EP0100532A2 - Verfahren und Einrichtung zur Leistungsregelung an einem Kraftwerksblock - Google Patents
Verfahren und Einrichtung zur Leistungsregelung an einem Kraftwerksblock Download PDFInfo
- Publication number
- EP0100532A2 EP0100532A2 EP83107456A EP83107456A EP0100532A2 EP 0100532 A2 EP0100532 A2 EP 0100532A2 EP 83107456 A EP83107456 A EP 83107456A EP 83107456 A EP83107456 A EP 83107456A EP 0100532 A2 EP0100532 A2 EP 0100532A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- steam
- turbine
- generator
- signal
- steam generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K3/00—Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein
- F01K3/18—Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having heaters
- F01K3/20—Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein having heaters with heating by combustion gases of main boiler
- F01K3/22—Controlling, e.g. starting, stopping
Definitions
- the controlled system is particularly slow with coal-fired steam generators and also has an integral behavior.
- the result is that the admission pressure regulator may only be switched on weakly, that is to say with a small proportionality constant and a long reset time, so that faults are corrected very slowly.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Eletrric Generators (AREA)
- Control Of Turbines (AREA)
- Steering Control In Accordance With Driving Conditions (AREA)
- Feedback Control In General (AREA)
Abstract
Description
- Die Erfindung bezieht sich auf ein Verfahren und eine Einrichtung zur Leistungsregelung an einem aus Zwangsdurchlauf - Dampferzeuger, Dampfturbine und Generator bestehenden Kraftwerksblock.
- Bei dem bisher üblichen Regelverfahren wird die von der Turbine abgegebene elektrische Leistung von einem PI-Regler, dem Turbinenregler, geregelt. Er wirkt direkt auf das Turbineneinlaßventil.
- Der Druck im Dampferzeuger vor dem Turbinenventil, der sogenannte Vordruck, wird von einem PID-Regler geregelt. Der Stelleingriff erfolgt in die Energiezufuhr der Dampferzeugung, also auf den Brennstoff- und Luftstrom oder auf Brennstoff-Luft- und Speisewasserstrom.
- Die Regelstrecke ist insbesondere bei kohlebeheizten Dampferzeugern sehr träge und hat darüber hinaus integrales Verhalten. Die Folge ist, daß der Vordruckregler nur schwach aufgeschaltet werden darf, also mit kleiner Proportionalitätskonstante und großer Nachstellzeit, so daß Störungen sehr langsam ausgeregelt werden.
- Es besteht die Aufgabe, das bekannte Regelverfahren so zu verbessern, daß es erheblich schneller auf Störungen bzw. Änderungen in der Regelstrecke reagiert.
- Eine Lösung der gestellten Aufgabe, wird in dem im Anspruch 1 angegebenen Verfahren gesehen. Durch die dynamische Korrektur, in der das Speicherverhalten und Dampferzeugungsverhalten des Dampferzeugers nachgebildet ist, wird der Vordruck so vorgesteuert, daß die Regelstrecke "Dampferzeuger und dynamisch vorgesteuerter Turbinenregelkreis" aus der Sicht des Leistungsreglers einfaches Verzögerungsverhalten mit einer geringen Zeitkonstante hat. Der Leistungsregelkreis ist folglich unkritisch und sehr schnell. In der Praxis hat sich gezeigt, daß die Nachstellzeit des Leistungsreglers etwa um den Faktor 100 verringert werden kann.
- Zur Erläuterung der Erfindung ist in der Figur ein Beispiel einer Schaltungsanordnung zur Durchführung des Verfahrens dargestellt und im folgenden beschrieben.
- Der Kraftwerksblock besteht aus dem Zwangsdurchlauf-Dampferzeuger 1, der Dampfturbine 2 und dem elektrischen Generator 3.
- In dem Dampferzeuger 1 wird das über die Leitung 4 zugeführte Speisewasser mit Hilfe des über die Leitung 5 zugeführten Brennstoff- bzw. Brennstoff-Luftgemischs verdampft und mit dem Vordruck pi über das Einlaßventil 6 der Dampfturbine 2 zugeführt.
- Die vom Generator 3 abgegebene elektrische Leistung Peli wird in einer Vergleichsstelle 7 mit einem in dem Sollwertsteller 8 eingestellten Leistungssollwert Pels verglichen. Die resultierende Regeldifferenz dPel wird einem Leistungsregler 9 mit PID-Verhalten zugeführt, dessen Ausgangsgröße als Stellsignal yL auf ein in die Energiezufuhr 5 eingreifendes Stellglied 10 und evtl. auf ein in den Speisewasserstrom eingreifendes Stellglied wirkt.
- Parallel dazu wird das Stellsignal yL des Leistungsreglers 9 dem Positiveingang eines Differenzglieds 11 und dem Eingang eines Übertragungsgliedes ,12 höherer Ordnung zugeführt, in welchem das Dampferzeugungsverhalten der Regelstrecke "Dampferzeuger" elektrisch nachgebildet wird. Das Ausgangssignal des Funktionsgenerators 12 ist dem Negativeingang des Differenzgliedes 11 aufgeschaltet, dessen Ausgang mit dem Eingang eines Verzögerungsgliedes 13 erster Ordnung verbunden ist, welches das Speicherverhalten des Dampferzeugers elektrisch nachbildet.
- Der das Druckkorrektursignal pk führende Ausgang des Verzögerungsgliedes 13 ist mit dem Negativeingang eines zweiten Differenzgliedes 14 verbunden, an dessen Positiveingang der Vordruck-Sollwert p s geschaltet ist. Die auf diese Weise dynamisch korrigierte Führungsgröße "Vordruck" für die Turbinenregelung wird einem Vordruckregler 15 mit PI-Verhalten zugeführt, seine Regelgröße ist der an einer Druckmeßstelle 16 in der Dampfleitung zur Dampfturbine 2 gemessene Istwert pi des Vordrucks. Das Stellsignal yT des Turbinenreglers 15 betätigt das Turbineneinlaßventil 6 und beeinflußt somit den Dampfdurchsatz durch die Turbine. Dieser Turbinenregelkreis ist schnell und unkritisch, so daß in Verbindung mit dem Leistungsregelkreis, der ebenfalls schnell und unkritisch ist, ein weitgehend verzögerungsfreies Ansprechen der Gesamtregelung des Kraftwerksblocks auf Änderungen der Führungs- bzw. Regelgröße "elektrische Leistung" erfolgt.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT83107456T ATE37588T1 (de) | 1982-08-03 | 1983-07-28 | Verfahren und einrichtung zur leistungsregelung an einem kraftwerksblock. |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE3228996 | 1982-08-03 | ||
| DE19823228996 DE3228996A1 (de) | 1982-08-03 | 1982-08-03 | Verfahren und einrichtung zur leistungsregelung an einem kraftwerksblock |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP0100532A2 true EP0100532A2 (de) | 1984-02-15 |
| EP0100532A3 EP0100532A3 (en) | 1985-07-03 |
| EP0100532B1 EP0100532B1 (de) | 1988-09-28 |
Family
ID=6170036
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP83107456A Expired EP0100532B1 (de) | 1982-08-03 | 1983-07-28 | Verfahren und Einrichtung zur Leistungsregelung an einem Kraftwerksblock |
Country Status (6)
| Country | Link |
|---|---|
| EP (1) | EP0100532B1 (de) |
| AT (1) | ATE37588T1 (de) |
| AU (1) | AU564160B2 (de) |
| DE (2) | DE3228996A1 (de) |
| IN (1) | IN158826B (de) |
| ZA (1) | ZA835638B (de) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3500482A1 (de) * | 1985-01-09 | 1986-07-10 | MAN Gutehoffnungshütte GmbH, 4200 Oberhausen | Verfahren und einrichtung zur steuerung der fuehrungsgroesse einer zwei regler aufweisenden regeleinrichtung |
| DE3632041A1 (de) * | 1985-10-03 | 1987-04-09 | Bbc Brown Boveri & Cie | Verfahren und einrichtung zur regelung der leistung eines dampfkraftwerkblocks |
| DE4405350A1 (de) * | 1993-08-13 | 1995-02-16 | Abb Patent Gmbh | Verfahren zur Bestimmung des Frischdampfmassenstromes in der Frischdampfleitung eines Dampfkraftwerks |
| EP0684366A1 (de) * | 1994-05-26 | 1995-11-29 | ABBPATENT GmbH | Verfahren und Einrichtung zur Steuerung und Regelung der Leistung eines Dampfkraftwerksblocks |
| EP1647676A1 (de) * | 2004-10-12 | 2006-04-19 | Siemens Aktiengesellschaft | Verfahren zur Simulation des Betriebsverhaltens einer Dampfturbinenanlage |
| EP1647677A1 (de) * | 2004-10-12 | 2006-04-19 | Siemens Aktiengesellschaft | Verfahren zur Simulation des Betriebsverhaltens einer Dampfturbinenanlage |
| WO2012160206A1 (fr) * | 2011-05-26 | 2012-11-29 | Electricite De France | Systeme de commande pour regulation multivariable de centrale thermique a flamme |
| WO2015028366A3 (de) * | 2013-08-28 | 2015-05-07 | Siemens Aktiengesellschaft | Betriebsverfahren für einen extern beheizten zwangdurchlaufdampferzeuger |
| CN112947048A (zh) * | 2021-01-28 | 2021-06-11 | 国网湖南省电力有限公司 | 一种多变量耦合控制系统的控制方法、系统及介质 |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2169272C2 (ru) * | 1996-03-07 | 2001-06-20 | Сименс Акциенгезелльшафт | Способ и устройство для быстрого регулирования мощности энергетической установки |
| DE102004014283B4 (de) * | 2004-03-22 | 2006-12-14 | Amovis Gmbh | Verfahren zum Betrieb eines unabhängigen Kreisprozesses |
| PL3269948T3 (pl) * | 2016-07-15 | 2022-07-18 | Carbon-Clean Technologies Gmbh | Sposób dostosowania mocy elektrowni z turbiną parową i elektrownia z turbiną parową |
| CN110761858B (zh) * | 2018-07-25 | 2022-03-08 | 中国石油化工股份有限公司 | 一种再热发电机组模拟系统 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE942514C (de) * | 1953-07-31 | 1956-05-03 | Siemens Ag | UEberstroemregelung fuer Dampfkraftmaschinen |
| US3338054A (en) * | 1964-12-29 | 1967-08-29 | Combustion Eng | Method and apparatus for increasing control response of a vapor generator |
| CH590401A5 (de) * | 1975-04-17 | 1977-08-15 | Sulzer Ag |
-
1982
- 1982-08-03 DE DE19823228996 patent/DE3228996A1/de not_active Withdrawn
-
1983
- 1983-07-26 IN IN927/CAL/83A patent/IN158826B/en unknown
- 1983-07-28 EP EP83107456A patent/EP0100532B1/de not_active Expired
- 1983-07-28 DE DE8383107456T patent/DE3378136D1/de not_active Expired
- 1983-07-28 AT AT83107456T patent/ATE37588T1/de not_active IP Right Cessation
- 1983-08-02 AU AU17507/83A patent/AU564160B2/en not_active Ceased
- 1983-08-02 ZA ZA835638A patent/ZA835638B/xx unknown
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3500482A1 (de) * | 1985-01-09 | 1986-07-10 | MAN Gutehoffnungshütte GmbH, 4200 Oberhausen | Verfahren und einrichtung zur steuerung der fuehrungsgroesse einer zwei regler aufweisenden regeleinrichtung |
| DE3632041A1 (de) * | 1985-10-03 | 1987-04-09 | Bbc Brown Boveri & Cie | Verfahren und einrichtung zur regelung der leistung eines dampfkraftwerkblocks |
| DE4405350A1 (de) * | 1993-08-13 | 1995-02-16 | Abb Patent Gmbh | Verfahren zur Bestimmung des Frischdampfmassenstromes in der Frischdampfleitung eines Dampfkraftwerks |
| EP0684366A1 (de) * | 1994-05-26 | 1995-11-29 | ABBPATENT GmbH | Verfahren und Einrichtung zur Steuerung und Regelung der Leistung eines Dampfkraftwerksblocks |
| EP1647676A1 (de) * | 2004-10-12 | 2006-04-19 | Siemens Aktiengesellschaft | Verfahren zur Simulation des Betriebsverhaltens einer Dampfturbinenanlage |
| EP1647677A1 (de) * | 2004-10-12 | 2006-04-19 | Siemens Aktiengesellschaft | Verfahren zur Simulation des Betriebsverhaltens einer Dampfturbinenanlage |
| WO2012160206A1 (fr) * | 2011-05-26 | 2012-11-29 | Electricite De France | Systeme de commande pour regulation multivariable de centrale thermique a flamme |
| FR2975797A1 (fr) * | 2011-05-26 | 2012-11-30 | Electricite De France | Systeme de commande pour regulation multivariable de centrale thermique a flamme |
| RU2611113C2 (ru) * | 2011-05-26 | 2017-02-21 | Электрисите Де Франс | Система управления для многовариантного регулирования теплоэлектростанции |
| WO2015028366A3 (de) * | 2013-08-28 | 2015-05-07 | Siemens Aktiengesellschaft | Betriebsverfahren für einen extern beheizten zwangdurchlaufdampferzeuger |
| CN112947048A (zh) * | 2021-01-28 | 2021-06-11 | 国网湖南省电力有限公司 | 一种多变量耦合控制系统的控制方法、系统及介质 |
| CN112947048B (zh) * | 2021-01-28 | 2023-08-04 | 国网湖南省电力有限公司 | 一种多变量耦合控制系统的控制方法、系统及介质 |
Also Published As
| Publication number | Publication date |
|---|---|
| DE3378136D1 (en) | 1988-11-03 |
| EP0100532A3 (en) | 1985-07-03 |
| EP0100532B1 (de) | 1988-09-28 |
| AU1750783A (en) | 1984-02-09 |
| ATE37588T1 (de) | 1988-10-15 |
| ZA835638B (en) | 1984-04-25 |
| AU564160B2 (en) | 1987-08-06 |
| DE3228996A1 (de) | 1984-02-09 |
| IN158826B (de) | 1987-01-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE3116340C3 (de) | ||
| EP0100532A2 (de) | Verfahren und Einrichtung zur Leistungsregelung an einem Kraftwerksblock | |
