EP0126302A2 - Zentriereinrichtung zum Aufsetzen des Kranoberteils - Google Patents
Zentriereinrichtung zum Aufsetzen des Kranoberteils Download PDFInfo
- Publication number
- EP0126302A2 EP0126302A2 EP84104404A EP84104404A EP0126302A2 EP 0126302 A2 EP0126302 A2 EP 0126302A2 EP 84104404 A EP84104404 A EP 84104404A EP 84104404 A EP84104404 A EP 84104404A EP 0126302 A2 EP0126302 A2 EP 0126302A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- pins
- carrier
- centering
- pin
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000000295 complement effect Effects 0.000 claims abstract description 4
- 230000000284 resting effect Effects 0.000 claims 1
- 230000000717 retained effect Effects 0.000 description 3
- 230000013011 mating Effects 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000013585 weight reducing agent Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/78—Supports, e.g. outriggers, for mobile cranes
- B66C23/80—Supports, e.g. outriggers, for mobile cranes hydraulically actuated
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Definitions
- This invention relates to an arrangement for centering the upper relative to the lower or carrier of separable cranes.
- a crane indicated generally at 10, includes an upper 12 which is rotatably mounted on a lower or carrier 14 by means of a turntable bearing 16.
- the turntable bearing is releaseably secured to a ring 18 secured to the upper with a locking ring expandable to interlock the bearing 16 and ring 18, and retractable to release the bearing from the ring to permit separation of the upper 12.
- a preferred means for such releaseable attachment of ring and bearing is more fully shown and described in U. S. Patent 3,923,407 issued Dec. 2, 1975 to L. B. Jensen and R. E. Thune.
- the ring must be aligned with the turntable bearing and the swing pinion must also be positioned for engagement with a ring gear on the outer race of the turntable bearing to permit swinging of the upper.
- the problem encountered with redecking of the upper on the carrier is alignment of these components within a relative close tolerance.
- the upper 12 carries a plurablity of legs 20, preferrably one at each of its corners, with a double-acting hydraulic.jack 22 affixed to, or otherwise incorporated into the free end of each leg 20. With the ring 18 and bearing 16 released, extension of these jacks will elevate the upper 12 above the carrier 14, as shown in Figure 1. Retraction of these jacks will lower the upper 12 onto the carrier 14.
- a pontoon or float 24 is pinned to the rod end of each jack 22 to distribute the load over a relatively large area and thereby achieve acceptable ground pressures. Alignment or centering of the aforementioned components is provided by four pins 26 carried on the upper 12, two at each end thereof, and corresponding sockets 28 affixed to the carrier 14. Since all of the pins 26 and their cooperating elements are similar, a description of one will be sufficient for a complete understanding.
- the centering pin 26 is slidably mounted in a tubular member or sleeve affixed to the upper 12.
- the pin 26 is itself preferrably a tubular member for weight reduction and has a hardened frustroconical cap 32 affixed to its lower end.
- a handle 34 is secured to the upper end of the pin 26. This handle is preferrably rigid with a transverse dimension greater than the interior diameter of the sleeve 30 to preclude the pin 26 from dropping through the sleeve.
- a crossbore 36 is provided in the pin 26 and a similar crossbore 38 is provided in the sleeve 30.
- a retaining pin 40 is capable of insertion through these crossbores.
- the centering pin 26 is retained in an operative or stowed position by manually raising the pin 26, by means of handle 34, and inserting pin 40 through the crossbore 38 so that the cap 32 rests on the pin 40, as shown in Figure 3.
- the pin 26 is retained in an operative or centering position by lowering it until the crossbores 36 and 38 are aligned and the retaining pin 40 inserted, as shown in Figure 4.
- the angle of the conical surface 44 and the cap 32. is chosen so that the tangent of this angle is approximately equal to the coefficient of friction between the materials thereof when lubricated. Such an angle assures effective centering without imposing large side loads on the structures.
- the upper and carrier are operatively assembled with the upper facing the rear of the carrier and aligned therewith in a fore and aft direction.
- the centering pin 26 is permitted to drop into contact with the unattached socket 42.
- the position of the socket is then adjusted so that the centerlines of the pin and socket are aligned and the socket 42 is then secured to the carrier 14.
- the centering sequence for redecking is illustrated in Figures 4-6.
- the centering pin 26 With the upper elevated from the carrier, as shown in Figure 1, the centering pin 26 is retained by pin 40 in its lowered or operative position.
- the carrier 14 is manuevered sufficiently to position the pin 26 so that at least a portion of the angled surface of the cap 32 is directly above the complementary surface 44.
- the centerline 46 of the pin 26 will most likely be offset from the centerline 48 of the socket 42, as indicated at 50 in Figure 4.
- the jacks 22 are then slowly contracted, lowering the upper 12 and causing the pin 26 to contact the socket 42, as shown in Figure 5. A further contraction of these jacks will cause the pin 26 to be urged by the socket 42 toward the center thereof.
- the upper 12 will, therefore, be displaced or moved in a horizontal direction, as indicated by the arrow 52 in Figure 6, relative to the stationary carrier 14.
- the pin and socket will now be aligned and will result, because there are four of these pins and sockets, in the upper 12 being aligned, within acceptable tolerances, to permit rejoining of the upper and carrier.
- the jacks 22 are then extended just enough to permit removal of retaining pin 40 from the bores 36 and 38.
- the jacks 22 are then retracted fully to redeck the upper on the carrier.
- the centering pin 26 is then manually raised by the handle 34 to permit the retaining pin 40 to be inserted through bore 38 below the cap 32 to retain the pin 26 in its stowed position. Swinging movement of the upper on the carrier is then possible.
- the floats 24, as shown in Figure 7, are provided with a base 54 to which a bearing block 56 is secured.
- An upper bearing plate 58 rests upon and is movable relative to the block 56. Both of these bearing members have smooth mating surfaces and are lubricated to provide as small a friction force to movement under load as possible.
- a fabricated socket 60 is attached to the plate 58 and facilitates attachment to the rod end of the jack 22 by means of a removable pin 62.
- a retaining flange is attached to the periphery of the plate 58 and limits lateral movement of the plate 58 relative to the block 56.
- the float 24 is initially positioned as shown in Figure 7 with the block 56 centered on the plate 58. This relationship is established by aligning the edges of a plate 66, on which the block 56 is centered and attached, forming a part of the fabricated base 54 with a flange 64 attached to plate 58. During the centering sequence illustrated in Figure 6, the leg 20 and jack 22 will also be displaced or moved laterally. The bearing plate 58 and its attached members will be able to move laterally as shown in Figure 8, to accommodate the movement of the upper 12. As shown in Figure 9, the movement of the plate 58 is universal in a horizontal plane and within the limits determined by contact between the flange 64 and the block 56. Handles 70 and 72 secured to the plate 58 and the base 54 respectively facilitate transport and positioning thereof.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
- Load-Engaging Elements For Cranes (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US48764083A | 1983-04-22 | 1983-04-22 | |
US487640 | 1983-04-22 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0126302A2 true EP0126302A2 (de) | 1984-11-28 |
EP0126302A3 EP0126302A3 (en) | 1986-02-05 |
EP0126302B1 EP0126302B1 (de) | 1988-01-13 |
Family
ID=23936556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19840104404 Expired EP0126302B1 (de) | 1983-04-22 | 1984-04-18 | Zentriereinrichtung zum Aufsetzen des Kranoberteils |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0126302B1 (de) |
JP (1) | JPS6012494A (de) |
DE (1) | DE3468663D1 (de) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1990013461A1 (en) * | 1989-04-28 | 1990-11-15 | Raa Koort | Working machine with stabilised driver's seat |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6250382B2 (ja) * | 2013-12-25 | 2017-12-20 | 日本車輌製造株式会社 | ブーム脱着構造 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1801878A1 (de) * | 1967-10-09 | 1969-07-10 | Western Electric Co | Verfahren und Einrichtung zur Halterung einer Werkstueckanordnung,insbesondere von Miniaturwerkstuecken |
US3460697A (en) * | 1967-02-07 | 1969-08-12 | Dobson Ltd W E & F | Transportable load carrying appliances |
US3624784A (en) * | 1970-06-30 | 1971-11-30 | Harnischfeger Corp | Decking and undecking apparatus for a truck crane |
DE2119030A1 (de) * | 1971-04-20 | 1972-11-09 | Fried. Krupp Gmbh, 4300 Essen | Eisenbahnkran |
DE2227593A1 (de) * | 1971-07-01 | 1973-01-11 | Clark Equipment Co | Anordnung und verfahren zur abnehmbaren montage des drehkranzes bei schweren kranen |
US3923407A (en) * | 1974-02-06 | 1975-12-02 | Fmc Corp | Mechanism for connecting and disconnecting crane sections |
US4273244A (en) * | 1979-01-29 | 1981-06-16 | Fmc Corporation | Crane upperstructure self-transferring system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS54122555A (en) * | 1978-03-14 | 1979-09-22 | Kato Seisakushiyo Kk | Upper turning body incorporating device to carrier |
-
1984
- 1984-04-18 DE DE8484104404T patent/DE3468663D1/de not_active Expired
- 1984-04-18 EP EP19840104404 patent/EP0126302B1/de not_active Expired
- 1984-04-23 JP JP8166284A patent/JPS6012494A/ja active Granted
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3460697A (en) * | 1967-02-07 | 1969-08-12 | Dobson Ltd W E & F | Transportable load carrying appliances |
DE1801878A1 (de) * | 1967-10-09 | 1969-07-10 | Western Electric Co | Verfahren und Einrichtung zur Halterung einer Werkstueckanordnung,insbesondere von Miniaturwerkstuecken |
US3624784A (en) * | 1970-06-30 | 1971-11-30 | Harnischfeger Corp | Decking and undecking apparatus for a truck crane |
DE2119030A1 (de) * | 1971-04-20 | 1972-11-09 | Fried. Krupp Gmbh, 4300 Essen | Eisenbahnkran |
DE2227593A1 (de) * | 1971-07-01 | 1973-01-11 | Clark Equipment Co | Anordnung und verfahren zur abnehmbaren montage des drehkranzes bei schweren kranen |
US3923407A (en) * | 1974-02-06 | 1975-12-02 | Fmc Corp | Mechanism for connecting and disconnecting crane sections |
US4273244A (en) * | 1979-01-29 | 1981-06-16 | Fmc Corporation | Crane upperstructure self-transferring system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1990013461A1 (en) * | 1989-04-28 | 1990-11-15 | Raa Koort | Working machine with stabilised driver's seat |
Also Published As
Publication number | Publication date |
---|---|
EP0126302B1 (de) | 1988-01-13 |
JPH027876B2 (de) | 1990-02-21 |
EP0126302A3 (en) | 1986-02-05 |
JPS6012494A (ja) | 1985-01-22 |
DE3468663D1 (en) | 1988-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4103503A (en) | Drilling substructure transfer system | |
DE68916909T2 (de) | Bewegliches Gegengewicht auf einem an einem Kran oder an einer Hebevorrichtung angebrachten Träger. | |
US8137044B2 (en) | Wheel handling apparatus | |
DE102011011603A1 (de) | Lastaufnahmemittel zum Anheben von schweren Komponenten oder Anlageteilen, insbesondere von Offshore-Anlagen | |
US4601401A (en) | Centering arrangement for redecking of crane upper | |
EP0856486B1 (de) | Gegengewichthandhabungseinrichtung für Drehkräne | |
US3502364A (en) | Hoist sling with tubular frame | |
US3967458A (en) | Marine apparatus having telescopic legs | |
EP2634078B1 (de) | Boje | |
US5865327A (en) | Hydraulic boom for gantry and the like | |
EP0126302A2 (de) | Zentriereinrichtung zum Aufsetzen des Kranoberteils | |
CA1194060A (en) | Air cushion vehicles | |
US3826099A (en) | Self-elevating offshore platform with folding legs | |
EP2396537B1 (de) | Vorrichtung und verfahren zur herstellung von offshore-windenergieanlagen | |
GB2095730A (en) | Support leg lifting means in an offshore structure | |
CN1229276C (zh) | 挂钩机构 | |
US5353940A (en) | Alignment system for crane works and method of alignment | |
CN110965641B (zh) | 一种装配式建筑预制钢结构构件的安装施工方法 | |
CN214935762U (zh) | 高压柜运输和装配装置 | |
JP2018183029A (ja) | 電柱元穴建替用架線物仮移設工具 | |
EP0204363A1 (de) | Vorrichtung zum Transportieren eines Gabelstaplers auf einen Lastkraftwagen | |
JPH0531034Y2 (de) | ||
US2977857A (en) | Carriage for a mobile missile mount | |
JP2022066932A (ja) | 受け台 | |
RU2133704C1 (ru) | Способ погрузки контейнера на транспортную платформу и транспортный агрегат для осуществления способа |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): DE FR GB IT |
|
17P | Request for examination filed |
Effective date: 19850416 |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Designated state(s): DE FR GB IT |
|
17Q | First examination report despatched |
Effective date: 19860926 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB IT |
|
REF | Corresponds to: |
Ref document number: 3468663 Country of ref document: DE Date of ref document: 19880218 |
|
ITF | It: translation for a ep patent filed | ||
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732 |
|
ITTA | It: last paid annual fee | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19960304 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19960322 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19960326 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19970418 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19970418 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19980101 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |