DE945316C - Device for loading and unloading the swing trays for tower or shaft dryers - Google Patents
Device for loading and unloading the swing trays for tower or shaft dryersInfo
- Publication number
- DE945316C DE945316C DEB5667D DEB0005667D DE945316C DE 945316 C DE945316 C DE 945316C DE B5667 D DEB5667 D DE B5667D DE B0005667 D DEB0005667 D DE B0005667D DE 945316 C DE945316 C DE 945316C
- Authority
- DE
- Germany
- Prior art keywords
- loading
- transport
- horde
- unloading
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B15/00—Machines or apparatus for drying objects with progressive movement; Machines or apparatus with progressive movement for drying batches of material in compact form
- F26B15/10—Machines or apparatus for drying objects with progressive movement; Machines or apparatus with progressive movement for drying batches of material in compact form with movement in a path composed of one or more straight lines, e.g. compound, the movement being in alternate horizontal and vertical directions
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B25/00—Details of general application not covered by group F26B21/00 or F26B23/00
- F26B25/001—Handling, e.g. loading or unloading arrangements
Description
Vorrichtung zur Aufgabe und Entnahme der Schaukelhorden für Turm- oder Schachttrockner Die vorliegende Erfindung betrifft eine Vorrichtung zur Aufgabe und Entnahme der Schaukelhorden für Turm- oder Schachttrockner.Device for loading and removing the swing trays for tower or chute dryer The present invention relates to an apparatus for the task and removal of the swing trays for tower or shaft dryers.
Die Beschickung von Turm- oder Schachttrocknern erfolgt meist derart, daß die zu trocknenden Güter, z. B. Kerne, von Hand oder auch mit Hilfe einerVorrichtung in die an einerDoppelstrangkette pendelnd hängenden Hordenschaukeln gelegt werden. Durch die immer weiter fortschreitende Leistungssteigerung ist jedoch eine Einzelaufgabe bzw. -abnahme dieser Güter kaum noch zu bewältigen, oder aber zumindest ist eine große Anzahl von Arbeitern hierfür erforderlich. Hinzu kommt, daß auch eine immer größere Zahl von Kernfertigungsmaschinen für die Leistung eines Trockners herangezogen werden muß, so daß auch räumliche Schwierigkeiten wegen der immer größer werdenden Entfernungen zwischen Fertigungsmaschine undTrockner entstehen. Man ist deshalb dazu übergegangen, ganze Hordengestelle an den Fertigungsmaschinen von Hand zu beschicken und mittels der bekannten Hubwagen zum Trockner zu befördern. Die Hordengestelle mußten dann unter der Transportkette des Trockners abgesetzt werden und wurden von dieser dann mitgenommen, wenn der Eingriff zwischen Aufhänger und Gehänge glatt erfolgt. Voraussetzung hierbei ist aber, daß die Hubgestelle, die meistens erhebliche Gewichte aufweisen, immer an einer genau festgelegten Stelle abgesetzt wurden. Das istjedoch bei der nur groben Fahrmöglichkeit eines Hubwagens häufig nur sehr schwer zu bewerkstelligen, so daß die Gestelle fast immer unter Aufwand von Handarbeit zurechtgerückt werden mußten, wodurch wieder mehrere Arbeitskräfte bereitgehalten werden mußten.The loading of tower or shaft dryers is usually carried out in such a way that that the goods to be dried, e.g. G. Cores, by hand or with the aid of a device are placed in the pendulum swings hanging on a double-strand chain. Due to the ever increasing increase in performance, however, it is a single task or acceptance of these goods can hardly be managed, or at least one is large numbers of workers are required for this. In addition, there is always one larger number of core manufacturing machines used for the performance of a dryer must be, so that spatial difficulties because of the ever increasing There are distances between the production machine and dryer. One is therefore switched to loading entire rack racks on the production machines by hand and to be transported to the dryer by means of the known lift trucks. The rack racks then had to be placed under the transport chain of the dryer and became taken away by this when the engagement between the hanger and the hanger is smooth he follows. The prerequisite here is that the lifting frames, which are usually considerable Weights have always been set down at a precisely defined location. That is however often very difficult with the rough travel options of a pallet truck to accomplish, so that the frames almost always require manual labor had to be straightened out, which again kept several workers ready had to be.
Gemäß der Erfindung wird eine Vorrichtung zur Aufgabe und Entnahme der Schaukelhorden für Turm- oder Schachttrockner, bei denen die Horden der innerhalb des Trockners umlaufenden Transportketten ein- und ausgehängt werden, vorgeschlagen. Das kennzeichnende Merkmal der Erfindung ist darin zu sehen, daß - gesehen in Richtung des Guttransportweges - vor der Ein- und hinter der Aushängstelle miteinander gekuppelte Aufgabe- und Entnahmefördereinrichtungen - z. B. Rollenbahnen-für,die Horden auf milden Lagerungen derTransportkettenumlenkräder fest verbundenen Auslegern und ein Anschlagschalter so angebracht sind, daß der von der jeweils einzuhängenden Horde auf der Aufgabeeinrichtung betätigte Schalter gerade dann die Aus,legerfördereinrichtungen süillsetzt und die Transportkette in Bewegung setzt, wenn sich die betreffende Horde in der Stellung befindet, in der die Transportkette die Horde erfaßt.According to the invention there is a device for loading and unloading the swing trays for tower or shaft dryers, where the hordes of the inside of the dryer revolving transport chains are attached and detached, proposed. The characteristic feature of the invention can be seen in the fact that - seen in the direction of the goods transport route - coupled to one another in front of the hook-in and behind the hook-off point Infeed and removal conveyors - z. B. roller conveyors-for, the hordes on mild bearings of the transport chain guide wheels firmly connected booms and a Stop switches are attached so that the horde to be suspended On the feeding device, the switch actuated the delivery conveyor devices süillsetzt and sets the transport chain in motion when the relevant horde is in the position in which the transport chain detects the horde.
Eine derartige Vorrichtung arbeitet z. B. wie folgt: Die mit einem Hubwagen lediglich in der Reichweite eines Elektrozuges abgesetzten Hordenschaukeln werden von dem Elektrozug erfaßt und auf die Rollenbahn eines am Turmtrockner angebrachten Auslegers gesetzt. In dem Gerüst desAuslegers läuft eine doppelte Transportkette, die in bestimmtenAbständenMitnehmer erhält. Durch diese Mitnehmer werden dieHordenschaukeln erfaßt und schrittweise zum eigentlichen Turmtrockner gefördert. Wenn eine Schaukel unter der senkrecht nach oben führenden Haupttransportkette des Trockners angelangt ist, betätigt sie- einen Endschalter, durch den, einmal die Mitnehmerketten des Auslegers ausgeschaltet und zum anderen die Haupttransportkette - des Trockners eingeschaltet wird. Nunmehr wird die Hordenschaukel von der Haupttransportkette erfaßt und in den Trockner gefördert. Der Transportvorgang für Aufgabe innerhalb des Trockners und für Abnahme erfolgt also periodisch. Die einzelnen Zwischenräume für die Beschickung werden durch die Leistung des Gesamtapparates festgelegt. Für die immer einwandfreie mechanische Beschickung ist bei solcher Arbeitsweise Grundbedingung, daß der Abstand der Umlenkkettenräder bis zur Rollenbahn des Auslegers konstant bleibt. Um dies zu erreichen, wird erfindungsgemäß das 'gesamte Profileisengerüst der Ausleger für Aufgabe und Abnahme als Spannwagen ausgebildet; so daß die Längenänderungen der Haupttransportkette, hervorgerufen durch Wärmeeinfluß oder mechanische Ursachen, einen Einfluß auf die Genauigkeit der Einstellung nicht ausüben können, wodurch die erste Voraussetzung für mechanische einwandfreie Aufgabe solcher Hordenschaukeln gesichert ist.Such a device works e.g. B. as follows: The one with a Pallet trucks only swing handle bars within the range of an electric hoist are detected by the electric train and attached to the roller conveyor of a tower dryer Boom set. A double transport chain runs in the frame of the boom, which receives drivers at certain intervals. The horde swings are made by these drivers recorded and gradually promoted to the actual tower dryer. When a swing Arrived under the main transport chain of the dryer, which leads vertically upwards is, it actuates a limit switch through which, once the driver chains of the The boom is switched off and, on the other hand, the main transport chain - the dryer is switched on. The horde swing is now part of the main transport chain captured and conveyed into the dryer. The transport process for task within of the dryer and for acceptance is therefore carried out periodically. The individual spaces for loading are determined by the performance of the entire apparatus. For Always flawless mechanical loading is a basic requirement for this type of operation, that the distance between the chain pulleys and the roller conveyor of the boom is constant remain. In order to achieve this, according to the invention, the entire profile iron framework the boom designed as a tensioning carriage for loading and acceptance; so that the length changes the main transport chain, caused by the influence of heat or mechanical causes, cannot exert any influence on the accuracy of the setting, as a result of which the first prerequisite for mechanically flawless task of such horde swings is secured.
Die Abnahme der Hordenschaukeln erfolgt in gleicher Weise automatisch.The hook swings are removed automatically in the same way.
DerAntrieb für die Mitnehmerketten an der Aufgabe- und Abnahmeseite ist gleich, so daß beim Einfahren der Schaukeln,an der Aufgabeseite auch gleichzeitig die Schaukeln an der Abnahmeseite ausfahren. Wenn also die Mitnehmerketten nach einem gewissen Vorlauf stillsetzen, so ist auch der Platz unter der Haupttransportkette an der Abnahmeseite frei. Hierdurch wird zusätzlich erreicht, daß ein Mann gleichzeitig Aufgabe und Abnahme bedienen kann, wofür bei anderer Arbeitsweise eine Reihe von Hilfskräften notwendig war. Die an sich bekannte Automatik in der Bedienung schlechthin ist nicht Gegenstand der Erfindung, vielmehr bestimmt die Überwindung der Schwierigkeit vom Handbetrieb auf die ,grundsätzliche Leistungserhöhung mit der Schaffung der eigenartigen Voraussetzung für die mechanische Aufgabe das Wesen des zu beanspruchenden Schutzes.The drive for the drag chains on the feed and take-off side is the same, so that when the swings are retracted, on the feed side also at the same time extend the swings on the acceptance side. So if the driver chains after stop a certain advance, so is the space under the main transport chain free on the acceptance side. This also ensures that one man at the same time Can serve task and acceptance, for which a number of when working differently Auxiliary workers was necessary. The well-known automatic in operation par excellence is not the subject of the invention, rather it determines the overcoming of the difficulty from manual operation to the, fundamental increase in performance with the creation of the peculiar prerequisite for the mechanical task the essence of what is to be claimed Protection.
Der Gegenstand der Erfindung ist in der Zeichnung im Aufriß schematisch in einem Ausführungsbeispiel wiedergegeben.The object of the invention is shown schematically in the drawing in elevation reproduced in one embodiment.
Mittels des Elektrozuges r werden die mit Hubwagen in der' Nähe des Trockners abgesetzten Hordenschaukeln erfaßt und bei 2 auf die Rollen des Aufgabetransportbandes gesetzt.By means of the electric hoist r, the lift trucks near the Detected dryer remote swings and at 2 on the rollers of the conveyor belt set.
Der Transport erfolgt für die Aufgabe und für die Abnahme durch die Mitnehmerketten 5. Die Umlenkräder der Haupttransportkette des Trockners sind mit 3, der gemeinsame Antrieb für die Mitnehmerketten mit q. und der Endschalter am Endpunkt der aufzugebenden Schaukelhorden mit 6 bezeichnet, der Transport innerhalb des Trocknerumlaufs erfolgt durch die Haupttransportketten 7 bis zum Endpunkt 9 auf den Tragrollen der Abführungskette. Der Elektrozug ro sorgt für den Abtransport.The transport takes place for the task and for the acceptance by the Driving chains 5. The pulleys of the main conveyor chain of the dryer are with 3, the common drive for the driver chains with q. and the limit switch on The end point of the swing trays to be abandoned is denoted by 6, the transport within The dryer circulation takes place through the main transport chains 7 to the end point 9 on the conveyor rollers of the removal chain. The electric hoist ro takes care of the removal.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEB5667D DE945316C (en) | 1943-12-28 | 1943-12-28 | Device for loading and unloading the swing trays for tower or shaft dryers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEB5667D DE945316C (en) | 1943-12-28 | 1943-12-28 | Device for loading and unloading the swing trays for tower or shaft dryers |
Publications (1)
Publication Number | Publication Date |
---|---|
DE945316C true DE945316C (en) | 1956-07-05 |
Family
ID=6954124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEB5667D Expired DE945316C (en) | 1943-12-28 | 1943-12-28 | Device for loading and unloading the swing trays for tower or shaft dryers |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE945316C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3334692A1 (en) * | 1983-09-24 | 1985-04-11 | Uhde Gmbh, 4600 Dortmund | METHOD AND DEVICE FOR THE TREATMENT TREATMENT OF PLASTIC-COATED METAL FILMS, IN PARTICULAR ALUMINUM FILMS |
-
1943
- 1943-12-28 DE DEB5667D patent/DE945316C/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3334692A1 (en) * | 1983-09-24 | 1985-04-11 | Uhde Gmbh, 4600 Dortmund | METHOD AND DEVICE FOR THE TREATMENT TREATMENT OF PLASTIC-COATED METAL FILMS, IN PARTICULAR ALUMINUM FILMS |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3929156C2 (en) | ||
EP1625793A1 (en) | Method and device for loading and unloading a storage device | |
DE2411660B2 (en) | DEVICE FOR COOLING THE PRESS MATERIAL IN THE COURSE OF THE PRODUCTION OF CHIPBOARD, FIBERBOARD AND THE LIKE. | |
DE2556703A1 (en) | NOTICE FOR LOADING SPINNING PREPARATION MACHINES | |
DE945316C (en) | Device for loading and unloading the swing trays for tower or shaft dryers | |
CH396764A (en) | Device for removing piece goods from a moving conveyor belt | |
DE2557877B2 (en) | DEVICE FOR REMOVING AND GIVING UP POULTRY FROM OR. ON TRANSPORT TRACKS | |
DE412683C (en) | Centrifugal casting device | |
DE641089C (en) | Machine for treating dies on molds | |
EP3369684A1 (en) | Method and device for commissioning an article | |
DE948501C (en) | Device for laterally removing sheet metal from a cooling bed | |
DE1280742B (en) | Device for directionally ordered individual delivery of objects lying in a disorganized heap | |
AT229223B (en) | Method and device for the treatment of sheet goods that are fed and processed like a conveyor belt | |
DE880089C (en) | Conveyor device for machines for processing, testing or other treatment of mass parts | |
DE573486C (en) | Conveyor device for chocolate mold cooling rooms | |
DE1145095B (en) | Transport device for removing hollow bodies from the thorns of a conveyor chain and for forwarding the hollow bodies | |
AT254014B (en) | Device for simultaneous loading and unloading of single or multi-surface racks | |
DE2234659C3 (en) | Device for conveying workpieces | |
AT236270B (en) | Device for aligning and stopping objects transported on a horizontal conveyor track | |
DE513816C (en) | Machine for removing flesh from fibrous leaf plants | |
DE1131850B (en) | Ingot casting machine | |
CH513758A (en) | Device for transporting reinforcing iron | |
DE374546C (en) | Trolley unloader | |
DE883117C (en) | Device for mixing tobacco leaves | |
AT210339B (en) | Rope conveying and removal system, especially for boards covered with concrete blocks |