EP0645503A2 - Wall - Google Patents
Wall Download PDFInfo
- Publication number
- EP0645503A2 EP0645503A2 EP94114685A EP94114685A EP0645503A2 EP 0645503 A2 EP0645503 A2 EP 0645503A2 EP 94114685 A EP94114685 A EP 94114685A EP 94114685 A EP94114685 A EP 94114685A EP 0645503 A2 EP0645503 A2 EP 0645503A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- wall
- strips
- wall according
- layer
- carrier material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/70—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood
- E04B2/706—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood with supporting function
- E04B2/709—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood with supporting function obturation by means of longitudinal elements with a plane external surface
Definitions
- the invention relates to a wall, in particular for a wooden house, consisting of several layers, namely at least one inner insulation and one covering boundary layer.
- Walls of wooden houses of the type described above are prefabricated in the workshop and assembled at the construction site.
- the walls consist of a frame supporting the boundary layer, which is made of wood, for example.
- the frame also receives the insulation layer, the insulation layer being made of insulation materials such as paper, rock wool, glass wool, polystyrene or natural materials such as straw, reeds, peat, chips, pods etc. exists.
- the boundary layer is preferably made of wood in a wooden house. However, it is also possible for the boundary layer to be multilayered, using different construction materials, such as gypsum cardboard, chipboard or plywood.
- the installation lines After installation, the installation lines must be laid in the walls immediately or, if necessary, only after years. For this purpose, it is usually necessary to either pry open the walls or pull the installation lines into the empty pipes provided in the walls. If the wall is pried open, there is a lot of work with the need to dispose of waste; in the case of pulling out empty pipes, installation is tied to the location of the empty pipes. This leads to additional effort when the planning changes.
- the work preparation for pulling in empty pipes is also cost-intensive. In particular, it is difficult to change the installation after moving in, since there are usually not enough empty pipes and subsequent installation of electrical lines or other installation lines is therefore very expensive.
- the invention has set itself the task of further developing a wall of the type described in such a way that both the installation of the installation in the wall during construction, as well as the subsequent installation of installations is facilitated.
- the invention is based on a wall of the type described above and proposes that an intermediate layer is arranged between the insulation layer and the boundary layer, which consists of a flat carrier material on which strip-like strips are arranged which face the boundary layer , being between neighboring Strip creates a channel that allows the installation of installation lines.
- the design according to the invention achieves a decisive rationalization when laying the installation in an unfinished building, since it is no longer necessary to plan and lay empty pipes in the wall. Subsequent pulling in of lines using pulling wires is also greatly facilitated, since through the design of the wall according to the invention there are installation channels over the entire width of the wall, which can be used like empty pipes.
- the intermediate layer is provided on both sides of the wall.
- the wall of a wooden house is increasingly being manufactured as a prefabricated part, an outer wall also being designed in such a way that the outside has an intermediate layer. This makes installations on the outside of the building easier, for example.
- the strips run vertically and / or horizontally in the wall.
- the majority of the installation lines in a building run vertically and horizontally, which is why it is advantageous to have the strips in the wall run vertically and with intervals, so that the ducts formed by the strips can accommodate the installation lines.
- the intermediate layer has an adhesive layer only in the area of the applied strips.
- the applied adhesive usually has a diffusion-inhibiting effect, which means breathability the wall subsides when too large areas are covered with adhesive.
- the exterior of the wall be breathable, that is, that diffusion processes are possible between the interior of the wall and the exterior of the wall.
- cardboard is provided as the carrier material. This preserves the solidity of the wooden wall, which improves the possibility of recycling the wall, since there is no need to separate the material.
- other materials for the carrier layer such as paper, laminated paper or cardboard, foils, plastics, aluminum foils or mixed fabrics.
- Cork as bark granules.
- Cork granulate occurs when processing cork into cork boards etc. and is a cheap alternative.
- cork is characterized by its low weight and its water resistance.
- the use of cork does not stand in the way of the solidity of the wall.
- other materials than granulate are used in addition to cork. Wood, styrofoam, rubber, rubber, sleeves, spreaders, straw, sand, lime, brick, wool, felt, moss, coconut, horsehair or plastic can be used as further materials. It is also possible to arrange strips of elastic continuous materials in addition to granules.
- water glass is used as the adhesive.
- water glass is a financially attractive option for attaching the strip material to the carrier material.
- water glass is flame retardant and has an anti-fungal property, which is due to the high pH value of 10.
- Water glass also has an insect-repelling effect.
- ants for example, avoid water glass.
- the mineral structure of the water glass ensures that the wooden wall has one substance.
- water glass as an adhesive it is possible, for example, to use all common resin and plastic glues or casein, bone glue, wallpaper adhesive, linguin, corn starch or bitumen as an adhesive or adhesive.
- the intermediate layer can be manufactured and rolled up by the meter, which facilitates the transport and storage of the intermediate layer.
- FIG. 1 the wall 1 is shown in a vertical section.
- the outside of wall 1 is designated by 11, the inside of wall 1 by 12.
- the wall 1 consists of several layers. It is formed from the outer boundary layer 3 and an insulation layer 2 lying between this boundary layer 3. Between the insulation layer 2 and the boundary layer 3, the intermediate layer 4 is provided, which receives the lines 5.
- the wall 1 is prepared in the factory, it essentially consists of a frame 6, on which outer planks 14 are applied on the outside 11 and is provided with an inner lining 15 on the inside 12. Both the outer planks 14 and the inner cladding 15 are made of wood, for example, and have tongue and groove connections.
- the wall 1 stands on a foundation 13, the outer planks 14 connecting to the foundation 13 with a lowermost outer plank 23.
- the lowermost outer screed 23 is connected to the foundation 13 with a fastening means 25, for example a screw.
- a spacer 24 is also provided, which is arranged between the foundation 13 and the lowermost outer screed 23.
- the screed 26 adjoins above the foundation 13, the floor covering, of course, being applied to the screed 26.
- the intermediate layer 4 is located both between the insulation layer 2 and the boundary layer 3 and between the insulation layer 2 and the frame 6 supporting the wall.
- the lower frame part 27, which rests on the foundation 13 has a bevel 20 on which the Outside 11 inclined frame edge, so that when the intermediate layer 4 is folded over in this area, a bead cannot lead to jamming and an empty space for horizontal lines is created.
- the intermediate layer 4 not only causes the provision of installation channels, as described at the beginning. It also brings about a spacer between the boundary layer 3 and the insulation layer 2. If there is a possibility, particularly in the case of openings in the outer planks 14, that water penetrates into the wall 1, this has hitherto led to the fact that the water was absorbed by the insulation material in the insulation layer 2. The insulation layer 2 thus becomes wet, and there was a risk that the insulation layer 2 would be damaged or destroyed as a result.
- the intermediate layer 4 now creates a space between the boundary layer 3 and the insulation layer 2, as a result of which penetrating water can run down into this space between the intermediate layer 4 and the boundary layer 3 and collect in the bevel 20 which extends along the frame 27 can. It is now possible, for example, that a drain opening is provided in the outer screed 14 for the drainage of the water that accumulates in the slope 20, or that the water evaporates again.
- These cable ducts 16 and 17 are formed, for example, by corner strips 21 and 22 which are attached to the inner lining 15 at the bottom (21) or at the top (22).
- Fig. 2 a horizontal section through the wall 1 is shown.
- the structure of the intermediate layer 4 can be seen here, it consists of a carrier material 7 on which strip-like strips 9 are applied.
- the strips 9 are applied at a certain distance from one another in parallel on the carrier material 7, the space between the individual strips forms a channel 10. It is provided, for example, the channel with dimensions of 0.5 to 2.0 cm in height and To design 1.0 to 7.0 cm in width.
- An elastic material is provided as the carrier material 7, for example, so that the carrier material 7 can be moved against the insulation layer 2, as is shown, for example, in the bulge 31.
- a line 32 in installed in the channel, the diameter of the line 32 being greater than the depth of the channel 10.
- the elastic configuration of the carrier material 7 makes it possible for the channel 10 to be widened locally, which means that the line 32 can be drawn in. Accordingly, the strip-like strips 9 do not abut the boundary layer 3 in this area. This is a particular advantage of the invention that lines with diameters greater than the depth of the channel can also be retrofitted in the walls.
- the intermediate layer 4 is arranged between the boundary layer 3 and the insulation layer 2 such that the carrier material 7 of the insulation layer 2 and the strip-like strips 9 of the boundary layer 3 are inclined.
- the intermediate layer 4 which is arranged on the outside 11 of the wall 1, is fastened on the inside 28 of the frame 6.
- the intermediate layer can, for example, be glued or stapled onto the frame.
- the outer planks 14 are, for example, applied directly to the frame 6 because of the window formation of the building and the static requirements.
- the intermediate layer 4 is applied continuously to the frame 6 on the inside in FIG. 2.
- the inner lining 15 is then fastened to the frame 6, the intermediate layer 4 also being between the frame and the inner lining.
- an adhesive is provided for fastening the intermediate layer 4 and as an extension joint on the frame 6, for example.
- the adhesive layer is designated 34.
- the strip-like strips 9 are connected to the carrier material 7 by an adhesive layer 8.
- the carrier material 7 On the outside 11, the carrier material 7 only has in the area of the strip-like strips 9 an adhesive layer, whereby the carrier material is open to diffusion.
- the carrier material 7 On the inside 12, however, the carrier material 7 is completely covered with an adhesive layer 8. This creates a vapor barrier or vapor barrier.
- suitable natural adhesives are water glass, casein, bone glue, wallpaper glue, corn starch, bitumen or liguin.
- Other properties such as fire protection, insect resistance, fungus resistance or environmental compatibility can also be influenced favorably by appropriate selection of the carrier material, the adhesive layer and the strip-like strips.
- FIGS. 3 and 4 each show an embodiment of the intermediate layer 4.
- a straight cardboard is provided as the carrier material 7, this has at constant intervals a longitudinal adhesive layer 8, on which the strip-like strips 9 are applied.
- the strip-like strips 9 are designed, for example, as single-row granules 36.
- strip-like strips 9 can be made from other materials, for example from glued-on, elastically continuous strips of material such as plastic, etc. According to the invention, reference is made to the use of cork which is glued on as cork granules.
- Fig. 3 it is shown that the granules are applied in one row (36) on the carrier material 7.
- a further embodiment is shown such that the granules are arranged in several rows (37) in a strip 9.
- the carrier material 7 also has a roof-like bead 38 in the region of the strip-like strips glued on on, which is achieved by folding the carrier material 7, for example cardboard, paper or laminated paper.
- the carrier material 7 for example cardboard, paper or laminated paper.
- multi-row granules it is also possible for multi-row granules to be applied to a flat carrier material.
- the carrier material 7 shown in FIGS. 3 and 4 further shapes are also possible.
- corrugated cardboard, cardboard with a point, sinusoidal corrugated cardboard, trapezoidal cardboard or dovetail cardboard as the carrier layer.
- the strip-like strips, here for example the granulate are applied to the raised sections of the cardboard.
- the cardboard e.g. also a corrugated cardboard
- the composite panel then forms the boundary layer.
- the present invention also has a cost advantage over the commonly used empty pipes.
- the invention is applicable not only to outer walls but also to inner walls and to sloping walls, that is to say in flat or flat or sloping ceilings or roofs.
Abstract
Description
Die Erfindung betrifft eine Wand insbesondere für ein Holzhaus, bestehend aus mehreren Schichten, und zwar mindestens einer inneren Isolations- und einer abdeckenden Begrenzungsschicht.The invention relates to a wall, in particular for a wooden house, consisting of several layers, namely at least one inner insulation and one covering boundary layer.
Wände von Holzhäusern der oben beschriebenen Art werden in der Werkstatt vorgefertigt und an der Baustelle montiert. Die Wände bestehen zum Beispiel bei einem Holzhaus aus einem die Begrenzungsschicht tragenden Rahmen, der hierbei beispielsweise aus Holz gefertigt ist. Der Rahmen nimmt auch die Isolationsschicht auf, wobei die Isolationsschicht aus Isolationsmaterialien, wie zum Beispiel Papier, Steinwolle, Glaswolle, Styropor oder Naturstoffen wie Stroh, Schilf, Torf, Spänen, Hülsen usw. besteht. Die Begrenzungsschicht besteht bevorzugt bei einem Holzhaus aus Holz. Es ist aber auch möglich, daß die Begrenzungsschicht mehrlagig ist, wobei verschiedene Bauwerkstoffe verwendet werden, wie zum Beispiel Gipspappeplatten, Span- oder Sperrholzplatten.Walls of wooden houses of the type described above are prefabricated in the workshop and assembled at the construction site. In a wooden house, for example, the walls consist of a frame supporting the boundary layer, which is made of wood, for example. The frame also receives the insulation layer, the insulation layer being made of insulation materials such as paper, rock wool, glass wool, polystyrene or natural materials such as straw, reeds, peat, chips, pods etc. exists. The boundary layer is preferably made of wood in a wooden house. However, it is also possible for the boundary layer to be multilayered, using different construction materials, such as gypsum cardboard, chipboard or plywood.
