US597281A - Concrete bridge - Google Patents
Concrete bridge Download PDFInfo
- Publication number
- US597281A US597281A US597281DA US597281A US 597281 A US597281 A US 597281A US 597281D A US597281D A US 597281DA US 597281 A US597281 A US 597281A
- Authority
- US
- United States
- Prior art keywords
- arch
- concrete
- asphalt
- bridge
- lead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004567 concrete Substances 0.000 title description 50
- 239000010426 asphalt Substances 0.000 description 34
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 239000004570 mortar (masonry) Substances 0.000 description 8
- 230000000284 resting Effects 0.000 description 8
- 238000009412 basement excavation Methods 0.000 description 6
- 238000004140 cleaning Methods 0.000 description 6
- 238000005336 cracking Methods 0.000 description 6
- 239000000203 mixture Substances 0.000 description 6
- 230000036633 rest Effects 0.000 description 6
- 239000007787 solid Substances 0.000 description 6
- 210000001503 Joints Anatomy 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 229910052742 iron Inorganic materials 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 230000000153 supplemental Effects 0.000 description 4
- 239000011398 Portland cement Substances 0.000 description 2
- 210000000614 Ribs Anatomy 0.000 description 2
- 239000011449 brick Substances 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 229910052570 clay Inorganic materials 0.000 description 2
- 230000000875 corresponding Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 230000000576 supplementary Effects 0.000 description 2
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
Definitions
- My invention relates to concrete archbridges and it consists in the novel construction, combination, and arrangement of parts hereinafter shown, described, and claimed.
- Figure 1 is a longitudinal sectional administrat.7 of a bridge constructed in accordance with my invention.
- Fig. 2 is a horizontal sectional View on the line 2 2 of Fig. 1
- Fig. 3 is a vertical transverse sectional view on the line 3 3 of Fig. 1.
- an excavation is made for the abutments 5 and 6 and the wing-walls '7, 8, 9, and lO of the bridge.
- Piles 1l and 12 are sunk in these excavations until a solid foundation is reached.
- the upper ends of these piles are sawed od on a horizontal line about one foot above the bottom of the excavation.
- the ground plan of the abutments and Wing-Walls is shown in Fig. 3, the piling being shown in dotted lines.
- Alayer of lead or asphalt 1S is inserted between each end of the arch and the skewbacks, and a similar layer is inserted on each side' of the keystone.
- the layers 1S should be at least an inch thick.
- the side pieces 15a and 15b are each constructed in five sections 15d, 15e, lf, 15g, 15, ll, 15J, 15k, 151, and 15m.
- the end section is cast, and before it has time to set the next section is cast and a bond forms between them, and so on until the pieces 15 and 15'D are complete.
- the arch is between thirty-five and forty per cent. thicker than at the inner ends of said pieces and about ten per cent. thicker than at the outer ends.
- the keystone 15c is then cast in position between said layers 1S.
- the center of the arch should be elevated slightly above a true center (about one inch to forty feet) in order that it may form a true arc of a circle after the bridge is completed and settled.
- the false Work used in casting the arch should be left in position about twenty days after the arch is closed or long enough to allow the concrete to set.
- the layers of lead or asphalt between the ends of the arch and the skewbacks form a joint between the arch and the abutments, which allows of sufficient action caused by Yexpansion or contraction without cramping the parts of the arch and cracking or breaking the archjand abutments.
- a layer of lead or asphalt when securely confined within the prescribed limits and subjected to great pressure will gradually change its form as the relative position or point of the greatest pressure changes.
- a layer of lead or asphalt resembles a pneumatic or hydraulic cushion in this quality of chang-ing its shape to conform to the change of the conditions to which it is subjected.
- scribed comprises three pieces and four joints. Eachof the three pieces are cast in position, as heretofore suggested. In making these castings the section to be constructed is subdivided to suit the exigencies of the case. After work commences on one of these subdivisionsthat subdivision must be linished before the work is discontinued for the noon hour or for the night in order that there may be no divisions or cracks in the subdivision caused by the hardening of one part of the concrete before the next part is added. When the subdivision is completed, thetemplets in which the subdivision has been cast are left in position until the workmen are ready to begin the'next subdivision.
- the templets are removedandr the exposed surface of the completed subdivision to which it is proposed to join the new subdivision is thoroughly scratched with an iron brush and cleaned off with water, and a thick coat of mortar is spread all over said surface in order to prepare it for takinga bond with the completed subdivision, and this process is repeated until the entire section is completed.
- the false work is thoroughly soaked for at least two days before the concrete-work commences, and then the sheeting of the false work is covered with waterproof paper, so that no additional moisture can come in contact with said false work.
- An arch consisting of konly three members constructed in accordance with my invention is strong enough to carry almost any weight, and supplemental haunches, which are a matter of necessity for either stone or brick arches, are .not required in my bridge. This omission takes a large weight off of the foundations of the bridge, or, in otherwords, the foundations for an arch of my construction do not need to be near as heavy as for the oldstyle .stone and iron arch. Y
- a concrete bridge consisting of abutments, skewbaeks formed upon said abutnients, Voussoirs of lead or asphalt upon said skewbaeks, and voussoirs bonded together inserted between said Voussoirs of lead or asphalt, substantially as specified.
- a concrete bridge consisting of abutments, skewbaeks formed upon said abutments, voussoirs of lead or asphalt. resting upon said skewbaoks, voussoirs of concrete bonded together resting upon said Voussoirs of lead or asphalt, voussoirs of lead or asphalt against the inner ends of said voussoirs of concrete, and a keystone between the lastmentioned voussoirs of lead or asphalt, substantially as specified.
- a concrete bridge Consisting of abutments, skewbacks formed upon said abutments, voussoirs of lead or asphalt resting upon said skewbaoks, Voussoirs of concrete bonded together resting upon said Voussoirs of lead or asphalt,v0ussoirs of lead or asphalt against the inner ends of said voussoirs of concrete, a keystone between the last-nientioned Voussoirs of lead and asphalt, and Walls on top of said voussoirs, said Walls being unbonded to said Voussoirs and to said abutments, substantially as specified.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Description
(No Model.)
A. GEISEL. CONCRETE BRIDGE.
No. 597,281. Patented Jan. 11, 898.
u u m m m w a N .n L o v o H a c s n m v s m n C N n r UNITED STATES Artnr @reitera ADAM GEISEL, OF ST. LOUIS, vMISSOURI.
CONCRETE BRIDGE.
SPECIFICATION forming part of Letters Patent No. 597,281, dated January 11, 1898.
Griginal application led March 23, 1896, Serial No. 584,439. Divided and this application led August 31, 1896. Renewed Y October 25,1897. Serial No. E56,320. (No model.)
To all whom t may concern,.-
Be it known that I, ADAM GEIsEL, of the city of St. Louis, State of Missouri, have invented certain new and useful Improvements in Concrete Bridges, of which the following is a full, clear, and exact description, reference being had to the accompanying drawings, forming a part hereof.
My invention relates to concrete archbridges and it consists in the novel construction, combination, and arrangement of parts hereinafter shown, described, and claimed.
This applica-tion is supplementary to and should be read in connection with my application filed March 23, 1896, and serially nurnbered 584,439.
Figure 1 is a longitudinal sectional vier.7 of a bridge constructed in accordance with my invention. Fig. 2 is a horizontal sectional View on the line 2 2 of Fig. 1, and Fig. 3 isa vertical transverse sectional view on the line 3 3 of Fig. 1.
Referring by numerals to the accompanying drawings, the Water 1 of the river rests on the bed 2 bet-Ween the banks 3 and 4. In each of the banks 3 and 4 an excavation is made for the abutments 5 and 6 and the wing-walls '7, 8, 9, and lO of the bridge. Piles 1l and 12 are sunk in these excavations until a solid foundation is reached. The upper ends of these piles are sawed od on a horizontal line about one foot above the bottom of the excavation. The ground plan of the abutments and Wing-Walls is shown in Fig. 3, the piling being shown in dotted lines.
After the piles have been driven and sawed off the excavations are clean ed out to the virgin earth. A layer of concrete about one foot in thickness is then placed in the excavation and thoroughly rammed around the heads of the piles. Similar layers of concrete are placed one on top of the other in the excavations until the abutments and Wing-Walls are of the desired height. Each layer is thoroughly sprinkled with Water before another is added in order to form a thorough bond between the layers. lVhen completed, the whole mass of each abutment audits Wing- Walls is a solid body of concrete. lNhen the abutments and Wing-Walls get above the surface of the ground, suitable false work is erected to mold said abutinents and Wingvvalls into the desired shape. After the concrete-Work is finished the false work is left in position about three days or until the concrete has become sufficiently hardened to stand.
On the facing-Walls of the abutments 5 and 6 are surfaces 13 and 14, forming the skewbacks, upon which the ends of the arch 15 are seated, the lines of said surfaces corresponding to the radial lines of the arch. Thearch is in three pieces when the bridge is complete and consists of the two sides 15 and 15b and the keystone 15.
Alayer of lead or asphalt 1S is inserted between each end of the arch and the skewbacks, and a similar layer is inserted on each side' of the keystone. The layers 1S should be at least an inch thick.
The side pieces 15a and 15b are each constructed in five sections 15d, 15e, lf, 15g, 15, ll, 15J, 15k, 151, and 15m. In constructing the arch I Work from each end toward the center. The end section is cast, and before it has time to set the next section is cast and a bond forms between them, and so on until the pieces 15 and 15'D are complete. between the second and third sections from the outer ends of the pieces 15a and 15b the arch is between thirty-five and forty per cent. thicker than at the inner ends of said pieces and about ten per cent. thicker than at the outer ends. After placing a layer 1S of lead or asphalt against the upper end of the side pieces of the arch the keystone 15c is then cast in position between said layers 1S.
The center of the arch should be elevated slightly above a true center (about one inch to forty feet) in order that it may form a true arc of a circle after the bridge is completed and settled. The false Work used in casting the arch should be left in position about twenty days after the arch is closed or long enough to allow the concrete to set.
I omit the usual haunchings on top of the arch and in their place I insert concrete walls 16 in the form of right-angled triangles. The short side of the triangle rests against the vertical face of the abutment and the hypotenuse rests upon the upper surface of the arch, thus bringing the long side of the right angle At the boundary-line ssy IOO
in a horizontal plane for the purpose of forming ribs to support the superstructure of the bridge. Similar walls 17 join with the wingwalls and the edges of the arch. There is no bond between the walls 16 and 17 and the arch. The space between these walls is filled with clean clay and rammed solid, after which the sidewalks and road-bed are laid in the usual way.
The distinguishing feature of my concrete arch-bridge is the joints in the arch and the substitution of the walls 16 and 17 for the usual haunchings, thus leaving the pieces of the arch free to expand or contract without cracking or breaking the arch and will also allow a settlement of the support of the arch without cracking the arch.
Where it is desired to build a bridge using a span or spans of from fifty to one hundred feet in length, the form of arch j ust described and shown in detail in Fig. 1 is sufficient and will prove very stron g and durable.
The layers of lead or asphalt between the ends of the arch and the skewbacks form a joint between the arch and the abutments, which allows of sufficient action caused by Yexpansion or contraction without cramping the parts of the arch and cracking or breaking the archjand abutments.
Within reasonable limits a layer of lead or asphalt when securely confined within the prescribed limits and subjected to great pressure will gradually change its form as the relative position or point of the greatest pressure changes. Within reasonable limits a layer of lead or asphalt resembles a pneumatic or hydraulic cushion in this quality of chang-ing its shape to conform to the change of the conditions to which it is subjected. In warm weather when the haunches of the bridge expand the center of the arch will raise and the greatest pressure will be thrown y upon the upper edges of the layers of asphalt v or lead which are between the lower ends of the haunches and the skewbacks, and said` upper edges will be compressed to some extent, and the material which is pressed out of Yagain the haunches will contract, the center of the arch will be lowered, and the pressure will be removed from the upper edges of the layers of asphalt or lead and transferred to the lower edges of said layers, and the form of said layers will again change to suit the new conditions.
Thus it will be seen that by adopting my invention a concrete arch-bridge may be built having spans from fifty to one hundred feet in length which could not be done by any known process. Y
A, complete concrete arch constructed vin accordance with my invention herein de.-
scribed comprises three pieces and four joints. Eachof the three pieces are cast in position, as heretofore suggested. In making these castings the section to be constructed is subdivided to suit the exigencies of the case. After work commences on one of these subdivisionsthat subdivision must be linished before the work is discontinued for the noon hour or for the night in order that there may be no divisions or cracks in the subdivision caused by the hardening of one part of the concrete before the next part is added. When the subdivision is completed, thetemplets in which the subdivision has been cast are left in position until the workmen are ready to begin the'next subdivision. Then the templets are removedandr the exposed surface of the completed subdivision to which it is proposed to join the new subdivision is thoroughly scratched with an iron brush and cleaned off with water, and a thick coat of mortar is spread all over said surface in order to prepare it for takinga bond with the completed subdivision, and this process is repeated until the entire section is completed.
In constructing the arch as hereinbefore de scribed I use concrete prepared as follows: Take one part of Portland cement, three parts of sand,and five parts of Macadam bymeasurement. Mix the sand andy cement thoroughly together while dry. Then add a good sprinkling of water. Mix again until a stiff mortar is formed. Then spread the Macadam all over the mortar and turn the whole mass over three or more times and until the spawls are all covered with mortar. Then place the concrete so formed immediately in position and ram the same until the water flushes to the surface, after which the concrete is not to be disturbed. In order not to disturb the newlymade subdivision of the section by expansion of the false work from the moisture or dampness of the fresh concrete which is to form the next adjacent subdivision, the false work is thoroughly soaked for at least two days before the concrete-work commences, and then the sheeting of the false work is covered with waterproof paper, so that no additional moisture can come in contact with said false work.
An arch consisting of konly three members constructed in accordance with my invention is strong enough to carry almost any weight, and supplemental haunches, which are a matter of necessity for either stone or brick arches, are .not required in my bridge. This omission takes a large weight off of the foundations of the bridge, or, in otherwords, the foundations for an arch of my construction do not need to be near as heavy as for the oldstyle .stone and iron arch. Y
In the place of the usual supplemental haunches I make the arch thicker at the breaking-point, which is about one-third of the length of the .span from the skewbacks,
. and from the breaking-point the'segments of the arch taper both ways, being the thinnest at the point next the keystone. The walls 1G IOO IIO
are not a necessary part of the arch, but may be inserted orleft out, as desired. Vhen inserted, these walls form a convenient and effective support for the roadway, sidewalks, or Whatever superstructure there maybe above the arch.
I Claiml. A concrete bridge, consisting of abutments, skewbaeks formed upon said abutnients, Voussoirs of lead or asphalt upon said skewbaeks, and voussoirs bonded together inserted between said Voussoirs of lead or asphalt, substantially as specified.
2. A concrete bridge, consisting of abutments, skewbaeks formed upon said abutments, voussoirs of lead or asphalt. resting upon said skewbaoks, voussoirs of concrete bonded together resting upon said Voussoirs of lead or asphalt, voussoirs of lead or asphalt against the inner ends of said voussoirs of concrete, and a keystone between the lastmentioned voussoirs of lead or asphalt, substantially as specified.
3. A concrete bridge, Consisting of abutments, skewbacks formed upon said abutments, voussoirs of lead or asphalt resting upon said skewbaoks, Voussoirs of concrete bonded together resting upon said Voussoirs of lead or asphalt,v0ussoirs of lead or asphalt against the inner ends of said voussoirs of concrete, a keystone between the last-nientioned Voussoirs of lead and asphalt, and Walls on top of said voussoirs, said Walls being unbonded to said Voussoirs and to said abutments, substantially as specified.
In testimonyT whereof I affix my signature in presence of two Witnesses.
ADAM GEISEL.
lVitnesses:
E. E. LONGAN, MAUD GRIFFIN.
Publications (1)
Publication Number | Publication Date |
---|---|
US597281A true US597281A (en) | 1898-01-11 |
Family
ID=2665926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US597281D Expired - Lifetime US597281A (en) | Concrete bridge |
Country Status (1)
Country | Link |
---|---|
US (1) | US597281A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3747289A (en) * | 1971-10-22 | 1973-07-24 | E Collins | Cantilevered support system for structures |
US4010617A (en) * | 1975-05-19 | 1977-03-08 | Armco Steel Corporation | Composite arch structure |
US4505088A (en) * | 1982-06-24 | 1985-03-19 | Lippe Lloyd K | Method of constructing arcuate structures |
US4587684A (en) * | 1983-10-14 | 1986-05-13 | Roman Arch And Culvert Corporation Of America | Precast concrete bridge |
US20030143029A1 (en) * | 2002-01-30 | 2003-07-31 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
US20050006725A1 (en) * | 2003-05-16 | 2005-01-13 | Tetsuya Kurosawa | Semiconductor device and manufacturing method thereof |
-
0
- US US597281D patent/US597281A/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3747289A (en) * | 1971-10-22 | 1973-07-24 | E Collins | Cantilevered support system for structures |
US4010617A (en) * | 1975-05-19 | 1977-03-08 | Armco Steel Corporation | Composite arch structure |
US4505088A (en) * | 1982-06-24 | 1985-03-19 | Lippe Lloyd K | Method of constructing arcuate structures |
US4587684A (en) * | 1983-10-14 | 1986-05-13 | Roman Arch And Culvert Corporation Of America | Precast concrete bridge |
US20030143029A1 (en) * | 2002-01-30 | 2003-07-31 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
US6854928B2 (en) * | 2002-01-30 | 2005-02-15 | Con/Span Bridge Systems Ltd. | Precast concrete culvert system |
US20050006725A1 (en) * | 2003-05-16 | 2005-01-13 | Tetsuya Kurosawa | Semiconductor device and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US571225A (en) | Concrete bridge | |
US597281A (en) | Concrete bridge | |
US568673A (en) | Concrete bridge | |
US1365687A (en) | Pavement | |
US1351607A (en) | Road or pavement | |
US5475A (en) | The graphic co | |
US1541830A (en) | Construction of roads and ways | |
US2405335A (en) | Concrete bridge superstructure | |
US1239762A (en) | Method of producing paving-blocks. | |
US319575A (en) | John gkant | |
USRE11088E (en) | Patrick griffin | |
Morgan et al. | THE CLAERWEN DAM. | |
US255687A (en) | Pavement | |
US1007299A (en) | Bridge. | |
Jee | DESCRIPTION OF THE DINTING VALE VIADUCT, ON THE LINE OF THE SHEFFIELD & MANCHESTER RAILWAY.(INCLUDES PLATES). | |
US209757A (en) | Improvement in the construction of cement vats for tanning and other purposes | |
US104941A (en) | Andrew dilger | |
Ogden | Sewer construction | |
Maw et al. | Modern examples of road and railway bridges: illustrating the most recent practice of leading engineers in Europe and America | |
ANSON et al. | CORRESPONDENCE. ON THE CONSTRUCTION OF A CONCRETE RAILWAY VIADUCT. | |
Williams | Highland Boulevard Viaduct, Milwaukee, Wisconsin | |
Tyrrell | Concrete Bridges and Culverts: For Both Railroads and Highways | |
Francis et al. | Discussion on Bridge Substructure | |
Crowell et al. | Discussion on Lonesome Valley Viaduct | |
Patton | A Practical Treatise on Foundations, Explaining Fully the Priciples Involved: With Descriptions of All of the Most Recent Structures... |