EP0308038A1 - Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben - Google Patents

Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben Download PDF

Info

Publication number
EP0308038A1
EP0308038A1 EP88305320A EP88305320A EP0308038A1 EP 0308038 A1 EP0308038 A1 EP 0308038A1 EP 88305320 A EP88305320 A EP 88305320A EP 88305320 A EP88305320 A EP 88305320A EP 0308038 A1 EP0308038 A1 EP 0308038A1
Authority
EP
European Patent Office
Prior art keywords
tube
concrete
tubular
joint
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP88305320A
Other languages
English (en)
French (fr)
Other versions
EP0308038B1 (de
Inventor
Hideyo Shimizu Construction Co. Ltd. Shiokawa
Tomoo Shimizu Construction Co. Ltd. Shokawa
Yutaka Shimizu Construction Co. Ltd. Saito
Yasukazu Shimizu Construction Co. Ltd. Nakamura
Yasushi Shimizu Construction Co. Ltd. Watanabe
Kenichi Shimizu Construction Co. Ltd. Ikeda
Yoshihiro Shimizu Construction Co. Ltd. Orito
Takanori Shimizu Construction Co. Ltd. Sato
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP62234374A external-priority patent/JPS6480638A/ja
Priority claimed from JP63080444A external-priority patent/JPH01256651A/ja
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Publication of EP0308038A1 publication Critical patent/EP0308038A1/de
Application granted granted Critical
Publication of EP0308038B1 publication Critical patent/EP0308038B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/36Columns; Pillars; Struts of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Definitions

  • This invention relates to a concrete filled tube column and a method of constructing the same, the concrete filled tube column constituting, for example, a part of a building structure, such as a column and a pile.
  • FIGS. 1 to 3 show an example of a conventional concrete filled tube column constituting a part of a building structure.
  • This column 20 is made of a steel outer tube 22 within which concrete is filled to form a concrete core 24.
  • the outer tube 22 includes a plurality of tube bodies 26, and a plurality of joint tubes 28. Each joint tube 28 coaxially interconnects two adjoining tube bodies 26.
  • the beams 30 of the building structure are welded to the outer face of each joint tube 28 so that an axial load is transmitted from the beams 30 to the outer tube 22.
  • a pair of vertically spaced parallel inner flanges 32 are circumferentially welded on the inner face of each joint tube 28, and project radially inward into the concrete core 24 to transmit the axial load from the outer tube 22 to the core 24.
  • the axial compressive strength of the concrete core 24 is enhanced by the lateral confinement of the outer tube 22, and thereby it is possible to considerably reduce the cross-sectional area of the column in comparison with the cross-sectional area of a conventional concrete column without an outer tube.
  • the charging of the concrete may be stopped every time the concrete is filled in the outer tube 22 up to the level of one of the inner flanges 32. After the charged concrete is hardened, concrete charging may be resumed until the concrete is filled up to the next inner flange 32.
  • a process of concrete charging considerably lengthens the construction period of the column 20.
  • Another object of the present invention is to provide a concrete filled tube column of which joint portion connected to the beams of the structure, does not have stiffener protruding outward but has excellent mechanical strength.
  • Still another object of the present invention is to provide a method of constructing the concrete filled tube column which prevents the concrete core from developing either air spaces or rock pockets without lengthening the construction period.
  • a further object of the present invention is to provide a method of constructing the concrete filled tube column which reliably maintains the compressive strength of the column.
  • a further object of the present invention is to provide a precast structural tube for use in the concrete filled tube column, which prevents the concrete core from having either air spaces or rock pockets.
  • an aspect of the present invention is directed to a concrete filled tube column which includes: an outer tube connected to beams of the structure so that an axial load is transferred from the beams and applied to the outer tube, the outer tube consisting of a plurality of tube pieces coaxially disposed in series, the tube pieces having substantially equal transverse inner sizes; a concrete core disposed within the outer tube; and a tubular member, coaxially fitting within each of the tube pieces, for transferring the axial load from the outer tube to the concrete core.
  • the tubular member has a constant transverse outer size and a lower end portion.
  • the lower end portion of the tubular member has a first inner peripheral face tapering upward so that the transverse inner size at the lower end of the tubular member is equal to the transverse inner size of each of the tube pieces.
  • the tapering inner peripheral face allows air thereunder to flow upward smoothly therealong, and thus preventing the generation of the air spaces under the tubular member.
  • the tapering inner peripheral face enables the concrete to smoothly move therealong and to come into the space directly under the tubular member. As a result, the generation of air spaces or rock pockets are prevented.
  • the tubular member may include: a radially inwardly projecting first inner flange peripherally mounted on the inner face of each of the tube pieces; and a concrete layer peripherally disposed on the inner face of each of the tube pieces.
  • the concrete layer has a first tubular portion, that is, the lower end portion of the tubular member positioned under the first inner flange in such a manner that the first tubular portion is in direct contact with the entire lower side of the first inner flange.
  • the concrete layer may further include a second tubular portion positioned above the first inner flange in such a manner that the second tubular portion is in direct contact with the entire upper side of the first inner flange.
  • the second tubular portion has a second inner peripheral face tapering downward so that the transverse inner size at the upper end of the tubular member is equal to the transverse inner size of each of the tube pieces.
  • the tubular member may be made of steel and integrally formed with each of the tube pieces.
  • the precast structural tube includes: a tube piece having first and second ends; a radially inwardly projecting first inner flange mounted on the inner face of the tube piece, the first side being closer to the first end of the tube piece than the second side; and a concrete layer peripherally disposed on the inner face of the tube piece.
  • the concrete layer includes a first tubular portion concentric with the tube piece.
  • the first tubular portion has a first inner peripheral face.
  • One of the opposite ends of the first tubular portion is in direct contact with the entire first side of the first inner flange.
  • the first inner peripheral face of the first tubular portion tapers toward the second end of the tube piece so that the transverse inner size at the other end of the first tubular portion is equal to the transverse inner size of the tube pieces.
  • Still another aspect of the present invention is directed to a method of constructing a concrete filled tube column.
  • a plurality of the precast structural tubes are prepared.
  • one of the prepared precast structural tubes is erected with the second end of the tube piece positioned above the first end of the tube piece.
  • Concrete is placed within the erected precast structural tube to form a concrete core within the structural tube.
  • the beams of the structure are connected to the erected precast structural tube.
  • Another precast structural tube is coaxially connected to the upper end of the erected precast structural tube, whereby said another structural tube is erected on the lower adjoining structural tube. Thereafter, the above-mentioned steps from the concrete-placing step to the tube-connecting step are repeated a plurality of times.
  • FIGS. 4 to 19 wherein like reference characters designate corresponding parts throughout several views, and descriptions of the corresponding parts are omitted after once given.
  • FIG. 4 shows a concrete filled tube column according to the present invention, which is erected on a foundation 40 and constitutes a part of a building structure.
  • This column has an outer tube 42 in which concrete is filled to form a concrete core 44.
  • the outer tube 42 consists of a plurality of round steel tube pieces 46 coaxially joined in series.
  • Each of the tube pieces 46 includes a joint tube 48 and a tube piece body 50 which is coaxially joined to the lower end of the joint tube 48.
  • a plurality of bracket members in the form of H-steel bars 52 are welded to the outer face of the joint tube 48 so as to project radially outward from the outer face, and interconnect the joint tube 48 with beams 54 of the building structure.
  • Each H-steel bar 52 consists of upper and lower flange portions 56 and 58 and a web portion 60 interconnecting the upper and lower flange portions 56 and 58 (see FIG. 5).
  • a tubular member 62 fits coaxially in the joint tube 48 and projects radially inward into the concrete core 44 in order to transfer the axial load from the joint tube 48 to the core 44.
  • This tubular member 62 consists of: a pair of vertically spaced parallel inner flanges 64 and 66 circumferentially welded to the inner face of the joint tube 48; and a concrete layer 68 made of a high strength concrete circumferentially disposed on the inner face of the joint tube 48.
  • Each of the inner flanges 64 and 66 is of a disk-like configuration having a central aperture and protrudes radially inward from the inner face of the joint tube 48.
  • the upper inner flange 64 is positioned at the same level as the upper flange portions 56 of the bracket members 52, while the lower inner flange 66 is positioned at the same level as the lower flange portions 58 of the bracket members 52.
  • the concrete layer 68 consists of three cylindrical portions, namely, first, second and third portions 70, 72 and 74.
  • the first portion 70 is positioned under the lower inner flange 66 in such a manner that the upper end of the first portion 70 is in direct contact with the entire lower side of the first inner flange 66.
  • This first portion 70 has an inner peripheral face 71 tapering upward so that the inner diameter at the upper end of the first portion 70 is generally equal to the inner diameter of the lower inner flange 66 and the inner diameter at the lower end of the first portion 70, i.e., the lower end of the tubular member 62 is generally equal to the inner diameter of the joint tube 48.
  • the tapering angle ⁇ 1 of the inner peripheral face 71 with respect to the axis of the joint tube 48 is, preferably, in the range of 45° to 60°.
  • the second portion 72 extends between the upper and lower inner flanges 64 and 66. This second portion 72 has an inner diameter generally equal to the inner diameters of the upper and lower inner flanges 64 and 66.
  • the third portion 74 is positioned above the upper inner flange 64 in such a manner that the lower end of the third portion 74 is in direct contact with the entire upper side of the upper inner flange 64.
  • This third portion 74 has an inner peripheral face 75 tapering downward so that the inner diameter at the lower end of the third portion 74 is generally equal to the inner diameter of the upper inner flange 64 and the inner diameter at the upper end of the third portion 74, i.e., the upper end of the tubular member 62 is generally equal to the inner diameter of the joint tube 48.
  • the tapering angle ⁇ 2 of the inner peripheral face 75 with respect to the axis of the joint tube 48 is, preferably, in the range of 45° to 60°.
  • the high strength concrete forming the concrete layer 68 has a compressive strength higher than the compressive strength of the concrete which forms the concrete core 44.
  • a separating layer 76 is interposed between the concrete core 44 and the inner face of each tube piece 46 so that the core 44 is not bonded to the inner face of each tube piece 46.
  • This separating layer 76 is made of a material such as asphalt, oil, grease, paraffin wax, petrolatum, synthetic resin and paper.
  • the thickness of the separating layer 76 is such that it provides a viscous slip to the concrete core 44. In asphalt, the thickness is about 20 to 100 ⁇ m.
  • the tube piece body 50 consists of upper and lower tubular sections 78 and 80.
  • each of the upper and lower sections 78 and 80 are axially spaced apart from each other so that axial stress reducing means in the form of a ring-shaped gap 82 is formed between the upper and lower sections 78 and 80.
  • the length of each of the upper and lower sections 78 and 80 is such that the gap 82 is positioned at the intermediate portion, that is, the inflection point of moment of the tube piece body 50. Since the separating layer 76 allows axial movement of each tube piece 46 relative to the core 44, the gap 82 varies its axial width W1 when each tube piece 46 is subjected to the axial load which is transmitted from the beams 54 of the building structure. Accordingly, an axial stress which develops in each tube piece 46 is reduced by the gap 82.
  • the concrete core 44 is subjected to considerably more axial stress than the tube pieces 46 since the axial load applied to each tube piece 46 is transmitted to the core 44 via the upper and lower inner flanges 64 and 66 and the concrete layer 68.
  • the outer tube 42 which is under considerably less stress than the core 44, provides the core 44 with sufficient lateral confinement, thereby effectively enhancing the axial compressive strength of the column.
  • FIGS. 6 to 9 show a process for constructing the concrete filled tube column in FIG. 4.
  • a plurality of precast structural tubes 84 are prepared in a factory.
  • One of the precast structural tubes 84 is shown in FIG. 6.
  • This structural tube 84 is manufactured in the following way: Three joint tubes 48 and three tube piece bodies 50 are prepared. Then, as shown in FIG. 7, the H-steel bars 52 are welded to the outer face of each of the prepared joint tubes 48, and the upper and lower inner flanges 64 and 66 are welded to the inner face of each of the prepared joint tubes 48. Thereafter, the concrete layer 68 is formed on the inner face of each joint tube 48 as shown in FIG. 8.
  • This concrete layer 68 is formed by rotating the joint tube 48 slowly about its axis, and by manually spreading a high strength concrete on the inner face of the joint tube 48 so that the tapering inner peripheral faces 71 and 75 are formed respectively at the first and third portions 70 and 74 of the concrete layer 68.
  • reinforcements may be provided along the inner face of the joint tube 48 to facilitate the application of the concrete.
  • the concrete may be placed between the inner surface of the joint tube 48 and a cylindrical formwork which is detachably fixed to the inner face of the joint tube 48.
  • the concrete layer 68 is formed by centrifugal molding.
  • a pair of hollow truncated conical frameworks 86 are detachably fixed to the inner face of the joint tube 48 as shown by a phantom line in FIG. 8.
  • the joint tube 48 is laid on a rotation machine in such a manner that the axis of the joint tube 48 extends substantially horizontally, and then the joint tube 48 is rotated about its axis at a high speed. Subsequently, a predetermined amount of high strength concrete is placed between the formworks 86. As a result, the concrete placed in the joint tube 48 is subjected to a centrifugal force due to the rotation of the tube piece 48, thereby being spread throughout the area between the frameworks 86 and forming the concrete layer 68.
  • a clearance 88 may be formed between each framework 86 and the corresponding inner flange so that the concrete between the inner flanges 64 and 66 flows through the clearance 88 into the frameworks 86 during the rotation of the joint tube 48.
  • through holes may be formed in the inner flanges 64 and 66 so as to allow the concrete to flow into the frameworks 86.
  • the three joint tubes 48 are concentrically welded respectively to the upper ends of the three tube piece bodies 50 to form three tube pieces 46.
  • three tube pieces 46 are coaxially joined in series to form the precast structural tube 84.
  • the concrete layer 68 is formed after the welding of the inner flanges 64 and 66 and the H-steel bars 52 to the joint tube 48, the concrete layer 68 is not subjected to the heat due to the welding, and thereby the deterioration of the concrete layer 68 is prevented.
  • the precast structural tubes manufactured as mentioned above are transported from the factory to a construction site, and there, one of the precast structural tubes 84 is erected on the foundation 40. Subsequently, as shown in FIG. 9, concrete is charged into the erected precast structural tube 84 by using, for example, a tremie 90 (which is a concrete-supplying pipe for conveying concrete) to form the concrete core 44. As the top face of the concrete approaches the inner peripheral face 71 of the concrete layer 68, air around the tapering inner peripheral face 71 flows upward smoothly along the inner peripheral face 71, and therefore the space under the inner peripheral face 71 is completely filled with the charged concrete.
  • a tremie 90 which is a concrete-supplying pipe for conveying concrete
  • each of the tube piece bodies 50 is separated into the upper and lower sections 78 and 80 by using a suitable cutter so that the gap 82 is formed between the upper and lower sections 78 and 80.
  • the beams 54 of the building structure are joined respectively to the H-steel bars 52 of the precast structural tube 84, and then, another precast structural tube 84 is coaxially joined to the upper end of the concrete filled precast structural tube 84. Thereafter, the above-mentioned steps from the concrete-charging step to the precast tube-joining step are repeated predetermined times, which results in the construction of the concrete filled tube column.
  • a precast structural tube having less than or more than three tube pieces 46 may be used for constructing the concrete filled tube column.
  • another first portion 70 and another third portion 74 may be formed respectively under the upper inner flange 64 and above the lower inner flange 66.
  • a tube piece body made of a carbon fiber reinforced concrete may be employed. This tube piece body consists of a hollow cylindrical cement matrix and a high strength carbon filament which is embedded within the cement matrix in such a manner that the carbon filament forms a coil coaxial with the cement matrix.
  • Such a tube piece body is prepared by impregnating the carbon filament with a cement paste including cement particles of a particle size smaller than the diameter of the carbon filament and by forming the carbon filament into a cylindrical configuration.
  • This fiber reinforced concrete tube piece body has a Young's modulus substantially equal to the Young' modulus of the concrete core 44, thereby providing the concrete core 44 with a sufficient lateral confinement even though neither the separating layer 76 nor stress reducing means 82 is disposed on the tube pieces.
  • FIGS. 10 and 11 illustrate another embodiment of the present invention, in which tube pieces 92 are axially spaced apart from one another so that a ring-shaped gap 82 is formed between any two adjoining tube pieces 92.
  • Each of the tube pieces 92 has a tubular member 94 fitting in the upper end section thereof.
  • this tubular member consists of: an inner flange 66 welded at the upper end of the tube piece 92; and a concrete layer 70 positioned under the inner flange 66.
  • a separating layer 76 is interposed between a concrete core 44 and that portion of the inner face of each tube piece 92 where the tubular member 94 is not disposed.
  • a plurality of bracket members 52 are welded to the outer face of each tube piece 92 and interconnecting the tube piece 92 with the beams 54 of the building structure.
  • An essentially ring-shaped spacer 96 is interposed between each tube piece 92 and the adjoining tube piece 92 so that the gap 82 is sealed.
  • This spacer 96 is made of a resilient material such as a rubber and synthetic resin, and is attached to the lower end of each tube piece 92 by an adhesive agent such as an epoxy resin and the like.
  • This concrete filled tube column is constructed as follows: A plurality of precast structural tubes, each having the tube piece 92, the tubular member 94, the bracket members 52, the separating layer 76 and the spacer 96, are manufactured in a factory.
  • a reinforcing member 98 (see FIG. 12) of a cylindrical skeleton construction may be disposed inside the joint portion of the two precast tubes and so that the mechanical strength of the joint portion is enhanced. More specifically, as shown in FIG.
  • the lower half of the reinforcing member 98 is embedded in the concrete core 44 formed in the lower precast tube 100 so that the upper half of the reinforcing member 98 project upward from the upper end of the lower precast tube 100, and then the upper precast tube 102 is coaxially placed on the lower precast tube 100 so that the upper half of the reinforcing member 98 is inserted into the upper precast tube 102. After that, concrete is charged into the upper precast tube 102.
  • each of tube pieces 104 consists of a plurality of tube elements 106 coaxially joined in series.
  • Each of the tube elements 106 is constituted of a joint tube 48 and a steel tube element body 108 coaxially welded to the lower end of the joint tube 48.
  • the joint tube 48 has a plurality of H-steel bars 52 and upper and lower inner flanges 64 and 66.
  • the beams 54 of the building structure are connected to the joint tube 48 via the H-steel bars 52.
  • the tube element body 108 has stress reducing means in the form of a plurality of circumferentially extending grooves 118 formed in its outer face.
  • each groove 118 and the axial width W2 and the radial depth D of each groove 118 are determined according to the design condition of the column.
  • a separating layer 76 is coated on the entire inner face of the tube piece body 108 and the inner face of the joint tube 48 except for that portion of the inner face between the upper and lower inner flanges 64 and 66.
  • Each of the tube piece 104 further has a concrete layer 110 which includes two cylindrical portions, namely, first and second portions 112 and 114, each being coaxial with the tube piece 104.
  • the first portion 112 is positioned under the lower inner flange 66 of the lowermost tube element 106 in such a manner that the upper end of the first portion 112 is in direct contact with the entire lower side of the first inner flange 66 of the lowermost tube element 106.
  • This first portion 112 has an inner peripheral face 71 tapering upward.
  • the second portion 114 extends between the lower inner flange 66 of the lowermost tube element 106 and the upper inner flange 64 of the uppermost tube element 106.
  • This second portion 114 has an inner diameter generally equal to the inner diameters of the upper and lower inner flanges 64 and 66.
  • the upper end portion of the joint tube 48 of the uppermost tube element 106 and lower end portion of the lowermost tube element are not provided with the concrete layer 110.
  • FIGS. 14 and 15 illustrate a process for constructing the concrete filled tube column shown in FIG. 13.
  • a plurality of precast structural tubes 120 are prepared in a factory.
  • One of the precast structural tubes 120 is shown in FIG. 14.
  • This precast structural tube 120 is manufactured as follows: A plurality of joint tubes 48 and a plurality of tube element bodies 108 are prepared.
  • the H-steel bars 52 are welded to the outer face of each of the prepared joint tubes 48, while the upper and lower inner flanges 64 and 66 are welded to the inner face of each of the prepared joint tubes 48.
  • the circumferential grooves 118 are formed at the intermediate portion of each of the prepared tube element bodies 108.
  • the separating material is coated on the inner face of each joint tube 48 and on the inner face of each tube element body 108 to form a separating layer 76.
  • the joint tubes 48 are concentrically welded the upper ends of the tube element bodies 108 respectively to form the tube elements 106, and thus prepared tube elements 106 are coaxially joined in series to form the tube piece 104.
  • the prepared tube piece 104 is provided with the concrete layer 110 by centrifugal molding. More specifically, a hollow truncated conical framework 86 is detachably fixed to the inner face of the lowermost tube element 106 as shown by a phantom line in FIG. 14.
  • the tube piece 104 is laid on a rotation machine, and then the tube piece 104 is rotated about its axis at a high speed. Subsequently, predetermined amount of high strength concrete is placed between the formwork 86 and the upper inner flange 64 of the uppermost tube element 106. As a result, the concrete placed in the tube piece 104 forms the concrete layer 110 as shown in FIG. 14. In the above-mentioned process, since the concrete layer 110 is formed after the welding of the inner flanges 64 and 66 and the H-steel bars 52, the concrete layer 110 is not subjected to the heat due to the welding, and thereby the deterioration of the concrete layer 110 is prevented.
  • the precast structural tubes 120 manufactured as mentioned above are transported from the factory to a construction site, and there, they are coaxially joined one by one in the same manner as described in the first embodiment.
  • the upper and lower inner flanges 64 and 66 between the upper inner flange 64 of the uppermost tube element 106 and lower inner flange 66 of the lowermost tube element 106 are embedded in the one concrete layer 110, it is not necessary to form tapering inner peripheral faces 71 under all the lower inner flanges 66. Therefore, the manufacturing efficiency of the precast structural tubes 120 is enhanced in comparison with that of the precast structural tube 84.