In die Wände müssen nach deren Aufstellung sofort oder gegebenenfalls erst nach Jahren die Installationsleitungen verlegt werden. Hierzu ist es in der Regel notwendig, entweder die Wände aufzustemmen oder die Installationsleitungen in die in den Wänden vorgesehenen Leerrohre einzuziehen. Im Fall des Aufstemmens der Wand ergibt sich ein hoher Arbeitsaufwand mit der Notwendigkeit der Abfallbeseitigung, im Fall des Vorziehens von Leerrohren ist man bei der Installierung an den Ort der Leerrohre gebunden. Das führt bei Abänderungen der Planung zu zusätzlichem Aufwand. Auch ist die Arbeitsvorbereitung für das Einziehen von Leerrohren kostenintensiv. Insbesondere ist nach dem Einzug ein Ändern der Installation nur schwer möglich, da in der Regel nicht ausreichend Leerrohre vorgesehen sind und somit ein nachträgliches Installieren von Elektroleitungen oder anderer Installationsleitungen mit einem hohen Aufwand verbunden ist.After installation, the installation lines must be laid in the walls immediately or, if necessary, only after years. For this purpose, it is usually necessary to either pry open the walls or pull the installation lines into the empty pipes provided in the walls. If the wall is pried open, there is a lot of work with the need to dispose of waste; in the case of pulling out empty pipes, installation is tied to the location of the empty pipes. This leads to additional effort when the planning changes. The work preparation for pulling in empty pipes is also cost-intensive. In particular, it is difficult to change the installation after moving in, since there are usually not enough empty pipes and subsequent installation of electrical lines or other installation lines is therefore very expensive.
Die Erfindung hat es sich zur Aufgabe gemacht, eine Wand der oben beschriebenen Art dahingehend weiter zu entwickeln, daß sowohl das Verlegen der Installation in der Wand während des Baues, wie auch das nachträgliche Verlegen von Installationen erleichtert wird.The invention has set itself the task of further developing a wall of the type described in such a way that both the installation of the installation in the wall during construction, as well as the subsequent installation of installations is facilitated.
Zur Lösung dieser Aufgabe geht die Erfindung aus von einer Wand der oben beschriebenen Art und schlägt vor, daß zwischen der Isolationsschicht und der Begrenzungsschicht eine Zwischenschicht angeordnet ist, die aus einem flächigen Trägermaterial besteht, auf dem leistenartige Streifen angeordnet sind, die der Begrenzungsschicht zugewandt sind, wobei zwischen benachbarten Streifen ein Kanal entsteht, der das Einfügen von Installationsleitungen zuläßt.To achieve this object, the invention is based on a wall of the type described above and proposes that an intermediate layer is arranged between the insulation layer and the boundary layer, which consists of a flat carrier material on which strip-like strips are arranged which face the boundary layer , being between neighboring Strip creates a channel that allows the installation of installation lines.
Durch die erfindungsgemäße Ausgestaltung wird eine entscheidende Rationalisierung beim Verlegen der Installation in einem Rohbau erreicht, da es nicht mehr notwendig ist, in der Wand Leerrohre vorzuplanen und zu verlegen. Auch ist das nachträgliche Einziehen von Leitungen unter Verwendung von Zugdrähten sehr stark erleichtert, da durch die erfindungsgemäße Ausgestaltung der Wand auf der ganzen Breite der Wand Installationskanäle vorhanden sind, die wie Leerrohre verwendet werden können.The design according to the invention achieves a decisive rationalization when laying the installation in an unfinished building, since it is no longer necessary to plan and lay empty pipes in the wall. Subsequent pulling in of lines using pulling wires is also greatly facilitated, since through the design of the wall according to the invention there are installation channels over the entire width of the wall, which can be used like empty pipes.
Es ist günstig, wenn die Zwischenschicht auf beiden Seiten der Wand vorgesehen ist. Die Wand eines Holzhauses wird vermehrt als Fertigteil hergestellt, wobei auch eine Außenwand so ausgestaltet ist, daß die Außenseite eine Zwischenschicht aufweist. Somit werden zum Beispiel Installationen auch auf der Außenseite des Gebäudes erleichtert.It is advantageous if the intermediate layer is provided on both sides of the wall. The wall of a wooden house is increasingly being manufactured as a prefabricated part, an outer wall also being designed in such a way that the outside has an intermediate layer. This makes installations on the outside of the building easier, for example.
Es ist von Vorteil, wenn die Streifen in der Wand vertikal und/oder horizontal verlaufen. Ein Großteil der Installationsleitungen in einem Gebäude verlaufen vertikal und horizontal, weshalb es günstig ist, die Streifen in der Wand vertikal und mit Abständen auch horizontal verlaufen zu lassen, damit die durch die Streifen gebildeten Kanäle die Installationsleitungen aufnehmen können.It is advantageous if the strips run vertically and / or horizontally in the wall. The majority of the installation lines in a building run vertically and horizontally, which is why it is advantageous to have the strips in the wall run vertically and with intervals, so that the ducts formed by the strips can accommodate the installation lines.
Eine einfache Herstellung wird erreicht, wenn die Streifen auf das Trägermaterial aufgeklebt sind.A simple production is achieved if the strips are glued to the carrier material.
Es hat sich als günstig herausgestellt, wenn die Zwischenschicht nur im Bereich der aufgebrachten Streifen eine Kleberschicht aufweist. Der aufgebrachte Kleber hat in der Regel eine diffusionshemmende Wirkung, das bedeutet, die Atmungsaktivität der Wand läßt nach, wenn zu große Flächenanteile mit Kleber bedeckt sind. Beim Aufbau einer Wand ist es jedoch wünschenswert, daß der Außenbereich der Wand atmungsaktiv ist, d.h. daß Diffusionsprozesse zwischen dem Inneren der Wand und der Außenseite der Wand möglich sind.It has proven to be advantageous if the intermediate layer has an adhesive layer only in the area of the applied strips. The applied adhesive usually has a diffusion-inhibiting effect, which means breathability the wall subsides when too large areas are covered with adhesive. When building a wall, however, it is desirable that the exterior of the wall be breathable, that is, that diffusion processes are possible between the interior of the wall and the exterior of the wall.
In Versuchen hat es sich herausgestellt, daß besonders gute Ergebnisse erzielt werden, wenn die Trägerschicht vollfächig mit einer Kleberschicht versehen ist und damit eine Dampfbremse bildet. Dies ist insbesondere dann von Vorteil, wenn die Innenwand eines Zimmers betrachtet wird, wo ein Diffundieren der feuchten Luft durch die Wand vermieden werden sollte, da sich ansonsten an kalten Stellen der Außenwand Kondenswasser bilden kann.Experiments have shown that particularly good results are achieved if the backing layer is fully covered with an adhesive layer and thus forms a vapor barrier. This is particularly advantageous when looking at the inside wall of a room, where diffusion of the humid air through the wall should be avoided, since otherwise condensation can form in cold places on the outside wall.
Es hat sich als vorteilhaft herausgestellt, wenn als Installationsleitungen Elektroleitungen in den Kanälen verlegt sind. Die Dimensionen des Kanals, also die Breite und die Tiefe, sind so abgestimmt, daß ein Elektrokabel in den Kanal verlegbar ist. Es ist beispielsweise aber auch möglich, daß bei einer entsprechenden Anpassung der Dimensionen des Kanals, also bei entsprechender Wahl der Höhe und dem Abstand der Streifen, in den Kanälen zum Beispiel auch Warmwasserleitungen oder Heizungsrohre verlegt werden.It has proven to be advantageous if electrical lines are laid in the ducts as installation lines. The dimensions of the channel, i.e. the width and the depth, are coordinated so that an electrical cable can be laid in the channel. However, it is also possible, for example, that with a corresponding adaptation of the dimensions of the channel, that is to say with a corresponding choice of the height and the spacing of the strips, hot water pipes or heating pipes are also laid in the channels.
Es hat sich als vorteilhaft herausgestellt, wenn als Trägermaterial Pappe vorgesehen ist. Dadurch wird die Einstofflichkeit der Holzwand gewahrt, wodurch sich die Möglichkeit des Recycelns der Wand verbessert, da eine aufwendige Stofftrennung hierbei entfällt. Es ist aber zum Beispiel auch möglich, andere Materialien für die Trägerschicht vorzusehen, Materialien wie Papier, kaschierte Papiere oder Pappen, Folien, Kunststoffe, Aluminiumfolien oder Mischgewebe.It has proven to be advantageous if cardboard is provided as the carrier material. This preserves the solidity of the wooden wall, which improves the possibility of recycling the wall, since there is no need to separate the material. However, it is also possible, for example, to provide other materials for the carrier layer, such as paper, laminated paper or cardboard, foils, plastics, aluminum foils or mixed fabrics.
Es ist günstig, wenn die Streifen durch Granulate gebildet sind. Granulate fallen in vielen industriellen Betrieben als Abfallmaterial an und können als günstiges Grundprodukt Verwendung finden, wobei auch hierbei ein Beitrag zur Abfallvermeidung geleistet und zugleich das Aufrollen des Trägermaterials ohne Rückstellungsbestreben erreicht wird.It is beneficial if the strips are formed by granules are. Granules accumulate as waste material in many industrial companies and can be used as a cheap basic product, whereby here too a contribution is made to avoiding waste and at the same time the rolling up of the carrier material is achieved without efforts to restore it.
Besonders gute Ergebnisse wurde hierbei mit Kork als Rindengranulat erreicht. Korkgranulat fällt bei der Verarbeitung von Kork zu Korkplatten usw. an und ist eine günstige Alternative. Des weiteren zeichnet sich Kork durch das geringe Gewicht und seine Wasserfestigkeit aus. Außerdem steht die Verwendung von Kork der Einstofflichkeit der Wand nicht entgegen. Es ist aber auch möglich, daß neben Kork andere Materialien als Granulat ver-wendet werden. Als weitere Materialien lassen sich hierbei Holz, Styropor, Gummi, Kautschuk, Hülsen, Spreizen, Stroh, Sand, Kalk, Ziegel, Wolle, Filz, Moos, Kokos, Roßhaar oder Plastik verwenden. Es ist hierbei auch möglich, neben Granulaten auch Streifen aus elastischen durchgehenden Materialien anzuordnen.Particularly good results were achieved with cork as bark granules. Cork granulate occurs when processing cork into cork boards etc. and is a cheap alternative. Furthermore, cork is characterized by its low weight and its water resistance. In addition, the use of cork does not stand in the way of the solidity of the wall. However, it is also possible that other materials than granulate are used in addition to cork. Wood, styrofoam, rubber, rubber, sleeves, spreaders, straw, sand, lime, brick, wool, felt, moss, coconut, horsehair or plastic can be used as further materials. It is also possible to arrange strips of elastic continuous materials in addition to granules.
Eine besonders günstige Lösung wird erzielt, wenn als Kleber Wasserglas dient. Wasserglas ist zum einen eine finanziell attraktive Möglichkeit, das Streifenmaterial auf dem Trägermaterial zu befestigen. Zum anderen ist Wasserglas schwer entflammbar und hat eine pilzhemmende Eigenschaft, die durch den hohen pH-Wert von 10 begründet ist. Wasserglas hat auch eine insektenvertreibende Wirkung. In Versuchen ist hierbei gefunden worden, daß zum Beispiel Ameisen Wasserglas meiden. Durch den mineralischen Aufbau des Wasserglases (Wasserglas ist ein wasserlösliches Kalium- oder Natriumsilicat) wird die Einstofflichkeit der Holzwand gewahrt. Neben Wasserglas als Kleber ist es möglich, zum Beispiel alle gängigen Harz- und Kunststoffleime oder Kasein, Knochenleim, Tapetenkleber, Linguin, Maisstärke oder Bitumen als Kleber oder Haftmittel zu verwenden.A particularly favorable solution is achieved if water glass is used as the adhesive. On the one hand, water glass is a financially attractive option for attaching the strip material to the carrier material. On the other hand, water glass is flame retardant and has an anti-fungal property, which is due to the high pH value of 10. Water glass also has an insect-repelling effect. Experiments have shown that ants, for example, avoid water glass. The mineral structure of the water glass (water glass is a water-soluble potassium or sodium silicate) ensures that the wooden wall has one substance. In addition to water glass as an adhesive, it is possible, for example, to use all common resin and plastic glues or casein, bone glue, wallpaper adhesive, linguin, corn starch or bitumen as an adhesive or adhesive.
Ferner wird vorgeschlagen, das es günstig ist, wenn die Streifen parallel zu der Längsrichtung der Zwischenschicht angeordnet sind.It is further proposed that it is advantageous if the strips are arranged parallel to the longitudinal direction of the intermediate layer.
Außerdem wird vorgeschlagen, daß der Abstand zwischen den Streifen konstant ist.It is also proposed that the distance between the strips be constant.
Es ist günstig, wenn die Zwischenschicht als Meterware herstellbar und rollbar ist, wodurch der Transport und die Lagerung der Zwischenschicht erleichtert wird.It is advantageous if the intermediate layer can be manufactured and rolled up by the meter, which facilitates the transport and storage of the intermediate layer.
In der Zeichnung ist die erfindungsgemäße Wand schematisch dargestellt. Es zeigen:
- Fig. 1
- einen lotrechten Schnitt durch die erfindungsgemäße Wand,
- Fig. 2
- einen horizontalen Schnitt durch die erfindungsgemäße Wand,
- Fig. 3
- eine Seitenansicht der Zwischenschicht und
- Fig. 4
- eine Seitenansicht einer weiteren Ausgestaltung der Zwischenschicht.
- Fig. 1
- a vertical section through the wall according to the invention,
- Fig. 2
- a horizontal section through the wall according to the invention,
- Fig. 3
- a side view of the intermediate layer and
- Fig. 4
- a side view of a further embodiment of the intermediate layer.
In Fig. 1 ist die Wand 1 in einem lotrechten Schnitt gezeigt. Die Außenseite der Wand 1 ist mit 11, die Innenseite der Wand 1 mit 12 bezeichnet.In Fig. 1 the
Die Wand 1 besteht aus mehreren Schichten. Sie wird gebildet aus der äußeren Begrenzungsschicht 3 und einer zwischen dieser Begrenzungsschicht 3 liegenden Isolationsschicht 2. Zwischen der Isolationsschicht 2 und der Begrenzungsschicht 3 ist die Zwischenschicht 4 vorgesehen, die die Leitungen 5 aufnimmt.The
Die Wand 1 wird im Werk vorbereitet, sie besteht im wesentlichen aus einem Rahmen 6, auf dem auf der Außenseite 11 Außenbohlen 14 aufgebracht sind und auf der Innenseite 12 mit einer Innenverkleidung 15 versehen ist. Sowohl die Außenbohlen 14 wie auch die Innenverkleidung 15 sind zum Beispiel aus Holz gefertigt und weisen Nut- und Federverbindungen auf.The
Die Wand 1 steht auf einem Fundament 13 auf, wobei die Außenbohlen 14 mit einer untersten Außenbohle 23 an das Fundament 13 anschließen. Die unterste Außenbohle 23 ist hierzu mit einem Befestigungsmittel 25, zum Beispiel einer Schraube, mit dem Fundament 13 verbunden. Hierbei ist auch noch ein Distanzstück 24 vorgesehen, das zwischen dem Fundament 13 und der untersten Außenbohle 23 angeordnet ist.The
Auf der Innenseite 12 schließt sich oberhalb des Fundamentes 13 der Estrich 26 an, wobei natürlich auf dem Estrich 26 der Fußbodenbelag aufgebracht ist.On the inside 12, the
Die Zwischenschicht 4 befindet sich sowohl zwischen der Isolationsschicht 2 und der Begrenzungsschicht 3 wie auch zwischen der Isolationsschicht 2 und dem die Wand tragenden Rahmen 6. Hierbei weist zum Beispiel der untere Rahmenteil 27, der auf dem Fundament 13 aufliegt, eine Abschrägung 20 auf der der Außenseite 11 zugeneigten Rahmenkante auf, wodurch beim Umschlagen der Zwischenschicht 4 in diesem Bereich ein Wulst nicht zu Verklemmungen führen kann und ein Leerraum für horizontale Leitungen entsteht.The
Die Zwischenschicht 4 bewirkt nicht nur allein das Bereitstellen von Installationskanälen, wie eingangs beschrieben. Sie bewirkt auch einen Distanzhalter zwischen der Begrenzungsschicht 3 und der Isolationsschicht 2. Wenn insbesondere bei Öffnungen der Außenbohlen 14 die Möglichkeit besteht, daß Wasser in die Wand 1 eindringt, so führte das bislang dazu, daß das Wasser von dem Isolationsmaterial in der Isolationsschicht 2 aufgesaugt wurde. Die Isolationsschicht 2 wird somit naß, und es bestand die Gefahr, daß die Isolationsschicht 2 hierdurch beschädigt oder zerstört wurde. Durch die Zwischenschicht 4 wird nun ein Raum zwischen der Begrenzungsschicht 3 und der Isolationsschicht 2 geschaffen, wodurch eindringendes Wasser in diesen Raum zwischen der Zwischenschicht 4 und der Begrenzungsschicht 3 herunterlaufen kann und sich in der Schräge 20, die sich längs des Rahmens 27 erstreckt, sammeln kann. Es ist nun zum Beispiel möglich, daß zum Abfluß des Wassers, das sich in der Schräge 20 ansammelt, in der Außenbohle 14 eine Abflußöffnung vorgesehen ist, oder daß das Wasser wieder verdunstet.The
Die Leitungen 5, die in der Zwischenschicht 4 sowohl auf der Außen- wie auf der Innenseite verlegt sind, sind mit Leitungen 18 und 19, die in Kanälen 16 und 17, die auf der Innenseite 12 der Wand 1 angeordnet sind, verbunden. Diese Kabelkanäle 16 und 17 werden zum Beispiel durch Eckleisten 21 und 22 gebildet, die unten (21) oder oben (22) auf der Innenverkleidung 15 angebracht sind.The
In Fig. 2 ist ein waagrechter Schnitt durch die Wand 1 gezeigt. Der Aufbau der Zwischenschicht 4 ist hierbei erkennbar, sie besteht aus einem Trägermaterial 7, auf dem leistenartige Streifen 9 aufgebracht sind. Die Streifen 9 sind mit einem gewissen Abstand zueinander parallel auf dem Trägermaterial 7 aufgebracht, der Raum zwischen den einzelnen Streifen bildet ein Kanal 10. Es ist zum Beispiel vorgesehen, den Kanal mit Abmessungen von 0,5 bis 2,0 cm in der Höhe und 1,0 bis 7,0 cm in der Breite auszugestalten.In Fig. 2 a horizontal section through the
Als Trägermaterial 7 ist beispielsweise ein elastisches Material vorgesehen, so daß sich das Trägermaterial 7 gegen die Isolationsschicht 2 verschieben läßt, wie dies zum Beispiel in der Ausbuchtung 31 gezeigt ist. Hierbei ist eine Leitung 32 in dem Kanal installiert worden, wobei der Durchmesser der Leitung 32 größer ist als die Tiefe des Kanals 10. Durch die elastische Ausgestaltung des Trägermaterials 7 ist es möglich, daß der Kanal 10 örtlich verbreitert wird, wodurch das Einziehen der Leitung 32 möglich ist. Dementsprechend liegen in diesem Bereich die leistenartigen Streifen 9 nicht an der Begrenzungsschicht 3 an. Dies ist ein besonderer Vorteil der Erfindung, daß Leitungen mit Durchmessern, die größer sind als die Tiefe des Kanals, in den Wänden auch noch nachträglich eingebaut werden können.An elastic material is provided as the
Die Zwischenschicht 4 ist derart zwischen der Begrenzungsschicht 3 und der Isolationsschicht 2 angeordnet, daß das Trägermaterial 7 der Isolationsschicht 2 und die leistenartigen Streifen 9 der Begrenzungsschicht 3 zugeneigt sind.The
Die Zwischenschicht 4, die auf der Außenseite 11 der Wand 1 angeordnet ist, ist auf der Innenseite 28 des Rahmens 6 befestigt. Hierzu kann beispielsweise die Zwischenschicht auf den Rahmen aufgeklebt oder aufgetackert sein. Die Außenbohlen 14 werden zum Beispiel direkt auf den Rahmen 6 wegen der Scheibenbildung des Bauwerkes und den statischen Erfordernissen aufgebracht.The
Auf der Innenseite ist in Fig. 2 die Zwischenschicht 4 durchgängig auf dem Rahmen 6 aufgebracht. Die Innenverkleidung 15 wird dann auf dem Rahmen 6 befestigt, wobei zwischen Rahmen und Innenverkleidung auch die Zwischenschicht 4 ist. Zum Befestigen der Zwischenschicht 4 und als Verlängerungsstoß auf dem Rahmen 6 ist zum Beispiel eine Verklebung vorgesehen. Die Kleberschicht ist mit 34 bezeichnet.The
Die leistenartigen Streifen 9 sind durch eine Kleberschicht 8 mit dem Trägermaterial 7 verbunden. Auf der Außenseite 11 weist das Trägermaterial 7 nur im Bereich der leistenartigen Streifen 9 eine Kleberschicht auf, wodurch das Trägermaterial diffusionsoffen ist. Auf der Innenseite 12 jedoch ist das Trägermaterial 7 vollflächig mit einer Kleberschicht 8 überzogen. Dadurch wird eine Dampfbremse oder Dampfsperre bewirkt. Je nach Wahl des Klebers ist eine größere oder geringere Diffusion möglich. Als Naturkleber kommen hierbei zum Beispiel Wasserglas, Kasein, Knochenleim, Tapetenkleber, Maisstärke, Bitumen oder Liguin in Betracht. Auch andere Eigenschaften wie Brandschutz, Insektenbeständigkeit, Pilzbeständigkeit oder Umweltverträglichkeit können durch entsprechende Wahl des Trägermaterials, der Kleberschicht und der leistenartigen Streifen günstig beeinflußt werden.The strip-
In Fig. 3 und Fig. 4 sind je eine Ausführungsform der Zwischenschicht 4 gezeigt. In Fig. 3 ist eine gerade Pappe als Trägermaterial 7 vorgesehen, diese weist in konstanten Abständen eine längsverlaufende Kleberschicht 8 auf, auf die die leistenartigen Streifen 9 aufgebracht sind. Hierbei sind die leistenartigen Streifen 9 zum Beispiel als einreihiges Granulat 36 ausgebildet.FIGS. 3 and 4 each show an embodiment of the
Es ist auch beispielsweise möglich, daß die leistenartigen Streifen 9 aus anderen Materialien hergestellt sind, zum Beispiel aus aufgeklebten, elastisch durchgehenden Materialstreifen wie Plastik usw. Erfindungsgemäß wird auf die Verwendung von Kork verwiesen, das als Korkgranulat aufgeklebt wird.It is also possible, for example, for the strip-
In Fig. 3 ist gezeigt, daß das Granulat einreihig (36) auf dem Trägermaterial 7 aufgebracht ist.In Fig. 3 it is shown that the granules are applied in one row (36) on the
In Fig. 4 ist ein weiteres Ausführungsbeispiel derart gezeigt, daß das Granulat mehrreihig (37) in einem Streifen 9 angeordnet ist. Hierbei weist auch das Trägermaterial 7 im Bereich der aufgeklebten leistenartigen Streifen einen dachartigen Wulst 38 auf, der durch eine Faltung des Trägermaterials 7, zum Beispiel Pappe, Papier oder kaschiertem Papier, erreicht wird. Es ist z.B. auch möglich, daß mehrreihiges Granulat auf einem ebenen Trägermaterial aufgebracht ist.In Fig. 4 a further embodiment is shown such that the granules are arranged in several rows (37) in a
Neben den in Fig. 3 und Fig. 4 gezeigten Ausführungsbeispielen für das Trägermaterial 7 sind noch weitere Formen möglich. Es ist beispielsweise möglich, als Trägerschicht Wellpappe, Pappen mit Spitz, sinusförmige Wellpappe, Trapezpappe oder Schwalbenschwanzpappe zu verwenden. Die leistenartigen Streifen, hier zum Beispiel das Granulat, werden hierbei auf den erhöhten Abschnitten der Pappe aufgebracht. Für eine bessere mechanische Stabilität und zur Erhöhung der Druckfestigkeit ist es auch möglich, die durch den Spitz gebildeten Ausnehmungen ebenfalls mit Granulat aufzufüllen.In addition to the exemplary embodiments for the
Um eine besonders einfache Herstellung der Wand zu ermöglichen, ist vorgesehen, die Pappe, z.B. auch eine Rillenpappe, werkseitig auf einer Verbundplatte anzuordnen, z.B. anzukleben. Die Verbundplatte bildet dann die Begrenzungsschicht.In order to enable a particularly simple manufacture of the wall, the cardboard, e.g. also a corrugated cardboard, to be arranged at the factory on a composite panel, e.g. to stick. The composite panel then forms the boundary layer.
