EP0976877A1 - Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte - Google Patents
Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte Download PDFInfo
- Publication number
- EP0976877A1 EP0976877A1 EP99401771A EP99401771A EP0976877A1 EP 0976877 A1 EP0976877 A1 EP 0976877A1 EP 99401771 A EP99401771 A EP 99401771A EP 99401771 A EP99401771 A EP 99401771A EP 0976877 A1 EP0976877 A1 EP 0976877A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- support
- shells
- shell
- support piece
- vault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
Definitions
- the invention relates to the production of vaulted structures such as passages lower, or upper, roads and highways and other constructions analogues.
- the SAMFLO document FR 2 751 675 teaches a method of making a vault in which two half-shells are placed, provided with a spoiler and support fittings, on shooting soles made on square. The two half-shells are then supported one on the other, by through the fittings, and a continuity keying between the upper edges of the two half-shells, on the spoilers, in order to make a keystone ensuring a transverse connection of continuity of the half-shells.
- fittings which ensure the support of the half-shells one on the other before key, are embedded in concrete and therefore lost. Now, these fittings represent a few percent of the cost of building a vault. The The plaintiff therefore sought to reduce the cost induced by these fittings.
- the invention relates to a method of producing a vault in which is supported by at least two half-shells one on the other by at least two supporting pieces that we match and, each half-shell comprising an upper edge and a bottom spoiler, we sink a keying material between said upper edges, on the bottom formed spoilers, to ensure a transverse connection of continuity of half-shells, process characterized by the fact that each part is fixed of support on a half-shell in a removable way, one puts in provisional support the two half-shells by their support piece without supporting their bottom spoilers, and, after pouring the keying material to proceed with a transfer of forces from the support pieces to the half-shells, the supporting parts.
- the support fittings can be reused later for the realization of a new vault.
- FR 2 723 116 PREFAC
- PREFAC PREFAC
- a process for producing a vault using at least two half-shells each comprising a bottom spoiler, in which the two half-shells are supported, spoiler against spoiler, with interposition of a compressible stud, and, for avoid any relative escape of the two half-shells and thus secure the support, we connect the two spoilers using a metal plate that we fixed to the undersides of the spoilers.
- the plate is put in place after stud and, therefore, after the compression thereof and the support half shells. As a result, it does not participate in the support half shells.
- the stud and the plate are normally removable. However, the stud being compressed between the two half-shells, it turns out cannot be removed later. However, if the stud is inserted between the spoilers, these are the ones that support the support effort of the two half-shells one on top of the other, even after the concrete has been poured, and not not the keying sill. It follows that the vault thus produced is exposed to premature wear.
- the support pieces can be placed at least partially above the half-shells or at least partly below the half-shells.
- it is placed end to end in two rows longitudinal two pluralities of half-shells and each half-shell of one of the rows on a half-shell of the other row, by means of at least two support pieces, respectively male and female, that we match so that the supporting parts of one of the two genera support the supporting parts of the other kind.
- the support points of the half-shells on each other are all at the same level, which ensures greater stability of the arch and a perfectly continuous underside.
- the invention also relates to a support piece for supporting the half-shells of the vault produced according to the above process, comprising a transverse support arm, characterized in that it comprises removable fixing means substantially orthogonal to the transverse arm.
- the invention also relates to a half-shell for the realization of the vault according to the above process, characterized in that it comprises support piece receiving means.
- the vault shown in Figure 1 is intended for the realization of a underpass under embankment and includes two longitudinal rows 10, 11 of prefabricated half-shells 1-8, here in concrete, arranged end to end, on either side of a median vertical longitudinal plane P, and secured transversely by a keystone 9.
- the vault includes four end half-shells 1, 2, 7, 8 (two to each end) and here four intermediate half-shells 3-6, located between the end half-shells 1, 2, 7, 8.
- the two half-shells end 1 and 8 have a width 1 equal to half the width L of the other half-shells 2-7.
- the half-shells 3, 5 and 7 of row 10 are offset by half a width 1 of half-shell, in the longitudinal direction, by compared to the half-shells 2, 4 and 6 of the other row 11.
- the half-shells 1-8 of the vault are thus staggered. Note that the width of a half-shell means the dimension of this half-shell in the longitudinal direction of the vault.
- each half-shell of one longitudinal rows 10 (11) is supported on a half-shell from the other longitudinal row 11 (10) via two pieces support, or "support fittings", temporary 30, 50, respectively male and female, that we match.
- Figure 3 shows two support pieces paired 30, 50 by means of which the half-shell 2 is in support on the half-shell 1.
- the half-shells 2-7 of length L are all identical. For the sake of clarity, only the half-shell 2 will now be described.
- the half-shell 2 constituting a portion of the wall of the vault, comprises a lower support edge 20 and a substantially vertical upper edge 21 at functional position.
- the half-shell 2 further comprises two external shoes, or sheaths 23 for receiving a support piece, fixed to the upper edge 21 of the half-shell and arranged substantially at a quarter and three-quarters of the width of the half-shell respectively.
- Each shoe 23 consists of a tube, or sheath, of square section, having an upper opening 24 of passage of a foot for fixing the support piece, the opening 24 extending in the plane of the upper face of the half-shell 2.
- the shoe 23 is pressed against the upper edge 21, by one of its lateral faces, and fixed to the half-shell 2 using a threaded anchor rod 26 and a nut 25 screwed on the rod 26.
- the half-shells 1 and 8, of length 1 are similar to the half-shell 2 described above, except that they do not contain a single external shoe for receiving a workpiece fixing foot support, arranged substantially at half the width of the half-shell.
- the female support pieces 30 include a transverse support arm 31 and a removable fixing foot 32.
- transversal is meant to qualify what extends orthogonally to a vertical plane extending in the longitudinal direction of the arch.
- the transverse support arm 31 comprises an external tube 34 of section square, open at one of its ends by an opening 35, and a tube internal 36 slidably mounted in the external tube 34 and provided, at one of its ends of a female support head 33 protruding from the outer tube 34 through the opening 35.
- the support head 33 is concave and provides a cavity receiving a convex male support head 53.
- the inner tube 36 and the outer tube 34 are connected to each other by a rod transverse thread 37 fixed to the bottom wall of the inner tube 36 opposite to the support head 33, by a fixing system 39, and extending through the bottom wall of the outer tube 34, opposite the opening 35.
- a nut 38 is mounted on the portion of the threaded rod 37 protruding from the outer tube 34 and welded to the bottom wall of the outer tube 34.
- the support arm 31, telescopic is thus adjustable in length, by screwing and unscrewing the rod 37.
- the removable fixing foot 32 integral with the transverse support arm 31, is orthogonal to it and supported by stiffeners 40, 41.
- the foot of attachment 32 intended to be removably fitted into an external shoe receiving half-shell, has a square section, of dimensions substantially equal to those of the inner section of the hoof.
- the male support pieces 50 differ from the female support pieces 30 only by the fact that they include, instead of the female support head 33, a male support head 53 of convex shape.
- the respectively concave and convex shapes of the support head 33 of a female support piece 30 and the support head 53 of a male support piece 50 are such that they provide vertical and horizontal support for one of the support pieces 30 (50) by the other support piece 50 (30), after pairing of the two parts 30, 50 by introduction of the male support head 53 into the female support head 33.
- Male 50 and female 30 support pieces are removably attached to the half-shells 1-8.
- a single support piece here male, is removably fixed.
- the length of the support arms of the male support pieces 50 is adjusted and females 30 so that the contact surface of the supporting parts matched of each pair of pairing extends substantially in the plane longitudinal median P of the arch.
- the two support soles 12, 13 are made by sparing in each of them a groove for receiving the lower support edges of the half-shells 1-8.
- the half-shell On one of the shooting soles 12, the half-shell is put in place end 2 which is stabilized. One then sets up one 1 of the half-shells end of length 1 on the strip base 13 and it is put in support on the half-shell 2, via the male support piece 50 of the half-shell 1 and of one of the female support pieces 30 of the half-shell 2 that we match.
- the male support piece 50 When pairing a male support piece 50 and a support piece female 30, the male support piece 50 is supported on the support piece female 30 so that the female support part 30 supports the part male support 50. Thus, all the female support pieces 30 of the arch support the male support pieces 50.
- the last half-shell put in place is the end half-shell 8, of length 1, which is supported on the end half-shell 7.
- the parts After pouring and drying the keying, the parts are separated from each other male 30 and female 50 support for each pair of paired support pieces, by unscrewing the rod 37 from one of the support arms of the pair of pair 31. There is thus a transfer of forces from the support pieces 30, 50 to the half-shells 1-8.
- the effort transverse support of each pair of half-shells, supported one on the other is supported by the keystone 9.
- each of the support pieces 30 (50) is removed, taking its foot out fixing 32 of the shoe in which it is fitted by vertical displacement towards the top.
- the supporting parts for that the female support pieces support the male support pieces.
- the half-shells 60 include, in place of the external shoes 23, internal shoes 63 embedded in the thickness of the half-shell 60, below the upper edge 61 thereof.
- Each shoe 63 consists of a sheath of square section and longitudinal axis 64. This axis 64 is here slightly inclined relative to the vertical, the distance between the axis 64 and the upper edge 61 of the half-shell 60 decreasing upwards.
- the support pieces 70 male and female, include a support arm transverse 71 and a fixing foot 72 intended to be fitted into a shoe internal 63.
- the support arm 71 similar to that previously described, extends along an axis 73.
- the fixing foot 72 has a square section equal to the internal section shoe 63, and extends along an axis 74, substantially orthogonally to the transverse arm 71.
- the angle formed between the axis 73 and the axis 74 and located on the side of the support head of the support arm 71, is slightly greater than 90 °.
- each half-shell in place of the hooves, includes at least one hole made in its upper face, below the edge upper, in which an internally threaded sleeve is installed.
- the socket does not pass through the thickness of the half-shell.
- Support pieces temporary include a transverse support arm and, in place of the foot fixing, a passage for receiving a fixing bolt, of orthogonal axis to the transverse support arm.
- the supporting pieces are placed at least in part above the half-shells. We could just as easily arrange the supporting parts at least partially below the half-shells.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Architecture (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Lining And Supports For Tunnels (AREA)
- Footwear And Its Accessory, Manufacturing Method And Apparatuses (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR9809688 | 1998-07-29 | ||
FR9809688A FR2781828B1 (fr) | 1998-07-29 | 1998-07-29 | Procede de realisation d'une voute, piece d'appui et demi-coquille pour la realisation de la voute |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0976877A1 true EP0976877A1 (fr) | 2000-02-02 |
Family
ID=9529138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP99401771A Withdrawn EP0976877A1 (fr) | 1998-07-29 | 1999-07-15 | Procédé de réalisation d'une voûte, pièce d'appui et demi-coquille pour la réalisation de la voûte |
Country Status (10)
Country | Link |
---|---|
US (1) | US6205605B1 (pt) |
EP (1) | EP0976877A1 (pt) |
JP (1) | JP2000087697A (pt) |
AU (1) | AU4233299A (pt) |
BR (1) | BR9903829A (pt) |
CA (1) | CA2277685C (pt) |
FR (1) | FR2781828B1 (pt) |
ID (1) | ID23711A (pt) |
MY (1) | MY119761A (pt) |
TR (1) | TR199901792A1 (pt) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2785311B1 (fr) * | 1998-11-02 | 2006-08-11 | Samflo | Dispositif de positionnement d'elements de construction |
FR2858640B1 (fr) * | 2003-08-06 | 2005-10-28 | Jean Marc Jailloux | Dispositif de chainage pour elements de voute et voute ainsi obtenue |
US7556451B2 (en) * | 2005-09-09 | 2009-07-07 | Contech Bridge Solutions Inc. | Precast concrete bridge and headwall assembly and method of production |
FR2979927B1 (fr) * | 2011-09-13 | 2019-03-15 | Mustapha Aboulcaid | Procede pour la construction d'ouvrages, notamment de passages sous des voies ferrees ou analogues en exploitation |
BR112014010712A2 (pt) * | 2011-11-02 | 2017-04-18 | Evershelter Aps | unidade de construção para abrigo permanente ou provisório |
US9970166B2 (en) | 2012-02-06 | 2018-05-15 | Contech Engineered Solutions LLC | Concrete bridge system and related methods |
USD697634S1 (en) | 2012-02-20 | 2014-01-14 | Contech Engineered Solutions LLC | Upper portion of a concrete bridge unit |
USD694910S1 (en) | 2012-04-03 | 2013-12-03 | Contech Engineered Solutions LLC | Upper portion of a concrete bridge unit |
ITSO20120002A1 (it) * | 2012-06-22 | 2013-12-23 | Zecca Prefabbricati S P A | Struttura di supporto per impianti ausiliari, particolarmente per gallerie stradali |
US9233775B1 (en) | 2012-09-12 | 2016-01-12 | Infiltrator Systems Inc. | Molded plastic stormwater chamber having a hinged top joint |
US9016979B1 (en) | 2012-09-12 | 2015-04-28 | Infiltrator Systems, Inc. | Plastic stormwater chamber made from separately molded half chambers |
KR101230769B1 (ko) | 2012-10-12 | 2013-02-12 | 주식회사 인터컨스텍 | 2분절 아치 구조체 및 그 시공 방법 |
US9822498B2 (en) | 2015-06-26 | 2017-11-21 | Structure Sight LLC | Precast concrete bridge unit and headwall assembly and method of production |
US9822522B2 (en) * | 2016-01-06 | 2017-11-21 | David Wayne Cruey | Arched cabin |
CN114214918B (zh) * | 2021-12-31 | 2022-08-23 | 山东大学 | 一种承插装配式拱肋、拱桥、制作及施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4349491A (en) * | 1980-03-25 | 1982-09-14 | Eyden Everett A | Method for forming a concrete deck |
FR2723116A1 (fr) * | 1994-07-28 | 1996-02-02 | Prefac Sa | Conduit souterrain |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US571225A (en) * | 1896-11-10 | Concrete bridge | ||
US886666A (en) * | 1907-07-05 | 1908-05-05 | William M Thomas | Automatic adjustable arch construction. |
US3374497A (en) * | 1965-06-01 | 1968-03-26 | Homayoun J. Meheen | Apparatus for erecting a bridge arch |
CH495469A (de) * | 1967-09-14 | 1970-08-31 | Desserich Marcel | Tunnel aus vorfabrizierten Betonteilen und Verfahren zu seiner Herstellung |
DE4226405A1 (de) * | 1992-08-10 | 1994-02-17 | Emunds & Staudinger Gmbh & Co | Verbauvorrichtung |
FR2751675B1 (fr) | 1996-07-24 | 1998-09-18 | Samflo | Element prefabrique en beton pour la construction d'un ouvrage d'art a paroi voutee |
-
1998
- 1998-07-29 FR FR9809688A patent/FR2781828B1/fr not_active Expired - Fee Related
-
1999
- 1999-07-08 CA CA002277685A patent/CA2277685C/fr not_active Expired - Fee Related
- 1999-07-15 EP EP99401771A patent/EP0976877A1/fr not_active Withdrawn
- 1999-07-27 TR TR1999/01792A patent/TR199901792A1/xx unknown
- 1999-07-28 AU AU42332/99A patent/AU4233299A/en not_active Abandoned
- 1999-07-28 JP JP11214014A patent/JP2000087697A/ja active Pending
- 1999-07-28 ID IDP990713D patent/ID23711A/id unknown
- 1999-07-28 MY MYPI99003206A patent/MY119761A/en unknown
- 1999-07-29 US US09/363,503 patent/US6205605B1/en not_active Expired - Fee Related
- 1999-07-29 BR BR9903829-3A patent/BR9903829A/pt not_active Application Discontinuation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4349491A (en) * | 1980-03-25 | 1982-09-14 | Eyden Everett A | Method for forming a concrete deck |
FR2723116A1 (fr) * | 1994-07-28 | 1996-02-02 | Prefac Sa | Conduit souterrain |
Also Published As
Publication number | Publication date |
---|---|
AU4233299A (en) | 2000-02-24 |
CA2277685C (fr) | 2007-02-27 |
CA2277685A1 (fr) | 2000-01-29 |
FR2781828B1 (fr) | 2000-09-22 |
TR199901792A1 (xx) | 2000-02-21 |
US6205605B1 (en) | 2001-03-27 |
MY119761A (en) | 2005-07-29 |
JP2000087697A (ja) | 2000-03-28 |
BR9903829A (pt) | 2000-08-29 |
FR2781828A1 (fr) | 2000-02-04 |
ID23711A (id) | 2000-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2277685C (fr) | Procede de realisation d'une voute, piece d'appui et demi-coquille pour la realisation de la voute | |
FR2712329A1 (fr) | Elément de parquet démontable. | |
EP0207848A1 (fr) | Revêtement mural composite à pierres apparentes | |
EP2816173A2 (fr) | Dispositif support de type plot pour la construction de terrasses | |
CA2239933C (fr) | Dispositif de jonction pour main courante | |
FR2962143A1 (fr) | Escalier prefabrique en beton a cremaillere modulaire | |
EP2270290A1 (fr) | Attache pour plancher | |
FR2997740A1 (fr) | Dispositif pour fixer un accessoire sur une toiture ondulee. | |
EP0364358B1 (fr) | Support de siège pour véhicule de transport en commun et siège equipe de ce support | |
FR2737231A1 (fr) | Joint de dilatation pour ouvrage routier | |
FR2716243A1 (fr) | Insert destiné à être rapport et fixé au travers d'un élément. | |
FR2484375A1 (fr) | Racloir de transporteur a racloirs a double chaine | |
FR2812893A1 (fr) | Paroi de parement d'un ouvrage de soutenement renforce et bloc d'attache d'une armature pour ladite paroi | |
FR2626922A1 (fr) | Coffrage de hauteur variable, pour une baie de porte ou ouverture similaire pratiquee dans une paroi de batiment | |
FR2684145A1 (fr) | Douille tubulaire de cheville a noyau d'expansion. | |
FR2757891A1 (fr) | Dispositif d'assemblage de profiles de structure notamment pour toiture de veranda ou analogue | |
FR2823681A1 (fr) | Dispositif de montage/demontage rapides d'une fixation de ski sur un ski | |
FR2856886A1 (fr) | Structure du type serre a entretoise deportee. | |
FR2640666A1 (fr) | Structure de poutre et procede de support d'un mur au moyen de cette structure | |
FR2611369A3 (fr) | Fixation de rail | |
FR2892138A1 (fr) | Piscine, en general de forme polygonale, reposant sur le sol et comportant des murs obtenus par superposition de poutres paralleles au sol | |
FR2634133A1 (fr) | Dispositif de guidage pour chaussure de ski de fond et semelle de chaussure destinee a un tel dispositif | |
FR2778213A1 (fr) | Ensemble destine a la realisation d'une bride, bride comprenant cet ensemble et construction comprenant un mat associe a au moins une hampe par cette bride | |
CH662149A5 (fr) | Element d'echafaudage a embout pour engagement d'un autre element avec percage des elements pour leur verrouillage. | |
EP1609923A1 (fr) | Entrevous en matière plastique alvéolaire pour poutrelles en acier plié |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
17P | Request for examination filed |
Effective date: 20000727 |
|
AKX | Designation fees paid |
Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
17Q | First examination report despatched |
Effective date: 20000920 |
|
19A | Proceedings stayed before grant |
Effective date: 20010417 |
|
19F | Resumption of proceedings before grant (after stay of proceedings) |
Effective date: 20051102 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20100202 |