EP1965005A1 - Device for driving a handrail post into the edge of a prefabricated slab - Google Patents
Device for driving a handrail post into the edge of a prefabricated slab Download PDFInfo
- Publication number
- EP1965005A1 EP1965005A1 EP08290153A EP08290153A EP1965005A1 EP 1965005 A1 EP1965005 A1 EP 1965005A1 EP 08290153 A EP08290153 A EP 08290153A EP 08290153 A EP08290153 A EP 08290153A EP 1965005 A1 EP1965005 A1 EP 1965005A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- insert
- partition
- tubular
- slab
- buttresses
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005192 partition Methods 0.000 claims abstract description 22
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 abstract description 4
- 230000003014 reinforcing effect Effects 0.000 abstract description 4
- 239000004567 concrete Substances 0.000 description 18
- 230000004888 barrier function Effects 0.000 description 3
- 230000009172 bursting Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 210000002435 tendon Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
- E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
- E04G15/061—Non-reusable forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3223—Means supported by building floors or flat roofs, e.g. safety railings
Definitions
- each buttress is connected to the tubular wall by an outer collar and is box-shaped open towards the tubular wall while the flange is extended downwards between each buttress by a bell-shaped wall whose lower edge is at an altitude higher than that of the end flanges of flying buttresses. This altitude is such that the bell does not enter the concrete of the predalle.
- Radial partitions extend between the tubular wall and the bell, which contributes to the strength of the part of the insert which is above the concrete slab.
- the device represented in figure 1 is insert according to the invention.
- This insert has a tubular partition 1 closed at the top by a detachable lid 2 and at the bottom by a bottom 3.
- This tubular partition is here equipped at its base with elements 4 and 5 of attachment of the insert to some of son 6 and 7 of reinforcement or preload of the predalle or the thin slab to achieve and represented by the dashed lines 8.
- These fastening elements are in the form of horizontal beams.
- One of them 4 has clipping notches 9 regularly distributed over its length.
- the other end has diverging fins 10. The divergent notches and fins are capable of overlapping the prestressing wires as shown in the figure.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Description
La présente invention concerne un dispositif d'encastrement d'un potelet de garde-corps destiné aux dalles minces, notamment préfabriquées en usine, en béton armé ou en béton précontraint, ou bien fabriquées in situ avec une armature métallique, pour assurer la sécurité passive collective des ouvriers et usagers de ces dalles lors de leur mise en place sur chantier et au cours de la construction de l'immeuble auquel elles appartiennent.The present invention relates to a device for embedding a guardrail post for thin slabs, especially prefabricated in the factory, reinforced concrete or prestressed concrete, or manufactured in situ with a metal frame, to ensure passive safety collective workers and users of these slabs during their establishment on site and during the construction of the building to which they belong.
Les garde-corps servent, pendant la construction d'un bâtiment, à prévenir la chute d'objets ou de personnes se trouvant en périphérie d'une toiture, d'une dalle, d'une trémie d'escalier.... Ils sont utilisés en concurrence avec d'autres systèmes de sécurité tels que des lignes de vie associés à des filins et des harnais. Leur avantage réside dans le fait qu'ils coopèrent à la formation d'une barrière temporaire à la périphérie d'une surface à l'intérieur de laquelle la sécurité des personnes est totale bien qu'elles disposent d'une grande liberté de mouvement. Leur mise en place est cependant plus lourde que celle des autres systèmes car il faut réaliser une liaison efficace, bien que temporaire, entre chaque poteau de barrière et la dalle qui porte la surface sur laquelle évolue le personnel, à la périphérie de celle-ci.The guardrails are used, during the construction of a building, to prevent the fall of objects or people located on the periphery of a roof, a slab, a stair hopper .... They are used in competition with other safety systems such as lifelines associated with ropes and harnesses. Their advantage lies in the fact that they cooperate in the formation of a temporary barrier on the periphery of a surface within which the security of the people is total although they have a great freedom of movement. Their installation is however heavier than that of other systems because it is necessary to achieve an effective, although temporary, between each barrier post and the slab that carries the surface on which the staff evolves, on the periphery thereof .