  • the concrete layer 110 is disposed neither at the upper end portion of the joint tube 48 of the uppermost tube element 106 nor at the lower end portion of the lowermost tube element, the concrete layer 110 is not subjected to the heat due to the mutual welding of the precast structural tubes 120.
  • a third portion of the concrete layer may be formed in such a manner that the lower end of the third portion is in direct contact with the entire upper side of the upper inner flange 64 of the uppermost tube element 106 and that the third portion has an inner peripheral face 75 tapering downward.
  • FIG. 16 illustrates a modified form of the concrete filled tube column in FIG. 13, in which each of tube element bodies 122 is made of the aforementioned carbon fiber reinforced concrete.
  • Each tube piece body 122 has upper and lower end portions 124 and 126 having smaller outer diameters than the outer diameter of its central portion.
  • the upper end portion 124 of the tube piece body 122 concentrically fits in the upper adjoining joint tube 48, while the lower end portion 126 of the tube piece body 122 coaxially fits in the lower adjoining joint tube 48.
  • a cylindrical connecting member 128 having an inner flange 66 is coaxially engaged with the lower end of the lowermost tube element body 122 of each tube piece 130, and is welded at its lower end to the uppermost joint tube 48 of the lower adjoining tube piece 130.
  • the uppermost joint tube 48 and the connecting member 128 of the tube piece 130 are fastened to each other by a plurality of axially extending reinforcing bars 132 circumferentially disposed at angular intervals about the axis the tube piece 130, whereby between the uppermost joint tube 48 and the connecting member 128, the other joint tubes 48 and the tube element bodies 122 are fixedly sandwiched.
  • Each of the reinforcing bars 132 has upper and lower threaded end portions and passes through all the inner flanges 64 and 66 of the tube piece 130.
  • the upper threaded end portion of each reinforcing bar 132 projects upward from the upper inner flange 64 of the uppermost joint tube 48 and is secured to the upper side of the upper inner flange 64 by a nut 134.
  • each reinforcing bar 132 projects downward from the inner flange 66 of the connecting member 128 and is secured to the lower side of the inner flange 66 by a nut 136.
  • a first portion 112 of the concrete layer 110 is formed under the inner flange 66 of the connecting member 128, while a second portion 114 of the concrete layer 110 is formed between the inner flange 66 of the connecting member 128 and the upper inner flange 64 of the uppermost joint tube 48.
  • Neither a separating layer nor stress reducing means is disposed on each tube piece 130.
  • a plurality of precast structural tubes 138 are manufactured in a factory.
  • Each precast structural tube 138 is manufactured almost in the same manner as the manner of manufacturing the precast tube 120 except that the joint tubes 48 and the tube element bodies 122 are alternately connected by using both the connecting member 128 and the reinforcing bars 132.
  • the concrete layer 110 is formed by the centrifugal molding after the continuous tube piece 130 is formed, and thereby the reinforcing bars 132 and the nuts 134 and 136 are embedded in the concrete layer 110 when the precast structural tube 138 is completed.
  • each of tube pieces 140 consists of a steel joint tube 142 and a steel tube piece body 50 concentrically welded to the lower end of the joint tube 142.
  • the joint tube 142 has a steel tubular member integrally formed therewith, that is, the joint tube 142 has first and second tapering inner peripheral faces 71 and 75 formed respectively at its lower end upper ends. Therefore, the inner diameters at the upper and lower end of the joint tube 142 are equal to the inner diameter of the tube piece body 50, and the inner diameter of the central portion of the joint tube 142 is considerably smaller than that of the tube piece body 50.
  • Each joint tube 142 is provided with a plurality of bracket members 52, while each tube piece body 50 is coated at its entire inner face with a separating layer 76. Needless to say, stress reducing means 82 is circumferentially disposed on the intermediate portion of each tube piece body 50.
  • the joint tubes 142 are prepared, for example, by centrifugal casting, and therefore have roughened inner faces.
  • the length L1 of each joint tube 142 is longer than sum of the height H1 of each bracket member 52 and the vertical length L2 of each tapering inner peripheral face.
  • precast structural tubes each including a predetermined number of the joint tubes 142 and tube piece bodies 50 alternately joined in series
  • the precast tubes are transported to a construction site, and they are connected one by one in the same manner as the manner of constructing the column in FIG. 4.
  • this concrete filled tube column the generation of both the air spaces and the rock pockets are also prevented, and furthermore, the mechanical strength of each joint tube 142 is enhanced in comparison with the joint tubes of the foregoing embodiment.
  • a deformed reinforcing steel bar 144 may be axially disposed within the concrete core 44 as shown in FIG. 19.
  • tube pieces have circular cross sections
  • tube pieces having polygonal cross sections may be employed in places of the round tube pieces.
  • the same concrete as the concrete constituting the core 44 is used for forming the concrete layers.
  • a plurality of rows of through slots formed in the tube piece may be employed. Such through slots in a row are circumferentially disposed on the tube piece at angular intervals about the axis of the tube piece, and adjacent through slots of two adjacent rows are shifted in their positions in a zigzag manner.
  • a method of constructing a concrete filled tube column which constitutes a part of the framework of a structure comprises the following steps:
  • step (a) may comprise:
  • Step (g) of the method described above may comprise:
  • Step (g) may alternatively comprise:

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Revetment (AREA)
EP88305320A 1987-09-18 1988-06-10 Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben Expired - Lifetime EP0308038B1 (de)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP234374/87 1987-09-18
JP62234374A JPS6480638A (en) 1987-09-18 1987-09-18 Connection structure of packed steel-pipe concrete post
JP63080444A JPH01256651A (ja) 1988-04-01 1988-04-01 鋼管コンクリート柱構造及びその施工方法
JP80444/88 1988-04-01

Publications (2)

Publication Number Publication Date
EP0308038A1 true EP0308038A1 (de) 1989-03-22
EP0308038B1 EP0308038B1 (de) 1993-09-15

Family

ID=26421454

Family Applications (1)

Application Number Title Priority Date Filing Date
EP88305320A Expired - Lifetime EP0308038B1 (de) 1987-09-18 1988-06-10 Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben

Country Status (5)

Country Link
EP (1) EP0308038B1 (de)
KR (1) KR940009460B1 (de)
CN (1) CN1017364B (de)
CA (1) CA1300920C (de)
DE (1) DE3884117T2 (de)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009090301A1 (en) * 2008-01-14 2009-07-23 Rautaruukki Oyj Method for manufacturing a fiber-reinforced concrete column used in the construction industry, and a fiber-reinforced concrete column
CN101324115B (zh) * 2008-07-04 2010-06-02 华南理工大学 钢管再生混合构件
JP2017089234A (ja) * 2015-11-10 2017-05-25 五洋建設株式会社 トレミー管
CN111749346A (zh) * 2020-06-30 2020-10-09 中国航空规划设计研究总院有限公司 一种含预制钢管混凝土芯柱构件的接长节点及施工方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2213831C (en) * 1996-09-09 2001-12-04 Finn A. Rasmussen Modular pillar
WO2011072451A1 (zh) * 2009-12-17 2011-06-23 Li Wenman 快装房屋模块及用其建成的快装房屋
CN102011432B (zh) * 2010-11-24 2012-01-25 同济大学 多边形组合式钢管
CN107246109B (zh) * 2017-03-12 2019-04-16 东北石油大学 实复式钢管混凝土组合柱组合梁构成的框架及其施工方法
CN111005737B (zh) * 2019-12-28 2021-07-23 上海建旗建筑工程设计有限公司 一种隧道形式预应力管幕结构及施工方法
CN113155555B (zh) * 2020-01-23 2023-04-11 天津市政工程设计研究总院有限公司 用于模拟混凝土管廊的镁合金模型的制作方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB287447A (en) * 1927-03-19 1928-07-12 Shojiro Takechi Improvements in method and apparatus for concrete piling
US3963056A (en) * 1974-01-02 1976-06-15 Nippon Concrete Kogyo Kabushiki Kaisha Concrete piles, poles or the like
FR2539782A1 (fr) * 1983-01-22 1984-07-27 Schlaich Joerg Poutre sollicitee en flexion en beton precontraint ou en beton arme
US4588327A (en) * 1984-02-28 1986-05-13 Lin Juei J Precast concrete pile and method of placing it in the ground
EP0195552A2 (de) * 1985-03-05 1986-09-24 SHIMIZU CONSTRUCTION Co. LTD. Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben
EP0218313A2 (de) * 1985-09-24 1987-04-15 SHIMIZU CONSTRUCTION Co. LTD. Mit Baufüllstoff gefüllte Stahlrohrstütze

