EP0133630A1 - Démolition pièce par pièce de cheminées - Google Patents

Démolition pièce par pièce de cheminées Download PDF

Info

Publication number
EP0133630A1
EP0133630A1 EP83304559A EP83304559A EP0133630A1 EP 0133630 A1 EP0133630 A1 EP 0133630A1 EP 83304559 A EP83304559 A EP 83304559A EP 83304559 A EP83304559 A EP 83304559A EP 0133630 A1 EP0133630 A1 EP 0133630A1
Authority
EP
European Patent Office
Prior art keywords
chimney
jacks
rig
feet
arms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
EP83304559A
Other languages
German (de)
English (en)
Inventor
William Brown Black
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
W B BLACK AND SONS HOLDINGS Ltd
Original Assignee
W B BLACK AND SONS HOLDINGS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by W B BLACK AND SONS HOLDINGS Ltd filed Critical W B BLACK AND SONS HOLDINGS Ltd
Priority to EP83304559A priority Critical patent/EP0133630A1/fr
Publication of EP0133630A1 publication Critical patent/EP0133630A1/fr
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G2023/087Wrecking of buildings of chimneys, smoke stacks or the like

Definitions

  • This invention relates to improvements in the piecemeal demolition of chimneys made of concrete, brick, steel, etc. ,
  • An object of the present invention is to obviate or mitigate the above disadvantages.
  • a rig for use in the piecemeal demolition of chimneys comprising a spider having a plurality of radiating arms, a jack mounted on each arm and adjustable therealong and having a supporting foot under the arm, and a substantially annular platform underslung from the spider.
  • a method of piecemeal demolition of chimneys comprising the steps of either erecting or placing on the top of a chimney the above rig with the spider supported, via the jacks, on the rim of the chimney and with the substantially annular platform adjacent either the outside or the inside of the wall of the chimney, removing the fabric of the chimney from under the feet of alternate ones of the jacks so as to form a castellated upper edge of the chimney, lowering the feet of the alternate jacks into supporting contact with the newly presented surfaces thereunder, removing the fabric of the chimney from under the feet of the intermediate ones of the jacks, lowering the feet of the intermediate jacks into supporting contact with the newly presented surface thereunder, and repeating the steps of removing the fabric of the chimney and lowering the feet of the jacks.
  • a chimney 1 is surmounted by a rig comprising a spider having twelve radiating arms 2 interconnected at their outer ends, and each in the form of an zaluminium lattice-work box beam.
  • the arms 2 support at their outer ends twelve modular arch members 3, each module being also in the form an aluminium lattice-work box beam, the arch members 3 forming a framework of a dome or igloo-type of structure.
  • Each arm 2 has a hydraulic jack 4 adjustable therealong with a supporting foot 5 in contact with the rim of the chimney.
  • Underslung from the arms 2 via substructures 6 at the outer ends of the arms is a substantially annular sectional platform 7, the sections of which are designed to surround and be contiguous with the outside of the chimney wall.
  • the sections of the platform 7 are slidable within the substructures 6 to accomodate the taper in the outside of the chimney wall.
  • an adjustable barrier or membrane 8 is underslung from the arms 2 via substructures 9.
  • Flexible edge seals may be provided for the sections of the platform 7 and the barrier or membrane 8 to contact the outside and inside of the chimney wall.
  • Communication between the platform 7 and the ground is by means of a cage 10 which can run up and down a modular lattice-work mast 11 secured to the outside of the chimney wall by outriggers 12.
  • the cage 10 may be driven up and down the mast 1 I by a rack-and-pinion system.
  • the rig is covered by a tough flexible plastics cover (not shown) which extends down to the platform 7, handraild being provided within the cover for the safety of personnel.
  • the rig may be either erected or placed substantially as a whole on the rim of a chimney by using a helicopter or a hoist mounted on top of the chimney to lift either parts or the whole of the rig as appropriate.
  • the operatives work from the platform 7 and remove the fabric of the chimney from under the feet 5 of alternate ones of the jacks 4 so as to form a castellated upper edge of the chimney. Then the feet 5 of the alternate jacks 4 are lowered into supporting contact with the newly presented surfaces thereunder and the fabric of the chimney is removed from under the feet 5 of the intermediate jacks 4 and these feet 5 are lowered into supporting contact with the newly presented surface thereunder.
  • the taper of the chimney is accomodated by adjustment of the jacks 4 along the arms 2, adjustment of the sections of the platform 7 and adjustment of the barrier or membrane 8.
  • the removed fabric of the chimney is prevented from falling into the chimney by the barrier or membrane 8 and is disposed of via the cage 10.
  • Some chimneys have stainless steel liners spaced inwardly from the inside of the chimney proper.
  • an annular platform is underslung from the arms of the spider via substructures inboard from the outer-ends of the arms to enter such space, steps being provided leading to the underslung platform from an upper and outer annular' platform on the outer ends of the arms of the spider and extending beyond the edge of the chimney so that a hoist arrangement can be fitted in a similar manner to that shown in the drawing.
  • a source of power supply and facilities are provided within the covered rig to maintain controlled working conditions and afford service and messing facilities for the operatives.
  • Service tappings are available at suitable voltage from the power supply for tools, general illumination and aircraft warning lights mounted atop the rig, thus allowing the main chimney lights to be removed from the chimney prior to commencement of demolition.
  • the rig thus enables demolition work to be continued irrespective of weather conditions.
  • wire ropes may be provided from the rig to the ground and be adjustably tensioned from the rig.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
EP83304559A 1983-08-05 1983-08-05 Démolition pièce par pièce de cheminées Ceased EP0133630A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP83304559A EP0133630A1 (fr) 1983-08-05 1983-08-05 Démolition pièce par pièce de cheminées

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP83304559A EP0133630A1 (fr) 1983-08-05 1983-08-05 Démolition pièce par pièce de cheminées

Publications (1)

Publication Number Publication Date
EP0133630A1 true EP0133630A1 (fr) 1985-03-06

Family

ID=8191233

Family Applications (1)

Application Number Title Priority Date Filing Date
EP83304559A Ceased EP0133630A1 (fr) 1983-08-05 1983-08-05 Démolition pièce par pièce de cheminées

Country Status (1)

Country Link
EP (1) EP0133630A1 (fr)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0320855A2 (fr) * 1987-12-15 1989-06-21 Przedsiebiorstwo Montazu I Dostaw Piecow Tunelowych Bipropiec Dispositif de démolition de cheminées, en particulier des cheminées convergentes
EP0369938A1 (fr) * 1988-10-25 1990-05-23 Otto Näf Ag Méthode et dispositif de démolition de murs
EP0370280A1 (fr) * 1988-11-24 1990-05-30 ROBOTA GMBH Feuerungs- und Schornsteinbau Dispositif de démolition de cheminées
US7653050B2 (en) 2002-02-05 2010-01-26 Nortel Networks Limited Technique for implementing a multi-service packet and optical/TDM virtual private cross-connect
JP2015031082A (ja) * 2013-08-05 2015-02-16 Jfeシビル株式会社 筒状構造物の外径変化に応じて位置調整可能な昇降機支持架台
RU2753332C1 (ru) * 2021-02-19 2021-08-13 Александр Васильевич Сало Машина для демонтажа дымовых труб

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2710418A (en) * 1952-06-04 1955-06-14 Ayers B Putnam Power scaffolds
GB1063027A (en) * 1963-05-10 1967-03-22 Siemens Bauunion Gmbh Improvements in and relating to sliding scaffolding for shuttering
GB1141015A (en) * 1965-04-10 1969-01-22 Gleitschnellbau Gmbh Slidable shuttering
US4068895A (en) * 1976-07-01 1978-01-17 O. W. Reese, Inc. Demolition machine for delining a furnace

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2710418A (en) * 1952-06-04 1955-06-14 Ayers B Putnam Power scaffolds
GB1063027A (en) * 1963-05-10 1967-03-22 Siemens Bauunion Gmbh Improvements in and relating to sliding scaffolding for shuttering
GB1141015A (en) * 1965-04-10 1969-01-22 Gleitschnellbau Gmbh Slidable shuttering
US4068895A (en) * 1976-07-01 1978-01-17 O. W. Reese, Inc. Demolition machine for delining a furnace

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0320855A2 (fr) * 1987-12-15 1989-06-21 Przedsiebiorstwo Montazu I Dostaw Piecow Tunelowych Bipropiec Dispositif de démolition de cheminées, en particulier des cheminées convergentes
EP0320855A3 (en) * 1987-12-15 1989-09-20 Przedsiebiorstwo Montazu I Dostaw Piecow Tunelowych Bipropiec Wrecking arrangement for chimneys, particularly for convergent chimneys
EP0369938A1 (fr) * 1988-10-25 1990-05-23 Otto Näf Ag Méthode et dispositif de démolition de murs
CH677385A5 (fr) * 1988-10-25 1991-05-15 Naef Otto Ag
EP0370280A1 (fr) * 1988-11-24 1990-05-30 ROBOTA GMBH Feuerungs- und Schornsteinbau Dispositif de démolition de cheminées
US7653050B2 (en) 2002-02-05 2010-01-26 Nortel Networks Limited Technique for implementing a multi-service packet and optical/TDM virtual private cross-connect
JP2015031082A (ja) * 2013-08-05 2015-02-16 Jfeシビル株式会社 筒状構造物の外径変化に応じて位置調整可能な昇降機支持架台
RU2753332C1 (ru) * 2021-02-19 2021-08-13 Александр Васильевич Сало Машина для демонтажа дымовых труб

Similar Documents

Publication Publication Date Title
CN108678422B (zh) 钢制烟囱的拆除方法
EP0487516B1 (fr) Appareil et méthode de construction
JP5059357B2 (ja) ボイラケージ部フロアの構築方法
CN104153598A (zh) 一种烟囱类构筑物的自举式拆除方法
EP0133630A1 (fr) Démolition pièce par pièce de cheminées
CN113896124B (zh) 超高层塔吊底部附着式液压自爬升硬防护平台、其安装工艺和爬升方法
CN107939141A (zh) 一种钢结构塔及其施工方法
CN108590170A (zh) 一种矩形烟囱双井架移置式模板整体提升装置及其施工方法
CN1109176C (zh) 原子能发电设施的建设施工方法
GB2120308A (en) Improvements in the piecemeal demolition of chimneys
CN204060023U (zh) 一种烟囱类构筑物的自举式拆除设备
CN216810895U (zh) 一种电梯井作业平台
US4395857A (en) Panelized leg and scale tower
SU1587220A1 (ru) Аварийно-спасательное устройство дл подъема людей в необорудованных восстающих выработках
AU2019201299A1 (en) System and method for a vertically adjustable tower crane
JP7475682B2 (ja) 洋上塔型風力発電設備の解体方法
JP7486187B2 (ja) 塔型風力発電設備の解体方法
JPH08198586A (ja) 煙突用移動式作業装置
JPH0718743A (ja) 大スパンドーム屋根の架設方法
CN214831948U (zh) 垂直钢塔斜拉桥安装支架平台
JP2002242421A (ja) 円柱鉄塔解体用足場と円柱鉄塔の解体方法
JP3864386B2 (ja) 有水式ガスホルダーの工法。
JPH10184037A (ja) 有水式ガスホルダーの工法
CN211143844U (zh) 组合式总装塔楼
CN110735399B (zh) 一种可自行升高或下降的现浇支架梁系统的安装方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

17P Request for examination filed

Effective date: 19850828

17Q First examination report despatched

Effective date: 19860407

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED

18R Application refused

Effective date: 19870620

RIN1 Information on inventor provided before grant (corrected)

Inventor name: BLACK, WILLIAM BROWN