On a pensé pratiquer des réserves dans la dalle avant la coulée du béton dans lesquelles il sera possible sur chantier d'emplanter les pieds de chaque poteau de barrière. Ces réserves sont le plus souvent des tronçons de tubes métalliques maintenus verticaux sur deux fils d'armature ou de tension par deux points de soudure qui n'ont que le rôle de maintenir en place les tronçons de tube lors de la coulée à l'encontre des efforts de poussée du béton déversé dans le moule. Il n'est pas rare dans ce cas que la résistance du béton, au voisinage du bord, cède sous un effort de poussée horizontale appliqué sur le poteau qui agit comme un bras de levier suffisamment puissant pour faire éclater le béton entre le tronçon tubulaire d'accueil du pied du poteau et la rive de la dalle. Il faut en effet rappeler que l'épaisseur d'une dalle préfabriquée (ou prédalle) est de l'ordre de cinq centimètres, ce qui est une hauteur d'encastrement faible.It was thought to practice reserves in the slab before pouring concrete in which it will be possible on site to plant the feet of each barrier post. These reserves are most often sections of metal tubes held vertical on two reinforcing wire or tension by two solder points which have only the role of keeping in place the pipe sections during the casting against thrust forces of the concrete poured into the mold. It is not uncommon in this case that the resistance of the concrete, in the vicinity of edge, yields under a horizontal thrust force applied to the pole which acts as a lever arm powerful enough to break the concrete between the tubular section home foot post and the edge of the slab. It should be recalled that the thickness of a prefabricated slab (or pre-slab) is of the order of five centimeters, which is a low installation height.
Par la présente invention, on entend remédier à cet inconvénient de fragilité de la tenue du garde-corps en prévoyant une armature d'accueil du pied de chaque potelet de garde-corps qui se substitue au béton pour encaisser les efforts du type de ceux rappelés ci-dessus y résister sans dommage et constituer un répartiteur des efforts dans le béton de manière à éliminer les concentrations de contraintes pouvant conduire à la fissuration et à l'éclatement du béton.By the present invention, it is intended to remedy this disadvantage of fragility of the behavior of the railing by providing a foot reinforcement of the foot of each railing post which is substituted for the concrete to cash the efforts of the type of those recalled above to withstand it without damage and to constitute a distribution of the forces in the concrete so as to eliminate the concentrations of stresses which can lead to the cracking and the bursting of the concrete.
L'invention a donc pour objet un insert d'emplanture de potelet de garde-corps dans une dalle mince, notamment préfabriquée (prédalle), armée ou précontrainte, possédant des fils d'armature ou de précontrainte, qui comporte une cloison tubulaire qui définit un logement d'accueil d'un pied de potelet, au moins deux éléments extérieurs s'étendant sensiblement horizontalement à la base de cette cloison et qui constituent des éléments de positionnement et d'accrochage de l'insert à certains des fils susdits de la dalle et au moins trois arcs-boutants s'étendant depuis le sommet de la cloison tubulaire jusqu'à une extrémité équipée d'une semelle, écartée de la cloison tubulaire et située à une altitude déterminée par rapport à celle des éléments de positionnement et d'accrochage.The subject of the invention is therefore an insert for anchoring a railing post in a thin slab, in particular prefabricated (pre-slab), reinforced or pre-stressed, having reinforcing or prestressing wires, which comprises a tubular partition which defines a housing for receiving a foot of the post, at least two external elements extending substantially horizontally at the base of this partition and which constitute positioning and hooking elements of the insert to some of the above-mentioned wires of the slab and at least three flying buttresses extending from the top of the tubular partition to an end equipped with a sole, spaced apart from the tubular partition and located at a determined altitude relative to that of the positioning elements and hooking.
La fabrication d'une dalle mince (prédalle), est réalisée par coulage d'une nappe de béton dans un moule équipé de fils de précontrainte tendus. L'épaisseur de la prédalle est en général comprise entre 4 et 5 centimètres. La situation des fils de précontrainte est parfaitement connue ; elle est en général à environ 2 centimètres du fond du moule. Cette nappe de fils constitue donc une référence à laquelle est rapportée la mise en place de l'insert selon l'invention. De manière normalisée, la distance maximale existant entre deux fils voisins est de 222 millimètres. Ainsi les éléments de positionnement auront un empattement suffisant pour pouvoir reposer sur deux fils adjacents dans le cas où ils sont le plus éloignés. De préférence, ces éléments posséderont des moyens d'encliquetage de l'insert sur les fils pour les assujettir à ceux-ci avant la coulée du béton et les tenir en place malgré les chocs qu'ils auront pu subir de la part des opérateurs se déplaçant sur la nappe de fils. Ces moyens d'encliquetage pourront simplement être des encoches ou des rainures dans lesquelles les fils seront légèrement entrés en force. Par cette disposition, la paroi tubulaire de l'insert se trouve placée à bonne hauteur dans l'épaisseur de la prédalle, évitant notamment qu'elle soit trop proche de la surface inférieure de cette dernière, ce qui nuirait à la bonne tenue du béton en dessous de l'insert.The manufacture of a thin slab (pre-slab) is made by pouring a concrete sheet into a mold equipped with tensioned tendons. The thickness of the predalle is generally between 4 and 5 centimeters. The situation of prestressing wires is well known; it is usually about 2 centimeters from the bottom of the mold. This sheet of son is therefore a reference to which is reported the establishment of the insert according to the invention. In a standardized way, the maximum distance existing between two neighboring wires is 222 millimeters. Thus the positioning elements will have a sufficient wheelbase to be able to rest on two adjacent son in the case where they are farthest away. Preferably, these elements will have snap-fastening means of the insert on the son to secure them before pouring the concrete and hold them in place despite the shocks they may have suffered from the operators themselves. moving on the sheet of wires. These snap means may simply be notches or grooves in which the son will be slightly entered in force. By this arrangement, the tubular wall of the insert is placed at a good height in the thickness of the predalle, avoiding in particular that it is too close to the lower surface of the latter, which would adversely affect the good behavior of the concrete below the insert.
Pour la même raison, à savoir la précision du positionnement en altitude (en Z) de l'insert dans la prédalle, les semelles d'extrémité des arcs-boutants sont noyées dans le béton au milieu de son épaisseur, ce qui garantit une bonne résistance à l'extraction de l'insert sous l'effet d'efforts de flexion.For the same reason, namely the accuracy of the altitude positioning (in Z) of the insert in the predalle, the end insoles of the flying buttresses are embedded in the concrete in the middle of its thickness, which guarantees a good resistance to the extraction of the insert under the effect of bending forces.
Dans un mode de réalisation préféré de cet insert, chaque arc-boutant est relié à la paroi tubulaire par une collerette extérieure et est en forme de caisson ouvert en direction de la paroi tubulaire tandis que la collerette est prolongée vers le bas entre chaque arc-boutant par une paroi en forme de cloche dont le bord inférieur est à une altitude supérieure à celle des semelles d'extrémité des arcs-boutants. Cette altitude est telle que la cloche ne pénètre pas dans le béton de la prédalle. Des cloisons radiales s'étendent entre la paroi tubulaire et la cloche, ce qui participe à la résistance de la partie de l'insert qui se trouve au-dessus de la prédalle de béton.In a preferred embodiment of this insert, each buttress is connected to the tubular wall by an outer collar and is box-shaped open towards the tubular wall while the flange is extended downwards between each buttress by a bell-shaped wall whose lower edge is at an altitude higher than that of the end flanges of flying buttresses. This altitude is such that the bell does not enter the concrete of the predalle. Radial partitions extend between the tubular wall and the bell, which contributes to the strength of the part of the insert which is above the concrete slab.
Dans un souci d'économie de matière (l'insert sera fabriqué par injection de matière plastique), on aura prévu quatre arcs-boutants dont deux de ceux-ci, diamétralement opposés, possèdent des semelles qui constituent les éléments de positionnement susdits de l'insert par rapport aux fils d'armature ou de précontrainte.In order to save material (the insert will be made by plastic injection), four flying buttresses are provided, two of which, diametrically opposed, have soles which constitute the above-mentioned positioning elements. insert relative to the reinforcing or prestressing wires.
Enfin, le logement défini par la cloison tubulaire est fermé en partie supérieure par un opercule séparable et, en partie inférieure par un fond, venu d'une pièce avec ou rapporté sur l'insert, en fonction des techniques de moulage qui auront été choisies pour sa réalisation.Finally, the housing defined by the tubular partition is closed in the upper part by a separable cap and, in the lower part by a bottom, come from a piece with or attached to the insert, depending on the molding techniques that have been chosen for its realization.
Ce qui est décrit ci-dessus pour une prédalle précontrainte s'applique également pour une prédalle en béton armé ou une dalle mince fabriquée in situ.What is described above for a prestressed pre-slab applies equally to a reinforced concrete slab or a slab made in situ.
D'autres caractéristiques et avantages de l'invention ressortiront de la description donnée ci-après de deux exemples de sa réalisation.Other features and advantages of the invention emerge from the description given below of two examples of its implementation.
Il sera fait référence aux dessins annexés dans lesquels :
- les
figures 1 illustre par un schéma, l'insert selon l'invention, - les
figures 2 et 3 illustrent par des vues extérieures de dessus et de dessous un mode de réalisation de cet insert.
- the
figures 1 illustrates by a diagram, the insert according to the invention, - the
Figures 2 and 3 illustrate with external views from above and from below an embodiment of this insert.
Le dispositif représenté à la
La cloison 1 comporte des arcs-boutants ou des contreforts, ici sous la forme d'ailes latérales 11, 12, 13 et 14 qui sont pourvues à leur base d'une semelle 15, 16 pour les ailes 11 et 12. Pour les autres ailes, les poutres horizontales 4 et 5 jouent aussi le rôle de semelles.The
La coopération de l'insert avec les fils de précontrainte fixe la position des poutres 4 et 5 ainsi que celle des semelles 15 et 16 dans l'épaisseur de la prédalle. On est de ce fait certain que le béton qui sera coulé noiera correctement la base des quatre ailes de contrefort de la cloison tubulaire. Tout couple de basculement qui est appliqué par le potelet sur la cloison tubulaire engendre des efforts sur les semelles qui sont contrés sans dommage par le béton dans lequel elles sont noyées. Les essais ont montré en effet aucune fissure ni aucun détachement ou éclatement du béton autour de l'insert, les efforts mis en jeu étant bien entendu de l'ordre de ceux qui peuvent se rencontrer sur chantier, multiplié par un coefficient de sécurité habituel.The cooperation of the insert with the prestressing wires fixes the position of the
Aux
Dans le cas de ces figures, la cloison tubulaire 1 est bordée en partie supérieure d'une collerette 20 par laquelle elle est reliée à une cloche ou jupe extérieure sensiblement cylindrique 21. Cette jupe est interrompue par les quatre contreforts ou arcs-boutants décrits ci-dessus 11, 12, 13 et 14. Ceux-ci sont ici en forme de caisson ouvert en direction de la paroi tubulaire 1 comme cela est visible sur la
La hauteur de la cloche extérieure 21 est inférieure à celle de la paroi tubulaire 1 de sorte que son bord inférieur 21a reste au-dessus et de préférence juste au niveau de la surface supérieure du béton de la prédalle.The height of the
Comme dans la réalisation précédente, la cloison tubulaire 1 est fermée par un opercule supérieur 22 séparable et par un fond inférieur 23 pour empêcher le logement qu'elle définit d'être rempli et par le béton au moment de la coulée de la dalle et par de l'eau pouvant geler ou des matériaux pouvant l'obstruer. Le fond peut être formé par un bouchon rapporté si cela convient mieux à sa fabrication.As in the previous embodiment, the
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL08290153T PL1965005T3 (en) | 2007-02-27 | 2008-02-18 | Device for driving a handrail post into the edge of a slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0701388A FR2913038B1 (en) | 2007-02-27 | 2007-02-27 | DEVICE FOR ENCASTREMENT OF A GUARD-POST POTELET ON THE EDGE OF A PREFABRICATED SLAB |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1965005A1 true EP1965005A1 (en) | 2008-09-03 |
EP1965005B1 EP1965005B1 (en) | 2011-09-21 |
Family
ID=38578295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08290153A Active EP1965005B1 (en) | 2007-02-27 | 2008-02-18 | Device for driving a handrail post into the edge of a slab |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1965005B1 (en) |
FR (1) | FR2913038B1 (en) |
PL (1) | PL1965005T3 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2189595A1 (en) * | 2008-11-21 | 2010-05-26 | Combisafe International Aktiebolag | Fixture for protective railing |
EP2375522A3 (en) * | 2010-04-09 | 2012-06-20 | Kaiser GmbH & Co. KG | Installation socket for electro-technical purposes |
EP2662509A1 (en) * | 2012-05-09 | 2013-11-13 | FEHR Groupe | Device for attaching an object to a prefabricated wall of a building and system for mounting a railing on a prefabricated wall comprising such an attachment device |
EP3772560A1 (en) * | 2019-08-08 | 2021-02-10 | Kp1 | Device for securing a construction accessory with a construction element and associated construction element |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1080793A (en) * | 1965-05-10 | 1967-08-23 | Rawlplug Co Ltd | Anchoring device |
GB1126900A (en) | 1966-06-03 | 1968-09-11 | Entpr S Balency & Schuhl S A | Improvements in the devices for anchoring temporary stays, specifically for prefabricated structures |
US4000591A (en) * | 1975-08-04 | 1977-01-04 | Superior Concrete Accessories, Inc. | Holder adapted for supporting an anchor insert to be embedded in a concrete slab |
FR2584440A1 (en) | 1985-07-05 | 1987-01-09 | Moreau Pierre | Socket for positioning a pipe during the pouring of reinforced concrete |
US20010032435A1 (en) * | 2000-02-18 | 2001-10-25 | Austin Barry J. | Methods and apparatus for providing fall-arrest protection |
US20040168375A1 (en) * | 2003-01-09 | 2004-09-02 | Sack James A. | Injection molded thermoplastic insert |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2528985A1 (en) * | 2005-12-06 | 2007-06-06 | Dennis J. Shymkowich | Safety railing for building construction |
-
2007
- 2007-02-27 FR FR0701388A patent/FR2913038B1/en not_active Expired - Fee Related
-
2008
- 2008-02-18 PL PL08290153T patent/PL1965005T3/en unknown
- 2008-02-18 EP EP08290153A patent/EP1965005B1/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1080793A (en) * | 1965-05-10 | 1967-08-23 | Rawlplug Co Ltd | Anchoring device |
GB1126900A (en) | 1966-06-03 | 1968-09-11 | Entpr S Balency & Schuhl S A | Improvements in the devices for anchoring temporary stays, specifically for prefabricated structures |
US4000591A (en) * | 1975-08-04 | 1977-01-04 | Superior Concrete Accessories, Inc. | Holder adapted for supporting an anchor insert to be embedded in a concrete slab |
FR2584440A1 (en) | 1985-07-05 | 1987-01-09 | Moreau Pierre | Socket for positioning a pipe during the pouring of reinforced concrete |
US20010032435A1 (en) * | 2000-02-18 | 2001-10-25 | Austin Barry J. | Methods and apparatus for providing fall-arrest protection |
US20040168375A1 (en) * | 2003-01-09 | 2004-09-02 | Sack James A. | Injection molded thermoplastic insert |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2189595A1 (en) * | 2008-11-21 | 2010-05-26 | Combisafe International Aktiebolag | Fixture for protective railing |
WO2010057872A1 (en) * | 2008-11-21 | 2010-05-27 | Combisafe International Aktiebolag | Fixture for protective railing |
EP2375522A3 (en) * | 2010-04-09 | 2012-06-20 | Kaiser GmbH & Co. KG | Installation socket for electro-technical purposes |
EP2662509A1 (en) * | 2012-05-09 | 2013-11-13 | FEHR Groupe | Device for attaching an object to a prefabricated wall of a building and system for mounting a railing on a prefabricated wall comprising such an attachment device |
EP3772560A1 (en) * | 2019-08-08 | 2021-02-10 | Kp1 | Device for securing a construction accessory with a construction element and associated construction element |
FR3099778A1 (en) * | 2019-08-08 | 2021-02-12 | Kp1 | Device for securing a construction accessory to a construction element and associated construction element |
Also Published As
Publication number | Publication date |
---|---|
FR2913038A1 (en) | 2008-08-29 |
EP1965005B1 (en) | 2011-09-21 |
FR2913038B1 (en) | 2010-03-19 |
PL1965005T3 (en) | 2012-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1965005B1 (en) | Device for driving a handrail post into the edge of a slab | |
EP2792806B1 (en) | Prefabricated slab with ruptured thermal bridge, its manufacturing process and method of building of a floor with such a slab | |
EP2402531A2 (en) | Prefabricated concrete staircase with modular stair carriage | |
EP2706161B1 (en) | Concrete pre-slab for construction of a building floor | |
CH689790A5 (en) | Device versatile road protection. | |
FR2939817A1 (en) | Prefabricated elementary block for constructing e.g. outer insulating wall of building, has connection elements connecting reinforcement structures to fix inner bearing wall and outer protective shell to maintain constant transversal gap | |
WO2019053615A1 (en) | Retaining wall comprising precast piles and pile for such a wall | |
FR3026121A1 (en) | BUILDING WITH IMPROVED THERMAL INSULATION, METHOD FOR CONSTRUCTING THE SAME BUILDING AND STAPLES DESIGNED FOR CARRYING OUT SAID METHOD | |
EP3631113A1 (en) | Insulating lost formwork and associated wall construction method | |
EP3581735B1 (en) | Railing and method of creating a security balustrade | |
EP0382608B1 (en) | Method of making an excavation by the trench wall technique involving the use of releasably prestressed floor elements | |
EP2563975B1 (en) | Molded wall having prefabricated cladding | |
EP2821552B1 (en) | Gateway and method for producing such a gateway | |
EP1918488A1 (en) | Formwork support device for constructions such as concrete reservoirs | |
FR2873727A1 (en) | Thermal bridges limiting process for e.g. slab and outer wall junction, involves erecting wall by forming positioning abutments for insulating units for localized concreting zones of another erected wall, and installing units between zones | |
EP2987921B1 (en) | Integrated formwork wall with thermal break, method for constructing a building from said wall, and building obtained | |
EP3070223B1 (en) | Straight edge of a construction element and construction element comprising such an edge | |
FR2584440A1 (en) | Socket for positioning a pipe during the pouring of reinforced concrete | |
FR2542347A1 (en) | Method for the construction and insulation of a building having a masonry-lined facade fastened to an intermediate floor | |
FR2913039A1 (en) | Blind housing reserving device for e.g. upright of balustrade, has cap including receiving unit that receives body via its end that emerges outside capacity, and maintaining unit provided against casing elements exterior to capacity | |
EP2189595B1 (en) | Fixture for protective railing | |
FR2987385A1 (en) | Method for constructing wall on stages in construction site, involves anchoring shoes of railing on construction element, and fixing posts on shoes, where posts exceed above horizontal upright of wood or metal framework of element | |
EP0851072A1 (en) | Insulating facing plates especially for façade claddings and method of production | |
FR2801621A1 (en) | Prefabricated concrete staircase for building has integral tread and bonder sections forming openings to receive reinforcing rods | |
AU2007209790A1 (en) | Frameless glazing panel system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
17P | Request for examination filed |
Effective date: 20090122 |
|
17Q | First examination report despatched |
Effective date: 20090225 |
|
AKX | Designation fees paid |
Designated state(s): BE DE FR LU NL PL |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RTI1 | Title (correction) |
Free format text: DEVICE FOR DRIVING A HANDRAIL POST INTO THE EDGE OF A SLAB |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE FR LU NL PL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602008009957 Country of ref document: DE Effective date: 20111117 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: PL Ref legal event code: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20120622 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602008009957 Country of ref document: DE Effective date: 20120622 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602008009957 Country of ref document: DE Representative=s name: SCHAUMBURG & PARTNER PATENTANWAELTE GBR, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602008009957 Country of ref document: DE Representative=s name: SCHAUMBURG & PARTNER PATENTANWAELTE MBB, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602008009957 Country of ref document: DE Representative=s name: SCHAUMBURG UND PARTNER PATENTANWAELTE MBB, DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20230216 Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 20230220 Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20230213 Year of fee payment: 16 Ref country code: DE Payment date: 20230216 Year of fee payment: 16 Ref country code: BE Payment date: 20230216 Year of fee payment: 16 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230601 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240220 Year of fee payment: 17 |