EP1600572B1 - Support for waterstop and method of producing concrete sections - Google Patents
Support for waterstop and method of producing concrete sections Download PDFInfo
- Publication number
- EP1600572B1 EP1600572B1 EP05010082A EP05010082A EP1600572B1 EP 1600572 B1 EP1600572 B1 EP 1600572B1 EP 05010082 A EP05010082 A EP 05010082A EP 05010082 A EP05010082 A EP 05010082A EP 1600572 B1 EP1600572 B1 EP 1600572B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- joint
- fixture
- strip
- sections
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6807—Expansion elements for parts cast in situ
Definitions
- the invention relates to a holder for a joint tape and a method for producing two separate by a joint concreting sections, which are connected to each other impermeable to water by a joint tape.
- Joint tapes serve for the elastic sealing of concrete structures in the area of expansion, movement or working joints formed between two respective adjacent concrete components.
- a side track of the joint tape is embedded in one of the concrete components.
- the side track regularly has a profiling to form the longest possible water circulation path.
- Joint tapes are used, for example, when basement walls of adjacent buildings are to be connected to each other in a water-impermeable manner, as is required in particular in the construction of terraced and semi-detached houses. So far, the basement walls of neighboring houses are staggered in stages in such cases.
- a joint formwork must be made with the involvement of the joint tape of the first concreting section, before the second concreting section can be produced with the integration of the still free side track of the joint strip after its hardening.
- a holder for a joint tape is also in the document DE 29 720 926 U shown.
- a waterproof connection temporally staggered concreting sections using joint tapes is therefore quite time consuming and labor intensive.
- the temporally staggered concreting sections require a repeated delivery of smaller quantities of concrete, which results in an increase in delivery costs.
- the bracket should be structurally simple and inexpensive to manufacture and easy to handle. Furthermore, the object of the invention is to propose an advantageous method for the production of two concreting sections separated by a joint.
- a holder for a joint tape comprising two identical support members, each support member having a plurality of band-shaped profiles with a U-shaped and two outgoing from the leg ends of the U-shaped section straight sections and the band-shaped profiles at their in direction the U-shaped portion facing side are arranged at a distance and parallel to each other at least one rod, which merges at the end into a mounting plate for fixing the support member on a formwork sole.
- the U-shaped portions of the band-shaped profiles of the opposing support members of the assembly serve as a receptacle for the side panels of the joint tape, which extends at a joint between adjacent basement walls of the formwork sole perpendicular to the top and transverse to the joint.
- the fugue-filling insulation materials in particular insulation boards on, which also take over the function of the joint shell during concreting.
- these joint shells must be produced in succession for the surfaces delimiting the joint.
- a particularly rigid connection and stable embodiment of the support members is characterized in that the band-shaped profiles of each support member are arranged on at least two rods designed as angle profiles.
- the angle profiles have a high buckling resistance and thus effectively prevent bending of the support elements under the action of the concrete. This ensures that the joint tape during the pouring of the concrete is fixed in the predetermined position perpendicular to the joint profile.
- angle profiles can be welded to the lower ends of the angle profiles mounting plates that allow easy installation and attachment of the support elements on the concrete sole.
- the angle profiles are located on both sides of the U-shaped sections. If the straight sections of the band-shaped profiles are of different lengths, a further angle profile can additionally be arranged in the edge region of the longer straight section.
- the straight sections of the support elements preferably extend at right angles from the leg walls of the U-shaped section.
- the two support members are fixed to each other at a distance to each other on the formwork sole that the straight portions of the band-shaped profiles of the opposing support members aligned parallel to each other are and the U-shaped portions of the band-shaped profiles of the opposing support members form a receptacle for the joint tape. Due to the strictly parallel alignment of the opposing identical support elements of the desired joint profile and the perpendicular thereto embedding of the joint strip is ensured.
- the distance of the straight portions of the band-shaped profiles of the opposing support members is chosen so that it corresponds to a required joint width in their attachment to the formwork sole.
- the one by the straight Intermediate space formed sections of the band-shaped profiles is filled with insulating materials, especially insulation boards, which also serve as a joint shell during concreting by keeping the joint free of concrete.
- the straight portions of the band-shaped profiles of each support member are angled at right angles to the end and on the outwardly facing sides of each angled portion, a spacer is arranged.
- the spacers are after the mounting of the support elements on the formwork of the concreting sections. Due to the spacers prevents the metallic band-shaped profiles of the support members reach up to the outer skin of the concreting section.
- the holder according to the invention for a joint tape consists of two identical with 1 designated support elements.
- Each support member 1 consists of a total of seven band-shaped flat steel profiles 2, which are welded at a distance of about 35 cm with three perpendicular to the flat steel profiles 2 angle sections 3.
- Each flat steel profile 2 has a U-shaped section 4 and two straight sections 5, 6 extending from the leg ends of the U-shaped section 4.
- the flat steel profiles 2 are welded in exactly parallel alignment with one another on the angle profiles 3, so that all U-shaped sections 4 are aligned with each other and thus form a receiving chamber for one of the side panels 7a, 7b of a joint strip 8.
- the straight sections 5, 6 of the flat steel profiles 2 are angled right angles at the ends.
- the angle profiles 3 are welded on the side of the straight sections 5, 6 pointing in the direction of the U-shaped section 4. This ensures that the straight sections 5, 6 on the side opposite the U-shaped section together form a straight bearing surface for the insulating material, in particular in the form of insulating boards, which are introduced between two mutually opposing mounting elements 1.
- the two immediately adjacent to the U-shaped sections 4 angle sections 3 have at their lower end a mounting plate 14 for fixing the support member 1 on a formwork sole.
- the mounting plate 14 is welded to the lower edge of the angle section 3.
- the basement walls of adjacent buildings pour in a single operation and at the same time connect waterproof with each other to form a gap 19 between the adjoining basement walls.
- the basement wall of the first building is referred to as the first concreting section 15 and the basement wall of the second building as the second concreting section 16.
- a first formwork skin 17 is erected on one side of the concreting sections 15, 16.
- the flat steel profiles 2, including the spacers 12, 13, extend over the entire thickness of the concreting sections 15, 16.
- the total designated 8 joint tape is cast with its lower edge transverse to the course of the joint 19 in the formwork sole. It consists in the embodiment of an extruded profile strand of plastic.
- joint tape 8 is a so-called expansion joint tape with a arranged in the region of the concrete-free joint 19 center hose 21 from which laterally two side panels 7 a, b extend in the opposite direction.
- the holder according to the invention can also be realized in so-called working joint bands without middle tube.
- the side panels 22 a, b have in their surface area a plurality of ribs.
- the left side panel 7 a in FIG. 2 is laterally inserted into the receptacle of the support element 1 formed by the U-shaped sections 4.
- the area between the joint tape 8 and the already erected first formwork skin 17 is then filled with insulation boards whose thickness corresponds approximately to the required joint width 25.
- the second support member 1 is aligned in the same way on the formwork sole and the side panel 7 b of the joint strip 8 is received in the opposite U-shaped section 4 of the second support member 1. Subsequently, the support member 1 is bolted to the formwork sole. After setting up the second support member 1 of the longer straight sections 6 of the flat steel profiles 2 of the opposing support members 1 and the joint tape 18 limited area is also filled with insulation boards 26.
- the insulation boards 26 are konfentechnischiert so that whose thickness corresponds to the required joint width 25 and that they come close to a second formwork skin 27, which is then built.
- the concreting sections 15, 16 separated by the insulating panels 26 in the joint 19 are preferably filled simultaneously or immediately one after the other with concrete which hardens, including the side panels 7a, 7b of the joint strip 8 and the support elements 1.
- the joint tape 8 After removal of the formwork, the joint tape 8 is in perfect position transverse to the joint 19 and extends from the formwork sole over the entire length of the elongated joint strip.
- the inexpensive support elements 1 are cast in as lost components.
- the use of the arrangement according to the invention for holding the joint tape allows not only the simultaneous or timely successive concreting of the two concreting sections, but also the introduction of a joint tape and a sound insulation between the two concreting sections in a single concreting the preceding step.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Building Environments (AREA)
- Decoration Of Textiles (AREA)
- Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Die Erfindung betrifft eine Halterung für ein Fugenband sowie ein Verfahren zur Herstellung von zwei durch eine Fuge getrennten Betonierungsabschnitten, die wasserundurchlässig durch ein Fugenband miteinander verbunden sind.The invention relates to a holder for a joint tape and a method for producing two separate by a joint concreting sections, which are connected to each other impermeable to water by a joint tape.
Fugenbänder dienen zum elastischen Abdichten von BetonBauwerken im Bereich von zwischen jeweils zwei benachbarten Beton-Bauteilen gebildeten Dehnungs-, Bewegungs- bzw. Arbeitsfugen. Zur Abdichtung wird jeweils eine Seitenbahn des Fugenbandes in eines der Beton-Bauteile eingebettet. Die Seitenbahn besitzt regelmäßig eine Profilierung, um einen möglichst langen Wasserumlaufweg zu bilden. Um den maximal möglichen Wasserumlaufweg zu gewährleisten, ist es notwendig, das Fugenband vor dem Betonieren derart an der Verschalung zu befestigen, dass sich die Seitenbahnen möglichst senkrecht zu der Fuge in den Beton hinein erstrecken. Es muss folglich durch eine geeignete Befestigung verhindert werden, dass die Seitenbahnen durch ihr Eigengewicht oder durch herabstürzenden Beton verbogen werden oder in unkontrollierter Lage in den Beton eingebettet werden.Joint tapes serve for the elastic sealing of concrete structures in the area of expansion, movement or working joints formed between two respective adjacent concrete components. For sealing, a side track of the joint tape is embedded in one of the concrete components. The side track regularly has a profiling to form the longest possible water circulation path. To ensure the maximum possible water circulation path, it is necessary to fasten the joint tape to the casing before concreting in such a way that the side panels extend into the concrete as perpendicularly as possible to the joint. It must therefore be prevented by a suitable attachment that the side panels are bent by their own weight or by falling concrete or embedded in an uncontrolled position in the concrete.
Zu diesem Zweck ist es beispielsweise bekannt, an den Randwulsten der Seitenbahn Klammern zu befestigen, die in Abständen von etwa 30 cm bis 50 cm voneinander angeordnet werden. An diesen Klammern werden Bindedrähte, sogenannte Rödeldrähte, befestigt, mit denen dann die Seitenbahn in ihrer vorbestimmten Lage durch schräges Abspannen fixiert wird. Bekannte Fugenbänder bestehen vorzugsweise aus thermoplastischen elastischen Kunststoffen, durch die eine weitgehende Abdichtung gegen Feuchtigkeit und andere Flüssigkeiten, die sonst zwischen den Betonbauwerken hindurchtreten könnten, erzielt wird.For this purpose, it is known, for example, to attach to the edge beads of the side panel brackets, which are arranged at intervals of about 30 cm to 50 cm from each other. At these brackets binding wires, so-called Rödeldrähte, attached, with which then the side panel is fixed in its predetermined position by oblique clamping. Known waterstops are preferably made of thermoplastic, thermoplastic materials, which provide a substantial seal against moisture and other liquids that might otherwise pass between the concrete structures.
Fugenbänder kommen beispielsweise zur Anwendung, wenn Kellerwände benachbarter Gebäude in wasserundurchlässiger Weise miteinander verbunden werden sollen, so wie dies insbesondere bei der Erstellung von Reihen- und Doppelhäusern erforderlich ist. Bisher werden in solchen Fällen die Kellerwände der benachbarten Häuser zeitlich gestaffelt betoniert. Zunächst muss eine Fugenschalung unter Einbindung des Fugenbandes des ersten Betonierungsabschnittes hergestellt werden, bevor nach deren Aushärtung der zweite Betonierungsabschnitt unter Einbindung der noch freien Seitenbahn des Fugenbandes hergestellt werden kann.Joint tapes are used, for example, when basement walls of adjacent buildings are to be connected to each other in a water-impermeable manner, as is required in particular in the construction of terraced and semi-detached houses. So far, the basement walls of neighboring houses are staggered in stages in such cases. First, a joint formwork must be made with the involvement of the joint tape of the first concreting section, before the second concreting section can be produced with the integration of the still free side track of the joint strip after its hardening.
Eine Halterung für ein Fugenband ist ebenfalls im Dokument
Eine wasserundurchlässige Verbindung zeitlich gestaffelter Betonierungsabschnitte mittels Fugenbändern ist daher recht zeitaufwändig und arbeitsintensiv. Darüber hinaus bedingen die zeitlich gestaffelten Betonierungsabschnitte eine mehrmalige Anlieferung kleinerer Betonmengen, was eine Erhöhung der Anlieferkosten zur Folge hat.A waterproof connection temporally staggered concreting sections using joint tapes is therefore quite time consuming and labor intensive. In addition, the temporally staggered concreting sections require a repeated delivery of smaller quantities of concrete, which results in an increase in delivery costs.
Ausgehend von diesem Stand der Technik besteht daher ein Bedürfnis, eine Halterung für Fugenbänder zu schaffen, die zumindest eine teilweise gleichzeitige oder unmittelbar aufeinanderfolgende Herstellung von zwei durch eine Fuge getrennten Betonierungsabschnitten ermöglicht, wobei die Halterung konstruktiv einfach und preiswert herstellbar sowie einfach handhabbar sein soll. Des Weiteren liegt der Erfindung die Aufgabe zugrunde ein vorteilhaftes Verfahren zur Herstellung von zwei durch eine Fuge getrennten Betonierungsabschnitten vorzuschlagen.Based on this prior art, therefore, there is a need to provide a support for joint tapes, which allows at least a partially simultaneous or immediately successive production of two separated by a joint concreting sections, the bracket should be structurally simple and inexpensive to manufacture and easy to handle. Furthermore, the object of the invention is to propose an advantageous method for the production of two concreting sections separated by a joint.
Diese Aufgabe wird erfindungsgemäß durch eine Halterung für ein Fugenband gelöst, die zwei baugleiche Halterungselemente umfasst, wobei jedes Halterungselement mehrere bandförmige Profile mit einem U-förmigen und zwei von den Schenkelenden des U-förmigen Abschnitts ausgehenden geraden Abschnitten aufweist und die bandförmigen Profile an ihrer in Richtung des U-förmigen Abschnitts weisenden Seite im Abstand und parallel zueinander an mindestens einem Stab angeordnet sind, der endseitig in eine Befestigungsplatte zur Befestigung des Halterungselements auf einer Schalungssohle übergeht.This object is achieved by a holder for a joint tape comprising two identical support members, each support member having a plurality of band-shaped profiles with a U-shaped and two outgoing from the leg ends of the U-shaped section straight sections and the band-shaped profiles at their in direction the U-shaped portion facing side are arranged at a distance and parallel to each other at least one rod, which merges at the end into a mounting plate for fixing the support member on a formwork sole.
Die U-förmigen Abschnitte der bandförmigen Profile der sich gegenüberstehenden Halterungselemente der Anordnung dienen als Aufnahme für die Seitenbahnen des Fugenbandes, das bei einer Fuge zwischen aneinander grenzenden Kellerwänden von der Schalungssohle senkrecht nach oben und quer zur Fuge verläuft.The U-shaped portions of the band-shaped profiles of the opposing support members of the assembly serve as a receptacle for the side panels of the joint tape, which extends at a joint between adjacent basement walls of the formwork sole perpendicular to the top and transverse to the joint.
An den geraden Abschnitten der bandförmigen Profile der sich gegenüberstehenden Halterungselemente liegen die die Fuge ausfüllenden Dämmstoffe, insbesondere Dämmplatten, an, die zudem während des Betonierens die Funktion der Fugenschalhaut übernehmen. Bei herkömmlichen, zeitlich gestaffelten Betonierungsabschnitten muss diese Fugenschalhaut nacheinander für die die Fuge begrenzenden Flächen hergestellt werden.At the straight sections of the band-shaped profiles of the opposing support members are the fugue-filling insulation materials, in particular insulation boards on, which also take over the function of the joint shell during concreting. For conventional staggered concreting sections, these joint shells must be produced in succession for the surfaces delimiting the joint.
Mit Hilfe der erfindungsgemäßen Anordnung ist ein zeitgleiches oder unmittelbar aufeinander folgendes Betonieren von zwei benachbarten, eine Fuge ausbildenden Betonierungsabschnitten möglich. Die hierzu erforderlichen Halterungselemente werden aus preiswertem Baustahl hergestellt.With the aid of the arrangement according to the invention, simultaneous or immediately successive concreting of two adjacent concreting sections forming a joint is possible. The support elements required for this purpose are made of inexpensive structural steel.
Eine besonders verbindungssteife und stabile Ausführung der Halterungselemente zeichnet sich dadurch aus, dass die bandförmigen Profile jedes Halterungselementes an mindestens zwei als Winkelprofile ausgestalteten Stäben angeordnet sind. Die Winkelprofile weisen eine hohe Knicksteifigkeit aus und verhindern damit wirksam eine Verbiegung der Halterungselemente unter der Einwirkung des Betons. Hierdurch wird gewährleistet, dass das Fugenband während des Eingießens des Betons in der vorbestimmten Position senkrecht zum Fugenverlauf fixiert wird.A particularly rigid connection and stable embodiment of the support members is characterized in that the band-shaped profiles of each support member are arranged on at least two rods designed as angle profiles. The angle profiles have a high buckling resistance and thus effectively prevent bending of the support elements under the action of the concrete. This ensures that the joint tape during the pouring of the concrete is fixed in the predetermined position perpendicular to the joint profile.
Darüber hinaus lassen sich an den unteren Enden der Winkelprofile Befestigungsbleche anschweißen, die eine problemlose Aufstellung und Befestigung der Halterungselemente auf der Betoniersohle ermöglichen. Vorzugsweise befinden sich die Winkelprofile zu beiden Seiten der U-förmigen Abschnitte. Sofern die geraden Abschnitte der bandförmigen Profile unterschiedlich lang sind, kann darüber hinaus ein weiteres Winkelprofil im Randbereich des längeren geraden Abschnitts angeordnet sein.In addition, can be welded to the lower ends of the angle profiles mounting plates that allow easy installation and attachment of the support elements on the concrete sole. Preferably, the angle profiles are located on both sides of the U-shaped sections. If the straight sections of the band-shaped profiles are of different lengths, a further angle profile can additionally be arranged in the edge region of the longer straight section.
Entsprechend dem üblichen Verlauf einer senkrechten Fuge zwischen zwei Betonierungsabschnitten, insbesondere den Kellerwänden von benachbarten Gebäuden, gehen die geraden Abschnitte der Halterungselemente vorzugsweise rechtwinkelig von den Schenkelwänden des U-förmigen Abschnitts aus.According to the usual course of a vertical joint between two concreting sections, in particular the basement walls of adjacent buildings, the straight sections of the support elements preferably extend at right angles from the leg walls of the U-shaped section.
Um eine möglichst kontrollierte Einbettung des Fugenbandes senkrecht zu der Fuge in dem Beton zu bewirken, ist es erfindungsgemäß vorgesehen, dass die beiden Halterungselemente im Abstand zueinander derart auf der Schalungssohle befestigt sind, dass die geraden Abschnitte der bandförmigen Profile der sich gegenüberstehenden Halterungselemente parallel zueinander ausgerichtet sind und die U-förmigen Abschnitte der bandförmigen Profile der sich gegenüberstehenden Halterungselemente eine Aufnahme für das Fugenband bilden. Durch die streng parallele Ausrichtung der sich gegenüberstehenden identischen Halterungselemente wird der gewünschte Fugenverlauf sowie die senkrecht dazu verlaufende Einbettung des Fugenbandes sichergestellt. Der Abstand der geraden Abschnitte der bandförmigen Profile der sich gegenüberstehenden Halterungselemente wird bei deren Befestigung auf der Schalungssohle so gewählt, dass er einer geforderten Fugenbreite entspricht. Der durch die geraden Abschnitte der bandförmigen Profile gebildete Zwischenraum wird mit Dämmstoffen, insbesondere Dämmplatten aufgefüllt, die während des Betonierens zugleich als Fugenschalhaut dienen, indem sie die Fuge frei von Beton halten.In order to effect the most controlled possible embedment of the joint strip perpendicular to the joint in the concrete, it is provided according to the invention that the two support members are fixed to each other at a distance to each other on the formwork sole that the straight portions of the band-shaped profiles of the opposing support members aligned parallel to each other are and the U-shaped portions of the band-shaped profiles of the opposing support members form a receptacle for the joint tape. Due to the strictly parallel alignment of the opposing identical support elements of the desired joint profile and the perpendicular thereto embedding of the joint strip is ensured. The distance of the straight portions of the band-shaped profiles of the opposing support members is chosen so that it corresponds to a required joint width in their attachment to the formwork sole. The one by the straight Intermediate space formed sections of the band-shaped profiles is filled with insulating materials, especially insulation boards, which also serve as a joint shell during concreting by keeping the joint free of concrete.
In einer weiteren bevorzugten Ausgestaltung der Erfindung ist es vorgesehen, dass die geraden Abschnitte der bandförmigen Profile jedes Halterungselement endseitig rechtwinkelig abgewinkelt sind und auf den nach außen weisenden Seiten jedes abgewinkelten Abschnitts ein Abstandshalter angeordnet ist. Die Abstandshalter liegen nach der Montage der Halterungselemente an der Schalhaut der Betonierungsabschnitte an. Aufgrund der Abstandshalter wird verhindert, dass die metallischen bandförmigen Profile der Halterungselemente bis an die Außenhaut des Betonierungsabschnitts heranreichen.In a further preferred embodiment of the invention, it is provided that the straight portions of the band-shaped profiles of each support member are angled at right angles to the end and on the outwardly facing sides of each angled portion, a spacer is arranged. The spacers are after the mounting of the support elements on the formwork of the concreting sections. Due to the spacers prevents the metallic band-shaped profiles of the support members reach up to the outer skin of the concreting section.
Unter Verwendung einer erfindungsgemäßen Anordnung lassen sich zwei durch eine Fuge getrennte Betonierungsabschnitte zumindest teilweise gleichzeitig oder unmittelbar aufeinanderfolgend herstellen und zugleich wasserundurchlässig durch ein Fugenband dadurch miteinander verbinden, dass
- einseitig eine erste Schalhaut für beide Betonierungsabschnitte auf einer Schalungssohle errichtet wird,
- dass eines der beiden Halterungselemente einer Anordnung nach einem der
Ansprüche 1 bis 6 auf der Schalungssohle befestigt wird, wobei die U-förmigen Abschnitte des Halterungselements quer zum Fugenverlauf ausgerichtet werden und einen Teil des Fugenbandes seitlich aufnehmen, - dass der Bereich zwischen Fugenband und Schalhaut mit Dämmstoffen aufgefüllt wird, deren Dicke der geforderten Fugenbreite entspricht,
- dass das zweite Halterungselement einer Anordnung nach einem der
Ansprüche 1 bis 6 auf der Schalungssohle befestigt wird, so dass der Abstand der geraden Abschnitte der bandförmigen Profile der sich gegenüberstehenden Halterungselemente der geforderten Fugenbreite entspricht, wobei die U-förmigen Abschnitte des Halterungselements quer zum Fugenverlauf ausgerichtet werden und einen Teil des Fugenbandes seitlich aufnehmen, - dass der durch die geraden Abschnitte der bandförmigen Profile der sich gegenüberstehenden Halterungselemente und das Fugenband begrenzte Bereich mit Dämmstoffen aufgefüllt wird, wobei die Dämmstoffe so konfektioniert werden, dass deren Dicke der geforderten Fugenbreite entspricht und dass sie bis an eine zweite Schalhaut heranreichen, die anschließend errichtet wird, und
- dass die durch den Dämmstoff in der Fuge getrennten Betonierungsabschnitte mit Beton verfüllt werden, der unter Einschluss des Fugenbandes sowie der Halterungselemente aushärtet.
- one side, a first formwork skin for both concreting sections is erected on a formwork sole,
- in that one of the two holding elements of an arrangement according to one of
Claims 1 to 6 is fastened on the formwork sole, the U-shaped sections of the holding element being aligned transversely to the course of the joint and receiving a part of the joint strip laterally, - that the area between joint tape and formwork is filled up with insulating materials whose thickness corresponds to the required joint width,
- in that the second holding element of an arrangement according to one of
claims 1 to 6 is fastened on the formwork sole, so that the spacing of the straight sections of the band-shaped profiles of the opposing holding elements corresponds to the required joint width, the U-shaped sections of the holding element being aligned transversely to the course of the joint and pick up part of the joint tape laterally, - that the limited by the straight portions of the band-shaped profiles of the opposing support members and the joint tape area is filled with insulating materials, the insulation materials are assembled so that their thickness corresponds to the required joint width and that they come up to a second formwork skin, which then built will, and
- that the concreting sections separated by the insulating material in the joint are filled with concrete which hardens, including the joint strip and the retaining elements.
Nachfolgend wird die Erfindung anhand der Figuren näher erläutert. Es zeigen
- Figur 1a
- eine perspektivische Ansicht eines Halterungselementes einer erfindungsgemäßen Halterung für ein Fugenband,
- Figur 1b
- eine Draufsicht auf ein Halterungselement nach Figur 1a,
- Figur 1c
- eine Seitenansicht eines Halterungselementes nach Figur 1a sowie
Figur 2- eine Draufsicht auf eine erfindungsgemäße Halterung für ein Fugenband in einer Einbausituation.
- FIG. 1a
- a perspective view of a support member of a holder according to the invention for a joint tape,
- FIG. 1b
- a top view of a support member of Figure 1a,
- Figure 1c
- a side view of a support member of Figure 1a and
- FIG. 2
- a plan view of a holder according to the invention for a joint tape in a mounting situation.
Die erfindungsgemäße Halterung für ein Fugenband besteht aus zwei baugleichen mit 1 bezeichneten Halterungselementen. Jedes Halterungselement 1 besteht aus insgesamt sieben bandförmigen Flachstahl-Profilen 2, die in einem Abstand von etwa 35 cm mit drei senkrecht zu den Flachstahl-Profilen 2 verlaufenden winkelprofilen 3 verschweißt sind. Jedes Flachstahl-Profil 2 weist einen U-förmigen Abschnitt 4 und zwei von den Schenkelenden des U-förmigen Abschnitts 4 ausgehende gerade Abschnitte 5, 6 auf. Die Flachstahl-Profile 2 sind in exakt paralleler Ausrichtung zueinander an den Winkelprofilen 3 angeschweißt, so dass sämtliche U-förmigen Abschnitte 4 miteinander fluchten und damit eine Aufnahmekammer für eine der Seitenbahnen 7a, 7b eines Fugenbandes 8 bilden.The holder according to the invention for a joint tape consists of two identical with 1 designated support elements. Each
Die geraden Abschnitte 5, 6 der Flachstahl-Profile 2 sind endseitig rechtwinkelig abgewinkelt. Auf der nach außen weisenden Seite der abgewinkelten Abschnitte 9, 11 sind Abstandshalter 12, 13 angeordnet, die im Ausführungsbeispiel aus Gummi bestehen.The
Wie deutlich aus Figuren 1a, b erkennbar, sind die Winkelprofile 3 auf derjenigen Seite der geraden Abschnitte 5,6 angeschweißt, die in Richtung des U-förmigen Abschnitts 4 weisen. Hierdurch wird gewährleistet, dass die geraden Abschnitte 5,6 auf der dem U-förmigen Abschnitt gegenüberliegenden Seite zusammen eine gerade Auflagefläche für das Dämmmaterial, insbesondere in Form von Dämmplatten, bilden, die zwischen zwei sich gegenüberstehenden Halterungselementen 1 eingebracht werden.As can be seen clearly from FIGS. 1 a, b, the angle profiles 3 are welded on the side of the
Die beiden unmittelbar zu den U-förmigen Abschnitten 4 benachbarten Winkelprofile 3 weisen an ihrem unteren Ende ein Befestigungsblech 14 zur Befestigung des Halterungselements 1 auf einer Schalungssohle auf. Das Befestigungsblech 14 ist am unteren Rand des Winkelprofils 3 angeschweißt.The two immediately adjacent to the
Mit Hilfe der erfindungsgemäßen Halterung lassen sich beispielsweise die Kellerwände benachbarter Gebäude in einem Arbeitsgang gießen und gleichzeitig wasserundurchlässig miteinander unter Ausbildung einer Fuge 19 zwischen den aneinander grenzenden Kellerwänden verbinden. Für die nachfolgenden Erläuterungen wird die Kellerwand des ersten Gebäudes als erster Betonierungsabschnitt 15 und die Kellerwand des zweiten Gebäudes als zweiter Betonierungsabschnitt 16 bezeichnet. Zunächst wird auf einer Seite der Betonierungsabschnitte 15, 16 eine erste Schalhaut 17 errichtet.With the help of the holder according to the invention, for example, the basement walls of adjacent buildings pour in a single operation and at the same time connect waterproof with each other to form a
Sodann wird ein erstes Halterungselement 1, wie es in Figur 1 dargestellt ist, mit den Befestigungsblechen 14 auf die Schalungssohle aufgesetzt, wobei die U-förmigen Abschnitte 4 rechtwinkelig zum Verlauf der herzustellenden Fuge 19 ausgerichtet werden. Wie aus Figur 2 erkennbar, erstrecken sich die Flachstahl-Profile 2 einschließlich der Abstandshalter 12,13 über die gesamte Dicke der Betonierungsabschnitte 15, 16. Nach dem Ausrichten des ersten Halterungselementes 1 wird dieses auf der Schalungssohle beispielsweise mittels Schrauben befestigt.Then, a
Das insgesamt mit 8 bezeichnete Fugenband ist mit seinem unteren Rand quer zum verlauf der Fuge 19 in die Schalungssohle eingegossen. Es besteht im Ausführungsbeispiel aus einem extrudierten Profilstrang aus Kunststoff. Bei dem dargestellten Fugenband 8 handelt es sich um ein sogenanntes Dehnungsfugenband mit einem im Bereich der betonfreien Fuge 19 angeordneten Mittelschlauch 21, von dem aus sich in entgegengesetzter Richtung seitlich zwei Seitenbahnen 7 a, b erstrecken. Selbstverständlich lässt sich die erfindungsgemäße Halterung jedoch auch bei sogenannten Arbeitsfugenbändern ohne Mittelschlauch verwirklichen. Die Seitenbahnen 22 a, b besitzen in ihrem Flächenbereich mehrere Rippen.The total designated 8 joint tape is cast with its lower edge transverse to the course of the joint 19 in the formwork sole. It consists in the embodiment of an extruded profile strand of plastic. In the illustrated joint tape 8 is a so-called expansion joint tape with a arranged in the region of the concrete-free joint 19 center hose 21 from which laterally two
Nach dem Befestigen des ersten Halterungselementes 1 auf der Schalungssohle wird die in Figur 2 linke Seitenbahn 7 a in die von den U-förmigen Abschnitten 4 gebildete Aufnahme des Halterungselementes 1 seitlich eingeschoben. Der Bereich zwischen dem Fugenband 8 und der bereits errichteten ersten Schalhaut 17 wird sodann mit Dämmplatten aufgefüllt, deren Dicke etwa der geforderten Fugenbreite 25 entspricht.After attaching the
Anschließend wird das zweite Halterungselement 1 in gleicher Weise auf der Schalungssohle ausgerichtet und die Seitenbahn 7 b des Fugenbandes 8 in dem gegenüberliegenden U-förmigen Abschnitt 4 des zweiten Halterungselementes 1 aufgenommen. Anschließend wird das Halterungselement 1 auf der Schalungssohle verschraubt. Nach Aufstellen des zweiten Halterungselementes 1 wird der durch die längeren geraden Abschnitte 6 der Flachstahl-Profile 2 der sich gegenüberstehenden Halterungselemente 1 und das Fugenband 18 begrenzte Bereich ebenfalls mit Dämmplatten 26 aufgefüllt. Die Dämmplatten 26 werden dabei so konfenktioniert, dass deren Dicke der geforderten Fugenbreite 25 entspricht und dass sie bis an eine zweite Schalhaut 27 heranreichen, die anschließend errichtet wird.Subsequently, the
Schließlich werden die durch die Dämmplatten 26 in der Fuge 19 getrennten Betonierungsabschnitte 15, 16 vorzugsweise gleichzeitig oder unmittelbar nacheinander mit Beton verfüllt, der unter Einschluss der Seitenbahnen 7a, 7b des Fugenbandes 8 sowie der Halterungselemente 1 aushärtet.Finally, the concreting
Nach dem Entfernen der Schalung befindet sich das Fugenband 8 in einwandfreier Lage quer zu der Fuge 19 und erstreckt sich von der Schalungssohle über die gesamte Länge des gestreckten Fugenbandes. Die preiswerten Halterungselemente 1 werden als verlorene Bauteile mit einbetoniert.After removal of the formwork, the joint tape 8 is in perfect position transverse to the joint 19 and extends from the formwork sole over the entire length of the elongated joint strip. The
Die Verwendung der erfindungsgemäßen Anordnung zur Halterung für das Fugenband ermöglicht nicht nur die zeitgleiche oder zeitnah aufeinanderfolgende Betonierung der beiden Betonierungsabschnitte, sondern darüber hinaus die Einbringung eines Fugenbandes sowie einer Schalldämmung zwischen den beiden Betonierungsabschnitten in einem einzigen dem Betonieren vorausgehenden Arbeitsschritt.The use of the arrangement according to the invention for holding the joint tape allows not only the simultaneous or timely successive concreting of the two concreting sections, but also the introduction of a joint tape and a sound insulation between the two concreting sections in a single concreting the preceding step.
Claims (9)
- A fixture for a joint strip, wherein
the fixture comprises two fixture elements (1) constructed in the same manner,
characterised in that each fixture element (1) has a plurality of strip-shaped profiles (2) with one U-shaped and two straight sections (5) emanating from the ends of the legs of the U-shaped section, and the strip-shaped profiles (2) on their side facing the direction of the U-shaped section are arranged at a distance from and parallel to each other on at least one bar (3), which at its end merges into a mounting plate (14) for purposes of attachment of the fixture element (1) to a formwork baseplate. - The fixture according to Claim 1,
characterised in that the strip-shaped profiles (2) of each fixture element (1) are arranged on at least two bars configured as angled profiles (3). - The fixture according to Claim 1 or 2,
characterised in that the straight sections (5,6) emanate at right-angles from the ends of the legs of the U-shaped section (4). - The fixture according to one of the Claims 1 to 3,
characterised in that the two fixture elements are arranged facing each other at a distance (25) such that the straight sections (5,6) of the strip-shaped profiles (2) of the fixture elements (1) facing each other are aligned parallel to each other and the U-shaped sections (4) of the strip-shaped profiles (2) of the fixture elements (1) facing each other form a receptacle for the joint strip (8). - The fixture according to Claim 4,
characterised in that the distance between the straight sections (5,6) of the strip-shaped profiles (2) of the fixture elements (1) facing each other corresponds to a required joint width. - The fixture according to one of the Claims 1 to 5,
characterised in that the straight sections (5,6) of the strip-shaped profiles (2) are angled at right-angles at their ends, and in that separators (12, 13) are arranged on the sections (9,11) facing outwards. - A method for the simultaneous manufacture of two sections (15, 16) to be concreted, separated by a joint, which sections are connected together in a manner impermeable to water by a joint strip (8), with the use of a fixture according to one of the Claims 1 to 6.
- The method according to Claim 7,
characterised in that- on one side a first formwork skin (17) is erected for both sections (15, 16) to be concreted on a formwork baseplate,- one of the two fixture elements (1) of a fixture according to one of the Claims 1 to 6 is attached to the formwork baseplate, wherein the U-shaped sections (4) of the fixture element (1) are aligned at right-angles to the line of the joint and laterally accommodate one part (7a) of the joint strip (8),- the region between joint strip (8) and formwork skin (17) is filled with insulating panels (26), whose thickness approximately corresponds to the required joint width (25),- the second fixture element (1) of a fixture according to one of the Claims 1 to 6 is attached to the formwork baseplate, such that the distance between the straight sections (5,6) of the strip-shaped profiles (2) of the fixture elements facing each other corresponds to the required joint width (25), wherein the U-shaped sections (4) of the fixture element (1) are aligned at right-angles to the line of the joint and laterally accommodate one part (7b) of the joint strip,- the region bounded by the straight sections (5,6) of the strip-shaped profiles (2) of the fixture elements (1) facing each other and by the joint strip (8) is filled with insulating materials (26), wherein the insulating materials are tailored such that their thickness approximately corresponds to the required joint width (25) and such that they extend up to a second formwork skin (27) that is subsequently erected, and- the sections to be concreted, separated by insulating materials (26) in the joint (19), are filled with concrete, which hardens with the inclusion of the joint strip (7a, b) and the fixture elements (1). - The method according to Claim 8,
characterised in that insulating panels (26) of a thickness corresponding to the joint thickness (25) are used as insulating materials.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004026429 | 2004-05-29 | ||
DE102004026429A DE102004026429B3 (en) | 2004-05-29 | 2004-05-29 | Joint tape holder as well as production process for concreting sections |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1600572A2 EP1600572A2 (en) | 2005-11-30 |
EP1600572A3 EP1600572A3 (en) | 2006-11-02 |
EP1600572B1 true EP1600572B1 (en) | 2008-01-02 |
Family
ID=34936313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05010082A Not-in-force EP1600572B1 (en) | 2004-05-29 | 2005-05-10 | Support for waterstop and method of producing concrete sections |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1600572B1 (en) |
AT (1) | ATE382749T1 (en) |
DE (2) | DE102004026429B3 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938717B (en) * | 2017-12-02 | 2019-06-28 | 江苏惠淳建设有限公司 | Basement post-pouring zone waterproof construction and its construction method |
CN113235798B (en) * | 2021-05-21 | 2022-10-25 | 铜陵有色建安钢构有限责任公司 | Method for mounting assembled laminated slab |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29720926U1 (en) * | 1997-11-26 | 1998-01-15 | Tiletschke, Lothar, 32130 Enger | Shuttering element |
DE19905691A1 (en) * | 1999-02-11 | 2000-08-17 | Dausend Hans Werner | Method for waterproofing between concrete sections has an elastic seal held in a wire cage for securing in the cast concrete |
DE10104376C1 (en) * | 2001-02-01 | 2002-08-22 | Jutta Quinting | Process for sealing a building joint and joint tape therefor |
DE20318608U1 (en) * | 2003-12-02 | 2004-03-04 | Msl Mathieu Schalungssysteme Und Lufttechnische Komponenten Gmbh | Method for producing an expansion joint in cast concrete with adjustable reinforcing linked by a ties and with cladding insert layers |
-
2004
- 2004-05-29 DE DE102004026429A patent/DE102004026429B3/en not_active Expired - Fee Related
-
2005
- 2005-05-10 AT AT05010082T patent/ATE382749T1/en not_active IP Right Cessation
- 2005-05-10 DE DE502005002372T patent/DE502005002372D1/en not_active Expired - Fee Related
- 2005-05-10 EP EP05010082A patent/EP1600572B1/en not_active Not-in-force
Also Published As
Publication number | Publication date |
---|---|
ATE382749T1 (en) | 2008-01-15 |
EP1600572A2 (en) | 2005-11-30 |
DE102004026429B3 (en) | 2006-02-02 |
DE502005002372D1 (en) | 2008-02-14 |
EP1600572A3 (en) | 2006-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2354368B1 (en) | Fixing holder for wall insulation | |
DE102015121810B4 (en) | Formwork for an upstand | |
EP0235843A1 (en) | Fastening device for walls cast in permanent moulds | |
DE60314459T2 (en) | CONSTRUCTION ELEMENT FOR CABINET CONSTRUCTION | |
EP2963205B1 (en) | Device for formwork | |
DE3128165C2 (en) | Sound-insulating wall construction system for industrial buildings, as well as cassette profile for this | |
EP0059171A1 (en) | Dowel and sleeve for the absorption and transfer of a shearing force | |
DE10147831B4 (en) | stud wall | |
EP1600572B1 (en) | Support for waterstop and method of producing concrete sections | |
EP0834622B1 (en) | Heat insulated connection between external concrete elements, particularly cantilever parts, and building | |
EP1707699A2 (en) | Ventilated and heat insulated building front | |
EP1270833B1 (en) | Heat-insulating construction element | |
EP2516761B1 (en) | Device for connecting two components separated by a gap and for absorbing transverse forces that occur between the components | |
EP1972734A1 (en) | Retaining body for an insulating board | |
EP1327732B1 (en) | Edge shuttering for concrete slabs | |
DE19521262A1 (en) | Building plate for reinforced steel concrete edge | |
DE202016103913U1 (en) | Insulating shell for a ring anchor of a masonry, insulating shell composite with two insulating shells and ring anchors with the insulating shell composite | |
EP0628115A1 (en) | Component for a permanent formwork | |
DE202020100059U1 (en) | Formwork element | |
EP0745741B1 (en) | Masonry lintel | |
EP0647744A1 (en) | Reinforcement for concrete constructions at a constructional joint | |
EP0083438B1 (en) | Form element of foamed thermosetting synthetics material for the concrete shell construction method | |
DE3214502A1 (en) | Slab-shaped building element for the haunching method of construction | |
EP1323876B1 (en) | Panel, spacer and trusslike beam therefor, building and method of construction | |
EP3754125B1 (en) | Construction element for installation in expansion joints of buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
17P | Request for examination filed |
Effective date: 20070309 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 502005002372 Country of ref document: DE Date of ref document: 20080214 Kind code of ref document: P |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20080305 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080413 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080502 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20080221 Year of fee payment: 4 |
|
ET | Fr: translation filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080602 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080402 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
BERE | Be: lapsed |
Owner name: KUZNIK, WILLI Effective date: 20080531 |
|
26N | No opposition filed |
Effective date: 20081003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080510 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20090510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090531 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20100129 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090602 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20080519 Year of fee payment: 4 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080703 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080403 |