EP1360397B2 - Method and pallet for the production of a precise pre-cast concrete piece - Google Patents

Method and pallet for the production of a precise pre-cast concrete piece Download PDF

Info

Publication number
EP1360397B2
EP1360397B2 EP02706697A EP02706697A EP1360397B2 EP 1360397 B2 EP1360397 B2 EP 1360397B2 EP 02706697 A EP02706697 A EP 02706697A EP 02706697 A EP02706697 A EP 02706697A EP 1360397 B2 EP1360397 B2 EP 1360397B2
Authority
EP
European Patent Office
Prior art keywords
accordance
foregoing
pallet
unfinished
shuttering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP02706697A
Other languages
German (de)
French (fr)
Other versions
EP1360397B1 (en
EP1360397A1 (en
Inventor
Stefan BÖGL
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Max Boegl Bauunternehmung GmbH and Co KG
Original Assignee
Max Boegl Bauunternehmung GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
Priority to DE10107119 priority Critical
Priority to DE10107119 priority
Priority to DE10133607A priority patent/DE10133607C5/en
Priority to DE10133607 priority
Priority to PCT/EP2002/000083 priority patent/WO2002065022A1/en
Application filed by Max Boegl Bauunternehmung GmbH and Co KG filed Critical Max Boegl Bauunternehmung GmbH and Co KG
Publication of EP1360397A1 publication Critical patent/EP1360397A1/en
Application granted granted Critical
Publication of EP1360397B1 publication Critical patent/EP1360397B1/en
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=26008510&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP1360397(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Publication of EP1360397B2 publication Critical patent/EP1360397B2/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/08Apparatus or processes for treating or working the shaped or preshaped articles for reshaping the surface, e.g. smoothing, roughening, corrugating, making screw-threads
    • B28B11/0863Apparatus or processes for treating or working the shaped or preshaped articles for reshaping the surface, e.g. smoothing, roughening, corrugating, making screw-threads for profiling, e.g. making grooves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/06Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/32Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone with armouring or reinforcement
    • E01B3/34Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone with armouring or reinforcement with pre-tensioned armouring or reinforcement
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers

Description

  • Die vorliegende Erfindung betrifft ein Verfahren zur Herstellung eines präzisen Betonfertigteiles, insbesondere in Form einer Schwelle oder einer Platte einer festen Fahrbahn für schienengeführte Fahrzeuge sowie eine Palette zur Herstellung eines vorgespannten Betonfertigteiles mit einer Schalung und einer Spannvorrichtung für Spannstähte. The present invention relates to a method for producing a precise precast concrete part, in particular in the form of a threshold or a slab of a fixed track for rail-guided vehicles and a pallet for producing a prestressed precast concrete part with a formwork and a tensioning device for tensioning wires.
  • Aus der EP-A-0 289 017 ist ein Verfahren zur Herstellung eines Betonfertigteiles, insbesondere in Form einer Schwelle bekannt. Aus der DE-A-19 708 734 Aus der EP-A-0 289 017 ist ein Verfahren zur Herstellung eines Betonfertigteiles, insbesondere in Form einer Schwelle bekannt. Aus der DE-A-19 708 734 Aus der EP-A-0 289 017 ist ein Verfahren zur Herstellung eines Betonfertigteiles, insbesondere in Form einer Schwelle bekannt. Aus der DE-A-19 708 734 Aus der EP-A-0 289 017 ist ein Verfahren zur Herstellung eines Betonfertigteiles, insbesondere in Form einer Schwelle bekannt. Aus der DE-A-19 708 734 ist eine Palette gemäß dem Oberbegriff des vorliegenden Anspruchs 33 bekannt. a pallet according to the preamble of present claim 33 is known. From the From the EP-A-0 289 017 EP-A-0 289 017 is a method for producing a precast concrete part, in particular in the form of a threshold known. is a method for producing a precast concrete part, in particular in the form of a threshold known. From the From the DE-A-19 708 734 DE-A-19 708 734 a pallet according to the preamble of present claim 33 is known. a pallet according to the preamble of present claim 33 is known.
  • Als Betonfertigteile werden beispielsweise feste Fahrbahnen für schienengeführte Fahrzeuge, Wandelemente oder andere Träger oder Stützen hergestellt. In den meisten Anwendungsfällen von Betonfertigteilen ist keine besondere Präzision hinsichtlich der Maße des Teiles erforderlich. Die üblichen, im Betonhandwerk erreichbaren Toleranzen sind hierbei ausreichend. Werden auf die Betonfertigteile andere Bauteile montiert, welche besonders enge Toleranzen einhalten müssen, so erfolgt dies üblicherweise mit Einstelleinrichtungen, so daß aus dem Beton herrührende Ungenauigkeiten ausgeglichen werden können. Insbesondere bei der Herstellung von festen Fahrbahnen, wie sie beispielsweise aus der DE 197 33 909 A1 Als Betonfertigteile werden beispielsweise feste Fahrbahnen für schienengeführte Fahrzeuge, Wandelemente oder andere Träger oder Stützen hergestellt. In den meisten Anwendungsfällen von Betonfertigteilen ist keine besondere Präzision hinsichtlich der Maße des Teiles erforderlich. Die üblichen, im Betonhandwerk erreichbaren Toleranzen sind hierbei ausreichend. Werden auf die Betonfertigteile andere Bauteile montiert, welche besonders enge Toleranzen einhalten müssen, so erfolgt dies üblicherweise mit Einstelleinrichtungen, so daß aus dem Beton herrührende Ungenauigkeiten ausgeglichen werden können. Insbesondere bei der Herstellung von festen Fahrbahnen, wie sie beispielsweise aus der DE 197 33 909 A1 bekannt sind, werden deshalb Schienenbefestigungen an den einzelnen Stützpunkten verwendet, welche in mehreren Richtungen die Schiene verstellbar machen, um die engen Toleranzen zwischen den einzelnen Schienen einhalten zu können. are known, therefore rail fastenings are used at the individual support points, which make the rail adjustable in several directions in order to be able to maintain the narrow tolerances between the individual rails. Außerdem werden elastische Zwischenlagen zwischen dem Betonfertigteil und der Schiene verwendet, welche unterschiedliche Dicken aufweisen um den Schienenkopf in der geforderten Höhe positionieren zu können. In addition, elastic intermediate layers are used between the precast concrete part and the rail, which have different thicknesses in order to be able to position the rail head at the required height. Hierdurch sind viele unterschiedlich dicke Zwischenlagen erforderlich, um die relativ großen Toleranzen des Betonteiles ausgleichen zu können. This means that many intermediate layers of different thicknesses are required in order to be able to compensate for the relatively large tolerances of the concrete part. Die Zwischenlagen und die einstellbaren Schienenbefestigungen sind aufwendig in der Herstellung, Montage und Lagerhaltung. The intermediate layers and the adjustable rail fastenings are complex to manufacture, assemble and store. For example, solid roadways for rail-guided vehicles, wall elements or other supports or supports are produced as precast concrete parts. For example, solid roadways for rail-guided vehicles, wall elements or other supports or supports are produced as precast concrete parts. In most applications of precast concrete parts, no particular precision in the dimensions of the part is required. In most applications of precast concrete parts, no particular precision in the dimensions of the part is required. The usual, achievable in the concrete trade tolerances are sufficient here. The usual achievable in the concrete trade tolerances are sufficient here. If other components are mounted on the precast concrete parts, which must comply with very tight tolerances, this is usually done with adjustment so that resulting from the concrete inaccuracies can be compensated. If other components are mounted on the precast concrete parts, which must comply with very tight tolerances, this is usually done with adjustment so that resulting from the concrete inaccuracies can be compensated. In particular, in the production of fixed carriageways, such as those from the In particular, in the production of fixed carriageways, such as those from the DE 197 33 909 A1 DE 197 33 909 A1 Are known, therefore, rail fasteners are used at the individual bases, which make the rail adjustable in several directions in order to comply with the tight tolerances between the individual rails can. Are known, therefore, rail fasteners are used at the individual bases, which make the rail adjustable in several directions in order to comply with the tight tolerances between the individual rails can. In addition, elastic intermediate layers are used between the precast concrete part and the rail, which have different thicknesses to be able to position the rail head in the required height. In addition, elastic intermediate layers are used between the precast concrete part and the rail, which have different thicknesses to be able to position the rail head in the required height. As a result, many different thicknesses of intermediate layers are required to compensate for the relatively large tolerances of the concrete part can. As a result, many different thicknesses of intermediate layers are required to compensate for the relatively large tolerances of the concrete part can. The intermediate layers and the adjustable rail fasteners are complex in the production, assembly and storage. The intermediate layers and the adjustable rail fasteners are complex in the production, assembly and storage.
  • Aufgabe der vorliegenden Erfindung ist es somit ein Verfahren und eine Vorrichtung zu schaffen, mit welcher Betonfertigteile herstellbar sind, welche engere als bisher übliche Toleranzen für Aufbauteile ermöglichen. Es wird damit der Aufwand für die Herstellung, Ausrüstung und Montage der Betonbauteile sowie der Schienen und deren Befestigung erheblich reduziert.Object of the present invention is thus to provide a method and an apparatus with which precast concrete parts can be produced, which allow tighter than usual tolerances for body parts. It is thus the cost of manufacturing, equipment and installation of concrete components and the rails and their attachment significantly reduced.
  • Die Aufgabe wird gelöst durch die Merkmale der unabhängigen Ansprüche 1 und 33.The object is solved by the features of independent claims 1 and 33.
  • Erfindungsgemäß wird bei einem Verfahren zur Herstellung eines präzisen Betonfertigteiles, insbesondere in Form einer Schwelle oder Platte für eine feste Fahrbahn für schienengeführte Fahrzeuge das Betonfertigteil zuerst in einer Schalung als Rohteil hergestellt. Anschließend wird es in vorteilhafter Ausgestaltung der Erfindung durch mehrtägige Lagerung ausgehärtet und sodann, zumindest an den funktionsrelevanten Teilen, falls erforderlich Material, beispielsweise Kunststoff aufgetragen und/oder spanend auf das vorbestimmte Maß abgearbeitet. Durch die mehrtägige Lagerung härtet das Betonfertigteil weitgehend aus, wodurch es bis nahezu seinem endgültigen Zustand kriecht und schwindet. Hierdurch wird ein Bauteil erhalten, welches weitgehend maßhaltig ist und sich somit auch bei seinem späteren Einsatz auf einer Baustelle kaum mehr verändern wird. Auf dieser Grundlage wird die Nachbearbeitung der funktionsrelevanten Stellen vorgenommen. Die Nachbearbeitung kann auch auf den inzwischen montierten Schienenbefestigungen erfolgen, welche insbesondere dann, wenn das Bauteil ausgehärtet ist, ebenfalls sehr maßgenau bearbeitet werden kann.According to the precast concrete part is first prepared in a formwork as a blank in a method for producing a precise precast concrete part, in particular in the form of a threshold or slab for a fixed track for rail-guided vehicles. It is then cured in an advantageous embodiment of the invention by storage for several days and then, at least on the functionally relevant parts, if necessary, applied material, for example plastic, and / or machined to the predetermined level. Due to the storage lasting several days, the prefabricated concrete element hardens to a great extent, as a result of which it creeps and shrinks to almost its final state. As a result, a component is obtained which is largely dimensionally stable and thus will hardly change even when later used on a construction site. On this basis, the post-processing of the functionally relevant bodies is carried out. The post-processing can also be done on the now mounted rail fasteners, which in particular, when the component is cured, can also be edited very accurately.
  • Werden als funktionsrelevante Stellen Montageflächen für die Montage der Schiene oder Verbindungsstellen einer Verbindung mehrerer Betonfertigteile miteinander bearbeitet, so werden sehr exakt definierte Schnittstellen für den Anbau von weiteren Bauteilen erhalten.Are processed as functionally relevant places mounting surfaces for mounting the rail or joints of a compound of several precast concrete parts together, so very precisely defined interfaces for the cultivation of other components are obtained.
  • Werden die bearbeiteten Stellen hinsichtlich des Ist-Maßes kontrolliert, so ist sichergestellt, daß das geforderte Soll-Maß gleichbleibend erhalten wird und auf der Baustelle eine Nacharbeit nicht mehr erforderlich ist. If the machined points are checked with regard to the actual dimension, it is ensured that the required nominal dimension is obtained consistently and no rework is required on the construction site.
  • Wird bei der Bearbeitung der funktionsrelevanten Stellen der aktuelle Verschleiß des Werkzeuges berücksichtigt, so ist eine weitere Maßnahme getroffen, daß das geforderte Sollmaß sehr genau erhalten wird.. If the current wear of the tool is taken into account in the processing of the function-relevant points, then a further measure is taken that the required nominal dimension is obtained very accurately.
  • Vorteilhafterweise hat das Rohteil Schienenstützpunkte, welche entsprechend den individuellen Erfordernissen des Betonfertigteiles auf das in der späteren Trasse erforderliche, vorbestimmte Maß bearbeitet werden. Es werden damit Bauteile erhalten, welche für einen speziellen Einsatzort in einer Trasse vorgesehen sein können. Zur Schienenbefestigung können relativ einfache Standard-Bauteile verwendet werden, welche sich nicht voneinander unterscheiden. Dies hat den Vorteil, daß beim Austausch von Schienen oder Schienenbefestigungen keine Rücksicht auf den speziellen Einsatzort genommen werden muß und daher beliebige Teile verwendet oder untereinander ausgetauscht werden können. Eine individuelle Bearbeitung der Befestigungsteile ist dadurch nicht notwendig.Advantageously, the blank rail supports, which are processed according to the individual requirements of the precast concrete part to the required in the later route, predetermined level. It thus components are obtained, which may be provided for a specific location in a route. For rail mounting relatively simple standard components can be used, which do not differ from each other. This has the advantage that when replacing rails or rail fasteners no consideration for the specific site must be taken and therefore any parts used or can be interchanged. An individual processing of the fasteners is not necessary.
  • Wenn zuerst das Bauteil ausgehärtet wird und sich später nicht mehr verändern wird, wird auch die bearbeitete Stelle das so bearbeitete Maß beibehalten. Werden anschließend hierauf andere Bauteile, wie beispielsweise Schienen auf der festen Fahrbahn montiert, so sind auch diese sehr präzise auf dem Bauteil zu befestigen. Insbesondere feste Fahrbahnen können dabei so ausgebildet werden, daß die funktionsrelevanten Flächen relativ gering sind. Es bietet sich hierbei beispielsweise an, die feste Fahrbahn mit Höcker auszubilden, welche die Stützpunkte für die Gleise darstellen. Es müssen somit nur diese Stützpunkte bearbeitet werden. Es sind aber natürlich auch andere Formen mit dem erfindungsgemäßen Verfahren herstellbar. Das übrige Betonfertigteil kann in einem Toleranzbereich liegen, wie er üblich für die Herstellung von Betonfertigteilen ist. Durch eine entsprechende Bearbeitung der funktionsrelevanten Stellen kann darüber hinaus ein individuelles Betonfertigteil hergestellt werden. Es ist somit möglich, bei festen Fahrbahnen, welche aus einer Vielzahl geradliniger Platten zusammengesetzt sind, durch eine Bearbeitung der entsprechenden Stützpunkte auch Radien zu verwirklichen.If the component is first hardened and will not change later, the machined part will retain the machined dimension. If subsequently other components, such as rails mounted on the fixed track, so these are very precise to attach to the component. In particular, solid lanes can be designed so that the functionally relevant surfaces are relatively small. It lends itself here, for example, to train the solid lane with hump, which represent the bases for the tracks. Thus, only these interpolation points must be processed. Of course, other forms can also be produced by the method according to the invention. The remaining precast concrete part can be within a tolerance range, as is customary for the production of precast concrete parts. In addition, an individual precast concrete part can be produced by a corresponding processing of the functionally relevant points. It is thus possible to realize at fixed lanes, which are composed of a plurality of rectilinear panels, by machining the corresponding bases also radii.
  • Besonders vorteilhaft ist es, wenn das Rohteil des Betonfertigteiles in Umlauffertigung hergestellt wird. Hierdurch kann gewährleistet werden, daß eine stets gleichbleibende Präzision des Rohteiles gewährleistet wird, wodurch auch die spanende Bearbeitung anschließend unter gleichbleibenden Voraussetzungen erfolgen kann. Die Präzision des Endteiles kann somit gewährleistet werden. Außerdem kann aus standardisierten Rohteilen eine Vielzahl individueller Fertigteile hergestellt werden. Darüber hinaus ist durch die Umlauffertigung ein wesentlich kostengünstiges Herstellungsverfahren gewählt. Die Bauteile können in einem Mehrschichtbetrieb hergestellt werden, wobei während der Trocknung der Bauteile bereits andere Formen wieder präpariert und gefüllt werden können.It is particularly advantageous if the blank of the precast concrete part is produced in circulation production. In this way it can be ensured that an always constant precision of the blank is guaranteed, whereby the machining can then be carried out under the same conditions. The precision of the end part can thus be guaranteed. In addition, a variety of individual finished parts can be made from standardized blanks. In addition, a substantially cost-effective production process is selected by the circulation production. The components can be produced in a multi-shift operation, wherein during the drying of the components already other shapes can be prepared and filled again.
  • Bisher war es nicht wirtschaftlich, Betonfertigteile mit der hier geforderten Präzision in Umlauffertigung herzustellen. Durch die vorliegende Erfindung ist es aber gelungen, mittels der entsprechenden Nachbearbeitung der Bauteile die Bauteile besonders kostengünstig auch in Umlauffertigung herstellen zu können. Ein weiteres Vorurteil war, daß durch die Umlauffertigung stets nur gleiche Bauteile wirtschaftlich herstellbar sind, während aber, insbesondere für die feste Fahrbahn meist sehr individuelle Bauteile erforderlich sind, um dem jeweiligen Streckenverlauf gerecht zu werden. Durch die Nachbearbeitung ist es nunmehr möglich, ausgehend von einem Standardteil individuelle Bauteile, welche durchnumeriert werden, zu schaffen.So far, it has not been economical to produce precast concrete parts with the required precision in circulation production. By means of the present invention, however, it has been possible, by means of the corresponding post-processing of the components, to be able to produce the components particularly inexpensively in circulating production. Another prejudice was that by circulation production always only the same components can be produced economically, while but, in particular for the solid road usually very individual components are required to meet the respective route. By post-processing, it is now possible, starting from a standard part individual components, which are numbered to create.
  • Vorteilhafterweise wird das Rohteil und dessen Schalung und/oder eine Spannvorrichtung für Spannstähle des Rohteils während der Fertigung des Rohteils auf bewegbaren Paletten befördert. Hierdurch sind alle herstellungsrelevanten Bauteile für das Rohteil auf der bewegbaren Palette angeordnet und können so den Fertigungsprozeß durchlaufen.Advantageously, the blank and its formwork and / or a clamping device for prestressing steels of the blank is transported during the manufacture of the blank on movable pallets. As a result, all production-relevant components for the blank are arranged on the movable pallet and can thus go through the manufacturing process.
  • Um eine komplette Herstellung des Rohteiles zu gewährleisten, ist die Umlauffertigung in verschiedene Bearbeitungsstationen unterteilt. Insbesondere sind eine Reinigungsstation, eine Dübel- und Spindelmontagestation für die Platte der festen Fahrbahn, eine Bewehrungsstation, eine Spannstation, eine Betonierstation mit oder ohne einer Verdichtungsstation, eine Trockenkammer, eine Entspann- und Entschalungsstation und/oder eine Rohteilentnahmestation vorgesehen. In der jeweiligen Station wird die dort befindliche Palette entsprechend bearbeitet und präpariert, um schließlich das Rohteil als Endprodukt entstehen zu lassen. Jede einzelne Station ist dabei spezialisiert auf eine oder mehrere spezielle Tätigkeiten. Es kann daher auch vorteilhafterweise vorgesehen sein, daß in jeder Station Roboter vorgesehen sind, welche alle oder einen Großteil der erforderlichen Arbeiten ausführen können. Um zu vermeiden, daß an einzelnen Stationen nicht weitergearbeitet werden kann, weil es an anderen Stationen Stillstände gibt oder dort längere Arbeitszeiträume erforderlich sind, ist es vorteilhaft, wenn zwischen zwei Stationen Puffer vorgesehen sind, in welchen die bewegbaren Paletten zwischengelagert werden können.To ensure a complete production of the blank, the circulation production is divided into different processing stations. In particular, a cleaning station, a dowel and spindle mounting station for the slab of the slab, a reinforcement station, a tensioning station, a concreting station with or without a compression station, a drying chamber, a decompression and deswelling station and / or a blank removal station are provided. In the respective station, the pallet located there is processed and prepared accordingly, in order to finally allow the blank to be produced as a final product. Each individual station specializes in one or more specific activities. It can therefore also be advantageously provided that robots are provided in each station, which can perform all or a large part of the required work. In order to avoid that it is not possible to continue working at individual stations because there are standstills at other stations or longer work periods are required there, it is advantageous if buffers are provided between two stations in which the movable pallets can be temporarily stored.
  • Vorteilhafterweise wird ein Teil der in dem Rohteil angeordneten Bewehrung vorgespannt. Hierdurch wird ein sehr stabiles Rohteil erhalten, welches auch bei der Verlegung auf der Baustelle sowie während des späteren Einsatzes weitgehend formbeständig bleibt und hohe Belastungen aufnehmen kann. Vorteilhafterweise ist die Bewehrung, insbesondere bei Platten einer festen Fahrbahn in Quer- und Längsrichtung des Rohteiles angeordnet. Typische Maße für Platten einer festen Fahrbahn sind Längen von ca. 6,50 m und Breiten zwischen 2,40 m und 3 m. Durch die Anordnung der Spannbewehrung in Querrichtung des Rohteiles, d.h. entlang der Breite des Rohteiles sind relativ kurze Spannstähle erforderlich. Pro Platte sind Vorspannungen von mehr als 400 Tonnen auf die Spannstähle erforderlich. Durch die kurzen Längen der Spannstähle ist eine präzise und hinsichtlich der einzelnen Spannstähle weitgehend gleichmäßige Vorspannung erforderlich, um ein gleichmäßig stabiles Bauteil schaffen zu können. Außerdem ist es erforderlich, daß durch die Vorspannung die Schalung des Rohteiles und damit die Form des Bauteiles nicht verändert wird. Es ist deshalb erfindungsgemäß vorgesehen, daß die Spannstähle unabhängig von der Schalung bzw. Schalfläche gespannt werden. Hierdurch wird wiederum ein sehr präzises Rohteil und somit ebenfalls ein sehr präzises Endprodukt erhalten, da die Vorspannung nicht in die Schalung eingeleitet wird, sondern an eigenen, extra dafür vorgesehenen Vorspanneinrichtungen. Die Schalung hat somit lediglich die Betonkräfte aufzunehmen und kann damit in üblicher Weise ausgeführt werden.Advantageously, a part of the reinforcement arranged in the blank is prestressed. As a result, a very stable blank is obtained, which remains largely dimensionally stable during installation on the construction site and during later use and can absorb high loads. Advantageously, the reinforcement, in particular in the case of slabs of a fixed carriageway in the transverse and longitudinal direction of the blank is arranged. Typical dimensions for slabs of a fixed carriageway are lengths of approx. 6.50 m and widths between 2.40 m and 3 m. By the arrangement of the clamping reinforcement in the transverse direction of the blank, i. along the width of the blank relatively short prestressing steels are required. Preload loads of more than 400 tonnes on the prestressing steels are required per plate. Due to the short lengths of the prestressing steels, a precise and, with regard to the individual prestressing steels, substantially uniform prestressing is required in order to be able to produce a uniformly stable component. In addition, it is necessary that the formwork of the blank and thus the shape of the component is not changed by the bias. It is therefore provided according to the invention that the prestressing steels are clamped independently of the formwork or formwork. As a result, in turn, a very precise blank and thus also obtain a very precise end product, since the bias is not introduced into the formwork, but on their own specially provided biasing devices. The formwork thus has to absorb only the concrete forces and can thus be performed in the usual way.
  • Alternativ, allerdings mit einer wesentlich stabileren Schalung, kann die Spannung sich auch auf der Schalung abstützen. Dies ist ausreichend, wenn an die Umfangsgestaltung der Bauteile keine hohen Anforderungen gestellt werden.Alternatively, but with a much more stable formwork, the tension can also be supported on the formwork. This is sufficient if no high demands are placed on the peripheral design of the components.
  • Um eine möglichst gleichmäßige Spannkraft auf die Spannstähle aufbringen zu können, ist es vorteilhaft, wenn mehrere Spannstähle gleichzeitig gespannt werden. Sind mehrere Spannstähle mittels einer Weg- und/oder Kraftausgleichseinrichtung miteinander verbunden, so wird eine gleichmäßige Spannung der Spannstähle ermöglicht.In order to apply the most uniform clamping force on the prestressing steels, it is advantageous if several prestressing steels are tensioned simultaneously. If a plurality of prestressing steels are connected to one another by means of a displacement and / or force compensation device, a uniform tension of the prestressing steels is made possible.
  • Neu und erfinderisch ist es, daß die Spannstähle zu Sektionen zusammengefaßt werden und die Sektionen einzeln, gruppenweise oder zusammen gespannt oder entspannt werden. Hierdurch sind zumindest einzelne Bereiche mit jeweils gleicher Spannkraft versehen, wodurch das Rohteil sehr gleichmäßig und stabil hergestellt werden kann.New and inventive is that the prestressing steels are combined into sections and the sections are stretched individually or in groups or together or relaxed. As a result, at least individual areas are each provided with the same clamping force, whereby the blank can be made very uniform and stable.
  • Vorteilhafterweise, insbesondere wenn gewisse Hinterschneidungen vorgesehen sind, wird zum Entschalen erst die Seitenschalung und anschließend die Bodenschalung von dem Rohteil entfernt. Um das Rohteil von der Bodenschalung trennen zu können hat sich als besonders vorteilhaft und erfinderisch herausgestellt, daß in der Schalung Öffnungen integriert sind, durch welche Stempel eingefahren werden können. Hierdurch wird das Rohteil von der Bodenschalung sehr schonend getrennt. Die späteren Bearbeitungsstellen werden hierbei nicht verletzt und es sind darüber hinaus keine Anschlagpunkte für Hebezeuge nötig. Es wird lediglich das Bauteil selbst angehoben.Advantageously, in particular if certain undercuts are provided, the side formwork and then the bottom formwork are removed from the blank for removal. To be able to separate the blank from the bottom formwork has proved to be particularly advantageous and inventive that in the formwork openings are integrated, can be retracted by which punch. As a result, the blank is very gently separated from the bottom formwork. The later processing points are not injured and in addition no lifting points for hoists are necessary. It is only the component itself raised.
  • Bei komplizierten Bauteilen, insbesondere wie es bei festen Fahrbahnen mit Höckern als Stützpunkten der Fall ist, ist unter Umständen das Entformen des Rohteils in Verbindung mit dem Lösen der Spannkräfte problematisch. Das Problem entsteht dadurch, daß beim Lösen der Spannvorrichtung das Bauteil durch die dann auf das Bauteil einwirkenden Spannkräfte geringfügig zusammengedrückt wird und sich dadurch möglicherweise in der Form klemmt. Das Abheben des Rohteils aus der Schalung ist damit nicht immer möglich, ohne daß das Rohteil beschädigt wird. Erfindungsgemäß wird daher vorgeschlagen, daß zuerst das Rohteil von der Bodenschalung gelöst wird und erst anschließend die Spannkraft auf das Bauteil einwirkt. Dies kann sowohl vollständig als auch nach und nach erfolgen, d. h., daß beispielsweise erst das Rohteil leicht aus der Bodenschalung abgehoben wird, sodann die Spannung leicht oder vollständig nachgelassen wird und erst in einem nächsten Arbeitsschritt das Rohteil vollständig von der Bodenschalung abgehoben wird. Alternativ kann auch vorgesehen werden, daß dieser Vorgang kontinuierlich erfolgt, d. h., daß gleichzeitig das Rohteil von der Bodenschalung gelöst und die Spannung der Spannstähle gelöst wird. Wichtig ist dabei in jedem Falle, daß vermieden wird, daß durch das Lösen der Spannung das Bauteil so weit schrumpft, daß das Bauteil nur erschwert aus der Bodenschalung abhebbar ist. Bei einfachen Bauteilen oder entsprechenden Einsätzen kann natürlich auch erst entspannt und anschließend entformt werden.In complicated components, especially as is the case with fixed roads with bumps as bases, under certain circumstances, the demolding of the blank in connection with the release of the clamping forces is problematic. The problem arises from the fact that when loosening the clamping device, the component is slightly compressed by the then acting on the component clamping forces and thereby possibly jammed in the mold. The lifting of the blank from the formwork is thus not always possible without the blank is damaged. According to the invention it is therefore proposed that first the blank is released from the bottom formwork and only then the clamping force acts on the component. This can be done both completely and gradually, d. h., That, for example, only the blank is lifted slightly from the bottom formwork, then the voltage is easily or completely diminished and only in a next step, the blank is completely lifted from the bottom formwork. Alternatively, it can also be provided that this process takes place continuously, d. h. That simultaneously solved the blank from the bottom formwork and the tension of the prestressing steels is released. It is important in any case, that avoids that by releasing the voltage, the component shrinks so far that the component is difficult to lift off the bottom formwork can be lifted. In the case of simple components or corresponding inserts, it is of course also possible to first relax and then demold them.
  • Um das Lagern der Rohteile in einem Aushärtlager sowie den Transport dorthin zu erleichtern, ist vorteilhafterweise vorgesehen, daß nach dem Entschalen überstehende Spannstähle abgetrennt werden. Die Rohteile können dadurch senkrecht stehend beispielsweise zum Aushärten gelagert werden.In order to facilitate the storage of the blanks in a Aushärtlager and the transport there, it is advantageously provided that after demoulding supernatant prestressing steels are separated. The blanks can be stored vertically, for example, for curing.
  • Das Rohteil wird vorteilhafterweise mittels eines Abtransportwagens in das Aushärtlager und später vom Aushärtlager zu einer Nachbearbeitungsstation transportiert.The blank is advantageously transported by means of a removal cart in the Aushärtlager and later from Aushärtlager to a finishing station.
  • Als besonders vorteilhaft hat sich erwiesen, wenn die Bearbeitung des Rohteils auf einer Betonfräs- oder Schleifmaschine erfolgt. Derartige stationäre Maschinen können beispielsweise in Portalbauweise ausgeführt sein und garantieren eine besonders präzise Bearbeitung der Bauteile. Die Bauteile können für die Bearbeitung entsprechend ihrer späteren Montagelage definiert gelagert werden und in dieser Lage bearbeitet werden. Es kann aber auch durch rechnerische Methoden die spätere Einbaulage in Relation zu der tatsächlichen Bearbeitungslage berechnet werden und mit der computergesteuerten Bearbeitungsmaschine die entsprechenden Bearbeitungen vorgenommen werden. Vorteilhafterweise, insbesondere bei Platten von festen Fahrbahnen wird die Bearbeitung, welche häufig spanend sein wird, an den späteren Auflageflächen der Schiene oder Schienenbefestigung und/oder an Zentrierstellen der festen Fahrbahn vorgenommen. An den Zentrierstellen ist die Verbindung zu weiteren festen Fahrbahnplatten vorgesehen, so daß insgesamt ein definiertes Schienenbett, das auf einer Vielzahl einzelner Platten zusammengesetzt ist, entsteht.It has proved to be particularly advantageous if the processing of the blank takes place on a concrete milling or grinding machine. Such stationary machines can be designed for example in gantry design and guarantee a particularly precise machining of the components. The components can be stored defined for processing according to their subsequent mounting position and edited in this situation. But it can also be calculated by computational methods, the later installation position in relation to the actual processing position and be made with the computer-controlled processing machine, the corresponding processing. Advantageously, especially in the case of slabs of fixed carriageways, the machining, which will often be machining, will be carried out on the later contact surfaces of the rail or rail fastening and / or on centering points of the fixed carriageway. At the centering the connection to other fixed carriageway slabs is provided, so that a total of a defined rail bed, which is composed of a plurality of individual plates, arises.
  • Vorteilhafterweise werden bereits in der Fertigungshalle, möglichst unmittelbar nach der Bearbeitung auf der festen Fahrbahn die Schienenbefestigungen und gegebenenfalls auch die Schienen montiert. Die komplette Platte kann anschließend an die Baustelle ausgeliefert werden und an dem vorgesehenen Platz eingebaut werden.Advantageously, the rail fasteners and possibly also the rails are already mounted in the production hall, as soon as possible after machining on the fixed track. The complete panel can then be delivered to the construction site and installed at the intended location.
  • Bei einer erfindungsgemäßen Palette zur Herstellung eines vorgespannten Betonfertigteiles mit einer Schalung und einer Spannvorrichtung für Spannstähle ist die Spannvorrichtung unabhängig von der Schalung gelagert. Hierdurch ist es möglich, ein Rohteil zu schaffen, welches für eine spätere Bearbeitung beste Voraussetzungen bietet, um sehr präzise Maße und sehr enge Toleranzen zu schaffen. Dadurch, daß die Spannvorrichtung unabhängig von der Schalfläche gelagert ist, wird bewirkt, daß die Schalung lediglich die Kräfte des Betons, aber nicht die Kräfte der Spanneinrichtung aufnehmen muß und somit die Formhaltigkeit des Bauteils gewährleistet wird. Außerdem ist das Entschalen und Spannen des Rohteiles unabhängig voneinander durchführbar.In a pallet according to the invention for producing a prestressed precast concrete part with a formwork and a clamping device for prestressing steels, the clamping device is mounted independently of the formwork. This makes it possible to create a blank, which offers the best conditions for later processing to create very precise dimensions and very tight tolerances. The fact that the tensioning device is mounted independently of the scarf surface, causes the formwork to absorb only the forces of the concrete, but not the forces of the clamping device and thus the dimensional stability of the component is ensured. In addition, the demoulding and clamping of the blank is independently feasible.
  • Vorteilhafterweise ist die Spannvorrichtung derart aufgebaut, daß sie mindestens eine Druckstütze und mindestens eine Zugeinrichtung aufweist. Die Druckstütze ist unabhängig von der Schalung und daher dazu geeignet, die Zugkräfte, welche auf die Spannstähle wirken, aufzunehmen. Konstruktiv besonders einfach ist es, wenn die Zugeinrichtung um die Druckstütze herum drehbar gelagert ist.Advantageously, the clamping device is constructed such that it has at least one pressure support and at least one pulling device. The pressure support is independent of the formwork and therefore suitable to absorb the tensile forces acting on the prestressing steels. It is particularly simple in construction when the pulling device is rotatably mounted around the pressure support.
  • Sind an einem Ende der Zugeinrichtung mindestens ein Zugstab und an dem anderen Ende mindestens eine Befestigungsvorrichtung für Spannstähle angeordnet, so kann mittels der Zugeinrichtung durch eine Drehung um die Druckstütze, welche zwischen der Zugeinrichtung und der Befestigungsvorrichtung für die Spannstähle angeordnet ist, die Krafteinleitung auf die Spannstähle sehr vorteilhaft durchgeführt werden.If at least one tension rod is arranged at one end of the pulling device and at least one fastening device for prestressing steel is arranged at the other end, then by means of the pulling device a rotation about the pressure support, which between the pulling device and the fastening device for the Prestressing steels is arranged, the force on the prestressing steels are carried out very advantageous.
  • Um die insbesondere für feste Fahrbahnen erforderlichen sehr hohen Zugkräfte aufzubringen, ist vorteilhafterweise vorgesehen, daß die Befestigungseinrichtung mittels einer oder mehrerer Spanneinheiten, insbesondere mittels einer Hydraulikeinrichtung gespannt und verriegelt werden. Die Spanneinheit kann anschließend wieder von der Befestigungseinrichtung entfernt werden und für den nächsten Spannvorgang eingesetzt werden.In order to apply the very high tensile forces required in particular for solid roads, it is advantageously provided that the fastening device be tensioned and locked by means of one or more clamping units, in particular by means of a hydraulic device. The clamping unit can then be removed again from the fastening device and used for the next clamping operation.
  • Um die Krafteinleitung auf die Spannstähle möglichst gleichmäßig einleiten zu können, ist es vorteilhaft, wenn die Befestigungsvorrichtung ein Kamm ist, in welchem mehrere Spannstähle eingehängt werden können. Die Spannung der Spannstähle erfolgt dann über eine Bewegung des Kammes in Richtung der Längsachse der Spannstähle, wodurch die Spannstähle gedehnt werden. Zum Entspannen wird der Kamm in die entgegengesetzte Richtung bewegt, wodurch die Spannstähle versuchen sich zu entspannen und damit in die Betonplatte eine Druckspannung einbringen. Um zu vermeiden, daß es innerhalb der Zugeinrichtung und der Befestigungsvorrichtung bzw. des Kammes zu Verspannungen kommt, ist es vorteilhaft, wenn die Befestigungsvorrichtung bzw. der Kamm an der Zugeinrichtung drehbar angeordnet ist.In order to initiate the introduction of force to the prestressing steels as uniformly as possible, it is advantageous if the fastening device is a comb in which a plurality of prestressing steels can be suspended. The tension of the prestressing steels is then effected by moving the comb in the direction of the longitudinal axis of the prestressing steels, whereby the prestressing steels are stretched. To relax the comb is moved in the opposite direction, whereby the prestressing steels try to relax and thus bring a compressive stress in the concrete slab. In order to avoid that it comes to tension within the drawbar and the fastening device or the comb, it is advantageous if the fastening device or the comb is rotatably mounted on the pulling device.
  • Zum Einhängen der Spannstähle in den Kamm ist es vorteilhaft, wenn die Spannstähle an den Enden aufgestaucht sind und somit eine Verbreiterung bilden. Diese Verbreiterung schafft eine formschlüssige Verbindung zwischen dem Bewehrungsstahl und dem Kamm. Es ist aber auch möglich, die Verbindung zwischen dem Bewehrungsstahl und dem Kamm mittels Muttern, welche über den Bewehrungsstahl geschraubt sind, oder mittels einzelnen Klemmvorrichtungen zu schaffen. Durch den Kamm und die formschlüssige Verbindung der Spannstähle mit dem Kamm ist ein automatisches Einhängen der Spannstähle in den Kamm sehr einfach zu realisieren, da die Spannstähle lediglich in einer Richtung über die Öffnungen des Kammes gelegt werden müssen. Durch Einsatz beispielsweise einer Hydraulikeinrichtung werden die Kämme, welche jeweils an einem Ende der Spannstähle angeordnet sind, voneinander weg bewegt und bewirken somit die Spannung der Spannstähle.For hanging the prestressing steels in the comb, it is advantageous if the prestressing steels are upset at the ends and thus form a broadening. This broadening creates a positive connection between the reinforcing steel and the comb. But it is also possible to provide the connection between the reinforcing steel and the comb by means of nuts which are screwed over the reinforcing steel, or by means of individual clamping devices. By the comb and the positive connection of the prestressing steels with the comb, an automatic hooking the prestressing steels in the comb is very easy to implement, since the prestressing steels must be placed only in one direction over the openings of the comb. By using, for example, a hydraulic device, the combs, which are each arranged at one end of the prestressing steels, moved away from each other and thus cause the tension of the prestressing steels.
  • Um die Palette und wesentliche Teile der Schalung für verschiedene Rohteile einsetzen zu können, ist es vorteilhaft, wenn die Schalung mit verschiedenen Einsätzen ausgerüstet werden kann. So ist es beispielsweise im Falle einer festen Fahrbahn möglich, auf verschiedene Befestigungssysteme für die Schienen derart einzugehen, daß durch die unterschiedlichen Einsätze unterschiedliche Formen der Stützpunkte für die Gleisbefestigung geschaffen werden. Die Einsätze, welche wahlweise in die Grundschalung eingelegt werden können, sind jeweils so ausgestaltet, daß sie für eine bestimmte Befestigungsmethode der Schienen geeignet sind. Alternativ oder zusätzlich können die Einsätze derart ausgebildet sein, daß sie die Schalung in mehrere Bauteile unterteilen. Hierdurch werden in einer einzigen Palette gleichzeitig mehrere Rohteile hergestellt, wobei jedes für sich vorgespannt sein kann.In order to use the pallet and essential parts of the formwork for different blanks, it is advantageous if the formwork can be equipped with various inserts. Thus, it is possible, for example in the case of a fixed track, to respond to different fastening systems for the rails so that different forms of bases for the track fastening are created by the different uses. The inserts, which can optionally be inserted into the basic formwork, are each designed so that they are suitable for a particular method of fastening the rails. Alternatively or additionally, the inserts may be designed such that they divide the formwork into several components. As a result, several blanks are produced simultaneously in a single pallet, each of which can be biased by itself.
  • Um Hinterschneidungen, insbesondere im Bereich der Stirnseiten der Platten von festen Fahrbahnen schaffen zu können, ist es vorteilhaft, wenn die Seitenschalung oder Teile davon von der Bodenschalung entfernbar sind. Ein weiterer Vorteil hierbei ist, daß das Einlegen der Spannstähle in die Kämme automatisch erfolgen kann. Erst nach dem Einlegen der Stähle wird ein Teil der Seitenschalungen befestigt, wodurch die Formgebung des Rohteiles bewirkt wird. Die Seitenschalungen weisen entsprechende Ausnehmungen oder Teilungen auf, so daß die Spannstähle durch die Seitenschalung hindurchgeführt werden können. Besonders vorteilhaft ist es, wie bereits oben erläutert wurde, wenn die Schalung jeweils unabhängig von der Spanneinrichtung ist und somit auch unabhängig hiervon angebaut oder abgebaut werden kann.In order to create undercuts, especially in the area of the faces of the slabs of solid lanes, it is advantageous if the side mold or parts thereof are removable from the bottom formwork. Another advantage here is that the insertion of the prestressing steels in the combs can be done automatically. Only after the insertion of the steels, a part of the side molds is fixed, whereby the shaping of the blank is effected. The side molds have corresponding recesses or pitches, so that the prestressing steels can be passed through the side formwork. It is particularly advantageous, as has already been explained above, if the formwork is in each case independent of the tensioning device and thus can also be grown or dismounted independently thereof.
  • Durch die Einteilung der Spannvorrichtung in einzelne Sektionen ist es in vorteilhafter Ausführung der Erfindung möglich, die Spannstähle gleichzeitig oder nacheinander zu spannen. Außerdem werden vorteilhafterweise pro Sektion gleichzeitig mehrere Spannstähle gespannt, so daß eine gleichmäßige Vorspannung und Einbringung der Vorspannkraft in die Spannstähle ermöglicht wird. Dies sorgt für eine gleichmäßige Festigkeit des Bauteils.By dividing the tensioning device into individual sections, it is possible in an advantageous embodiment of the invention to tension the prestressing steels simultaneously or in succession. In addition, advantageously more sections are stretched simultaneously per section, so that a uniform bias and introduction of the biasing force is made possible in the prestressing steels. This ensures a uniform strength of the component.
  • Um die Palette für die Umlauffertigung vorteilhaft auszugestalten, ist vorgesehen, daß sie Schienen oder Rollen aufweist. Hierdurch ist eine Bewegung der Palette von Station zu Station der Umlauffertigung sehr einfach zu realisieren. In order to make the pallet for circulation production advantageous, it is provided that it has rails or rollers. As a result, a movement of the pallet from station to station of the circulation production is very easy to implement.
  • Weitere Vorteile der Erfindung sind in den nachfolgenden Ausführungsbeispielen beschrieben. Es zeigt:
  • Figur 1 Figure 1
    eine Fertigungsanlage, a manufacturing facility,
    Figur 2 Figure 2
    eine Palette in Vorderansicht, a pallet in front view,
    Figur 3 Figure 3
    eine Palette in Seitenansicht, a pallet in side view,
    Figur 4 Figure 4
    eine Palette in perspektivischer Ansicht, a palette in perspective view,
    Figur 5 Figure 5
    ein Schienenstützpunkt. a rail support point.
    Further advantages of the invention are described in the following exemplary embodiments. Further advantages of the are described in the following example of the invention. It shows: It shows:
    FIG. FIG. 1 1
    a production plant, a production plant,
    FIG. FIG. 2 2
    a pallet in front view, a pallet in front view,
    FIG. FIG. 3 3
    a palette in side view, a palette in side view,
    FIG. FIG. 4 4th
    a pallet in perspective view, a pallet in perspective view,
    FIG. FIG. 5 5
    a rail base. a rail base.
  • In Figur 1 In Figur 1 sind die verschiedenen Stationen der erfindungsgemäßen Umlauffertigung 1 zur Herstellung von präzisen Betonfertigteilen, insbesondere aus Faserbeton dargestellt. the various stations of the rotary production 1 according to the invention for the production of precise precast concrete parts, in particular made of fiber concrete, are shown. Eine Palette 20 wird einem ersten Puffer 2 über herkömmliche Fördereinrichtungen zugeführt. A pallet 20 is fed to a first buffer 2 via conventional conveyors. Aus dem Puffer 2 gelangt die Palette 20 in eine Reinigungsstation 3. Hier wird die Schalung und gegebenenfalls die Spanneinrichtung gereinigt, um eine sichere Funktionsfähigkeit zu gewährleisten. The pallet 20 passes from the buffer 2 into a cleaning station 3. Here the formwork and, if necessary, the clamping device are cleaned in order to ensure reliable functionality. In der Reinigungsstation 3 stehen hierfür beispielsweise Staubsauger zur Verfügung, welche vorteilhafterweise mittels Roboter bedient werden und die Palette 20 reinigen. For this purpose, vacuum cleaners, for example, are available in the cleaning station 3, which are advantageously operated by robots and which clean the pallet 20. In In FIG. FIG. 1 1 are the various stations of the invention circulation production 1 for the production of precise precast concrete elements, in particular made of fiber concrete. are the various stations of the invention circulation production 1 for the production of precise precast concrete elements, in particular made of fiber concrete. A pallet 20 is fed to a first buffer 2 via conventional conveyors. A pallet 20 is fed to a first buffer 2 via conventional conveyors. From the buffer 2, the pallet 20 enters a cleaning station 3. Here, the formwork and, where appropriate, the clamping device is cleaned to ensure safe operation. From the buffer 2, the pallet 20 enters a cleaning station 3. Here, the formwork and, where appropriate, the clamping device is cleaned to ensure safe operation. In the Cleaning station 3 are for this purpose, for example, vacuum cleaners available, which are advantageously operated by means of robots and clean the pallet 20. In the cleaning station 3 are for this purpose, for example, vacuum cleaners available, which are advantageously operated by means of robots and clean the pallet 20.
  • Nachdem die Palette 20 beziehungsweise die Schalung gereinigt ist, wird sie einem weiteren Puffer 2 zugeführt. Aus diesem Puffer 2 wird anschließend in der Station 4 die Dübel- bzw. Spindelmontage durchgeführt. Die Dübel und Spindeln sind insbesondere in einer Platte einer festen Fahrbahn für schienengeführte Fahrzeuge erforderlich. Mittels den Spindeln wird später auf der Baustelle oder zur Bearbeitung die Lage der Platte ausgerichtet. Über die Dübel werden die Schienen bzw. Schienenbefestigungen zur Führung des Fahrzeuges auf der Platte befestigt. Auch in dieser Station ist die Dübel- und Spindelmontage weitgehend automatisch mittels nicht dargestellter Roboter durchführbar.After the pallet 20 or the formwork has been cleaned, it is fed to a further buffer 2. From this buffer 2, the dowel or spindle assembly is then performed in the station 4. The dowels and spindles are required in particular in a slab of a fixed track for rail-guided vehicles. By means of the spindles, the position of the plate is later aligned on the construction site or for processing. About the dowels, the rails or rail fasteners to guide the vehicle are mounted on the plate. Also in this station, the dowel and spindle assembly is largely feasible by means not shown robot.
  • Aus dem Puffer 2 gelangt die Palette 20 in die erste Bewehrungsstation 5. Je nachdem, welches Bauteil geschaffen werden soll, sind unterschiedliche Bewehrungen erforderlich. So kann in einem ersten Teil der Bewehrungsstation 5 ein Teil der Bewehrung, beispielsweise Matten oder Spannstähle, welche insbesondere bei Platten von festen Fahrbahnen ausgelegt werden, in die Schalung eingelegt werden. Im nächsten Teil der Bewehrungsstation 5 können die quer hierzu eingelegten Spannstähle, beispielsweise Gewindestähle, eingelegt werden. Zwischen den beiden Bewehrungsstationen 5 ist eine weiterer Puffer 2 angeordnet.From the buffer 2, the pallet 20 enters the first reinforcement station 5. Depending on which component is to be created, different reinforcements are required. Thus, in a first part of the reinforcement station 5, a part of the reinforcement, for example mats or prestressing steels, which are designed in particular for slabs of fixed carriageways, are inserted into the formwork. In the next part of the reinforcement station 5, the transverse thereto inserted prestressing steels, such as threaded rods, can be inserted. Between the two reinforcement stations 5, a further buffer 2 is arranged.
  • In der darauffolgenden Spannstation 6 sind Hydraulikeinrichtungen vorgesehen, mit welchen die Spannstähle vorgespannt werden können. Außerdem werden die vorgespannten Stähle in der Spannstation 6 fixiert, so daß die beispielsweise hydraulische Vorspannung nach der Fixierung der Spannstähle wieder entfernt werden kann und für die nächste Palette 20 bzw. nächste Station verwendet werden kann. Die Spannung der Stähle kann einzeln erfolgen. Vorzugsweise wird die Spannung aber mindestens sektionsweise erfolgen, wobei es auch vorteilhaft sein kann, mehrere Sektionen gleichzeitig zu spannen. Hierdurch wird das Spannen aller Spannstähle schneller erfolgen können als wenn dies nacheinander geschieht, so daß gegebenenfalls die Durchlaufzeit einer Palette verringert werden kann. Nach der Spannstation 6 wird ein weiterer Puffer 2 von der Palette 20 angefahren. Die Palette 20 bleibt solange in dem Puffer 2 bis die nachfolgende Station wieder frei geworden ist.In the subsequent tensioning station 6 hydraulic devices are provided with which the prestressing steels can be biased. In addition, the prestressed steels are fixed in the tensioning station 6, so that the example hydraulic bias after fixing the prestressing steels can be removed again and can be used for the next pallet 20 or next station. The tension of the steels can be done individually. Preferably, however, the tension will be at least section wise, and it may also be advantageous to tension several sections simultaneously. As a result, the clamping of all prestressing steels can be done faster than if this happens one after the other, so that if necessary, the cycle time of a pallet can be reduced. After the tensioning station 6, a further buffer 2 is approached by the pallet 20. The pallet 20 remains in the buffer 2 until the next station has become free again.
  • In der Betonierstation 7 wird die Schalung mit Beton, beispielsweise Faserbeton, ausgefüllt und gegebenenfalls verdichtet, wodurch das eigentliche Bauteil entsteht. Zum Trocknen des Betons wird die Palette in eine Trockenkammer 9 eingefahren. Um möglichst viele Paletten in der Trockenkammer 9 lagern zu können, ist jeweils ein Hublift 8, 8' am Anfang und am Ende der Trockenkammer 9 angeordnet. Mittels dieser Hublifte 8, 8' werden die Paletten 20 in verschiedene Etagen der Trockenkammer 9 verfahren, so daß eine große Anzahl von Paletten 20 gleichzeitig in Umlauf sein kann und eine große Anzahl von Betonfertigteilen gleichzeitig gefertigt werden kann.In the concreting station 7, the formwork with concrete, such as fiber concrete, filled and optionally compacted, whereby the actual component is created. To dry the concrete, the pallet is moved into a drying chamber 9. In order to store as many pallets in the drying chamber 9, a lift 8, 8 'at the beginning and at the end of the drying chamber 9 is arranged in each case. By means of these lifts 8, 8 ', the pallets 20 are moved to different levels of the drying chamber 9, so that a large number of pallets 20 may be in circulation at the same time and a large number of precast concrete parts can be made simultaneously.
  • Nach dem Trocknen des Betons wird die Palette 20 aus der Trockenkammer 9 über den Hublift 8' entnommen und einer Entschal- und Entspannstation 10 zugeführt. In der Station 10 wird gleichzeitig die Entspannung der Spannstähle und das Entformen vorgenommen. Je nach Ausführung des Bauteils kann es auch vorteilhaft sein, zuerst das Bauteil von der Bodenschalung leicht abzuheben und anschließend erst den Entspannvorgang der Spannstähle zu beginnen. Dies kann kontinuierlich oder schrittweise erfolgen. Es wird damit bewirkt, daß die Entschalung einfach und ohne Beschädigung des Bauteiles erfolgen kann.After drying of the concrete, the pallet 20 is removed from the drying chamber 9 via the lift 8 'and fed to a demoulding and relaxation station 10. In the station 10, the relaxation of the prestressing steels and the demolding is carried out simultaneously. Depending on the design of the component, it may also be advantageous to first lift the component slightly from the bottom formwork and then to begin the expansion process of the prestressing steel. This can be done continuously or step by step. It is thus effected that the demoulding can be done easily and without damaging the component.
  • In der darauffolgenden Station 11 wird die Platte der festen Fahrbahn aus der Palette vollständig entnommen und auf einen Abtransportwagen 12 aufgelegt. Gegebenenfalls wird hier auch die eingebaute Spindel beispielsweise 20mm in die Höhe gedreht um später gereinigt werden zu können. Anschließend erfolgt in einer Station 18 die Abtrennung der überstehenden Spannstahlenden und die Reinigung der Spindeln.In the subsequent station 11, the plate of the fixed carriageway is completely removed from the pallet and placed on a dump truck 12. If necessary, the built-in spindle, for example, 20mm is turned up here to be cleaned later. Subsequently, in a station 18, the separation of the protruding prestressing steel ends and the cleaning of the spindles.
  • Der Abtransportwagen 12 bringt die Platte in eine Kippstation 13, in welcher die Platte beispielsweise um 90° gedreht und in einem Lager abgestellt wird. In diesem Lager härtet der Beton aus, wodurch dieser kriecht und schwindet und sein Endmaß weitgehend annimmt. Nach einer Zeit von beispielsweise 28 Tagen hat das Betonteil weitgehend sein endgültiges Maß erreicht und kann nachbearbeitet werden. Hierzu wird es über die Kippstation 13 wiederum auf einen Transportwagen 12 aufgelegt und einer weiteren Bearbeitungsstation 15 zugeführt. In der Station 15 wird hierzu die Platte aufgespindelt. Dies bedeutet, daß die Platte entsprechend ihrer späteren Einbaulage in der festen Fahrbahn ausgerichtet wird. In dieser Lage wird sie einer Bearbeitungsmaschine 16 zugeführt, in welcher beispielsweise Stützpunkte für die spätere Lagerung der Schienen auf den 10-tel Millimeter genau bearbeitet werden. Diese Bearbeitungsstation 16 kann beispielsweise eine Betonfräsmaschine, Bohrmaschine oder eine Schleifmaschine beinhalten, mit welcher die entsprechenden Stellen des Rohteils präzise und formgerecht bearbeitet oder für die Montage vorbereitet werden. Dadurch, daß die Platte ausgehärtet ist, bewirkt die Bearbeitung der Platte, daß auch in der späteren Einbaulage die hier erreichten Maße beibehalten werden können.The removal cart 12 brings the plate into a tilting station 13, in which the plate is rotated, for example, by 90 ° and parked in a warehouse. In this camp, the concrete hardens, causing it to creep and shrink and take on its final dimensions largely. After a period of, for example, 28 days, the concrete part has largely reached its final dimensions and can be reworked. For this purpose, it is again placed on a trolley 12 via the tilting station 13 and fed to a further processing station 15. In the station 15, the plate is spindled for this purpose. This means that the plate is aligned according to their subsequent installation position in the fixed lane. In this position, it is fed to a processing machine 16, in which, for example, bases for the subsequent storage of the rails are processed to the nearest 10th of a millimeter. This processing station 16 may include, for example, a concrete milling machine, drill or a grinding machine, with which the corresponding points of the blank are machined precisely or in shape or prepared for assembly. The fact that the plate is cured causes the processing of the plate, that even in the later installation position, the dimensions achieved here can be maintained.
  • Die Bearbeitung der Platte kann beispielsweise auch das Fräsen von Aussparungen für Führungen beinhalten, welche an den Enden der Platten einsetzbar sind. Die Führungen, welche beispielsweise einen trapezförmigen Querschnitt aufweisen und aus Stahl hergestellt sind, überlappen zwei Platten und erlauben somit eine exakte Ausrichtung der Platten zueinander. Pro Plattenstoß haben sich drei solcher Führungen an der Ober-, Unterund/oder den Seitenflächen der Platte als vorteilhaft erwiesen um eine sichere Positionierung der Platten in x-, y- und z-Richtung zueinander solange aufrechtzuerhalten, bis die Lage der Platten endgültig, z.B. durch einen Unterguß fixiert ist. Durch eine entsprechend winkelige Anordnung der Aussparungen zur Längsachse der Platte ist es möglich eine Polygonverlegung der Platten vorzusehen.The processing of the plate may for example also include the milling of recesses for guides, which are used at the ends of the plates. The guides, which for example have a trapezoidal cross-section and are made of steel, overlap two plates and thus allow an exact alignment of the plates to each other. Per plate impact, three such guides on the top, bottom and / or side surfaces of the plate have proven to be advantageous to secure positioning of the plates in the x-, y- and z-direction each other as long maintain until the position of the plates is finally fixed, for example by a bottom casting. By a corresponding angular arrangement of the recesses to the longitudinal axis of the plate, it is possible to provide a polygon laying of the plates.
  • Nachdem alle wichtigen Maße bearbeitet wurden, wird das Betonfertigteil einer letzten Station, nämlich einer Montagestation 17 zugeführt. In der Montagestation 17 werden die Schienenbefestigungen und gegebenenfalls sogar die Schienen selbst auf die Platte montiert. Diese vormontierte Platte ist später auf der Baustelle sehr schnell verarbeitbar, da weitgehend auf Einstellarbeiten verzichtet werden kann, nachdem die Vorgaben, welche an die einzelne individuelle Platte gegeben wurden bereits bei der Bearbeitung und bei der Montage berücksichtigt werden konnten. Die individuell für einen speziellen Einbauplatz in der festen Fahrbahn gefertigte Platte wird gegebenenfalls numeriert und über einen Abtransportwagen 12 einem Lager oder direkt auf die Baustelle transportiert.After all important dimensions have been processed, the precast concrete part of a last station, namely an assembly station 17 is supplied. In the assembly station 17, the rail fasteners and possibly even the rails themselves are mounted on the plate. This pre-assembled plate can be processed very quickly later on the construction site, as adjustment can largely be dispensed with after the specifications which were given to the individual individual plate could already be taken into account during machining and assembly. The plate made individually for a special slot in the fixed carriageway is optionally numbered and transported via a transport cart 12 a warehouse or directly to the site.
  • Durch die Umlauffertigung wird zuerst ein Rohteil geschaffen, welches weitgehend ein Universalteil für die meisten Anwendungsfälle darstellt. Aus diesem universellen Rohteil wird in der Bearbeitungsstation später ein individuelles, gegebenenfalls mit einer Nummer versehenes Bauteil geschaffen, welches genau seinen Platz in der festen Fahrbahn hat. By circulating a blank is first created, which is largely a universal part for most applications. From this universal blank later in the processing station an individual, possibly provided with a number component is created, which has its exact location in the fixed lane.
  • In Figur 2 In Figur 2 ist eine Vorderansicht einer Palette 20 dargestellt. a front view of a pallet 20 is shown. Die Palette 20 ist auf Trägern 21 und Schienen 22 aufgebaut. The pallet 20 is constructed on supports 21 and rails 22. Auf den Trägern 21 ist die Bodenschalung 23 und die Seitenschalung 24 und 24' angeordnet. The bottom formwork 23 and the side formwork 24 and 24 'are arranged on the carriers 21. In der Seitenschalung 24 der Stirnseite sind verschiedene Hinterschneidungen vorgesehen, um die Verbindung benachbarter Platten der festen Fahrbahn durchführen zu können. Various undercuts are provided in the side formwork 24 of the front side in order to be able to carry out the connection of adjacent slabs of the fixed track. Die Seitenschalung 24 ist beispielsweise mit nicht dargestellten Einrichtungen abklappbar oder entfernbar von der Bodenschalung, so daß das Entformen des späteren Rohteils einfach möglich ist. The side shuttering 24 can be folded down or removed from the bottom shuttering, for example with devices not shown, so that the subsequent blank can be easily removed from the mold. In In FIG. FIG. 2 2 a front view of a pallet 20 is shown. a front view of a pallet 20 is shown. The pallet 20 is constructed on carriers 21 and rails 22. On the supports 21, the bottom formwork 23 and the side molds 24 and 24 'are arranged. The pallet 20 is constructed on carriers 21 and rails 22. On the supports 21, the bottom formwork 23 and the side molds 24 and 24 'are arranged. In the side wall 24 of the front side various undercuts are provided in order to carry out the connection of adjacent plates of the fixed carriageway. In the side wall 24 of the front side various undercuts are provided in order to carry out the connection of adjacent plates of the fixed carriageway. The side mold 24 is, for example, with devices not shown hinged or removable from the bottom mold, so that the removal of the subsequent blank is easily possible. The side mold 24 is, for example, with devices not shown hunged or removable from the bottom mold, so that the removal of the subsequent blank is easily possible.
  • An der Palette 20 sind mehrere Spannvorrichtungen 30 vorgesehen. Jede Spannvorrichtung besteht aus einer Druckstütze 31 und einer Zugeinrichtung 32. Die Zugeinrichtung 32 ist um einen Drehpunkt 33 der Druckstütze 31 drehbar gelagert. Unterhalb der Druckstütze 31 ist ein Zugstab 34 angeordnet.On the pallet 20 a plurality of clamping devices 30 are provided. Each tensioning device consists of a pressure support 31 and a traction device 32. The traction device 32 is rotatably mounted about a pivot point 33 of the pressure support 31. Below the pressure support 31, a tension rod 34 is arranged.
  • Eine zweite Zugeinrichtung 32' ist an der Druckstütze 31 fest angeordnet. Mit ihr wirkt eine Spindel 40 und eine Mutter 39 zusammen. Die wirksame Länge der Spindel 40 ist verkürzbar. Das Verkürzen erfolgt beispielsweise mittels einer Hydraulikeinrichtung, welche auf die Spindel 40 einwirkt und dessen wirksame Länge verkürzt. Durch die Verkürzung der Spindel 40 wird die Zugeinrichtung 32 um den Drehpunkt 33 gedreht und der Spannstahl 35 und der Zugstab 34 gedehnt. Die verkürzte Spindel 40 wird mittels der Mutter 39 fixiert.A second pulling device 32 'is fixed to the pressure support 31. With her, a spindle 40 and a nut 39 cooperates. The effective length of the spindle 40 can be shortened. The shortening is done for example by means of a hydraulic device which acts on the spindle 40 and shortens its effective length. By shortening the spindle 40, the pulling device 32 is rotated about the pivot point 33 and the prestressing steel 35 and the tension rod 34 is stretched. The shortened spindle 40 is fixed by means of the nut 39.
  • Die zweite Zugeinrichtung 32' kann an der Druckstütze 31 auch drehbar, gleich oder ähnlich der Befestigung der Zugeinrichtung 32 angeordnet sein.The second pulling device 32 'may also be rotatable, equal or similar to the attachment of the pulling device 32 to the pressure support 31.
  • Die Spannstähle 35 sind mit dem oberen Ende der Zugeinrichtung 32 und 32' verbunden. Die Verbindung der Spannstähle 35 erfolgt in dem vorliegenden Ausführungsbeispiel mittels eines Kammes 36, welcher über einen Drehpunkt 37 mit dem oberen Ende der Zugeinrichtung 32 verbunden ist. Die Spannstähle 35 werden vorzugsweise über eine Aufstauchung in dem Kamm 36 eingehängt. Es sind aber auch andere, zuvor bereits beschriebene Querschnittsveränderungen möglich.The prestressing steels 35 are connected to the upper end of the drawbar 32 and 32 '. The connection of the prestressing steels 35 takes place in the present embodiment by means of a comb 36, which is connected via a pivot point 37 with the upper end of the pulling device 32. The prestressing steels 35 are preferably hung in the comb 36 via an upsetting. But there are also other cross-sectional changes already described above possible.
  • Die Spannvorrichtung 30 wirkt unabhängig von der Schalung 23, 24, 24', so daß eine Verformung der Schalung 23, 24, 24' bei Einsetzen der Zugspannung nicht auftritt. Die Zugspannung stützt sich im wesentlichen über die Druckstütze 31 ab, welche an dem Rahmen der Palette 20 befestigt ist. Die Druckstütze 31 ist so stabil ausgebildet, daß eine Verformung der Palette 20 ebenfalls vermieden wird. The tensioning device 30 acts independently of the formwork 23, 24, 24 ', so that a deformation of the formwork 23, 24, 24' does not occur when the tension is applied. The tension is essentially supported by the pressure support 31, which is fastened to the frame of the pallet 20. The pressure support 31 is formed so stable that a deformation of the pallet 20 is also avoided.
  • In Figur 3 In Figur 3 ist eine Seitenansicht einer Palette 20 dargestellt. a side view of a pallet 20 is shown. Das Grundgerüst der Palette 20 besteht aus den Trägern 21 und der Schiene 22. Auf den Trägern 21 ist die Bodenschalung 23 und die Seitenschalung 24, 24' aufgebaut. The basic structure of the pallet 20 consists of the beams 21 and the rail 22. The bottom formwork 23 and the side formwork 24, 24 'are built on the beams 21. In der Darstellung der In the representation of the Figur 3 Figure 3 wird deutlich, daß entlang der Palette 20 eine Vielzahl von Spannvorrichtungen 30 angeordnet sind. it is clear that a plurality of clamping devices 30 are arranged along the pallet 20. Jede Spannvorrichtung 30 weist einen Zugstab 34 auf. Each tensioning device 30 has a pull rod 34. Der Zugstab 34 ist mit der Zugeinrichtung 32 verbunden, welche sich an der Druckstütze 31 abstützt. The pull rod 34 is connected to the pulling device 32, which is supported on the pressure support 31. Am Ende der Zugeinrichtung 32, welche dem Zugstab 34 gegenüberliegt, ist der Kamm 36 angeordnet. At the end of the pulling device 32, which is opposite the pulling rod 34, the comb 36 is arranged. Der Kamm 36 weist mehrere Öffnungen 38 auf, in welche die Spannstähle einlegbar sind. The comb 36 has several openings 38 into which the prestressing steels can be inserted. Durch Betätigung einer Spannvorrichtung 30 werden somit gleichzeitig mehrere Spannstähle 35 gespannt. By operating a clamping device 30, several prestressing steels 35 are clamped at the same time. Hierdurch wird eine gleichmäßige Spannung bewirkt, welche insbesondere aufgrund der kurzen Länge der Spannstähle 35 besonders wichtig ist, um eine gleichmäßige Spannung zu erzielen. This brings about a uniform tension, which is particularly important due to the short length of the prestressing steel 35 in order to achieve a uniform tension. Die Spannung des Zugstabes 34 kann so erfolgen, daß eine Hydraulikeinrichtung auf die Spindel 40 aus The tensioning of the tension rod 34 can take place in such a way that a hydraulic device acts on the spindle 40 Figur 2 Figure 2 zugreift und diese verkürzt, so daß zwei gegenüberliegende Kämme 36 auseinander bewegt werden und dadurch die Spannstähle 35 spannen. accesses and shortens it, so that two opposing combs 36 are moved apart and thereby tension the prestressing steel 35. Eine derartige Spannung kann einzeln pro Spannvorrichtung 30 vollzogen werden. Such a tension can be carried out individually for each tensioning device 30. Es können aber auch mehrere der Spannvorrichtungen 30 gleichzeitig gespannt werden, so daß das Spannen der kompletten Palette 20 schneller erfolgt. However, several of the clamping devices 30 can also be clamped at the same time, so that the entire pallet 20 is clamped more quickly. Die Zykluszeiten können somit verringert werden. The cycle times can thus be reduced. In In FIG. FIG. 3 3 a side view of a pallet 20 is shown. a side view of a pallet 20 is shown. The skeleton of the pallet 20 consists of the carriers 21 and the rail 22. On the supports 21, the bottom formwork 23 and the side mold 24, 24 'is constructed. The skeleton of the pallet 20 consists of the carriers 21 and the rail 22. On the supports 21, the bottom formwork 23 and the side mold 24, 24 'is constructed. In the presentation of the In the presentation of the FIG. FIG. 3 3 It is clear that along the pallet 20, a plurality of clamping devices 30 are arranged. It is clear that along the pallet 20, a plurality of clamping devices 30 are arranged. Each tensioning device 30 has a tension rod 34. The tension rod 34 is connected to the traction device 32, which is supported on the pressure support 31. At the end of the traction device 32, which is opposite to the tension rod 34, the comb 36 is arranged. Each tensioning device 30 has a tension rod 34. The tension rod 34 is connected to the traction device 32, which is supported on the pressure support 31. At the end of the traction device 32, which is opposite to the tension rod 34, the comb 36 is arranged. The comb 36 has a plurality of openings 38 into which the prestressing steels can be inserted. The comb 36 has a plurality of openings 38 into which the prestressing steels can be inserted. By actuating a clamping device 30, a plurality of prestressing steels 35 are thus simultaneously tensioned. By actuating a clamping device 30, a plurality of prestressing steels 35 are thus simultaneously tensioned. As a result, a uniform tension is effected, which is particularly important, in particular due to the short length of the prestressing steels 35, in order to achieve a uniform tension. As a result, a uniform tension is achieved, which is particularly important, in particular due to the short length of the prestressing steels 35, in order to achieve a uniform tension. The tension of the tension rod 34 may be such that a hydraulic device on the spindle 40 from The tension of the tension rod 34 may be such that a hydraulic device on the spindle 40 from FIG. FIG. 2 2 accesses and shortens these, so that two opposed combs 36 are moved apart and thereby tension the prestressing steels 35. Such a voltage can be completed individually per clamping device 30. But it can also be clamped several of the clamping devices 30 simultaneously, so that the clamping of the complete pallet 20 is faster. accesses and shortens these, so that two opposed combs 36 are moved apart and thereby tension the prestressing steels 35. Such a voltage can be completed individually per clamping device 30. But it can also be clamped several of the clamping devices 30 simultaneously, so that the clamping of the complete pallet 20 is faster. The cycle times can thus be reduced. The cycle times can thus be reduced.
  • Durch die Anordnung verschiedener Spannvorrichtungen 30 ist ein sektionsweiser Aufbau der Palette 20 bewirkt. Die Palette 20 kann hierdurch mehr oder weniger lang ausgestaltet werden, ohne daß der prinzipielle Aufbau der Palette 20 geändert werden muß. Ebenso ist durch den sektionsweisen Aufbau die Einbringung der Spannkräfte gleichmäßig zu bewerkstelligen. Anstelle oder zusätzlich zum Kammes 36 kann auch eine beispielsweise mehrfach gelagerte Kraft- oder Wegausgleichseinrichtung eingesetzt werden, um eine gleichmäßige Zugkraft in den Spannstählen 35 zu bewirken. Derartige Hilfsmittel können auf Grund der unüblich kurzen Spannstähle 35 erforderlich sein.Due to the arrangement of different clamping devices 30, a section-wise structure of the pallet 20 is effected. The pallet 20 can thereby be designed more or less long, without the basic structure of the pallet 20 must be changed. Likewise, the introduction of the clamping forces is to accomplish uniformly by the sectional structure. Instead of or in addition to the comb 36 may also be, for example, multiple stored Force or Wegausgleichseinrichtung be used to cause a uniform tensile force in the prestressing steels 35. Such aids may be required due to the unusually short prestressing steels 35.
  • In Figur 4 ist eine perspektivische Darstellung der Palette 20 dargestellt. a perspective view of the pallet 20 is shown. An den Schienen 22 sind Träger 21 befestigt, welche das Grundgerüst der Einrichtung bilden. Carriers 21, which form the basic structure of the device, are attached to the rails 22. Die Bodenschalung 23 weist Einsätze 26 auf, in welchen Höcker 25 der Platte der festen Fahrbahn eingearbeitet sind. The bottom formwork 23 has inserts 26 in which humps 25 of the slab of the solid roadway are incorporated. Aufgrund unterschiedlicher Befestigungssysteme für die auf der Platte zu montierenden Schienen der Bahn sind verschiedene Höckerformen erforderlich. Due to different fastening systems for the rails of the railway to be mounted on the plate, different hump shapes are required. Diese können durch einfachen Austausch der Einsätze 26 bei ansonsten unveränderter Palette 20 realisiert werden. These can be implemented by simply exchanging the inserts 26 with the pallet 20 otherwise unchanged. Pro Sektion ist eine Spannvorrichtung 30 vorgesehen, welche eine Druckstütze 31, zwei Zugeinrichtungen 32 und einen Zugstab 34 aufweist. A tensioning device 30 is provided per section, which has a pressure support 31, two pulling devices 32 and a pulling rod 34. An den beiden Zugeinrichtungen 32 ist jeweils ein Kamm 36 angeordnet, in welchen die in diesem Ausführungsbeispiel sechs Spannstähle 35 in Öffnungen 38 aufgenommen werden. A comb 36 is arranged on each of the two pulling devices 32, in which the six prestressing bars 35 in this exemplary embodiment are received in openings 38. Durch das Spannen der Spindel 40 werden die in den Kämmen 36 eingehängten Spannstähle 35 auseinandergezogen und gespannt. By tensioning the spindle 40, the tensioning steels 35 suspended in the combs 36 are pulled apart and tensioned. Mit der Mutter 39 wird die Spannung aufrechterhalten. With the nut 39, the tension is maintained. Nachdem die Spannstähle 35 gespannt sind, wird entsprechend der in After the prestressing steels 35 are tensioned, according to the in Figur 1 Figure 1 dargestellten Umlauffertigung Beton in die Schalung eingefüllt. The circulating production shown is filled with concrete in the formwork. In In FIG. FIG. 4 4th a perspective view of the pallet 20 is shown. a perspective view of the pallet 20 is shown. On the rails 22 supports 21 are fixed, which form the backbone of the device. On the rails 22 supports 21 are fixed, which form the backbone of the device. The bottom formwork 23 has inserts 26, in which bumps 25 of the slab of the fixed carriageway are incorporated. The bottom formwork 23 has inserts 26, in which bumps 25 of the slab of the fixed carriageway are incorporated. Due to different mounting systems for the track rails to be mounted on the track, various bump shapes are required. Due to different mounting systems for the track rails to be mounted on the track, various bump shapes are required. These can be realized by simply replacing the inserts 26 with otherwise unchanged pallet 20. Per section, a tensioning device 30 is provided, which has a pressure support 31, two pulling devices 32 and a tension rod 34. A comb 36 is in each case arranged at the two draw devices 32, in which the six prestressing steels 35 are received in openings 38 in this exemplary embodiment. These can be realized by simply replacing the inserts 26 with otherwise unchanged pallet 20. Per section, a tensioning device 30 is provided, which has a pressure support 31, two pulling devices 32 and a tension rod 34. A comb 36 is in each case arranged at the two draw devices 32, in which the six prestressing steels 35 are received in openings 38 in this exemplary embodiment. By tightening the spindle 40, the hooked in the combs 36 tensioning steels 35 are pulled apart and stretched. By tightening the spindle 40, the hooked in the combs 36, tensioning steels 35 are pulled apart and stretched. With the mother 39, the voltage is maintained. With the mother 39, the voltage is maintained. After the prestressing steels 35 are tensioned, according to the in After the prestressing steels 35 are tensioned, according to the in FIG. FIG. 1 1 shown circulating concrete poured into the formwork. shown circulating concrete poured into the formwork.
  • Die Schienen 22 dienen zum Transport der Palette 20, indem sie über Transportsysteme hinweggeführt werden. Die Palette 20 kann damit von Station zu Station bewegt werden. Dies kann beispielsweise durch motorisch angetriebene Rollen erfolgen. Es ist aber auch möglich, daß an Stelle der Schienen 22 Rollen angeordnet sind, welche ihrerseits auf festmontierten Schienen abrollen. Die hier dargestellte Ausführungsform hat allerdings den Vorteil, daß die Schienen 22 gleichzeitig zur Stabilisierung der Palette 20 und zum Transport der Palette 20 dienen.The rails 22 serve to transport the pallet 20 by being passed over transport systems. The pallet 20 can thus be moved from station to station. This can be done for example by motorized rollers. But it is also possible that instead of the rails 22 rollers are arranged, which in turn roll on fixed rails. However, the embodiment shown here has the advantage that the rails 22 serve to stabilize the pallet 20 and to transport the pallet 20 at the same time.
  • Figur 5 zeigt eine Detailansicht einer Platte 42 mit einem Schienenstützpunkt. shows a detailed view of a plate 42 with a rail support point. Der Schienenstützpunkt besteht aus zwei Höckern 43 sowie einer Auflage 44. Eine Schiene 45 ist zwischen den beiden Höckern 43 befestigt. The rail support point consists of two cusps 43 and a support 44. A rail 45 is attached between the two cusps 43. Die Schiene 45 wird dabei unter Zuhilfenahme von Zwischenlagen, welche einerseits den Höhenausgleich und andererseits eine Dämpfung der Schiene 45 bewirken, auf der Auflage 44 angeordnet. The rail 45 is arranged on the support 44 with the aid of intermediate layers which, on the one hand, effect height compensation and, on the other hand, dampen the rail 45. Die Befestigung der Schiene 45 erfolgt mittels Schrauben 47, welche in dem Beton der Platte 42 mittels Dübel 51 verankert sind sowie mittels Klammern 49, welche auf dem Höcker 43 bzw. einer Winkelführungsplatte 49 und dem Schienenfuß 45 abgestützt sind. The rail 45 is fastened by means of screws 47 which are anchored in the concrete of the plate 42 by means of dowels 51 and by means of clamps 49 which are supported on the hump 43 or an angled guide plate 49 and the rail foot 45. Für die korrekte Ausrichtung der Schiene 45 in horizontaler Richtung sind die Winkelführungsplatten 49 zwischen dem Höcker 43 und dem Fuß der Schiene 45 angeordnet. For the correct alignment of the rail 45 in the horizontal direction, the angled guide plates 49 are arranged between the hump 43 and the foot of the rail 45. Mittels der Winkelführungsplatten 49 wird die Schiene 45 in der gewünschten Position in horizontaler Richtung gehalten. By means of the angle guide plates 49, the rail 45 is held in the desired position in the horizontal direction. FIG. FIG. 5 5 shows a detailed view of a plate 42 with a rail support. shows a detailed view of a plate 42 with a rail support. The rail support consists of two humps 43 and a support 44. A rail 45 is secured between the two humps 43. The rail 45 is thereby arranged with the aid of intermediate layers, which on the one hand cause the height compensation and on the other hand, an attenuation of the rail 45 on the support 44. The attachment of the rail 45 by means of screws 47 which are anchored in the concrete of the plate 42 by means of dowels 51 and by means of brackets 49 which are supported on the bump 43 and an angled guide plate 49 and the rail 45. For the correct orientation of the rail 45 in the horizontal direction, the angle guide plates 49 between the bump 43 and the foot of the rail 45 are arranged. The rail support consists of two humps 43 and a support 44. A rail 45 is secured between the two humps 43. The rail 45 is thereby arranged with the aid of intermediate layers, which on the one hand cause the height compensation and on the other hand, an attenuation of the rail 45 on the support 44. The attachment of the rail 45 by means of screws 47 which are anchored in the concrete of the plate 42 by means of dowels 51 and by means of brackets 49 which are supported on the bump 43 and an angled guide plate 49 and the rail 45. For the correct orientation of the rail 45 in the horizontal direction, the angle guide plates 49 between the bump 43 and the foot of the rail 45 are arranged. By means of the angle guide plates 49, the rail 45 is held in the desired position in the horizontal direction. By means of the angle guide plates 49, the rail 45 is held in the desired position in the horizontal direction.
  • Die Winkelführungsplatten 49 können Standardteile sein, welche einander weitgehend gleichen. Hierdurch ist ein Austausch bzw. beliebiger Einsatz der Winkelführungsplatten 49 bei der Verlegung einer Schiene 45 möglich.The angled guide plates 49 may be standard parts which are substantially equal to each other. As a result, an exchange or any use of the angle guide plates 49 during the laying of a rail 45 is possible.
  • Geschaffen wird diese standardisierte Verwendung von Winkelführungsplatten 49 sowie Zwischenlagen 46 dadurch, daß die Innenseiten der Höcker 43 sowie bei Bedarf die Auflage 44 der Platte 42 bearbeitet wird. Diese insbesondere spanende Bearbeitung des Betons an den Flanken 50 sowie der Auflage 44 ermöglicht die exakte Ausrichtung der Schiene 45 bereits während der Herstellung der Platte 42. Wie durch gestrichelte Linien angedeutet ist, wird die Platte 42 im Bereich der Flanken 50 und der Auflage 44 zuerst mit Übermaß hergestellt.This standardized use of angled guide plates 49 and intermediate layers 46 is created by machining the insides of the protuberances 43 and, if required, the support 44 of the plate 42. This particular machining of the concrete on the flanks 50 and the support 44 allows the exact alignment of the rail 45 during the production of the plate 42. As indicated by dashed lines, the plate 42 in the region of the flanks 50 and the support 44 first made with oversize.
  • Durch die spanende Bearbeitung kann an den Flanken 50 und der Auflage 44 mehr oder weniger Material abgetragen werden, so daß die exakte Ausrichtung der Schiene 45 in horizontaler und vertikaler Richtung bereits weitgehend durch die individuelle Gestaltung des Schienenstützpunktes vorgegeben ist. Durch dieses Verfahren ist es sogar möglich Radien oder eine Polygonverlegung des Gleises allein durch die Bearbeitung der Höcker 43 bzw. Flanken 50 zu verwirklichen. Die Platten 42 werden dabei zuerst standardmäßig hergestellt und erst durch die spanende Bearbeitung individualisiert. Hierdurch ist eine sehr schnelle und dadurch kostengünstige Fertigung einer Vielzahl von Platten 42 mit einer einzigen Formart möglich. Eine im Vergleich zu früheren Herstell- und Montagemethoden deutlich schnellere Fertigung und Verlegung von Fertigteilplatten 42 macht den Einsatz dieser Systeme als feste Fahrbahnen noch vorteilhafter.By machining, more or less material can be removed on the flanks 50 and the support 44, so that the exact alignment of the rail 45 in the horizontal and vertical directions is already largely predetermined by the individual design of the rail support. By this method, it is even possible to realize radii or a polygon laying of the track solely by the processing of the bumps 43 and flanks 50. The plates 42 are first produced by default and only individualized by the machining. As a result, a very fast and thus cost-effective production of a plurality of plates 42 with a single mold is possible. A significantly faster production and installation of prefabricated panels 42 in comparison with earlier manufacturing and assembly methods makes the use of these systems as fixed tracks even more advantageous.
  • Die vorliegende Erfindung ist nicht auf die dargestellten Ausführungsbeispiele beschränkt. So kann insbesondere das Prinzip der Palette auch für andere Bauteile als für Platten einer festen Fahrbahn Verwendung finden. Denkbar sind hierfür beispielsweise Stützen oder Träger, welche ebenfalls in Umlauffertigung hergestellt werden können.The present invention is not limited to the illustrated embodiments. Thus, in particular, the principle of the pallet can also be used for other components than for slabs of a solid roadway. Conceivable, for example, supports or carriers, which can also be produced in circulation production.

Claims (46)

  1. A method for the manufacture of a precise, precast concrete part, the precast concrete part is initially manufactured in shuttering on a pallet as an unfinished part containing prestressing steel for reinforcement,
    the prestressing steels of the precast concrete part are grouped in a number of sections,
    the sections are stressed and/or released individually, so that a stable, standardised unfinished part is created,
    the standardised unfinished part is subsequently machined, at least at functionally relevant locations, to achieve an individually specified dimension,
    each section is stressed with its own stressing device,
    with one stressing device per section the prestressing steels of one section are stressed simultaneously.
  2. A method in accordance with Claim 1, wherein the unfinished part is hardened through several days of storage after manufacture and before machining.
  3. A method in accordance with one or more of the foregoing claims wherein the mounting surfaces for mounting the rails (45) or the jointing locations for joining a number of precast concrete parts together are machined as the functionally relevant locations.
  4. A method in accordance with one or more of the foregoing claims wherein the actual dimensions of the machined surfaces are checked.
  5. A method in accordance with one or more of the foregoing claims wherein the current level of wear of the tool is taken into account as the functionally relevant locations are machined.
  6. A method in accordance with one or more of the foregoing claims wherein the unfinished part and/or a location on the unfinished part is machined, in particular using a cutting process.
  7. A method in accordance with one or more of the foregoing claims wherein the unfinished part has rail support points that are machined in accordance with the individual requirements of the precast concrete part to achieve the specified dimensions that will later be necessary on the line.
  8. A method in accordance with one or more of the foregoing claims wherein rail fastening locations that are machined are positioned on the unfinished part.
  9. A method in accordance with one or more of the foregoing claims wherein the unfinished part is manufactured in a circulating production process.
  10. A method in accordance with one or more of the foregoing claims wherein the unfinished part and its shuttering (23, 24) and/or clamping gear (30) is conveyed on moveable pallets during production.
  11. A method in accordance with one or more of the foregoing claims wherein the circulating production facility includes a variety of processing stations, in particular a cleaning station, a dowel and spindle mounting station, a reinforcing station, a tensioning station, a concreting station with or without a compacting station, a drying chamber, an unclamping and shuttering release station and/or an unfinished part removal station.
  12. A method in accordance with one are more of the foregoing claims wherein at least a few of the stations are operated by robots.
  13. A method in accordance with one or more of the foregoing claims wherein buffers are provided between two stations.
  14. A method in accordance with one or more of the foregoing claims wherein reinforcement located within the unfinished part is prestressed.
  15. A method in accordance with one or more of the foregoing claims wherein the unfinished part is manufactured from fibre concrete.
  16. A method in accordance with one or more of the foregoing claims wherein the reinforcement has a longitudinal and/or transverse positioning within the unfinished part.
  17. A method, in accordance with one or more of the foregoing claims, wherein the prestressing steel (35) is tensioned independently of the shuttering surface.
  18. A method in accordance with one or more of the foregoing claims wherein the prestressing steel (35) is clamped to the shuttering (23, 24).
  19. A method in accordance with one or more of the foregoing claims wherein several prestressing steel parts (35) are tensioned simultaneously.
  20. A method in accordance with one or more of the foregoing claims wherein a number of prestressing steel bars (35) are joined together by means of a displacement and/or force equalisation mechanism.
  21. A method in accordance with one or more of the foregoing claims wherein the shuttering is released by first removing the side shuttering (24) and then the floor shuttering (23) from the unfinished part.
  22. A method in accordance with one or more of the foregoing claims wherein the unfinished part is separated from the floor shuttering (23) in particular by means of plungers.
  23. A method in accordance with one or more of the foregoing claims wherein the unfinished part is first released from the floor shuttering (23) after which the tension is released from the prestressing steel (35).
  24. A method in accordance with one or more of the foregoing claims 1 to 22 wherein the unfinished part is released from the floor shuttering (23) and the tension released from the prestressing steel (35) simultaneously.
  25. A method in accordance with one or more of the foregoing claims 1 to 22 wherein the tension is first released from the prestressing steel (35) after which the unfinished part is released from the floor shuttering (23).
  26. A method in accordance with one or more of the foregoing claims wherein, after removal of the shuttering, protruding prestressing steel (35) is cut off and the unfinished part is taken away by a transport wagon, particularly to a hardening store.
  27. A method in accordance with one or more of the foregoing claims wherein the unfinished part is taken by means of a transport wagon, in particular after hardening, to a further processing area.
  28. A method in accordance with one or more of the foregoing claims wherein material is applied to the unfinished part or is removed from the unfinished part, from a coating or from an additional mounted part in the further processing area.
  29. A method in accordance with one or more of the foregoing claims wherein the unfinished part is machined on a machine tool, in particular a concrete cutting or grinding machine.
  30. A method in accordance with one or more of the foregoing claims wherein the unfinished part is mounted in a defined way for its machining, in particular in accordance with the orientation in which will later be mounted.
  31. A method in accordance with one or more of the foregoing claims wherein the unfinished part is machined on the surfaces where the rail (45) will later be supported or at the rail fastening and/or centring locations.
  32. A method in accordance with one or more of the foregoing claims wherein rails (45) or rail fastenings are mounted at the fixed track after the machining.
  33. A pallet for the manufacture of a pre-stressed, precast concrete part a shuttering is positioned on the pallet,
    furthermore multiple stressing devices for prestressing steels for reinforcing the precast concrete part are located at the pallet,
    the stressing devices are supported at the pallet independently of the shuttering,
    each stressing device forms an individual section for tensioning multiple prestressing steels one section at a time and the prestressing steels of one section are stressed simultaneously in one stressing device.
  34. A pallet in accordance with the foregoing claim wherein every clamping gear (30) has at least one compression support and at least one tensioning unit.
  35. A pallet in accordance with one or more of the foregoing claims 33 to 34 wherein the tensioning unit is mounted so that it can pivot around the compression support.
  36. A pallet in accordance with one or more of the foregoing claims 33 to 35 wherein at one end of the tensioning unit there is at least one tension bar and at the other end at least one unit to which the prestressing steel (35) can be fastened.
  37. A pallet in accordance with one or more of the foregoing claims 33 to 36 wherein the fastening gear is tensioned and locked by one or more tensioning units, in particular with the aid of hydraulic equipment.
  38. A pallet in accordance with one or more of the foregoing claims 33 to 37 wherein the fastening gear is a comb (36) or a perforated plate to which several prestressing steel bars (35) can be fastened.
  39. A pallet in accordance with one or more of the foregoing claims 33 to 38 wherein the side shuttering (24) has a pattern that corresponds to that of the fastening gear and/or the locations of the prestressing steel bars (35).
  40. A pallet in accordance with one or more of the foregoing claims 33 to 39 wherein the fastening gear is located at the tensioning unit and can rotate.
  41. A pallet in accordance with one or more foregoing claims 33 to 40 wherein the cross-section of the prestressing steel bars (35) changes at their ends, have in particular been mushroomed, have a provision for clamping or a thread with a nut so that they can be engaged with the fastening gear.
  42. A pallet in accordance with one or more of the foregoing claims 33 to 41 wherein the clamping gear or the thread with the nut is used to grip, clamp, tension and/or lock the prestressing steel (35) with the fastening gear.
  43. A pallet in accordance with one or more of the foregoing claims 33 to 42 wherein the shuttering (23, 24) can be fitted with a variety of inserts.
  44. A pallet in accordance with one or more of the foregoing claims 33 to 43 wherein inserts divide the shuttering (23, 24) into a number of parts.
  45. A pallet in accordance with one or more of the foregoing claims 33 to 44 wherein the side shuttering (24) can be removed from the floor shuttering (23).
  46. A pallet in accordance with one or more of the foregoing claims 33 to 45 wherein rails or rollers are located on the pallet (20).
EP02706697A 2001-02-14 2002-01-08 Method and pallet for the production of a precise pre-cast concrete piece Not-in-force EP1360397B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE10107119 2001-02-14
DE10107119 2001-02-14
DE10133607 2001-07-13
DE10133607A DE10133607C5 (en) 2001-02-14 2001-07-13 Method and pallet for producing a precise precast concrete part
PCT/EP2002/000083 WO2002065022A1 (en) 2001-02-14 2002-01-08 Method and pallet for the production of a precise pre-cast concrete piece

Publications (3)

Publication Number Publication Date
EP1360397A1 EP1360397A1 (en) 2003-11-12
EP1360397B1 EP1360397B1 (en) 2004-07-28
EP1360397B2 true EP1360397B2 (en) 2009-11-11

Family

ID=26008510

Family Applications (1)

Application Number Title Priority Date Filing Date
EP02706697A Not-in-force EP1360397B2 (en) 2001-02-14 2002-01-08 Method and pallet for the production of a precise pre-cast concrete piece

Country Status (4)

Country Link
EP (1) EP1360397B2 (en)
AT (1) AT272164T (en)
AU (1) AU2002240897A1 (en)
WO (1) WO2002065022A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104960089A (en) * 2015-07-06 2015-10-07 天津银龙预应力材料股份有限公司 Production line of bidirectional earlier-opened track plates for high-speed railway ballast-less tracks

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101758557B (en) * 2009-12-30 2012-07-18 中铁二十三局集团有限公司 Producing method of track slabs
DE102010039796A1 (en) * 2010-06-14 2011-12-15 Max Bögl Bauunternehmung GmbH & Co. KG Tower with an adapter piece and method of making a tower with an adapter piece
CN102357929A (en) * 2011-10-21 2012-02-22 中铁十二局集团有限公司 Rail slab stress tensioning system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4758393A (en) 1982-01-21 1988-07-19 Societe Anonyme De Traverses En Beton Arme Systeme Vagneux Process for casting elements in reinforced concrete
DE3931201C1 (en) 1989-09-19 1990-11-22 Wayss & Freytag Ag, 6000 Frankfurt, De Concrete railway sleepers mfr. - uses moving frame mechanism which releases each sleeper immediately
EP0436859A2 (en) 1990-01-12 1991-07-17 Wayss & Freytag Aktiengesellschaft Shuttering for making prestressed concrete sleepers with immediate anchoring
DE4100191C1 (en) 1991-01-05 1992-05-14 Stewing Stahl- Und Anlagenbau Gmbh & Co. Kg, 4270 Dorsten, De Mould for reinforced concrete sleepers - has several mould cavities and has jacking devices for tensioning reinforcement bars
EP0592695A1 (en) 1992-10-08 1994-04-20 Wayss & Freytag Aktiengesellschaft Assembly for prestressed concrete moulded elements
DE4203895C2 (en) 1992-02-11 1996-08-29 Dyckerhoff & Widmann Ag Device for producing prefabricated components from prestressed concrete with immediate bond, in particular prestressed concrete sleepers

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1206781B (en) * 1987-04-29 1989-05-03 Scac Spa Plant for the manufacture of linear artifacts in prestressed concrete.
FR2714689B1 (en) * 1993-12-30 1996-03-15 Rector Sa Device for notching external surfaces of concrete products.
DE19708734C2 (en) * 1997-03-04 2001-05-31 Dorstener Maschf Ag Method and device for producing plate-shaped or beam-shaped reinforced concrete parts, in particular reinforced concrete sleepers
DE19709535A1 (en) * 1997-03-10 1998-09-17 Hochtief Ag Hoch Tiefbauten Method and device for concreting rail bases for slab tracks
DE19733909B4 (en) 1997-08-05 2006-07-06 Max Bögl Bauunternehmung GmbH & Co. KG Prefabricated reinforced concrete precast slab and process for its production
DE19753705A1 (en) * 1997-12-02 1999-06-10 Teerbau Gmbh Strassenbau Concrete slab grooving procedure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4758393A (en) 1982-01-21 1988-07-19 Societe Anonyme De Traverses En Beton Arme Systeme Vagneux Process for casting elements in reinforced concrete
DE3931201C1 (en) 1989-09-19 1990-11-22 Wayss & Freytag Ag, 6000 Frankfurt, De Concrete railway sleepers mfr. - uses moving frame mechanism which releases each sleeper immediately
EP0436859A2 (en) 1990-01-12 1991-07-17 Wayss & Freytag Aktiengesellschaft Shuttering for making prestressed concrete sleepers with immediate anchoring
DE4100191C1 (en) 1991-01-05 1992-05-14 Stewing Stahl- Und Anlagenbau Gmbh & Co. Kg, 4270 Dorsten, De Mould for reinforced concrete sleepers - has several mould cavities and has jacking devices for tensioning reinforcement bars
DE4203895C2 (en) 1992-02-11 1996-08-29 Dyckerhoff & Widmann Ag Device for producing prefabricated components from prestressed concrete with immediate bond, in particular prestressed concrete sleepers
EP0592695A1 (en) 1992-10-08 1994-04-20 Wayss & Freytag Aktiengesellschaft Assembly for prestressed concrete moulded elements

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104960089A (en) * 2015-07-06 2015-10-07 天津银龙预应力材料股份有限公司 Production line of bidirectional earlier-opened track plates for high-speed railway ballast-less tracks

Also Published As

Publication number Publication date
AU2002240897A1 (en) 2002-08-28
AT272164T (en) 2004-08-15
EP1360397B1 (en) 2004-07-28
WO2002065022A9 (en) 2002-12-12
EP1360397A1 (en) 2003-11-12
WO2002065022A1 (en) 2002-08-22
WO2002065022B1 (en) 2003-03-20

Similar Documents

Publication Publication Date Title
FI65183B (en) Saett att tillverka betongsliperblock samt matrisuppsaettning foer utfoerande av saettet
EP1417379B1 (en) Method for the continuous laying of a rail on a rigid track, in addition to an alignment device and a rigid track
EP1899552B1 (en) Ceiling formwork system
EP1789299B1 (en) Maintenance vehicle
DE69828775T2 (en) DEVICE AND METHOD FOR CHANGING METAL PRESSES FOR PANEL THICKER-PRESSING PRESSES
EP2626170B1 (en) Wheel set press
EP2161236B1 (en) Stacker crane with running gear
EP2145061B1 (en) Ceiling joist formwork with automatic stripping of the inner board
WO2002026420A1 (en) Device for manufacturing models layer by layer
EP3004467B1 (en) Concrete foundation, method for producing a concrete foundation for a wind power tower, and positioning device for positioning jacket pipes in a concrete foundation
EP1488041B1 (en) Method for precisely placing a guideway support, and guideway
EP2914790B1 (en) Method for producing a tower construction from reinforced concrete
EP2598267B1 (en) Forging die and method
EP1414597B1 (en) Device and working method for automatically changing the work rolls, the back-up rolls and the intermediate rolls of a single-stand or multiple-stand strip mill
DE4138564A1 (en) PAVING STONE SET AND METHOD AND DEVICE FOR PRODUCING THE SAME
EP2191073B1 (en) Formwork configuration for the cantilever construction of bridges
EP2279065A2 (en) Method for producing concrete prefinished parts
DE19733909B4 (en) Prefabricated reinforced concrete precast slab and process for its production
EP2150663A2 (en) Parking/storage device for motor vehicles
EP3150779B1 (en) Assembly of formwork and graduated anchoring system
WO1999064188A1 (en) Method and device for directly producing an investment casting mold for castings made of metal
EP2789772B1 (en) Holder for a guide sleeve of a climbing system for concrete formwork
DE102011010479A1 (en) Slipform road paver with tractor frame with adjustable length
EP2755806A1 (en) Method and device for producing a concrete component, and concrete component produced according to the method
EP2740842B1 (en) Method for converting a gravel track into a solid track

Legal Events

Date Code Title Description
17P Request for examination filed

Effective date: 20030727

AX Request for extension of the european patent to

Extension state: AL LT LV MK RO SI

AK Designated contracting states:

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1059813

Country of ref document: HK

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040728

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040728

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040728

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040728

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040728

AK Designated contracting states:

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: GERMAN

REF Corresponds to:

Ref document number: 50200700

Country of ref document: DE

Date of ref document: 20040902

Kind code of ref document: P

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041028

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041028

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041028

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041108

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050108

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20040728

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977

Effective date: 20040728

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050131

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050131

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050131

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

26 Opposition filed

Opponent name: PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG

Effective date: 20050428

EN Fr: translation not filed
R26 Opposition filed (correction)

Opponent name: PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG

Effective date: 20050428

BERE Be: lapsed

Owner name: MAX *BOGL BAUUNTERNEHMUNG G.M.B.H. & CO. K.G.

Effective date: 20050131

NLR1 Nl: opposition has been filed with the epo

Opponent name: PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG

NLR1 Nl: opposition has been filed with the epo

Opponent name: PFLEIDERER INFRASTRUKTURTECHNIK GMBH & CO. KG

BERE Be: lapsed

Owner name: MAX *BOGL BAUUNTERNEHMUNG G.M.B.H. & CO. K.G.

Effective date: 20050131

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041228

27A Maintained as amended

Effective date: 20091111

AK Designated contracting states:

Kind code of ref document: B2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: AEN

Free format text: AUFRECHTERHALTUNG DES PATENTES IN GEAENDERTER FORM

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20050110

NLR2 Nl: decision of opposition

Effective date: 20091111

NLR3 Nl: receipt of modified translations in the netherlands language after an opposition procedure
REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1059813

Country of ref document: HK

PGFP Postgrant: annual fees paid to national office

Ref country code: NL

Payment date: 20150122

Year of fee payment: 14

PGFP Postgrant: annual fees paid to national office

Ref country code: IT

Payment date: 20150123

Year of fee payment: 14

Ref country code: CH

Payment date: 20150122

Year of fee payment: 14

Ref country code: DE

Payment date: 20150116

Year of fee payment: 14

PGFP Postgrant: annual fees paid to national office

Ref country code: AT

Payment date: 20150122

Year of fee payment: 14

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50200700

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 272164

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160108

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20160201

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160802

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160201

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160108

PG25 Lapsed in a contracting state announced via postgrant inform. from nat. office to epo

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160108