EP0152643A1 EP84201689A EP84201689A EP0152643A1 EP 0152643 A1 EP0152643 A1 EP 0152643A1 EP 84201689 A EP84201689 A EP 84201689A EP 84201689 A EP84201689 A EP 84201689A EP 0152643 A1 EP0152643 A1 EP 0152643A1
Authority
EP
European Patent Office
Prior art keywords
chain
auxiliary
machine
excavation
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP84201689A
Other languages
German (de)
French (fr)
Inventor
Fritz Bühler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LES FILS D'AUGUSTE SCHEUCHZER SA
Original Assignee
LES FILS D'AUGUSTE SCHEUCHZER SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LES FILS D'AUGUSTE SCHEUCHZER SA filed Critical LES FILS D'AUGUSTE SCHEUCHZER SA
Publication of EP0152643A1 publication Critical patent/EP0152643A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track

Definitions

  • the present invention relates to a rolling machine for excavating ballast from railways, in particular a stripping machine, provided with an excavation chain having a transverse lower strand which passes below the track, and means for picking up ballast. at the switchgear locations, intended to advance on a service track temporarily replacing the switchgear.
  • Excavation machines are already known, in particular screen-strippers suitable for treating the ballast bed of the tracks, in particular the locations of the track apparatus.
  • One of these machines currently known is provided with an excavation chain which passes under the switchgear and which transports the excavated material on a screen where this material is cleaned and the clean ballast put back on the track; rubbish is loaded onto wagons on a parallel track or at the head of the machine.
  • the lower strand of this excavation chain can be extended manually. As shown in Figure 1, the normal reach of the lower strand is represented by the distance A.
  • the machine must be stopped to widen the lower horizontal strand of the chain excavation passing under the track by means of an additional element with a width B making it possible to excavate a bed width A + B, then with a new element for excavating a width A + 2B etc.
  • the extension of the horizontal strand each time requires an interruption of the operation and represents significant work, considerably reducing the efficiency of the machine.
  • the screener is provided with tracks, which are implemented as soon as the track device is dismantled. It is fitted either with conventional chains, like the machine described above, or with pivoting chains.
  • Such a machine has the disadvantage of having to load the trash on a parallel track. In addition, it is difficult to maintain the digging depth, as well as the inclination of the platform, in a constant manner.
  • the present invention aims to remedy these drawbacks by proposing a machine designed to run on the service track and which makes it possible to easily clean the ballast at the locations of the track apparatus.
  • the invention is characterized by the features of claim 1.
  • this auxiliary excavation device So by this auxiliary excavation device, one can very easily move the ballast which is outside the reach of the normal excavation chain, towards the axis of the track so that it can be taken in charge and mounted to the screen through this normal excavation chain.
  • this auxiliary excavation device can be constituted by an auxiliary chain with continuous digging.
  • this auxiliary excavation device in order to be able to use the machine in any direction for all types of switchgear, it is preferably provide an auxiliary excavation device on each side of the machine. It is also possible to use a mechanical shovel mounted on the machine as an auxiliary excavation device.
  • This machine has the following advantages: First of all, it allows continuous excavation of the entire area of the track apparatus as well as loading of screenings without using the parallel track. By equipping the machine with two auxiliary devices arranged on either side of said machine, it is possible to excavate double track devices in a single pass. Furthermore, with this machine, it is possible to obtain perfect equalization of the ballast recovered during a second pass with the main excavation chain and the auxiliary excavation chains, the superfluous ballast being loaded during the second pass.
  • the machine a stripper-screener, rolls on a service track 1 which was installed on the ballast 2 at the location of the old track device, after dismantling of this, in a manner known per se.
  • the machine which advances in the direction indicated by the arrow F1, comprises a chassis 3 rolling by means of bogies 4.5 on the service track 1.
  • On this chassis 3 is mounted a main excavation chain 6 of a construction normal and known per se, the lower strand 6a of which passes under the service track 1 to excavate the ballast which is then transported, by means of inclined sections, to the top of the excavation chain 6, above the entry opening of a vibrating screen 8.
  • a device 7 makes it possible to adjust the position of the main excavation chain 6.
  • the cleaned ballast falls on a conveyor 9 to be redeposited behind the excavation area.
  • Two 9.9 'conveyors are provided, each located above each rail.
  • Figure 4 there is illustrated how these conveyors 9,9 'can be rotated about a vertical axis in order to adjust their position to allow to drop the cleaned ballast at the desired location.
  • the possible movement of these conveyor 9,9 ′ is illustrated by the double arrows F2.
  • the waste resulting from the screening is taken up by a conveyor 10 which transports it in the direction of advancement of the machine, on another conveyor 11 so that this waste can be loaded on a transport wagon placed at the front of the machine, not illustrated, or be unloaded directly next to the track or on a transport wagon moving on a parallel track, and for this purpose, the conveyor 11 can also rotate around a vertical axis in a known manner.
  • auxiliary excavation chains 12, 12 ′ are provided, provided with shovels 13 and arranged on either side of the chassis 3 and which make it possible to pick up all the ballast located outside the range of the chain. of main excavation 6.
  • FIG. 2 shows how, depending on the shape of the switchgear, the auxiliary chain 12 is put into action and is gradually deployed to cover the entire area which was out of reach of the main excavation chain 6 as the ballast bed widens.
  • This auxiliary chain 12 does not lift the ballast but the excavate by moving it in an essentially horizontal plane towards the axis of the track where it is taken up by the main excavation chain 6.
  • This displaced ballast is illustrated by heap 2a figure 5.
  • the maximum reach of the two auxiliary excavation chains is naturally adapted to the maximum width of the switches and crossings.
  • a cable 22 is provided passing over a deflection wheel 23 and actuated by a cylinder 24 (fig. 4) .
  • This device makes it possible to tow the auxiliary excavation chain 12 in the desired angular position against the resistance force resulting from the advance of the machine and also to adjust the width of the work.
  • FIG. 5 there is shown schematically a cylinder 19 for adjusting the height, respectively the inclination of the auxiliary chain 12 which can rotate according to the double arrow F4 around the horizontal axes 18, 18a.
  • FIG. 4 the elements of the other auxiliary excavation chain 12 ′ have been shown by the same references as those of the first auxiliary excavation chain 12, but with a bonus, namely: the lever 14 ′, the pivot 15 ', the vertical axis 16', the arm 17 '(also visible in Figure 5), the cable 22' and finally the cylinder 24 '.
  • FIGs 8 and 9 there is illustrated a second embodiment of the auxiliary excavation chain 12 comprising shovels 13, the machine always moving in the direction of arrow F1.
  • this auxiliary chain 12 works in an inclined plane, and the shovels 13 do not only push the ballast in a horizontal plane, as in the previous embodiment, but lift it to throw it directly forward or into the shovels of the main excavation chain 6, on the ascending strand of this chain.
  • This auxiliary chain 12 is also mounted in an adjustable manner on the chassis 3 of the machine.
  • the arrow F6 illustrates the direction in which the ballast is picked up by the shovels 13 which throw it onto the ascending strand of the main chain 6 by means of which it is transported towards the screen in the direction of the arrow F7.
  • FIG. 10 and 11 is illustrated a third embodiment of the auxiliary excavation device.
  • a mechanical shovel 30 articulated to the chassis 3 by means of a horizontal articulation axis 35.
  • This mechanical shovel 30 comprises a telescopic tube 31 with an arm 32 extendable, according to the double arrow F9, at the end of which is articulated in a known manner, by means of a system of jacks 33, the shovel 34.
  • a jack 36 articulated on the one hand on the chassis 3 and on the other hand on the telescopic tube 31 makes it possible to tilt the mechanical shovel 30 around the axis 35 upwards or downwards according to arrow F8.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The machine, in particular a ballast scarifier and screening machine, is equipped with a main removal chain (6) whose lower side (6a) passes below the track, and at least one auxiliary removal device (12, 12'), arranged on one side of the frame (3) of the machine in front of the main removal chain (6), for collecting ballast at the sites of switches. This machine advances along a service track provisionally replacing the switch. The device is arranged so as to convey the material to be excavated which is situated outside the range of the main removal chain (6) into the radius of action of the latter; the position of this auxiliary removal device (12, 12'), which may be an removal chain or a mechanical shovel, can be regulated to adjust its radius of action. <IMAGE>

Description

La présente invention concerne une machine roulante pour excaver le ballast des voies ferrées, particulièrement une dégarnisseuse-cribleuse, munie d'une chaine d'excavation ayant un brin inférieur transversal qui passe au-dessous de la voie, et des moyens pour ramasser le ballast aux emplacements des appareils de voie, prévue pour avancer sur une voie de service remplaçant provisoirement l'appareil de voie.The present invention relates to a rolling machine for excavating ballast from railways, in particular a stripping machine, provided with an excavation chain having a transverse lower strand which passes below the track, and means for picking up ballast. at the switchgear locations, intended to advance on a service track temporarily replacing the switchgear.

On connait déjà des machines d'excavation, notamment des dégarnisseuses-cribleuses adaptées à traiter le lit de ballast des voies, en particulier les emplacements des appareils de voie. Une de ces machines actuellement connues, est munie d'une chaîne d'excavation qui passe sous l'appareil de voie et qui transporte le matériel excavé sur un crible où ce matériel est nettoyé et le ballast propre remis sur la voie; les détritus sont chargés sur des wagons se trouvant sur une voie parallèle ou en tête de machine. Pour atteindre le ballast se trouvant en dehors de la largeur du lit normal, dans la zone où l'appareil de voie s'élargit. le brin inférieur de cette chaine d'excavation peut être allongé manuellement. Comme indiqué sur la figure 1, la portée normale du brin inférieur est représentée par la distance A. Au fur et à mesure de l'élargissement de l'appareil de voie, la machine doit être arrêtée pour élargir le brin horizontal inférieur de la chaine d'excavation passant sous la voie au moyen d'un élément supplémentaire d'une largeur B permettant d'excaver une largeur de lit A+B, puis d'un nouvel élément pour excaver une largeur A+2B etc. Le rallongement du brin horizontal exige chaque fois une interruption de l'opération et représente un travail important, diminuant considérablement le rendement de la machine.Excavation machines are already known, in particular screen-strippers suitable for treating the ballast bed of the tracks, in particular the locations of the track apparatus. One of these machines currently known, is provided with an excavation chain which passes under the switchgear and which transports the excavated material on a screen where this material is cleaned and the clean ballast put back on the track; rubbish is loaded onto wagons on a parallel track or at the head of the machine. To reach the ballast outside the width of the bed normal, in the area where the switchway widens. the lower strand of this excavation chain can be extended manually. As shown in Figure 1, the normal reach of the lower strand is represented by the distance A. As the track gauge widens, the machine must be stopped to widen the lower horizontal strand of the chain excavation passing under the track by means of an additional element with a width B making it possible to excavate a bed width A + B, then with a new element for excavating a width A + 2B etc. The extension of the horizontal strand each time requires an interruption of the operation and represents significant work, considerably reducing the efficiency of the machine.

Selon un autre type de machine connu, la cribleuse est munie de chenilles, lesquelles sont mises en oeuvre dès que l'appareil de voie est démonté. Elle est équipée soit de chaines conventionnelles, comme la machine précédemment décrite, soit de chaines pivotantes. Une telle machine présente l'inconvénient de devoir charger les détritus sur une voie parallèle. En outre, il est difficile de maintenir la profondeur de creusage, ainsi que l'inclinaison de la plate-forme, d'une façon constante.According to another known type of machine, the screener is provided with tracks, which are implemented as soon as the track device is dismantled. It is fitted either with conventional chains, like the machine described above, or with pivoting chains. Such a machine has the disadvantage of having to load the trash on a parallel track. In addition, it is difficult to maintain the digging depth, as well as the inclination of the platform, in a constant manner.

En règle générale, lors de l'entretien de l'emplacement des appareils de voie, tels que des aiguillages, des branchements-traversées ou des croisements non seulement on nettoie le ballast, mais on profite de l'occasion pour remplacer ou réviser l'appareil de voie. Pour effectuer ces travaux, il est connu de remplacer l'appareil de voie enlevé par une voie de service, permettant le passage de la dégarnisseuse-cribleuse, avant la pose d'un nouvel appareil de voie. Cette voie de service est installée provisoirement et ses rails ne sont pas maintenus par des traverses mais simplement par des barres d'écartement, ce qui facilite l'enlèvement et la redépose du ballast. Cependant, il existe toujours la difficulté mentionnée précédemment de devoir adapter la largeur du brin inférieur de la chaine d'excavation à la largeur du lit de ballast.As a general rule, during the maintenance of the location of the track devices, such as switches, crossings or crossings, not only do you clean the ballast, but you take the opportunity to replace or revise the switchgear. To carry out this work, it is known to replace the removed track device with a service track, allowing the passage of the screen stripper, before installing a new track device. This service track is provisionally installed and its rails are not held by crosspieces but simply by spreader bars, which facilitates the removal and redeposition of the ballast. However, there is still the previously mentioned difficulty of having to adapt the width of the lower strand of the excavation chain to the width of the ballast bed.

La présente invention vise à remédier à ces inconvénients en proposant une machine prévue pour rouler sur la voie de service et qui permet de nettoyer facilement le ballast aux emplacements des appareils de voie.The present invention aims to remedy these drawbacks by proposing a machine designed to run on the service track and which makes it possible to easily clean the ballast at the locations of the track apparatus.

Dans ce but, l'invention est caractérisée par les caractéristiques de la revendication 1.For this purpose, the invention is characterized by the features of claim 1.

Donc par ce dispositif d'excavation auxiliaire, on peut très facilement déplacer le ballast qui se trouve en dehors de la portée de la chaine d'excavation normale, vers l'axe de la voie afin qu'il puisse être pris en charge et monté vers le crible par cette chaine d'excavation normale.So by this auxiliary excavation device, one can very easily move the ballast which is outside the reach of the normal excavation chain, towards the axis of the track so that it can be taken in charge and mounted to the screen through this normal excavation chain.

De préférence, ce dispositif d'excavation auxiliaire peut être constitué par une chaine auxiliaire à creusage continu. En outre, afin de pouvoir utiliser la machine dans n'importe quelle direction pour tous les types d'appareils de voie, on peut de préférence prévoir un dispositif d'excavation auxiliaire de chaque côté de la machine. Il est également possible d'utiliser une pelle mécanique montée sur la machine comme dispositif d'excavation auxiliaire.Preferably, this auxiliary excavation device can be constituted by an auxiliary chain with continuous digging. In addition, in order to be able to use the machine in any direction for all types of switchgear, it is preferably provide an auxiliary excavation device on each side of the machine. It is also possible to use a mechanical shovel mounted on the machine as an auxiliary excavation device.

Cette machine présente les avantages suivants : Elle permet tout d'abord une excavation continue de toute la zone de l'appareil de voie ainsi que le chargement des criblures sans utilisation de la voie parallèle. En équipant la machine de deux dispositifs auxiliaires disposés de part et d'autre de ladite machine, il est possible d'excaver des appareils de voie doubles en un seul passage. Par ailleurs, avec cette machine, il est possible d'obtenir une égalisation parfaite du ballast récupéré lors d'un deuxième passage avec la chaine d'excavation principale et les chaines d'excavation auxiliaires, le ballast superflu étant chargé lors du deuxième passage.This machine has the following advantages: First of all, it allows continuous excavation of the entire area of the track apparatus as well as loading of screenings without using the parallel track. By equipping the machine with two auxiliary devices arranged on either side of said machine, it is possible to excavate double track devices in a single pass. Furthermore, with this machine, it is possible to obtain perfect equalization of the ballast recovered during a second pass with the main excavation chain and the auxiliary excavation chains, the superfluous ballast being loaded during the second pass.

Dans ce qui suit, l'invention est exposée plus en détail à l'aide des dessins représentant, schématiquement, plusieurs modes d'exécution de la machine.In what follows, the invention is explained in more detail using the drawings showing, schematically, several embodiments of the machine.

  • La figure 1, mentionnée dans l'introduction, illustre schématiquement la manière d'opérer avec une cribleuse connue avec laquelle il faut modifier manuellement au fur et à mesure de l'avance de la machine, la largeur du brin de la chaine d'excavation qui passe en dessous des rails.Figure 1, mentioned in the introduction, schematically illustrates the way of operating with a known screener with which it is necessary to manually change as the machine advances, the width of the strand of the excavation chain passing under the rails.
  • La figure 2 représente une illustration correspondante pour schématiser l'opération selon l'invention.FIG. 2 represents a corresponding illustration to diagram the operation according to the invention.
  • La figure 3 est une vue latérale schématique d'une cribleuse selon l'invention.Figure 3 is a schematic side view of a screen according to the invention.
  • La figure 4 en est une vue de dessus.Figure 4 is a top view.
  • La figure 5 est une vue en coupe selon l'axe V-V de la figure 4 montrant, schématiquement, seulement les éléments nécessaires à la compréhension de l'invention.Figure 5 is a sectional view along the axis V-V of Figure 4 showing, schematically, only the elements necessary for understanding the invention.
  • La figure 6 est une vue de dessus de la figure 5.Figure 6 is a top view of Figure 5.
  • La figure 7 est une vue en coupe selon l'axe VII-VII deFigure 7 is a sectional view along the axis VII-VII of
  • la figure 5 pour illustrer un détail d'exécution.Figure 5 to illustrate a detail of execution.
  • La figure 8 montre schématiquement, en vue de dessus, une deuxième forme d'exécution de la machine avec un autre type de chaine d'excavation.Figure 8 shows schematically, in top view, a second embodiment of the machine with another type of excavation chain.
  • La figure 9 est une vue en coupe schématique selon l'axe IX-IX de la figure 8.FIG. 9 is a schematic sectional view along the axis IX-IX of FIG. 8.
  • La figure 10 est une vue schématique, perpendiculaire au plan de la voie, d'une troisième forme d'exécution de la machine munie d'une pelle mécanique pour le ramassage du ballast latéral.Figure 10 is a schematic view, perpendicular to the track plane, of a third embodiment of the machine provided with a mechanical shovel for picking up the lateral ballast.
  • La figure 11 est une vue de dessus de la figure 10.Figure 11 is a top view of Figure 10.

En se référant aux figures 3 et 4, la machine, une dégarnisseuse-cribleuse, roule sur une voie de service 1 qui a été installée sur le ballast 2 à l'emplacement de l'ancien appareil de voie, après le démontage de celui-ci, d'une manière connue en soi. La machine, qui avance dans la direction indiquée par la flèche F1, comporte un châssis 3 roulant au moyen de boggies 4,5 sur la voie de service 1. Sur ce châssis 3 est montée une chaine d'excavation principale 6 d'une construction normale et connue en soi, dont le brin inférieur 6a passe sous la voie de service 1 pour excaver le ballast lequel est ensuite transporté, par l'intermédiaire de sections inclinées, vers le sommet de la chaine d'excavation 6, au-dessus de l'ouverture d'entrée d'un crible à vibration 8. Un dispositif 7 permet d'ajuster la position de la chaine d'excavation principale 6. Le ballast nettoyé tombe sur un transporteur 9 pour être redéposé derrière la zone d'excavation. Il est prévu deux transporteurs 9,9', situés chacun au-dessus de chaque rail. Sur la figure 4 on a illustré de quelle manière ces transporteurs 9,9' peuvent être tournés autour d'un axe vertical afin de régler leur position pour permettre de faire tomber le ballast nettoyé à l'endroit désiré. Le déplacement possible de ces transporteur 9,9' est illustré par les doubles flèches F2.Referring to Figures 3 and 4, the machine, a stripper-screener, rolls on a service track 1 which was installed on the ballast 2 at the location of the old track device, after dismantling of this, in a manner known per se. The machine, which advances in the direction indicated by the arrow F1, comprises a chassis 3 rolling by means of bogies 4.5 on the service track 1. On this chassis 3 is mounted a main excavation chain 6 of a construction normal and known per se, the lower strand 6a of which passes under the service track 1 to excavate the ballast which is then transported, by means of inclined sections, to the top of the excavation chain 6, above the entry opening of a vibrating screen 8. A device 7 makes it possible to adjust the position of the main excavation chain 6. The cleaned ballast falls on a conveyor 9 to be redeposited behind the excavation area. Two 9.9 'conveyors are provided, each located above each rail. In Figure 4 there is illustrated how these conveyors 9,9 'can be rotated about a vertical axis in order to adjust their position to allow to drop the cleaned ballast at the desired location. The possible movement of these conveyor 9,9 ′ is illustrated by the double arrows F2.

Les déchets résultant du criblage sont repris par un transporteur 10 qui les transporte dans la direction d'avancement de la machine, sur un autre transporteur 11 de telle manière que ces déchets peuvent être chargés sur un wagon de transport disposé à l'avant de la machine, non illustré, ou être déchargés directement à côté de la voie ou sur un wagon de transport se déplaçant sur une voie parallèle, et dans ce but, le transporteur 11 peut également tourner autour d'un axe vertical d'une manière connue.The waste resulting from the screening is taken up by a conveyor 10 which transports it in the direction of advancement of the machine, on another conveyor 11 so that this waste can be loaded on a transport wagon placed at the front of the machine, not illustrated, or be unloaded directly next to the track or on a transport wagon moving on a parallel track, and for this purpose, the conveyor 11 can also rotate around a vertical axis in a known manner.

Selon l'invention, il est prévu deux chaines d'excavation auxiliaires 12,12' munies de pelles 13 et disposées de part et d'autre du châssis 3 et qui permettent de ramasser tout le ballast situé en dehors de la portée de la chaine d'excavation principale 6. Ces chaines d'excavation auxiliaires 12.12' sont mises en action dès que le lit de ballast s'élargit aux emplacements des appareils de voie et sont prévues pour ramasser la totalité du ballast dépassant de la portée A de la chaine d'excavation principale 6, comme illustré dans les figures 2 et 5. La figure 2 montre comment, selon la forme de l'appareil de voie, la chaine auxiliaire 12 est mise en action et est déployée progressivement pour couvrir toute la zone qui était hors de portée de la chaine d'excavation principale 6 au fur et à mesure de l'élargissement du lit de ballast. Cette chaine auxiliaire 12 ne soulève pas le ballast mais l'excave en le déplaçant dans un plan essentiellement horizontal vers l'axe de la voie où il est repris par la chaine d'excavation principale 6. Ce ballast déplacé est illustré par le tas 2a figure 5. La portée maximum des deux chaines d'excavation auxiliaires est naturellement adaptée à la largeur maximum des appareils de voie.According to the invention, two auxiliary excavation chains 12, 12 ′ are provided, provided with shovels 13 and arranged on either side of the chassis 3 and which make it possible to pick up all the ballast located outside the range of the chain. of main excavation 6. These auxiliary excavation chains 12.12 'are put into action as soon as the ballast bed widens at the locations of the track equipment and are provided to collect all of the ballast protruding from the range A of the chain main excavation 6, as illustrated in FIGS. 2 and 5. FIG. 2 shows how, depending on the shape of the switchgear, the auxiliary chain 12 is put into action and is gradually deployed to cover the entire area which was out of reach of the main excavation chain 6 as the ballast bed widens. This auxiliary chain 12 does not lift the ballast but the excavate by moving it in an essentially horizontal plane towards the axis of the track where it is taken up by the main excavation chain 6. This displaced ballast is illustrated by heap 2a figure 5. The maximum reach of the two auxiliary excavation chains is naturally adapted to the maximum width of the switches and crossings.

En nous référant aux figures 4, 5, 6 et 7 plus particulièrement, nous allons maintenant décrire d'une manière plus détaillée les chaines d'excavation auxiliaires 12,12' qui sont disposées dans un plan perpendiculaire à la voie mais qui travaillent dans un plan horizontal grâce à des pelles 13 illustrées figure 7.With particular reference to FIGS. 4, 5, 6 and 7, we will now describe in a more detailed manner the auxiliary excavation chains 12, 12 ′ which are arranged in a plane perpendicular to the track but which work in a horizontal plane using shovels 13 illustrated in FIG. 7.

Nous ne décrirons ci-après qu'une chaine d'excavation auxiliaire 12 étant entendu que l'autre chaine d'excavation auxiliaire 12' lui est symétrique et comporte les mêmes éléments, comme illustré figure 4.We will only describe below an auxiliary excavation chain 12, it being understood that the other auxiliary excavation chain 12 ′ is symmetrical to it and has the same elements, as illustrated in FIG. 4.

Sur le châssis 3 sont articulés autour d'un axe 16 vertical deux bras 17,17a superposés, entre les extrémités desquels est montée une pièce formant pivot 15 qui tourne autour d'un axe vertical. Sur cette dernière sont articulés deux leviers 14, 14a auxquels la chaine d'excavation auxiliaire 12 est suspendue. Les deux leviers 14, 14a sont chacun articulés sur un axe horizontal 18, 18a porté par le pivot 15. Sur la figure 5, on a illustré la manière dont est fixée la chaine d'excavation auxiliaire 12 aux leviers 14.14a. à savoir pour le bras 14, par l'intermédiaire d'un pivot 21 porté par une projection 20 solidaire du carter de la chaine 12, et pour le bras 14a par l'intermédiaire d'une articulation analogue.On the chassis 3 are articulated around a vertical axis 16 two superimposed arms 17, 17a, between the ends of which is mounted a part forming a pivot 15 which rotates around a vertical axis. On the latter are articulated two levers 14, 14a to which the auxiliary excavation chain 12 is suspended. The two levers 14, 14a are each articulated on a horizontal axis 18, 18a carried by the pivot 15. In FIG. 5, the manner in which the auxiliary excavation chain 12 is fixed to the levers 14.14a. namely for the arm 14, by means of a pivot 21 carried by a projection 20 secured to the casing of the chain 12, and for the arm 14a by means of a similar articulation.

Pour faire tourner la chaine d'excavation auxiliaire 12 autour du pivot 15, suivant la double flèche F3 (fig.6), il est prévu un câble 22 passant sur une roue de renvoi 23 et actionné par un cylindre 24 (fig.4). Ce dispositif permet de tracter la chaine d'excavation auxiliaire 12 dans la position angulaire voulue à l'encontre de la force de résistance résultant de l'avance de la machine et également de régler la largeur du travail.To rotate the auxiliary excavation chain 12 around the pivot 15, along the double arrow F3 (fig. 6), a cable 22 is provided passing over a deflection wheel 23 and actuated by a cylinder 24 (fig. 4) . This device makes it possible to tow the auxiliary excavation chain 12 in the desired angular position against the resistance force resulting from the advance of the machine and also to adjust the width of the work.

De cette manière, il est possible d'une part de régler la largeur maximum de la chaine d'excavation auxiliaire 12 en faisant basculer les bras 17 autour de l'axe 16 et d'autre part de faire varier la largeur effective de la chaine auxiliaire 12 pendant le travail en faisant basculer celle-ci autour du pivot vertical 15. En reprenant la figure 2, on peut voir deux positions angulaires possibles de la chaine d'excavation auxiliaire 12 après basculement autour du pivot 15.In this way, it is possible on the one hand to adjust the maximum width of the auxiliary excavation chain 12 by tilting the arms 17 around the axis 16 and, on the other hand, varying the effective width of the auxiliary chain 12 during work by tilting the latter around the vertical pivot 15. Taking again figure 2, we can see two possible angular positions of the auxiliary excavation chain 12 after tilting around the pivot 15.

Sur la figure 5 on a montré d'une manière schématique un vérin 19 permettant d'ajuster la hauteur, respectivement l'inclinaison de la chaine auxiliaire 12 qui peut tourner selon la double flèche F4 autour des axes horizontaux 18, 18a.In Figure 5 there is shown schematically a cylinder 19 for adjusting the height, respectively the inclination of the auxiliary chain 12 which can rotate according to the double arrow F4 around the horizontal axes 18, 18a.

Sur la figure 4, on a montré les éléments de l'autre chaîne d'excavation auxiliaire 12' par les mêmes références que celles de la première chaine d'excavation auxiliaire 12, mais avec un prime, à savoir: le levier 14', le pivot 15', l'axe vertical 16', le bras 17' (visible également sur la figure 5), le cable 22' et enfin le cylindre 24'.In FIG. 4, the elements of the other auxiliary excavation chain 12 ′ have been shown by the same references as those of the first auxiliary excavation chain 12, but with a bonus, namely: the lever 14 ′, the pivot 15 ', the vertical axis 16', the arm 17 '(also visible in Figure 5), the cable 22' and finally the cylinder 24 '.

Sur les figures 8 et 9, on a illustré une deuxième forme d'exécution de la chaine d'excavation auxiliaire 12 comportant des pelles 13, la machine se déplaçant toujours dans le sens de la flèche F1. Dans ce cas, cette chaîne auxiliaire 12 travaille dans un plan incliné, et les pelles 13 ne font pas que pousser le ballast dans un plan horizontal, comme dans la forme d'exécution précédente, mais le soulèvent pour le jeter directement en avant ou dans les pelles de la chaine d'excavation principale 6, sur le brin ascendant de cette chaîne. Cette chaine auxiliaire 12 est également montée d'une manière réglable sur le châssis 3 de la machine. Par la flèche F6 on a illustré le sens de ramassage du ballast par les pelles 13 qui le jettent sur le brin ascendant de la chaine principale 6 au moyen duquel il est transporté vers le crible dans le sens de la flèche F7.In Figures 8 and 9, there is illustrated a second embodiment of the auxiliary excavation chain 12 comprising shovels 13, the machine always moving in the direction of arrow F1. In this case, this auxiliary chain 12 works in an inclined plane, and the shovels 13 do not only push the ballast in a horizontal plane, as in the previous embodiment, but lift it to throw it directly forward or into the shovels of the main excavation chain 6, on the ascending strand of this chain. This auxiliary chain 12 is also mounted in an adjustable manner on the chassis 3 of the machine. The arrow F6 illustrates the direction in which the ballast is picked up by the shovels 13 which throw it onto the ascending strand of the main chain 6 by means of which it is transported towards the screen in the direction of the arrow F7.

Sur les figures 10 et 11 est illustrée une troisième forme d'exécution du dispositif d'excavation auxiliaire. Au lieu d'une chaine excavatrice travaillant de façon continue, il est prévu une pelle mécanique 30 articulée au châssis 3 par l'intermédiaire d'un axe d'articulation horizontal 35. Cette pelle mécanique 30 comprend un tube télescopique 31 avec un bras 32 extensible, selon la double flèche F9, à l'extrémité duquel est articulée d'une manière connue, par l'intermédiaire d'un système de vérins 33, la pelle 34. Un vérin 36 articulé d'une part sur le châssis 3 et d'autre part sur le tube télescopique 31 permet de basculer la pelle mécanique 30 autour de l'axe 35 vers le haut ou vers le bas selon la flèche F8.In Figures 10 and 11 is illustrated a third embodiment of the auxiliary excavation device. Instead of an excavator chain working continuously, there is provided a mechanical shovel 30 articulated to the chassis 3 by means of a horizontal articulation axis 35. This mechanical shovel 30 comprises a telescopic tube 31 with an arm 32 extendable, according to the double arrow F9, at the end of which is articulated in a known manner, by means of a system of jacks 33, the shovel 34. A jack 36 articulated on the one hand on the chassis 3 and on the other hand on the telescopic tube 31 makes it possible to tilt the mechanical shovel 30 around the axis 35 upwards or downwards according to arrow F8.

Donc, pendant le travail, partant de la position illustrée figure 10 avec la pelle en position basse, celle-ci creuse et déplace le ballast vers l'axe de la voie en rentrant le tube 32, puis elle est basculée vers le haut, déployée de nouveau vers l'extérieur et ensuite basculée vers le bas pour recommencer l'opération.So, during work, starting from the position illustrated in Figure 10 with the shovel in the low position, it digs and moves the ballast towards the axis of the track by returning the tube 32, then it is tilted upwards, deployed again outwards and then tilted down to start the operation again.

L'invention n'est, bien entendu, pas limitée aux formes d'exécution décrites, mais laisse la possibilité de prévoir de nombreuses variantes.The invention is, of course, not limited to the embodiments described, but leaves the possibility of providing numerous variants.

Claims (5)

1. Machine roulante pour excaver le ballast des voies ferrées, particulièrement une dégarnisseuse-cribleuse, munie d'une chaine d'excavation ayant un brin inférieur transversal qui passe au-dessous de la voie, et de moyens pour ramasser le ballast aux emplacements des appareils de voie, prévue pour avancer sur une voie de service remplaçant provisoirement l'appareil de voie, caractérisée par le fait qu'elle comprend au moins un dispositif d'excavation auxiliaire (12,12';30), disposé sur un côté du châssis (3) de la machine, devant ladite chaîne d'excavation (6) et adapté à transporter le matériel à excaver se trouvant en dehors de la portée de ladite chaine d'excavation (6) dans le rayon d'action de cette dernière, la position de ce dispositif auxiliaire étant réglable pour ajuster son rayon d'action.1. Rolling machine for excavating ballast from railways, particularly a screen-stripper, provided with an excavation chain having a transverse lower strand which passes below the track, and means for picking up ballast at the locations of switchgear, intended to advance on a service track temporarily replacing the switchgear, characterized in that it comprises at least one auxiliary excavation device (12,12 '; 30), arranged on one side of the chassis (3) of the machine, in front of said excavation chain (6) and adapted to transport the material to be excavated being outside the scope of said excavation chain (6) within the radius of action of the latter , the position of this auxiliary device being adjustable to adjust its range of action. 2. Machine selon la revendication 1, caractérisée par le fait que le dispositif d'excavation auxiliaire est constitué par une chaine auxiliaire (12,12') à creusage continu, qui est basculable autour d'un axe vertical (15).2. Machine according to claim 1, characterized in that the auxiliary excavation device is constituted by an auxiliary chain (12,12 ') with continuous digging, which is tiltable around a vertical axis (15). 3. Machine selon la revendication 1, caractérisée par le fait que le dispositif d'excavation auxiliaire est constitué par une pelle mécanique (30).3. Machine according to claim 1, characterized in that the auxiliary excavation device is constituted by a mechanical shovel (30). 4. Machine selon l'une des revendications 1 à 3, caractérisée par le fait qu'il est prévu deux dispositifs d'excavation auxiliaires, disposés de part et d'autre du châssis (3).4. Machine according to one of claims 1 to 3, characterized in that there are provided two auxiliary excavation devices, arranged on either side of the frame (3). 5. Machine selon l'une des revendications 1 à 4, caractérisée par le fait que le dispositif d'excavation auxiliaire est réglable en hauteur et/ou en inclinaison.5. Machine according to one of claims 1 to 4, characterized in that the auxiliary excavation device is adjustable in height and / or in inclination.
EP84201689A 1984-01-05 1984-11-21 Travelling machine for removing ballast from rail tracks Withdrawn EP0152643A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH3784A CH655333A5 (en) 1984-01-05 1984-01-05 ROLLING MACHINE FOR EXCAVATING THE BALLAST OF RAILWAYS.
CH37/84 1984-01-05

Publications (1)

Publication Number Publication Date
EP0152643A1 true EP0152643A1 (en) 1985-08-28

Family

ID=4177897

Family Applications (1)

Application Number Title Priority Date Filing Date
EP84201689A Withdrawn EP0152643A1 (en) 1984-01-05 1984-11-21 Travelling machine for removing ballast from rail tracks

Country Status (4)

Country Link
EP (1) EP0152643A1 (en)
CH (1) CH655333A5 (en)
DD (1) DD228317A5 (en)
ES (1) ES539242A0 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516984B1 (en) 2000-03-17 2003-02-11 Jac Products, Inc. Vehicle article carrier for supporting articles adjacent a liftgate of a vehicle
US6729513B2 (en) 2001-10-29 2004-05-04 Jac Products Inc. Vehicle article carrier having telescopically extendable article carrier portion
EP1475478A1 (en) * 2003-05-06 2004-11-10 Scheuchzer S.A. Method for treating railway ballast
WO2009132745A1 (en) * 2008-04-28 2009-11-05 Franz Plasser Bahnbaumaschinen- Industriegesellschaft Mbh Method for the removal of ballast from a track
WO2012069127A1 (en) * 2010-11-25 2012-05-31 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Method and machine for cleaning a ballast bed of a track
WO2017129345A1 (en) * 2016-01-29 2017-08-03 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Machine with ballast receiving device
US11718963B2 (en) 2017-03-17 2023-08-08 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Machine and method for profiling and distributing ballast of a track

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1242520A (en) * 1958-12-23 1960-09-30 Improvements to machines for treating railroad ballast
US3380180A (en) * 1965-05-10 1968-04-30 Speno International Ballast cleaning apparatus
FR2141681A1 (en) * 1971-06-02 1973-01-26 Matisa Materiel Ind Sa
FR2330804A1 (en) * 1975-11-10 1977-06-03 Knape Fritz PROCEDURE FOR REMOVING STONE FROM THE RAILWAY BALLAST
FR2470189A1 (en) * 1979-11-23 1981-05-29 Plasser Bahnbaumasch Franz MOBILE MACHINE FOR CLEANING A BALLAST BED, INCLUDING LEVELING AND COMPACTION DEVICES, AND METHOD FOR TREATING A BALLAST BED USING SUCH A MACHINE

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1242520A (en) * 1958-12-23 1960-09-30 Improvements to machines for treating railroad ballast
US3380180A (en) * 1965-05-10 1968-04-30 Speno International Ballast cleaning apparatus
FR2141681A1 (en) * 1971-06-02 1973-01-26 Matisa Materiel Ind Sa
FR2330804A1 (en) * 1975-11-10 1977-06-03 Knape Fritz PROCEDURE FOR REMOVING STONE FROM THE RAILWAY BALLAST
FR2470189A1 (en) * 1979-11-23 1981-05-29 Plasser Bahnbaumasch Franz MOBILE MACHINE FOR CLEANING A BALLAST BED, INCLUDING LEVELING AND COMPACTION DEVICES, AND METHOD FOR TREATING A BALLAST BED USING SUCH A MACHINE

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516984B1 (en) 2000-03-17 2003-02-11 Jac Products, Inc. Vehicle article carrier for supporting articles adjacent a liftgate of a vehicle
US6729513B2 (en) 2001-10-29 2004-05-04 Jac Products Inc. Vehicle article carrier having telescopically extendable article carrier portion
EP1475478A1 (en) * 2003-05-06 2004-11-10 Scheuchzer S.A. Method for treating railway ballast
CH696884A5 (en) * 2003-05-06 2008-01-15 Scheuchzer Sa A method of treating ballast of a railway track.
WO2009132745A1 (en) * 2008-04-28 2009-11-05 Franz Plasser Bahnbaumaschinen- Industriegesellschaft Mbh Method for the removal of ballast from a track
WO2012069127A1 (en) * 2010-11-25 2012-05-31 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Method and machine for cleaning a ballast bed of a track
US9157194B2 (en) 2010-11-25 2015-10-13 Plasser & Theurer, Export von Bahnbaumaschinen, Gesellschaft m.b.H. Machine for cleaning a ballast bed of a track
EA024913B1 (en) * 2010-11-25 2016-11-30 Франц Плассер Банбаумашинен-Индустригезельшафт Мбх Method and machine for cleaning a ballast bed of a track
WO2017129345A1 (en) * 2016-01-29 2017-08-03 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Machine with ballast receiving device
CN108495965A (en) * 2016-01-29 2018-09-04 普拉塞-陶依尔铁路出口股份有限公司 Machinery with ballast collecting device
US10753048B2 (en) 2016-01-29 2020-08-25 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Machine with ballast receiving device
EA036751B1 (en) * 2016-01-29 2020-12-16 Плассер Энд Тойрер Экспорт Фон Банбаумашинен Гезельшафт М.Б.Х. Track machine with ballast receiving device
US11718963B2 (en) 2017-03-17 2023-08-08 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Machine and method for profiling and distributing ballast of a track

Also Published As

Publication number Publication date
ES8608084A1 (en) 1985-11-01
DD228317A5 (en) 1985-10-09
ES539242A0 (en) 1985-11-01
CH655333A5 (en) 1986-04-15

Similar Documents

Publication Publication Date Title
EP0251876B1 (en) Mechanized assembly for digging a trench and laying elongate objects
CA2224443A1 (en) Snow blower swivelling blade
EP2239377A1 (en) Motorized machine for digging a trench in the soil and for depositing in said trench long objects
CA2370486C (en) Motorized road vehicle for digging trenches in the ground
EP1194031A2 (en) Device and method for treating the soil by aeration
EP0152643A1 (en) Travelling machine for removing ballast from rail tracks
CH657649A5 (en) Railway site machine for the at least partial repair of a railway track portion
FR2578903A1 (en) Excavating machine for hard ground
EP0505240B1 (en) Device for placing and replacing rail components and procedure for using this device
FR2672320A1 (en) Improvements to machines for cleaning beaches
FR2777024A1 (en) MACHINE COMPRISING A DEVICE FOR CLEANING CROSS-CROSS BOXES
FR2504162A1 (en) ROLLING INSTALLATION FOR CARRYING OUT A PROTECTIVE LAYER EXTENDING BETWEEN THE TRACK BEARING AND THE BALLAST PIERRAILLE BED OF A RAILWAY
FR2718169A1 (en) Machine for making or repairing verges and adjacent ditches at sides of roads
EP0197833A1 (en) Public works machine such as a scraper-loader
EP0085790B1 (en) Railway track reconditioning train
EP0059800B1 (en) Machine for renewing railway tracks, comprising a plough
FR2664919A1 (en) MOTOR VEHICLE, ESPECIALLY A WHEEL OR TRACKED VEHICLE, FOR THE TRANSPORT AND PLACEMENT OF A DEMONTABLE BRIDGE.
FR2551781A1 (en) Method and apparatus for the continuous re-forming of railway ballast
FR3121691A1 (en) Trencher equipped with a digging device and an adjustable transverse belt.
BE825875A (en) DEVICE FOR FLOOR LEVELING
EP0162750A1 (en) Method and apparatus for renewing railway switches
CH629556A5 (en) Device for removing snow
FR2554141A1 (en) Machine for cleaning beach sand
FR2588023A1 (en) Method and machine for clearing the ballast from a railway track
FR2676691A1 (en) Self-propelled vehicle for carrying out handling work

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LI NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19860429

RIN1 Information on inventor provided before grant (corrected)

Inventor name: BUEHLER, FRITZ