EP1700955A1 - Method of railway track renewal - Google Patents

Method of railway track renewal Download PDF

Info

Publication number
EP1700955A1
EP1700955A1 EP06075143A EP06075143A EP1700955A1 EP 1700955 A1 EP1700955 A1 EP 1700955A1 EP 06075143 A EP06075143 A EP 06075143A EP 06075143 A EP06075143 A EP 06075143A EP 1700955 A1 EP1700955 A1 EP 1700955A1
Authority
EP
European Patent Office
Prior art keywords
track
beams
rails
bridge
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP06075143A
Other languages
German (de)
French (fr)
Inventor
Nicolaas Johannes Antonius Van Den Hurk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VolkerRail Nederland BV
Original Assignee
VolkerRail Nederland BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VolkerRail Nederland BV filed Critical VolkerRail Nederland BV
Publication of EP1700955A1 publication Critical patent/EP1700955A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor

Abstract

Method of railway track renewal in an underground tube by replacing a long part of the track by a temporary auxiliary track or bridging construction (2) such that said auxiliary track becomes part of the course of the original track and the train traffic can remain its normal route. The bridge (2) comprises two parallel rigid longitudinal beams (3) between temporary rails (5) and in length adjustable cross beams (4), such that the mutual spacing between beams (3) and rails (5) can be adjusted. The bridge also has the (negative) conductor rail (6) and longitudinal beams (7) parallel to beams (3) and supports (8), having an adjustible length. Bridge(2) behaves like a unitary object.

Description

  • This invention is concerned with maintenance to a railway track, particularly within the narrow space of a buried tube of a subway, especially if the tube dimensions are adapted to contain merely a single track. Although the invention is illustrated by way of replacing the railway track within the buried tube of a subway, it will be appreciated that the field of application is broader and is generally applicable to a railway and its maintenance.
  • Commonly, a tube containing a single track offers little or no space aside the track, since the cross sectional tube dimensions are adapted to tightly enclose the track, its foundation, the train moving along the track and the energy and auxiliary supplies. In that case, if replacement of parts of the track is required, e.g. the rails and sleepers, the supply, installation and discharge of the relatively large and heavy parts is difficult and time consuming since all material, equipment and personnel is forced to use the same tube. In practise, when train traffic may be disabled for only a short period, e.g. three hours during the night, the daily progress of replacement of the track is very limited to e.g. one or two meters.
  • The object of the invention is to improve the processing of a railway track renewal by proposing to replace a longitudinal part of the track by a temporary auxiliary track which is preferably designed such that it contains means to adapt or adjust the auxiliary track to the local conditions, e.g. one or more of rail width, (horizontal) curvature, level, cant, alignment, such that said auxiliary track becomes part of the course of the original track and the train traffic can maintain its normal route and speed.
  • The invention is further eloborated by way of a non-limiting embodiment, refering to the enclosed drawing.
  • Fig. 1 shows partly a cross section of a subway tube to which the invention can be applied. Typically, it contains spaced apart, parallel, train wheel bearing rails of the track that are mounted by rail mountings on wooden sleepers, embedded in concrete having a central recess containing gravel. Conductor rails on insulators, between and aside the train rails provide electrical driving power supply to the train. The train rails can be of the so called bullhead type, i.e. they are syzametricaily shaped such they can also be used in inverted position after the original rail head is worn out. It will however be appreciated that the invention is also applicable to different rail types and rail connections and also to different sleeper and power supply types.
  • To replace the train rails by another, more common rail type, e.g. vignola or flat bottom type, the original train rails, rail mountings, sleepers and conductor rails have to be removed. These parts are replaced by concrete sleepers and different conductor rails, rail mountings and rails.
  • In accordance with the invention, a temporary bridge part or adjustible construction 2 is provided, as illustrated in cross section in fig. 1 and 2, in sectional side view according to line A-A and B-B in fig. 3 resp. 4 and in sectional top view according to line C-C in fig. 5. In the drawings, the construction 2 is shown during the operation of track replacement. Fig. 3, 4 and 5 show only a longitudinal part of the construction 2 at the location where it connects to the original (to be replaced) track. The original track is at the left hand side of line Z (fig. 3-5). Obviously, the construction 2 at its opposite end connects to the original track or new track.
  • Construction 2 is provided by two parallel rigid longitudinal beams 3 at both sides of the centre line A-A of the track, between temporary rails 5 of low height. The beams 3 and rails 5 are mutually connected by a plurality of cross beams 4 spaced along their length. These cross beams 4 have an adjustable length, such that the mutual spacing between beams 3 and rails 5 can be adjusted. This is important not only for adjustment to the ends of the original track to which this construction 2 is connected, but also to bend the rails 5 according to the (horizontal) curvature (e.g. a radius of 60 m) of the original track it temporarily replaces. Obviously, the bending stiffness of the beams 3 is sufficiently high such that they form the proper solid "backbone" to horizontally and vertically bend the rails 5. For tight curves the construction 2 offers space to apply a check rail at the inner rail 5.
  • Obviously, the cross beams 4 provide some kind of sleepers, adjustable in length. In stead of this, the fastening of the rails 5 and the conductor rail 6 to the relevant cross beam 4 can as an alternative be adjustable or repositionable, such that the cross beams 4 can have a fixed length. E.g. the rail 5 can be clamped to the beam 4 such that it can be shifted along beam 4 after loosening the clamps.
  • The central cross beam 4 bears the (negative) conductor rail 6 which also belongs to construction 2.
  • To further strengthen construction 2, further longitudinal beams 7 parallel to beams 3 can be provided, e.g. at the outer ends of outer beams 4 as shown.
  • Construction 2 is provided with a plurality of longitudinally spaced supports 8, preferably having an adjustible length, e.g. as telescopic rods or tubes. As shown, two arrays of these supports 8 are provided at both sides of the track centre line, also allowing for adjustment of the cant or vertical alignment. Preferably, these supports 8 are designed to completely support the construction 2 and a train bearing on the rails 5. The construction 2 behaves like a unitary object.
  • Construction 2 can be provided with running wheels (not shown) or skates or equivalent means such that it can conveniently be moved over the substrate in longitudinal direction, e.g. after being jacked up. Or it can be provided with equipment with lifting points, such that construction 2 can be hoisted to the tunnel roof. It can also be provided with integrated walkway boards to provide an (emergency) walkway.
  • Preferably the spacing between the cross beams is such that the old or new sleepers can be nested between these cross beams 4.
  • The dimensions of the rail 5 and beam 4 are such that the top of rail 5 is level with the top of the corresponding rail 1 of the original track and the new track.
  • With the construction 2 track replacement can be carried out as follows:
  • At day 1 the original rails 1, central (negative) conductor rail 10 and sleepers 9 are removed over a predetermined length, preferably substantially equal to the length of the construction 2. Preferably, said length corresponds to a plurality of a length part that can be replaced during a single daily shift when applying the prior art method. Conveniently, said length corresponds to a standard rail length, which is at least 10 m. The original lateral (positive) conductor rail 11 remains in place. The construction 2 is installed and its rails 5 are connected to the ends of the existing rails 1 and its central conductor rail 6 is connected to the ends of the existing central conductor rail 10 and the required alignements of the components of the construction 2 are carried out to allow safe railway traffic. Thus, construction 2 bridges the gap in the original track due to removal of the original rails 1, central (negative) conductor rail 10 and sleepers 9 over said predetermined length. Supports 8 are located in a previously with gravel filled recess 12 in the concrete rail embedment 13.
  • At day 2 first the construcion 2 is removed (e.g. rolled forward or backward over at least a distance corresponding to its length) and then the concrete embedment 13 is removed and finally the construction 2 is replaced to allow safe railway traffic.
  • At day 3 first the construction 2 is removed, then new sleepers and new rails are installed and aligned, whereafter the sleepers are anchored and then the new rails are removed and finally the construction 2 is replaced to allow safe railway traffic.
  • At day 4 first the construction 2 is removed, then the new embedment is installed and finally the construction 2 is replaced to allow safe railway traffic.
  • At day 5 first the construction 2 is removed, and then the new rails and the new central conductor rail are installed such that the track replacement for this length part is completed and safe railway traffic in this length part is permanently provided. Then the construction 2 will be used to process a subsequent length of the track, wherein the steps according to day 1 - 5 can be subsequently repeated.
  • The invention also covers embodiments obtained by removing one or more features of the above disclosed embodiment, or replacing it by a functional equivalent.

Claims (10)

  1. Method of railway track renewal in an underground tube by replacing a long part of the track by a temporary auxiliary track or bridging construction (2) such that said auxiliary track becomes part of the course of the original track and the train traffic can remain its normal route.
  2. Method according to claim 1, wherein the bridge (2) has means to adjust or adapt it to the local conditions, e.g. any of rail width, (horizontal) curvature, level, cant, alignment.
  3. Method according to claim 1 or 2, carried out in a tube with just enough space for a single track for civil train traffic.
  4. Method according to claim 1, 2 or 3, wherein the original rails (1), its mountings, (wooden) sleepers (9) and conductor rail (10) are renewed.
  5. Method according to claim 1, 2, 3 or 4, wherein the bridge (2) comprises one or two parallel rigid longitudinal beams (3) at both sides of the centre line A-A of the track, between temporary rails (5), which beams (3) and rails (5) are mutually connected by a plurality of cross beams (4) spaced along their length and adjustable in length, such that the mutual spacing between beams (3) and rails (5) can be adjusted.
  6. Method according to any of claims 1-5, the (negative) conductor rail (6) also belongs to bridge (2).
  7. Method according to any of claims 1-6, further longitudinal beams (7) parallel to beams (3), e.g. at the outer ends of beams (4) also belong to bridge (2).
  8. Method according to any of claims 1-7, longitudinally spaced supports (8), preferably having an adjustible length, e.g. as telescopic rods or tubes, also belong to bridge (2).
  9. Method according to any of claims 1-8, wherein the bridge (2) behaves like a unitary object.
  10. Method according to any of claims 1-9, wherein the construction (2) is removed at a later time by moving it in longitudinal direction or lifting it and after that is replaced, while in between renewal work is carried out.
EP06075143A 2005-01-21 2006-01-21 Method of railway track renewal Withdrawn EP1700955A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL1028088 2005-01-21

Publications (1)

Publication Number Publication Date
EP1700955A1 true EP1700955A1 (en) 2006-09-13

Family

ID=36071950

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06075143A Withdrawn EP1700955A1 (en) 2005-01-21 2006-01-21 Method of railway track renewal

Country Status (1)

Country Link
EP (1) EP1700955A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1775381A1 (en) * 2005-10-12 2007-04-18 Volker Rail Nederland BV Underground track replacement in tube tunnels
FR3000113A1 (en) * 2012-12-21 2014-06-27 Sncf Supporting structure for supporting portion of railway that is utilized for e.g. supporting train, has set of support spacers extending between cross-pieces and rails and fixed with reinforcement beam to support portion of railway
RU2521913C2 (en) * 2012-04-26 2014-07-10 Общество с ограниченной ответственностью "МЕТРО-СТИЛЬ 2000" Rail track superstructure
RU2549423C2 (en) * 2009-06-16 2015-04-27 Фкк Конструксион, С.А. Method of laying of continuous subrail supports in two-pipe tunnels

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2666599A1 (en) * 1990-09-10 1992-03-13 Sud Ouest Travaux Method and device for continuous laying and/or replacing of railway tracks
FR2783847A1 (en) * 1998-09-29 2000-03-31 Nfm Tech Access ramp for service train fitting inside follower train of tunnelling machine has rails supported by parallel lengthwise members
DE10148727A1 (en) * 2001-10-02 2003-04-10 Ferd Braselmann Gmbh & Co Kg Arrangement for mounting rails, in particular, in tunnels comprises a plurality of sleepers which only partially rest on the base structure, and are provided with rail clamping/positioning elements
EP1396578A1 (en) * 2002-09-04 2004-03-10 Volker Stevin Rail & Traffic BV Method for processing a railway track

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2666599A1 (en) * 1990-09-10 1992-03-13 Sud Ouest Travaux Method and device for continuous laying and/or replacing of railway tracks
FR2783847A1 (en) * 1998-09-29 2000-03-31 Nfm Tech Access ramp for service train fitting inside follower train of tunnelling machine has rails supported by parallel lengthwise members
DE10148727A1 (en) * 2001-10-02 2003-04-10 Ferd Braselmann Gmbh & Co Kg Arrangement for mounting rails, in particular, in tunnels comprises a plurality of sleepers which only partially rest on the base structure, and are provided with rail clamping/positioning elements
EP1396578A1 (en) * 2002-09-04 2004-03-10 Volker Stevin Rail & Traffic BV Method for processing a railway track

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1775381A1 (en) * 2005-10-12 2007-04-18 Volker Rail Nederland BV Underground track replacement in tube tunnels
RU2549423C2 (en) * 2009-06-16 2015-04-27 Фкк Конструксион, С.А. Method of laying of continuous subrail supports in two-pipe tunnels
RU2521913C2 (en) * 2012-04-26 2014-07-10 Общество с ограниченной ответственностью "МЕТРО-СТИЛЬ 2000" Rail track superstructure
FR3000113A1 (en) * 2012-12-21 2014-06-27 Sncf Supporting structure for supporting portion of railway that is utilized for e.g. supporting train, has set of support spacers extending between cross-pieces and rails and fixed with reinforcement beam to support portion of railway

Similar Documents

Publication Publication Date Title
CN101503870B (en) Construction method for two-block unballasted track bed board
CN106758590B (en) Construction temporary beam for replacing railway track under non-stop condition and construction method
KR100757958B1 (en) Insert reclamation apparatus for construction of linear induction motor panel in linear induction motor
CN101173492B (en) Runway switch laying method for ballast track passenger special line
CN109183530B (en) Line temporary overhead device and method for ballastless track disease remediation
CN103452018B (en) Track gauge correction method for double-block type ballastless track construction
CN109235291B (en) Railway bridge beam replacing system
KR100891961B1 (en) The construction infrastructure the use road the martial art as a matter of bridge of the bridge which is old in the railroad or the railroad respects the induction event a method of construction which shifts the bridge and the system
EP1700955A1 (en) Method of railway track renewal
KR102105230B1 (en) Railroad bridge construction method for keeping preexistence railroad track and rail service
KR20050108867A (en) A method for changing plate-girder bridge of railway bridge into slab bridge by using temporary construction bents.
KR100924306B1 (en) Crossbeam push a moving on shifts of temporary bridge construction method : P.M.T
EP1558815B1 (en) Fixed track for rail vehicles and method for production thereof
CN105603838A (en) Track board lifting trolley and method
KR20040012295A (en) Method and apparatus for changing steel bridge of supporting rail into concrete bridge using temporary bent
CN217324965U (en) Face track laying base bridge that combines forever
CN106677076A (en) Simple and rapid method and device for mounting box girder at the top of adjacent bent cap by using span pier gantry crane
KR102197762B1 (en) A Special train for replacing gravel ballast to concrete ballast
CN110629684A (en) Construction method for spliced railway construction temporary beam
RU2352705C1 (en) Method for installation of permanent way
JP7368685B2 (en) Bridge reconstruction method and bridge superstructure
AT500950A4 (en) METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES
CN114134801A (en) Main beam dismantling structure and dismantling construction method for overwater large-span tied arch bridge
CN211772922U (en) Translation thrustor for rush repair of railway pier
RU2377356C2 (en) Method of tie replacement

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

17P Request for examination filed

Effective date: 20070308

17Q First examination report despatched

Effective date: 20070411

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20120802