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB287447A (en) * 1927-03-19 1928-07-12 Shojiro Takechi Improvements in method and apparatus for concrete piling
US3963056A (en) * 1974-01-02 1976-06-15 Nippon Concrete Kogyo Kabushiki Kaisha Concrete piles, poles or the like
FR2539782A1 (fr) * 1983-01-22 1984-07-27 Schlaich Joerg Poutre sollicitee en flexion en beton precontraint ou en beton arme
US4588327A (en) * 1984-02-28 1986-05-13 Lin Juei J Precast concrete pile and method of placing it in the ground
EP0195552A2 (de) * 1985-03-05 1986-09-24 SHIMIZU CONSTRUCTION Co. LTD. Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben
EP0218313A2 (de) * 1985-09-24 1987-04-15 SHIMIZU CONSTRUCTION Co. LTD. Mit Baufüllstoff gefüllte Stahlrohrstütze

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009090301A1 (en) * 2008-01-14 2009-07-23 Rautaruukki Oyj Method for manufacturing a fiber-reinforced concrete column used in the construction industry, and a fiber-reinforced concrete column
CN101324115B (zh) * 2008-07-04 2010-06-02 华南理工大学 钢管再生混合构件
JP2017089234A (ja) * 2015-11-10 2017-05-25 五洋建設株式会社 トレミー管
CN111749346A (zh) * 2020-06-30 2020-10-09 中国航空规划设计研究总院有限公司 一种含预制钢管混凝土芯柱构件的接长节点及施工方法

Also Published As

Publication number Publication date
CN1032375A (zh) 1989-04-12
KR890005360A (ko) 1989-05-13
DE3884117D1 (de) 1993-10-21
KR940009460B1 (ko) 1994-10-13
DE3884117T2 (de) 1994-05-05
CA1300920C (en) 1992-05-19
EP0308038B1 (de) 1993-09-15
CN1017364B (zh) 1992-07-08

Similar Documents

Publication Publication Date Title
US4864797A (en) Concrete filled tube column and method of constructing same
US5012622A (en) Structural filler filled steel tube column
CA1259808A (en) Concrete filled steel tube column and method of constructing same
US4783940A (en) Concrete filled steel tube column and method of constructing same
US5345742A (en) Force transfer body for an anchorage
EP0308038A1 (de) Stütze aus einem mit Beton gefüllten Rohr und Verfahren zur Herstellung derselben
CN111042439A (zh) 一种装配式混凝土建筑结构的预制柱及其梁柱节点
EP0214800B1 (de) Mit Füllstoff gefüllte Stahlrohrsäule
EP0218313B1 (de) Mit Baufüllstoff gefüllte Stahlrohrstütze
JP3700102B2 (ja) 建築物の基礎構造
US20200157759A1 (en) Foundation for a Tower of a Wind-Turbine
CN110725475A (zh) 一种内置通高波纹管的预制柱及其框架结构及施工方法
JP6640298B2 (ja) 既製杭
GB2261456A (en) A shoe for a concrete pile
JPH0674621B2 (ja) 綱管コンクリート柱の継手構造、綱管コンクリート柱及びその施工方法
CN210315969U (zh) 连接节点结构及装配式建筑
JP3320049B2 (ja) 杭の製造方法
JP6407603B2 (ja) 基礎杭と地上構造物との接合構造
JPH01315534A (ja) アンボンド型プレキャスト鋼管コンクリート柱構造
CN210562273U (zh) 一种用于承载装配式电梯的地基
CN214531160U (zh) 一种复合桩柱与地下室梁板的连接构造
JPH0314483Y2 (de)
CN114808928B (zh) 一种装配式桩板结构连接节点及施工方法
CN214498251U (zh) 一种装配式混凝土电梯井筒
CN116464219A (zh) 钢管混凝土加劲混合结构柱、柱梁连接节点及施工方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE FR GB

17P Request for examination filed

Effective date: 19890826

17Q First examination report despatched

Effective date: 19910207

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB

REF Corresponds to:

Ref document number: 3884117

Country of ref document: DE

Date of ref document: 19931021

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19940610

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19940610

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19950228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19950301

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST