EP0976877A1 - Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte - Google Patents

Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte Download PDF

Info

Publication number
EP0976877A1
EP0976877A1 EP99401771A EP99401771A EP0976877A1 EP 0976877 A1 EP0976877 A1 EP 0976877A1 EP 99401771 A EP99401771 A EP 99401771A EP 99401771 A EP99401771 A EP 99401771A EP 0976877 A1 EP0976877 A1 EP 0976877A1
Authority
EP
European Patent Office
Prior art keywords
support
shells
shell
support piece
vault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP99401771A
Other languages
German (de)
English (en)
French (fr)
Inventor
Pierre Orsat
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Freyssinet International STUP SA
Original Assignee
Freyssinet International STUP SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freyssinet International STUP SA filed Critical Freyssinet International STUP SA
Publication of EP0976877A1 publication Critical patent/EP0976877A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Definitions

  • the invention relates to the production of vaulted structures such as passages lower, or upper, roads and highways and other constructions analogues.
  • the SAMFLO document FR 2 751 675 teaches a method of making a vault in which two half-shells are placed, provided with a spoiler and support fittings, on shooting soles made on square. The two half-shells are then supported one on the other, by through the fittings, and a continuity keying between the upper edges of the two half-shells, on the spoilers, in order to make a keystone ensuring a transverse connection of continuity of the half-shells.
  • fittings which ensure the support of the half-shells one on the other before key, are embedded in concrete and therefore lost. Now, these fittings represent a few percent of the cost of building a vault. The The plaintiff therefore sought to reduce the cost induced by these fittings.
  • the invention relates to a method of producing a vault in which is supported by at least two half-shells one on the other by at least two supporting pieces that we match and, each half-shell comprising an upper edge and a bottom spoiler, we sink a keying material between said upper edges, on the bottom formed spoilers, to ensure a transverse connection of continuity of half-shells, process characterized by the fact that each part is fixed of support on a half-shell in a removable way, one puts in provisional support the two half-shells by their support piece without supporting their bottom spoilers, and, after pouring the keying material to proceed with a transfer of forces from the support pieces to the half-shells, the supporting parts.
  • the support fittings can be reused later for the realization of a new vault.
  • FR 2 723 116 PREFAC
  • PREFAC PREFAC
  • a process for producing a vault using at least two half-shells each comprising a bottom spoiler, in which the two half-shells are supported, spoiler against spoiler, with interposition of a compressible stud, and, for avoid any relative escape of the two half-shells and thus secure the support, we connect the two spoilers using a metal plate that we fixed to the undersides of the spoilers.
  • the plate is put in place after stud and, therefore, after the compression thereof and the support half shells. As a result, it does not participate in the support half shells.
  • the stud and the plate are normally removable. However, the stud being compressed between the two half-shells, it turns out cannot be removed later. However, if the stud is inserted between the spoilers, these are the ones that support the support effort of the two half-shells one on top of the other, even after the concrete has been poured, and not not the keying sill. It follows that the vault thus produced is exposed to premature wear.
  • the support pieces can be placed at least partially above the half-shells or at least partly below the half-shells.
  • it is placed end to end in two rows longitudinal two pluralities of half-shells and each half-shell of one of the rows on a half-shell of the other row, by means of at least two support pieces, respectively male and female, that we match so that the supporting parts of one of the two genera support the supporting parts of the other kind.
  • the support points of the half-shells on each other are all at the same level, which ensures greater stability of the arch and a perfectly continuous underside.
  • the invention also relates to a support piece for supporting the half-shells of the vault produced according to the above process, comprising a transverse support arm, characterized in that it comprises removable fixing means substantially orthogonal to the transverse arm.
  • the invention also relates to a half-shell for the realization of the vault according to the above process, characterized in that it comprises support piece receiving means.
  • the vault shown in Figure 1 is intended for the realization of a underpass under embankment and includes two longitudinal rows 10, 11 of prefabricated half-shells 1-8, here in concrete, arranged end to end, on either side of a median vertical longitudinal plane P, and secured transversely by a keystone 9.
  • the vault includes four end half-shells 1, 2, 7, 8 (two to each end) and here four intermediate half-shells 3-6, located between the end half-shells 1, 2, 7, 8.
  • the two half-shells end 1 and 8 have a width 1 equal to half the width L of the other half-shells 2-7.
  • the half-shells 3, 5 and 7 of row 10 are offset by half a width 1 of half-shell, in the longitudinal direction, by compared to the half-shells 2, 4 and 6 of the other row 11.
  • the half-shells 1-8 of the vault are thus staggered. Note that the width of a half-shell means the dimension of this half-shell in the longitudinal direction of the vault.
  • each half-shell of one longitudinal rows 10 (11) is supported on a half-shell from the other longitudinal row 11 (10) via two pieces support, or "support fittings", temporary 30, 50, respectively male and female, that we match.
  • Figure 3 shows two support pieces paired 30, 50 by means of which the half-shell 2 is in support on the half-shell 1.
  • the half-shells 2-7 of length L are all identical. For the sake of clarity, only the half-shell 2 will now be described.
  • the half-shell 2 constituting a portion of the wall of the vault, comprises a lower support edge 20 and a substantially vertical upper edge 21 at functional position.
  • the half-shell 2 further comprises two external shoes, or sheaths 23 for receiving a support piece, fixed to the upper edge 21 of the half-shell and arranged substantially at a quarter and three-quarters of the width of the half-shell respectively.
  • Each shoe 23 consists of a tube, or sheath, of square section, having an upper opening 24 of passage of a foot for fixing the support piece, the opening 24 extending in the plane of the upper face of the half-shell 2.
  • the shoe 23 is pressed against the upper edge 21, by one of its lateral faces, and fixed to the half-shell 2 using a threaded anchor rod 26 and a nut 25 screwed on the rod 26.
  • the half-shells 1 and 8, of length 1 are similar to the half-shell 2 described above, except that they do not contain a single external shoe for receiving a workpiece fixing foot support, arranged substantially at half the width of the half-shell.
  • the female support pieces 30 include a transverse support arm 31 and a removable fixing foot 32.
  • transversal is meant to qualify what extends orthogonally to a vertical plane extending in the longitudinal direction of the arch.
  • the transverse support arm 31 comprises an external tube 34 of section square, open at one of its ends by an opening 35, and a tube internal 36 slidably mounted in the external tube 34 and provided, at one of its ends of a female support head 33 protruding from the outer tube 34 through the opening 35.
  • the support head 33 is concave and provides a cavity receiving a convex male support head 53.
  • the inner tube 36 and the outer tube 34 are connected to each other by a rod transverse thread 37 fixed to the bottom wall of the inner tube 36 opposite to the support head 33, by a fixing system 39, and extending through the bottom wall of the outer tube 34, opposite the opening 35.
  • a nut 38 is mounted on the portion of the threaded rod 37 protruding from the outer tube 34 and welded to the bottom wall of the outer tube 34.
  • the support arm 31, telescopic is thus adjustable in length, by screwing and unscrewing the rod 37.
  • the removable fixing foot 32 integral with the transverse support arm 31, is orthogonal to it and supported by stiffeners 40, 41.
  • the foot of attachment 32 intended to be removably fitted into an external shoe receiving half-shell, has a square section, of dimensions substantially equal to those of the inner section of the hoof.
  • the male support pieces 50 differ from the female support pieces 30 only by the fact that they include, instead of the female support head 33, a male support head 53 of convex shape.
  • the respectively concave and convex shapes of the support head 33 of a female support piece 30 and the support head 53 of a male support piece 50 are such that they provide vertical and horizontal support for one of the support pieces 30 (50) by the other support piece 50 (30), after pairing of the two parts 30, 50 by introduction of the male support head 53 into the female support head 33.
  • Male 50 and female 30 support pieces are removably attached to the half-shells 1-8.
  • a single support piece here male, is removably fixed.
  • the length of the support arms of the male support pieces 50 is adjusted and females 30 so that the contact surface of the supporting parts matched of each pair of pairing extends substantially in the plane longitudinal median P of the arch.
  • the two support soles 12, 13 are made by sparing in each of them a groove for receiving the lower support edges of the half-shells 1-8.
  • the half-shell On one of the shooting soles 12, the half-shell is put in place end 2 which is stabilized. One then sets up one 1 of the half-shells end of length 1 on the strip base 13 and it is put in support on the half-shell 2, via the male support piece 50 of the half-shell 1 and of one of the female support pieces 30 of the half-shell 2 that we match.
  • the male support piece 50 When pairing a male support piece 50 and a support piece female 30, the male support piece 50 is supported on the support piece female 30 so that the female support part 30 supports the part male support 50. Thus, all the female support pieces 30 of the arch support the male support pieces 50.
  • the last half-shell put in place is the end half-shell 8, of length 1, which is supported on the end half-shell 7.
  • the parts After pouring and drying the keying, the parts are separated from each other male 30 and female 50 support for each pair of paired support pieces, by unscrewing the rod 37 from one of the support arms of the pair of pair 31. There is thus a transfer of forces from the support pieces 30, 50 to the half-shells 1-8.
  • the effort transverse support of each pair of half-shells, supported one on the other is supported by the keystone 9.
  • each of the support pieces 30 (50) is removed, taking its foot out fixing 32 of the shoe in which it is fitted by vertical displacement towards the top.
  • the supporting parts for that the female support pieces support the male support pieces.
  • the half-shells 60 include, in place of the external shoes 23, internal shoes 63 embedded in the thickness of the half-shell 60, below the upper edge 61 thereof.
  • Each shoe 63 consists of a sheath of square section and longitudinal axis 64. This axis 64 is here slightly inclined relative to the vertical, the distance between the axis 64 and the upper edge 61 of the half-shell 60 decreasing upwards.
  • the support pieces 70 male and female, include a support arm transverse 71 and a fixing foot 72 intended to be fitted into a shoe internal 63.
  • the support arm 71 similar to that previously described, extends along an axis 73.
  • the fixing foot 72 has a square section equal to the internal section shoe 63, and extends along an axis 74, substantially orthogonally to the transverse arm 71.
  • the angle formed between the axis 73 and the axis 74 and located on the side of the support head of the support arm 71, is slightly greater than 90 °.
  • each half-shell in place of the hooves, includes at least one hole made in its upper face, below the edge upper, in which an internally threaded sleeve is installed.
  • the socket does not pass through the thickness of the half-shell.
  • Support pieces temporary include a transverse support arm and, in place of the foot fixing, a passage for receiving a fixing bolt, of orthogonal axis to the transverse support arm.
  • the supporting pieces are placed at least in part above the half-shells. We could just as easily arrange the supporting parts at least partially below the half-shells.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
EP99401771A 1998-07-29 1999-07-15 Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte Withdrawn EP0976877A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9809688 1998-07-29
FR9809688A FR2781828B1 (fr) 1998-07-29 1998-07-29 Procede de realisation d'une voute, piece d'appui et demi-coquille pour la realisation de la voute

Publications (1)

Publication Number Publication Date
EP0976877A1 true EP0976877A1 (fr) 2000-02-02

Family

ID=9529138

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99401771A Withdrawn EP0976877A1 (fr) 1998-07-29 1999-07-15 Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte

Country Status (10)

Country Link
US (1) US6205605B1 (pt)
EP (1) EP0976877A1 (pt)
JP (1) JP2000087697A (pt)
AU (1) AU4233299A (pt)
BR (1) BR9903829A (pt)
CA (1) CA2277685C (pt)
FR (1) FR2781828B1 (pt)
ID (1) ID23711A (pt)
MY (1) MY119761A (pt)
TR (1) TR199901792A1 (pt)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2785311B1 (fr) * 1998-11-02 2006-08-11 Samflo Dispositif de positionnement d'elements de construction
FR2858640B1 (fr) * 2003-08-06 2005-10-28 Jean Marc Jailloux Dispositif de chainage pour elements de voute et voute ainsi obtenue
US7556451B2 (en) * 2005-09-09 2009-07-07 Contech Bridge Solutions Inc. Precast concrete bridge and headwall assembly and method of production
FR2979927B1 (fr) * 2011-09-13 2019-03-15 Mustapha Aboulcaid Procede pour la construction d'ouvrages, notamment de passages sous des voies ferrees ou analogues en exploitation
BR112014010712A2 (pt) * 2011-11-02 2017-04-18 Evershelter Aps unidade de construção para abrigo permanente ou provisório
US9970166B2 (en) 2012-02-06 2018-05-15 Contech Engineered Solutions LLC Concrete bridge system and related methods
USD697634S1 (en) 2012-02-20 2014-01-14 Contech Engineered Solutions LLC Upper portion of a concrete bridge unit
USD694910S1 (en) 2012-04-03 2013-12-03 Contech Engineered Solutions LLC Upper portion of a concrete bridge unit
ITSO20120002A1 (it) * 2012-06-22 2013-12-23 Zecca Prefabbricati S P A Struttura di supporto per impianti ausiliari, particolarmente per gallerie stradali
US9233775B1 (en) 2012-09-12 2016-01-12 Infiltrator Systems Inc. Molded plastic stormwater chamber having a hinged top joint
US9016979B1 (en) 2012-09-12 2015-04-28 Infiltrator Systems, Inc. Plastic stormwater chamber made from separately molded half chambers
KR101230769B1 (ko) 2012-10-12 2013-02-12 주식회사 인터컨스텍 2분절 아치 구조체 및 그 시공 방법
US9822498B2 (en) 2015-06-26 2017-11-21 Structure Sight LLC Precast concrete bridge unit and headwall assembly and method of production
US9822522B2 (en) * 2016-01-06 2017-11-21 David Wayne Cruey Arched cabin
CN114214918B (zh) * 2021-12-31 2022-08-23 山东大学 一种承插装配式拱肋、拱桥、制作及施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4349491A (en) * 1980-03-25 1982-09-14 Eyden Everett A Method for forming a concrete deck
FR2723116A1 (fr) * 1994-07-28 1996-02-02 Prefac Sa Conduit souterrain

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US571225A (en) * 1896-11-10 Concrete bridge
US886666A (en) * 1907-07-05 1908-05-05 William M Thomas Automatic adjustable arch construction.
US3374497A (en) * 1965-06-01 1968-03-26 Homayoun J. Meheen Apparatus for erecting a bridge arch
CH495469A (de) * 1967-09-14 1970-08-31 Desserich Marcel Tunnel aus vorfabrizierten Betonteilen und Verfahren zu seiner Herstellung
DE4226405A1 (de) * 1992-08-10 1994-02-17 Emunds & Staudinger Gmbh & Co Verbauvorrichtung
FR2751675B1 (fr) 1996-07-24 1998-09-18 Samflo Element prefabrique en beton pour la construction d'un ouvrage d'art a paroi voutee

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4349491A (en) * 1980-03-25 1982-09-14 Eyden Everett A Method for forming a concrete deck
FR2723116A1 (fr) * 1994-07-28 1996-02-02 Prefac Sa Conduit souterrain

Also Published As

Publication number Publication date
AU4233299A (en) 2000-02-24
CA2277685C (fr) 2007-02-27
CA2277685A1 (fr) 2000-01-29
FR2781828B1 (fr) 2000-09-22
TR199901792A1 (xx) 2000-02-21
US6205605B1 (en) 2001-03-27
MY119761A (en) 2005-07-29
JP2000087697A (ja) 2000-03-28
BR9903829A (pt) 2000-08-29
FR2781828A1 (fr) 2000-02-04
ID23711A (id) 2000-05-11

Similar Documents

Publication Publication Date Title
CA2277685C (fr) Procede de realisation d'une voute, piece d'appui et demi-coquille pour la realisation de la voute
FR2712329A1 (fr) Elément de parquet démontable.
EP0207848A1 (fr) Revêtement mural composite à pierres apparentes
EP2816173A2 (fr) Dispositif support de type plot pour la construction de terrasses
CA2239933C (fr) Dispositif de jonction pour main courante
FR2962143A1 (fr) Escalier prefabrique en beton a cremaillere modulaire
EP2270290A1 (fr) Attache pour plancher
FR2997740A1 (fr) Dispositif pour fixer un accessoire sur une toiture ondulee.
EP0364358B1 (fr) Support de siège pour véhicule de transport en commun et siège equipe de ce support
FR2737231A1 (fr) Joint de dilatation pour ouvrage routier
FR2716243A1 (fr) Insert destiné à être rapport et fixé au travers d'un élément.
FR2484375A1 (fr) Racloir de transporteur a racloirs a double chaine
FR2812893A1 (fr) Paroi de parement d'un ouvrage de soutenement renforce et bloc d'attache d'une armature pour ladite paroi
FR2626922A1 (fr) Coffrage de hauteur variable, pour une baie de porte ou ouverture similaire pratiquee dans une paroi de batiment
FR2684145A1 (fr) Douille tubulaire de cheville a noyau d'expansion.
FR2757891A1 (fr) Dispositif d'assemblage de profiles de structure notamment pour toiture de veranda ou analogue
FR2823681A1 (fr) Dispositif de montage/demontage rapides d'une fixation de ski sur un ski
FR2856886A1 (fr) Structure du type serre a entretoise deportee.
FR2640666A1 (fr) Structure de poutre et procede de support d'un mur au moyen de cette structure
FR2611369A3 (fr) Fixation de rail
FR2892138A1 (fr) Piscine, en general de forme polygonale, reposant sur le sol et comportant des murs obtenus par superposition de poutres paralleles au sol
FR2634133A1 (fr) Dispositif de guidage pour chaussure de ski de fond et semelle de chaussure destinee a un tel dispositif
FR2778213A1 (fr) Ensemble destine a la realisation d'une bride, bride comprenant cet ensemble et construction comprenant un mat associe a au moins une hampe par cette bride
CH662149A5 (fr) Element d'echafaudage a embout pour engagement d'un autre element avec percage des elements pour leur verrouillage.
EP1609923A1 (fr) Entrevous en matière plastique alvéolaire pour poutrelles en acier plié

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20000727

AKX Designation fees paid

Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

17Q First examination report despatched

Effective date: 20000920

19A Proceedings stayed before grant

Effective date: 20010417

19F Resumption of proceedings before grant (after stay of proceedings)

Effective date: 20051102

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20100202