EP0011060A1 - Apparatus for manufacturing elements, in particular building elements, such as moulded blocks - Google Patents
Apparatus for manufacturing elements, in particular building elements, such as moulded blocks Download PDFInfo
- Publication number
- EP0011060A1 EP0011060A1 EP79890042A EP79890042A EP0011060A1 EP 0011060 A1 EP0011060 A1 EP 0011060A1 EP 79890042 A EP79890042 A EP 79890042A EP 79890042 A EP79890042 A EP 79890042A EP 0011060 A1 EP0011060 A1 EP 0011060A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- elements
- conveying
- hardening
- end station
- particular building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 10
- 238000004378 air conditioning Methods 0.000 claims abstract description 5
- 230000001143 conditioned effect Effects 0.000 claims 1
- 238000000465 moulding Methods 0.000 abstract description 3
- 239000007787 solid Substances 0.000 abstract 2
- 238000010438 heat treatment Methods 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- 239000011230 binding agent Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 244000144619 Abrus precatorius Species 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000003958 fumigation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 230000002250 progressing effect Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000010025 steaming Methods 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B15/00—Machines or apparatus for drying objects with progressive movement; Machines or apparatus with progressive movement for drying batches of material in compact form
- F26B15/10—Machines or apparatus for drying objects with progressive movement; Machines or apparatus with progressive movement for drying batches of material in compact form with movement in a path composed of one or more straight lines, e.g. compound, the movement being in alternate horizontal and vertical directions
- F26B15/12—Machines or apparatus for drying objects with progressive movement; Machines or apparatus with progressive movement for drying batches of material in compact form with movement in a path composed of one or more straight lines, e.g. compound, the movement being in alternate horizontal and vertical directions the lines being all horizontal or slightly inclined
- F26B15/16—Machines or apparatus for drying objects with progressive movement; Machines or apparatus with progressive movement for drying batches of material in compact form with movement in a path composed of one or more straight lines, e.g. compound, the movement being in alternate horizontal and vertical directions the lines being all horizontal or slightly inclined the objects or batches of materials being carried by wheeled trucks
Definitions
- Manufacturing plants with such facilities are known to comprise a number of stations, which the elements or their means of funding run through continuously or step by step and in which the individual manufacturing processes take place one after the other.
- These manufacturing processes usually also include a phase in which the elements are used for a more or less long period of time in a moist manner to improve the quality of their final strength and to accelerate the setting or hardening process, depending on the nature of the hydraulic or synthetic bandage and / or warm atmosphere or in a particularly nitrogen or oxygen-rich atmosphere are stored.
- German Patent No. 1, 061 n76 which has the generic features mentioned at the beginning.
- the elements manufactured in an initial station are placed in this known device by a gripper onto rail-bound carriages and are moved with these carriages into so-called hardening pipes, which are hermetically lockable and contain rail sections to accommodate the carriages in groups.
- hardening tubes in turn rest on trolleys that run on tracks that run across the rails of the wagons, and they are each individually transported to the track of the rail-bound wagons for unloading and refilling, where the rail sections contained therein with the rail track of these Cars s worn.
- the hardening pipes are filled with steam after they have been filled outside the rail track of the wagons, after the hardening phase they are returned to the rail track, unloaded and simultaneously loaded with a new wagon group.
- this known device does not provide a really continuous circulation of the wagons.
- the funding operations are time consuming and the required funding facilities are complicated.
- the object of the invention is to design a device of the type mentioned at the outset in such a way that it enables genuinely continuous conveying of the elements and that the elements conveyed by the conveying means are hardened within the continuous conveying path of the conveying means without the need for loading into their own hardening chambers can be done.
- fixed walls of the individual funding form five-sided closed cargo spaces, the open side of which within the conveying path either through a fixed wall of an adjacent same funding means or through a separate, self-supporting same cover or stationary wall can be temporarily covered and locked for air conditioning of the cargo holds.
- Transport plates 5, on which the molded groups 4 are placed by the paver 2 are used in a conventional manner to convey such molded groups 4 between these stations along the conveyor circuit 1.
- Loading device has in order to be able to place individual transport plates 5 ′ loaded with molded groups 4 in the direction of arrows 6 ′ into loading spaces 8 closed on five sides of the conveying means consisting of the mobile or slidable carriage 9. From such a loading device 6, the loading spaces 8 of a carriage 9 located in the open position, for example progressing from right to left, are gradually loaded and filled with molded groups 4.
- the air conditioning of the loading spaces 8 of the conveying means can also be ensured in the context of the invention by any other covering of the open loading space sides, e.g. through a blind, sliding wall, insert wall or the like.
- any other covering of the open loading space sides e.g. through a blind, sliding wall, insert wall or the like.
- the use of the closed rear sides of subsequent wagons adjacent to each other in the conveyor circuit for closing the open sides of cargo spaces previously filled proves to be particularly economical within the scope of the invention.
- the carriages 9 now arrive at a charger 11 located in the delivery station (end station); this charger 11 could possibly be identical to the charger 6, above all because of the better clarity, it is shown in the exemplary embodiment as a second charger.
- Mold groups 4 are transferred from the charger 11 to a conveyor (not shown) of any kind and are deposited in the direction of the arrow 3 'at the storage location 3, where they are allowed to harden completely.
- the empty transport plates 5 ge long along the conveyor circuit 1 back to the paver 2, from which they are again occupied with groups of moldings 4.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
Description
Die Erfindung betrifft eine Einrichtung zum Fertigen von Elementen, insbesondere Bauelementen, wie Formsteinen, aus einer formbaren, allmählich erhärtenden Masse, vor= zugsweise Beton, wobei zwischen einer der Formung dieser Elemente dienenden Anfangsstation und einer der Abgabe der Elemente dienenden Endstation eine Anzahl ortsbewe= glicher, zur Aufnahme vorzugsweise jeweils mehrerer Elemente geeigneter und hiezu mit Laderäumen ausgestatte= ter Fördermittel vorgesehen ist, deren Laderäume zeit= weise, während der allmählichen, im Verlauf der Förderung der Elemente zur Endstation stattfindenden Erhärtung der Masse klimatisierbar sind.The invention relates to a device for manufacturing elements, in particular components, such as shaped stones, from a moldable, gradually hardening mass, preferably = concrete, wherein between a starting station serving to form these elements and a terminating station serving to deliver the elements, a number of locations = Equal, preferably suitable for receiving several elements each and equipped with cargo holds = ter funding is provided, the cargo spaces = time, during the gradual hardening of the mass taking place in the course of the promotion of the elements to the terminal station.
Fertigungsanlagen mit solchen Einrichtungen umfassen be= kanntlich eine Anzahl von Stationen, welche von den Elementen bzw. deren Fördermitteln stetig oder schritt= weise durchlaufen werden und in denen die einzelnen Ferti= gungsvorgänge nacheinander stattfinden.Manufacturing plants with such facilities are known to comprise a number of stations, which the elements or their means of funding run through continuously or step by step and in which the individual manufacturing processes take place one after the other.
Zu diesen Fertigungsvorgängen gehört meist auch eine Phase, innerhalb derer die Elemente zwecks qualitativer Verbesserung ihrer Endfestigkeit und zwecks Beschleunigung des Abbinde- bzw. Erhärtungsvorganges je nach der Be= schaffenheit des hydraulischen oder synthetischen Binde= mittels über einen mehr oder weniger langen Zeitraum in einer feuchten und/oder warmen Atmosphäre bzw. in einer besonders stickstoff- oder sauerstoffreichen Atmosphäre gelagert werden.These manufacturing processes usually also include a phase in which the elements are used for a more or less long period of time in a moist manner to improve the quality of their final strength and to accelerate the setting or hardening process, depending on the nature of the hydraulic or synthetic bandage and / or warm atmosphere or in a particularly nitrogen or oxygen-rich atmosphere are stored.
Aus der deutschen Patentschrift Nr. 1, 061 n76 ist bereits eine Einrichtung zum Härten von kalkgebundenen Elementen in Dampf bekanntgeworden, welche die eingangs erwähnten Gattungsmerkmale aufweist.A device for hardening lime-bonded elements in steam has already become known from German Patent No. 1, 061 n76, which has the generic features mentioned at the beginning.
