EP0908598A2 - Verfahren zum Verlegen einer Leitung sowie Leitung mit einem Mantelrohr und einem Produktrohr - Google Patents
Verfahren zum Verlegen einer Leitung sowie Leitung mit einem Mantelrohr und einem Produktrohr Download PDFInfo
- Publication number
- EP0908598A2 EP0908598A2 EP98118688A EP98118688A EP0908598A2 EP 0908598 A2 EP0908598 A2 EP 0908598A2 EP 98118688 A EP98118688 A EP 98118688A EP 98118688 A EP98118688 A EP 98118688A EP 0908598 A2 EP0908598 A2 EP 0908598A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- product
- casing
- pipe
- segment
- elastic material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 title description 2
- 239000013013 elastic material Substances 0.000 claims abstract description 21
- 238000003825 pressing Methods 0.000 claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 239000000463 material Substances 0.000 claims abstract description 5
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 4
- 238000005260 corrosion Methods 0.000 claims description 14
- 239000011248 coating agent Substances 0.000 claims description 6
- 238000000576 coating method Methods 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 5
- 239000002131 composite material Substances 0.000 claims description 4
- 239000006260 foam Substances 0.000 claims description 3
- 239000000314 lubricant Substances 0.000 claims description 3
- 229920002635 polyurethane Polymers 0.000 claims description 3
- 239000004814 polyurethane Substances 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 2
- 230000007797 corrosion Effects 0.000 description 7
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 239000003345 natural gas Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000000109 continuous material Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000001141 propulsive effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 231100000817 safety factor Toxicity 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/08—Casing joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/18—Pipes provided with plural fluid passages
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
- E21B7/205—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes without earth removal
Definitions
- the invention relates to a method for laying a line that consists of a jacket pipe and a product pipe, the casing pipe from a starting pit to to a target pit using a hydraulic pneumatic or mechanical Pressing device is pressed through the soil.
- the invention further relates to a Pipe with a jacket pipe and a product pipe with an anti-corrosion coating is provided.
- Jacket pipe / product pipe lines for the transport of liquid or gaseous Substances, such as natural gas, are usually laid when the line is one Crosses railway line, road or waterway.
- the sealing of the jacket tube ends is further complicated by cable protection tubes, that must be carried in the casing tube.
- the space between the product pipe and the casing pipe can also be filled with cement become.
- the invention has for its object, on the one hand, a time-saving and safe Process for laying a casing pipe and a product pipe To create management and on the other hand to provide a generic management, in which the product pipe when laying before mechanical damage and after the installation is protected against corrosion damage.
- the method according to the invention is characterized in that that segments consisting of a casing pipe and product pipe section manufactured and one by one pre-pressed through the soil, whereby adjacent product pipe sections with each other before each pre-pressing step get connected.
- the process is time-saving because the pre-pressing of the casing pipe and product pipe section in one phase and not in succession. Because the product line is not must be pulled in later, there is no damage to the anti-corrosion coating. During the pressing process, the jacket tube protects the product tube from mechanical Damage from obstacles.
- the pressing forces act exclusively on the casing tube.
- the Product pipe is not loaded, so that damage is avoided.
- the invention also provides a line with a jacket tube and a product tube which is provided with an anti-corrosion coating.
- the line is marked through a plurality of segments, which consist of a tubular casing section made of concrete and a product pipe section made of steel, the product pipe sections welded and the jacket pipe sections are non-positively connected.
- An annular space is preferably formed between the casing pipe section and the product pipe section formed, the thickness of max. 3% of the outside diameter of the product pipe is.
- An elastic material is advantageously located in the annular space.
- the annular space between the casing pipe section and the product pipe section is intended to be of fundamental importance Considerations should be kept as small as possible so the outside diameter of the overall system and thus the pressing resistance (negative skin friction) are as small as possible. This requirement also applies to the optimization of the casing tube wall thickness.
- An advantageous embodiment of the invention is that the first to be installed Segment of the line has a product pipe protrusion at one end.
- Each additional segment has a product tube protrusion at one end and at the other opposite end of a jacket tube protrusion of substantially the same length on.
- This design of the segments enables the product pipes in front of each Prepress step can be welded together.
- the jacket tube overhang enables moving the jacket pipe protrusion until a positive connection is reached at the joints of the jacket pipe sections.
- the elastic material is preferably connected to the tubular casing section. Between the corrosion protection covering of the product pipe section and the elastic Sliding relative movement of the material is possible. This will avoid that the product pipe is loaded during the advance. The strains that go through the introduction of the propulsive force in the jacket tube will not arise on the Transfer product pipe.
- the elastic material electrolytic conductivity This will make the cathodic more effective Corrosion protection not impaired.
- a polyurethane composite foam is preferably used as the elastic material.
- the elastic material can be designed as a band-shaped endless material, that can be placed in a spiral around the product tube.
- At least the side of the elastic tube facing the jacket tube is preferred Material liquid-tight.
- An advantageous embodiment of the invention is that in the tubular section Cable channels and / or channels for a pressing aid are cast in the concrete.
- Fig. 1 shows a section through a segment, which consists of a tubular casing section 1 Reinforced concrete and a product pipe section 2 is made.
- a product pipe section is a steel pipe for the transportation of natural gas.
- the tubular casing section t contains a steel reinforcement, not shown. Between An annular space 3 is formed in the casing tube section 1 and the product tube section 2. whose thickness max. 3% of the outer diameter of the product pipe section 2.
- an elastic material 4 which is connected to the tubular casing section 1 is connected.
- a polyurethane composite foam is used as the elastic material used, which is designed as a band-shaped continuous material that spirals around the product pipe can be laid.
- the elastic material has an electrolytic conductivity in order not to impair the cathodic corrosion protection of the product pipe.
- the elastic material is on the side facing the tubular casing section Liquid-tight side.
- cable channels 5 and channels 6 are for a pressing aid, e.g. B. poured concrete.
- the segments are prefabricated in a production facility and used for installation transported.
- the max. Segment length depends on the means of transport available from.
- a product pipe section 2a is from one Surround casing pipe section 1a.
- the segment 7a faces the excavation pit end up a product pipe protrusion 9a.
- the pressing forces of a not shown act hydraulic-pneumatic or mechanical pressing device on the segment 7a, and was exclusively on the tubular casing section 1a.
- the segment 7a can be closed by a closure 10.
- a closure 10 it is also possible that the bottom is pressed into the product tube open at the front and is removed later.
- a drill head can be used.
- a second segment 7b is inserted into the Starting pit 8 introduced.
- the second segment 7b faces the opposite end the first segment 7a is directed to a product pipe protrusion 9b and to the opposite one End of a substantially equal length of jacket pipe section protrusion 12 on.
- Fig. 4 it is shown that a third segment 7c is introduced into the starting pit has been. The individual steps of the process are repeated as needed, until the first segment 7a has reached a target pit, not shown.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
- Sewage (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
- Fig. 1
- einen Schnitt durch ein Segment, das aus einem Mantelrohrabschnitt und einem Produktrohrabschnitt besteht;
- Fig. 2
- eine schematische Darstellung des Vorpressens eines ersten Segmentes;
- Fig. 3
- eine schematische Darstellung der Verbindung und des Vorpressens von zwei Segmenten;
- Fig. 4
- eine schematische Darstellung des Vorpressens weiterer Segmente.
Claims (14)
- Verfahren zum Verlegen einer Leitung, die aus einem Mantelrohr und einem Produktrohr besteht, wobei das Mantelrohr von einer Startbaugrube bis zu einer Zielbaugrube mittels einer hydraulischen, pneumatischen oder mechanischen Preßvorrichtung durch das Erdreich vorgepreßt wird, dadurch gekennzeichnet, daß Segmente (7), bestehend aus einem Mantelrohr- und Produktrohrabschnitt (1, 2) hergestellt und eines nach dem anderen durch das Erdreich vorgepreßt werden, wobei aneinander anschließende Produktrohrabschnitte vor jedem Vorpressungsschritt miteinander verbunden werden.
- Verfahren nach Anspruch 1,
dadurch gekennzeichnet,
daß die Preßkräfte ausschließlich auf die Mantelrohrabschnitte (1) einwirken. - Verfahren nach Anspruch 1 oder 2
dadurch gekennzeichnet,a) daß ein erstes Segment (7a) vorgepreßt wird, das an einem Ende einen Produktrohr-Überstand (9a) aufweistb) daß ein zweites Segment (7b) in die Startbaugrube (8) eingebracht wird, das an einem Ende einen Produktrohr-Überstand (9b) und an dem anderen Ende einen im wesentlichen gleichgroßen Mantelrohr-Überstand (12) aufweist,c) daß die Produktrohr-Überstände (9a, 9b) der beiden Segmente (7a, 7b) verschweißt werden und daß der Mantelrohrabschnitt des zweiten Segmentes verschoben wird, bis eine kraftschlüssige Verbindung an der Stoßstelle der Mantelrohrabschnitte des ersten und zweiten Segmentes (7a, 7b) erreicht ist, undd) daß die Schritte b) und c) bedarfsabhängig wiederholt werden. - Leitung mit einem Mantelrohr und mit einem Produktrohr, das mit einer Korrosionsschutz-Umhüllung versehen ist,
gekennzeichnet durch
eine Mehrzahl von Segmenten (7), die aus einem Mantelrohrabschnitt (1) aus Stahlbeton und einem Produktrohrabschnitt (2) aus Stahl bestehen, wobei die Produktrohrabschnitte (2) verschweißt und die Mantelrohrabschnitte (1) kraftschlüssig miteinander verbunden sind. - Segment nach Anspruch 4,
dadurch gekennzeichnet,
daß zwischen Mantelrohrabschnitt (1) und Produktrohrabschnitt (2) ein Ringraum (3) gebildet wird, dessen Dicke maximal 3 % des Außendurchmessers des Produktrohrabschnittes beträgt und daß sich im Ringraum (3) ein elastisches Material befindet. - Segment nach einem der Ansprüche 4 bis 5,
dadurch gekennzeichnet,
daß das erste Segment (7a) der Leitung an einem Ende einen Produktrohr-Überstand (9a) aufweist. - Segment nach einem der Ansprüche 4 bis 5
dadurch gekennzeichnet,
daß das zweite und jedes weitere Segment (7b, c) an einem Ende einen Produktrohr-Überstand (9b) an dem gegenüberliegenden Ende einen im wesentlichen gleichlangen Mantelrohr-Überstand (12) aufweist. - Segment nach einem der Ansprüche 5 bis 7,
dadurch gekennzeichnet,
daß das elastische Material (4) mit dem Mantelrohrabschnitt (1) verbunden ist. - Segment nach einem der Ansprüche 5 bis 8,
dadurch gekennzeichnet,
daß zwischen dem elastischen Material und der Korrosionsschutz-Umhüllung des Produktrohres ein Gleitmittel vorhanden ist. - Segment nach Anspruch 5 bis 9,
dadurch gekennzeichnet,
daß das elastische Material eine elektrolytische Leitfähigkeit aufweist. - Segment nach einem der Ansprüche 5 bis 10,
dadurch gekennzeichnet,
daß als elastisches Material (4) ein Polyurethan-Verbundschaum verwendet wird. - Segment nach Anspruch 11,
dadurch gekennzeichnet,
daß das elastische Material (4) als bandförmiges Endlosmaterial ausgebildet ist das spiralförmig um das Produktrohr legbar ist. - Segment nach einem der Ansprüche 5 bis 12,
dadurch gekennzeichnet,
daß mindestens die dem Mantelrohrabschnitt zugewandte Seite des elastischen Material (4) flüssigkeitsdicht ist. - Segment nach einem der Ansprüche 5 bis 13,
dadurch gekennzeichnet,
daß im Mantelrohrabschnitt im Beton Kabelkanäle (5) und/oder Kanäle (6) für ein Preßhilfsmittel eingegossen sind.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19745130 | 1997-10-13 | ||
| DE1997145130 DE19745130A1 (de) | 1997-10-13 | 1997-10-13 | Verfahren zum Verlegen einer Leitung sowie Leitung mit einem Mantelrohr und einem Produktrohr |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP0908598A2 true EP0908598A2 (de) | 1999-04-14 |
| EP0908598A3 EP0908598A3 (de) | 2002-04-03 |
Family
ID=7845368
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP98118688A Withdrawn EP0908598A3 (de) | 1997-10-13 | 1998-10-02 | Verfahren zum Verlegen einer Leitung sowie Leitung mit einem Mantelrohr und einem Produktrohr |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP0908598A3 (de) |
| DE (1) | DE19745130A1 (de) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2007067063A1 (en) * | 2005-12-07 | 2007-06-14 | International Research Institute Of Stavanger As | A device for a borehole arrangement |
| EP2035645A4 (de) * | 2006-06-16 | 2012-12-26 | Vermeer Mfg Co | Mikrotunnelungsystem und -vorrichtung |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102007038297A1 (de) | 2007-08-14 | 2009-02-19 | Egeplast Werner Strumann Gmbh & Co. Kg | Verfahren zur grabenlosen Verlegung mindestens zweier Rohre oder Leitungen |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3445124C1 (de) * | 1984-12-11 | 1986-01-23 | Nukem Gmbh, 6450 Hanau | Auskleidung fuer Bohrloecher in Salzstoecken |
| DE3618334C1 (de) * | 1986-05-30 | 1987-07-02 | Meyer & John Gmbh & Co | Vortriebsrohr |
| DE3823331A1 (de) * | 1988-07-09 | 1990-01-11 | Schmidt Paul | Verfahren und vorrichtung zum einrammen von rohren |
| DE4117950A1 (de) * | 1991-05-31 | 1991-12-19 | Schaefertoens Joern Henrich | Vortriebsrohr |
| DE4224831A1 (de) * | 1992-07-28 | 1994-02-03 | Beb Erdgas & Erdoel Gmbh | Verfahren und Vorrichtung zur unterirdischen Einbringung von Transportrohren größerer Länge in das Erdreich |
| BE1008489A3 (fr) * | 1994-07-13 | 1996-05-07 | Centre Etd Energie Nucleaire | Procede de realisation d'un tunnel revetu. |
| DE29611452U1 (de) * | 1996-07-01 | 1996-10-17 | Halbergerhütte GmbH, 66111 Saarbrücken | Rohrstrang für die grabenlose Herstellung von Rohrleitungen |
-
1997
- 1997-10-13 DE DE1997145130 patent/DE19745130A1/de not_active Withdrawn
-
1998
- 1998-10-02 EP EP98118688A patent/EP0908598A3/de not_active Withdrawn
Non-Patent Citations (1)
| Title |
|---|
| None |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2007067063A1 (en) * | 2005-12-07 | 2007-06-14 | International Research Institute Of Stavanger As | A device for a borehole arrangement |
| GB2445702A (en) * | 2005-12-07 | 2008-07-16 | Internat Res Inst Of Stavanger | A device for a borehole arrangement |
| EP2035645A4 (de) * | 2006-06-16 | 2012-12-26 | Vermeer Mfg Co | Mikrotunnelungsystem und -vorrichtung |
| US8439132B2 (en) | 2006-06-16 | 2013-05-14 | Vermeer Manufacturing Company | Microtunnelling system and apparatus |
Also Published As
| Publication number | Publication date |
|---|---|
| EP0908598A3 (de) | 2002-04-03 |
| DE19745130A1 (de) | 1999-04-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0247496B1 (de) | Vortriebsrohr | |
| DE102005021216A1 (de) | Verfahren und Vorrichtungen zur grabenlosen Verlegung von Rohrleitungen | |
| DE2120178A1 (de) | Verschiebbare Auskleidungs- und Abstützungsstruktur sowie Verfahren zum Auskleiden von Tunnels und Schächten | |
| DE4314288C2 (de) | Verfahren und Vorrichtung zum Verlegen unterirdischer Rohrleitungen | |
| DE4446001A1 (de) | Flexible Gasleitung | |
| EP2369130B1 (de) | Verfahren zur Sanierung einer Tunnelröhre | |
| EP0908598A2 (de) | Verfahren zum Verlegen einer Leitung sowie Leitung mit einem Mantelrohr und einem Produktrohr | |
| EP0585537B1 (de) | Korrosionsgeschütztes Tragelement für einen Erd- oder Felsanker, einen Druckpfahl oder dergleichen | |
| DE29900679U1 (de) | Vortriebsrohr zur unterirdischen Verlegung von Rohrleitungen | |
| DE3700883A1 (de) | Verfahren zur erneuerung von begehbaren oder bekriechbaren geschlossenes profil aufweisenden linienfoermigen bauwerken untertage, insbesondere abwasserkanaelen sowie bauelementensatz aus kunststoff zur verwirklichung des verfahrens | |
| DD281635A5 (de) | Verfahren und vorrichtung zur neuverrohrung geschaedigter, nichtbegehbarer gerader kanalstrecken | |
| DE3213952C2 (de) | Ausbau für den Tunnelbau, insbesondere im Untertagebergbau mit Hilfe von gekrümmten Stahlbetonfertigschalen | |
| CH686198A5 (de) | Verfahren zur Erstellung eines tragenden Tunnelausbaus mit integrierter Isolation. | |
| DE19860259B4 (de) | Vortriebsrohrleitung | |
| EP1020615A2 (de) | Rohrvortriebsverfahren zur unterirdischen Verlegung von Rohrleitungen und Vortriebsrohr zur Durchführung des Verfahrens | |
| DE19645346A1 (de) | Verfahren zum Erneuern eines im Boden verlegten Schutzrohres für eine Produktenleitung | |
| DE202008015669U1 (de) | Anordnung zum Sanieren schadhafter Rohrleitungen eines Kanalnetzes | |
| DE2348657A1 (de) | Rohrleitungssystem fuer tiefsttemperatur-fluessigkeiten | |
| EP1548228B1 (de) | Verfahren zur Erstellung einer unterirdischen Röhre und Vorrichtung zur Durchführung des Verfahrens | |
| DE2531007C3 (de) | Verfahren und Vorrichtung zur Erstellung von Arbeitsschächten innerhalb im Schildvortrieb aufgefahrener Gräben | |
| DE9017653U1 (de) | Dichtung zwischen aneinanderschließenden Betonrohren | |
| DE3626462C2 (de) | ||
| DE1634554A1 (de) | Injektionszuganker | |
| EP0716258B1 (de) | Flexible Gasleitung | |
| WO2002077512A1 (de) | Vorrichtung, verfahren und verlegeeinrichtung zur hydraulischen stützung eines tunnels |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
| AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
| AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
| AKX | Designation fees paid | ||
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20021005 |