EP1700955A1 - Procédé de réfection de voies de chemin de fer - Google Patents

Procédé de réfection de voies de chemin de fer Download PDF

Info

Publication number
EP1700955A1
EP1700955A1 EP06075143A EP06075143A EP1700955A1 EP 1700955 A1 EP1700955 A1 EP 1700955A1 EP 06075143 A EP06075143 A EP 06075143A EP 06075143 A EP06075143 A EP 06075143A EP 1700955 A1 EP1700955 A1 EP 1700955A1
Authority
EP
European Patent Office
Prior art keywords
track
beams
rails
bridge
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP06075143A
Other languages
German (de)
English (en)
Inventor
Nicolaas Johannes Antonius Van Den Hurk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VolkerRail Nederland BV
Original Assignee
VolkerRail Nederland BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VolkerRail Nederland BV filed Critical VolkerRail Nederland BV
Publication of EP1700955A1 publication Critical patent/EP1700955A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor

Definitions

  • This invention is concerned with maintenance to a railway track, particularly within the narrow space of a buried tube of a subway, especially if the tube dimensions are adapted to contain merely a single track.
  • the invention is illustrated by way of replacing the railway track within the buried tube of a subway, it will be appreciated that the field of application is broader and is generally applicable to a railway and its maintenance.
  • a tube containing a single track offers little or no space aside the track, since the cross sectional tube dimensions are adapted to tightly enclose the track, its foundation, the train moving along the track and the energy and auxiliary supplies.
  • the cross sectional tube dimensions are adapted to tightly enclose the track, its foundation, the train moving along the track and the energy and auxiliary supplies.
  • the supply, installation and discharge of the relatively large and heavy parts is difficult and time consuming since all material, equipment and personnel is forced to use the same tube.
  • train traffic may be disabled for only a short period, e.g. three hours during the night, the daily progress of replacement of the track is very limited to e.g. one or two meters.
  • the object of the invention is to improve the processing of a railway track renewal by proposing to replace a longitudinal part of the track by a temporary auxiliary track which is preferably designed such that it contains means to adapt or adjust the auxiliary track to the local conditions, e.g. one or more of rail width, (horizontal) curvature, level, cant, alignment, such that said auxiliary track becomes part of the course of the original track and the train traffic can maintain its normal route and speed.
  • a temporary auxiliary track which is preferably designed such that it contains means to adapt or adjust the auxiliary track to the local conditions, e.g. one or more of rail width, (horizontal) curvature, level, cant, alignment, such that said auxiliary track becomes part of the course of the original track and the train traffic can maintain its normal route and speed.
  • the invention is further eloborated by way of a non-limiting embodiment, refering to the enclosed drawing.
  • Fig. 1 shows partly a cross section of a subway tube to which the invention can be applied.
  • it contains spaced apart, parallel, train wheel bearing rails of the track that are mounted by rail mountings on wooden sleepers, embedded in concrete having a central recess containing gravel.
  • Conductor rails on insulators, between and aside the train rails provide electrical driving power supply to the train.
  • the train rails can be of the so called bullhead type, i.e. they are syzametricaily shaped such they can also be used in inverted position after the original rail head is worn out. It will however be appreciated that the invention is also applicable to different rail types and rail connections and also to different sleeper and power supply types.
  • a temporary bridge part or adjustible construction 2 is provided, as illustrated in cross section in fig. 1 and 2, in sectional side view according to line A-A and B-B in fig. 3 resp. 4 and in sectional top view according to line C-C in fig. 5.
  • the construction 2 is shown during the operation of track replacement.
  • Fig. 3, 4 and 5 show only a longitudinal part of the construction 2 at the location where it connects to the original (to be replaced) track.
  • the original track is at the left hand side of line Z (fig. 3-5).
  • the construction 2 at its opposite end connects to the original track or new track.
  • Construction 2 is provided by two parallel rigid longitudinal beams 3 at both sides of the centre line A-A of the track, between temporary rails 5 of low height.
  • the beams 3 and rails 5 are mutually connected by a plurality of cross beams 4 spaced along their length.
  • These cross beams 4 have an adjustable length, such that the mutual spacing between beams 3 and rails 5 can be adjusted. This is important not only for adjustment to the ends of the original track to which this construction 2 is connected, but also to bend the rails 5 according to the (horizontal) curvature (e.g. a radius of 60 m) of the original track it temporarily replaces.
  • the bending stiffness of the beams 3 is sufficiently high such that they form the proper solid "backbone" to horizontally and vertically bend the rails 5.
  • the construction 2 offers space to apply a check rail at the inner rail 5.
  • the cross beams 4 provide some kind of sleepers, adjustable in length.
  • the fastening of the rails 5 and the conductor rail 6 to the relevant cross beam 4 can as an alternative be adjustable or repositionable, such that the cross beams 4 can have a fixed length.
  • the rail 5 can be clamped to the beam 4 such that it can be shifted along beam 4 after loosening the clamps.
  • the central cross beam 4 bears the (negative) conductor rail 6 which also belongs to construction 2.
  • Construction 2 is provided with a plurality of longitudinally spaced supports 8, preferably having an adjustible length, e.g. as telescopic rods or tubes. As shown, two arrays of these supports 8 are provided at both sides of the track centre line, also allowing for adjustment of the cant or vertical alignment. Preferably, these supports 8 are designed to completely support the construction 2 and a train bearing on the rails 5. The construction 2 behaves like a unitary object.
  • Construction 2 can be provided with running wheels (not shown) or skates or equivalent means such that it can conveniently be moved over the substrate in longitudinal direction, e.g. after being jacked up. Or it can be provided with equipment with lifting points, such that construction 2 can be hoisted to the tunnel roof. It can also be provided with integrated walkway boards to provide an (emergency) walkway.
  • the spacing between the cross beams is such that the old or new sleepers can be nested between these cross beams 4.
  • the dimensions of the rail 5 and beam 4 are such that the top of rail 5 is level with the top of the corresponding rail 1 of the original track and the new track.
  • the original rails 1, central (negative) conductor rail 10 and sleepers 9 are removed over a predetermined length, preferably substantially equal to the length of the construction 2.
  • said length corresponds to a plurality of a length part that can be replaced during a single daily shift when applying the prior art method.
  • said length corresponds to a standard rail length, which is at least 10 m.
  • the original lateral (positive) conductor rail 11 remains in place.
  • the construction 2 is installed and its rails 5 are connected to the ends of the existing rails 1 and its central conductor rail 6 is connected to the ends of the existing central conductor rail 10 and the required alignements of the components of the construction 2 are carried out to allow safe railway traffic.
  • construction 2 bridges the gap in the original track due to removal of the original rails 1, central (negative) conductor rail 10 and sleepers 9 over said predetermined length.
  • Supports 8 are located in a previously with gravel filled recess 12 in the concrete rail embedment 13.
  • the construcion 2 is removed (e.g. rolled forward or backward over at least a distance corresponding to its length) and then the concrete embedment 13 is removed and finally the construction 2 is replaced to allow safe railway traffic.
  • the construction 2 is removed, and then the new rails and the new central conductor rail are installed such that the track replacement for this length part is completed and safe railway traffic in this length part is permanently provided. Then the construction 2 will be used to process a subsequent length of the track, wherein the steps according to day 1 - 5 can be subsequently repeated.
  • the invention also covers embodiments obtained by removing one or more features of the above disclosed embodiment, or replacing it by a functional equivalent.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
EP06075143A 2005-01-21 2006-01-21 Procédé de réfection de voies de chemin de fer Withdrawn EP1700955A1 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL1028088 2005-01-21

Publications (1)

Publication Number Publication Date
EP1700955A1 true EP1700955A1 (fr) 2006-09-13

Family

ID=36071950

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06075143A Withdrawn EP1700955A1 (fr) 2005-01-21 2006-01-21 Procédé de réfection de voies de chemin de fer

Country Status (1)

Country Link
EP (1) EP1700955A1 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1775381A1 (fr) * 2005-10-12 2007-04-18 Volker Rail Nederland BV Procédé pour le renouvellement de voies ferrées en tunnel
FR3000113A1 (fr) * 2012-12-21 2014-06-27 Sncf Structure de support d'une portion de voie ferree.
RU2521913C2 (ru) * 2012-04-26 2014-07-10 Общество с ограниченной ответственностью "МЕТРО-СТИЛЬ 2000" Верхнее строение рельсового пути
RU2549423C2 (ru) * 2009-06-16 2015-04-27 Фкк Конструксион, С.А. Способ укладки сплошных подрельсовых оснований в двухтрубных туннелях

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2666599A1 (fr) * 1990-09-10 1992-03-13 Sud Ouest Travaux Procede et dispositif pour la pose en continu et/ou le renouvellement de voies ferrees.
FR2783847A1 (fr) * 1998-09-29 2000-03-31 Nfm Tech Rampe d'acces d'un train de service dans un train suiveur d'un tunnelier
DE10148727A1 (de) * 2001-10-02 2003-04-10 Ferd Braselmann Gmbh & Co Kg Einrichtung zur Verlagerung von Schienen sowie Bodenschwelle
EP1396578A1 (fr) * 2002-09-04 2004-03-10 Volker Stevin Rail & Traffic BV Methode de traitement d'une voie ferrée

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2666599A1 (fr) * 1990-09-10 1992-03-13 Sud Ouest Travaux Procede et dispositif pour la pose en continu et/ou le renouvellement de voies ferrees.
FR2783847A1 (fr) * 1998-09-29 2000-03-31 Nfm Tech Rampe d'acces d'un train de service dans un train suiveur d'un tunnelier
DE10148727A1 (de) * 2001-10-02 2003-04-10 Ferd Braselmann Gmbh & Co Kg Einrichtung zur Verlagerung von Schienen sowie Bodenschwelle
EP1396578A1 (fr) * 2002-09-04 2004-03-10 Volker Stevin Rail & Traffic BV Methode de traitement d'une voie ferrée

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1775381A1 (fr) * 2005-10-12 2007-04-18 Volker Rail Nederland BV Procédé pour le renouvellement de voies ferrées en tunnel
RU2549423C2 (ru) * 2009-06-16 2015-04-27 Фкк Конструксион, С.А. Способ укладки сплошных подрельсовых оснований в двухтрубных туннелях
RU2521913C2 (ru) * 2012-04-26 2014-07-10 Общество с ограниченной ответственностью "МЕТРО-СТИЛЬ 2000" Верхнее строение рельсового пути
FR3000113A1 (fr) * 2012-12-21 2014-06-27 Sncf Structure de support d'une portion de voie ferree.

Similar Documents

Publication Publication Date Title
CN101503870B (zh) 一种双块式无砟轨道道床板的施工方法
CN106758590B (zh) 用于不停运条件下更换铁路轨道的施工便梁及施工方法
KR102105230B1 (ko) 기존 철도선로와 철도운행을 유지하는 철도교량 시공방법
KR100757958B1 (ko) 선형유도전동기에서 선형유도전동기 패널의 부설을 위한인서트 매립 장치
CN107060823B (zh) 隧道锚段二衬混凝土施工无拆卸台车
CN103452018B (zh) 一种双块式无碴轨道施工的轨距校正方法
CN109235291B (zh) 铁路桥梁换梁系统
KR100891961B1 (ko) 가설구조물을 이용하여 도로 또는 철도의 노후된 교량이나 무도상 교량을 유도상화 하기 위한 교량 교체공법 및 그 장치
EP1700955A1 (fr) Procédé de réfection de voies de chemin de fer
KR100556219B1 (ko) 철도교량의 상부구조물 교체 및 이를 이용한 유도상화방법.
KR102197762B1 (ko) 도상 교체용 특수 철도차량
CN106677076A (zh) 用一个跨墩龙门吊安装相邻盖梁顶箱梁的简易快速方法及装置
KR100924306B1 (ko) 이동형 가로보를 갖는 가설교량의 시공방법
EP1558815B1 (fr) Chaussee solide destinee au trafic ferroviaire et son procede de production
CN105603838A (zh) 一种轨道板抬升小车及方法
KR20040012295A (ko) 가벤트를 이용하여 철도교의 강교를 콘크리트교로치환하여 유도상화하는 공법 및 그 장치
JP7368685B2 (ja) 橋梁の架替工法および橋梁上部構造
CN217324965U (zh) 一种永临结合的铺轨基地桥梁
CN106368089A (zh) 有轨电车小半径曲线轨道铺设及线型控制的施工方法
CN110629684A (zh) 拼接式铁路施工便梁施工方法
RU2352705C1 (ru) Способ укладки верхнего строения пути
AT500950A4 (de) Verfahren zur herstellung einer tunnelfahrbahn für schienenfahrzeuge
CN211772922U (zh) 一种铁路桥墩抢修用平移顶推装置
CN114134801A (zh) 一种水上大跨度系杆拱桥主梁拆除结构及拆除施工方法
RU2377356C2 (ru) Способ замены шпал

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

17P Request for examination filed

Effective date: 20070308

17Q First examination report despatched

Effective date: 20070411

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20120802