Die Vorteile der Erfindung lassen sich wie folgt zusammenfassen.The advantages of the invention can be summarized as follows.
Es wird kein Kunststoff mehr in der Wand verarbeitet, wie es bislang für die Verarbeitung von Leerrohren notwendig war. Insbesondere bei der Erstellung von Holzhäusern wird somit ein großer Vorteil erreicht, da nur Cellulosematerialien wie Papier, Pappe, Karton, Altpapier oder Holz usw. verwendet werden. Es wird somit ein großer Beitrag zum Umweltschutz geleistet, da durch die Einstofflichkeit der Wand eine Entsorgung oder Aufbereitung der Wand keine Probleme bereitet. Des weiteren wird durch die vorliegende Erfindung ein vielseitiger, uneingeschränkter, sofort oder auch nachträglich verwendbarer Installationskanal, an jeder Stelle vorbereitet, verfügbar.No more plastic is processed in the wall, as was previously necessary for processing empty pipes. A great advantage is thus achieved in the construction of wooden houses in particular, since only cellulose materials such as paper, cardboard, cardboard, waste paper or wood etc. are used. A large contribution to environmental protection is thus made, since the wall's materiality means that disposal or treatment of the wall poses no problems. Furthermore, the present invention makes available a versatile, unrestricted, immediately or subsequently usable installation channel, prepared at every point.
Dadurch reduzieren sich sowohl die Leitungsvorplanungsaufwendungen wie auch die Leitungsverlegungsaufwendungen. Zur Verwendung der Zwischenschicht in der Wand wird auch eine Entkopplung der Innenverkleidung von dem Rahmen und den Außenbohlen bewirkt. Daraus resultiert eine erhöhte Schalldämmung. Der zusätzlich geschaffene Raum in den Kanälen der Zwischenschicht bewirkt auch eine weitere Kälte- und Wärmedämmung. Das durchgängige Verlegen der Zwischenschicht auf mindestens einer Seite der Wand bewirkt eine weitere Windabdichtung der Wand.This reduces both the pre-planning costs as well as the laying costs. To use the intermediate layer in the wall, a decoupling of the inner cladding from the frame and the outer planks is also effected. This results in increased sound insulation. The additional space created in the channels of the intermediate layer also provides additional cold and heat insulation. The continuous laying of the intermediate layer on at least one side of the wall creates a further wind seal on the wall.
Neben diesen zusätzlichen Vorteilen wiest die vorliegende Erfindung auch einen Kostenvorteil gegenüber den üblich verwendeten Leerrohren auf.In addition to these additional advantages, the present invention also has a cost advantage over the commonly used empty pipes.
Die Erfindung ist nicht nur bei Außenwänden sondern auch bei Innenwänden sowie bei geneigten Wänden, also in ebenen bzw. flachen oder geneigten Decken oder Dächern anwendbar.The invention is applicable not only to outer walls but also to inner walls and to sloping walls, that is to say in flat or flat or sloping ceilings or roofs.
Claims (14)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4332593A DE4332593A1 (en) | 1993-09-24 | 1993-09-24 | wall |
DE4332593 | 1993-09-24 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0645503A2 true EP0645503A2 (en) | 1995-03-29 |
EP0645503A3 EP0645503A3 (en) | 1995-10-18 |
EP0645503B1 EP0645503B1 (en) | 1998-06-03 |
Family
ID=6498561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP94114685A Expired - Lifetime EP0645503B1 (en) | 1993-09-24 | 1994-09-17 | Wall |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP0645503B1 (en) |
AT (1) | ATE166939T1 (en) |
DE (2) | DE4332593A1 (en) |
DK (1) | DK0645503T3 (en) |
ES (1) | ES2117746T3 (en) |
FI (1) | FI944388A (en) |
NO (1) | NO312557B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT13558U1 (en) * | 2013-02-04 | 2014-03-15 | Baumeister Ing Juergen Hoeller Gmbh | Connection structure of a load-bearing straw bale wall to a base plate |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19750668C2 (en) * | 1997-11-15 | 2001-05-03 | Lothar Beer | Prefabricated component as a load-bearing element for fastening components |
DE19963360C2 (en) * | 1999-02-03 | 2003-08-21 | Jochen Leserer | Procedure for the construction of buildings with low K-values |
DE10005155A1 (en) * | 2000-02-07 | 2001-08-23 | Oekologische Bausysteme B I Mo | Supply channel for walls with a vapor barrier |
DE102006045326A1 (en) * | 2006-09-22 | 2008-04-03 | Richard Schmidler | Planking used in wooden house construction comprises parallel boards extending over the length of a post and rail framework and interlocking via profiles running along their long sides parallel to the posts or rails |
DE202006014865U1 (en) * | 2006-09-22 | 2008-02-07 | Schmidler, Richard | Wall element in timber frame construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3318056A (en) * | 1957-03-25 | 1967-05-09 | Cue Thompson & Company | Ventilating wall construction with stud location indicators |
DE1534694B1 (en) * | 1966-08-10 | 1970-01-22 | Asbestzement Ind Gmbh Karl Ado | Building wall with a load-bearing framework and wall shells made of fiber cement panels and an assembly unit for producing the same |
DE3217072A1 (en) * | 1982-05-06 | 1983-11-10 | Gotthard 8359 Ortenburg Sonnleitner | Wooden-log cabin |
US4488390A (en) * | 1982-04-26 | 1984-12-18 | Mulford Cass F | Structural building members and wall incorporating same |
WO1992017657A1 (en) * | 1991-04-01 | 1992-10-15 | Walter Lindal | Wooden frame building construction |
-
1993
- 1993-09-24 DE DE4332593A patent/DE4332593A1/en not_active Withdrawn
-
1994
- 1994-08-19 NO NO19943061A patent/NO312557B1/en unknown
- 1994-09-17 EP EP94114685A patent/EP0645503B1/en not_active Expired - Lifetime
- 1994-09-17 DE DE59406122T patent/DE59406122D1/en not_active Expired - Fee Related
- 1994-09-17 DK DK94114685T patent/DK0645503T3/en active
- 1994-09-17 ES ES94114685T patent/ES2117746T3/en not_active Expired - Lifetime
- 1994-09-17 AT AT94114685T patent/ATE166939T1/en not_active IP Right Cessation
- 1994-09-22 FI FI944388A patent/FI944388A/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3318056A (en) * | 1957-03-25 | 1967-05-09 | Cue Thompson & Company | Ventilating wall construction with stud location indicators |
