US571225A - Concrete bridge - Google Patents
Concrete bridge Download PDFInfo
- Publication number
- US571225A US571225A US571225DA US571225A US 571225 A US571225 A US 571225A US 571225D A US571225D A US 571225DA US 571225 A US571225 A US 571225A
- Authority
- US
- United States
- Prior art keywords
- arch
- concrete
- bridge
- shoes
- walls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004567 concrete Substances 0.000 title description 44
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 12
- 230000000284 resting Effects 0.000 description 12
- 230000036633 rest Effects 0.000 description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 10
- 238000010276 construction Methods 0.000 description 8
- 238000005336 cracking Methods 0.000 description 8
- 239000011270 tar paper Substances 0.000 description 8
- 238000009412 basement excavation Methods 0.000 description 6
- 238000004140 cleaning Methods 0.000 description 6
- 229910052742 iron Inorganic materials 0.000 description 6
- 239000004570 mortar (masonry) Substances 0.000 description 6
- 239000007787 solid Substances 0.000 description 6
- 210000001503 Joints Anatomy 0.000 description 4
- 230000023298 conjugation with cellular fusion Effects 0.000 description 4
- 230000013011 mating Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000000203 mixture Substances 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 230000000153 supplemental Effects 0.000 description 4
- 230000021037 unidirectional conjugation Effects 0.000 description 4
- 240000002989 Euphorbia neriifolia Species 0.000 description 2
- 239000011398 Portland cement Substances 0.000 description 2
- 210000000614 Ribs Anatomy 0.000 description 2
- 239000011449 brick Substances 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 229910052570 clay Inorganic materials 0.000 description 2
- 230000000875 corresponding Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
Definitions
- Figure 1 is a longitudinal sectional view of a bridge constructed in accordance with my invention.
- Fig. 2 is a horizontal sectional view on the line 2 2 of Fig. 1.
- Fig. 3 is a vertical transverse sectional view on the line 3 3 of Fig. 1.
- Fig. 1 is an enlarged longitudinal sectional detail of the arch used in constructing the bridge shown in Fig. 1 and illustratesthe form of arch which I use for short spans.
- Fig. 5 is an enlarged longitudinal setional detail of a modified form of the arch shown in Fig. 1 and illustrates an arch constructed in accordance with my invention where a very long span is required.
- the water 1 of the river rests on the bed 2 between the banks 3 and at.
- an excavation is made for the abutments 5 and 6 and the wing walls 7, 8, 9, and 10 of the bridge.
- Piles 11 and 12 are sunk in these excavations until a solid foundation is reached;
- the upper ends of these piles are sawed off on a horizontal line about one foot above the bottom of the excavation.
- wing walls is shown in Fig. 3, the piling being shown in dotted lines.
- After the piles have been driven and sawed off the excavations are cleaned out to the virgin earth.
- a layer of concrete about one foot in thickness is then placed in the excavation and thoroughly rammed around the heads of the piles.
- the arch is in three pieces when the bridge is complete, and consists of the two sides 15 and 15 and the keystone 15.
- the surfaces 13 and 14 are covered with tar-paper or other suitable substance to prevent the arch from forming a bond with the abutment.
- the side pieces 15 and 15 are each constructed in five sections 15, 15, 15 15 15, 15 15 15 and 15. In constructing the arch I work from each end toward the center. The end section is cast, and before it has time to set the next section is cast and a bond forms between them, and
- the arch is between thirty-five and forty per cent. thicker than at the inner ends of said pieces and about ten per cent. thicker than at the outer ends.
- the inner ends of the pieces 15 and 15 are covered with tar-paper or other suitable material to prevent a bond with the keystone.
- the keystone 15 is then cast in position.
- the center of the arch should be elevated slightly above a true center, (about one inch to forty feet,) in order that it may form a true are of a circle after the bridge is completed and settled.
- the false work used in casting the arch should be left in position about twenty days after the arch is closed, or long enough to allow the concrete so set.
- finishing coat showing an imitation of alternate smooth and rock face stonework.
- arch bridge is the joints in the arch and the substitution of the walls 16 and 17 for the usual haunchings, thus leaving the pieces of the arch free to expand or contract without cracking or breaking the arch, and will also allow a settlement of the support of the arch without cracking the arch.
- the layer of tar-paper between the ends of the arch and the skewbacks forms a joint between the arch and the abutments which allows of sufficient action caused by expansion or contraction without cramping the parts of the arch and cracking or breaking the arch and abutments.
- ⁇ Vhen it is desired to build a span of from one hundred to three hundred feet, I employ the construction shown in detail in Fig. 5.
- One end of the shoe rests upon the surface of the skewbacks, and the lower end of the arch rests upon the other surface, thus forming a hinge-joint between the arch and the skewbacks.
- a similar shoe is inserted between the upper end of the segments of the arch and the keystone.
- the shoes 19 extend the whole width of the bridge, as do the layers of tar-paper, as heretofore described, and form supports for the arch and allow of its moving by expansion or contraction without injuring the pieces of which the arch is composed and without breaking or cracking any part of the bridge. This construction allows the foundations to settle without showing any cracks.
- a complete concrete arch constructed in accordance with my invention herein described comprises three pieces and fourj oints. Each of the three pieces are cast in position as heretofore suggested. In making these castings the section to be constructed is subdivided to suit the exigencies of the case. After work commences on one of these subdivisions that subdivision must be finished before the work is discontinued for the noon hour or for the night, in order that there may be no divisions or cracks in the subdivision caused by the hardening of one part of the concrete before the next part is added. hen the subdivision is completed, the templets in which the subdivision has been cast are left in position until the workmen are ready to begin the next subdivision.
- the templets are removed and the exposed surface of the completed subdivision to which it is proposed to join the new subdivision is thoroughly scratched by an iron brush and cleaned 01f with water, and athin coat of mortar is spread all over said surface, in order to prepare it for taking a bond with the neXt-to-be-completed subdivision, and this process is repeated until the entire section is completed.
- the false work is thoroughly soaked for at least two days before the concrete work commences, and then the sheeting of the false work is covered with waterproof paper, so that no additional moisture can come in contact with said false work.
- An arch consisting of only three members constructed in accordance with my invention is strong enough to carry almost any weight, and supplemental haunches, which are a matter of necessity for either stone or brick arches, are not required in my bridge.
- This omission takes a large weight off of the foundations of the bridge, or, in other words, the foundations for an arch of my construction do not need to be near as heavy as for the oldstyle stone or iron arch.
- the walls 16 are not a necessary part of the arch, but may be inserted or left out, as desired. When inserted, these walls form a convenient and effective support for the roadway, sidewalks, or whatever superstructure there may be above the arch. i
- I claim- 1 In a concrete bridge, metallic shoes jointed together and inserted between the ends of the haunches and the skewbacks and between the opposite ends ofthe haunches and the keystone, substantially as specified.
- a concrete bridge consisting of abutments having skewbacks, metallic shoes resting upon said skewbaoks, mating metallic shoes jointed to said first-mentioned shoes, haunches comprising voussoirs. of concrete bonded together resting in said second-mentioned metallic shoes, metallic shoes at the upper ends of said haunches and metallic shoes jointed to the last-mentioned shoes, and a keystone resting between said last-mentioned Q shoes, substantially as specified.
- a concrete bridge consisting of abutments having skewbacks, metallic shoes resting upon said skewbacks, mating metallic shoes jointed to said first-mentioned shoes, haunches comprising Voussoirs of concrete bonded together resting in said second-mentioned metallic shoes, metallic shoes at the upper ends of said haunches and metallic shoes jointed to the last-mentioned shoes, a keystone resting between said last-mentioned shoes, and walls on top of said haunches, said Walls being unbonded from said haunches and said abutments, substantially as specified.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Description
(No Model.) 2 Sheets-Sheet 1.
A. GEISEL. CONCRETE BRIDGE.
No. 571,225. atented Nov. 10, 1896.
IIIIIIIIIIIIII IIII;
I I I I I I. III
I III m: NURRIS Perms no, PMOTO-LITNOY, msnmsrm. u c.
(No Model.) 2 Sheets-Sheet A. GEISEL. .UONGRETE BRIDGE.
No. 571,225. Patented Novfio, 1896.
THE mums PETERS co. PHOYO-LITNQ, \NASHXNGTON. or c Arena:
.ADAM GEISEL, OF ST. LOUIS, MISSOURI.
I CONCRETE BRIDGE.
SPECIFICATION forming part of Letters Patent No. 571,225, dated November 10, 1896.
- Application filed March 23, 1896. Serial No. 584,440. No model.)
f all whom, it may concern:
Be it known that I, ADAM GEISEL, of the city of St. Louis, State of Missouri, have in In the drawings, Figure 1 is a longitudinal sectional view of a bridge constructed in accordance with my invention. Fig. 2 is a horizontal sectional view on the line 2 2 of Fig. 1. Fig. 3 is a vertical transverse sectional view on the line 3 3 of Fig. 1. Fig. 1 is an enlarged longitudinal sectional detail of the arch used in constructing the bridge shown in Fig. 1 and illustratesthe form of arch which I use for short spans. Fig. 5 is an enlarged longitudinal setional detail of a modified form of the arch shown in Fig. 1 and illustrates an arch constructed in accordance with my invention where a very long span is required.
Referring by numerals to the accompanying drawings, the water 1 of the river rests on the bed 2 between the banks 3 and at. In each of the banks 3 and 4 an excavation is made for the abutments 5 and 6 and the wing walls 7, 8, 9, and 10 of the bridge. Piles 11 and 12 are sunk in these excavations until a solid foundation is reached; The upper ends of these piles are sawed off on a horizontal line about one foot above the bottom of the excavation. and wing walls is shown in Fig. 3, the piling being shown in dotted lines. After the piles have been driven and sawed off the excavations are cleaned out to the virgin earth. A layer of concrete about one foot in thickness is then placed in the excavation and thoroughly rammed around the heads of the piles. Similar layers of concrete are placed one on top of the other in the excavations until the abutments and wing walls are of the desired The ground plan of the abutments height. Each layer is thoroughly sprinkled with water before another is added, in order to form a thorough bond between the layers. WVhen eompleted,the whole mass of each abut ment and its wing walls is a solid body of concrete. When the abutments and wing walls get above the surface of the ground, suitable false work is erected to mold said abutments and wing walls into the desired shape. After the concrete work is finished the false work is left in position about three days or until the concrete has become sufficiently hardened to stand.
On the facing walls of the abutments 5 and 6 are surfaces 13 and 14, forming the skewbacks, upon which the ends of the arch 15 are seated, the lines of said surfaces corresponding to the radial lines of the arch. The arch is in three pieces when the bridge is complete, and consists of the two sides 15 and 15 and the keystone 15. The surfaces 13 and 14 are covered with tar-paper or other suitable substance to prevent the arch from forming a bond with the abutment. The side pieces 15 and 15 are each constructed in five sections 15, 15, 15 15 15, 15 15 15 15 and 15. In constructing the arch I work from each end toward the center. The end section is cast, and before it has time to set the next section is cast and a bond forms between them, and
r so on until the pieces 15 and 15 are complete.
At the boundary-line between the second and third sections from the outer ends of the pieces 15 and 15 the arch is between thirty-five and forty per cent. thicker than at the inner ends of said pieces and about ten per cent. thicker than at the outer ends. The inner ends of the pieces 15 and 15 are covered with tar-paper or other suitable material to prevent a bond with the keystone. The keystone 15 is then cast in position. The center of the arch should be elevated slightly above a true center, (about one inch to forty feet,) in order that it may form a true are of a circle after the bridge is completed and settled.
The false work used in casting the arch should be left in position about twenty days after the arch is closed, or long enough to allow the concrete so set.
I omit the usual haunchings on top of thearch, and in their place I insert concrete walls 16 in the form of right-angled triangles. The
short side of the triangle rests against the vertical face of the abutment and the hypothenuse rests upon the upper surface of the arch, thus bringing the long side of the right angle in a horizontal plane for the purpose of forming ribs to support the superstructure of the bridge. Similar walls 17 join with the wing walls and the edges of the arch.
There is no bond between the walls 16 and 17 and the arch. The space between these walls is filled with clean clay and rammed solid, after which the sidewalks and road-bed are laid in the usual way.
Several coats of plastering are applied to the face of the arch and the wing walls, the
finishing coat showing an imitation of alternate smooth and rock face stonework.
arch bridge is the joints in the arch and the substitution of the walls 16 and 17 for the usual haunchings, thus leaving the pieces of the arch free to expand or contract without cracking or breaking the arch, and will also allow a settlement of the support of the arch without cracking the arch.
There it is desired to build a bridge using a span or spans of from twenty to fifty feet in length, the form of arch just described and shown in detail in Fig. 4 is sufficient and will prove very strong and durable.
The layer of tar-paper between the ends of the arch and the skewbacks forms a joint between the arch and the abutments which allows of sufficient action caused by expansion or contraction without cramping the parts of the arch and cracking or breaking the arch and abutments. This construction is shown, described, and claimed in my application above referred to, filed concurrently herewith and serially numbered 584,439.
\Vhen it is desired to build a span of from one hundred to three hundred feet, I employ the construction shown in detail in Fig. 5. I employ iron shoes 19, having joints 20 in their center and the faces 21 on each end. One end of the shoe rests upon the surface of the skewbacks, and the lower end of the arch rests upon the other surface, thus forming a hinge-joint between the arch and the skewbacks. A similar shoe is inserted between the upper end of the segments of the arch and the keystone. The shoes 19 extend the whole width of the bridge, as do the layers of tar-paper, as heretofore described, and form supports for the arch and allow of its moving by expansion or contraction without injuring the pieces of which the arch is composed and without breaking or cracking any part of the bridge. This construction allows the foundations to settle without showing any cracks.
Thus it will be seen that by adopting my invention a concrete arch bridge may be built having spans up to three hundred feet in length, which could not be done by any known old process.
A complete concrete arch constructed in accordance with my invention herein described comprises three pieces and fourj oints. Each of the three pieces are cast in position as heretofore suggested. In making these castings the section to be constructed is subdivided to suit the exigencies of the case. After work commences on one of these subdivisions that subdivision must be finished before the work is discontinued for the noon hour or for the night, in order that there may be no divisions or cracks in the subdivision caused by the hardening of one part of the concrete before the next part is added. hen the subdivision is completed, the templets in which the subdivision has been cast are left in position until the workmen are ready to begin the next subdivision. Then the templets are removed and the exposed surface of the completed subdivision to which it is proposed to join the new subdivision is thoroughly scratched by an iron brush and cleaned 01f with water, and athin coat of mortar is spread all over said surface, in order to prepare it for taking a bond with the neXt-to-be-completed subdivision, and this process is repeated until the entire section is completed.
In constructing the arch as hereinbefore described I use concrete prepared as follows: Take one part of Portland cement, three parts of sand, and five parts of macadam by meas urement. Mix the sand and cement thor oughly together while dry, then add a good sprinkling of water, mix again until a stiff mortar is formed, then spread the macadam all over the motar, and turn the whole mass over three or more times and until the spawls are all covered with mortar. Then place the concrete so formed immediately in position and ram the same until the water flushes to the surface, after which the concrete is not to be disturbed. In order not to disturb the newly-made subdivision of the section by expansion of the false work from the moisture or dampness of the fresh concrete which is to form the next adjacent subdivision, the false work is thoroughly soaked for at least two days before the concrete work commences, and then the sheeting of the false work is covered with waterproof paper, so that no additional moisture can come in contact with said false work.
An arch consisting of only three members constructed in accordance with my invention is strong enough to carry almost any weight, and supplemental haunches, which are a matter of necessity for either stone or brick arches, are not required in my bridge. This omission takes a large weight off of the foundations of the bridge, or, in other words, the foundations for an arch of my construction do not need to be near as heavy as for the oldstyle stone or iron arch.
In the place of the usual supplemental haunches I make the arch thicker at the breaking-point, which is about one-third of the length of the span from the skewbacks, and from the breaking-point the segments of IIO ' at the point next the keystone.
the arch taper both ways, being the thinnest The walls 16 are not a necessary part of the arch, but may be inserted or left out, as desired. When inserted, these walls form a convenient and effective support for the roadway, sidewalks, or whatever superstructure there may be above the arch. i
I claim- 1. In a concrete bridge, metallic shoes jointed together and inserted between the ends of the haunches and the skewbacks and between the opposite ends ofthe haunches and the keystone, substantially as specified.
2. A concrete bridge consisting of abutments having skewbacks, metallic shoes resting upon said skewbaoks, mating metallic shoes jointed to said first-mentioned shoes, haunches comprising voussoirs. of concrete bonded together resting in said second-mentioned metallic shoes, metallic shoes at the upper ends of said haunches and metallic shoes jointed to the last-mentioned shoes, and a keystone resting between said last-mentioned Q shoes, substantially as specified.
3. A concrete bridge consisting of abutments having skewbacks, metallic shoes resting upon said skewbacks, mating metallic shoes jointed to said first-mentioned shoes, haunches comprising Voussoirs of concrete bonded together resting in said second-mentioned metallic shoes, metallic shoes at the upper ends of said haunches and metallic shoes jointed to the last-mentioned shoes, a keystone resting between said last-mentioned shoes, and walls on top of said haunches, said Walls being unbonded from said haunches and said abutments, substantially as specified.
In testimony whereof I affiX my signature in presence of two witnesses.
ADAM GEISEL.
Witnesses:
EDWARD E. LONGAN, MAUD GRIFFIN.
Publications (1)
Publication Number | Publication Date |
---|---|
US571225A true US571225A (en) | 1896-11-10 |
Family
ID=2639924
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US571225D Expired - Lifetime US571225A (en) | Concrete bridge |
Country Status (1)
Country | Link |
---|---|
US (1) | US571225A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6205605B1 (en) * | 1998-07-29 | 2001-03-27 | Freyssinet International (Stup) | Method of construction of a vault, bearing piece and half-shell for construction of the vault |
US6745421B2 (en) * | 2002-01-10 | 2004-06-08 | Robert K. Barrett | Abutment with seismic restraints |
US6890127B1 (en) | 2003-12-23 | 2005-05-10 | Robert K. Barrett | Subsurface platforms for supporting bridge/culvert constructions |
US20050135882A1 (en) * | 2003-12-18 | 2005-06-23 | Barrett Robert K. | Method and apparatus for creating soil or rock subsurface support |
US20070172315A1 (en) * | 2003-12-18 | 2007-07-26 | Barrett Robert K | Method and Apparatus for Creating Soil or Rock Subsurface Support |
US7338233B2 (en) | 2003-12-18 | 2008-03-04 | Barrett Robert K | Soil nail and method of installing a subsurface support |
US7384217B1 (en) | 2007-03-29 | 2008-06-10 | Barrett Robert K | System and method for soil stabilization of sloping surface |
US8376661B2 (en) | 2010-05-21 | 2013-02-19 | R&B Leasing, Llc | System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports |
US8851801B2 (en) | 2003-12-18 | 2014-10-07 | R&B Leasing, Llc | Self-centralizing soil nail and method of creating subsurface support |
US9273442B2 (en) | 2003-12-18 | 2016-03-01 | R&B Leasing, Llc | Composite self-drilling soil nail and method |
-
0
- US US571225D patent/US571225A/en not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6205605B1 (en) * | 1998-07-29 | 2001-03-27 | Freyssinet International (Stup) | Method of construction of a vault, bearing piece and half-shell for construction of the vault |
US6745421B2 (en) * | 2002-01-10 | 2004-06-08 | Robert K. Barrett | Abutment with seismic restraints |
US7338233B2 (en) | 2003-12-18 | 2008-03-04 | Barrett Robert K | Soil nail and method of installing a subsurface support |
US20050135882A1 (en) * | 2003-12-18 | 2005-06-23 | Barrett Robert K. | Method and apparatus for creating soil or rock subsurface support |
US7226247B2 (en) | 2003-12-18 | 2007-06-05 | Barrett Robert K | Method and apparatus for creating soil or rock subsurface support |
US20070172315A1 (en) * | 2003-12-18 | 2007-07-26 | Barrett Robert K | Method and Apparatus for Creating Soil or Rock Subsurface Support |
US20100054866A1 (en) * | 2003-12-18 | 2010-03-04 | Barrett Robert K | Method and apparatus for creating soil or rock subsurface support |
US8851801B2 (en) | 2003-12-18 | 2014-10-07 | R&B Leasing, Llc | Self-centralizing soil nail and method of creating subsurface support |
US9273442B2 (en) | 2003-12-18 | 2016-03-01 | R&B Leasing, Llc | Composite self-drilling soil nail and method |
US6890127B1 (en) | 2003-12-23 | 2005-05-10 | Robert K. Barrett | Subsurface platforms for supporting bridge/culvert constructions |
US7384217B1 (en) | 2007-03-29 | 2008-06-10 | Barrett Robert K | System and method for soil stabilization of sloping surface |
US8376661B2 (en) | 2010-05-21 | 2013-02-19 | R&B Leasing, Llc | System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports |
US8708597B2 (en) | 2010-05-21 | 2014-04-29 | R&B Leasing, Llc | System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US571225A (en) | Concrete bridge | |
US597281A (en) | Concrete bridge | |
US568673A (en) | Concrete bridge | |
US1063672A (en) | Process of constructing sewers, aqueducts, &c. | |
US400997A (en) | Paving-block | |
US541213A (en) | Bridge construction | |
US1365687A (en) | Pavement | |
US209757A (en) | Improvement in the construction of cement vats for tanning and other purposes | |
US263579A (en) | Ernest l | |
Ogden | Sewer construction | |
US398074A (en) | Combined curb and gutter | |
Kim | Design and field construction of Hawkeye Bridge using ultra high performance concrete for accelerated bridge construction | |
US1239762A (en) | Method of producing paving-blocks. | |
US104941A (en) | Andrew dilger | |
US319575A (en) | John gkant | |
US1573923A (en) | Pavement and process of making | |
US153187A (en) | Improvement in paving-blocks | |
US5475A (en) | The graphic co | |
Williams | Highland Boulevard Viaduct, Milwaukee, Wisconsin | |
US166486A (en) | Improvement in concrete pavements | |
Crowell et al. | Discussion on Lonesome Valley Viaduct | |
Tuska | Construction of Substructure for Lonesome Valley Viaduct, Knoxville, Cumberland Gap and Louisville Railroad | |
US748247A (en) | Method of laying asphalt or bituminous roadways. | |
US168805A (en) | Improvement in brick pavements | |
US162218A (en) | Improvement in wood pavememts |