| EP0428550B1 (de) | Stereolambdaregelung | |
| DE102007035976A1 (de) | Dampftemperatursteuerung unter Verwendung eines integrierten Funktionsblocks | |
| WO2002008576A1 (de) | Verfahren zur primärregelung mit einer kombinierten gas- und dampfturbinenanlage | |
| CH617494A5 (de) | ||
| DE19830341C1 (de) | Verfahren zum Betreiben einer Regelungseinrichtung und Vorrichtung zur Durchführung des Verfahrens | |
| DE102010041964A1 (de) | Verfahren zur Regelung einer kurzfristigen Leistungserhöhung einer Dampfturbine | |
| DE2025528C3 (de) | Regeleinrichtung für eine Dampfturbinen-Kraftanlage | |
| DE2445525B2 (de) | Verfahren zum beeinflussen der austrittstemperatur des eine beruehrungsheizflaeche eines dampferzeugers durchstroemenden dampfes | |
| EP1053512B1 (de) | Verfahren und regeleinrichtung zur regelung eines gasturbosatzes, insbesondere von gas- und dampf-kraftwerken | |
| EP3542229A1 (de) | Einrichtung und verfahren zur bestimmung der parameter einer regeleinrichtung | |
| DE3541148C2 (de) | ||
| EP0178485B1 (de) | Einrichtung zur Regelung des Ladedrucks einer Brennkraftmaschine | |
| DE2518158B2 (de) | Leistungsregler für thermische Energieerzeugungsanlagen | |
| EP0684366B1 (de) | Verfahren und Einrichtung zur Steuerung und Regelung der Leistung eines Dampfkraftwerksblocks | |
| DE4124678A1 (de) | Verfahren und einrichtung zur wiederherstellung der turbinenstellreserve nach dem ausregeln einer leistungs-sollwertaenderung in einem dampfkraftwerksblock | |
| DE4329759C2 (de) | Verfahren zur Regelung eines Prozesses | |
| DE1426803A1 (de) | Elektrohydraulische Regeleinrichtung fuer eine Dampfturbine | |
| EP0507730B1 (de) | Einrichtung zum lastabhängigen Regeln der Speisewassermenge eines Zwanglaufdampferzeugers | |
| DE19510342C2 (de) | Verfahren zum Regeln der Ausgangsgröße eines Kraftwerksparks | |
| DE10055166C2 (de) | Verfahren zur Regelung der Leistung und Drehzahl einer Turbine | |
| DE29908581U1 (de) | Vorrichtung zur Überprüfung der Betriebssicherheit einer Turbine bei einem Lastabwurf | |
| DE1145739B (de) | Regelung von Zwangdurchlaufdampferzeugern | |
| DE885853C (de) | Regeleinrichtung fuer Dampfkraftanlagen mit parallel geschalteten Kraftmaschinen |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Designated state(s): AT BE DE GB IT NL SE |
|
| 17P | Request for examination filed |
Effective date: 19841219 |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Designated state(s): AT BE DE GB IT NL SE |
|
| 17Q | First examination report despatched |
Effective date: 19861002 |
|
| D17Q | First examination report despatched (deleted) | ||
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE DE GB IT NL SE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19880928 |
|
| REF | Corresponds to: |
Ref document number: 37588 Country of ref document: AT Date of ref document: 19881015 Kind code of ref document: T |
|
| REF | Corresponds to: |
Ref document number: 3378136 Country of ref document: DE Date of ref document: 19881103 |
|
| GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) | ||
| ITF | It: translation for a ep patent filed | ||
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed | ||
| ITTA | It: last paid annual fee | ||
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20020619 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20020711 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20020715 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20020719 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20020916 Year of fee payment: 20 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20030727 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20030728 Ref country code: AT Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20030728 |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 |
|
| NLV7 | Nl: ceased due to reaching the maximum lifetime of a patent |
Effective date: 20030728 |