EP1888963A1 - Verfahren zur herstellung eines hausverbindungsmoduls, hausverbindungsmodul und verfahren zur installation des hausverbindungsmoduls in einem rohrsystem - Google Patents

Verfahren zur herstellung eines hausverbindungsmoduls, hausverbindungsmodul und verfahren zur installation des hausverbindungsmoduls in einem rohrsystem

Info

Publication number
EP1888963A1
EP1888963A1 EP06764491A EP06764491A EP1888963A1 EP 1888963 A1 EP1888963 A1 EP 1888963A1 EP 06764491 A EP06764491 A EP 06764491A EP 06764491 A EP06764491 A EP 06764491A EP 1888963 A1 EP1888963 A1 EP 1888963A1
Authority
EP
European Patent Office
Prior art keywords
house
connection module
module
tube
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP06764491A
Other languages
English (en)
French (fr)
Other versions
EP1888963A4 (de
Inventor
Raimo Krooks
Karl-Erik Wasberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Uponor Infra Oy
Original Assignee
KWH Pipe Oy AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KWH Pipe Oy AB filed Critical KWH Pipe Oy AB
Publication of EP1888963A1 publication Critical patent/EP1888963A1/de
Publication of EP1888963A4 publication Critical patent/EP1888963A4/de
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/179Devices for covering leaks in pipes or hoses, e.g. hose-menders specially adapted for bends, branch units, branching pipes or the like
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/26Pigs or moles, i.e. devices movable in a pipe or conduit with or without self-contained propulsion means
    • F16L55/265Pigs or moles, i.e. devices movable in a pipe or conduit with or without self-contained propulsion means specially adapted for work at or near a junction between a main and a lateral pipe

Definitions

  • the invention is directed to a method of injecting polyurethane or another curable material into special modules for pipelines that are to be installed at house- connections and a module.
  • a special module is installed at a house-connection in a pipeline.
  • the space between the module and the pipeline to be reconstructed is sealed by injection of polyurethane in expansion collars in the line on both sides of the connection.
  • the injection is carried out with a device that is pushed into the pipe, the nozzle of which is directed into an injection valve arranged on the inner surface of the module.
  • the task can be carried out without any digging, through the sewer inspection shaft.
  • Drawbacks of present methods are installation difficulties and a phase in the installation phase where an injection nozzle is directed to the valve of the module.
  • Other disadvantages in the present methods are the slowness of installation work that leads apart from high installation costs to the need for the customer to adapt to the need of space needed by the installation equipment, pipes and installation team, sometimes in very highly habituated and trafficked areas.
  • the present invention is directed to a new method for manufacturing and installation of VipLiner house-connections and a house-connection.
  • the module is made by cutting an extruded tube at a fixed length and drilling a hole at the centre for a house connection.
  • the cut tube is turned according to the demands of the male and female connection ends and a sealing tape is arranged in the male end in its own groove, additionally grooves are turned at both sides of the drilled hole in the center of the tube for a back valve and rubber bands are fitted in the grooves and the edges of the back valve are marked on the inner surface of the tube.
  • a sealing collar is mounted on the outside of the back valve. Additionally a cover profile is made, which is directed to the hole drilled for the house connection.
  • the module can also be made by injection moulding, in which case there is no need for turning.
  • a method for installing a house connection module in a pipeline comprising cleaning of the old pipeline and filming the same with a video camera whereas the distances from the installation shafts to the house connections are marked, and using the markings the house connections are installed at the distances in the correct order, additionally the connection module is turned in a way that places the hole (opening) of the module at the place for the inlet pipe of the house.
  • the method comprises steps, wherein an injection head with its resin transfer tubes is pushed to the position of the connection, the puncture/injection nozzle is placed axially in the tube between the marked boundary areas and the injection head is pushed through the wall of the module using a hydraulic cylinder. After this polyurethane or other hardening material is pumped into the insulation collar. The rise of the pressure of the urethane indicates when a sufficient tightness is achieved, whereby the nozzle piece is drawn back into the tube by the hydraulics. The back valve prevents the not yet hardened material from flowing through the punctured wall of the module.
  • Fig 1 shows a house-connection module with the cover profile arranged in place.
  • Fig 2 shows the house-connection module and the cover profile separately.
  • Fig 3 shows a back valve arranged in its groove.
  • Fig 4 shows the injection of urethane and the injection situation in the installation step.
  • an extruded tube 4 is used for making a house connection module 2.
  • the manufacturing starts by cutting the tube 4 to fixed length.
  • the tube is then turned according to the demands of the male and female binding ends.
  • 50-200mm, preferably 100 mm wide grooves for the back valves 22 are also turned.
  • a groove is additionally turned for the sealing tape 10.
  • a hole 18 for the house connection is drilled at the center of the module. Rubber bands are placed in the turned grooves, which bands function as back valves 22 and the boundary edges 12 of the back valves 22 are marked on the inside of the module.
  • Sealing collars 14 are arranged on the outside of the back valves 22 in which collars the insulation material is injected during the installation step.
  • a sealing tape 10 is arranged in the grooves turned for it.
  • a cover profile 16 is made, which fits into hole 18 of module 2, to be arranged in connection module 2.
  • the module can be made by injection moulding a ready module in its final shape, in which case the need for turning disappears.
  • connection module according to the invention is additionally to lower production costs, that no special back valve or the installation of the same is needed, which is both harder and more time consuming that CNC-turning of a groove and installation of a rubber band.
  • the solution according to the invention is also cheaper than the previously known.
  • a house connection module with a cover profile 16 arranged around the connection hole 18 is installed without any digging, through a sewer inspection shaft. Before the actual installation the existing pipeline is cleaned and filmed with a video camera. In connection to the filming the distances to the house connections from the installation shaft are marked. Based on the measurements the special modules 2 for the house connections can be installed in the correct order, so that the connection module 2 is at the inlet pipe of the house connection.
  • connection module 2 When the connection module 2 is at the correct place it is rotated so that the opening 18 of the module is at the inlet pipe of the house.
  • injection apparatus 20 which comprises a blender and pumping unit, tubes and an injection head, is prepared for injection of polyurethane.
  • the injection head and its resin transportation tubes are pushed inside the pipe to the first sealing collar 14 of the connection module 2, then the injection head is pushed through the wall of the module with the help of a hydraulic cylinder.
  • Polyurethane is pumped through the injection head into the sealing collar 14 until the rising pressure of the urethane indicates that a sufficient fullness and thereby a sufficient thickness for the insulation is reached.
  • the nozzle piece is drawn back into the pipe by the hydraulics, whereas the back valve prevents the unhardened resin from flowing back into the pipe through the pierced hole. The same operation is repeated at the second sealing collar of the connection module 2.
  • a dosing apparatus for two-component resin and a specially made injection head the central parts of which are a forth and back operating hydraulic cylinder for punctuation, and an actual punctuation and injection head are needed, apart from the connection module.
  • the hydraulic cylinder is used as described above, for pushing the injection head through the wall and for releasing it after the injection.
  • the manufacturing and installation method for a house-connection module according to the invention solves the problems found in the present methods as well as the slowness of installation work and the high costs.
  • the solution according to the invention is especially preferable therein that the problem relating to the direction of the injection head to the valve of the module in the prior art is solved.
  • the solution according to the present invention is faster and requires less preciseness in the injection step, as the injection nozzle does not need to be directed more precisely than that it hits inside the boundaries of the back valve. This makes the installation essentially faster and results in that the total installation work can be carried through faster, which leads to lower installation costs and that the spacious pipes and installation equipment can be removed from densely habituated and highly trafficked areas faster.
EP06764491.4A 2005-06-10 2006-06-09 Verfahren zur herstellung eines hausverbindungsmoduls, hausverbindungsmodul und verfahren zur installation des hausverbindungsmoduls in einem rohrsystem Withdrawn EP1888963A4 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20050618A FI119658B (fi) 2005-06-10 2005-06-10 Taloliittymämoduuli ja menetelmä sen valmistamiseksi
PCT/FI2006/050246 WO2006131605A1 (en) 2005-06-10 2006-06-09 Method for manufacturing a house-connection module, a house-connection module and a method for installing the house-connection module in a pipe system

Publications (2)

Publication Number Publication Date
EP1888963A1 true EP1888963A1 (de) 2008-02-20
EP1888963A4 EP1888963A4 (de) 2014-03-05

Family

ID=34778338

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06764491.4A Withdrawn EP1888963A4 (de) 2005-06-10 2006-06-09 Verfahren zur herstellung eines hausverbindungsmoduls, hausverbindungsmodul und verfahren zur installation des hausverbindungsmoduls in einem rohrsystem

Country Status (6)

Country Link
EP (1) EP1888963A4 (de)
JP (1) JP2008542665A (de)
FI (1) FI119658B (de)
NO (1) NO20080093L (de)
RU (1) RU2391598C2 (de)
WO (1) WO2006131605A1 (de)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4504086A (en) * 1983-01-10 1985-03-12 Phillips Petroleum Company Pipe tee
EP0337031A1 (de) * 1988-04-13 1989-10-18 OY WIIK & HÖGLUND AB Verfahren zum Neuauskleiden eines Abwasserrohres
US5676404A (en) * 1996-02-12 1997-10-14 Sisk; David E. Low profile flanged tee

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8506556D0 (en) * 1985-03-13 1985-04-17 Brickhouse Dudley Plc Grouting method
JPH04248096A (ja) * 1991-01-23 1992-09-03 Osaka Gas Co Ltd 配管連結部のガス漏れ防止方法
US5351720A (en) * 1992-03-10 1994-10-04 Link-Pipe, Inc. Apparatus for repairing conduits
JP3507606B2 (ja) * 1995-12-15 2004-03-15 積水化学工業株式会社 管渠の築造方法
DE20008293U1 (de) * 2000-05-09 2000-07-27 Jansen Franz Vorrichtung zum Reparieren unterirdisch verlegter Abwasserkanäle o.dgl.

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4504086A (en) * 1983-01-10 1985-03-12 Phillips Petroleum Company Pipe tee
EP0337031A1 (de) * 1988-04-13 1989-10-18 OY WIIK & HÖGLUND AB Verfahren zum Neuauskleiden eines Abwasserrohres
US5676404A (en) * 1996-02-12 1997-10-14 Sisk; David E. Low profile flanged tee

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2006131605A1 *

Also Published As

Publication number Publication date
FI119658B (fi) 2009-01-30
RU2008100034A (ru) 2009-07-20
NO20080093L (no) 2008-01-07
EP1888963A4 (de) 2014-03-05
WO2006131605A1 (en) 2006-12-14
JP2008542665A (ja) 2008-11-27
FI20050618A (fi) 2006-12-11
RU2391598C2 (ru) 2010-06-10
FI20050618A0 (fi) 2005-06-10

Similar Documents

Publication Publication Date Title
US11555572B2 (en) Device and method for repairing pipe
FI84925C (fi) Omfordring av avloppsroer och liknande.
US10436374B2 (en) Grooved sealing member for sealing pipes and other underground structures and method of using
US7094308B1 (en) Method for sealing an annular space
JPH03504037A (ja) 近接不可能な家屋下水管を主管内で作動する遠隔制御装置により修理する方法
US8757930B2 (en) Apparatus and method for providing access to a buried pipe
JPH02210122A (ja) パイプとマンホールのシール装置及び方法
RU2625411C2 (ru) Сегмент для восстановительной трубы и способ восстановления труб
AU630729B2 (en) Method for water leakage prevention in pipeline and liner for water leakage prevention
US5971032A (en) Apparatus and method for the robotic repairing of an underground pipe junction
US6082411A (en) Apparatus and method for the robotic repairing of an underground pipe junction
EP2304306B1 (de) Verfahren zur in-situ-reparatur eines rohrlochs in rohrleitungen
US20190293225A1 (en) System and method for repair of underground pipes using water infiltration
RU2137885C1 (ru) Способ изготовления герметичных вводов домовых выпусков и подобных подводящих труб в канализационные каналы
US20130156506A1 (en) Method for Renewal or Rehabilitation of Water Supply Pipelines and Plug Arrangement for use in Said Method
KR100784192B1 (ko) 비 굴착식 관보수용 팩커를 이용한 비 굴착식 관 보수방법
WO2006131605A1 (en) Method for manufacturing a house-connection module, a house-connection module and a method for installing the house-connection module in a pipe system
JP5485810B2 (ja) 注入工法および装置
KR101325300B1 (ko) 수밀튜브 및 상하수도관과 이를 이용한 관의 수밀 연결구조
KR101432945B1 (ko) 원터치식 배관 연결장치
JP4938407B2 (ja) 既設管補修工法
EP0891857A2 (de) Vorrichtung zum Orten des Eintritts einer Abzweigrohrleitung und Rohrauskleidungsverfahren unter Verwendung dieser Vorrichtung
US3821340A (en) Method and apparatus for sealing pipe sections
CN117921939A (zh) 用于管柱内衬管的加工装置及制造管柱内衬管的方法
JP4212530B2 (ja) 逆打ち工法におけるコンクリートの打継方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20071214

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20140203

RIC1 Information provided on ipc code assigned before grant

Ipc: F16L 55/26 20060101ALI20140128BHEP

Ipc: F16L 55/179 20060101AFI20140128BHEP

Ipc: E03F 3/06 20060101ALI20140128BHEP

17Q First examination report despatched

Effective date: 20150304

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20160209

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20160621