US5475A - The graphic co - Google Patents

The graphic co Download PDF

Info

Publication number
US5475A
US5475A US5475DA US5475A US 5475 A US5475 A US 5475A US 5475D A US5475D A US 5475DA US 5475 A US5475 A US 5475A
Authority
US
United States
Prior art keywords
panel
stone
panels
laid
access
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Publication date
Application granted granted Critical
Publication of US5475A publication Critical patent/US5475A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/006Foundations for pavings made of prefabricated single units

Definitions

  • A is the subsoil cleared to a proper depth and grade to finish the work as required, in this; a, is a sewer and 1, is a side drain to a culvert or dwelling; b, are Water mains and 2 is a supply branch from one; c, are gas pipes and 3, a supply branch; these are all to be made and placed before or after the construction of the road above in the usual way and are only represented herein to identify them with the means of access to them as shown hereafter.
  • the positions of the sewers pipes and branches are to be defined7 and metal or wood frames laid out in the manner shown by d, d. These are thicker at the bottoms than at the to-ps.
  • the frames successively laid are to circumscribe a space or spaces forming a panel or panels over each sewer pipe and branch beneath, and may be made of sound wood though common cast iron or iron stone pottery burned earth or any other lit materialmay be used for the frame pieces in the sectional form shown in larger size in the detached Fig.
  • bolts and rings may be used while in the smaller panels one will be sutlicient the bolts employed for these purposes may be of a small eXtra length that will find place in the subsoil and a countersink in the face of the concrete is to receive the ring in this way on applying power to raise the panel the ring will lift clear of the face without breakage or injury to the concrete.
  • the concrete is then to be filled in and consolidated after which it may be lifted out of any panel or section -as may be required by shears or derricks placed above with tackles hooked into the rings e, e, in the panel the inverted wedge formed p0rtions of the frame d, al, allowing each panel of cement to be freely lifted out and placed on one side while access is needed to the parts beneath and receiving the panel of cement in replacement again when the access beneath is no longer needed.
  • the gutter stones f, curb ystones g, and iagging of the side walks D may all be laid on paneled and divided sections of concrete in the same manner and with the same advantages and effects, but in the drawing the roadway only is shown thus prepared and fitted.
  • the stone over the center of each section or panel is to have two countersunk holes to receive an inverted lewis by which it may be lifted out so as to furnish the commencement of a removal to obtain access to the panel beneath, and this stone should be only set in l clean sand and all the rest of the stones are to be covered with sand that must be well washed into the interstices between the stones and then consolidated by a portion of loose grouting, that is hydraulic cement in a sufficient quantity of water to run freely into the sand and harden between the stones.
  • the formation of the pavement in diagonal lines with the street is to be commenced and followed up by placing the rst stone of each range so that side shall form an abutment and tie for the head or fore end of the first stone in the next range and the dimensions of the panels or sections and paving stones may be varied as required.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Description

