to the consumer.
  • the dehydration and pelletizer 64 With the dehydration and pelletizer 64 shown, valuable fuel pellets are recovered from the digestate. If the substrate mixture for the fermentation process mainly consists of straw and solid manure, fermentation residue pellets are obtained whose calorific value is between 5000 and 5400 kWh per tonne of dry matter. As a result, an energetically and economically valuable fuel is created, for its generation only waste heat is used, which is obtained anyway, and a small fraction of the power generated anyway in the biomass power plant. Since the fermentation residues are washed out in the fermenter 16 and in the digestate bunker 60, the resulting fuel has a good quality with respect to immission. The efficiency of the biomass power plant as a whole is extremely high due to the inventive combination of biogas production by fermentation of straw and Gärrestepelletie- tion.
  • Biomass power plant as an example of a biogas plant

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Organic Chemistry (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Zoology (AREA)
  • Genetics & Genomics (AREA)
  • Biochemistry (AREA)
  • Microbiology (AREA)
  • Biotechnology (AREA)
  • General Engineering & Computer Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Sustainable Development (AREA)
  • Molecular Biology (AREA)
  • Clinical Laboratory Science (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Processing Of Solid Wastes (AREA)
  • Preparation Of Compounds By Using Micro-Organisms (AREA)
  • Treatment Of Sludge (AREA)
  • Fertilizers (AREA)

Abstract

L'invention concerne une installation de biogaz ainsi qu'un procédé de production de biogaz par le procédé de digestion de solides par des bactéries anaérobies. L'installation de biogaz comprend plusieurs fermenteurs du type en garage et au moins une cuve (PUT) de recirculation de percolat qui est reliée à au moins un fermenteur associé pour recevoir les percolats, la PUT étant raccordée au système de biogaz et présentant un volume qui représente au moins 5 %, de préférence au moins 7 %, de façon particulièrement préférable au moins 10 % et en particulier au moins 12 % du volume du fermenteur ou des fermenteurs auxquels elle est raccordée pour recevoir les percolats.
EP07856639.5A 2007-06-27 2007-12-12 Installation de biogaz avec digestion de solides et production de méthane dans une cuve de recirculation de percolat Withdrawn EP2162526A1 (fr)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DE102007029700A DE102007029700A1 (de) 2007-06-27 2007-06-27 Biomasse-Kraftwerk
PCT/EP2007/006681 WO2009000305A1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de matières premières ligneuses
PCT/EP2007/009809 WO2009000307A1 (fr) 2007-06-27 2007-11-13 Installation de biogaz et procédé de production de biogaz à partir de paille avec pelletisation des résidus de fermentation
PCT/EP2007/010892 WO2009000309A1 (fr) 2007-06-27 2007-12-12 Installation de biogaz avec digestion de solides et production de méthane dans une cuve de recirculation de percolat

Publications (1)

Publication Number Publication Date
EP2162526A1 true EP2162526A1 (fr) 2010-03-17

Family

ID=39154372

Family Applications (5)

Application Number Title Priority Date Filing Date
EP15001025.4A Active EP2927309B1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de paille
EP15000919.9A Active EP2927308B1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de paille
EP07786393.4A Revoked EP2167631B1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de matières premières ligneuses
EP07846568.9A Not-in-force EP2160458B1 (fr) 2007-06-27 2007-11-13 Installation de biogaz et procédé de production de biogaz à partir de paille avec pelletisation des résidus de fermentation
EP07856639.5A Withdrawn EP2162526A1 (fr) 2007-06-27 2007-12-12 Installation de biogaz avec digestion de solides et production de méthane dans une cuve de recirculation de percolat

Family Applications Before (4)

Application Number Title Priority Date Filing Date
EP15001025.4A Active EP2927309B1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de paille
EP15000919.9A Active EP2927308B1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de paille
EP07786393.4A Revoked EP2167631B1 (fr) 2007-06-27 2007-07-27 Installation de biogaz et procédé de production de biogaz à partir de matières premières ligneuses
EP07846568.9A Not-in-force EP2160458B1 (fr) 2007-06-27 2007-11-13 Installation de biogaz et procédé de production de biogaz à partir de paille avec pelletisation des résidus de fermentation

Country Status (8)

Country Link
US (1) US9963665B2 (fr)
EP (5) EP2927309B1 (fr)
DE (4) DE102007029700A1 (fr)
DK (1) DK2167631T3 (fr)
ES (1) ES2558364T3 (fr)
HU (1) HUE027343T2 (fr)
PL (1) PL2167631T3 (fr)
WO (3) WO2009000305A1 (fr)

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007029700A1 (de) 2007-06-27 2009-01-08 Michael Feldmann Biomasse-Kraftwerk
CA2866645A1 (fr) 2007-12-21 2009-07-23 Inbicon A/S Fermentation non-sterile de bioethanol
DE102009024287B4 (de) 2008-06-23 2019-04-25 Hochschule Ostwestfalen-Lippe Verfahren der Biogasgewinnung
US20120040328A1 (en) * 2009-01-28 2012-02-16 Michael Niederbacher Fermenter feed system for fermentable biomass of a biogas system and method for operating the feed system
ES2537320T3 (es) * 2009-02-16 2015-06-05 Kompoferm Gmbh Instalación de fermentación y procedimiento para el funcionamiento de una instalación de este tipo
DE102009009920A1 (de) * 2009-02-18 2010-08-26 Meyer, Herwig, Dipl.-Landw. Einrichtung zur verbesserten Gasausbeute durch weiteren Aufschluss von organischer Biomasse in Biogasanlagen
DE102009020200A1 (de) * 2009-05-07 2010-11-11 Niederbacher, Michael, Dr. Verfahren zum Betreiben einer Biogasanlage sowie Biogasanlage
DE102009045895A1 (de) * 2009-10-21 2011-04-28 Planungsbüro Rossow Gesellschaft für Versorgungstechnik mbH Verfahren und Vorrichtung zur Erhöhung der Besiedlungsdichte von methanbildenden Bakterienstämmen in Biogasfermentern
DE102009050867A1 (de) * 2009-10-27 2011-04-28 Vsr Industrietechnik Gmbh Verfahren zur Erzeugung von Biogas durch Trockenfermentation sowie Biogasanlage zur Gewinnung von Biogas durch Trockenfermentation
DE102010005253B4 (de) * 2010-01-20 2024-02-08 Bts Biogas Srl/Gmbh Verfahren und Vorrichtung zum Behandeln und/oder Aufbereiten von flüssigem Gärrest aus einem Nachgärer und/oder Fermenter einer Biogasanlage
DE102010017818A1 (de) 2010-02-17 2011-08-18 Meissner, Jan A. Verfahren und Anlage zur Herstellung von CBM (Compressed BioMethane) als treibhausgasfreier Kraftstoff
DE102011113646B3 (de) * 2011-09-19 2013-01-03 Prüf- und Forschungsinstitut Pirmasens e.V. Vorrichtung und Verfahren zum hydrothermalen Aufschluss von getrockneten, verholzten Lignocellulose-haltigen Biomassen
DE102011055695A1 (de) * 2011-11-24 2013-05-29 Renergon International AG Vorrichtung zur Fermentation organischer Feststoffe
DK177818B1 (da) * 2012-04-11 2014-08-11 C F Nielsen As Fremgangsmåde til behandling af en biomasse med et indhold af lignocellulose
DE102012016951B4 (de) * 2012-08-28 2014-11-06 Yoen Ok Roth Vorrichtung und Verfahren für die Fermentation mikrobieller Kulturen
US9523102B2 (en) * 2012-09-13 2016-12-20 Novus Energy Llc Methods of anaerobic digestion of biomass to produce biogas
DE102012109821A1 (de) * 2012-10-15 2014-04-17 Renergon International AG Verfahren und Vorrichtung zur Erzeugung von Biogas
DE102012222590A1 (de) 2012-12-07 2014-06-12 Planungsbüro Rossow Gesellschaft für erneuerbare Energien mbH Biogaserzeugung durch mehrstufige fermentation in einem monobehälter
DE102012112898A1 (de) * 2012-12-21 2014-06-26 Verbio Vereinigte Bioenergie Ag Verfahren und Anlage zur Herstellung von Biogas aus lignocellulosehaltiger Biomasse
EP2792739B1 (fr) * 2013-04-15 2021-03-24 BTS Biogas Srl/GmbH Installation de biogaz dotée d'un dispositif d'alimentation en ferments
DE102013107683B4 (de) * 2013-07-18 2017-10-12 Peter Lutz Biogasanlage zur Erzeugung von Biogas aus nicht-pumpbarer Biomasse sowie Verfahren zu ihrem Betrieb
DE102014005270A1 (de) 2014-04-09 2015-10-15 Christine Apelt Verfahren zur Befähigung von Methanfermentationsanlagen zur stofflichen und energetischen Verwertung von lignocellulosehaltigen biogenen Einsatzstoffen und Anordnung zur Durchführung des Verfahrens
DE102014011479A1 (de) * 2014-07-31 2016-02-04 Christoph Bürger Neues Verfahren zur Vergärung biogener Energieträger
CN104384170B (zh) * 2014-10-23 2016-08-24 长沙学院 一种生物处理城市有机垃圾及农业有机废物的工艺及装置
US20160185633A1 (en) * 2014-12-30 2016-06-30 University Of Florida Research Foundation, Inc. Recovery of nutrients from water and wastewater by precipitation as struvite
GB2546243B (en) * 2015-12-23 2018-07-11 Aerothermal Green Energy Ltd Biomass, thermal pressure hydrolysis and anaerobic digestion
DE102017005627A1 (de) 2016-10-07 2018-04-12 Lennart Feldmann Verfahren und System zur Verbesserung der Treibhausgas-Emissionsminderungsleistung biogener Kraft-, Heiz- und Brennstoffe und/oder zur Anreicherung landwirtschaftlich genutzter Flächen mit Humus-C
WO2018064993A1 (fr) 2016-10-09 2018-04-12 Archea New Energy Gmbh Système multichambre conçu pour générer un biogaz
WO2018085487A1 (fr) * 2016-11-02 2018-05-11 Casad Robert C Jr Procédés et dispositifs de traitement de biomasse lignocellulosique en utilisant le prétraitement mécanique pour améliorer les propriétés d'hydratation de charge d'alimentation
EP3354718A1 (fr) 2017-01-30 2018-08-01 HERBST Umwelttechnik GmbH Procédé et dispositif destinés a la production de biogaz
FI130177B (en) * 2019-02-22 2023-03-29 Erkki Kalmari Procedure for the production of biogas and arrangements related thereto
CN110004186B (zh) * 2019-03-19 2020-12-15 上海市环境科学研究院 一种秸秆干式厌氧发酵快速启动及稳定运行方法
FR3102989B1 (fr) * 2019-11-07 2021-10-15 Eric Goubin Procédé et installation de génération de matière première pour des installations de méthanisation à partir de déchets de matière organique contenant une majorité de plantes herbacées
CN111778292A (zh) * 2020-06-22 2020-10-16 四川华地康生态农业有限公司 一种农业固废生物发酵方法
CN113105997B (zh) * 2021-04-14 2022-07-01 河北省农业科技发展中心 能够抽取沼液的厌氧发酵装置
WO2022217365A1 (fr) 2021-04-15 2022-10-20 Iogen Corporation Procédé et système de production d'hydrogène renouvelable à faible intensité de carbone
CA3214954A1 (fr) 2021-04-22 2022-10-27 Patrick J. Foody Procede et systeme de production de combustible
DE102021126275A1 (de) * 2021-10-11 2023-04-13 Clemens Maier Regeneratives Speicherkraftwerk mit Rückführung von Biomaterial
US11807530B2 (en) 2022-04-11 2023-11-07 Iogen Corporation Method for making low carbon intensity hydrogen

Family Cites Families (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3302246A (en) * 1964-01-16 1967-02-07 Nat Bagasse Products Corp Preparation of bagasse and like fibers
DE2730671C2 (de) * 1977-07-07 1983-12-29 Fa. Matthias Trienekens, 4060 Viersen Anlage zur Aufbereitung von Haus- und Gewerbemüll
DE3013421C2 (de) 1980-04-05 1984-07-12 Xaver 7090 Ellwangen Lipp Gärbehälter zum Herstellen von Biogas
FR2495887A2 (fr) 1980-12-12 1982-06-18 Nayet Roger Digesteur horizontal mixte, en vue de la production continue de gaz methane
DE3341691A1 (de) 1983-11-18 1985-05-30 Walter 8531 Schauerheim Feilhauer Verfahren und vorrichtung zur anaeroben behandlung organischer substanzen
DE3711813A1 (de) * 1987-04-08 1988-11-03 Recycling Energie Abfall Verfahren und vorrichtung zur aufbereitung und anaerober vergaerung biogen-organischer abfaelle
US4997488A (en) * 1988-02-05 1991-03-05 The United States Of America As Represented By The Secretary Of Agriculture Combined physical and chemical treatment to improve lignocellulose digestibility
US5147502A (en) * 1990-05-10 1992-09-15 Recycle Processes Inc. Method for conditioning baled wastepaper in recycling operations
US5269634A (en) 1992-08-31 1993-12-14 University Of Florida Apparatus and method for sequential batch anaerobic composting of high-solids organic feedstocks
DE4308920A1 (de) 1993-03-19 1994-09-22 Linde Kca Dresden Gmbh Vorrichtung zur Behandlung von Bioabfällen oder dergleichen
DE4409487C2 (de) * 1993-10-09 1996-07-11 Steffen Ingenieurgesellschaft Verfahren und Anlage zur Vergärung von biogen-organischen Rohabfällen
JP2647804B2 (ja) * 1994-09-30 1997-08-27 工業技術院長 生ゴミの処理方法
DE19532359C2 (de) 1995-09-01 2001-02-01 Winkler Hans Peter Verfahren zur Biogaserzeugung aus feststoffreicher Biomasse
DE19633928A1 (de) 1996-08-22 1998-02-26 Winkler Hans Peter Verfahren zur Hanffasergewinnung
DE19805045A1 (de) * 1998-02-09 1999-08-12 Manfred Prof Dr Hoffmann Verfahren und Vorrichtung zur Methanisierung von Biomassen
US6342378B1 (en) * 1998-08-07 2002-01-29 The Regents Of The University Of California Biogasification of solid waste with an anaerobic-phased solids-digester system
DE19857870A1 (de) 1998-12-15 2000-06-21 Res & Dev Of Renewable Energy Verfahren und Vorrichtung zur vollständigen und schadstoffreien Konversion von Material
US7211429B1 (en) * 1999-07-20 2007-05-01 Organic Resource Technologies Limited Organic waste material treatment process
CA2400336C (fr) * 2000-02-17 2010-04-27 Forskningscenter Riso Procede de traitement de matiere lignocellulosique
DE10021383A1 (de) * 2000-05-03 2001-11-08 Wea Waste Energy Action Intern Verfahren und Vorrichtung zur vollständigen und schadstoffreien Konversion von Reststoffgemengen
US6299774B1 (en) * 2000-06-26 2001-10-09 Jack L. Ainsworth Anaerobic digester system
US6365732B1 (en) * 2000-07-10 2002-04-02 Sweet Beet Incorporated Process for obtaining stereoisomers from biomass
DE20104047U1 (de) * 2000-07-14 2001-10-25 Bekon Energy Technologies Gmbh Bioreaktor zur Methanisierung von Biomasse und eine Biogasanlage zur Erzeugung von thermischer, elektrischer oder mechanischer Energie aus Biomasse mit einem solchen Bioreaktor
US6419788B1 (en) * 2000-08-16 2002-07-16 Purevision Technology, Inc. Method of treating lignocellulosic biomass to produce cellulose
DE10050623B4 (de) 2000-10-12 2010-07-29 Ludwig Schiedermeier Garagenförmiger Fermenter zur Feststoffmethanisierung
US6905600B2 (en) * 2001-11-16 2005-06-14 Ch2M Hill, Inc. Method and apparatus for the treatment of particulate biodegradable organic waste
DE20121701U1 (de) * 2001-11-22 2003-03-13 Atz Evus Vorrichtung zum Abbau organischer Substanzen
SE526875C2 (sv) * 2002-08-14 2005-11-15 Tekniska Verken Linkoeping Ab Sätt och anordning för att framställa biogas ur ett organiskt material
DE10257849A1 (de) * 2002-12-11 2004-07-08 Ludwig Schiedermeier Vorrichtung zur anaeroben Fermentation von Biomasse
US20060275895A1 (en) * 2003-06-27 2006-12-07 Bio-Circuit Biogas producing facility with anaerobic hydrolysis
JP2005087977A (ja) * 2003-09-22 2005-04-07 Mitsui Eng & Shipbuild Co Ltd 有機性廃棄物処理方法および有機性廃棄物処理システム
DE202004012746U1 (de) 2004-01-31 2004-12-16 Berger Landtechnik Gmbh Semikontinuierlich arbeitender Schwerkraftfermenter zur Trockenvergärung
DE202004003398U1 (de) * 2004-03-04 2005-07-14 Lutz, Peter Transporteinrichtung für Biomasse in einem Fermenter zur Erzeugung von Biogas sowie Großfermenter zur Erzeugung von Biogas aus Biomasse
JP4866845B2 (ja) * 2004-06-16 2012-02-01 ザ テキサス エイ・アンド・エム ユニヴァーシティ システム カルボン酸及びアルコールへのバイオマスの転換用の方法及び系
DE102004053615B3 (de) * 2004-11-03 2006-05-18 Brandenburgische Technische Universität Cottbus Abbauverfahren von biogenem Material
DE102005001783B4 (de) 2005-01-14 2007-01-04 U.T.S. Umwelt-Technik-Süd GmbH Biogasanlagen-Feststoffbeschickungsvorrichtung an einem Fermenter einer Biogasanlage
DE102005019445A1 (de) 2005-04-22 2006-10-26 Schulze, Günter Verfahren und Anlage zur Gewinnung von Biogas aus Biomasse
DE102005037452B3 (de) * 2005-04-27 2006-08-03 Hartmut Wallin Verfahren zur Biogaserzeugung durch Trockenfermentation sowie Biogasanlage dafür
DE102005029306B4 (de) * 2005-06-22 2007-09-20 Joachim Kausch Verfahren zum Betreiben einer Feststofffermenteranlage sowie Vorrichtung hierzu
US7552688B2 (en) * 2006-02-23 2009-06-30 Lundell John H Method and apparatus for converting animal waste into bedding or soil amendment
DE202006003293U1 (de) 2006-02-27 2006-05-18 Müller, Wilfried, Dr. Anlage zur Biogaserzeugung mit wenigstens einem Trockenfermenter und mindestens einem damit verbundenen Perkolataufbereiter
DE102007029700A1 (de) 2007-06-27 2009-01-08 Michael Feldmann Biomasse-Kraftwerk

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
None *
See also references of WO2009000309A1 *

Also Published As

Publication number Publication date
US20100285556A1 (en) 2010-11-11
US9963665B2 (en) 2018-05-08
EP2167631A1 (fr) 2010-03-31
DE202007019668U1 (de) 2015-03-25
DK2167631T3 (en) 2016-01-18
EP2927309B1 (fr) 2020-03-11
EP2160458B1 (fr) 2018-07-11
EP2927308A1 (fr) 2015-10-07
DE102007029700A1 (de) 2009-01-08
DE202007019678U1 (de) 2015-06-17
WO2009000309A8 (fr) 2018-03-29
WO2009000305A1 (fr) 2008-12-31
EP2927309A1 (fr) 2015-10-07
WO2009000307A1 (fr) 2008-12-31
EP2167631B1 (fr) 2015-10-07
WO2009000309A1 (fr) 2008-12-31
EP2927308B1 (fr) 2020-03-18
ES2558364T3 (es) 2016-02-03
HUE027343T2 (en) 2016-10-28
EP2160458A1 (fr) 2010-03-10
PL2167631T3 (pl) 2016-04-29
DE202007019537U1 (de) 2013-06-04

Similar Documents

Publication Publication Date Title
EP2162526A1 (fr) Installation de biogaz avec digestion de solides et production de méthane dans une cuve de recirculation de percolat
EP0698005B1 (fr) Procede et dispositif pour le compostage et la fermentation par voie humide de dechets biologiques
DE102007012861B3 (de) Biogaserzeugung durch Trockenfermentation nachwachsender Rohstoffe
DE102007004892A1 (de) Verfahren und Vorrichtung zur Aufbereitung organischer Reststoffe aus Biogasanlagen
DE102008015609A1 (de) Biogasanlage und Verfahren zur Erzeugung von Biogas
EP1945751A1 (fr) Fermenteur pour la production de biogaz a partir de matiere organique
DE102012109821A1 (de) Verfahren und Vorrichtung zur Erzeugung von Biogas
DE102015015776A1 (de) Verfahren und Vorrichtung zur Verwertung von Feucht- und Trockenhalmgut
WO2011076444A1 (fr) Dispositif et procédé permettant la fermentation, le compostage et la décomposition intensive de produits de traitement
DE4111204A1 (de) Verfahren und technik zur entsorgung von kot/harngemischen, klaerschlamm, muell und dergleichen, sowie zur konditionierung von schnellwachsenden rohstoffen und futterverpilzung
EP3400775B1 (fr) Dispositif permettant l'obtention de l'acide lactique à partir de biomasse ensillée et procédé de traitement de l'ensilage
EP0589155A1 (fr) Traitement anaérobique de substrats à forte concentration en graisses
EP0886631A1 (fr) Procede et installation de valorisation de dechets organiques et nouvelle installation de biogaz appropriee
DE102013102642A1 (de) Verfahren und Vorrichtung zur Erzeugung von Biogas
DE102004035997A1 (de) Biogasanlage zur Bereitstellung von methanhaltigen Gasen
AT412276B (de) Verfahren und anlage zur herstellung von biogas aus biomüll
DE3023012A1 (de) Verfahren und vorrichtung zum erzeugen von heizwaerme unter ausnutzung der mikrobiellen zersetzung von oragnischen substanzen
EP3017052B1 (fr) Procédé d'initialisation du processus de fermentation dans des installations de production de biogaz
DE102011012285B4 (de) Hybrid Fermentation
DE102010000576B4 (de) Anlage und Verfahren zur hydrothermalen Karbonisierung von Biomasse
DE102021005384A1 (de) Verfahren zum wirtschaftlichen Weiterbetrieb von Biogasanlagen nach Ende der 20-jährigen Förderung durch dasErneuerbare-Energie-Gesetz (EEG)
Tarafdar et al. Residue management and composting

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20100120

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20170117

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: C12M 1/00 20060101AFI20180126BHEP

Ipc: C12M 1/107 20060101ALI20180126BHEP

Ipc: C12M 1/16 20060101ALI20180126BHEP

Ipc: C12M 3/00 20060101ALI20180126BHEP

INTG Intention to grant announced

Effective date: 20180307

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20180823

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20190103