DE6610344U - POST FOUNDATION. - Google Patents

POST FOUNDATION.

Info

Publication number
DE6610344U
DE6610344U DE19686610344 DE6610344U DE6610344U DE 6610344 U DE6610344 U DE 6610344U DE 19686610344 DE19686610344 DE 19686610344 DE 6610344 U DE6610344 U DE 6610344U DE 6610344 U DE6610344 U DE 6610344U
Authority
DE
Germany
Prior art keywords
anchor bolts
foundation
foundations
driven pile
masts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19686610344
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE19686610344 priority Critical patent/DE6610344U/en
Publication of DE6610344U publication Critical patent/DE6610344U/en
Expired legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

Die Erfindung bezieht sich auf eine Rammpfahlgründung, insbesondere für Aufsetzmaste.The invention relates to a driven pile foundation, in particular for masts.

Bei der Herstellung von Gründungen, insbesondere auch Flachmast gründung en für Fahrleitungen, werden während des Aushebens oder Bohrens der Fundamentgrube Schalungen erforderlich, die aus Brettern, Spundwanddielen, Betonrohren und dgl. hergestellt werden. Diese Aussteifungen werden dann während oder kurz nach dein Betonieren der Gründungen aus der Grundungsgrube entfernt. Zur "Verbindung der Maste mit den Gründungen dienen Ankerbolzen, die direkt oder mit der Bewehrung der Gründung verbunden einbetoniert werden,When making foundations, especially flat masts foundations for contact lines, formwork is required during the excavation or drilling of the foundation pit made of boards, sheet piling, concrete pipes and the like will. These stiffeners are then removed from the foundation pit during or shortly after concreting the foundations. Anchor bolts are used to "connect the masts to the foundations, which are concreted in directly or connected to the reinforcement of the foundation,

W H) 344-ΐ λ ηW H) 344-ΐ λ η

Hr/RtMr. / Rt

PLA 68/1466PLA 68/1466

Es ist auch schon bekannt, Rammpfähle aus Stahl oder Stahlbeton zur Gründung von Bauwerken oder Masten in Böden schlechter Tragfähigkeit und zur Verkürzung .der Bauzeit zu verwenden. Bei Verwendung von Rammgründungen für Aufsetzmaste werden nach dem ■ J Rammen im allgemeinen armierte Betonköpfe mit Ankerbolzen auf- i gegossen. ■ |It is also already known to use driven piles made of steel or reinforced concrete for the foundation of structures or masts in soils with poor load-bearing capacity and to shorten the construction time. When using Rammgründungen for Aufsetzmaste ramming generally reinforced concrete heads with anchor bolts are cast up after i ■ J. ■ |

Aufgabe der Erfindung ist es, die Zeit für die Erstellung einer | Gründung weiter zu verkürzen. Die Lösung besteht darin, daß .1 der Rammpfahl als dünnwandiges Rohr mit daran angeordneten I Ankerbolzen ausgebildet ist. Auf diese'Weise können innerhalb sehr kurzer Zeit sofort belastbare Gründungen erstellt werden, die z.B. beim Einsatz in Braunkohlengruben (Tagebau), im Katastropheneinsatz und bei anderen Gründungen, die nur für wenige Jahre benötigt werden, wieder ausgebaut und weiter verwendet werfen KOiiIieii. x>2.e üUSulxuUxig ä_L8 uUmmSuulgcS λΟχΙ-ι.' eriiiOgxxCii υ in einfacher Weise auch nachträglich ein Ausrichten der Ankerbolzen. IThe object of the invention is to reduce the time it takes to create a | Further shorten the establishment. The solution is that .1 the driven pile is designed as a thin-walled tube with anchor bolts arranged on it. In this way, within Resilient foundations can be created immediately in a very short time, e.g. when used in lignite mines (opencast mining), in disaster operations and for other foundations that are only needed for a few years, expanded again and used again throw KOiiIieii. x> 2.e üUSulxuUxig ä_L8 uUmmSuulgcS λΟχΙ-ι. ' eriiiOgxxCii υ Alignment of the anchor bolts can also be carried out subsequently in a simple manner. I.

In der Zeichnung ist die Erfindung am Beispiel einer Flachmast- -] gründung für elektrische Bahnen näher erläutert. Fig. 1 zeigt j eine Ansicht und Fig. 2 eine Draufsicht auf einen Rammpfahl.In the drawing, the invention is shown using the example of a flat mast -] establishment for electric railways explained in more detail. FIG. 1 shows a view and FIG. 2 shows a plan view of a driven pile.

Der erfindungsgemäSe Rammpfahl ist als dünnwandiges Rohr 1 ausgebildet, an des Ankerbolzen 2 bis 5 angeordnet sind. Vorzugsweise sind die Ankerbolzen an dem Rohr 1 angeschweißt. Dabei ist auch die Verwendung von. handelsüblichen Gewinde-The driven pile according to the invention is designed as a thin-walled tube 1, are arranged on the anchor bolts 2 to 5. Preferably the anchor bolts are welded to the pipe 1. This also includes the use of. commercially available thread

-2- Iir/Rt-2- Iir / Rt

PLA 68/1466PLA 68/1466

bolzen mit Kopf möglich.bolts with head possible.

Das neue Rammrohr kann beispielsweise bei einer Länge von 2 m oder 2,5 m eiden· Durchmesser von 0,64 m und eine Wandstärke von 4 mm haben,The new pile-driving pipe can, for example, have a length of 2 m or 2.5 m · diameter of 0.64 m and a wall thickness of 4 mm have,

2 Figuren2 figures

2-ÄäSÄÖpi sprüche2-ÄäSÄÖpi proverbs

Claims (2)

P.Ä.57SE6i»*2ä.3.E3 - PLA 68/1466 ^ Ln sprücheP.Ä.57SE6i »* 2ä.3.E3 - PLA 68/1466 ^ Ln proverbs 1. Rammpfahlgründung, insbesondere für Aufsetzmaste, dadurch
gekennzeichnet, daß der Rammpfahl als dünnwandiges Rohr \ (Ϊ) mit daran angeordneten Ankerbolzen (2 bis 5) ausgebildet i ist. . . I
1. Driven pile foundation, especially for top-mounted masts, thereby
characterized in that the driven pile is designed as a thin-walled tube \ (Ϊ) with anchor bolts (2 to 5) arranged thereon. . . I.
2. Gründung nach Anspruch 1, dadurch gekennzeichnet, daß die | Ankerbolzen (2 bis 5) an dem Rohr (1) angeschweißt sind. " |2. Foundation according to claim 1, characterized in that the | Anchor bolts (2 to 5) are welded to the tube (1). "|
DE19686610344 1968-09-28 1968-09-28 POST FOUNDATION. Expired DE6610344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19686610344 DE6610344U (en) 1968-09-28 1968-09-28 POST FOUNDATION.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19686610344 DE6610344U (en) 1968-09-28 1968-09-28 POST FOUNDATION.

Publications (1)

Publication Number Publication Date
DE6610344U true DE6610344U (en) 1973-10-04

Family

ID=6588568

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19686610344 Expired DE6610344U (en) 1968-09-28 1968-09-28 POST FOUNDATION.

Country Status (1)

Country Link
DE (1) DE6610344U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3345383A1 (en) * 1983-12-15 1985-06-27 Brown, Boveri & Cie Ag, 6800 Mannheim Foundation of a mast for a high-power transmission line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3345383A1 (en) * 1983-12-15 1985-06-27 Brown, Boveri & Cie Ag, 6800 Mannheim Foundation of a mast for a high-power transmission line

Similar Documents

Publication Publication Date Title
DE202022104117U1 (en) An underground mine support structure combined with piles and pipes, which can take into account the treatment of voids
EP2698476A1 (en) Method for the construction of an offshore structure and foundation for an offshore structure
DE3445965A1 (en) COMPACTING DEPTH, METHOD AND DEVICE FOR PRODUCING THE SAME
CH610966A5 (en) Rock or slope revetment and method of constructing it
EP0109397B1 (en) Hollow foundation element and manufacturing method thereof
DE6610344U (en) POST FOUNDATION.
DE1784878A1 (en) Driven pile foundation
DE2532964C2 (en) Method for producing and manipulating a large-format prefabricated wall component
DE3626169A1 (en) Foundation with pile support
AT241362B (en) Procedure for the foundation of structures below the water table
AT387256B (en) Arrangement for providing a foundation for a pole
DE6609772U (en) COMPONENT FOR THE PRODUCTION OF SLOTTED OR DRILLED PILE WALLS.
DE3703200C2 (en) Foundation device for a mast
DE2105432C3 (en) Process for the production of a longitudinally prestressed composite pile
DE3516921C2 (en)
AT60934B (en) Foundation for masts for electrical lines or the like.
AT70928B (en) Method for inserting a girder for bracing construction pits, in particular for building underground railways.
DE1759692A1 (en) Process for soil compaction and for increasing the load-bearing capacity of compression and tension piles
DE2710456A1 (en) Masonry wall inclined pile and underpinning - is made of reinforced concrete with common reinforcing core to base of wall
AT388406B (en) Pile foundation structure and apparatus and concreting tank for producing the same
DE2942428A1 (en) New or existing harbour wall reinforcement - has submerged pile wall built from elements and intervening drilled tubes
CH439133A (en) Process for producing a pile in the ground and concrete pile for carrying out the process
DE3131725A1 (en) Noise-protection wall
DE1459870A1 (en) Process for the construction of underground tunnels to be constructed using an open excavation
DE1534348B1 (en) Ground mounting plate made of reinforced concrete, in particular as a road surface or aircraft track, and a method for producing the ground mounting plate