y UNITED STATES PATENT OFFCE.
H. P. RUSS, OF NEW YORK, N. Y.
SUBSTRATA FOR PAVEMENTS.
Specification forming part of Letters Patent No. 5,475, dated March 14, 1848; Reissued March 28,
f 1854, No. 261.
T 0 all 'wh-0m t may concern Be it known that I, HORACE P. Russ, of the city, county, and State of New York, civil engineer, have invented and made and applied to use certain new and useful improvements in the construction and arrangement of the parts constituting the carriageways of streets and roads by which, while the durability is maintained, access can be hadto sewers, water-pipes, or gas-pipes or otherneedful fixtures beneath the surface and the carriageway be replaced without injury and at little cost, for which improvement I seek Letters-Patent of the United States, and that the said improvements and the mode of arranging and constructing the same, and the effects obtained thereby are fully and substantially set forth and shown in the following description and in the dra-W- ings annexed to and making part of this specification, wherein- Figure l, is a plan of a street, road, or highway formed with my improvements and showing the progressive arrangements that commence with clearing the subsoil to receive the structure and terminate with the nish of the roadway. Fig. 2, is a section of the same across the street or road.
The detached figures are separately referred to and the same letters numbers and other marks of reference apply to the like part-'s in all the figures. a
A, is the subsoil cleared to a proper depth and grade to finish the work as required, in this; a, is a sewer and 1, is a side drain to a culvert or dwelling; b, are Water mains and 2 is a supply branch from one; c, are gas pipes and 3, a supply branch; these are all to be made and placed before or after the construction of the road above in the usual way and are only represented herein to identify them with the means of access to them as shown hereafter.
When the subsoil is graded and ready a quantity of granite, or other masons or quarry chips each from four to six or eight inches in diameter and about half that thickness are to be laid with the lattest side upward in the manner shown by 4, 4, in Fig. l, and rammed down flush with the gra-ding so as to form an open heading or partial pavement foundation for the-next part of the work. This is to be proceeded in as follows.
The positions of the sewers pipes and branches are to be defined7 and metal or wood frames laid out in the manner shown by d, d. These are thicker at the bottoms than at the to-ps. The frames successively laid are to circumscribe a space or spaces forming a panel or panels over each sewer pipe and branch beneath, and may be made of sound wood though common cast iron or iron stone pottery burned earth or any other lit materialmay be used for the frame pieces in the sectional form shown in larger size in the detached Fig. 3, and placed on the graded subsoil and partial pavement, then a proper set of open wooden shallow vats are to be prepared for mixing in them what is now well known by the technical name of concrete namely a mixture of masons chips, broken stone, hydraulic cement clean sand (not salt beach sand) and fresh water in such proportions as the quality of the cement will require to form a sound foundation B, abo-ve the subsoil A, that will in a short time become an artificial flag or slab of rock about eight to ten inches thick to bear the pavement above, but before the mixture is placed into the panels or sections formed by the frames d, d, those panels that..
may hereafter have to be lifted out for access to the parts beneath are to have bars of iron laid into them forming crosses e, 1, with holes in them through which they are united by an eye bolt e, with a ring in the head of each bolt as shown in Figs. 4 and 5 and in the larger panels two or more of these sets of bars, bolts and rings may be used while in the smaller panels one will be sutlicient the bolts employed for these purposes may be of a small eXtra length that will find place in the subsoil and a countersink in the face of the concrete is to receive the ring in this way on applying power to raise the panel the ring will lift clear of the face without breakage or injury to the concrete. The concrete is then to be filled in and consolidated after which it may be lifted out of any panel or section -as may be required by shears or derricks placed above with tackles hooked into the rings e, e, in the panel the inverted wedge formed p0rtions of the frame d, al, allowing each panel of cement to be freely lifted out and placed on one side while access is needed to the parts beneath and receiving the panel of cement in replacement again when the access beneath is no longer needed.
The gutter stones f, curb ystones g, and iagging of the side walks D, may all be laid on paneled and divided sections of concrete in the same manner and with the same advantages and effects, but in the drawing the roadway only is shown thus prepared and fitted. a
When the concrete foundation is fully consolidated, a pavement of granite or sienite stone blocks `c, averaging about ten to twelve inches long four to five inches Wide and a nearly e ual depth of about ten inches are to be carefully laid to an even surface commencing so as to form the ranges of stones into lozenge formed divisions as shown in Fig. l by which the edges are presented diagonally to the wheel tires of carriages or to any other passing weight, the stone over the center of each section or panel is to have two countersunk holes to receive an inverted lewis by which it may be lifted out so as to furnish the commencement of a removal to obtain access to the panel beneath, and this stone should be only set in l clean sand and all the rest of the stones are to be covered with sand that must be well washed into the interstices between the stones and then consolidated by a portion of loose grouting, that is hydraulic cement in a sufficient quantity of water to run freely into the sand and harden between the stones.
The formation of the pavement in diagonal lines with the street is to be commenced and followed up by placing the rst stone of each range so that side shall form an abutment and tie for the head or fore end of the first stone in the next range and the dimensions of the panels or sections and paving stones may be varied as required.
- I do not claim to have invented or discovered any of the materials or parts described as used herein all being well known,
but
I do claim as new and of my own invention- The constructing a concrete foundation B in panels or sections (to give access to pipes and conduits below) by the application and combinationtherewith of frames 05, d, formed of any suitable material with a thinner edge lupward to allow of the concreteniass to be lifted out when needed, substantially as de-V scribed when this is combined with a paved roadway of any kind laid thereon, as described.
In witness whereof I have hereunto set my hand in the city of New York this twenty sixth day of December one thousand eight hundred and forty siX.
HORACE P. RUSS.
Witnesses:
WM. SERRELL, EDW. W. SERRELL.
US5475D The graphic co Expired - Lifetime US5475A (en)

Publications (1)

Publication Number Publication Date
US5475A true US5475A (en) 1848-03-14

Family

ID=2065776

Family Applications (1)

Application Number Title Priority Date Filing Date
US5475D Expired - Lifetime US5475A (en) The graphic co

Country Status (1)

Country Link
US (1) US5475A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050215988A1 (en) * 2000-01-25 2005-09-29 Palomar Medical Technologies, Inc. Method and apparatus for medical treatment utilizing long duration electromagnetic radiation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050215988A1 (en) * 2000-01-25 2005-09-29 Palomar Medical Technologies, Inc. Method and apparatus for medical treatment utilizing long duration electromagnetic radiation

Similar Documents

Publication Publication Date Title
Garilli et al. Stone pavement materials and construction methods in Europe and North America between the 19th and 20th century
CN112695582A (en) Assembly type construction and repair structure of highway pavement and rapid construction method thereof
CN110670436A (en) Structure for preventing urban road subgrade from non-uniform settlement and construction method thereof
US5475A (en) The graphic co
US510259A (en) Pavement
CN211142682U (en) Structure for preventing urban road subgrade from non-uniform settlement
Sharp Concrete in Highway Engineering: International Series of Monographs in Civil Engineering
US1351607A (en) Road or pavement
US1610756A (en) Process and apparatus for repairing pavements
USRE261E (en) Improvement in substrata for pavements
US398074A (en) Combined curb and gutter
DE1922637A1 (en) Process for the production of factory-made, mountable asphalt and hard concrete roads, dike and bank fortifications with small concrete-steel composite elements
RU2140480C1 (en) Transport complex of megalopolis and method for control and relief of passenger, freight - passenger and freight traffics of megalopolis transport complex
Judson City roads and pavements suited to cities of moderate size
Rundlett THE CONSTRUCTION AND BRIDGING OF MAIN ROADS IN BURMA.
US421235A (en) Pavement and gutter
Breed Recent developments in concrete pavements
Green A Review of Chicago Paving Practice
Taylor NOTES ON STONE PAVEMENTS FOR ENTRANCE COURTS AND DRIVEWAYS
Goldsmith Modern road construction and maintenance
Jee DESCRIPTION OF THE DINTING VALE VIADUCT, ON THE LINE OF THE SHEFFIELD & MANCHESTER RAILWAY.(INCLUDES PLATES).
Uhlmeyer PCCP Intersections Design and Construction in Washington State
Anderton Concrete paving blocks: Facilities Engineering Applications Program (FEAP) Demonstration, FY89
FORD COVENTRY BY-PASS ROAD.(ABRIDGED).
Evans Design for mechanized road construction