DE1534694B1 (en) * | 1966-08-10 | 1970-01-22 | Asbestzement Ind Gmbh Karl Ado | Building wall with a load-bearing framework and wall shells made of fiber cement panels and an assembly unit for producing the same |
US4488390A (en) * | 1982-04-26 | 1984-12-18 | Mulford Cass F | Structural building members and wall incorporating same |
DE3217072A1 (en) * | 1982-05-06 | 1983-11-10 | Gotthard 8359 Ortenburg Sonnleitner | Wooden-log cabin |
WO1992017657A1 (en) * | 1991-04-01 | 1992-10-15 | Walter Lindal | Wooden frame building construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT13558U1 (en) * | 2013-02-04 | 2014-03-15 | Baumeister Ing Juergen Hoeller Gmbh | Connection structure of a load-bearing straw bale wall to a base plate |
Also Published As
Publication number | Publication date |
---|---|
FI944388A (en) | 1995-03-25 |
NO943061L (en) | 1995-03-27 |
FI944388A0 (en) | 1994-09-22 |
DK0645503T3 (en) | 1999-03-22 |
EP0645503A3 (en) | 1995-10-18 |
ES2117746T3 (en) | 1998-08-16 |
ATE166939T1 (en) | 1998-06-15 |
DE59406122D1 (en) | 1998-07-09 |
NO943061D0 (en) | 1994-08-19 |
NO312557B1 (en) | 2002-05-27 |
EP0645503B1 (en) | 1998-06-03 |
DE4332593A1 (en) | 1995-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0581269B1 (en) | External insulating and surface treatment system | |
DE69838687T2 (en) | REFILLABLE VENTILATION ROOFING DEVICES AND METHOD FOR THEIR USE | |
DE102004042667A1 (en) | Multilayered building wall | |
DE202016104722U1 (en) | modular house | |
DE2804484A1 (en) | INSULATING WALL COMPONENT FOR A BUILDING | |
DE2125621A1 (en) | Heatable and coolable building structure layer | |
EP0645503B1 (en) | Wall | |
DE3546032A1 (en) | Covering for roofs with a structured roof outer side | |
EP0103097B1 (en) | Cavity wall | |
EP1268952B1 (en) | Wall of a building | |
CH687884A5 (en) | A wooden panel. | |
DE102006028841B4 (en) | Insulating arrangement and method for producing an insulating strip | |
DE3114732A1 (en) | Plaster facade with heat-insulating/cold-insulating panels | |
DE1081205B (en) | Method for insulating and watertight covering of buildings, in particular flat concrete roofs | |
EP1992740B1 (en) | Sound protection element and method for its production | |
DE3021537A1 (en) | Thermal insulation for tall or underground buildings - esp. where profiled polymer sheet forms air cushion between two aluminium sheets or foils | |
DE10030729A1 (en) | Plate element for construction of walls, ceilings or roofs of buildings comprises a concrete and wooden structure provided with an inner layer which consists of a mechanically stable, self-supporting material | |
DE19725040C2 (en) | External wall for residential buildings | |
DE1658907A1 (en) | Insulating sheet | |
DE19601956A1 (en) | Sealing method for prevention of dangerous gas entry into buildings | |
DE2037472C3 (en) | Building in cellular construction with a hexagonal grid | |
EP0219792A2 (en) | Heat-insulating load-bearing construction element | |
DE102022111477A1 (en) | multi-room unit | |
DE10101929A1 (en) | Insulated roof spar system for covered roofs uses individual strips of insulation held tight and gap-free at side by purlin beam mounted and fixed crosswise to spar direction | |
EP4293168A1 (en) | Drywall and method for producing drywall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE DK ES FR GB IE IT LI PT SE |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE DK ES FR GB IE IT LI PT SE |
|
17P | Request for examination filed |
Effective date: 19951118 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
17Q | First examination report despatched |
Effective date: 19971105 |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK ES FR GB IE IT LI PT SE |
|
REF | Corresponds to: |
Ref document number: 166939 Country of ref document: AT Date of ref document: 19980615 Kind code of ref document: T |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: PA ALDO ROEMPLER Ref country code: CH Ref legal event code: EP |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19980603 |
|
REF | Corresponds to: |
Ref document number: 59406122 Country of ref document: DE Date of ref document: 19980709 |
|
ET | Fr: translation filed | ||
ITF | It: translation for a ep patent filed |
Owner name: BUGNION S.P.A. |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2117746 Country of ref document: ES Kind code of ref document: T3 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: GERMAN |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 19980630 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20000908 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20000918 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20000922 Year of fee payment: 7 Ref country code: DK Payment date: 20000922 Year of fee payment: 7 Ref country code: BE Payment date: 20000922 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20000928 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20001006 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20001013 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20001212 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010917 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010917 Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010917 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010918 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010918 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
BERE | Be: lapsed |
Owner name: FRITZ HUBERT Effective date: 20010930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020331 |
|
EUG | Se: european patent has lapsed |
Ref document number: 94114685.4 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20010917 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020531 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: MM4A Free format text: LAPSE DUE TO NON-PAYMENT OF FEES Effective date: 20020331 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20020906 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030917 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20021011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050917 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20051122 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070403 |