EP1700955A1 - Procédé de réfection de voies de chemin de fer - Google Patents
Procédé de réfection de voies de chemin de fer Download PDFInfo
- Publication number
- EP1700955A1 EP1700955A1 EP06075143A EP06075143A EP1700955A1 EP 1700955 A1 EP1700955 A1 EP 1700955A1 EP 06075143 A EP06075143 A EP 06075143A EP 06075143 A EP06075143 A EP 06075143A EP 1700955 A1 EP1700955 A1 EP 1700955A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- track
- beams
- rails
- bridge
- length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B23/00—Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
Definitions
- This invention is concerned with maintenance to a railway track, particularly within the narrow space of a buried tube of a subway, especially if the tube dimensions are adapted to contain merely a single track.
- the invention is illustrated by way of replacing the railway track within the buried tube of a subway, it will be appreciated that the field of application is broader and is generally applicable to a railway and its maintenance.
- a tube containing a single track offers little or no space aside the track, since the cross sectional tube dimensions are adapted to tightly enclose the track, its foundation, the train moving along the track and the energy and auxiliary supplies.
- the cross sectional tube dimensions are adapted to tightly enclose the track, its foundation, the train moving along the track and the energy and auxiliary supplies.
- the supply, installation and discharge of the relatively large and heavy parts is difficult and time consuming since all material, equipment and personnel is forced to use the same tube.
- train traffic may be disabled for only a short period, e.g. three hours during the night, the daily progress of replacement of the track is very limited to e.g. one or two meters.
- the object of the invention is to improve the processing of a railway track renewal by proposing to replace a longitudinal part of the track by a temporary auxiliary track which is preferably designed such that it contains means to adapt or adjust the auxiliary track to the local conditions, e.g. one or more of rail width, (horizontal) curvature, level, cant, alignment, such that said auxiliary track becomes part of the course of the original track and the train traffic can maintain its normal route and speed.
- a temporary auxiliary track which is preferably designed such that it contains means to adapt or adjust the auxiliary track to the local conditions, e.g. one or more of rail width, (horizontal) curvature, level, cant, alignment, such that said auxiliary track becomes part of the course of the original track and the train traffic can maintain its normal route and speed.
- the invention is further eloborated by way of a non-limiting embodiment, refering to the enclosed drawing.
- Fig. 1 shows partly a cross section of a subway tube to which the invention can be applied.
- it contains spaced apart, parallel, train wheel bearing rails of the track that are mounted by rail mountings on wooden sleepers, embedded in concrete having a central recess containing gravel.
- Conductor rails on insulators, between and aside the train rails provide electrical driving power supply to the train.
- the train rails can be of the so called bullhead type, i.e. they are syzametricaily shaped such they can also be used in inverted position after the original rail head is worn out. It will however be appreciated that the invention is also applicable to different rail types and rail connections and also to different sleeper and power supply types.
- a temporary bridge part or adjustible construction 2 is provided, as illustrated in cross section in fig. 1 and 2, in sectional side view according to line A-A and B-B in fig. 3 resp. 4 and in sectional top view according to line C-C in fig. 5.
- the construction 2 is shown during the operation of track replacement.
- Fig. 3, 4 and 5 show only a longitudinal part of the construction 2 at the location where it connects to the original (to be replaced) track.
- the original track is at the left hand side of line Z (fig. 3-5).
- the construction 2 at its opposite end connects to the original track or new track.
- Construction 2 is provided by two parallel rigid longitudinal beams 3 at both sides of the centre line A-A of the track, between temporary rails 5 of low height.
- the beams 3 and rails 5 are mutually connected by a plurality of cross beams 4 spaced along their length.
- These cross beams 4 have an adjustable length, such that the mutual spacing between beams 3 and rails 5 can be adjusted. This is important not only for adjustment to the ends of the original track to which this construction 2 is connected, but also to bend the rails 5 according to the (horizontal) curvature (e.g. a radius of 60 m) of the original track it temporarily replaces.
- the bending stiffness of the beams 3 is sufficiently high such that they form the proper solid "backbone" to horizontally and vertically bend the rails 5.
- the construction 2 offers space to apply a check rail at the inner rail 5.
- the cross beams 4 provide some kind of sleepers, adjustable in length.
- the fastening of the rails 5 and the conductor rail 6 to the relevant cross beam 4 can as an alternative be adjustable or repositionable, such that the cross beams 4 can have a fixed length.
- the rail 5 can be clamped to the beam 4 such that it can be shifted along beam 4 after loosening the clamps.
- the central cross beam 4 bears the (negative) conductor rail 6 which also belongs to construction 2.
- Construction 2 is provided with a plurality of longitudinally spaced supports 8, preferably having an adjustible length, e.g. as telescopic rods or tubes. As shown, two arrays of these supports 8 are provided at both sides of the track centre line, also allowing for adjustment of the cant or vertical alignment. Preferably, these supports 8 are designed to completely support the construction 2 and a train bearing on the rails 5. The construction 2 behaves like a unitary object.
- Construction 2 can be provided with running wheels (not shown) or skates or equivalent means such that it can conveniently be moved over the substrate in longitudinal direction, e.g. after being jacked up. Or it can be provided with equipment with lifting points, such that construction 2 can be hoisted to the tunnel roof. It can also be provided with integrated walkway boards to provide an (emergency) walkway.
- the spacing between the cross beams is such that the old or new sleepers can be nested between these cross beams 4.
- the dimensions of the rail 5 and beam 4 are such that the top of rail 5 is level with the top of the corresponding rail 1 of the original track and the new track.
- the original rails 1, central (negative) conductor rail 10 and sleepers 9 are removed over a predetermined length, preferably substantially equal to the length of the construction 2.
- said length corresponds to a plurality of a length part that can be replaced during a single daily shift when applying the prior art method.
- said length corresponds to a standard rail length, which is at least 10 m.
- the original lateral (positive) conductor rail 11 remains in place.
- the construction 2 is installed and its rails 5 are connected to the ends of the existing rails 1 and its central conductor rail 6 is connected to the ends of the existing central conductor rail 10 and the required alignements of the components of the construction 2 are carried out to allow safe railway traffic.
- construction 2 bridges the gap in the original track due to removal of the original rails 1, central (negative) conductor rail 10 and sleepers 9 over said predetermined length.
- Supports 8 are located in a previously with gravel filled recess 12 in the concrete rail embedment 13.
- the construcion 2 is removed (e.g. rolled forward or backward over at least a distance corresponding to its length) and then the concrete embedment 13 is removed and finally the construction 2 is replaced to allow safe railway traffic.
- the construction 2 is removed, and then the new rails and the new central conductor rail are installed such that the track replacement for this length part is completed and safe railway traffic in this length part is permanently provided. Then the construction 2 will be used to process a subsequent length of the track, wherein the steps according to day 1 - 5 can be subsequently repeated.
- the invention also covers embodiments obtained by removing one or more features of the above disclosed embodiment, or replacing it by a functional equivalent.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL1028088 | 2005-01-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1700955A1 true EP1700955A1 (fr) | 2006-09-13 |
Family
ID=36071950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP06075143A Withdrawn EP1700955A1 (fr) | 2005-01-21 | 2006-01-21 | Procédé de réfection de voies de chemin de fer |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP1700955A1 (fr) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1775381A1 (fr) * | 2005-10-12 | 2007-04-18 | Volker Rail Nederland BV | Procédé pour le renouvellement de voies ferrées en tunnel |
FR3000113A1 (fr) * | 2012-12-21 | 2014-06-27 | Sncf | Structure de support d'une portion de voie ferree. |
RU2521913C2 (ru) * | 2012-04-26 | 2014-07-10 | Общество с ограниченной ответственностью "МЕТРО-СТИЛЬ 2000" | Верхнее строение рельсового пути |
RU2549423C2 (ru) * | 2009-06-16 | 2015-04-27 | Фкк Конструксион, С.А. | Способ укладки сплошных подрельсовых оснований в двухтрубных туннелях |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2666599A1 (fr) * | 1990-09-10 | 1992-03-13 | Sud Ouest Travaux | Procede et dispositif pour la pose en continu et/ou le renouvellement de voies ferrees. |
FR2783847A1 (fr) * | 1998-09-29 | 2000-03-31 | Nfm Tech | Rampe d'acces d'un train de service dans un train suiveur d'un tunnelier |
DE10148727A1 (de) * | 2001-10-02 | 2003-04-10 | Ferd Braselmann Gmbh & Co Kg | Einrichtung zur Verlagerung von Schienen sowie Bodenschwelle |
EP1396578A1 (fr) * | 2002-09-04 | 2004-03-10 | Volker Stevin Rail & Traffic BV | Methode de traitement d'une voie ferrée |
-
2006
- 2006-01-21 EP EP06075143A patent/EP1700955A1/fr not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2666599A1 (fr) * | 1990-09-10 | 1992-03-13 | Sud Ouest Travaux | Procede et dispositif pour la pose en continu et/ou le renouvellement de voies ferrees. |
FR2783847A1 (fr) * | 1998-09-29 | 2000-03-31 | Nfm Tech | Rampe d'acces d'un train de service dans un train suiveur d'un tunnelier |
DE10148727A1 (de) * | 2001-10-02 | 2003-04-10 | Ferd Braselmann Gmbh & Co Kg | Einrichtung zur Verlagerung von Schienen sowie Bodenschwelle |
EP1396578A1 (fr) * | 2002-09-04 | 2004-03-10 | Volker Stevin Rail & Traffic BV | Methode de traitement d'une voie ferrée |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1775381A1 (fr) * | 2005-10-12 | 2007-04-18 | Volker Rail Nederland BV | Procédé pour le renouvellement de voies ferrées en tunnel |
RU2549423C2 (ru) * | 2009-06-16 | 2015-04-27 | Фкк Конструксион, С.А. | Способ укладки сплошных подрельсовых оснований в двухтрубных туннелях |
RU2521913C2 (ru) * | 2012-04-26 | 2014-07-10 | Общество с ограниченной ответственностью "МЕТРО-СТИЛЬ 2000" | Верхнее строение рельсового пути |
FR3000113A1 (fr) * | 2012-12-21 | 2014-06-27 | Sncf | Structure de support d'une portion de voie ferree. |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101503870B (zh) | 一种双块式无砟轨道道床板的施工方法 | |
CN106758590B (zh) | 用于不停运条件下更换铁路轨道的施工便梁及施工方法 | |
KR102105230B1 (ko) | 기존 철도선로와 철도운행을 유지하는 철도교량 시공방법 | |
KR100757958B1 (ko) | 선형유도전동기에서 선형유도전동기 패널의 부설을 위한인서트 매립 장치 | |
CN107060823B (zh) | 隧道锚段二衬混凝土施工无拆卸台车 | |
CN103452018B (zh) | 一种双块式无碴轨道施工的轨距校正方法 | |
CN109235291B (zh) | 铁路桥梁换梁系统 | |
KR100891961B1 (ko) | 가설구조물을 이용하여 도로 또는 철도의 노후된 교량이나 무도상 교량을 유도상화 하기 위한 교량 교체공법 및 그 장치 | |
EP1700955A1 (fr) | Procédé de réfection de voies de chemin de fer | |
KR100556219B1 (ko) | 철도교량의 상부구조물 교체 및 이를 이용한 유도상화방법. | |
KR102197762B1 (ko) | 도상 교체용 특수 철도차량 | |
CN106677076A (zh) | 用一个跨墩龙门吊安装相邻盖梁顶箱梁的简易快速方法及装置 | |
KR100924306B1 (ko) | 이동형 가로보를 갖는 가설교량의 시공방법 | |
EP1558815B1 (fr) | Chaussee solide destinee au trafic ferroviaire et son procede de production | |
CN105603838A (zh) | 一种轨道板抬升小车及方法 | |
KR20040012295A (ko) | 가벤트를 이용하여 철도교의 강교를 콘크리트교로치환하여 유도상화하는 공법 및 그 장치 | |
JP7368685B2 (ja) | 橋梁の架替工法および橋梁上部構造 | |
CN217324965U (zh) | 一种永临结合的铺轨基地桥梁 | |
CN106368089A (zh) | 有轨电车小半径曲线轨道铺设及线型控制的施工方法 | |
CN110629684A (zh) | 拼接式铁路施工便梁施工方法 | |
RU2352705C1 (ru) | Способ укладки верхнего строения пути | |
AT500950A4 (de) | Verfahren zur herstellung einer tunnelfahrbahn für schienenfahrzeuge | |
CN211772922U (zh) | 一种铁路桥墩抢修用平移顶推装置 | |
CN114134801A (zh) | 一种水上大跨度系杆拱桥主梁拆除结构及拆除施工方法 | |
RU2377356C2 (ru) | Способ замены шпал |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
17P | Request for examination filed |
Effective date: 20070308 |
|
17Q | First examination report despatched |
Effective date: 20070411 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20120802 |