Die in einer Anfangsstation gefertigten Elemente werden bei dieser vorbekannten Einrichtung von einem Greifer auf schienengebundene Wagen abgesetzt und mit diesen Wagen in sogenannte Härterohre verfahren, welche hermetisch ab= schließbar sind und Schienenabschnitte enthalten, um die Wagen gruppenweise aufzunehmen. Diese Härterohre ruhen ihrerseits auf Fahrwerken, die auf quer zu den Schienen der Wagen geführten Gleisen laufen, und sie werden zur Ent= ladung und neuerlichen Füllung jeweils einzeln in die Laufbahn der schienengebundenen Wagen befördert, wo dann die in ihnen enthaltenen Schienenabschnitte mit der Schienenlaufbahn dieser Wagen fluchten. Zwecks Härtung .der darin befindlichen Elemente werden die Härterohre nach ihrer Füllung jeweils außerhalb der Schienenlaufbahn der Wagen mit Dampf beschickt, nach Ablauf der Härtungs= phase werden sie wieder in die Schienenlaufbahn rückgeführt, entladen und gleichzeitig mit einer neuen Wagengruppe beladen.The elements manufactured in an initial station are placed in this known device by a gripper onto rail-bound carriages and are moved with these carriages into so-called hardening pipes, which are hermetically lockable and contain rail sections to accommodate the carriages in groups. These hardening tubes in turn rest on trolleys that run on tracks that run across the rails of the wagons, and they are each individually transported to the track of the rail-bound wagons for unloading and refilling, where the rail sections contained therein with the rail track of these Cars swore. For the hardening of the elements inside, the hardening pipes are filled with steam after they have been filled outside the rail track of the wagons, after the hardening phase they are returned to the rail track, unloaded and simultaneously loaded with a new wagon group.
Wegen der Notwendigkeit, die Härterohre einzeln zuzuführen und abzuführen sowie die Wagengruppen mit den darauf be= findlichen Elementen in die.Härterohre einzubringen und herauszuholen,kommt bei dieser vorbekannten Einrichtung kein echt kontinuierlicher Umlauf der Wagen zustande. Die Fördervorgänge sind infolgedessen zeitaufwendig und die erforderlichen Fördereinrichtungen sind kompliziert.Because of the necessity to feed and discharge the hardening tubes individually and to introduce and remove the groups of wagons with the elements on them in the hardening tubes, this known device does not provide a really continuous circulation of the wagons. As a result, the funding operations are time consuming and the required funding facilities are complicated.
Aufgabe der Erfindung ist es, eine Einrichtung der eingangs bezeichneten Gattung so auszugestalten, daß sie eine echt kontinuierliche Förderung der Elemente ermöglicht und daß dabei die Härtung der von den Fördermitteln beförderten Elemente - ohne Notwendigkeit einer Verladung in eigene Härtekammern - innerhalb des kontinuierlichen Förderweges der Fördermittel erfolgen kann.The object of the invention is to design a device of the type mentioned at the outset in such a way that it enables genuinely continuous conveying of the elements and that the elements conveyed by the conveying means are hardened within the continuous conveying path of the conveying means without the need for loading into their own hardening chambers can be done.
Diese Aufgabe wird gemäß den wesentlichen Merkmalen der Erfindung dadurch gelöst, daß feste Wandungen der einzel= nen Fördermittel fünfseitig geschlossene Laderäume bilden, deren offene Seite innerhalb des Förderweges entweder durch eine feste Wandung eines jeweils benachbarten glei= chen Fördermittels oder durch eine gesonderte, eigenbewe= gliche Abdeckung oder ortsfeste Wandung zeitweise zur Klimatisierung der Laderäume abdeckbar und abschließbar ist.This object is achieved according to the essential features of the invention in that fixed walls of the individual funding form five-sided closed cargo spaces, the open side of which within the conveying path either through a fixed wall of an adjacent same funding means or through a separate, self-supporting same cover or stationary wall can be temporarily covered and locked for air conditioning of the cargo holds.
Dank dieser erfindungsgemäßen Lösung können die Förder= mittel selbst geschlossene Klimakammern verkörpern und die zu härtenden Elemente brauchen nicht in gesondertan= 'zuordnende Klimakammern eingebracht und aus diesen wieder herausbefördert werden. Die Gestaltung der Einrichtung wird dadurch erheblich vereinfacht und dr- erforderliche maschi= nelle Aufwand wird außerordentlich verringert.Thanks to this inventive solution, the conveyor can = medium itself embody closed air chambers and the to be hardened elements need not gesondertan = 'associating environmental chambers introduced and conveyed out of this again. This considerably simplifies the design of the device and greatly reduces the mechanical effort required.
Grundsätzlich mag es, beispielsweise bei der Fertigung von Beton-Bauelementen,.ausreichen, die Laderäume der Förder= mittel abzuschließen, weil allein schon durch den physi= kalischen Vorgang des Abbindens (Abbindewärme und Feuchtig= keit des Frischbetons) in den Laderäumen eine feuchtwarme Atmosphäre zustandekommt. Man kann aber im Rahmen der Er= findung darüber hinaus auch noch künstlich zu einer Inten= sivierung des Erhärtungsvorganges beitragen, indem man die von den Fördermitteln gebildeten Laderäume beispielsweise mittels Sprüh-, Begasungs- und/oder Heizvorrichtungen zu= sätzlich klimatisiert.Basically, it may be sufficient, for example in the production of concrete components, to close the loading spaces of the conveying means, because the warmth of the setting (heating and moisture and moisture = fresh concrete) in the loading spaces alone creates a warm, humid atmosphere comes about. However, within the scope of the invention, one can also artificially contribute to intensifying the hardening process by additionally air-conditioning the loading spaces formed by the funding, for example by means of spraying, gassing and / or heating devices.
Ein Ausführungsbeispiel der erfindungsgemäßen Einrichtung ist in der einzigen Zeichnungsfigur in einer Draufsicht schematisch veranschaulicht, wobei lediglich die Förder= mittel der Anschaulichkeit wegen in Horizontalschnitten dargestellt sind.An embodiment of the device according to the invention is schematically illustrated in a plan view in the single drawing figure, only the conveying means being represented in horizontal sections for the sake of clarity.
Die Einrichtung umfaßt einen strichpunktiert angedeuteten geschlossenen Förderkreislauf 1, innerhalb dessen die von einem Fertiger 2, z.B. irgend einem üblichen Form- und Verdichtungsgerät, gebildete Anfangsstation und die von einem Lagerplatz 3 verkörperte Endstation angeordnet sind, in welch letzterer die fertig geformten und zumindest teil= weise abgebundenen bzw. erhärteten Elemente gruppenweise, also in.Formlingsgruppen 4, gelagert-und zum Abtransport bereitgestellt werden.The device comprises a closed conveyor circuit 1 indicated by dash-dotted lines, within which the starting station formed by a
Zur Förderung solcher Formlingsgruppen 4 zwischen diesen Stationen längs des Förderkreislaufes 1 dienen in üblicher Weise Transportplatten 5, auf denen die Formlingsgruppen 4 vom Fertiger 2 abgesetzt werden.
Jeweils einzelne vom Fertiger 2 mit solchen Formlingsgrup= pen 4 beladene Transportplatten 5 gelangen - über einen nicht dargestellten - grundsätzlich beliebigen Förderer, z.B. über ein Förderband, ein Gliederband, eine Rollenbahn od.dgl. zu einem Ladegerät 6, welches innerhalb eines Be= reiches 7, vorzugsweise im Sinne des Doppelpfeiles 7' so= wohl quer zum Förderkreislauf 1 verschiebbar und hin- und herbeweglich ist, als auch einen höhenverstellbaren und parallel zum Förderkreislauf 1 verschiebbaren Greifer,eine. Gabel, Plattform od.dgl. Ladeorgan aufweist, um einzelne, mit Formlingsgruppen 4 beladene Transportplatten 5'in Richtung der Pfeile 6' in fünfseitig geschlossene Laderäume 8 der aus den fahr- oder gleitfähigen Wagen 9 bestehenden Fördermittel absetzen zu können. Von einem solchen Lade= gerät 6 werden also die Laderäume 8 jeweils eines in'Auf= nahmeposition befindlichen Wagens 9, z.B. von rechts nach links fortschreitend, allmählich mit Formlingsgruppen 4 beschickt und gefüllt.In each case,
Ist ein solcher Wagen 9 voll und wird er in Richtung des Förderkreislaufes 1 weiter, also rückwärts bewegt, tritt ein leerer bzw. soeben in der Endstation geleerter Wagen 9 von rechts aus dieser Endstation ankommend an seine Stelle. Dadurch verschließt die feste Rückwand 8' des ankommenden Leerwagens die Laderäume 8 des vollen, rückwärtsbewegten Wagens 9 und in diesen dadurch klimatisch abgeschlossenen Laderäumen kann.sich ein für das Abbinden bzw. Erhärten des Materiales der Elemente optimales Klima bilden bzw. kann gewünschtenfalls eine optimale Atmosphäre künstlich geschaffen werden, beispielsweise durch Begasung, Be= dampfung, Beheizung u.dgl. physikalische Maßnahmen.If such a
Die Klimatisierung der Laderäume 8 der Fördermittel kann im Rahmen der Erfindung auch durch irgend eine andere Abdeckung der offenen Laderaumseiten sichergestellt wer= den, z.B. durch eine Jalousie, Schiebewand, Einsatzwand od.dgl. Die dargestellte Verwendung der geschlossenen Rück= seiten von im Förderkreislauf jeweils benachbarten nach= folgenden Wagen zum Abschließen der offenen Seiten vorher gefüllter Laderäume erweist sich aber im Rahmen der Erfin= dung als besonders wirtschaftlich.The air conditioning of the
Die mit ihren offenen Längsseiten an die Rückseiten jeweils benachbarter, anschließend folgender Wagen fluchtend an= liegenden Wagen folgen nun dem Förderkreislauf 1 so dicht aneinander, daß die Laderäume 8 während dieser Fortbewegung - von welcher die Zeichnung bloß einen Ausschnitt darstellt - stets geschlossen bleiben. Bloß während der Phase der Umlenkung in die gegenläufige Richtung der Förderung, also in Richtung zur Abgabestation, ändert sich kurzfristig die relative Stellung .benachbarter Wagen zueinander nach dem Paternoster-System. Es kann in diesem Bereich eine ortsfeste Wandung 10 vorgesehen werden, um auch während dieses Stellungswechsels die Laderäume 8 der Wagen 9 ge= schlossen zu halten.With their open long sides on the back of each adjacent, then following wagon in alignment = lying wagons now follow the conveyor circuit 1 so closely that the cargo holds 8 remain closed during this movement - of which the drawing is only a section. Only during the phase of redirection in the opposite direction of the conveyance, i.e. towards the delivery station, does the relative position of neighboring wagons change briefly according to the paternoster system. It can in this area a stationary wall 1 0 be provided even during this change of position of the
Im Wege des Förderkreislaufes 1 gelangen nun die Wagen 9 zu einem in der Abgabestation (Endstation) befindlichen Ladegerät 11; dieses Ladegerät 11 könnte gegebenenfalls mit dem Ladegerät 6 ident sein, vor allem wegen der besse= ren Anschaulichkeit ist es beim Ausführungsbeispiel als ein zweites Ladegerät dargestellt.By means of the
Jedenfalls ist dieses Ladegerät 11 gleichermaßen wie das Ladegerät 6 innerhalb eines sich quer zum Förderkreislauf 1 erstreckenden Bereiches 12 in Richtung des Doppelpfeiles 12' hin- und herbeweglich und besitzt gleichfalls ein höhenverstellbares Huborgan, um einzelne, mit Formlings= gruppen 4 beladene Transportplatten 5 aus den Laderäumen 8 eines Wagens 9 in Richtung der Pfeile 11' zu entladen. Die auf diesen Transportplatten 5 jeweils gelagerten, in= nerhalb der Laderäume 8 zumindest teilweise erhärteten Formlingsgruppen 4 werden vom Ladegerät 11 einem beliebi= gen, nicht dargestellten Förderer übergeben und in Rich= tung des Pfeiles 3' am Lagerplatz 3 abgesetzt, wo man sie völlig aushärten läßt. Die leeren Transportplatten 5 ge= langen längs des Förderkreislaufes 1 zurück zum Fertiger 2, von dem sie neuerlich mit Formlingsgruppen 4 belegt werden.In any case, this charger 11 is similarly to the
Die Erfindung ist gleichermaßen auf die Herstellung von Elementen, insbesondere Bauelementen, aus Beton mit hydrau= lischen Bindemitteln als auch auf die Fertigung von anderen mit Bindemitteln angereicherten erhärtenden Elementen, z.B. Kunstharzelementen, anwendbar, wobei selbstverständlich für die Wahl der optimalen, das Erhärten begünstigenden klimatischen Verhältnisse und für'die Dauer der Klimati= sierung jeweils verschiedenerlei Kriterien zu beachten sind, deren Berücksichtigung im Rahmen des Standes der Technik jedem Fachmann geläufig ist.The invention is equally applicable to the production of elements, in particular structural elements, from concrete with hydraulic binders as well as to the production of other hardening elements enriched with binders, e.g. Synthetic resin elements, applicable, of course, for the selection of the optimal, hardening favorable climatic conditions and for the duration of the climatisation = various criteria must be observed, the consideration of which within the framework of the prior art is familiar to any person skilled in the art.
Claims (1)
daß feste Wandungen dieser einzelnen Fördermittel (9') fünfseitig geschlossene Laderäume (8) bilden, deren offene Seite innerhalb des Förderweges (1) entweder durch eine feste Wandung (8') eines jeweils benachbarten glei= chen Fördermittels (9) oder durch eine gesonderte, eigen= bewegliche Abdeckung oder ortsfeste Wandung (10) zeitweise zur Klimatisierung der Laderäume (8) abdeckbar und ab= schließbar ist.Device for manufacturing elements, in particular building elements, such as shaped stones, from a moldable, gradually hardening mass, preferably concrete, with an initial station (1) serving to form these elements (4 ' ) and one to deliver the finished elements (4 ) serving end station (.3) a number of mobile = movable, preferably for accommodating several elements (4) in each case and with loading spaces (8) equipped funding (9) is provided, the loading spaces (8) temporarily, during the gradual, in Course of the conveying of the elements (4) to the end station (3) of the hardening of the mass which can be conditioned, characterized in that
that fixed walls of these individual conveying means (9 ') form five-sided closed loading spaces (8), the open side of which within the conveying path ( 1 ) either through a fixed wall (8') of an adjacent same = equal conveying means (9) or through a separate one , Eigen = movable cover or stationary wall ( 1 0) can be temporarily covered and closed = for air conditioning of the cargo holds (8).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT7760/78 | 1978-10-30 | ||
AT776078A AT360898B (en) | 1978-10-30 | 1978-10-30 | DEVICE FOR MANUFACTURING ELEMENTS, IN PARTICULAR COMPONENTS, LIKE SHAPED STONES |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0011060A1 true EP0011060A1 (en) | 1980-05-14 |
EP0011060B1 EP0011060B1 (en) | 1982-06-30 |
Family
ID=3599220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19790890042 Expired EP0011060B1 (en) | 1978-10-30 | 1979-10-17 | Apparatus for manufacturing elements, in particular building elements, such as moulded blocks |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0011060B1 (en) |
AT (1) | AT360898B (en) |
DE (1) | DE2963259D1 (en) |
DK (1) | DK456479A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0018286A1 (en) * | 1979-04-17 | 1980-10-29 | So.De.Em Societe D'exploitation Des Etablissements Minato | Method and device for producing concrete products |
FR2454360A1 (en) * | 1979-04-17 | 1980-11-14 | Minato Exploitation | Plant handling moulded concrete products - transfers mouldings from press to drying area on boards fitting inside storage boxes |
DE19813868A1 (en) * | 1998-03-29 | 1999-09-30 | Ulrich Ostertag | Transfer platform feed device for concrete block molding machines |
CN107520949A (en) * | 2017-10-19 | 2017-12-29 | 浙江益能建材科技有限公司 | Porous brick rack |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113319998A (en) * | 2021-06-03 | 2021-08-31 | 深圳市鹏翔建筑科技有限公司 | Prefabricated superimposed sheet production system |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH566852A5 (en) * | 1973-03-07 | 1975-09-30 | Rinter Technik Ag | Plant for accelerating concrete hardening by heating - has circulating support pallets with heating hoods |
-
1978
- 1978-10-30 AT AT776078A patent/AT360898B/en not_active IP Right Cessation
-
1979
- 1979-10-17 EP EP19790890042 patent/EP0011060B1/en not_active Expired
- 1979-10-17 DE DE7979890042T patent/DE2963259D1/en not_active Expired
- 1979-10-29 DK DK456479A patent/DK456479A/en not_active Application Discontinuation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH566852A5 (en) * | 1973-03-07 | 1975-09-30 | Rinter Technik Ag | Plant for accelerating concrete hardening by heating - has circulating support pallets with heating hoods |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0018286A1 (en) * | 1979-04-17 | 1980-10-29 | So.De.Em Societe D'exploitation Des Etablissements Minato | Method and device for producing concrete products |
FR2454360A1 (en) * | 1979-04-17 | 1980-11-14 | Minato Exploitation | Plant handling moulded concrete products - transfers mouldings from press to drying area on boards fitting inside storage boxes |
DE19813868A1 (en) * | 1998-03-29 | 1999-09-30 | Ulrich Ostertag | Transfer platform feed device for concrete block molding machines |
CN107520949A (en) * | 2017-10-19 | 2017-12-29 | 浙江益能建材科技有限公司 | Porous brick rack |
Also Published As
Publication number | Publication date |
---|---|
AT360898B (en) | 1980-02-10 |
DK456479A (en) | 1980-05-01 |
DE2963259D1 (en) | 1982-08-19 |
EP0011060B1 (en) | 1982-06-30 |
ATA776078A (en) | 1980-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0979713B1 (en) | Flexible process and plant for making concrete railway sleepers | |
DE1962131B1 (en) | Automatic molding plant and operating procedures for this | |
EP0011060B1 (en) | Apparatus for manufacturing elements, in particular building elements, such as moulded blocks | |
DE2257768A1 (en) | PLANT FOR PRODUCING PRE-FABRICATED CONCRETE PARTS | |
DE2423979A1 (en) | EQUIPMENT FOR THE MANUFACTURE AND PROMOTION OF COMPONENTS | |
DE800646C (en) | Conveyor system for moldings | |
DE2032793C3 (en) | System and method for shuttering, demoulding, cleaning and emptying of mold trolleys | |
EP0927615B1 (en) | Plant for producing vapour-hardened building materials | |
EP1295691B1 (en) | Plant for producing vapour-hardened building materials | |
EP0018356B1 (en) | Method of moist stacking shaped articles, apparatus for carrying out this method, and covering for the shaped articles to be stacked in this apparatus | |
DE2311762A1 (en) | PALLET SILO | |
DE3316673C2 (en) | ||
DE29800471U1 (en) | Plant for the production of steam-hardened building materials | |
EP3787990A1 (en) | Sorting method and device for sorting plate-shaped objects, preferably glass panel cut pieces, method and device for producing glass panel cut pieces with a sorting device of this type | |
DE102017127014A1 (en) | Aggregate for picking up, transporting and discharging previously collected moist material | |
EP2113450A2 (en) | Production line for motor vehicles | |
DE1097881B (en) | Plant for the production of lightweight concrete bodies | |
DE1927745C (en) | Device for the fully automatic loading and unloading of mobile shelf trolleys with raw bricks that can be raised and lowered in stages by means of a lifting platform | |
DE2116223C3 (en) | Arrangement for conveying fresh concrete parts | |
DE1683985A1 (en) | Concrete block making plant | |
DE1459230A1 (en) | Steaming tunnel to accelerate the setting of precast concrete parts | |
DE2404765A1 (en) | FASSILO | |
DE2129825A1 (en) | Pallet orbit | |
EP0090217A2 (en) | Foundry transport cart | |
DE102008022558A1 (en) | Method for continuous handling, particularly for unloading and loading of goods wagon on tracks, involves shifting goods wagon in loading station on loading track in retraction direction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): BE CH DE FR GB IT LU NL SE |
|
17P | Request for examination filed |
Effective date: 19801112 |
|
ITF | It: translation for a ep patent filed | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): BE CH DE FR GB IT LU NL SE |
|
DB1 | Publication of patent cancelled | ||
PUAC | Information related to the publication of a b1 document modified or deleted |
Free format text: ORIGINAL CODE: 0009299EPPU |
|
REF | Corresponds to: |
Ref document number: 2963259 Country of ref document: DE Date of ref document: 19820819 |
|
AK | Designated contracting states |
Designated state(s): BE CH DE FR GB IT LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19820922 Ref country code: NL Effective date: 19820922 Ref country code: FR Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19820922 Ref country code: BE Effective date: 19820922 |
|
RB1 | B1 document published (corrected) |
Effective date: 19820922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19821031 Ref country code: CH Effective date: 19821031 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
EN | Fr: translation not filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19830701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19881118 |
|
EUG | Se: european patent has lapsed |
Ref document number: 79890042.9 Effective date: 19850611 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |