DE748319C - Apparatus and method for manufacturing clad tubes - Google Patents

Apparatus and method for manufacturing clad tubes

Info

Publication number
DE748319C
DE748319C DEO25047D DEO0025047D DE748319C DE 748319 C DE748319 C DE 748319C DE O25047 D DEO25047 D DE O25047D DE O0025047 D DEO0025047 D DE O0025047D DE 748319 C DE748319 C DE 748319C
Authority
DE
Germany
Prior art keywords
mold
cooling
cladding
sand
plating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEO25047D
Other languages
German (de)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to DEO25047D priority Critical patent/DE748319C/en
Application granted granted Critical
Publication of DE748319C publication Critical patent/DE748319C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D19/00Casting in, on, or around objects which form part of the product
    • B22D19/0072Casting in, on, or around objects which form part of the product for making objects with integrated channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Description

Vorrichtung und Verfahren zur Herstellung plattierter Rohre Es ist bekannt, innen und/oder außen plattierte Rohre aus ein- oder beiderseitig plattierten Blechen herzustellen. Aus diesem Werkstoff werden Ronden ausgeschnitten, die topfförmig gepreßt und dann nach der Entfernung des Topfbodens stufenweise bis zu dem gewünschten inneren und äußeren Durchmesser gewalzt oder gezogen werden. Dieses Verfahren ist verhältnismäßig umständlich, teuer, mit großem Abfall verbunden und liefert nicht mit Sicherheit eine vollkommen gleichmäßige Stärke der Auflagen auf ihrer ganzen Ausdehnung.Apparatus and method for making clad pipes It is known, inside and / or outside clad tubes made of one or both sides clad Manufacture sheet metal. Round blanks are cut out of this material, which are pot-shaped pressed and then, after removing the bottom of the pot, gradually up to the desired one inner and outer diameter are rolled or drawn. This procedure is relatively cumbersome, expensive, associated with a lot of waste and does not deliver certainly a perfectly even thickness of the editions over their whole Expansion.

Gemäß der Erfindung werden die genannten :Yachteile j-ermieden. Die Schweißverbindung zwischen den Plattierungsblechen und dem Grundwerkstoff wird dabei in bekannter Weise hergestellt, indem das Grundmetall zwischen die Plattierungsbleche eingegossen wird, die gleichzeitig gekühlt werden. Das Neue besteht dabei darin, daß die Fußplatte, auf welcher die die Form ummantelnde Kokille ruht, eine Sandform enthält, in welche der oder die die Plattierung bildenden Mäntel eingesetzt sind. Während das Grundmetall eingegossen wird, wird die die äußere Plattierung umschließende Kokille durch ein hinsichtlich seiner Kühlwirkung regelbares Mittel beeinflußt, das vorteilhaft Hohlräume der Kokille durchströmt. Gleichzeitig wird die Kühlung der inneren Plattierauflage durch eine in dem schrumpffähigen, z. B: aus Sand bestehenden Kern liegende Kühleinrichtung bewirkt. Durch die genannte Kühlung wird erreicht, daß die Plattierungsbleche während des Eingießens des Grund-,verkstoffes derart gekühlt werden, daß. sie auf ihren inneren, dem Grundwerkstoff zugekehrten Schichten bis nahe an ihren Schmelzpunkt erwärmt werden und in diesem Zustand eine feste Schweißverbindung mit dem anfließenden Metall eingehen. Die Kokillenform selbst bietet die Gewähr dafür, daß die stark erwärmten Plattierungsbleche während des Gusses keine Verformung erleiden.According to the invention, the named: Yach parts are avoided. the Welded connection between the cladding sheets and the base material is made made in a known manner by placing the base metal between the cladding sheets is poured, which are cooled at the same time. The new thing is that the base plate, on which the mold encasing the mold rests, is a sand mold contains, in which the or the cladding forming jackets are used. While the base metal is being poured in, the outer cladding becomes enclosed Mold influenced by a means that can be regulated with regard to its cooling effect, which advantageously flows through cavities in the mold. At the same time the cooling the inner plating overlay by an in the shrinkable, z. B: made of sand Causes the core lying cooling device. The aforementioned cooling achieves that the plating sheets during the pouring of the base, Verkstoffes in such a way be cooled that. them on their inner layers facing the base material are heated to close to their melting point and in this state a solid welded joint enter with the flowing metal. The mold itself provides the guarantee that the hot cladding sheets do not deform during casting suffer.

Es ist schon vorgeschlagen worden, plattiertes Halbgut in der Weise herzustellen, daß aus dem Plattierungsmetall ein topfförmiger Behälter hergestellt und in diesen sodann das Grundmetall eingegossen wird, während der Topf gleichzeitig von außen gekühlt wird. Dieses vorbekannte Verfahren ist aber sehr teuer, weil für jedes Werkstück eine besondere Topfform hergestellt werden muß, Außerdem fehlten bei diesem früheren Vorschlag nähere Angaben darüber, in welcher Weise die Kühlung zweckmäßig durchgeführt wird.It has already been proposed to clad semi-finished products in the manner produce that made a cup-shaped container from the plating metal and then the base metal is poured into this while the pot is at the same time is cooled from the outside. This known method is very expensive because for Each workpiece must have a special pot shape, moreover were missing in this earlier proposal, details of the way in which the cooling is carried out is carried out expediently.

In der Zeichnung ist als Ausführungsbeispiel eine Vorrichtung zur Durchführung des Verfahrens in senkrechtem Ouerschititt dargestellt.'.' Es soll ein Rohling hergestellt «-erden, der rohrförmig ausgebildet ist und aus dein Grundwerkstoff i sowie den beiden innen und außen aufgeschweißten Plattierungsauflagen 2 und 3 besteht. Zu diesem Zweck wird zunächst in dem Bodenkasten 4 der Fuß @ der Form gestampft. Gleichzeitig wird in der Mitte des Kastens .1 das Rohr 6 für den mittleren Sandkern 7 gestampft. Vorteilhaft ist das Rohr 6 ,an verschiedenen Stellen seines Außenmantel: tnit üffnungen versehen und in bekannter Weise mit einem (nicht dargestellten) Seil aus Holzwolle o. dgl. umwickelt, damit der Fornikern 7 bei der Erkaltung des Werkstückes hinreichend schrumpfen kann. L'ber das Kernrohr 6 wird das aus dein Plattierungsmetall bestehende Auskleidungsrohr 2 gestülpt. Der Kerl' 7 kann gegebenenfalls erst nach dem Einsetzen dieses Rohres gestampft werden. Sodann wird das wesentlich weitere Plattierungsrohr 3 aufgesetzt; «-elches die Außenfläche des fertigen Rolirroltlings bilden soll. Das Rohr 3 wird schließlich von der zweckmäßig teilbaren Kokille 8 umgeben. Sodann kann noch ein wenig Sand 9 zwischen die beiden Rohre 2 und 3 eingefüllt und gestampft werden, damit die Fußteile dieser Rohre fest im Sand stehen. Auf die ganze Forin wird noch ein weiterer Formkasten io gesetzt. In diesem sind die Gieftrichter i i ausgespart.In the drawing, a device is shown as an embodiment Execution of the procedure shown in vertical section. '.' It should a blank produced «-erden, which is tubular and made of the base material i as well as the two inside and outside welded cladding supports 2 and 3 consists. For this purpose, the foot @ of the form is first tamped in the bottom box 4. At the same time, the tube 6 for the middle sand core is placed in the middle of the box .1 7 stamped. The pipe 6 is advantageous at various points on its outer jacket: tnit provided with openings and in a known manner with a (not shown) rope made of wood wool or the like. Wrapped so that the Fornikern 7 when the workpiece cools down can shrink sufficiently. Via the core tube 6, this is made from your plating metal existing lining pipe 2 turned inside out. The guy '7 may have to wait until after be tamped with the insertion of this pipe. Then it becomes much more Cladding tube 3 put on; «-Which is the outer surface of the finished rollerball should form. The pipe 3 is finally held by the mold 8, which can be divided in an expedient manner surround. A little sand 9 can then be poured in between the two tubes 2 and 3 and tamped so that the feet of these pipes stand firmly in the sand. On the Whole Forin, another molding box is set. In this one are the gorge funnels i i recessed.

Wird nunmehr von oben her durch die Trichter 11 das flüssige Metall für den Rohrkern 1 eingegossen, so tritt unverzüglich eine starke Erhitzung der beiden Plattierungsrohre 2 und 3 ein. Diese Rohre verschweißen sich mit dem Kernmetall i. Ein Wiederabliisett der Plattierungsauflagen beim Erkalton ist nicht zu befürchten, da die Sandform bei der eintretenden Schrumpfung nachgeben kann. Der fertig plattierte Rohling kann sodann in üblicher Weise durch Walzen otlcr Ziehen weiterverarbeitet werden auf die gewünschten Maße der fertigen Rohre.Is now from above through the funnel 11 the liquid metal cast for the pipe core 1, then immediately a strong heating of the both plating tubes 2 and 3. These tubes weld to the core metal i. There is no reason to fear that the plating layers will be rediscovered in the case of the cold clay, because the sand mold can give way when it shrinks. The finished plated The blank can then be further processed in the usual way by rolling or drawing are made to the desired dimensions of the finished pipes.

Wird als Grundwerkstoff i ein Metall finit li(@lieni Schmelzpunkt verwandt, so ist zweckmäßig die Kokille 8 mit einer Kühleiprichtung zu versehen. Es können zu diesem Zweck in dein Mantel der Kokille Hohlräume vorgesehen sein, durch welche ein Kühlmittel finit regelbarer Kühlwirkung hindurchgeleitet wird. Auch das innere Plattierungsrolir 2 kann gekühlt werden beispielsweise durch Anordnung einer Kühlschnecke im Formkern ; .If a metal finite li (@lieni melting point related, the mold 8 is expediently provided with a Kühleiprichtung. For this purpose, cavities can be provided in the shell of the mold, through which a coolant finitely controllable cooling effect is passed. The inner plating roller 2 can also be cooled, for example, by arrangement a cooling screw in the mold core; .

' -Soll lediglich ein Rohr mit ä uGterer Plattierüng hergestellt werden, so wird die Gießform innen durch den 1#ot-iiil:et-n; b@greti7.t. Ist nur eine innere Plattierung erwünscht, so begrenzt die Kokille 8 die Gief9fornt an der Außenseite.'- If only a pipe with an outer cladding is to be produced, so the mold is inside by the 1 # ot-iiil: et-n; b@greti7.t. Is just an inner one If plating is desired, the mold 8 delimits the Gief9fornt on the outside.

Claims (3)

PATENTANSPRÜCHE: i'. Vorrichtung zur ller:trlluiig von innen und/oder außen plattierten Rohren, bei welcher der Formhohlraum für das Gutirnetall zusätzlich durch die innere und/oder äußere Plattierung begrenzt wird, in welche das Gußinetall unter gleichzeitiger Kühlung der Plattierung eingegossen wird, dadurch gekennzeichnet, daß die Fußplatte (.4), auf welcher die die Form ummantelnde Kokille (8) ruht, eine Sandform (5, g) enthält, in welche der oder die die Plattierung bildenden Mäntel (2, 3) eingesetzt sind. PATENT CLAIMS: i '. Device for ller: trlluiig from the inside and / or tubes clad on the outside, in which the mold cavity for the Gutirnetall is additionally is limited by the inner and / or outer cladding into which the cast metal is poured in with simultaneous cooling of the cladding, characterized in that that the base plate (.4) on which the mold encasing the mold (8) rests, a Sand mold (5, g) contains, in which the or the cladding forming jackets (2, 3) are used. 2. Verfahren zum Kühlen der Vorrichtung nach Anspruch i, dadurch gekentizeichnet, daß die die äußere Plattierung (3) umschließende Kokille durch ein Hinsichtlich seiner Kühlwirkung regelbares Mittel beeinflußt wird, das vorteilhaft Hohlräume der Kokille chirchströnit. 2. A method for cooling the device according to claim i, thereby gekentizeichnet that the outer plating (3) enclosing mold is influenced by a means that can be regulated with regard to its cooling effect advantageous cavities of the mold chirchströnit. 3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, daß die Kühlung der inneren Plattierungsauflage (2) durch eine in dein schrumpffähigen, z. B. -ans Sand bestehenden Kern liegende Kühleinrichtung et-folgt. Zur Abgrenzung des Annieldungsgegenstandes vom Stand der Technik sind im Erteilungsverfahren folgende Druckschriften in Betracht gezogen worden: deutsche Patentschriften .... \r.361 1.16, 659 2-17 USA.-Patentschriften ...... - i i8o2-19, 1 567 286, 1 767 287; britische Patentschrift ...... - 420 9 16.3. The method according to claim 2, characterized in that the cooling of the inner plating support (2) by a shrinkable in your, z. B. -ans sand existing core cooling device et-follows. To distinguish the subject matter of the application from the state of the art, the following publications were taken into account in the granting procedure: German patents .... \ r.361 1.16, 659 2-17 USA patents ...... - i8o2-19, 1,567,286, 1,767,287; British patent specification ...... - 420 9 16.
DEO25047D 1941-06-21 1941-06-21 Apparatus and method for manufacturing clad tubes Expired DE748319C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEO25047D DE748319C (en) 1941-06-21 1941-06-21 Apparatus and method for manufacturing clad tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEO25047D DE748319C (en) 1941-06-21 1941-06-21 Apparatus and method for manufacturing clad tubes

Publications (1)

Publication Number Publication Date
DE748319C true DE748319C (en) 1944-11-01

Family

ID=7356282

Family Applications (1)

Application Number Title Priority Date Filing Date
DEO25047D Expired DE748319C (en) 1941-06-21 1941-06-21 Apparatus and method for manufacturing clad tubes

Country Status (1)

Country Link
DE (1) DE748319C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3708243A1 (en) * 1987-03-13 1988-09-22 Kloeckner Humboldt Deutz Ag Method for local surface treatment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1180249A (en) * 1914-04-07 1916-04-18 Otto H De Lapotterie Compound metal body.
DE361146C (en) * 1922-10-10 Ernst Mayer Process for the production of castings with cast-in reinforcements
US1567286A (en) * 1925-01-30 1925-12-29 American Cast Iron Pipe Co Flanged pipe and method of producing
US1767287A (en) * 1928-04-30 1930-06-24 Shakeproof Lock Washer Co Bolt lock
GB420916A (en) * 1932-06-09 1934-12-10 Peter Ostendorf Method of manufacturing plated metal goods
DE659247C (en) * 1934-12-07 1938-04-29 Charles Giulioli Device for pouring out bearing shells

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE361146C (en) * 1922-10-10 Ernst Mayer Process for the production of castings with cast-in reinforcements
US1180249A (en) * 1914-04-07 1916-04-18 Otto H De Lapotterie Compound metal body.
US1567286A (en) * 1925-01-30 1925-12-29 American Cast Iron Pipe Co Flanged pipe and method of producing
US1767287A (en) * 1928-04-30 1930-06-24 Shakeproof Lock Washer Co Bolt lock
GB420916A (en) * 1932-06-09 1934-12-10 Peter Ostendorf Method of manufacturing plated metal goods
DE659247C (en) * 1934-12-07 1938-04-29 Charles Giulioli Device for pouring out bearing shells

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3708243A1 (en) * 1987-03-13 1988-09-22 Kloeckner Humboldt Deutz Ag Method for local surface treatment

Similar Documents

Publication Publication Date Title
DE844806C (en) Method and device for the production of composite metal bars
DE823483C (en) Method and device for the continuous casting of metal pipes
DE1458122B1 (en) THERMAL INSULATING LINING IN A LINING IN A CONTINUOUSLY CASTING GRILL
DE1583729A1 (en) Process for the continuous formation of hard coatings on rollers
DE748319C (en) Apparatus and method for manufacturing clad tubes
DE2939974C2 (en)
DE807125C (en) Process for the production of socket pipes
DE539734C (en) Method and device for the production of castings and molds that are used in dental technology
DE400746C (en) Method for pouring waves
DE1204364B (en) Process for the production of a repeatable casting mold
AT215259B (en) Method and device for oxy-fuel cutting of metallic hollow blocks, possibly produced in continuous casting plants
DE670894C (en) Block casting mold with individual layers that can be built up in the vertical direction
DE846439C (en) Device for the production of composite metal bars
DE751355C (en) Device and method for the continuous casting of hollow bolts or pipes made of metal
AT228952B (en)
AT295765B (en) Mold for the production of hollow blocks from metal or metal alloys
DE656809C (en) Process for the manufacture of runners for rotary piston engines and machines as well as similar cylindrical workpieces
DE866235C (en) Method for casting hollow stretches, in particular of light metal
DE428400C (en) Process for the production of bearings in machine parts
DE392403C (en) Machine for the production of pipes u. Like. By centrifugal casting
DE764301C (en) Device for pouring out bearing shells
DE743039C (en) Method and mold for the manufacture of runners for compressed air generators
DE938870C (en) Process and device for the production of composite cast bearing shells in round production
DE2440850A1 (en) PROCESS AND DEVICE FOR PRE-HEATING OF BEARING BODIES TO BE PASTED IN THE SPINNER COMPOSITE
DE811266C (en) Casting mold for continuous casting of metals